Loading...
HomeMy WebLinkAboutAPPROVED_Sunridge_Wet_Weather_Plan_11012025IN COMPLIANCE WITH CITY OF RENTON STANDARDS '0)+0''4+0) 6' & Ä   Ä     5704+&)'A6190*1/'5A++ %A    .7 #    Ä       %   Ä       4Ä 24    Ä       24 1 , ' % 6 A 5 7 0 4 + & ) ' A 6 1 9 0 * 1 / ' 5 A + + NOTES: 1.THIS PLAN IS FOR WORK OCCURRING OCT 1ST - APR 30TH. TURBUDITY LEVEL OF TREATED WATER LEAVING SITE MUST NOT EXCEED 25 NTUS. pH 2. ph LEVEL MUST BE BETWEEN A MIN OF 6.5 AND A MAX OF 8.5. 3. SWPPP TO BE ONSITE DURING CONSTRUCTION 4. MEASURES SHALL BE PROVIDED IN THE FIELD TO PREVENT SURFACE RUNOFF RUNNING FROM SUBJECT LOT TO ADJACENT PROPERTIES. 5. SEE GEOTECHNICAL REPORT BY COBALT GEOSCIENCES FOR DESIGN, CONSTRUCTION, AND ANY EROSION CONTROL RECOMMENDATIONS. 6. ANY DAMGE TO CURB AND SIDEWALK DURING CONSTRUCTION WILL REQUIRE 7. RESTORATION AS PER CITY OF RENTON STANDARD PLAN. 8. TREE PROTECTION FENCING SHALL STAY INTACT FOR THOSE TREES WITH DRIP LINES WITHIN THE CLEARING LIMIT UNTIL AUTHORIZED TO BE REMOVED BY CITY STAFF. 9. A CERTIFIED ARBORIST SHALL BE ONSITE DURING EXCAVATING WORK ASSOCIATED WITH THE BUILDING LOCATED WITHIN THE DRIPLINE OF THE OFFSITE TREES. THE ARBORIST SHALL ASSESS THE CONDITION OF THE TREES ANO PROVIDE A MEMORANDOM DETAILING ANY SPECIAL CONSTRUCTION CONSIDERATIONS ANO BEST PRACTICES TO PROTECT THE INTEGRITY OF THE OFF-SITE TREES PRIOR TO CITY STAFF AUTHORIZING REMOVAL OF TREE PROTECTION FENCING. 24 1 , ' % 6 A 5 7 0 4 + & ) ' A 6 1 9 0 * 1 / ' 5 A + + DEVELOPMENT ENGINEERING msippo 11/11/2025 IN COMPLIANCE WITH CITY OF RENTON STANDARDS '0)+0''4+0) 6' & Ä   Ä     5704+&)'A6190*1/'5A++ %A  .7 #    Ä       %   Ä       4Ä 24    Ä       24 1 , ' % 6 A 5 7 0 4 + & ) ' A 6 1 9 0 * 1 / ' 5 A + + 24 1 , ' % 6 A 5 7 0 4 + & ) ' A 6 1 9 0 * 1 / ' 5 A + +