HomeMy WebLinkAboutWTR2701496 PLAT OF HI-'THBURY PARR EDMONDS AV @ NE 4TH W-510
1
i5-
1
{ M-
9
Yr°
�yt
CITY OFF ENTON NOo . 3M .
MPUTWAT OF ?UBLIC WORKS
PptMIT NO. RENTON, WA. .1", 19 22
RE�IVED of L v (,
k
�• PLANS DEPOSIT
MAPS
POSTAGE
MISCELLANEOUS
TAX
// TOTAL
BY
� t ~
JO
1
i
}
Sr
C
A
W - SIO
j pF RF
ti
o PUBLIC WORKS DEPARTMENT s I
4rR Z ENGINEERING DIVISION 235 -2631
MUNICIPAL BUILDING 200 MILL AVE. SO, RENTON,WASH.96M
�q rEO SE0E lone 12, 1'I;'d e '
CHARLES J DELAURENTI
MAYOR
,,.�. 'r,
Y.i
Wall 6 Redekop Corporation
412 400 108th Ave. NE III
Bellevue, WA 98004 t"
Subject: Highbury I.atecom.•r charge -
Gentlemen:
Re your letter of May 22, 1979 enclosing check for $6,088.75, please be III',JI
advised that the vatet line installed in Edmonds Ave. on the west side `R•..
of your project was a 16'I line. The City feels that vour plat should not
be responsible for one-half the cost of this 16" main so they computed
the 12" water Hain project that was installed at the same time and will
assess you the latecomer fee based on one-half the cost of that 12" line. - ,.p.•
(Thus the $6,088.75). -
Your length abutting Edmonds Avenue is 2538 l.t. The coat assessed you
was $7.74 per ft. •`
If you have any questions please contact this office.
I
Very truly yours,
Ronald L. Olsen
Utilities Engineering -
RLID:pmp ;:ar
• 'fP.
k+
&S
1 tP
t
% ys.:
•
,a
cif
-TO OP 4C lino e.
vp � u � M oR 4tR
✓mil kE.
L �
oN ��Q N�AL .r
OIL
9v f-f- s o b Nd u4-% 1 .r: 'r ZkrC
t3 etN-o. L l
�x
1.
r
y
f I•t
PUBLIC W'RKS DEPARTMENT qy f
SUILDiNG DIVISION
CITY OF RENTON, WASHINGTON
APPLICATION ONLY - UNTIL VALIDATED
Owner Location
//of Work
Address V, b._ PAY
Address
,9 - loge A e I NUM T
u BER
.8
INSPECTIONS FEES
CONSTRUCTION Sid, sewer
PERMIT storm sewer
Right-of-Way Construction
Water System DOV. Fee• �Q^,
(Fablic Right-of-Way) Water latecomer room /41
Water Insp/Approvsl Fees
Sewer System D,v. Fee, _
sewer Latecomer Feu b
Date Issued Sewer Insp/Approval Fees _
Special Deposit
Expiration Date TOTAL FEE 2 72, 90 ---
Description of Work
and Number of Feet
Business
Contrac ,1// Liana, .S
�' P,... -d L7/,1,7� S¢✓v; Bond
` T,l,phon, rem
60 zLhe/� (�✓ar a I)) f6H - y �R-4
IT IS UNDERSTOOD THAT THE CTrY OF RENT'ON SHALL BE HEIR HARMLESS OF ANY AND ALL
LIABILITY, DAMAGE OR INJURY ARISING FROM THE PERFORMANCE OF SAID WORK.
ANY WORK PERFORWED WITHIN THE RIGHT-OF-WAY OR ON S'IiER MAIN MUST BE DOME BY A
LICENSED, BONDED CONTRACTOR. LOCATE UTILITIES BEFORE EXCAVATING.
CALL 235-2631 FOR INSPECTION. APPLICANT A �
Call between B AM and 9 AM for
inspection in afternoons call
before 12 Noon the day bar r, PUBLIC WORKU DIRECTOR
for inspection in morning.
BPBCIFY TIME FOR INBPBCTION. �-
CALL 235-7630 for street signs BY ..�
and lighting.
PUBLIC WORKS DEPARTMENT
BUILDING DIVISION A 0..
CITY OF RENTON, WASHINGTON /*$'
APPLICATION ONLY - UNTIL VALIDATED 4
Owner Location of Work
L6E _ Pt, ,ki�
pxiT
NUMBER
INSPECTIONS FEES
CONSTRUCTION side sewer
Storm sewer
PERMIT Right-of-Way Construction
water System Dev. POOR
(public Right-of-Nay) Water Latecomer Fees
water Insp/Approval Pees
sewer System Dev. Pees
Sewer Latecomer Peas
Date Issued Sewer Insp/Approval Fees
12
e Special Deposit
U
Expiration Date TOTAL PEE Jr,.�.�.i.zz 90
uescriWon of work
and Number of Fast '
Business
Contrac ,.� �'' ��• LlCeMe .3
Bond
Add[ees � _ On
Telephone
IT IS UNDERSTOOD THAT THE CITY cr RENTON SHALL BE HELD HARNNLE88 Or Am AID ALL
LIABILITY, DAMAGE OR INJURY ARISING FROM THE PERFORMANCE OF SAID WORE.
ANY WORK PERFoRI= WITHIN E LIOCATEOUTILITIR ON SEWER
E BEFORE MAIN
NAMUST SS DONE BY A
MS LICHND, BONDED CONTRACTOR.
CALL 235-2631 FOR INSFECf1oN•
Call between L AN and 9 AN ffK APPLICANT-- n A• fii
inspection in afternoons Call
before 12 Moon the day before PUBI•IC WORKS DIRECTOR
for inspection in swrning-
SPECIFY TIME FOR IMBFBCIZOM.
CALL 235-2630 for street signs
BY
and lighting.
, ,r ra lYrwl,isr v !•sa[w,rtleMrr a:i r afr,.rruilJ er •ar�law ii+3 II�Wiwearfi...iNk ••.}!11NBNBW1 �Na
i
4s�'
CA L AO ZAu70 I $NO 39 $92. R(o
LU0
d
r +`
Q+9l0 ,r 34' it Aw
2S 39 �„ F
C ' •�
� 3°1,29¢ ,oq
'iS 4
— Or 7 74 rc `
OA
A
f
07,
4
k�
,a
.0
m
Y=a
�n.
BEGINNING
OF FILE
FILE TITLE - -
i
90,r K - Eci m orcis Ave,
I
..m.n-n-r-; .:rs.:r:.--'=-�s"AReeM J.+.........•�r}:=-+'FxTe-- _- - . - ._ ., _ .. « ..:
• =j
Yr♦
.r
a
ENDING
OF
FILETITU GTE
• •
.r
y . 5 . . .
CLRTIFlUrlON OF INSPLLTION AND INSTALLATION OF PUBLIC kATER SYSTEM PRWLCrS
6ffective January 4, 197b the following Regulation applies: WAC 249-54-6511 - Within • LXty
days following the completion of and prior to th;, use of any project or portioc theteuf for
which plans and specifications have received the approval of the Secretory, certification
shall be made to the Secretary and signed by a professional engineer that the project was
inspected by him or his aurhorized agent and that it was eonstr(cted in accordance with the
I :,;ana and specifications approved by the Secrotary.
Instructions:
(a) If a , oject is being completed in stage construction, attach a map and description of
porric., of project being certified as completed as approved on date given below.
(b) As future portions of staged construction proje,ta are completed, each muwt be
certified as required by WAC 248-54-650.
(c) ,. .dttiansl certification forme are svailaole upon request from nSHS offs-es listed
below.
Par4 Sub.
ame o atlr ystem Hon orable Mayor S Vembers of�`� Water System No.
ritV s`all city rnowil____
Mailing Address Referendum —T'�T--(�
_K�r.f � �� �ra ��y No. (if any) L 1 l i 1
1tC' y --- State __—'Zipl
Date Plans and Specificat 'otus Approved by
Department of Social and Health Services
PROJLCr NM1E Mir) DESCRIPTIVE TULt :
Renton ,later ;ro a tamint Date Project or Portions Thereof Completed
f hlgnkury Park Subdlyision
f
the undersigned engineer or his authorized agent has inspected the above-described project,
which as to layout, size and type of pipe, valves and materials, reservoir and other
designed physical facilities has been constructed in accordance with the plans and spaci-
fications approved by the Secretary, Department or Social and Health Services, and in the
,nion of the engineer, the installation, testing and disinfection of the system was I(I
tried out in :cc.-rdance with the specification, approved by the Secretary for thz project.
ngil'—'rwer ... ..
f Fngineers i
Y Seal
)ate
Please return completed farm to DSHS office checked below.
0 Seattle Regional Gffice Olyaoia Regional Office (�Spokane Regional Office
1,Health Services Divisl.)n Health Services Division t—i Health Services Division
Water Supply 6 Waste Section Water Supply 6 Waste Section Water Supply 6 Waste Suction
` Smith Tower building flail Stop LD-11 West 924 Sint
Seattle, Washington 99104 Olympia, Washington 98504 Spokane, Washington 99201
II a;HS 9-346 (i-78)
t
Y
�4K�#w+ir�irtl�r+rNWYYA,uau�iu,us..
2')
STATE.OF DEPARTMENT OF SOCIAL-AND HEAI_TH SERVICES
WASHINGTON J v Ss .h T, � N 179,S, i,,W.. ,4�WIN
Daxy L«ws
cow May 29, 1979
Rf ��
� Honorable Mayor 8 Members of the City Council - L fl
C City Hall J'rJU-,V 4 Zy
Kent, WA 98031 �_- —
ri
�'-- -- --- Subject: Renton Water Department S OFFICE
Highbury Park Subdivision Cf
Gentlemen: „ y-
Plans for the above project, received in this office May 8, .
1979 together with documents have been reviewed and, 'n
accordance with the provisions of WAC 248-54 are hereby ' .•
approved.
As required in WAC 248-54-650, within 60 days following
the completion of and prior to the use of the above project
or portions thereof, the attached certification must be com-
pleted by a professional engineer and returned to this
Department.
t
WAC 248-54-600(4) provides that if the certification of
completion has not been submitted within two years of the
date of this letter, this approval will become null and
void unless you take action at that time to arrange for an
extension of the approval period in the manner prescribed.
Sincerely,
uohn A. Beare, M. D.
Director
Robert E. Leaver
Supervising Engineer
Water Supply and Waste Section
RELrta
Encl
CC: Norman Associates, Inc.
Seattle-King County Public Health Dept.
* 1
CITY of
{
May 29, 1979
Robert E. Leaver
Supa-•:ising Engineer
Water Supply 6 Waste Section
DSHS
1409 Smith Tower B17-9
Seattle, Washington 98104
RE: Highbury Park Subdivision
Dear Bob:
The enclosed documents are the City of Renton's, rather than
Kent's.
Very truly yours,
r ,
�cLcY
G. W. Ulett, P.E.
Director of Public Works
ks
cc; 050ton Water Department
Ow
►yt
1
CIRTIFI(71IRIN OF iNSFkITI(N AND INSTALIX110Y OF d"1BL1C k'ATI(R SYMN PRWXrS
dffective Jnnuary 4, 1978 the (allowing Regulation applies: `+.'AC 248-54-6141 - With!' wiAty
days following the completion of and prior to the ilae of any project or portion therv�f for
whlch plane and specifications haVa received the approval of the Secretary, certification
shall tor mide to the Secretary and signed by a Professional engineer that the project was
inspected by him or his . ierized agent and that it was constructed in accordance etch the
plans and specifications approved by the Secretary.
Ilia,ructicna:
(a) If a project is being completed in stage runstruccion, attach a map and description of
portion of project being certified as completed as approved on date given below.
(h) As future portions of staged construction projects are completed, each must be
certified as required by WAC 248-54-650.
(c) Additional certification forms are available upon request arum USHS offices listed
ielow.
t
Kest aaterU:Fa—rtr_ny 91;hl`!�_Park Sub.
1`ar`„e 0TT:Ttir�ystem Honorable tlaYor L PIe:dberS of DSflS Water System No.
City Hall City Council__
tdr171 ng A—Tigress Referendum
Kent HA ?1031 % (if any)
ty i —StateV
Date Flans and Specifications Approved by
Department of Social and Health Services
FRwLCr NA%J MID D SCRIPr1VL TITLE: ::ay 24 1279 _
K^_nt (later Dew rt :Nit Date Project or Portion; Thereof Completed
11191itury Park aubdividion
'the undersigned engineer or his authorized agent has inspected the above-described project,
wlich as to layout, size and type of pipe, valves and materials, reservoir and other
designed physical facilities ha, been constructed in accordance with the plans and speci-
fications approved by the Secretary, Department of Social and Health ervices, and in the
opinion of the engineer, the installation, testing ant: disinfection of the system was
carried out in accordance with t`a specifications approved by the Secretary for the project.
' • —
ngineer
I [Engineers t
Seal Date
i
Please return completed foa.,n to DSI1S office checked below.
Dfice
Seane Regional Of
I ,
Seattle Regional Office Olympia Regional Office P g i
Cl Health Services Division
Health Services Division Health Services wastDivie
Sec Water Supply b Waste Section)
water Supply b Waste Section Water Supply b Waste Section PP n
Smith Tower Building, Mail Stop In-ll west 924 Sico 1
Seattle, Washington 98104 Olympia, Washington 98504 Spokane, Washington 99201
DSH, 9-346 (1 7R)
Is
_ -,,......a.....aw.y.
WE
LKATIMa. -
nATE .�/L/79 _
PER+tr
-- � GATE I:,StICD 9WRACTT
Side Sewer _
Storm Sewer --/RAI Construction 84"* --��— _e.14&7- So4..1
Inter system Deveiament 916. X _ g/c
Hater Eatecrner $W.7S � O.d�a✓
4ater lnsnerVon �9 G• d� _ �i_ pS � ••
:ewer System rAwI wt ! �G. _ x/L
sewer latecrner
Seer inspection iyp7 101
• i
STATE OF DEPARThIENT OF SOCIA_ ,ND HEALTH SERVICES
- WASHING TON purr sewn 7,w R n 9.Srmb.Way. %1,
Chxy Lee Ray
finvrnnr
3' May 24, 1979
Honorable Mayor G Members of the City Council
City Hall
Kent, WA 98031
Subject: Koni Water Department
Highbury Park Subdivision
Gentlemen:
Plan,; for the above project, received in this office May 8, 1979
Loge'her with documents have been reviewed and, in accordance
with the provisions of WAC 248-54 are hereby approved.
As required in WAC 248-54-650, within 60 days following the com-
pletion of and prior to the use of the above project or portions
thereof, the attached certification must be completed by a pro-
fessional engineer and returned ) this Department.
WAC 248-54-600/4) provides that if the certification of completion
has not been submitted within two years of the date of th4s letter,
this approval will become null and void A ess you take action at
that time to arrange for an extension of the approval period in
the manner prescribes.
Sincerely,
John A. Beare, M. D.
Director f�
Robert E. Leaver
Supervising Engineer
Water Supply b Waste Section
REL:ta
Encl.
CC: Ncrman ociates, Inc.
Seattle-king County Public Health Dept.
o-
SPEED LETTER
t n
PROJECT:
/.
s4?�
r I
lop
N
M•
i a
W'
5�O City of Renton, Utility Dept.
PRESSURE TEST FORM
wr
Water Project
Name of Project fI 'e-,v i3uty /gR-ic—
J..
This test was taken by f,^ , I,,.u� p .t on '7-3a-- 7 JF ,
At a pressure of PSI , for / S minutes.
The test "Felipe" on
"Passed" I./ on
Consents:
j :
i
City of Renton, Utility rept.
f
PRESSURE TEST FORM
Water Project /
�—1
ham of Project
This test was taken by M LuA,14, on 2-/1 -
At a pressure of 560 PSI , for O minutes.
The test "Failed" on
"Passed" on
/ � -4 Iry / N
Conments:
i
City of Renton, Utility Dr,t. r..?
sit
PRESSURE TEST FORM
w
i �x
Water Project
Name of Project
�.
A
This test was takei by on - 71 _
At a pressure Of PSI , for minutes . yy ;
The test "Failed" on
"Passed" ✓ on 7 r
r
Comments: _.nr4 /6 f (� r__, L, ! '4 — �1 ! Z S/
5
), �PIONEER NATIONAL
TITU INSURANCE
,nl.M(aaeYww
'3 I?" W, Hn uxi ut Hw9uae aI
.d l __
k ,
TO
^" l
N
LJ
BILL OF SALE
i K.MM ALL MFN BY THESE MESENT' Tbt HALL a AEDBKOP CU.,VUAATIUJ
d dm am
f.�unty ul wing Slaw d WUNytm i ,thr Paty M tb e,.pn
la,M H caaid�nea d W au.01
` OJE A6/0 30/100'S ($1.00) Ddro
wwlul maeey ul Is,UWwd SUtm of Awakm,b it m bd pW by
THE CITY JP REtiMU
the Wty d the ww" pet, to natal wheel w hemby .ct.wMdged, b es by tam p ,, arm
bvpk,d1 ua ddimr as,tb rid Pan y of the w Pun,de keswh,a dwrmwi PWMW pt p"y Noe
kceud., Highbury Park Plat
1.Ow kllo ut Aenton ,Camy of King ud Saw d Waibpn,
The complete street liyhtiny system in Highbury Park Plat, consisting
Of the follwingt 10,610 ft of BB THW copper wire (black); 5,300 ft of 010 THIJ copper Wire (green); 5,200 ft of 1-1/2" 1WC conduit; 1
Skyline cabinet WxWxW; 25 lighting fixtures 5-1J0111; 21 iuka
Poise with MPAE aryl 50 U811-AD buss fume holders; 50 .1E.1-10A fuses;
1 meter socket GE 761x5G91 1 Patin GE TL47051 1 liyhtiny contactor
GE C•TOI41603AAil 2 ci.•ouit breskere GE T11JL 2150; 1 circuit bcoaker
GE THQL 11201 25 concrete handholes.
TO HAVE AND TU HOLD the wmw b Um wW put y ul Ike ee•d pen. its bka, earzdmn.
demuintaa m,d aura fame. AM rid Pan y of dw Me pam b its kin,
e„fylpr,,admlae,nlum,w 1111 and";,a I.ed efth aw aM pay d Oe aced pat. its
nwutar. Mm:nbin,on mM ,Imp,. tW rd aIy d the fim mn is the w.ew d 0. .ed
pr,peny,pwd,u,d,hmwb wW as Pnd nplt wed IWI•utbedty .wy Is,awe ad de it
.dl wurnv eal ddIed the ak bw&y made as,th.,ad Irry wl dw Bead put, its
eawula,,md.iniwraam sd arlan mWm W and wwery peema a pwom,mbwerawe,bell;dhdes,a a lu
dale,b saw
IN WITIN-ES.S WHEREOF Tlw,W pmn Y d is,6rw pan he a amass,as its y
e.d W,w -, T1 deyul rebruery, 0.
41Jd..J,.
STATE OFu,,l Les tnn _) Dye
Camp d_- m a
y ,r.• +.
On i+& a.w ys
dead.a Ne6by Pk6B.b W da rs dkab.d a..w A D. I91G halwn ma mm en w
dac ds�ansaYltbead mad mere sw...dt.Ms. - fa.., a n _and
b sa►ewe s,be Tha.�/1^e- a'lald -QW1
W 11 l Bedehne ->wra6.1•w.Pe/wab•al
W eawpwmewa id mawr,l Or bewdxs brnaaet aad aaimwwbdpd tb add beeera W be 11N ANN r ae►
1 ere r red dml of-W--n wm$W% 4e be as and Papmw 1k.e'm"A W...6 a�lY ass--h.
"I wakwW w.verb As W bwaemmw mad"16 u W wfed iw iu
�M.Wa uwwPebaa red ad aaM
w'flT61!w hand and new mad bwee,Brad th.da asd yaw 1.dy emir dew.w eaa
t"•v`wd^m b r"w+w'a Plraws lkalr•*es,aawaaa,Y ha L MI
1.
I i• 7 I R 0 / ! I C L C 0 R R E S P 0 R D d R C I
Data Delembe, 31 , 1980
TO, Mike McCarty
rwas, Arlene Haight, Utilities Engineering
sus,mm Plat of Highbury Park
Hater Project No. 510
Take into plant the following inventory under the above referenced project:
Yatermain:
8" - 1880 Ft.
6" - 1700 Ft.
4" - 250 Ft.
Last $58,190.00
Valves:
2 - 8" Gate Valves
9 - 6" Gate Valves
Hydrants:
5 Fire Hydrants
Cost f 8.500.00
TOTAL COST 156,6A
Arlene Haight
i
• i