Loading...
HomeMy WebLinkAboutPN_Construction Mitigation Description_250930_v1AP CONSULTING ENGINEERS PLLC CIVIL ENGINEERING APCE@APConsultingEngineers.com (253) 737-4173 PO Box 162, Auburn, WA 98071 September 30th, 2025 City of Renton Community and Economic Development Department 1055 S. Grady Way Renton, WA 98057 RE: Dulay 102nd Ave SE Subdivision Construction Mitigation Description (APCE Project #2025010) AP Consulting Engineers PLLC is providing the enclosed Construction Mitigation Description. a. Proposed construction dates (begin and end dates): Construction dates are determined by permitting and plan review. Specific dates have not been determined at this time. b. Hours and days of operation: Construction activities are projected to be Monday thru Friday from 7AM to 7PM or dusk. c. Proposed hauling / transportation routes: The logistical route that will have least impacts on residential areas is as followed: 108th Ave SE to SE 192nd Street, right turn on 102nd Ave SE and the project will be on the left-hand side. Please See the include haul route map. d. Any special hours proposed for construction or hauling There are not any expected special hours of hauling or construction at this time. e. Preliminary traffic control plan. Traffic control plans will be provided prior to civil engineering construction permit issuance. This is a premature request at this phase of preliminary plat initial submittal. Please let us know if we can provide you with any additional information to support your review. If you have any questions, we can be reached at (253) 737-4173 or via email at PhilB@APConsultingEngineers.com. Sincerely, AP Consulting Engineers PLLC ***Included: - Haul Route Map Phil Becker Civil Project Engineer AP CONSULTING ENGINEERS PLLC CIVIL ENGINEERING APCE@APConsultingEngineers.com (253) 737-4173 PO Box 162, Auburn, WA 98071 Haul Route Map Commercial vehicles ingress and egress route NON-Commercial vehicles ingress and egress route PROJECT LOCATION