Loading...
HomeMy WebLinkAboutRegular Council Agenda Packet - 15 Apr 2013 - PdfAGENDA RENTON CITY COUNCIL REGULAR MEETING April 15, 2013 Monday, 7 p.m. 1.CALL TO ORDER AND PLEDGE OF ALLEGIANCE 2.ROLL CALL 3.PROCLAMATION a. Week of the Young Child - April 15 to 19, 2013 4.ADMINISTRATIVE REPORT 5.AUDIENCE COMMENT (Speakers must sign up prior to the Council meeting. Each speaker is allowed five minutes. The first comment period is limited to one-half hour. The second comment period later on in the agenda is unlimited in duration.) When you are recognized by the Presiding Officer, please walk to the podium and state your name and city of residence for the record, SPELLING YOUR LAST NAME. NOTICE to all participants: pursuant to state law, RCW 42.17A.555, campaigning for any ballot measure or candidate in City Hall and/or during any portion of the council meeting, including the audience comment portion of the meeting, is PROHIBITED. 6.CONSENT AGENDA The following items are distributed to Councilmembers in advance for study and review, and the recommended actions will be accepted in a single motion. Any item may be removed for further discussion if requested by a Councilmember. a. Approval of Council meeting minutes of 4/8/2013. Council concur. b. City Clerk reports bid opening on 4/2/2013 for CAG-13-037, Emergency Power for the Corrision Control and Treatment Facility (CCTF) 2013 project; six bids; engineer's estimate $124,859.02; and submits staff recommendation to award the contract to the low bidder, High Mountain Electric, Inc., in the amount of $131,838. Council concur. c. City Clerk reports bid opening on 4/9/2013 for CAG-13-044, President Park Water Main Replacement project, eight bids; engineer's estimate $925,767.75; and submits staff recommendation to award the contract to the low bidder, J.R. Rodarte Construction, Inc., in the amount of $733,003.95. Council concur. d. City Clerk reports bid opening on 4/9/2013 for CAG-13-045, East Renton Lift Station Elimination project; 11 bids; engineer's estimate $482,993.55; and submits staff recommendation to award the contract to the low bidder, Hoffman Construction, Inc., in the amount of $275,468.06. Council concur. e. City Clerk submits quarterly contract list for period 1/1/2013 through 3/31/2013, and expiration report for agreements expiring 4/1/2013 to 9/30/2013. Information. Page 1 of 47 f. Community and Economic Development Department requests authorization to replace a vacant half-time Permit Technician position (grade a10) with a new full-time Permit Technician position (grade a10), with salary adustment to be made through existing salary savings. Council concur. g. Community Services Department reports receipt of four 2013 Neighborhood Grant Program - Newsletter/Communication applications and recommends funding three projects totaling $5,347. Refer to Finance Committee. h. Transportation Systems Division recommends approval of Amendment #2 to LAG-11-003, with Rainier Flight Services, to extend the term to 3/31/2015 and increase the rate in the amount of $348 annually. Refer to Transportation (Aviation) Committee. 7.UNFINISHED BUSINESS Topics listed below were discussed in Council committees during the past week. Those topics marked with an asterisk (*) may include legislation. Committee reports on any topics may be held by the Chair if further review is necessary. a. Finance Committee: Vouchers; Youth Education & Safety Fair Fee Waiver Request; 2013 Carry- forward Budget Amendment* 8.RESOLUTIONS AND ORDINANCES Ordinance for first reading: a. 2013 Carry-forward budget amendment (See 7.a.) 9.NEW BUSINESS (Includes Council Committee agenda topics; call 425-430-6512 for recorded information.) 10.AUDIENCE COMMENT 11.EXECUTIVE SESSION - Labor Negotiations (RCW 42.30.140.4.a.) 30 minutes 12.ADJOURNMENT COMMITTEE OF THE WHOLE AGENDA (Preceding Council Meeting) COUNCIL CHAMBERS April 15, 2013 Monday, 5:30 p.m. Cedar River Library Schematic Design Emerging Issues • Hearing assistance devices for use in the Council Chambers are available upon request to the City Clerk • CITY COUNCIL MEETINGS ARE TELEVISED LIVE ON GOVERNMENT ACCESS CHANNEL 21 AND ARE RECABLECAST: Tues. & Thurs. at 11 AM & 9 PM, Wed. & Fri at 9 AM & 7 PM and Sat. & Sun. at 1 PM & 9 PM Page 2 of 47 3a. - Week of the Young Child - April 15 to 19, 2013 Page 3 of 47 CITY OF RENTON COUNCIL AGENDA BILL Subject/Title: Award of Bid Opening on 4/2/2013 for CAG-13- 037, Emergency Power for CCTF 2013 Project Meeting: Regular Council - 15 Apr 2013 Exhibits: Staff Recommendation Bid Tab (six bids) Submitting Data: Dept/Div/Board: City Clerk Staff Contact: Bonnie Walton, City Clerk, ext. 6502 Recommended Action: Council Concur Fiscal Impact: Expenditure Required: $ $131,838 Transfer Amendment: $ Amount Budgeted: $ Revenue Generated: $ Total Project Budget: $ 210,000 City Share Total Project: $ SUMMARY OF ACTION: Engineer's Estimate: $124,859.02 In accordance with Council procedure, bids submitted at the subject bid opening met the following three criteria: There was more than one bid, there were no irregularities with the low bid, and the low bid was within total project budget. Therefore, staff recommends accepting the low bid from High Mountain Electrical, Inc. in the amount of $131,838.00. STAFF RECOMMENDATION: Accept the low bid from High Mountain Electric, Inc. in the amount of $131,838 for the Emergency Power for CCTF 2013 project. 6b. - City Clerk reports bid opening on 4/2/2013 for CAG-13-037, Emergency Page 4 of 47 6b. - City Clerk reports bid opening on 4/2/2013 for CAG-13-037, Emergency Page 5 of 47 6b. - City Clerk reports bid opening on 4/2/2013 for CAG-13-037, Emergency Page 6 of 47 6b. - City Clerk reports bid opening on 4/2/2013 for CAG-13-037, Emergency Page 7 of 47 CITY OF RENTON COUNCIL AGENDA BILL Subject/Title: Award of Bid Opening on 4/9/2013 for CAG-13- 044, President Park Water Main Replacement Meeting: Regular Council - 15 Apr 2013 Exhibits: Staff Recommendation Bid Tab (eight bids) Submitting Data: Dept/Div/Board: City Clerk Staff Contact: Bonnie Walton, City Clerk, ext. 6502 Recommended Action: Council Concur Fiscal Impact: Expenditure Required: $ 733,003.95 Transfer Amendment: $ Amount Budgeted: $ Revenue Generated: $ Total Project Budget: $ 1,000,000 City Share Total Project: $ SUMMARY OF ACTION: Engineer's Estimate: $925,767.75 In accordance with Council procedure, bids submitted at the subject bid opening met the following three criteria: There was more than one bid, the low bid had no significant irregularities, and the low bid was within total project budget. Therefore, staff recommends accepting the low bid from J.R. Rodarte Construction, Inc. in the amount of $733,003.95. STAFF RECOMMENDATION: Accept the low bid from J.R. Rodarte Construction, Inc. in the amount of $733,003.95 for the President Park Water Main Replacement project. 6c. - City Clerk reports bid opening on 4/9/2013 for CAG-13-044, President Park Page 8 of 47 6c. - City Clerk reports bid opening on 4/9/2013 for CAG-13-044, President Park Page 9 of 47 6c. - City Clerk reports bid opening on 4/9/2013 for CAG-13-044, President Park Page 10 of 47 6c. - City Clerk reports bid opening on 4/9/2013 for CAG-13-044, President Park Page 11 of 47 6c. - City Clerk reports bid opening on 4/9/2013 for CAG-13-044, President Park Page 12 of 47 CITY OF RENTON COUNCIL AGENDA BILL Subject/Title: Award of Bid Opening on 4/9/2013 for CAG-13- 045; East Renton Lift Station Elimination Meeting: Regular Council - 15 Apr 2013 Exhibits: Staff Recommendation Bid Tab (11 bids) Submitting Data: Dept/Div/Board: City Clerk Staff Contact: Bonnie Walton, City Clerk, ext. 6502 Recommended Action: Council Concur Fiscal Impact: Expenditure Required: $ 275,468.06 Transfer Amendment: $ Amount Budgeted: $ Revenue Generated: $ Total Project Budget: $ 625,000 City Share Total Project: $ SUMMARY OF ACTION: Engineer's Estimate: $482,993.55 In accordance with Council procedure, bids submitted at the subject bid opening met the following three criteria: There was more than one bid, there were no irregularities with the low bid, and the low bid was within project budget. Therefore, staff recommends accepting the low bid from Hoffman Construction, Inc. in the amount of $275,468.06 STAFF RECOMMENDATION: Accept the low bid submitted by Hoffman Construction, Inc. in the amount of $275,468.06 for the East Renton Lift Station Elimination project. 6d. - City Clerk reports bid opening on 4/9/2013 for CAG-13-045, East Renton Page 13 of 47 6d. - City Clerk reports bid opening on 4/9/2013 for CAG-13-045, East Renton Page 14 of 47 6d. - City Clerk reports bid opening on 4/9/2013 for CAG-13-045, East Renton Page 15 of 47 6d. - City Clerk reports bid opening on 4/9/2013 for CAG-13-045, East Renton Page 16 of 47 6d. - City Clerk reports bid opening on 4/9/2013 for CAG-13-045, East Renton Page 17 of 47 6d. - City Clerk reports bid opening on 4/9/2013 for CAG-13-045, East Renton Page 18 of 47 6d. - City Clerk reports bid opening on 4/9/2013 for CAG-13-045, East Renton Page 19 of 47 CITY OF RENTON COUNCIL AGENDA BILL Subject/Title: City of Renton Contract Lists: 1st Quarter 2013 Report Six-month Expiration Report Meeting: Regular Council - 15 Apr 2013 Exhibits: List of contracts fully executed from January 1, 2013 through March 31, 2013; List of contracts expiring between April 1, 2013 and September 30, 2013. Submitting Data: Dept/Div/Board: City Clerk Staff Contact: Bonnie I. Walton, City Clerk Recommended Action: None Information only Fiscal Impact: Expenditure Required: $ N/A Transfer Amendment: $N/A Amount Budgeted: $ N/A Revenue Generated: $N/A Total Project Budget: $ N/A City Share Total Project: $ N/A SUMMARY OF ACTION: Fully executed in 1st quarter 2013 were 39 contracts, 12 addendums, 20 change orders, and 3 leases affecting 74 agreements. The six-month expiration report shows 33 agreements that will expire between April 1, 2013 and September 30, 2013. STAFF RECOMMENDATION: None Information only 6e. - City Clerk submits quarterly contract list for period 1/1/2013 through Page 20 of 47 Contracts Fully Executed Between 01/01/2013 and 03/31/2013 CONTRACT Number CAG-10-156 Addendum Number Fully Executed Contractor 03/08/2013 013391 - CANBER CORPS Description Division Canber Corporation - Landscape maintenance CS for 33 sites ($80,568.81 per year - $161,137.62 total contract) Correction Addenda is attached true contract amount with Adden #1 & CO #1 is $220,394.84. Expiration 12/31/2012 4/9/2013 Original Current Contract Contract Amount $80,569 Amount Class $534,157 P CAG-11-031 03/12/2013 014385-CAYCE & GROVE PS Cayce & Grove, LLC - Indigent Defense Services -Public Defense Contract. NEW adden extended contract until Expiration on 12/31/2013 AJLS 12/31/2013 $369,224 $738,448 P CAG-11-174 01/10/2013 046646 - MAKERS ARCHITECTURE & Makers Architecture & Urban Design - EDNSP Consultant agreement to Develop a community plan for the Benson Hill Area - $79,030.00 12/31/2012 $79,030 $79,030 P CAG-11-133 03/08/2013 031899 - GUY F ATKINSON CONSTRUCTION Guy F. Atkinson Construction, LLC. - Strander PBPW Boulevard/SW 27th Street Extension - Phase 1, Segment 2A 12/31/2017 $11,381,159 $11,840,057 P CAG-12-006 02/28/2013 091850 -WIDENER& ASSOCIATES Widener & Associates - Environmental Consultant - Maintenance Dredging & Shoreline Mitigation Project. $34,930.00 PBPW 02/01/2013 $34,930 $34,930 P CAG-12-008 02/28/2013 016463 - COAST & HARBOR ENGINEERING INC Coast & Harbor Engineering, Inc. - Consultant PBPW design service for Maintenance dredging & Shoreline mitigation project 02/28/2013 $99,527 $99,527 P CAG-12-018 02/22/2013 083660 - URS CORP URS Corporation - On-Call Architectural & Engineering Services PBPW 12/31/2012 172,600 $172,600 P CAG-11-192 03/13/2013 039317 - JOHANSEN EXCAVATING INC Johansen Excavating, Inc - Public Works PBPW project - Rainier Av S (SR 167) S Grady Way to S 2nd Street ($16,032,772.44) - This is a 2011 contract that was signed in 2012. 12/31/2014 $16,032,772 $16,784,303 P \\RVAPP02\EdenReports\reports\sitespec\renton\reports\cmBrianHilderman1 .rpt Page 1 of 7 6e . - C i t y C l e r k s u b m i t s q u a r t e r l y c o n t r a c t li s t f o r p e r i o d 1 / 1 / 2 0 1 3 t h r o u g h Pa g e 2 1 o f 4 7 CONTRACT Addendum „ L L Number Number Fully Executed Contractor CAG-12-038 Description 01/22/2013 066451 - REID MIDDLETON INC Reid Middleton Inc - Airport Taxiway Bravo PBPW Rehabilitation Division Expiration 12/31/2012 Original Contract Amount Current Contract Amount Class $415,297 $674,773 P CAG-12-021 02/25/2013 036552 - ICON MATERIALS INC ICON Materials - South Lake Washington PBPW Roadway Improvements (Garden AV Widening) 12/31/2013 $1,968,691 $2,014,017 P CAG-12-086 01/11/2013 022723 - EA ENGINEERING EA/Blumen Consulting Group, inc - Quendall Terminals EIS Addendum. $39,765.00 - Expires: 3/31/2013 EDNSP 03/31/2013 $39,765 4,590 P CAG-12-089 03/08/2013 070474 - SANDERS GENERAL CONSTRUCTION Sanders General Construction, LLC - NE 3rd & PBPW NE 4th Corridor Improvements - (NE4th Street / Whitman Av NE) Phase 1 Intersection Improvements (TIB 8-1-102(033)-1) $2,129,217.63 12/31/2013 $2,129,218 $2,221,058 P CAG-12-106 02/14/2013 037360 - INSITUFORM TECHNOLOGIES INC Insituform Technologies - Sanitary Sewer Rehabilitation 2012 & Lake Washington Blvd Pipe Rehabilitation (247,327.03) PBPW 12/31/2013 $247,327 $302,795 P CAG-12-126 01/29/2013 069020 - RODARTE CONSTRUCTION INC Rodarte Construction, Inc. - Stevens Av NW & PBPW Lind Av NW Strom System Improvement Project 12/31/2013 $189,765 $189,765 P CAG-12-143 01/03/2013 053120-NATIVE GREEN LANDSCAPES Native Green Landscapes - Plant native trees CS & shrubs- Removing existing invasive plants while protecting May Creek Trail and existing trees & plants to remain. Install a soft surface trail, temporary irrigation & plant native trees, shrubs & mulch. 03/01/2013 $152,506 $181,535 P CAG-12-166 01/29/2013 011141 - BOYD & ASSOCIATES INC Boyd & Associates - Property boundary surveying services of Tiffany-Cascade Connector CS 04/01/2013 $10,300 12,300 P CAG-13-001 01/07/2013 066950 - RENTON CHAMBER OF, COMMERCE Renton Chamber of Commerce - Renton Visitor's Connection EDNSP 12/31/2013 $120,000 $120,000 P \\RVAPP02\EdenReports\reports\sitespec\renton\reports\cmBrianHilderman1 .rpt Page 2 of 7 6e . - C i t y C l e r k s u b m i t s q u a r t e r l y c o n t r a c t li s t f o r p e r i o d 1 / 1 / 2 0 1 3 t h r o u g h Pa g e 2 2 o f 4 7 CONTRACT Addendum Number Number Fully Executed Contractor Description Division Expiration Original Contract Amount Current Contract Amount Class CAG-13-002 01/07/2013 005237 - APS SURVEY < MAPPING LLC APS Survey & Mapping - Storm System Field PBPW Mapping - NPDES Permit Project 08/31/2013 $98,286 $98,286 P CAG-13-003 01/11/2013 056071 - NORTHERN PACIFIC CONSTRUCTION Northern Pacific Construction, Design & Development, LLC. - PW Shops Building D Remodel CS 12/31/2013 $94,522 4,522 P CAG-13-005 01/10/2013 058565-OTAK INC Technical Assistance Related to wetlands and/or streams EDNSP 12/31/2013 $15,000 15,000 P CAG-12-159 01/14/2013 068487 - R L ALIA COMPANY R. L. Alias Company - Wells PW-8, PW-9, EW-3 Primary Disinfection Project PBPW 12/31/2013 $874,890 $874,890 P CAG-13-007 01/14/2013 069671 - ROTH HILL LLC Roth Hill Engineering - Consultant for PBPW engineering and survey services for S 132nd Sewer Extension project. 03/31/2014 $31,300 $31,300 P CAG-13-010 01/16/2013 Renton Rowing Club - MOA for a contract for CS rowing for members on the Cedar River 02/01/2014 $0 $0 M CAG-13-011 01/17/2013 024363 - EPICENTER SERVICES LLC Epicenter Services, Inc - Consultant to assist PBPW with solid waste issues including Code review & revisions, Republic Franchise implementations, direct disposal payments. 12/31/2013 $14,500 $14,500 P CAG-13-014 01/17/2013 All Around Fencing Company - Perimeter Security Fencing Upgrade - Apron B. $34,564.77 - Exp: 2/28/2013 PBPW 02/28/2013 $34,565 $34,565 P CAG-13-006 01/25/2013 1067-KING COUNTY Seattle-KC Dept of Public Health - 2013 Local PBPW Hazardous Waste Management Program Grant ($33,849.61 rev) 12/31/2013 $33,850 $33,850 R \\RVAPP02\EdenReports\reports\sitespec\renton\reports\cmBrianHilderman1.rpt Page 3 of 7 6e . - C i t y C l e r k s u b m i t s q u a r t e r l y c o n t r a c t li s t f o r p e r i o d 1 / 1 / 2 0 1 3 t h r o u g h Pa g e 2 3 o f 4 7 CONTRACT Number CAG-13-012 Addendum IMumber Fully Executed 01/24/2013 Contractor 058621 - OUTCOMES BY LEVY LLC Description Division Outcomes by Levy - State Legislative AJLS Consultant Services. $55,800.00 - Expiration 12/31/2013 Expiration 12/31/2013 Original Contract Amount $55,800 Current Contract Amount Glass $55,800 P CAG-13-016 01/26/2013 058118 - ORB ORGANIZATION INC O.R.B. Architects - Henry Moses Aquatic CS Center water feature replacement. 12/31/2013 $12,204 $12,204 P CAG-13-021 01/31/2013 012960-CH2M HILL INC CH2M Hill - Sunset Terrace Regional PBPW Stormwater Facility (SWP 27-5292) $179,003 - Exp: 6/30/2015 06/30/2015 $179,003 $179,003 P CAG-13-009 02/06/2013 1067 - KING COUNTY KC Flood Control District - Cedar River Gravel PBPW Removal Project Grant (Rev: $5,313,000) 03/31/2016 $5,313,000 $5,313,000 R CAG-13-020 02/05/2013 S. 7th St @ Shattuck Av S Intersection Improvements $585,230. PBPW 12/31/2017 $585,230 $585,230 R CAG-13-023 02/05/2013 012960 - CH2M HILL INC CH2MHili Engineers, Inc. - Sunset Community PBPW Plan SSIP - Harrington Avenue NE Green Project 06/30/2015 $212,704 $212,704 p CAG-13-018 02/16/2013 WSDOT - Logan Av N Roadway PBPW Improvements, STP Funds for Design (rev. $951,000.00) 12/31/2016 $951,000 $951,000 R CAG-13-024 03/04/2013 012525- BUSH, ROED & HITCHING INC Bush, Roed & Hitchings - Surveying Services PBPW for Water Main Replacement Program 03/31/2014 . $80,747 $80,747 P CAG-13-025 02/14/2013 Comcast - Conduit Use Agreement for Carco AJLS Theatre 12/31/2017 $0 $0 M \\RVAPP02\EdenReports\reports\sitespec\renton\reports\cmBrianHilderman1 .rpt Page 4 of 7 6e . - C i t y C l e r k s u b m i t s q u a r t e r l y c o n t r a c t li s t f o r p e r i o d 1 / 1 / 2 0 1 3 t h r o u g h Pa g e 2 4 o f 4 7 CONTRACT Addendum Number Number Fully Executed CAG-13-026 02/14/2013 Contractor 024312 - ENRICHED DESIGNS INC Description Enriched Design, Inc., aka EDI - Regis Storage Facility Restoration/Vandalism Division Expiration CS 05/31/2013 Original Contract Amount Current Contract Amount Class $30,928 $30,928 P CAG-13-038 02/22/2013 Seattle International Film Festival (SIFF) - AJLS MOU identifying the roles and responsibility of each party - Renton Community Marketing Campaign 06/01/2013 $o M CAG-13-019 02/26/2013 WSDOT - S 7th Street at Shattuck Av S PBPW Intersection Improvement CMAQ Grant (rev: $500,000) 12/31/2016 $500,000 $500,000 R CAG-13-027 02/27/2013 WHPacific, Inc. - 820 Demo Building Project. PBPW $49,984.00 09/19/2013 $49,984 $49,984 p CAG-13-028 02/27/2013 009510 - BHC CONSULTANTS LLC BHC Consultants, LLC. - NE 10th and PBPW Anacortes Av NE Detention Pone Retrofit Proj 12/31/2014 $54,232 $54,232 P CAG-13-031 02/28/2013 Coal Creek Utility District - Emergency sale of PBPW water (50 years) 12/31/2063 $0 $0 M CAG-13-034 02/28/2013 Comcast - relocation of existing Comcast PBPW facilities 12/31/2033 $28,380 $28,380 R CAG-13-029 03/04/2013 King County Metro Transit - ORCA Business PBPW Passport Interlocal Agreement 02/28/2014 $79,886 $79,886 p CAG-13-030 03/08/2013 Wa DNR - Urban Forestry Restoration Project CS Grant - Free Labor 06/30/2013 $0 M \\RVAPP02\EdenReports\reports\sitespec\renton\reports\cmBrianHiiderman1.rpt Page 5 of 7 6e . - C i t y C l e r k s u b m i t s q u a r t e r l y c o n t r a c t li s t f o r p e r i o d 1 / 1 / 2 0 1 3 t h r o u g h Pa g e 2 5 o f 4 7 CONTRACT Number CAG-13-032 Addendum Number Fully Executed Contractor 03/05/2013 041648 - KING COUNTY Description Division KC Dept of Transportation - Van Donation Zone Fire 3 Explorers Program Expiration 12/31/2999 Original Contract Amount $0 Current Contract Amount Class $0 M CAG-13-036 03/07/2013 013783 - CAROLLO ENGINEERS PC Carollo Engineers, Inc - Water System Rezone PBPW Study to optimize City water system 12/31/2013 $136,003 $136,003 P CAG-13-039 03/08/2013 Green Effects, Inc. - Landscape Maintenance PBPW Service contract 12/31/2014 $8,000 $8,000 p CAG-13-033 03/12/2013 Valley Medical Center dba Occupational Health Fire Services - Wellness Examinations for Firefighters 12/31/2015 $63,000 $63,000 P CAG-13-035 03/13/2013 Kent Fire Department Regional Fire Authority- Fire Isuzu Truck donation to Zone 3 Rention Fire Dept Explorers' Program 12/31/2999 $0 M CAG-13-041 03/12/2013 009510-BHC CONSULTANTS LLC BHC Consultants, LLC - Engineering Consultant agreement re: Sewer System Maintenance Access Road Improvements Projects PBPW 06/30/2014 $94,474 $94,474 P CAG-13-043 03/12/2013 061767 - PIAZZA RENTON Piazza Renton - Downtown Events in the Piazza EDNSP 12/31/2014 $0 $0 M CAG-13-047 03/13/2013 Davidson Fixed Income Management, Inc. Investment Portfolio Evaluation FIS 06/15/2013 $5,000 $5,000 P CAG-13-048 03/18/2013 042740 - KOLKE CONSULTING GROUP INC Koike Consulting Group, Inc. - Structural & Non-structural Plan Review EDNSP 12/31/2013 $20,000 $20,000 P \\RVAPP02\EdenReports\reports\sitespec\renton\reports\cmBrianHilderman1 .rpt Page 6 of 7 6e . - C i t y C l e r k s u b m i t s q u a r t e r l y c o n t r a c t li s t f o r p e r i o d 1 / 1 / 2 0 1 3 t h r o u g h Pa g e 2 6 o f 4 7 CONTRACT Number CAG-13-051 Addendum Number Fully Executed 03/25/2013 Contractor Description Division Expiration Axis Survey & Mapping - Topographic survey of CS 07/01/2013 the Rention Senior Activity Center Original Contract Amount $9,680 Current Contract Amount Class $9,680 P CAG-13-052 03/27/2013 Renton Technical College - Sponsorship for the CS 09/30/2013 $2,000 $2,000 R Renton Tuesday Farmers Market Community Booth part of 2013 Budget for Farmers Market ($2,000 rev) CAG-13-008 11/08/2013 069671 - ROTH HILL LLC Roth Hill, LLC - Consultant engineering and PBPW 06/30/2014 $63,200 $80,200 p survey services for 2013 Sewer Rehabilitation Project - Tiffany Park P = Payables $202,509,861 R = Receivables $7,413,460 ' Fully Executed Contracts This Period: 72 M = Misc $0 \\RVAPP02\EdenReports\reports\sitespeo\renton\reports\cmBrianHilderman1.rpt \\RVAPP02\EdenReports\reports\sitespec\renton\reports\cmBrianHilderman1 .rpt Page 7 of 7 6e . - C i t y C l e r k s u b m i t s q u a r t e r l y c o n t r a c t li s t f o r p e r i o d 1 / 1 / 2 0 1 3 t h r o u g h Pa g e 2 7 o f 4 7 Contracts Expiring Between 04/01/2013 and 09/30/2013 4/9/2013 CONTRACT Number CAG-08-050 Addendum Number Fully Executed 04/15/2008 Contractor 1340 - WASHINGTON STATE Division WA Transportation - Ripley Lane North Storm PBPW System Improvement Project Expiration 04/14/2013 Original Current Contract Contract Amount Amount Class $678,223 $678,223 R CAG-12-057 04/12/2012 Karen's Foot Care - Foot care service provided CS at Senior Center rev: $600.00 04/23/2013 $600 $600 R CAG-12-131 09/17/2012 091707 - WHITNEY EQUIPMENT CO INC Whitney Equipment Co, Inc. - Oakesdale PBPW underpass pumps for the Pump Station Repair Project. 04/30/2013 5,401 5,401 P CAG-11-094 05/06/2011 023171 - TYLER TECHNOLOGIES Permitting, inspection & licensing software to FIS INC replace Permits Plus (current software system) ($582,148.00- 1st year) 05/05/2013 $582,148 148 p CAG-11-044 CO #2-12 05/26/2011 068487 - R L ALIA COMPANY R.L. Alia Company - Benson Rd 16' Water Main Replacement Project - $591,738 EXP: 5/30/2013 PBPW 05/30/2013 $591,738 $628,027 P CAG-12-112 08/17/2012 1067 -KING COUNTY King County - Joint agreement with King County & Human Services for Community Development block Grant Funds. $284,530 rev CS 05/31/2013 $284,530 $284,530 R CAG-13-026 02/14/2013 024312 - ENRICHED DESIGNS INC Enriched Design, Inc., aka EDI - Regis Storage Facility Restoration/Vandalism CS 05/31/2013 $30,928 $30,928 P CAG-13-038 02/22/2013 Seattle International Film Festival (SIFF) - AJLS MOU identifying the roles and responsibility of each party - Renton Community Marketing Campaign 06/01/2013 $0 M CAG-13-047 03/13/2013 Davidson Fixed Income Management, Inc. Investment Portfolio Evaluation FIS 06/15/2013 $5,000 $5,000 P CAG-11-163 08/16/2011 400032 - WA TRAFFIC SAFETY COMMISSION MOU - Overtime funding for LEAs to conduct Police Drug Recognition Experts (DRE) services and participate in emphasis patrols 06/30/2013 $0 M \\RVAPP02\EdenReports\reports\sitespec\renton\reports\cmBrianHilderman0.rpt Page 1 of 4 6e . - C i t y C l e r k s u b m i t s q u a r t e r l y c o n t r a c t li s t f o r p e r i o d 1 / 1 / 2 0 1 3 t h r o u g h Pa g e 2 8 o f 4 7 CONTRACT Number Addendum Number Fully Executed Contractor Division Expiration Original Contract Amount Current Contract Amount Class CAG-11-172 09/26/2011 1340 - WASHINGTON STATE Wa Transportation (WSDOT) - Monitor CTR • Affected worksites for progress and compliance in the City of Renton (7/1/2011 - 6/30/2013) Rev: $81,272 for 2 years. PBPW 06/30/2013 ,272 $81,272 R CAG-12-048 03/30/2012 012960-CH2M HILL INC CH2M Hill - Sunset Community Stormwater Retrofit/LID Prelim Design Project - Data collection on subsurface conditions & soil. PBPW 06/30/2013 $86,824 i,824 P CAG-12-090 06/11/2012 060581 - INTEGRATED AQUATICS Integrated Aquatics - Consultant contract for PBPW Cedar River Monitoring. $38,266.51 - Expires: 6/30/2013 06/30/2013 $38,267 S.267 P CAG-12-118 07/24/2012 King County Sherrifs Office - KC Sex Offender Police Cost Reimbursement Agreement ($48,302.03 rev) 06/30/2013 $48,302 $48,302 R CAG-12-146 10/18/2012 Washington Traffic Safety Commission - MOU Police to provide funding for KC LEA's to participate in Target Zero Teams (Rev: 16,320.00) 06/30/2013 $16,320 $16,320 R CAG-13-030 03/08/2013 Wa DNR - Urban Forestry Restoration Project CS Grant - Free Labor 06/30/2013 $0 $0 M CAG-13-051 03/25/2013 Axis Survey & Mapping - Topographic survey of CS the Rention Senior Activity Center 07/01/2013 $9,680 CAG-93-055 Adden #1-07 06/07/1993 089191 - WAST DEPT OF COMMUNITY, TRADE Public Works Trust Fund loan - Install East Renton Sanitary Sewer Interceptor PBPW 07/01/2013 CAG-93-056 Adden #1-07 06/07/1993 089191 - WAST DEPT OF COMMUNITY, TRADE Wa Community, Trade & Economic Development Trust Fund Loan - Central Renton Subbasin PBPW 07/01/2013 $0 M CAG-12-110 07/20/2012 056490 - NW HYDRAULIC CONSULTANTS INC Northwest Hydraulic Consultants, Inc. - 2012 PBPW Cedar River Sediment Survey Project 07/28/2013 $26,961 $26,961 P \\RVAPP02\EdenReports\reports\sitespec\renton\reports\cmBrianHilderman0.rpt Page 2 of 4 6e . - C i t y C l e r k s u b m i t s q u a r t e r l y c o n t r a c t li s t f o r p e r i o d 1 / 1 / 2 0 1 3 t h r o u g h Pa g e 2 9 o f 4 7 CONTRACT Number CAG-12-025 Addendum Number Fully Executed Contractor Division 02/16/2012 068180 - RH2 ENGINEERING INC RH2 Engineering, Inc. - Consultant Contract for PBPW engineering services for Liberty High School sewer lift station Expiration 07/31/2013 Original Contract Amount $69,970 Current Contract Amount Class $69,970 p CAG-12-102 07/17/2012 012525- BUSH, ROED & HITCHING INC Bush Roed & Hitchings, Inc. - Surveying services for base maps for 2012 President Park Water Main Replacement Project. $31,648.57 PBPW 07/31/2013 $31,649 $31,649 P CAG-12-020 02/09/2012 031906 - HDR ENGINEERING INC HDR Engineering, Inc. - Design of access PBPW platforms, tie off points & mitigation for H2 gas generation - Maplewood WTP equipment access & Improvements 08/01/2013 $27,001 $27,001 P CAG-13-066 04/02/2013 PACE Engineers, Inc. - Topographic survey of CS a portion of Gene Coulon Memorial Beach Park. $12,200.00 08/01/2013 $12,200 $12,200 P CAG-10-092 07/12/2010 Seattle Public Utilities - Memorandum of Agreement - Cedar River Access Facility & Broodstock collection facility on city properties CS 08/21/2013 $0 M CAG-10-132 09/30/2010 031907-HABITAT FOR HUMANITY Habitat for Humanity of East King County - Housing Opportunity Fund (HOF) Agreement for La Fortuna Phase I home ownership project (grant: $75,000) EDNSP 08/31/2013 CAG-13-002 01/07/2013 005237 - APS SURVEY & MAPPING LLC APS Survey & Mapping - Storm System Field PBPW Mapping - NPDES Permit Project 08/31/2013 $98,286 1,286 P CAG-13-027 02/27/2013 WHPacific, Inc. - 820 Demo Building Project. PBPW $49,984.00 09/19/2013 $49,984 $49,984 P CAG-10-170 10/04/2010 3136 - DEPTARTMENT OF JUS Department of Justice - Grant for the Domestic Police Violence Advocacy assistance program & the AED's (rev: $42,164) 09/30/2013 $42,164 $42,164 R CAG-11-020 02/02/2011 009244 - BENSON SHAW Benson Shaw - Public artist for Rainier Av Improvements Project EDNSP 09/30/2013 $50,000 $50,000 P \\RVAPP02\EdenReports\reports\sitespec\renton\reports\cmBrianHilderman0.rpt Page 3 of 4 6e . - C i t y C l e r k s u b m i t s q u a r t e r l y c o n t r a c t li s t f o r p e r i o d 1 / 1 / 2 0 1 3 t h r o u g h Pa g e 3 0 o f 4 7 CONTRACT Number CAG-12-169 Addendum Number Fully Executed 12/12/2012 Contractor 068180 - RH2 ENGINEERING INC RH2 Engineering, Inc - Maplewood and Downtown Well Aquifer Monitoring (WTR-13-0121). $22,131.38 Division PBPW Expiration 09/30/2013 Original Contract Amount $22,131 Current Contract Amount Class $22,131 p CAG-13-052 03/27/2013 Renton Technical College - Sponsorship for the CS Renton Tuesday Farmers Market Community Booth part of 2013 Budget for Farmers Market ($2,000 rev) 09/30/2013 $2,000 $2,000 R P = Payables $2,463,484 R = Receivables $1,153,411 Expiring Contracts This Period: 33 M = Misc $0 \\RVAPP02\EdenReports\reports\sitespec\renton\reports\cmBrianHilderman0.rpt \\RVAPP02\EdenReports\reports\sitespec\renton\reports\cmBrianHilderman0.rpt Page 4 of 4 6e . - C i t y C l e r k s u b m i t s q u a r t e r l y c o n t r a c t li s t f o r p e r i o d 1 / 1 / 2 0 1 3 t h r o u g h Pa g e 3 1 o f 4 7 CITY OF RENTON COUNCIL AGENDA BILL Subject/Title: Request for Permit Technician Position Revision Meeting: Regular Council - 15 Apr 2013 Exhibits: Issue Paper Submitting Data: Dept/Div/Board: Community and Economic Development Staff Contact: Neil Watts, Development Service Director (x7218) Recommended Action: Council Concur Fiscal Impact: Expenditure Required: $ 90,610 Transfer Amendment: $ Amount Budgeted: $ 46,406 Revenue Generated: $ Total Project Budget: $ City Share Total Project: $ SUMMARY OF ACTION: The budget and staffing for the Building Section currently includes a half time Permit Technician position. This half time position will be vacated on April 16, 2013, with the employee moving to another position in the City. The increasing work demands for the permit counter justify an increase in staffing levels. The increasing work demands include increased permitting activities, support work on the new permitting system to expand online permit capabilities, and work to support implementation of electronic plan review options for our customers. We are therefore requesting replacing the half time position with a permanent full time Permit Technician position. There is a difference of $44,000 between the expenditure required and the amount budgeted. This difference will come from existing salary savings and will be monitored throughout 2013 and 2014. STAFF RECOMMENDATION: Approve replacing a vacant half time position with a new full time Permit Technician position. 6f. - Community and Economic Development Department requests Page 32 of 47 DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE:April 10, 2013 TO:Randy Corman, Council President Members of the Renton City Council VIA:Denis Law, Mayor FROM:C.E. “Chip” Vincent, CED Administrator/Planning Director (x 6588) STAFF CONTACT:Neil Watts, Development Service Director (x7218) SUBJECT:Request for Permit Technician Position Revision ISSUE: Should the City approve a permanent full time Permit Technician position in place of an existing half time Permit Technician position? RECOMMENDATION: Approve replacing a vacant half time position with a new full time Permit Technician position. The position is within the Development Services Division of the Community and Economic Development Department and is needed to respond to increased work levels for permit applications and building inspection requests. BACKGROUND SUMMARY: The budget and staffing for the Building Section currently includes a half time Permit Technician position. This half time position will be vacated on April 16, 2013, with the employee moving to another position in the City. The increasing work demands for the permit counter justify an increase in staffing levels. The increasing work demands include increased permitting activities, support work on the new permitting system to expand online permit capabilities, and work to support implementation of electronic plan review options for our customers. We are therefore requesting replacing the half time position with a permanent full time Permit Technician position. There is a difference of $44,000 between the expenditure required and the amount budgeted. This difference will come from existing salary savings and will be monitored throughout 2013 and 2014. 6f. - Community and Economic Development Department requests Page 33 of 47 CITY OF RENTON COUNCIL AGENDA BILL Subject/Title: 2013 Neighborhood Project Grant Applications Meeting: Regular Council - 15 Apr 2013 Exhibits: Issue Paper Submitting Data: Dept/Div/Board: Community Services Staff Contact: Norma McQuiller, extension 6595 Recommended Action: Refer to Finance Committee Fiscal Impact: Expenditure Required: $ $5,347 Transfer Amendment: $ Amount Budgeted: $ $72,590 Revenue Generated: $ Total Project Budget: $ $5,347 City Share Total Project: $ $5,347 SUMMARY OF ACTION: The City Council appropriated $72,590 in the 2013 Community Services Fund budget for the three Neighborhood Grant Programs: Neighborhood Newsletter/Communication Grants; Neighborhood Project Grants; and Neighborhood Mini-grant Projects. The Neighborhood Program announced the availability of funds in January for the 2013 Newsletter/Communi-cation Grants for Officially Recognized Neighborhoods. The total amount of the eligible communication grant requests came to $9,150.00, leaving a balance of $63,440 for the remaining two Neighborhood Project Grant categories. Four Project Grant applications were received for a total request of $15,737 in funding. The Interdepartmental Grant Review Team analyzed the applications and recommended three (LaCrosse, Talbot Hill and Maplewood) projects for funding based on the criteria of meeting the overall objectives of the Neighborhood Program. A total of $5,347 in matching funds is recommended, which will leave a balance of $58,093 available for the Mini-grant Program and funding for a second round of 2013 Neighborhood Project Grants. The Neighborhood Grant Program continues to provide neighborhood associations with opportunities to promote and improve their community while getting to better know their neighbors. STAFF RECOMMENDATION: Approve three of the requested 2013 Neighborhood Project Grants and authorize expenditures for a total of $5,347 from the allocated Neighborhood Program funds. 6g. - Community Services Department reports receipt of four 2013 Page 34 of 47 COMMUNITY SERVICES DEPARTMENT M E M O R A N D U M DATE:April 15, 2013 TO:Randy Corman, Council President Members of City Council VIA:Denis Law, Mayor FROM:Terry Higashiyama, Administrator STAFF CONTACT:Norma McQuiller, Neighborhood Program Coordinator Ext. 6595 SUBJECT:2013 Neighborhood Project Grant Applications ISSUE: Should four applications for 2013 Neighborhood Project Grants be approved for funding? RECOMMENDATION: Approve three of the requested 2013 Neighborhood Project Grants and authorize expenditures for a total of $5,347 from the allocated 2013 Neighborhood Program funds. BACKGROUND SUMMARY: The City Council appropriated $72,590 in the 2013 Community Services Fund budget for the three Neighborhood Grant Programs: Neighborhood Newsletter/Communication Grants; Neighborhood Project Grants; and Neighborhood Mini-grant Projects. The Neighborhood Program announced the availability of funds in January for the 2013 Newsletter/ Communication Grants for Officially Recognized Neighborhoods. The total amount of the eligible communication grant requests came to $9,150.00, leaving a balance of $63,440 for the remaining two Neighborhood Project Grant categories. Four Project Grant applications were received for a total request of $15,757 in funding. The Interdepart-mental Grant Review Team analyzed the applications and recommended three projects for funding based on the criteria of meeting the overall objectives of the Neighborhood Program which are: Project size, location, and complexity are appropriate for the neighborhood group. Project was developed with a realistic budget. Documentation shows neighborhood participation and adequate volunteer labor reflecting community support for the project. Project includes maintenance after project completion. Physical improvements are visible and benefit a large area of a community. Project demonstrates networking, self-help, and neighborhood organization. Sufficient matching funds exist through volunteer labor, cash, and/or materials. 6g. - Community Services Department reports receipt of four 2013 Page 35 of 47 2013 Neighborhood Project Grant Applications April 15, 2013 Page 2 4/12/2013 A total of $5,347 in matching funds is recommended, which will leave a balance of $58,093 available for the Mini-grant Program and funding for a second round of 2013 Neighborhood Project Grants. The eligible applications are listed in the following table with a brief project synopsis. 2013 Neighborhood Project Grant Recommendations Requested Amount* Recommended Amount* LaCrosse Homeowners Association $1,965 $1,965 Talbot Hill Neighborhood Association $2,010 $2,010 Maplewood Neighborhood Association $1,372 $1,372 TOTAL $5,347 * Note: The above amounts are rounded to the nearest dollar. Neighborhood Grant Request Total Project Cost Project Description Meets Neighborhood Program Objectives LaCrosse Homeowners Association $1,965 $3,930 LaCrosse is requesting grant funds to create a social, meditation/reflection area in their community garden. This would include a small fountain, picnic-style seating, a table, and some additional décor. Yes The improvements would add to the current garden and enhance the tranquility for the residents. The HOA must provide adequate access to a Vactor truck for vault cleanouts; need to check for accessible easements. Talbot Hill Neighborhood Association $2,010 $6,888 Revitalize the area around the entrance sign and add improvements to the signage. Yes Maplewood Neighborhood Association $1,372 $2,744 Erect a bus shelter for the school children to protect them from the elements. Yes Project reflects stewardship and concern of children waiting for the school bus during the inclement weather. Neighborhood project manager will provide engineered drawings for construction. The shelter shall be required to meet ADA access and the project shall meet all City requirements. All required permits will be acquired before starting. 6g. - Community Services Department reports receipt of four 2013 Page 36 of 47 2013 Neighborhood Project Grant Applications April 15, 2013 Page 3 4/12/2013 Neighborhood Grant Request Total Project Cost Project Description Meets Neighborhood Program Objectives South Renton Neighborhood Association (SRNA) $10,000 $10,000 The SRNA plan is to use grant funds to build 100 planter boxes to be placed along the parking strip throughout the neighborhood. Neighbor would help neighbor in the building, planting, harvesting, and maintenance of the garden boxes. A Master Gardner that resides in the neighborhood would hold gardening and cooking classes for residents. NA Staff recommends this project be re-submitted as either a pilot project or through a Mini-grant in the second round of 2013 funding applications. Reason: While it appears to be a great project, it is an aggressive project to start with 100 garden boxes. Staff recommends the project be scaled down to a pilot project starting with perhaps ten garden boxes and, if successful, adding more as residents commit to wanting a box garden. The Neighborhood would need to check with City Building Department regarding placement location, right-of- way, and if permits are required. This information would need to be included when re-submitting the grant application package. CONCLUSION: The Neighborhood Grant Program continues to provide neighborhood associations with opportunities to promote and improve their community while getting to better know their neighbors. The recommended expenditures are an appropriate use of City funds. cc:Bonnie Rerecich, Community Services, Neighborhoods, Resources and Events Manager Norma McQuiller, Community Services, Neighborhood Coordinator Jennifer Jorgenson, Community Services Administration 6g. - Community Services Department reports receipt of four 2013 Page 37 of 47 CITY OF RENTON COUNCIL AGENDA BILL Subject/Title: Amendment 2 to RainierFlight Service, LLC Lease LAG Meeting: Regular Council - 15 Apr 2013 Exhibits: Issue Paper Amendment 02-13 to Rainier Flight Service LLC Lease Submitting Data: Dept/Div/Board: Public Works Staff Contact: Ryan Zulauf, Airport Manager, x7471 Recommended Action: Refer to Transportation/Aviation Committee Fiscal Impact: Expenditure Required: $ Transfer Amendment: $ Amount Budgeted: $ Revenue Generated: $$348 Total Project Budget: $ City Share Total Project: $ SUMMARY OF ACTION: Rainier Flight Service LLC is requesting a two year extension to their lease, LAG 11-003, for the second floor of the 790 Building (Quonset Hut) and adjacent tiedown area for their flight instruction operation. The two year extension will expire on March 31, 2015. A building and ground lease rate adjustment has been calculated using the Consumer Price Index-Urban, effective April 1, 2013 for the term of the lease, and will increase the Airport’s annual revenue by $348. STAFF RECOMMENDATION: Approve a two year lease extension, terminating on March 31, 2015, with Rainier Flight Service LLC and authorize the Mayor and City Clerk to execute Amendment 02-13 to lease LAG 11-003. 6h. - Transportation Systems Division recommends approval of Amendment #2 Page 38 of 47 PUBLIC WORKS DEPARTMENT M E M O R A N D U M DATE:April 15, 2013 TO:Randy Corman, Council President Members of the Renton City Council VIA:Denis Law, Mayor FROM:Gregg Zimmerman, Administrator STAFF CONTACT:Ryan Zulauf, Airport Manager (ext 7471) SUBJECT:Amendment 2 to Rainier Flight Service LLC Lease LAG 11-003 ISSUE: Should the Council approve a two year lease extension to Rainier Flight Service’s lease, LAG 11-003, for the 790 Building? RECOMMENDATION: Approve a two year lease extension, terminating on March 31, 2015, with Rainier Flight Service LLC and authorize the Mayor and City Clerk to execute Amendment 02-13 to lease LAG 11-003. BACKGROUND: Rainier Flight Service LLC has been leasing the second floor of the 790 Building (Quonset Hut) and adjacent tiedown area since April 1, 2011, under lease LAG 11-003, which expired March 31, 2013. They operate a successful flight instruction school from this location and they have requested to continue their lease for an additional two year period. An amendment to their lease has been written, extending the term of their lease to March 31, 2015. The amendment also adjusts the building lease rate and ground lease rate using the Consumer Price Index-Urban. The building lease rate will be increased, effective April 1, 2013, from $1.105 to $1.12 per square foot per month and the ground lease rate will be increased from $0.63 to $0.64 per square foot per year. This results in a total annual increase of $348 for both the building lease area and the tiedown lease area. cc:Doug Jacobson, Deputy PW Administrator – Transportation Connie Brundage, Transportation Administrative Secretary 6h. - Transportation Systems Division recommends approval of Amendment #2 Page 39 of 47 6h. - Transportation Systems Division recommends approval of Amendment #2 Page 40 of 47 6h. - Transportation Systems Division recommends approval of Amendment #2 Page 41 of 47 6h. - Transportation Systems Division recommends approval of Amendment #2 Page 42 of 47 6h. - Transportation Systems Division recommends approval of Amendment #2 Page 43 of 47 8a. - 2013 Carry-forward budget amendment (See 7.a.) Page 44 of 47 8a. - 2013 Carry-forward budget amendment (See 7.a.) Page 45 of 47 8a. - 2013 Carry-forward budget amendment (See 7.a.) Page 46 of 47 8a. - 2013 Carry-forward budget amendment (See 7.a.) Page 47 of 47