Loading...
HomeMy WebLinkAboutR-43781100 C'7 0 w I 0 4'-0" #6x a CORNER BARS 10" O.C. E.F. 20'-O" 0- J ,3 INLET & OUTLET LOCATIONS PER A z INLET & OUTLET LOCATIONS PER CIVIL ENGR. REINF. AROUND '� S5 CIVIL ENGR. REINF. AROUND OPENING PER F/S1-------_ OPENING PER F/Sl b i I _ STEP FOOTING —7 fl46100 1 -I 461.00 \ i I I '4'-6 01,f \ b \ i I , i I I i I j I I 1 L - - -i L -4 --J7'-11"L - -' \\ 0\Q • OONC 0. I I I I I I I - —+— - --+- - L- _J L_ J _ LJ \ — \ C Z'i 9'-0" 9'-0" , 5'-7 \34m \ S5 rn I r- --I I-- 71F-- --- �--� � I ' I I + I I -� 6" SLAB ON GRADE W/ #4 L_T_J L_ _ L_ _-- _ 16" O.C. EA. WAY b C I , \ MID -DEPTH OF SLAB I-- i --I r-�-, + f —� _-I f- I - I D I I I I L- - S5 �-- -J + L- --I L- J \\ ICL: I_i l I t 459.80 \\ I I I I I L -SLOPE L- -J L -J L-7_-J L_ t � SLOPE � \/ A 111 T nn If^I IAIM A mrl^KI nl A AI 1'-C C.I.P. CONC. WALL INLET & OUTLET LOCATIONS PER CIVIL ENGR. REINF. AROUND OPENING PER F/S1 77'-2" IZ C uj r_�_� r_�_� o r_�__1 r_�_� I-- �_-� 463.0 J L_t_J L_t_J L-t-J L_t_J L_t_J L_ I I I I I I i I -- - r- - r- - r- -� r- - r- -7 - -� I I i I I I I I I I I I I I I I I I I I I I I I I I _J L-+-J L_+_J L- _J L_ L-+-J 1 459.00 I Q I L i -i 1 I i I I�� r—I—� r—i—� -1-7 r —I ---I I I I i I I I I I I I I _J L_ -J L- L_ _J i 1 I I I I I--- - (-- - I r-7 r- -7 I -_ _J L-T J L_ _J L_ -J L �J L- _J r I 461.33 I' I 11 -1 f 1 r r L--�- - -�- - - -4- -4- -+- r-� 7 r r I I I I II I I _J L_+_J L_ J L-+_J S5 L J LJ L-+._J r--I r- I I 1 I 1 I I I I 1 i I I 1 I I t I�J L_ J L- -J L--J L_ _J L L_ -J II i I I ' 463.00 I I 0 L_-_J I L---J I L-- J I L- �'J I L__-J I L_ -J I - VAULT B1 FOU SCALE: � 1) ELEVATIONS N IN BOX (xxx.xx) ARE TO TOP OF CONCRETE. Z3)ENCE ML ENGINEER'S DRAWINGS FOR ELEVATIONS AND SLOPES. DISCREPANCIES S BROUGHT TO THE ATTENTION L AND STRUCTURAL ENGINEERS IMMEDIATELY. HEET S1 FOR GENERAL NOTESAND TYPICAL DETAILS.IS TO HAVE SOIL ENGINEER REVIEW FOUNDATION PLAN PRIOR TO GRADING TO VERIFY C NCE WrrH THE GEOTECHNICAL REPORT'S RECOMMENDATIONS. 5) CONTRACTOR IS TO HAVE SOIL ENGINEER INSPECT ALL FOOTING AREAS PRIOR TO PLACEMENT OF REINFORC TO VERIFY SOIL CONDITION AS DESCRIBED IN GEOTECHNICAL REPORT. 6) SHORING IS THE RESPONSIBILITY OF THE CONTRACTOR. 7) VAULT LIDS MUST BE IN PLACE PRIOR TO BACKFILLING AND COMPACTING SOIL BEHIND WALLS. 8) REFERENCE DETAIL K/S1 FOR S.O.G. JOINT DETAIL. PLAN 1/8"=1'-0" — INLET & OUTLET LOCATIONS PER CIVIL ENGR. REINF. AROUND OPENING PER F/S1 6" TYP. `o 3'-0" DEEP b 10" C. WALL, S5S5 b 11ILLI dC vuiLCI LvuhiiuNa rCK CIVIL ENGR. REINF. AROUND OPENING PER I-/S1 6" SLAB ON GRADE W/ #4 16" O.C. EA. WAY MID -DEPTH OF SLAB VAULT A FOUNDATION PLAN SCALE: 1 /8" =1'-0" tee. 12-06-04 AO&1� ENGINEERS, INC. 600 UNIVERSITY STREET -SUITE 1122 SEATTLE • WASHINGTON • 98101-4104 (206) 381.9900 • FAX (206) 381-9909 AKB JOB No. 202016 z z 0 0 �W U f� C!) W � r� co r__4 F m O i I. z N � � o ZZ ' W o o d M0 Q t-AH L CS cq inPPF4 a DATE: 3/13/03 FOUNDATION PLAN S2 202016 R-437811