COST DATA AND INVENTORY
SUBJECT: , 3r^'7 CITY PROJECT NUMBERS: W- .1
tuau� c (� S
TO: CITY OF RENTON FROM:
UTILITIES DIVISION
200 MILL AVE. SO. _
RENTON WA 98055
DATE:
Per your request, the following information is furnished concerning costs for improve-
ments installed for the above referenced project.
WATER SYSTEM:
Length Size Type
L.F. OF i z nz WATERMAIN
L.F. OF " WATERMAIN
_ L.F. OF WATERMAIN
L.F. OF WATERMAIN
EACH :F GATE VALVES
EACH OF _ _" GATE VALVES
Z EACH OF ! GATE VALVES �1
Size Type SUBTOTAL $ _ �T
3 EACH OF _ C Mrc-y FIRE HYDRANT ASSEMBLIES S�
(COST OF FIRE HYDRANTS MUST BE LISTED SEPARATELY),
TOTAL COST FOR WATER SYSTEM
SANITARY SEWER SYSTEM:
Length Size Type
L.F. OF SEWER MAIN
L.F. OF SEWER MAIN
L.F. OF SEWER MAIN
EACH OF DIAMETER MANHOLES
TOTAL COST FOR SANITARY SEWER SYSTEM $
STORM DRAINAGE SYSTEM:
Length Size Type
' .F. OF " ____ STORM LINE
L.F. OF __ STORM LINZ
_ L.F. OF "` _�___ STORM LINE
L .F OF STORM LINE
TOTAL COS1 FOR STORM DRAINAGE SYSTEM $
STREET 114PROVERENTS: (Including Curb, Gutter, Sidewalk)
TOTAL COST FOR STREET IMPROVEMENTS $
SIGNATURE)
(SIGNATORY MUST BE AUTHORIZED AGENT OR
OWNER OF SUBJECT DEVELOPMENT)
SPEED LETTER
TO• DATE: 7-
PROJECT:
SUBJECT:
ot
I
AY
G
Signed
A+
A !�
T;Y
A+ Q
� 1
f � •
P�r
R
xp
/{ a
SPEED LETTER
TO: ,'? e� , ' DATE:
PROJECT:_
IL ZZ
Iq
LZ
x7re
2
c '
S 9ne
o PUBLIC WORKS DEPARTMENT
;r DESIGN/UTILITY ENGINEERING Y 235-2631
fI ISL n MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.99065
Q
J9,rEn SE Pt E�'��
BARBARA Y. SHINPOCH November 5, 1980
MAYOR
Mr. Vince Minice
Coluccio Constructiun Co. , Inc.
9600 Empire Way S.
Seattle WA 98118
Subject: Raymond Avenue S.W. - L. I .U. 307
w- y15
Dear Mr. Minice:
An inspection of the project was made un Octuber 31 , 1980, in conjunction
with the ine-year maintenance and guarantee ?rovision of the contras'.
During that inspection, it was found that puts of the joints of the
asph,.lt were holding water and were generally of an unacceptable nature.
it is requested that you make arrangements to have this problem corrected.
A one-incl. overlay of a modified asphaltic concrete mix 11id with proper
cross slope is one way to correct the problem.
If you have any other options that you feel will satisfactorily correct N
the prublem we would be more than happy to discuss them with you.
This work should not be done at this time but should be delayed until
spring. By this letter, the City of Renton is hereby extending the
maintenance and guarantee period until the completion of the above-
mentioned work. Also, any items remaining on the punch list that have
not been completed should be taken care of as soon as possible.
If you would like to discuss the matter further, please advise.
Very truly yours,
Warren C. Gonnason, P.E.
Public Works Director