Loading...
HomeMy WebLinkAboutWTR2701746 W 495 Lid 307 BEGINNING OF FILE FILE 1111E /' /, /^- ,✓ � - I cttl � lt E n9inee �� ng r?rro> e�ts r /2lj#/e7 C COST DATA AND INVENTORY SUBJECT: , 3r^'7 CITY PROJECT NUMBERS: W- .1 tuau� c (� S TO: CITY OF RENTON FROM: UTILITIES DIVISION 200 MILL AVE. SO. _ RENTON WA 98055 DATE: Per your request, the following information is furnished concerning costs for improve- ments installed for the above referenced project. WATER SYSTEM: Length Size Type L.F. OF i z nz WATERMAIN L.F. OF " WATERMAIN _ L.F. OF WATERMAIN L.F. OF WATERMAIN EACH :F GATE VALVES EACH OF _ _" GATE VALVES Z EACH OF ! GATE VALVES �1 Size Type SUBTOTAL $ _ �T 3 EACH OF _ C Mrc-y FIRE HYDRANT ASSEMBLIES S� (COST OF FIRE HYDRANTS MUST BE LISTED SEPARATELY), TOTAL COST FOR WATER SYSTEM SANITARY SEWER SYSTEM: Length Size Type L.F. OF SEWER MAIN L.F. OF SEWER MAIN L.F. OF SEWER MAIN EACH OF DIAMETER MANHOLES TOTAL COST FOR SANITARY SEWER SYSTEM $ STORM DRAINAGE SYSTEM: Length Size Type ' .F. OF " ____ STORM LINE L.F. OF __ STORM LINZ _ L.F. OF "` _�___ STORM LINE L .F OF STORM LINE TOTAL COS1 FOR STORM DRAINAGE SYSTEM $ STREET 114PROVERENTS: (Including Curb, Gutter, Sidewalk) TOTAL COST FOR STREET IMPROVEMENTS $ SIGNATURE) (SIGNATORY MUST BE AUTHORIZED AGENT OR OWNER OF SUBJECT DEVELOPMENT) SPEED LETTER TO• DATE: 7- PROJECT: SUBJECT: ot I AY G Signed A+ A !� T;Y A+ Q � 1 f � • P�r R xp /{ a SPEED LETTER TO: ,'? e� , ' DATE: PROJECT:_ IL ZZ Iq LZ x7re 2 c ' S 9ne o PUBLIC WORKS DEPARTMENT ;r DESIGN/UTILITY ENGINEERING Y 235-2631 fI ISL n MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.99065 Q J9,rEn SE Pt E�'�� BARBARA Y. SHINPOCH November 5, 1980 MAYOR Mr. Vince Minice Coluccio Constructiun Co. , Inc. 9600 Empire Way S. Seattle WA 98118 Subject: Raymond Avenue S.W. - L. I .U. 307 w- y15 Dear Mr. Minice: An inspection of the project was made un Octuber 31 , 1980, in conjunction with the ine-year maintenance and guarantee ?rovision of the contras'. During that inspection, it was found that puts of the joints of the asph,.lt were holding water and were generally of an unacceptable nature. it is requested that you make arrangements to have this problem corrected. A one-incl. overlay of a modified asphaltic concrete mix 11id with proper cross slope is one way to correct the problem. If you have any other options that you feel will satisfactorily correct N the prublem we would be more than happy to discuss them with you. This work should not be done at this time but should be delayed until spring. By this letter, the City of Renton is hereby extending the maintenance and guarantee period until the completion of the above- mentioned work. Also, any items remaining on the punch list that have not been completed should be taken care of as soon as possible. If you would like to discuss the matter further, please advise. Very truly yours, Warren C. Gonnason, P.E. Public Works Director DGM:ckd cc: M.A. Segale ENDING OF FILE w dow l-r'd 307 En9ineer (' n9 wall er �rojec�