Loading...
HomeMy WebLinkAboutP_Site_Plan_092925_v1BU R N E T T A V E N '307' '325' '308' '316' LO R G A N A V E N WI L L I A M S A V E N N 3R D S T N 3RD ST EO P CL RO W P0 1 EOP=2'6'' CL=19' CL=21'6'' N ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. POWER GENERAL NOTES 1.All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by Potelco's Project Manager and NOTED on the Foremans' Copy. 2.All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. 3.Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. 4.All work is to be done in accordance with local municipal and county permit requirements as applicable. 5.Inclement weather conditions may cause delays in construction times and dates. 514302415 186065553 101164646/108148378 PROJECT PHASE PWR NOTIF#ORDER# Superior Sub Order SITE SPECIFIC NOTES P01 (318096-166058) -REPLACE 45' CL3 POLE -INST 50' CL1 POLE (6010.1000 PD501) -INST 3Ø SGL ARM (6033.1010 TAN312) -INST 9' SGL ARM CUTOUT (6011.1000 ARD19C) -TRANSFER (3) 75kVA 120/240v XFs W/ LB C/O FUSED AT 25T (3412400) EA -TRANSFER OH SEC. SPLICE & EXTEND IF NECESSARY (_______/___') -TRANSFER OH SVCs. SPLICE & EXTEND IF NECESSARY (_______/___') -TOP POLE TO COMMS N/A N/A PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" "Veg Management Required" "Joint Trench Coord Required" NoYes NoYes X X X X THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG SA P W . O . # 18 6 0 6 5 5 5 3 VICINITY MAP FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. OH CIRCUIT MAP: D2305E088 SCALE 6" = 1 MILE DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP M. COBBINAH 253-337-9804 04/03/24 M. COBBINAH 253-337-9804 04/03/24 N/A N/A N/A A. FARAH N/A 04/03/24 N/A RENTON ENGR1 COMCAST TK#5654735 REPLACE (1 ) DIST POLE 308 BURNETT AVE N RENTON, WA 98057 POTELCO N/A N/A N/A 186065553 AS NOTED 1/1 KING N/A N/A QCSOKE T23, R05E, S17 N/A N/A A2305E066 D2305E088 R2305E066NW PCR-14 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A JOB SITE JOB SITE NOT TO SCALE ROW PROFILE: P01 POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS SITE # POLE DATA POLE TEL TV FIBER TRAN RMVD ID NUMBER GRID #HEIGHT CLASS YEAR TOPPED RMVD P01 318096-166058 45 3 1975 N/A POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P01 318096-166058 50 1 Installed at site: Grid Number: Bank Configuration Foreman to redline the following information TRANSFORMER BANK TRANSFER A Phase Xfrmr MID # Secondary Voltage: KVA B Phase Xfrmr MID #KVA C Phase Xfrmr MID #KVA Tested Secondary Voltage: A Phase Xfrmr Company ID # B Phase Xfrmr Company ID # C Phase Xfrmr Company ID # P01 318096-166058 Wye/Delta UNITS OF PROPERTY INSTALL ONLY CROSSARMS MATERIAL QTY DIST. WOOD DIST. FIBERGLASS DIST. STEEL DIST. OTHERS TRANS. WOOD TRANS. FIBERGLASS TRANS. STEEL TRANS. OTHERS UNITS OF PROPERTY INSTALL ONLY LINE FIXTURES MATERIAL QTY DIST. ARRESTERS DIST. CUTOUTS DIST. INSULATORS TRANS. ARRESTERS TRANS. INSULATORS SCALE: 1:100 SITE PLAN: P01