HomeMy WebLinkAbout04-01-87.2TITLE
COVER SHEET
INDEX OF SHEETS
INDEX OF SHEETS
EXISTING PAVEMENT CROSS SECTIONS
PAVEMENT CONSTRUCTION HISTORY
SUMMARY OF PAVEMENT CONDITION SURVEY
ALLOWABLE LOADS OF SINGLE GEAR AIRCFAFT
5,000 ANNUAL OPERATIONS
ALLOWABLE LOADS OF SINGLE GEAR AIRCRAFT
50,000 ANNUAL OPERATIONS
ALLOWABLE LOADS OF SINGLE GEAR AIRCRAFT
100,000 ANNUAL OPERATIONS
ALLOWABLE LOADS OF DUAL GEAR AIRCRAFT
100 ANNUAL OPERATIONS
ALLOWABLE LOADS OF DUAL GEAR AIRCRAFT
500 ANNUAL OPERATIONS
ALLOWABLE LOADS OF DUAL TANDEM AIRCRAFT
100 ANNUAL OPERATIONS
AIRFIELD PAVEMENT MANAGEMENT PLAN
SHEET NO.
i
2
3
5 (2 SHTS)
7
P
E
10
11
12
13 (4 SHTS)
Page_ of /—