Loading...
HomeMy WebLinkAboutAttach F - Preliminary Geotechnical Report 1101 Fawcett Avenue, Suite 200 Tacoma, Washington 98402 253.383.4940 February 12, 2025 City of Renton 1055 South Grady Way Renton, Washington 98057 Attention: Jared McDonald, PE Subject: Preliminary Geotechnical Design Report for 10% Design Panther Creek Culvert Replacement Project Renton, Washington File No. 0693-093-00 Introduction and Background This geotechnical report presents the preliminary results of GeoEngineers, Inc.’s (GeoEngineers) geotechnical services for the Panther Creek Culvert Replacement Project. We understand the project is at the 10% Design stage. Additional geotechnical analyses will occur during subsequent design stages. We previously completed a preliminary geotechnical analysis in November 2023. At that time the preferred design concept was a concrete box culvert. We understand that the current preferred design concept is a concrete bridge. Our preliminary design considerations for 10 percent design are based on review of our previous subsurface exploration and site observations. The project site is located where Talbot Road crosses Panther Creek as shown in the Vicinity Map, Figure 1. Talbot road is supported on fill which spans the Panther Creek valley. Panther Creek flows from east to west through an existing 36-inch diameter fiberglass-reinforced pipe (FRP) located in the lower portion of the fill prism. The layout of the site is shown in Figure 2. We understand the proposed bridge will be approximately 100 feet long and about 57 feet wide. Most of the fill that currently supports Talbot Road will be removed as a part of the project. The single-span bridge will be supported by concrete abutments that bear on either 4- or 5-foot-diameter drilled shafts. Short wing walls will border the abutments to the east and west. The type of walls utilized for the wing walls is presently unknown and could comprise conventional concrete, structural earth walls (SEW) or soldier piles. Short concrete diaphragm walls will be located between the concrete girders, adjacent to the abutment locations. The approximate location of the proposed bridge is shown in Figure 2. ATTACHMENT F City of Renton | February 12, 2025 Page 2 File No. 0693-093-00 Scope of Services Our services for this portion of the project include the following: 1. Complete subsurface explorations at the project site. This included three borings at the locations shown in Figure 2. Copies of the boring logs are included in Appendix A. 2. Review documents previously completed by GeoEngineers in the project vicinity. These included cross sections and photographs generated during a landslide investigation adjacent to the site in 2006. These data are included in Appendix B. 3. Review published geologic maps of the site area. 4. Review photographs taken by GeoEngineers personnel during wetland mapping work in June, 2023. 5. Review historic information regarding former wooden trestle bridges that existed at the site until about 1933. 6. Review our November 2, 2023 preliminary geotechnical design letter. 7. Provide geotechnical support during development of the 10% Design, including the following tasks:  Provide a preliminary summary of potential soil, rock, and groundwater conditions based on subsurface explorations completed at the site.  Develop preliminary geotechnical recommendations to support 10% Design. Recommendations include preliminary axial and lateral capacity considerations for drilled shafts.  Provide preliminary recommendations for earthwork, including temporary and permanent slope inclinations, suitability of onsite soil for reuse as structural fill, import fill criteria and fill compaction criteria.  Evaluate potential construction considerations, including conceptual dewatering needs based on subsurface conditions encountered in our explorations, as appropriate.  Develop preliminary lateral earth pressure criteria for design of abutment walls. Published and Unpublished Information Review GEOLOGIC MAP Published geologic information for the project vicinity includes a U.S. Geological Survey Map titled “Geologic Map of the Renton Quadrangle, King County, Washington” by Mullineaux (1965) and the “Geologic Map of King County”, by Booth, Troost and Wisher (2007). The geologic map indicates that Vashon glacial till is mapped over a broad region in the site vicinity, A thin portion of the Panther Creek valley bottom, at the project site, is mapped as Renton Formation bedrock. Vashon glacial till is a very dense mixture of silt, sand, gravel, and occasional cobbles/boulders that was deposited at the base of the Vashon-age glacier as it moved from north to south through the site area. Renton Formation bedrock comprises layers of arkosic sandstone, shale, mudstone, and coal. City of Renton | February 12, 2025 Page 3 File No. 0693-093-00 PREVIOUS GEOENGINEERS INFORMATION GeoEngineers evaluated a landslide just southwest of the project site in 2006. The landslide occurred on the left stream bank of Panther Creek, just west of Talbot Road. The approximate location of this feature is shown in Figure 2 and in Appendix B. During our work we observed Renton Formation sedimentary bedrock on the left stream bank up to about 5 vertical feet from the top of the stream bank. The stream bank is about 30 feet in vertical height. A cross section showing the distribution of the Renton Formation material is included in Appendix B. The rock appeared weathered and fractured in photographs reviewed for this study. HISTORIC BRIDGE INFORMATION The historic information reviewed comprises photographs, inspection reports and drawings of the proposed bridge replacement. This information dates to the early 1990s, from 1912 to 1934. Historic information indicates that a wood trestle bridge existed at the site from at least 1912 to 1934. The bridge was described as an 11 panel, wood trestle structure that was about 172 feet long and about 12 feet wide. The attached photo is dated 1932 and appears to be looking along Talbot Road from south to north. Photograph 1. Photo of Talbot Road Bridge in 1932, looking to the north. A King County Engineer Office plan sheet, dated February 19, 1934, indicates the bridge was to be removed and replaced with a fill embankment and a 12-inch-diameter, 30-foot-long culvert. Approximately 12,000 yards of material was to be excavated as a borrow source for the new embankment. City of Renton | February 12, 2025 Page 4 File No. 0693-093-00 GeoEngineers Reconnaissance GeoEngineers completed a reconnaissance of the site on June 28, 2023. We observed exposures of weathered Renton Formation rock beneath the existing culvert and in the stream bank southwest of the existing culvert. These exposures are shown in Photographs 2 and 3. Photograph 2. Photograph of perched outfall, looking east from the Panther Creek stream channel. Renton Formation Rock City of Renton | February 12, 2025 Page 5 File No. 0693-093-00 Photograph 3. Photograph of exposed weathered Renton Formation rock. Exposure is looking south from the Panther Creek stream channel at the base of the left stream bank. Field Investigations SUBSURFACE CONDITIONS We completed three drilled borings at the site in August, 2023. The locations of our explorations are shown in Figure 2. Copies of the boring logs are contained in Appendix A. Our interpretation of subsurface conditions encountered in the borings are provided in the Cross Section, Figure 3. Talbot Road, at the culvert location, is underlain by a significant thickness of loose fill. Approximately 15 inches of asphalt pavement was encountered in each boring, suggesting the fill has settled over time. The east portion of the north-bound lane has several sags and depressions, suggesting settlement is on-going. Fill encountered in the borings comprised silty sand or sandy silt in a loose to medium dense/stiff condition. The fill contains a moderate to very high percentage of silt. Organic debris was also occasionally observed in the fill material. An obstruction within the fill was encountered in B-2 at a depth of about 26½ feet. City of Renton | February 12, 2025 Page 6 File No. 0693-093-00 Weathered and unweathered Renton Formation rock was encountered in B-1 and B-3 below the loose fill. The weathered Renton Formation material encountered in the borings was in a dense to very dense condition. The unweathered Renton Formation material is in a very dense condition. Groundwater was not observed in the borings. Preliminary Geotechnical Considerations EARTHWORK Earthwork for the project will involve removing most of the loose fill to construct the proposed bridge. Large diameter drilled shafts founded within the Renton Formation are proposed for support of the structure. Some work within the Panther Creek stream and valley bottom area will also occur. The existing fill contains a moderate to high percentage of fines and will be difficult to work during wet weather conditions. The fill also appears to contain debris of an unknown nature (Boring B-2). The earthwork contractor should be prepared to encounter and remove large debris from the excavation. We recommend that earthwork take place during the normally dry late summer and early fall months, when surface water flows within Panther Creek are lowest. The existing fill soils are not suitable for re-use as fill on this project and may not be suited as structural fill for other projects based on the fines content and in situ moisture content. We anticipate that the Renton Formation bedrock, particularly where weathered, can be excavated using conventional construction equipment. The unweathered rock may require rippers or impact hammers to remove from the site. EROSION AND SEDIMENTATION CONTROL The site soils are erosion sensitive. We recommend that a temporary erosion control plan be prepared in accordance with applicable city and county standards. The plan should incorporate basic planning principles, including provisions for site monitoring to evaluate the effectiveness of the erosion control measures and repair and/or modify them as appropriate. TEMPORARY AND PERMANENT SLOPES The soils encountered at the site are classified as Type C soil in accordance with the provisions of Title 296-155 Washington Administrative Code (WAC), Part N, “Excavation, Trenching, and Shoring.” Temporary slopes should be inclined at 1.5H:1V (horizontal to vertical) or flatter. Flatter cut slopes may be necessary for longer slopes, where groundwater seepage is encountered, or in areas of current slope instability. Additional recommendations should be developed during final design. We recommend that permanent cut and fill slopes be constructed no steeper than 2H:1V. FOUNDATION SUPPORT We understand that 4- or 5-foot-diameter drilled shafts are being considered for preliminary design. We anticipate the shafts will bear on unweathered Renton Formation rock. Preliminary axial and lateral capacity considerations are provided below. City of Renton | February 12, 2025 Page 7 File No. 0693-093-00 Axial Capacity The performance of drilled shaft foundations can be greatly affected by the method of construction. Softening, loosening or other changes in soil and rock conditions caused by the construction method can result in a reduction in shaft resistance and an increase in shaft displacement. Therefore, evaluation of the effects of the shaft construction procedure on resistance, including methods for preparing the bearing surface should be considered in design. Based on our experience and preliminary analyses, we expect the nominal tip resistance for shafts bearing on the Renton Formation will be greater than 400 kips per square foot (ksf) and nominal frictional resistance within this deposit will be greater than 20 ksf. Rock cores and laboratory testing should be completed prior to final design to confirm appropriate design values. Lateral Capacity Geotechnical design parameters for use in preliminary analyses of drilled shaft lateral capacity using LPILE are provided in Table 1. Shafts spaced closer than five diameters (as measured center-to-center) apart will experience lateral group effects that will result in a lower lateral load capacity for trailing rows of shafts with respect to leading rows of shafts for an equivalent deflection. We recommend the lateral load capacity for trailing shafts in a shaft group spaced less than five pile diameters apart be reduced in accordance with the factors in Table 2. TABLE 1. PRELIMINARY RECOMMENDED LPILE SOIL AND ROCK PARAMETERS SOIL UNIT APPROX. LAYER EL (TOP TO BOTTOM) SOIL MODEL EFFECTIVE UNIT WEIGHT (PCF) FRICTION ANGLE (DEGREE) UNDRAINED SHEAR STRENGTH (PSF) STIFFNESS PARAMETER, K (PCI) STRAIN FACTOR Ε50 Static Conditions Fill 86 to 69.5 Sand (Reese) 115 30 - 90 - Weathered bedrock 69.5 to 62 Sand (Reese) 67.6 35 - 125 - Intact Bedrock 62 to 50 Sand (Reese) 77.6 42 - 125 - Notes: pcf = pounds per cubic foot; psf = pounds per square foot; pci = pounds per cubic inch GWT = groundwater table TABLE 2. SHAFT P-MULTIPLIERS, PM, FOR MULTIPLE ROW SHADING SHAFT SPACING1 (IN TERMS OF SHAFT DIAMETER) P-MULTIPLIERS, PM2, 3 ROW 1 (LEADING ROW) ROW 2 (1ST TRAILING ROW) ROW 3 AND HIGHER (2ND TRAILING ROW) 3D 0.85 0.65 0.55 5D 1.0 0.85 0.80 Notes: 1 The P-multipliers in the table above are a function of the center-to-center spacing of shafts in the group in the direction of loading expressed in multiples of the shaft diameter, D. 2 The values of Pm were developed for vertical shafts only. 3 The P-multipliers are dependent on the shaft spacing and the row number in the direction of the loading. To establish values of Pm for other shaft spacing values, interpolation between values should be conducted. City of Renton | February 12, 2025 Page 8 File No. 0693-093-00 Limitations We have prepared this preliminary report for the exclusive use of the City of Renton and their authorized agents. Within the limitations of scope, schedule and budget, our services have been executed in accordance with generally accepted practices in the field of geotechnical consultation in this area at the time this report was prepared. No warranty or other conditions, express or implied, should be understood. Any electronic form, facsimile, or hard copy of the original document (email, text, table, and/or figure), if provided, and any attachments are only a copy of the original document. The original document is stored by GeoEngineers, Inc. and will serve as the official document of record. Please refer to Appendix D, “Report Limitations and Guidelines for Use” for additional information pertaining to use of this report. We appreciate the opportunity to provide geotechnical services on this project. Please contact us if you have any questions or if we can provide any additional information. Sincerely, GeoEngineers, Inc. Stephen W. Helvey, LG, LEG, LHG Debra C. Overbay, PE Senior Engineering Geologist Associate SWH:DCO:leh Attachments Figure 1. Vicinity Map Figure 2. Site Plan Figure 3. Cross Section Appendix A. Field Explorations Figure A-1 – Key to Exploration Logs Figures A-2 through A-4 – Log of Borings Appendix B. 2006 Landslide Site Plan and Cross Section Appendix C. Report Limitations and Guidelines for Use One electronic copy submitted Disclaimer: Any electronic form, facsimile or hard copy of the original document (email, text, table, and/or figure), if provided, and any attachments are only a copy of the original document. The original document is stored by GeoEngineers, Inc. and will serve as the official document of record. Burling t o n N o r th e r n S a n t a F e B u r l i n g to n N o r t h e r n Santa Fe B u r l i n g to n N o r t h e r n S a nta F e S W 34th S t Talb o t R d S S W 4 1 s t S t L i n d A v e S W S W 3 9 th S t E V a l l e y R d 167 V alley Me dical Ce nter B u r l i n g t on N o r t h e r n S a n t a F e S 50th S t S 18 7th S t 90th Ave S S 1 8 0 t h S t 167 Gre at Wa l l M all S E 1 7 2 nd S t Mo r r i s A ve S 108t h A v e S E Mi l l A v e S S38th C t Talbot Rd S 103rd Ave SE S 3 6 t h P l 1 0 6 t h A v e S E B e n s o n R d S B e n s o n D r S S E C a r r R d 515 P a n t h e r C r e e k S E C a r r R d 515 SITE Vicinity Map Figure 1 Panther Creek at Talbot Road S. Culvert Replacement Project Renton, Washington 3 Alpine Lak es Wilder ness Kent Tacoma Seattle 0 2,000 Feet P: \ 0 \ 0 6 9 3 0 9 3 \ G I S \ 0 6 9 3 0 9 3 _ P r o j e c t \ 0 6 9 3 0 9 3 _ P r o j e c t . a p r x \ 0 6 9 3 0 9 3 0 0 _ F 0 1 _ V i c i n i t y M a p D a t e E x p o r t e d : 0 8 / 1 4 / 2 3 b y c c a b r e r a Source(s): • ESRI Coordinate System: NAD 1983 StatePlane Washington North FIPS 4601 Feet Disclaimer: This figure was created for a specific purpose and project. Any use of this figure for any other project or purpose shall be at the user's sole risk and without liability to GeoEngineers. The locations of features shown may be approximate. GeoEngineers makes no warranty or representation as to the accuracy, completeness, or suitability of the figure, or data contained therein. The file containing this figure is a copy of a master document, the original of which is retained by GeoEngineers and is the official document of record. 20 + 0 0 21 + 0 0 22 + 0 0 23 + 0 0 24 + 0 0 60 60 6 5 7 0 7 5 80 85 90 95 75 75 80 80 85 85 90 90 95 95 65 7 0 75 75 8 0 80 85 85 90 90 95 95 Wetland A B-3 B-1 B-2 Proposed Bridge Wing Walls Proposed Bridge Footing Proposed Bridge Footing Proposed Bridge Wing Walls N N Figure 2 Site Plan P: \ 0 \ 0 6 9 3 0 9 3 \ C A D \ 0 0 \ G e o t e c h R e p o r t \ 0 6 9 3 0 9 3 0 0 _ F 0 2 _ S i t e P l a n . d w g 2 D a t e E x p o r t e d : 2/ 5 / 2 0 2 5 1 1 : 5 4 A M - b y Ga b b y R e g i s t e r Panther Creek at Talbot Road S. Culvert Replacement Project Renton, Washington Legend 50 N Source(s): ·Aerial from Google Earth Pro, dated 24/8/2022 ·Survey or Background from KPFF, dated 7/14/2023 Coordinate System: Washington State Plane, North Zone, NAD83, US Foot Disclaimer: This figure was created for a specific purpose and project.  Any use of this figure for any other project or purpose shall be at the user's sole risk and without liability to GeoEngineers.  The locations of features shown may be approximate.  GeoEngineers makes no warranty or representation as to the accuracy, completeness, or suitability of the figure, or data contained therein.  The file containing this figure is a copy of a master document, the original of which is retained by GeoEngineers and is the official document of record. Feet 0 Ta l b o t R o a d S o u t h S 3 8 t h C o u r t Panther C r e e k Pa n t h e r C r e e k Ordinary High-water Mark (OHWM) B-1 Boring by GeoEngineers, Inc., 2023 B- 3 (8 f t ) B- 1 (3 f t ) B- 2 (2 f t ) A (South) A' (North) ? ? ? ? ? ? ? ? ? ? 7 7 4 9 25 AC GM ML ML SM 6 4 6 45 29 36 50/6" AC SM SM RX RX ? ? ? ? ? ? ? ? ? ? ? ? ? 9 6 20 6 50/5" 50/4.5" 50/4" AC GP-GM SM SM RX RX Talbot Road South Renton Formation Rock Renton Formation Rock Fill (Loose)El e v a t i o n ( F e e t ) El e v a t i o n ( F e e t ) Distance (Feet) 60 80 100 120 60 80 100 120 0 20 40 60 80 100 120 140 160 180 200 220 240 ???????? ? ? ? ? ? ? ? ? ? ? ? ? ? ? Weathered Renton Formation Rock Weathered Renton Formation Rock Figure 3 Cross Section A-A' Legend Note(s): 1.The subsurface conditions shown are based on interpolation between widely spaced explorations and should be considered approximate; actual subsurface conditions may vary from those shown. Datum: NAVD88 Disclaimer: This figure was created for a specific purpose and project.  Any use of this figure for any other project or purpose shall be at the user's sole risk and without liability to GeoEngineers.  The locations of features shown may be approximate.  GeoEngineers makes no warranty or representation as to the accuracy, completeness, or suitability of the figure, or data contained therein.  The file containing this figure is a copy of a master document, the original of which is retained by GeoEngineers and is the official document of record. P: \ 0 \ 0 6 9 3 0 9 3 \ C A D \ 0 0 \ G e o t e c h R e p o r t \ 0 6 9 3 0 9 3 0 0 _ F 0 2 - F 0 3 _ S i t e P l a n a n d S e c t i o n A - A ' . d w g 3 D a t e E x p o r t e d : 10 / 2 7 / 2 0 2 3 1 1 : 0 8 A M - b y Ja c k s o n N . F e l l o w s Horizontal Feet 0 20 10 Vertical Feet 0 Vertical Exaggeration = X2 Legend Groundwater Measured in Piezometer Renton Formation rock Fill Weathered Renton Formation Rock SM 20 Boring Soil Classification Blow Count Bo r i n g I D (O f f s e t ) Inferred Soil Contact Panther Creek at Talbot Road S. Culvert Replacement Project Renton, Washington or?? Asphalt Appendix A Field Explorations Measured groundwater level in exploration, well, or piezometer Measured free product in well or piezometer Distinct contact between soil strata Approximate contact between soil strata Contact between geologic units SYMBOLS TYPICAL DESCRIPTIONS GW GP SW SP SM FINE GRAINED SOILS SILTS AND CLAYS NOTE: Multiple symbols are used to indicate borderline or dual soil classifications MORE THAN 50% RETAINED ON NO. 200 SIEVE MORE THAN 50% PASSING NO. 200 SIEVE GRAVEL AND GRAVELLY SOILS SC LIQUID LIMIT LESS THAN 50 (APPRECIABLE AMOUNT OF FINES) (APPRECIABLE AMOUNT OF FINES) COARSE GRAINED SOILS MAJOR DIVISIONS GRAPH LETTER GM GC ML CL OL SILTS AND CLAYS SANDS WITH FINES SAND AND SANDY SOILS MH CH OH PT (LITTLE OR NO FINES) CLEAN SANDS GRAVELS WITH FINES CLEAN GRAVELS (LITTLE OR NO FINES) WELL-GRADED GRAVELS, GRAVEL -SAND MIXTURES CLAYEY GRAVELS, GRAVEL - SAND -CLAY MIXTURES WELL-GRADED SANDS, GRAVELLYSANDS POORLY-GRADED SANDS, GRAVELLYSAND SILTY SANDS, SAND - SILT MIXTURES CLAYEY SANDS, SAND - CLAYMIXTURES INORGANIC SILTS, ROCK FLOUR,CLAYEY SILTS WITH SLIGHTPLASTICITY INORGANIC CLAYS OF LOW TOMEDIUM PLASTICITY, GRAVELLYCLAYS, SANDY CLAYS, SILTY CLAYS,LEAN CLAYS ORGANIC SILTS AND ORGANIC SILTYCLAYS OF LOW PLASTICITY INORGANIC SILTS, MICACEOUS ORDIATOMACEOUS SILTY SOILS INORGANIC CLAYS OF HIGHPLASTICITY ORGANIC CLAYS AND SILTS OFMEDIUM TO HIGH PLASTICITY PEAT, HUMUS, SWAMP SOILS WITHHIGH ORGANIC CONTENTSHIGHLY ORGANIC SOILS SOIL CLASSIFICATION CHART MORE THAN 50% OF COARSE FRACTION RETAINED ON NO. 4 SIEVE MORE THAN 50% OF COARSE FRACTION PASSING ON NO. 4 SIEVE SILTY GRAVELS, GRAVEL - SAND -SILT MIXTURES POORLY-GRADED GRAVELS,GRAVEL - SAND MIXTURES LIQUID LIMIT GREATER THAN 50 Continuous Coring Bulk or grab Direct-Push Piston Shelby tube Standard Penetration Test (SPT) Contact between soil of the same geologic unit Material Description Contact Graphic Log Contact NOTE: The reader must refer to the discussion in the report text and the logs of explorations for a proper understanding of subsurface conditions. Descriptions on the logs apply only at the specific exploration locations and at the time the explorations were made; they are not warranted to be representative of subsurface conditions at other locations or times. Groundwater Contact Blowcount is recorded for driven samplers as the number of blows required to advance sampler 12 inches (or distance noted). See exploration log for hammer weight and drop. "P" indicates sampler pushed using the weight of the drill rig. "WOH" indicates sampler pushed using the weight of the hammer. Key to Exploration Logs Figure A-1 Sampler Symbol Descriptions ADDITIONAL MATERIAL SYMBOLS SYMBOLS Asphalt Concrete Cement Concrete Crushed Rock/ Quarry Spalls Topsoil GRAPH LETTER AC CC SOD Sod/Forest Duff CR DESCRIPTIONS TYPICAL TS No Visible Sheen Slight Sheen Moderate Sheen Heavy Sheen Laboratory / Field Tests 2.4-inch I.D. split barrel / Dames & Moore (D&M) %F %G AL CA CP CS DD DS HA MC MD Mohs OC PM PI PL PP SA TX UC UU VS Sheen Classification NS SS MS HS Percent fines Percent gravel Atterberg limits Chemical analysis Laboratory compaction test Consolidation test Dry density Direct shear Hydrometer analysis Moisture content Moisture content and dry density Mohs hardness scale Organic content Permeability or hydraulic conductivity Plasticity index Point lead test Pocket penetrometer Sieve analysis Triaxial compression Unconfined compression Unconsolidated undrained triaxial compression Vane shear Rev 01/2022 Hard drilling 49 49 45 17 30 19 33 Approximately 15 inches of asphalt concrete pavement Gray silty sand with gravel (loose, moist) (fill) Gray silty sand (loose, moist) (fill) Light gray weathered sandstone (Renton formation) Light gray/white sandstone/siltstone (Renton formation) 1 %F 2 MC 3 4 %F 5 6 %F 6 9 10 16 14 14 6 4 6 45 29 36 AC SM SM RX RX Notes: 36.5 PW SH Holocene Drilling, Inc. Hollow-stem Auger D-50 Truck-mountedDrilling EquipmentAutohammer 140 (lbs) / 30 (in) Drop WA State Plane North NAD83 (feet) 1299470 165449 97 NAVD88 Easting (X) Northing (Y) Start Total Depth (ft) Logged By Checked By End Surface Elevation (ft) Vertical Datum Drilled Hammer Data System Datum Driller Drilling Method Groundwater not observed at time of exploration 8/25/20238/25/2023 Note: See Figure A-1 for explanation of symbols. Coordinates Data Source: Horizontal approximated based on Topographic Survey. Vertical approximated based on Topographic Survey. Sheet 1 of 2Project Number: Project Location: Project: 0693-093-00 Log of Boring B-1 Figure A-2 Panther Creek Culvert Renton, Washington Da t e : 1 0 / 2 7 / 2 3 P a t h : \ \ G E O E N G I N E E R S . C O M \ W A N \ P R O J E C T S \ 0 \ 0 6 9 3 0 9 3 \ G I N T \ 0 6 9 3 0 9 3 0 0 . G P J D B L i b r a r y / L i b r a r y : G E O E N G I N E E R S _ D F _ S T D _ U S _ J U N E _ 2 0 1 7 . G L B / G E I 8 _ G E O T E C H _ S T A N D A R D _ % F _ N O _ G W REMARKS Fi n e s Co n t e n t ( % ) Mo i s t u r e Co n t e n t ( % ) FIELD DATA MATERIAL DESCRIPTION Sa m p l e N a m e Te s t i n g Re c o v e r e d ( i n ) In t e r v a l Bl o w s / f o o t Co l l e c t e d S a m p l e De p t h ( f e e t ) 0 5 10 15 20 25 30 35 Gr a p h i c L o g Gr o u p Cl a s s i f i c a t i o n El e v a t i o n ( f e e t ) 95 90 85 80 75 70 65 Very hard drilling71750/6" Sheet 2 of 2Project Number: Project Location: Project: 0693-093-00 Log of Boring B-1 (continued) Figure A-2 Panther Creek Culvert Renton, Washington Da t e : 1 0 / 2 7 / 2 3 P a t h : \ \ G E O E N G I N E E R S . C O M \ W A N \ P R O J E C T S \ 0 \ 0 6 9 3 0 9 3 \ G I N T \ 0 6 9 3 0 9 3 0 0 . G P J D B L i b r a r y / L i b r a r y : G E O E N G I N E E R S _ D F _ S T D _ U S _ J U N E _ 2 0 1 7 . G L B / G E I 8 _ G E O T E C H _ S T A N D A R D _ % F _ N O _ G W REMARKS Fi n e s Co n t e n t ( % ) Mo i s t u r e Co n t e n t ( % ) FIELD DATA MATERIAL DESCRIPTION Sa m p l e N a m e Te s t i n g Re c o v e r e d ( i n ) In t e r v a l Bl o w s / f o o t Co l l e c t e d S a m p l e De p t h ( f e e t ) 35 Gr a p h i c L o g Gr o u p Cl a s s i f i c a t i o n El e v a t i o n ( f e e t ) 52 16 18 11 18 Approximately 15 inches of asphalt concrete pavement Brown gravel with silt and sand (medium dense, moist) Orange-gray sandy silt with gravel (medium stiff, moist) Gray sandy silt with gravel (medium stiff, moist) Gray/green silty fine sand with gravel (loose, moist) Met refusal at approximately 26½ feet on concrete blocks? 1 %F 2 3 %F 4 5 MC 18 18 18 18 18 7 7 4 9 25 AC GM ML ML SM Notes: 26.5 PW SH Holocene Drilling, Inc. Hollow-stem Auger D-50 Truck-mountedDrilling EquipmentAutohammer 140 (lbs) / 30 (in) Drop WA State Plane North NAD83 (feet) 1299468 165385 97 NAVD88 Easting (X) Northing (Y) Start Total Depth (ft) Logged By Checked By End Surface Elevation (ft) Vertical Datum Drilled Hammer Data System Datum Driller Drilling Method Groundwater not observed at time of exploration 8/24/20238/24/2023 Note: See Figure A-1 for explanation of symbols. Coordinates Data Source: Horizontal approximated based on Topographic Survey. Vertical approximated based on Topographic Survey. Sheet 1 of 1Project Number: Project Location: Project: 0693-093-00 Log of Boring B-2 Figure A-3 Panther Creek Culvert Renton, Washington Da t e : 1 0 / 2 7 / 2 3 P a t h : \ \ G E O E N G I N E E R S . C O M \ W A N \ P R O J E C T S \ 0 \ 0 6 9 3 0 9 3 \ G I N T \ 0 6 9 3 0 9 3 0 0 . G P J D B L i b r a r y / L i b r a r y : G E O E N G I N E E R S _ D F _ S T D _ U S _ J U N E _ 2 0 1 7 . G L B / G E I 8 _ G E O T E C H _ S T A N D A R D _ % F _ N O _ G W REMARKS Fi n e s Co n t e n t ( % ) Mo i s t u r e Co n t e n t ( % ) FIELD DATA MATERIAL DESCRIPTION Sa m p l e N a m e Te s t i n g Re c o v e r e d ( i n ) In t e r v a l Bl o w s / f o o t Co l l e c t e d S a m p l e De p t h ( f e e t ) 0 5 10 15 20 25 Gr a p h i c L o g Gr o u p Cl a s s i f i c a t i o n El e v a t i o n ( f e e t ) 95 90 85 80 75 With wood fragments Big tree root 42 39 15 27 Approximately 15 inches of asphalt concrete pavement Brown gravel with silt, sand and boulder (medium dense, moist) Orange-gray silty sand with gravel (loose, moist) (fill) Gray silty sand with gravel and organic matter (wood) (medium dense, moist) (fill) Red-brown weathered sandstone (Renton formation) Light gray sandstone/siltstone (Renton formation) 1 2 %F 3%F 4 5 6 4 7 18 4 12 11 9 6 20 6 50/5" 50/4.5" AC GP-GM SM SM RX RX Notes: 36 PW SH Holocene Drilling, Inc. Hollow-stem Auger D-50 Truck-mountedDrilling EquipmentAutohammer 140 (lbs) / 30 (in) Drop WA State Plane North NAD83 (feet) Undetermined NAVD88 Easting (X) Northing (Y) Start Total Depth (ft) Logged By Checked By End Surface Elevation (ft) Vertical Datum Drilled Hammer Data System Datum Driller Drilling Method Groundwater not observed at time of exploration 8/24/20238/24/2023 Note: See Figure A-1 for explanation of symbols. Coordinates Data Source: Horizontal approximated based on Topographic Survey. Vertical approximated based on Topographic Survey. Sheet 1 of 2Project Number: Project Location: Project: 0693-093-00 Log of Boring B-3 Figure A-4 Panther Creek Culvert Renton, Washington Da t e : 1 0 / 2 7 / 2 3 P a t h : \ \ G E O E N G I N E E R S . C O M \ W A N \ P R O J E C T S \ 0 \ 0 6 9 3 0 9 3 \ G I N T \ 0 6 9 3 0 9 3 0 0 . G P J D B L i b r a r y / L i b r a r y : G E O E N G I N E E R S _ D F _ S T D _ U S _ J U N E _ 2 0 1 7 . G L B / G E I 8 _ G E O T E C H _ S T A N D A R D _ % F _ N O _ G W REMARKS Fi n e s Co n t e n t ( % ) Mo i s t u r e Co n t e n t ( % ) FIELD DATA MATERIAL DESCRIPTION Sa m p l e N a m e Te s t i n g Re c o v e r e d ( i n ) In t e r v a l Bl o w s / f o o t Co l l e c t e d S a m p l e De p t h ( f e e t ) 0 5 10 15 20 25 30 35 Gr a p h i c L o g Gr o u p Cl a s s i f i c a t i o n El e v a t i o n ( f e e t ) 650/4" Sheet 2 of 2Project Number: Project Location: Project: 0693-093-00 Log of Boring B-3 (continued) Figure A-4 Panther Creek Culvert Renton, Washington Da t e : 1 0 / 2 7 / 2 3 P a t h : \ \ G E O E N G I N E E R S . C O M \ W A N \ P R O J E C T S \ 0 \ 0 6 9 3 0 9 3 \ G I N T \ 0 6 9 3 0 9 3 0 0 . G P J D B L i b r a r y / L i b r a r y : G E O E N G I N E E R S _ D F _ S T D _ U S _ J U N E _ 2 0 1 7 . G L B / G E I 8 _ G E O T E C H _ S T A N D A R D _ % F _ N O _ G W REMARKS Fi n e s Co n t e n t ( % ) Mo i s t u r e Co n t e n t ( % ) FIELD DATA MATERIAL DESCRIPTION Sa m p l e N a m e Te s t i n g Re c o v e r e d ( i n ) In t e r v a l Bl o w s / f o o t Co l l e c t e d S a m p l e De p t h ( f e e t ) 35 Gr a p h i c L o g Gr o u p Cl a s s i f i c a t i o n El e v a t i o n ( f e e t ) 0 10 20 30 40 50 60 70 80 90 100 0.0010.010.11101001000 PE R C E N T P A S S I N G B Y W E I G H T GRAIN SIZE IN MILLIMETERS U.S. STANDARD SIEVE SIZE 2” SAND SILT OR CLAYCOBBLES GRAVEL COARSE MEDIUM FINECOARSEFINE Boring Number Depth (feet)Soil Description B-1 B-2 B-2 20 5 15 Silty sand with gravel (SM) Sandy silt with gravel (ML) Silty sand (SM) Symbol Moisture (%) 19 18 11 3/8”3” 1.5”#4 #10 #20 #40 #60 #1003/4” Fi g u r e A - 5 Si e v e A n a l y s i s R e s u l t s Pa n t h e r C r e e k Re n t o n , W a s h i n g t o n 00693-093-00 Date Exported: 09/12/2023 Note: This report may not be reproduced, except in full, without written approval of GeoEngineers, Inc. Test results are applicable only to the specific sample on which they were performed, and should not be interpreted as representative of any other samples obtained at other times, depths or locations, or generated by separate operations or processes. The grain size analysis results were obtained in general accordance with ASTM D6913. GeoEngineers 17425 NE Union Hill Road Ste 250, Redmond, WA 98052 #2001”#140 Appendix B 2006 Landslide Site Plan and Cross Section Appendix C Report Limitations and Guidelines for Use City of Renton | February 12, 2025 Page C-1 File No. 0693-093-00 Appendix C Report Limitations and Guidelines For Use1 This appendix provides information to help you manage your risks with respect to the use of this report. READ THESE PROVISIONS CLOSELY It is important to recognize that the geoscience practices (geotechnical engineering, geology, and environmental science) rely on professional judgment and opinion to a greater extent than other engineering and natural science disciplines, where more precise and/or readily observable data may exist. To help clients better understand how this difference pertains to our services, GeoEngineers includes the following explanatory “limitations” provisions in its reports. Please confer with GeoEngineers if you need to know more how these “Report Limitations and Guidelines for Use” apply to your project or site. GEOTECHNICAL SERVICES ARE PERFORMED FOR SPECIFIC PURPOSES, PERSONS, AND PROJECTS This report has been prepared for City of Renton and for the Project(s) specifically identified in the report. The information contained herein is not applicable to other sites or projects. GeoEngineers structures its services to meet the specific needs of its clients. No party other than the party to whom this report is addressed may rely on the product of our services unless we agree to such reliance in advance and in writing. Within the limitations of the agreed scope of services for the Project, and its schedule and budget, our services have been executed in accordance with our Agreement with City of Renton dated May 19, 2023 and generally accepted geotechnical practices in this area at the time this report was prepared. We do not authorize, and will not be responsible for, the use of this report for any purposes or projects other than those identified in the report. A GEOTECHNICAL ENGINEERING OR GEOLOGIC REPORT IS BASED ON A UNIQUE SET OF PROJECT-SPECIFIC FACTORS This report has been prepared for the proposed Panther Creek Culvert Replacement Project. GeoEngineers considered a number of unique, project-specific factors when establishing the scope of services for this project and report. Unless GeoEngineers specifically indicates otherwise, it is important not to rely on this report if it was: ■ Not prepared for you, ■ Not prepared for your project, ■ Not prepared for the specific site explored, or ■ Completed before important project changes were made. 1 Developed based on material provided by GBA, GeoProfessional Business Association; www.geoprofessional.org. City of Renton | February 12, 2025 Page C-2 File No. 0693-093-00 For example, changes that can affect the applicability of this report include those that affect: ■ The function of the proposed structure; ■ Elevation, configuration, location, orientation, or weight of the proposed structure; ■ Composition of the design team; or ■ Project ownership. If changes occur after the date of this report, GeoEngineers cannot be responsible for any consequences of such changes in relation to this report unless we have been given the opportunity to review our interpretations and recommendations. Based on that review, we can provide written modifications or confirmation, as appropriate. ENVIRONMENTAL CONCERNS ARE NOT COVERED Unless environmental services were specifically included in our scope of services, this report does not provide any environmental findings, conclusions, or recommendations, including but not limited to, the likelihood of encountering underground storage tanks or regulated contaminants. SUBSURFACE CONDITIONS CAN CHANGE This geotechnical or geologic report is based on conditions that existed at the time the study was performed. The findings and conclusions of this report may be affected by the passage of time, by man-made events such as construction on or adjacent to the site, new information or technology that becomes available subsequent to the report date, or by natural events such as floods, earthquakes, slope instability or groundwater fluctuations. If more than a few months have passed since issuance of our report or work product, or if any of the described events may have occurred, please contact GeoEngineers before applying this report for its intended purpose so that we may evaluate whether changed conditions affect the continued reliability or applicability of our conclusions and recommendations. GEOTECHNICAL AND GEOLOGIC FINDINGS ARE PROFESSIONAL OPINIONS Our interpretations of subsurface conditions are based on field observations from widely spaced sampling locations at the site. Site exploration identifies the specific subsurface conditions only at those points where subsurface tests are conducted or samples are taken. GeoEngineers reviewed field and laboratory data and then applied its professional judgment to render an informed opinion about subsurface conditions at other locations. Actual subsurface conditions may differ, sometimes significantly, from the opinions presented in this report. Our report, conclusions and interpretations are not a warranty of the actual subsurface conditions. GEOTECHNICAL ENGINEERING REPORT RECOMMENDATIONS ARE NOT FINAL We have developed the following recommendations based on data gathered from subsurface investigation(s). These investigations sample just a small percentage of a site to create a snapshot of the subsurface conditions elsewhere on the site. Such sampling on its own cannot provide a complete and accurate view of subsurface conditions for the entire site. Therefore, the recommendations included in this report are preliminary and should not be considered final. GeoEngineers’ recommendations can be finalized only by observing actual subsurface conditions revealed during construction. GeoEngineers City of Renton | February 12, 2025 Page C-3 File No. 0693-093-00 cannot assume responsibility or liability for the recommendations in this report if we do not perform construction observation. We recommend that you allow sufficient monitoring, testing and consultation during construction by GeoEngineers to confirm that the conditions encountered are consistent with those indicated by the explorations, to provide recommendations for design changes if the conditions revealed during the work differ from those anticipated, and to evaluate whether earthwork activities are completed in accordance with our recommendations. Retaining GeoEngineers for construction observation for this project is the most effective means of managing the risks associated with unanticipated conditions. If another party performs field observation and confirms our expectations, the other party must take full responsibility for both the observations and recommendations. Please note, however, that another party would lack our project- specific knowledge and resources. A GEOTECHNICAL ENGINEERING OR GEOLOGIC REPORT COULD BE SUBJECT TO MISINTERPRETATION Misinterpretation of this report by members of the design team or by contractors can result in costly problems. GeoEngineers can help reduce the risks of misinterpretation by conferring with appropriate members of the design team after submitting the report, reviewing pertinent elements of the design team’s plans and specifications, participating in pre-bid and preconstruction conferences, and providing construction observation. DO NOT REDRAW THE EXPLORATION LOGS Geotechnical engineers and geologists prepare final boring and testing logs based upon their interpretation of field logs and laboratory data. The logs included in a geotechnical engineering or geologic report should never be redrawn for inclusion in architectural or other design drawings. Photographic or electronic reproduction is acceptable, but separating logs from the report can create a risk of misinterpretation. GIVE CONTRACTORS A COMPLETE REPORT AND GUIDANCE To help reduce the risk of problems associated with unanticipated subsurface conditions, GeoEngineers recommends giving contractors the complete geotechnical engineering or geologic report, including these “Report Limitations and Guidelines for Use.” When providing the report, you should preface it with a clearly written letter of transmittal that: ■ Advises contractors that the report was not prepared for purposes of bid development and that its accuracy is limited; and ■ Encourages contractors to conduct additional study to obtain the specific types of information they need or prefer. CONTRACTORS ARE RESPONSIBLE FOR SITE SAFETY ON THEIR OWN CONSTRUCTION PROJECTS Our geotechnical recommendations are not intended to direct the contractor’s procedures, methods, schedule, or management of the work site. The contractor is solely responsible for job site safety and for managing construction operations to minimize risks to on-site personnel and adjacent properties. City of Renton | February 12, 2025 Page C-4 File No. 0693-093-00 BIOLOGICAL POLLUTANTS GeoEngineers’ Scope of Work specifically excludes the investigation, detection, prevention, or assessment of the presence of Biological Pollutants. Accordingly, this report does not include any interpretations, recommendations, findings, or conclusions regarding the detecting, assessing, preventing or abating of Biological Pollutants, and no conclusions or inferences should be drawn regarding Biological Pollutants as they may relate to this project. The term “Biological Pollutants” includes, but is not limited to, molds, fungi, spores, bacteria, and viruses, and/or any of their byproducts. A Client that desires these specialized services is advised to obtain them from a consultant who offers services in this specialized field. INFORMATION PROVIDED BY OTHERS GeoEngineers has relied upon certain data or information provided or compiled by others in the performance of our services. Although we use sources that we reasonably believe to be trustworthy, GeoEngineers cannot warrant or guarantee the accuracy or completeness of information provided or compiled by others.