Loading...
HomeMy WebLinkAbout2025-10-08 - Lindbergh High School Field Improvements - 25B121-01 - 5200_Compressive Strength of Concrete_000007 (2)Specimen Number Test Age Days Test Date Field / Lab Cure Days Average Cylinder Diameter (in) Cylinder Area (in²) Max Load (lbs) Strength (psi) Fracture Type Break Remark Capping Method 7-1 7 10/15/25 1 / 6 4.00 12.57 47,014 3,740 2 U 7-2 28 11/05/25 1 / 27 3.99 12.50 67,885 5,430 1 CP U 7-3 28 11/05/25 1 / 27 3.99 12.50 70,493 5,640 1 CP U 7-4 28 11/05/25 1 / 27 3.99 12.50 69,511 5,560 2 CP U 7-5 28 11/05/25 1 / 27 3.99 12.50 71,561 5,720 3 CP U Test Age Average Strengths (psi): 7 Day - 3740, 28 Day - 5590 CP: Compressive Strength meets project requirements at design strength age. Tested By: Paul Fuentes (1,2,3,4,5) Checked In : 10/09/2025 (1,2,3,4,5) Capping Methods U: Unbonded Caps (ASTM C1231) Set #:7 Specimen Size:4" X 8" Specimens In Set:5 Truck / Ticket #:1173 / 1257288 Contractor:Needed Construction Technician:Tesfaldet Michael Cast By:Tesfaldet Michael Date Cast:10/08/25 Sampled From:Chute Placement Method:Pump Sample Details Batched:12:26 PDT Sampled:13:10 PDT Cast:13:20 PDT Truck Empty:13:50 PDT Placement Time:84 (min) Placement Location:Building Interior - Foundation Wall Location Details:Site improvement, rail foundation wall Sample Location / Notes:Lowest foundation wall Batch Log Strength:5000 (psi) Specifications Supplier:Miles Plant:202 Sample Condition: Mix Design:1250AFG On-Site Admixtures: None Location Field Measurements Plastic Unit Weight: Air Content:5.0 Load Volume:11.00 (yd³) Weather:Sunny, 67°F Slump (in):5 Air Temperature (F):64 Concrete Temp (F):67 Lab Test Results Testing Lab: Burlington, 777 Chrysler Drive, Burlington, WA, 98233 General Remarks Site improvement, stair rail foundation wall As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval. Page 1 of 1 Client: Renton School District No. 403 Renton, WA 98057 300 SW 7th St Project: Lindbergh High School Field Improvements 25B121-01 (Bldg Permit: B25002218) Renton, WA 98059 16426 128th Avenue Southeast Compressive Strength of Concrete Test Method: ASTM C 39 Sample: 5200 Sample 5200 Report #: CC-000007-01 Burlington 777 Chrysler Drive Burlington, WA 98233 Phone: (360) 755-1990 Report Date: 11/05/2025 15:41