Loading...
HomeMy WebLinkAboutP_Traffic Control SR167_250909_v1.pdfFILE NAME TIME DATE DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM.REVISION DATE BY SHEET OF SHEETS Washington State Department of Transportation P.E. STAMP BOX P.E. STAMP BOX DATE DATE LOCATION NO.CONTRACT NO. JOB NUMBER REGION NO. STATE FED.AID PROJ.NO. WASH PLOTTED BY PLAN REF NO mangaha 07/16/2024 14:04:55 c:\users\mangaha\pw_wsdot\d0619428\XL6747_PS_TC_SR167_Sect13.dgn 10 Plot 1 SR 167 SB SR 167 NB SR 167 NB SR 167 SB NOT TO SCALE N. MENZEL A. MANGAHAS A. EMERSON B. NIELSEN p w : \ \ p r o je c t s t o r e . w s d o t . w a . g o v : W S D O T \D o c u m e n t s \ N o r t h w e s t \ _ P r o j e c t s \ 0 0 0 \ X L 6 7 4 7 _ N W R S o u t h S t r a t e g i c P v m t P r e s \ D e s i g n \ _ C A D \ _ S h e e t s \ X L 6 7 4 7 _ P S _ T C _ S R 1 6 7 _ S e c t 1 3 . d g n A. MANGAHAS T A RLB X 48" 48" RAMP CLOSED AHEAD W20-3 ALTW20-1 ROAD WORK AHEAD 48" 48" 48" 48" RIGHT LANE CLOSED AHEAD W20-5R 48" 60" R11-1501 (B/W) WILL BE CLOSED XX/XX - XX/XX RAMP UPDATED WEEKLY DATES & TIME UPCOMING CLOSURE 4:30AM - 10:30PM M4-9 48" SEE NOTE 13 36" A B C A B C D E D 48" 30" R11-201 (B/W) RAMP CLOSED G E F G TRAFFIC CONTROL PLAN PAVEMENT REPAIR SR 167 NB & I-405 SB ON-RAMP RIGHT LANE CLOSURE SECTION 13 RAMP CLOSED I-405 SB SR 167 N B TOI-405 NB TOSR 167 NB RAMP CLOSED SR 167 N B TO I-4 0 5 N B NB TO I-405 SR 167 SB T O I-4 0 5 NB SR 167 SB SB TO I-405 SR 167 SB G 48" 48" W4-2R F L X X DRUMS SPACING BY HALF REDUCE TRAFFIC SAFETY S E E T H IS S H E E T M A T C H L IN E S E E T H IS S H E E T M A T C H L IN E 2.0 SEC 2.0 SEC PCMS 1 2 AHEAD MILES 1.5 CLOSED LANE RIGHT PER STD. SPEC. 1-10.3(3)C. PRIOR TO CLOSURE TAPER H RAMP CLOSED 48"x30" BLACK/WHITE W/ TYPE C LIGHTS W/ R11-201 SIGN TYPE III BARRICADE (ONE PER LANE) H 1 13 TC101 S E E S H E E T T C 1 0 2 M A T C H L IN E SEE SHEET TC106 I-5 ET AL. NWR SOUTH 23-25 2. SEE SHEET DU32 FOR ADDITIONAL RAMP CLOSURE DETOUR SIGNAGE. DATA, CHANNELIZATION DEVICE SPACING, AND GENERAL NOTES. 1. SEE SHEET TC2 FOR LEGEND, TAPER LENGTHS, SIGN SPACING, BUFFER NOTES: DETOUR P C M S FILE NAME TIME DATE DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM.REVISION DATE BY SHEET OF SHEETS Washington State Department of Transportation P.E. STAMP BOX P.E. STAMP BOX DATE DATE LOCATION NO.CONTRACT NO. JOB NUMBER REGION NO. STATE FED.AID PROJ.NO. WASH PLOTTED BY PLAN REF NO mangaha 07/16/2024 14:04:56 c:\users\mangaha\pw_wsdot\d0619428\XL6747_PS_TC_SR167_Sect13.dgn 10 Plot 2 S O U T H W E S T G R A D Y W Y S G R A D Y W A Y N. MENZEL A. MANGAHAS A. EMERSON B. NIELSEN p w : \ \ p r o je c t s t o r e . w s d o t . w a . g o v : W S D O T \D o c u m e n t s \ N o r t h w e s t \ _ P r o j e c t s \ 0 0 0 \ X L 6 7 4 7 _ N W R S o u t h S t r a t e g i c P v m t P r e s \ D e s i g n \ _ C A D \ _ S h e e t s \ X L 6 7 4 7 _ P S _ T C _ S R 1 6 7 _ S e c t 1 3 . d g n A. MANGAHAS NOT TO SCALE 30" 36" (B/W) MOD R3-6R W20-1 ROAD WORK AHEAD 48" 48" A B A B SR 167 TRAFFIC CONTROL PLAN PAVEMENT REPAIR SR 167 NB & S GRADY WAY RIGHT LANE CLOSURE SECTION 13 TO I-405 SB S R 1 6 7 S B SB TO I-4 0 5 SR 167NB RAMP CLOSED C 48" 60" R11-1501 (B/W) WILL BE CLOSED 10/25 - 10/20 RAMP UPDATED WEEKLY DATES & TIME UPCOMING CLOSURE 4:30AM - 10:30PM C X A X X HARDIE AVE SW 2 13 48" 48" RAMP CLOSED AHEAD W20-3 ALT M4-9 48" SEE NOTE 13 36" D E TC102 S E E S H E E T T C 1 0 1 M A T C H L IN E S E E S H E E T T C 103 MA T C H L IN E S E E SH E E T TC 1 0 7 I-5 ET AL. NWR SOUTH 23-25 2. SEE SHEET DU32 FOR ADDITIONAL RAMP CLOSURE DETOUR SIGNAGE. DATA, CHANNELIZATION DEVICE SPACING, AND GENERAL NOTES. 1. SEE SHEET TC2 FOR LEGEND, TAPER LENGTHS, SIGN SPACING, BUFFER NOTES: DETOUR KO FILE NAME TIME DATE DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM.REVISION DATE BY SHEET OF SHEETS Washington State Department of Transportation P.E. STAMP BOX P.E. STAMP BOX DATE DATE LOCATION NO.CONTRACT NO. JOB NUMBER REGION NO. STATE FED.AID PROJ.NO. WASH PLOTTED BY PLAN REF NO mangaha 07/16/2024 14:04:57 c:\users\mangaha\pw_wsdot\d0619428\XL6747_PS_TC_SR167_Sect13.dgn 10 Plot 3 N. MENZEL A. MANGAHAS A. EMERSON B. NIELSEN p w : \ \ p r o je c t s t o r e . w s d o t . w a . g o v : W S D O T \D o c u m e n t s \ N o r t h w e s t \ _ P r o j e c t s \ 0 0 0 \ X L 6 7 4 7 _ N W R S o u t h S t r a t e g i c P v m t P r e s \ D e s i g n \ _ C A D \ _ S h e e t s \ X L 6 7 4 7 _ P S _ T C _ S R 1 6 7 _ S e c t 1 3 . d g n A. MANGAHAS NOT TO SCALE 30" 36" (B/W) MOD R3-6R W20-1 ROAD WORK AHEAD 48" 48" A C C A B X TRAFFIC CONTROL PLAN SR 167 S W 7 T H S T S 7T H S T 48" 48" LEFT LANE CLOSED AHEAD W20-5L PAVEMENT REPAIR DATA, CHANNELIZATION DEVICE SPACING, AND GENERAL NOTES. 1. SEE SHEET TC2 FOR LEGEND, TAPER LENGTHS, SIGN SPACING, BUFFER NOTES: SR 167 NB & S 7TH ST RIGHT LANE CLOSURE SECTION 13 A X X TO IHOP ACCESS 3 13 TC103 S E E S H E E T T C 1 0 2 M A T C H L IN E SEE SHEET TC104MATCH LINE I-5 ET AL. NWR SOUTH 23-25 KO FILE NAME TIME DATE DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM.REVISION DATE BY SHEET OF SHEETS Washington State Department of Transportation P.E. STAMP BOX P.E. STAMP BOX DATE DATE LOCATION NO.CONTRACT NO. JOB NUMBER REGION NO. STATE FED.AID PROJ.NO. WASH PLOTTED BY PLAN REF NO mangaha 07/16/2024 14:04:58 c:\users\mangaha\pw_wsdot\d0619428\XL6747_PS_TC_SR167_Sect13.dgn 10 Plot 4 N. MENZEL A. MANGAHAS A. EMERSON B. NIELSEN p w : \ \ p r o je c t s t o r e . w s d o t . w a . g o v : W S D O T \D o c u m e n t s \ N o r t h w e s t \ _ P r o j e c t s \ 0 0 0 \ X L 6 7 4 7 _ N W R S o u t h S t r a t e g i c P v m t P r e s \ D e s i g n \ _ C A D \ _ S h e e t s \ X L 6 7 4 7 _ P S _ T C _ S R 1 6 7 _ S e c t 1 3 . d g n A. MANGAHAS NOT TO SCALE B A 30" 36" (B/W) MOD R3-6R W20-1 ROAD WORK AHEAD 48" 48" A B A B A A TRAFFIC CONTROL PLAN S 4 T H P L SR 167 R E N T O N C E N T E R W A Y S 3 R D P L PAVEMENT REPAIR DATA, CHANNELIZATION DEVICE SPACING, AND GENERAL NOTES. 1. SEE SHEET TC2 FOR LEGEND, TAPER LENGTHS, SIGN SPACING, BUFFER NOTES:SR 167 NB & S 4TH PL & S 3RD PL RIGHT LANE CLOSURE SECTION 13 X X X X X X 4 13 TC104 S E E S H E E T T C 1 0 3 M A T C H L IN E S E E S H E E T T C 1 0 5 M A T C H L I N E I-5 ET AL. NWR SOUTH 23-25 KO FILE NAME TIME DATE DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM.REVISION DATE BY SHEET OF SHEETS Washington State Department of Transportation P.E. STAMP BOX P.E. STAMP BOX DATE DATE LOCATION NO.CONTRACT NO. JOB NUMBER REGION NO. STATE FED.AID PROJ.NO. WASH PLOTTED BY PLAN REF NO mangaha 07/16/2024 14:05:00 c:\users\mangaha\pw_wsdot\d0619428\XL6747_PS_TC_SR167_Sect13.dgn 10 Plot 5 N. MENZEL A. MANGAHAS A. EMERSON B. NIELSEN p w : \ \ p r o je c t s t o r e . w s d o t . w a . g o v : W S D O T \D o c u m e n t s \ N o r t h w e s t \ _ P r o j e c t s \ 0 0 0 \ X L 6 7 4 7 _ N W R S o u t h S t r a t e g i c P v m t P r e s \ D e s i g n \ _ C A D \ _ S h e e t s \ X L 6 7 4 7 _ P S _ T C _ S R 1 6 7 _ S e c t 1 3 . d g n A. MANGAHAS NOT TO SCALE W20-1 ROAD WORK AHEAD 48" 48" A 100 ' A X TRAFFIC CONTROL PLAN S 3 R D S T S W S U N S E T B L V D S 2 N D S T SR 167 PAVEMENT REPAIR DATA, CHANNELIZATION DEVICE SPACING, AND GENERAL NOTES. 1. SEE SHEET TC2 FOR LEGEND, TAPER LENGTHS, SIGN SPACING, BUFFER NOTES:S 2ND ST LEFT LANE CLOSURE SR 167 NB & SW SUNSET BLVD/S 3RD ST & SECTION 13 5 13 TC105 S E E S H E E T T C 1 0 4 M A T C H LI N E I-5 ET AL. NWR SOUTH 23-25 FILE NAME TIME DATE DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM.REVISION DATE BY SHEET OF SHEETS Washington State Department of Transportation P.E. STAMP BOX P.E. STAMP BOX DATE DATE LOCATION NO.CONTRACT NO. JOB NUMBER REGION NO. STATE FED.AID PROJ.NO. WASH PLOTTED BY PLAN REF NO mangaha 07/16/2024 14:05:01 c:\users\mangaha\pw_wsdot\d0619428\XL6747_PS_TC_SR167_Sect13.dgn 10 Plot 11 N. MENZEL A. MANGAHAS A. EMERSON B. NIELSEN p w : \ \ p r o je c t s t o r e . w s d o t . w a . g o v : W S D O T \D o c u m e n t s \ N o r t h w e s t \ _ P r o j e c t s \ 0 0 0 \ X L 6 7 4 7 _ N W R S o u t h S t r a t e g i c P v m t P r e s \ D e s i g n \ _ C A D \ _ S h e e t s \ X L 6 7 4 7 _ P S _ T C _ S R 1 6 7 _ S e c t 1 3 . d g n A. MANGAHAS TRAFFIC CONTROL PLAN PAVEMENT REPAIR 13 6 NOT TO SCALE S E E T H IS S H E E T M A T C H L IN E B S E E T H I S S H E E T M A T C H L I N E A S E E T H I S S H E E T M A T C H L I N E A S E E T H IS S H E E T M A T C H L I N E B S E E S H E E T T C 94 I-405 NB TO SR 167 N B RAMP CLOSED 500' L H E DRUMS SPACING BY HALFREDUCE TRAFFIC SAFETY 500' F A B C 48" 48" RAMP CLOSED AHEAD W20-3 ALTW20-1 ROAD WORK AHEAD 48" 48" 48" 48" RIGHT LANE CLOSED AHEAD W20-5R M4-9 48" SEE NOTE 13 36" A B C D E 48" 30" R11-201 (B/W) RAMP CLOSED 48" 48" W4-2R F RAMP CLOSED 48"x30" BLACK/WHITE W/ TYPE C LIGHTS W/ R11-201 SIGN TYPE III BARRICADE (ONE PER LANE) H D I-405 NB TO SR 167 NB 2.0 SEC 2.0 SEC PCMS 1 2 DETOUR FOLLOW CLOSED NB EXIT SR 167 PER STD. SPEC. 1-10.3(3)C. PRIOR TO CLOSURE TAPER I-405 TO TO SR 167 NB RAMP CLOSURE SECTION 13 X X X I-405 NB I-405 NB I-405 NB TC106 I-5 ET AL. NWR SOUTH 23-25 2. SEE SHEET DU32 FOR ADDITIONAL RAMP CLOSURE DETOUR SIGNAGE. DATA, CHANNELIZATION DEVICE SPACING, AND GENERAL NOTES. 1. SEE SHEET TC2 FOR LEGEND, TAPER LENGTHS, SIGN SPACING, BUFFER NOTES: DETOUR P C M S FILE NAME TIME DATE DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM.REVISION DATE BY SHEET OF SHEETS Washington State Department of Transportation P.E. STAMP BOX P.E. STAMP BOX DATE DATE LOCATION NO.CONTRACT NO. JOB NUMBER REGION NO. STATE FED.AID PROJ.NO. WASH PLOTTED BY PLAN REF NO mangaha 07/16/2024 14:05:02 c:\users\mangaha\pw_wsdot\d0619428\XL6747_PS_TC_SR167_Sect13.dgn 10 Plot 12 N. MENZEL A. MANGAHAS A. EMERSON B. NIELSEN p w : \ \ p r o je c t s t o r e . w s d o t . w a . g o v : W S D O T \D o c u m e n t s \ N o r t h w e s t \ _ P r o j e c t s \ 0 0 0 \ X L 6 7 4 7 _ N W R S o u t h S t r a t e g i c P v m t P r e s \ D e s i g n \ _ C A D \ _ S h e e t s \ X L 6 7 4 7 _ P S _ T C _ S R 1 6 7 _ S e c t 1 3 . d g n A. MANGAHAS TRAFFIC CONTROL PLAN PAVEMENT REPAIR 13 7 NOT TO SCALE S E E S H E E T T C 1 0 2 S E E T H I S S H E E T M A T C H L I N E S E E T H I S S H E E T M A T C H L I N E D A B C DRUMS SPACING BY HALFREDUCE TRAFFIC SAFETY M4-9 48" SEE NOTE 13 36" B 48" 30" R11-201 (B/W) RAMP CLOSED C RAMP CLOSED 48"x30" BLACK/WHITE W/ TYPE C LIGHTS W/ R11-201 SIGN TYPE III BARRICADE (ONE PER LANE) D I-405 SB TO RAMP CLOSED SR 167 NB I-405SB TO SR 167 NB 48" 48" RAMP CLOSED AHEAD W20-3 ALT A I-405 SB TO SR 167 NB CLOSURE SECTION 13 I-405 SB I-405 SB TC107 S E E S H E E T T C108 M A T C H LI N E I-5 ET AL. NWR SOUTH 23-25 2. SEE SHEET DU32 FOR ADDITIONAL RAMP CLOSURE DETOUR SIGNAGE. DATA, CHANNELIZATION DEVICE SPACING, AND GENERAL NOTES. 1. SEE SHEET TC2 FOR LEGEND, TAPER LENGTHS, SIGN SPACING, BUFFER NOTES: DETOUR Plot 13 N. MENZEL A. MANGAHAS A. EMERSON B. NIELSEN p w : \ \ p r o je c t s t o r e . w s d o t . w a . g o v : W S D O T \D o c u m e n t s \ N o r t h w e s t \ _ P r o j e c t s \ 0 0 0 \ X L 6 7 4 7 _ N W R S o u t h S t r a t e g i c P v m t P r e s \ D e s i g n \ _ C A D \ _ S h e e t s \ X L 6 7 4 7 _ P S _ T C _ S R 1 6 7 _ S e c t 1 3 . d g n A. MANGAHAS TRAFFIC CONTROL PLAN PAVEMENT REPAIR 13 8 NOT TO SCALE X 48" 48" RAMP CLOSED AHEAD W20-3 ALTW20-1 ROAD WORK AHEAD 48" 48" A BI-405SB TOS R 167 N B 2.0 SEC 2.0 SEC PCMS 1 2 DETOUR FOLLOW CLOSED NB EXIT SR 167 PER STD. SPEC. 1-10.3(3)C. PRIOR TO CLOSURE TAPER C B A X X M4-9 48" SEE NOTE 13 36" C I-405 SB TO SR 167 NB CLOSURE SECTION 13 I- 405 SB FILE NAME TIME DATE DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM.REVISION DATE BY SHEET OF SHEETS Washington State Department of Transportation P.E. STAMP BOX P.E. STAMP BOX DATE DATE LOCATION NO.CONTRACT NO. JOB NUMBER REGION NO. STATE FED.AID PROJ.NO. WASH PLOTTED BY PLAN REF NO mangaha 07/16/2024 14:05:03 c:\users\mangaha\pw_wsdot\d0619428\XL6747_PS_TC_SR167_Sect13.dgn 10 TC108 SEE SHEET TC107 MATCH LINE I-5 ET AL. NWR SOUTH 23-25 2. SEE SHEET DU32 FOR ADDITIONAL RAMP CLOSURE DETOUR SIGNAGE. DATA, CHANNELIZATION DEVICE SPACING, AND GENERAL NOTES. 1. SEE SHEET TC2 FOR LEGEND, TAPER LENGTHS, SIGN SPACING, BUFFER NOTES: DETOUR P C M S FILE NAME TIME DATE DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM.REVISION DATE BY SHEET OF SHEETS Washington State Department of Transportation P.E. STAMP BOX P.E. STAMP BOX DATE DATE LOCATION NO.CONTRACT NO. JOB NUMBER REGION NO. STATE FED.AID PROJ.NO. WASH PLOTTED BY PLAN REF NO mangaha 07/16/2024 14:05:04 c:\users\mangaha\pw_wsdot\d0619428\XL6747_PS_TC_SR167_Sect13.dgn 10 Plot 16 N. MENZEL A. MANGAHAS A. EMERSON B. NIELSEN p w : \ \ p r o je c t s t o r e . w s d o t . w a . g o v : W S D O T \D o c u m e n t s \ N o r t h w e s t \ _ P r o j e c t s \ 0 0 0 \ X L 6 7 4 7 _ N W R S o u t h S t r a t e g i c P v m t P r e s \ D e s i g n \ _ C A D \ _ S h e e t s \ X L 6 7 4 7 _ P S _ T C _ S R 1 6 7 _ S e c t 1 3 . d g n A. MANGAHAS TRAFFIC CONTROL PLAN PAVEMENT REPAIR NOT TO SCALE X X B CA L B T A R B A W20-1 ROAD WORK AHEAD 48" 48" A 48" 48" LEFT LANE CLOSED AHEAD W20-5L C SR 167 NB SR 167 SB SR 167 SB SR 167 & I-405 SB ON-RAMP LEFT LANE CLOSURE SECTION 13 SR 167 SB T O I-4 0 5 NBI-405 NB TOSR 167 NB I-405SB TO SR 167 SB SR 167 N B TO I-405 SB I-405NB TO SR 167 SB SR 167 NB TO I-4 0 5 N B S E E T H IS S H E E T M A T C H L IN E S E E T H IS S H E E T M A T C H L I N E XX 2.0 SEC 2.0 SEC PCMS 1 2 AHEAD MILES 1.5 CLOSED LANE LEFT PER STD. SPEC. 1-10.3(3)C. PRIOR TO CLOSURE TAPER 48" 48" W4-2L B SR 167 NB 13 9 TC109 S E E S H E E T T C 1 1 0 M A T C H L IN E I-5 ET AL. NWR SOUTH 23-25 2. SEE SHEET DU32 FOR ADDITIONAL RAMP CLOSURE DETOUR SIGNAGE. DATA, CHANNELIZATION DEVICE SPACING, AND GENERAL NOTES. 1. SEE SHEET TC2 FOR LEGEND, TAPER LENGTHS, SIGN SPACING, BUFFER NOTES: P C M S Plot 17 N. MENZEL A. MANGAHAS A. EMERSON B. NIELSEN p w : \ \ p r o je c t s t o r e . w s d o t . w a . g o v : W S D O T \D o c u m e n t s \ N o r t h w e s t \ _ P r o j e c t s \ 0 0 0 \ X L 6 7 4 7 _ N W R S o u t h S t r a t e g i c P v m t P r e s \ D e s i g n \ _ C A D \ _ S h e e t s \ X L 6 7 4 7 _ P S _ T C _ S R 1 6 7 _ S e c t 1 3 . d g n A. MANGAHAS TRAFFIC CONTROL PLAN PAVEMENT REPAIR NOT TO SCALE W20-1 ROAD WORK AHEAD 48" 48" A B C 48" 48" TO STOP PREPARED BE W20-7B 48" 48" W20-7A XCXB B X C X X X X X D A 48" 48" LEFT LANE CLOSED AHEAD W20-5L SR 167 S O U T H W E S T G R A D Y W Y S G R A D Y W A Y SR 167 & S GRADY WAY LEFT LANE CLOSURE SECTION 13 S R 1 6 7 S B TO I-405 SB I-4 0 5 S B T O SR 167NB X C B A X C B A X A HARDIE AVE SW D 10 FILE NAME TIME DATE DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM.REVISION DATE BY SHEET OF SHEETS Washington State Department of Transportation P.E. STAMP BOX P.E. STAMP BOX DATE DATE LOCATION NO.CONTRACT NO. JOB NUMBER REGION NO. STATE FED.AID PROJ.NO. WASH PLOTTED BY PLAN REF NO mangaha 07/16/2024 14:05:05 c:\users\mangaha\pw_wsdot\d0619428\XL6747_PS_TC_SR167_Sect13.dgn 10 13 TC110 S E E S H E E T T C 1 0 9 M A T C H L IN E S E E S H E E T T C 111 MAT C H L IN E I-5 ET AL. NWR SOUTH 23-25 2. SEE SHEET DU32 FOR ADDITIONAL RAMP CLOSURE DETOUR SIGNAGE. DATA, CHANNELIZATION DEVICE SPACING, AND GENERAL NOTES. 1. SEE SHEET TC2 FOR LEGEND, TAPER LENGTHS, SIGN SPACING, BUFFER NOTES: Plot 18 N. MENZEL A. MANGAHAS A. EMERSON B. NIELSEN p w : \ \ p r o je c t s t o r e . w s d o t . w a . g o v : W S D O T \D o c u m e n t s \ N o r t h w e s t \ _ P r o j e c t s \ 0 0 0 \ X L 6 7 4 7 _ N W R S o u t h S t r a t e g i c P v m t P r e s \ D e s i g n \ _ C A D \ _ S h e e t s \ X L 6 7 4 7 _ P S _ T C _ S R 1 6 7 _ S e c t 1 3 . d g n A. MANGAHAS TRAFFIC CONTROL PLAN PAVEMENT REPAIR NOT TO SCALE X X W20-1 ROAD WORK AHEAD 48" 48" A B 48" 48" TO STOP PREPARED BE W20-7B 48" 48" W20-7A X X X X X X X SR 167 S W 7T H S T S 7T H S T DATA, CHANNELIZATION DEVICE SPACING, AND GENERAL NOTES. 1. SEE SHEET TC2 FOR LEGEND, TAPER LENGTHS, SIGN SPACING, BUFFER NOTES:SR 167 & S 7TH ST LEFT LANE CLOSURE SECTION 13 C X A B C A B C C B C B 11 FILE NAME TIME DATE DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM.REVISION DATE BY SHEET OF SHEETS Washington State Department of Transportation P.E. STAMP BOX P.E. STAMP BOX DATE DATE LOCATION NO.CONTRACT NO. JOB NUMBER REGION NO. STATE FED.AID PROJ.NO. WASH PLOTTED BY PLAN REF NO mangaha 07/16/2024 14:05:07 c:\users\mangaha\pw_wsdot\d0619428\XL6747_PS_TC_SR167_Sect13.dgn 10 13 S E E S H E E T T C 1 1 0 M A T C H L I N E SEE SHEET TC112 MATCH LINE TC111 I-5 ET AL. NWR SOUTH 23-25 FILE NAME TIME DATE DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM.REVISION DATE BY SHEET OF SHEETS Washington State Department of Transportation P.E. STAMP BOX P.E. STAMP BOX DATE DATE LOCATION NO.CONTRACT NO. JOB NUMBER REGION NO. STATE FED.AID PROJ.NO. WASH PLOTTED BY PLAN REF NO mangaha 07/16/2024 14:05:08 c:\users\mangaha\pw_wsdot\d0619428\XL6747_PS_TC_SR167_Sect13.dgn 10 Plot 19 N. MENZEL A. MANGAHAS A. EMERSON B. NIELSEN p w : \ \ p r o je c t s t o r e . w s d o t . w a . g o v : W S D O T \D o c u m e n t s \ N o r t h w e s t \ _ P r o j e c t s \ 0 0 0 \ X L 6 7 4 7 _ N W R S o u t h S t r a t e g i c P v m t P r e s \ D e s i g n \ _ C A D \ _ S h e e t s \ X L 6 7 4 7 _ P S _ T C _ S R 1 6 7 _ S e c t 1 3 . d g n A. MANGAHAS TRAFFIC CONTROL PLAN PAVEMENT REPAIR NOT TO SCALE W20-1 ROAD WORK AHEAD 48" 48" A B C 48" 48" TO STOP PREPARED BE W20-7B 48" 48" W20-7A C B A X X X X X X X X X X X X X X B X C X X X B X C X R E N T O N C E N T E R W A Y S 3 R D P LS 4 T H P L SR 167 DATA, CHANNELIZATION DEVICE SPACING, AND GENERAL NOTES. 1. SEE SHEET TC2 FOR LEGEND, TAPER LENGTHS, SIGN SPACING, BUFFER NOTES:SR 167 & S 4TH PL & S 3RD PL LEFT LANE CLOSURE SECTION 13 C B A CB BC A C B C B A 12 13 S E E S H E E T T C 1 1 1 M A T C H L IN E S E E S H E E T T C 1 1 3 M A T C H L I N E TC112 I-5 ET AL. NWR SOUTH 23-25 FILE NAME TIME DATE DESIGNED BY ENTERED BY CHECKED BY PROJ. ENGR. REGIONAL ADM.REVISION DATE BY SHEET OF SHEETS Washington State Department of Transportation P.E. STAMP BOX P.E. STAMP BOX DATE DATE LOCATION NO.CONTRACT NO. JOB NUMBER REGION NO. STATE FED.AID PROJ.NO. WASH PLOTTED BY PLAN REF NO mangaha 07/16/2024 14:05:09 c:\users\mangaha\pw_wsdot\d0619428\XL6747_PS_TC_SR167_Sect13.dgn 10 Plot 20 A. EMERSON B. NIELSEN p w : \ \ p r o je c t s t o r e . w s d o t . w a . g o v : W S D O T \D o c u m e n t s \ N o r t h w e s t \ _ P r o j e c t s \ 0 0 0 \ X L 6 7 4 7 _ N W R S o u t h S t r a t e g i c P v m t P r e s \ D e s i g n \ _ C A D \ _ S h e e t s \ X L 6 7 4 7 _ P S _ T C _ S R 1 6 7 _ S e c t 1 3 . d g n A. MANGAHAS N. MENZEL A. MANGAHAS TRAFFIC CONTROL PLAN PAVEMENT REPAIR NOT TO SCALE W20-1 ROAD WORK AHEAD 48" 48" A B C 48" 48" TO STOP PREPARED BE W20-7B 48" 48" W20-7A X X C B A X X X X X 100 ' 48" 48" LEFT LANE CLOSED AHEAD W20-5L 48" 48" W4-2L ED S 3 R D S T S W S U N S E T B L V D S 2 N D S T SR 167 DATA, CHANNELIZATION DEVICE SPACING, AND GENERAL NOTES. 1. SEE SHEET TC2 FOR LEGEND, TAPER LENGTHS, SIGN SPACING, BUFFER NOTES:S 2ND ST LEFT LANE CLOSURE SR 167 & SW SUNSET BLVD/S 3RD ST & SECTION 13 B C C B 13 13 S E E S H E E T T C 1 1 2 M A T C H LI N E TC113 I-5 ET AL. NWR SOUTH 23-25