Loading...
HomeMy WebLinkAboutDOE_Kennydale Lakeline Sewer System Replacement Project STATE OF WASHINGTON DEPARTMENT OF ECOLOGY Northwest Region Office PO Box 330316, Shoreline, WA 98133-9716 • 206-594-0000 November 14, 2025 City of Renton Anousheh Nawaz 1055 South Grady Way Renton, WA 98057 Re: City of Renton Substantial Development Permit No. LUA25-000219 Ecology Permit No. 2025-NWRO-9357 Dear Anousheh Nawaz: On November 14, 2025, the Department of Ecology (Ecology) received notice that the City of Renton (City) has approved with conditions your application for a Substantial Development Permit (SDP) to replace an existing 4,680-foot in-lake sewer system with a new land-based low- pressure sewer system serving 56 properties and a public park. The proposed replacement system includes approximately 4,950 linear feet of new force main, 55 individual grinder pump stations, and associated electrical and utility improvements, to be constructed primarily within Mountain View Avenue North and an unnamed access road east of the lake. The project will occur in two phases: upland construction of the new sewer system and in-water decommissioning of the existing lake-line system. The project is located at Kennydale Beach Park and 56 private properties along Lake Washington from the north end of Gene Coulon Memorial Beach Park to just south of May Creek, within a Residential shoreline environment designation along Lake Washington. By law, local governments must review all SDPs for compliance with: • The Shoreline Management Act (Chapter 90.58 RCW), • The SDP approval criteria (WAC 173-27-150), and • The Renton Shoreline Master Program. Local governments, after reviewing SDPs for compliance, are required to submit them to Ecology. We have received your SDP. Kennydale Lakeline Sewer System Replacement Project November 14, 2025 Page 2 of 2 What Happens Next? Before you begin activities authorized by this permit, the law requires you to wait at least 21 days from November 14, 2025, the "date of filing." This appeal period allows anyone (including you) who disagrees with any aspect of this permit to appeal the decision to the state Shorelines Hearings Board (SHB). You must wait for the conclusion of an appeal before you can begin the activities authorized by this permit. The SHB will notify you if they receive an appeal. We recommend that you contact the SHB before you begin permit activities to ensure they have not received an appeal. You may reach them at 360-664-9160, eluho@eluho.wa.gov, or https://eluho.wa.gov/boards/shorelines- hearings-board. If you want to appeal this decision, you can find appeal instructions at https://eluho.wa.gov/boards/shorelines-hearings-board/how-file-petition-review or on the website of the Washington State Legislature at: http://apps.leg.wa.gov/wac/default.aspx?cite=461-08 (Chapter 461-08 WAC). Please note, other federal, state, and local permits may be required in addition to this shoreline permit. If you have any questions about this letter, please contact Brooke Sullivan at 425-570-2028 or Brooke.Sullivan@ecy.wa.gov. Sincerely, Katarina Wells Administrative Assistant Shorelands and Environmental Assistance Program ec: Alex Morganroth, City of Renton Brooke Sullivan, Department of Ecology