Loading...
HomeMy WebLinkAboutRS_2025_1013_Hyatt_TESC_PlansSD SD SDSD SD SD SD SD SD SD SD SD SD SD SD SDSD SD SD SD SD SD SD SD SD SD SD SD SDSD SD SD SD SD SD SD SD SD SD SD SD SDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD S D S D S D S D S D S D S D S D S D S D S D SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD S D S D SD SD S D SDS D S D S D S D S D S D S D S D S D S D S D S D S D S D S D S D SD SD S D S D EXISTING BUILDING EXISTING BUILDING EXISTING STORMWATER DISCHARGE POINT TYP EXISTING STORMWATER MANHOLE TYP EXISTING STORMWATER CATCH BASIN TYP EXISTING STORMWATER PIPE TYP SEE TESC PLAN SHEET 2 JOB SITE 1053 LAKE WASHINGTON BLVD N RENTON, WA. 98056 0523059075 LOT B JOB SITE SOUTHPORT LLC 0823059216 JOB SITE 1083 LAKE WASHINGTON BLVD N RENTON, WA. 98056 0523059076 DRAINAGE & UTILITY EASEMENT RESERVED FOR THE USE OF LOTS 1, 2, 3 AND 4 PER REC. NO. 20000131900006 LAKE WASHINGTON WORK AREA RE V I S I O N DA T E DE S C R I P T I O N AP P R O V E D B Y : CH E C K E D B Y : DE S I G N E D B Y : IS S U E D A T E : DE S C R I P T I O N : 1234 41 4 N E R A V E N N A B L V D S T E . A # 1 0 5 5 WW W . P A C I F I C S W S . C O M PR E P A R E D F O R : PA C I F I C ST O R M W A T E R HY A T T R E G E N C Y 10 5 3 L A K E W A S H I N G T O N B O U L E V A R D N RE N T O N , W A 9 8 0 5 6 HYATT REGENCY PIER REPLACEMENT SHEET OF NW 1/4, SECTION 8, TOWNSHIP 23N, RANGE 5E Know what's Call below. before you dig. R ER O S I O N A N D S E D I M E N T A T I O N C O N T R O L 10/15/25 1.PROJECT DESCRIPTION CONDUCT ELEVEN (11) PILE SPLICES TO EXISTING FLOAT PIER, PER PLAN. REMOVE EIGHT (8) DERELICT PILES. NO EXCAVATION OR FILL IS PROPOSED. ALL WORK WILL BE PERFORMED FROM UTILITY BARGE (NO WORK WILL BE PERFORMED FROM THE LAND). 2.CONSTRUCTION TECHNIQUE & SEQUENCING A. PRE-FABRICATION SPLICES WILL BE FABRICATED IN THE CONTRACTOR’S SEATTLE YARD AND WILL BE EPOXY COATED. ALL CONSTRUCTION MATERIALS WILL BE LOADED ONTO THE CRANE BARGE IN THE CONTRACTOR’S SEATTLE YARD AND TRANSPORTED TO THE SITE FOR INSTALLATION. B. SITE PREPARATION THIS SITE REQUIRES NO PREPARATION PRIOR TO CONSTRUCTION. C. ONSITE CONSTRUCTION 1) MOBILIZATION OF CRANE AND UTILITY BARGE; 2) REMOVE EIGHT (8) DERELICT PILES; 3) SPLICE ELEVEN (11) INTERNAL FLOAT PILES; -ALL SPLICES WILL BE PREFABRICATED AT CONTRACTOR’S SEATTLE SHOP. -DIVERS WILL INSTALL ALL SPLICES USING HAND TOOLS UNDER THE BUILDING. -SPLICES ARE SECURED WITH ¾ INCH THROUGH BOLTS AND BATTERS WILL BE ATTACHED TO VERTICAL PILES. 4) ALL OLD WOOD PILES WILL BE HAULED OUT AND DISCARDED IN AN APPROVED UPLAND RENEW CONTAINER. D. EQUIPMENT USED ALL CONSTRUCTION EQUIPMENT AND MATERIALS USED IN THIS PROJECT WILL BE STATIONED ON THE CONSTRUCTION BARGE. E. MATERIALS USED METAL WILL BE EPOXY-COATED HDG OR STAINLESS HARDWARE. F. WORK CORRIDOR THE CONSTRUCTION BARGE WILL OPERATE OFFSHORE TO AVOID BOTTOM AND SHORELINE DISTURBANCES THAT COULD OCCUR WITH GROUND-BASED EQUIPMENT. ALL STAGING WILL TAKE PLACE ON THE BARGE. G. STAGING AREA THE BARGE WILL HOLD ALL CONSTRUCTION MATERIALS DURING THE PROJECT AND ALL CONSTRUCTION DEBRIS WILL BE HELD IN A 20 C/Y STEEL DEBRIS CONTAINER THAT IS SECURED ON THE BARGE FOR UPLAND DISPOSAL LATER. H. RUNNING OF EQUIPMENT DURING CONSTRUCTION EQUIPMENT WILL BE RUNNING OFF AND ON DURING THE CONSTRUCTION PHASE, ONLY WHEN REQUIRED, AND ONLY DURING ALLOWED WORK HOURS. I. CLEAN-UP ALL CONSTRUCTION DEBRIS WILL BE REMOVED AND LOADED INTO A 20 C/Y STEEL DEBRIS CONTAINER SECURED ON THE CONSTRUCTION BARGE DURING CONSTRUCTION. DEBRIS IS THEN TRANSPORTED BY BARGE TO THE CONTRACTOR’S SEATTLE YARD, OFF-LOADED, AND SHIPPED TO AN APPROVED UPLAND DISPOSAL SITE. J. PROJECT TIMING ALL PROPOSED CONSTRUCTION WILL TAKE PLACE DURING DAYLIGHT HOURS IN APPROVED WORK WINDOWS UNLESS WORK NEEDS TO BE COORDINATED WITH EVENING HOURS TO FACILITATE CONSTRUCTION IN THE APPROVED WORK WINDOW. K. DURATION OF CONSTRUCTION ON SITE CONSTRUCTION WILL TAKE TWO WEEKS. PROJECT NOTES: SCALE: 1" = 50' 0'50'100' SI T E P L A N ES-11 3 SITE PLAN FLOATING DEBRIS BOOM AND SILT CURTAIN PROJECT EXTENTS NO WORK SHALL BE PERFORMED FROM THE LAND-SIDE ALL WORK TO BE DONE FROM A UTILITY BARGE NO EARTHWORK/DISTURBANCE PROPOSED 171 SQFT RAMP TO REMAIN (NO WORK PROPOSED) 36 SQFT PIER TO REMAIN (NO WORK PROPOSED) THE BRISTOL AT SOUTHPORT I 1083 LAKE WASHINGTON BLVD N RENTON, WA 98056 052305-9076 2166.7 SQFT PIER TO BE REPAIRED W/ (11) PILE SPLICES OHWL 21.85' @ FACE OF BULKHEAD ±520-LF CONC. BULKHEAD TO REMAIN (NO WORK PROPOSED) 36 SQFT PIER TO REMAIN (NO WORK PROPOSED) 156.75 SQFT RAMP TO REMAIN (NO WORK PROPOSED) 400 SQFT FLOAT TO REMAIN (NO WORK PROPOSED) EXISTING 4120 SQFT PIER TO REMAIN (NO WORK PROPOSED) HYATT REGENCY AT SOUTHPORT 1053 LAKE WASHINGTON BLVD N RENTON, WA 98056 052305-9075 1883.44 SQFT FLOATS TO REMAIN (NO WORK PROPOSED) Ø5" FLOTATION Ø1"x6" STEEL PIPE OR CHAIN WEIGHTS FLOATING DEBRIS BOOM CURTAIN Ø1x6" PIPE OR CHAIN WEIGHTS 3.0 O.C. 4.0 O.C. 1.5 FLOATING DEBRIS BOOM PROFILE NTS RE V I S I O N DA T E DE S C R I P T I O N AP P R O V E D B Y : CH E C K E D B Y : DE S I G N E D B Y : IS S U E D A T E : DE S C R I P T I O N : 1234 41 4 N E R A V E N N A B L V D S T E . A # 1 0 5 5 WW W . P A C I F I C S W S . C O M PR E P A R E D F O R : PA C I F I C ST O R M W A T E R HY A T T R E G E N C Y 10 5 3 L A K E W A S H I N G T O N B O U L E V A R D N RE N T O N , W A 9 8 0 5 6 HYATT REGENCY PIER REPLACEMENT SHEET OF NW 1/4, SECTION 8, TOWNSHIP 23N, RANGE 5E Know what's Call below. before you dig. R ER O S I O N A N D S E D I M E N T A T I O N C O N T R O L 10/15/25 SCALE: 1" = 30' 0'30'60' PL A N & P R O F I L E ES-22 3 PLAN VIEW 1"=30' 1.SEE WATERFRONT CONSTRUCTION DOCUMENTS FOR CONSTRUCTION REQUIREMENTS. 2.CONTRACTOR IS SOLELY RESPONSIBLE FOR PREVENTING ANY AND ALL DEBRIS FROM LEAVING THE CONTAINMENT AREA. CONSTRUCTION NOTES: TESC PLAN TESC PROFILE 3 3 RE V I S I O N DA T E DE S C R I P T I O N AP P R O V E D B Y : CH E C K E D B Y : DE S I G N E D B Y : IS S U E D A T E : DE S C R I P T I O N : 1234 41 4 N E R A V E N N A B L V D S T E . A # 1 0 5 5 WW W . P A C I F I C S W S . C O M PR E P A R E D F O R : PA C I F I C ST O R M W A T E R HY A T T R E G E N C Y 10 5 3 L A K E W A S H I N G T O N B O U L E V A R D N RE N T O N , W A 9 8 0 5 6 HYATT REGENCY PIER REPLACEMENT SHEET OF NW 1/4, SECTION 8, TOWNSHIP 23N, RANGE 5E Know what's Call below. before you dig. R ER O S I O N A N D S E D I M E N T A T I O N C O N T R O L NO T E S 10/15/25 ES-31STANDARD EROSION AND SEDIMENTATION CONTROL NOTES RENTON STANDARD PLAN 268.00