TEMPORARY EROSION CONTROL SEED MIX TS \ STANDARD ESC PLAN NOTES
-- %1€IG'1 tfi — 3�--PUtfiY—- GERt�IPTiOi�— x 1�- 1. APPROVAL OF THIS EROSION AND SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN
— — ' \ APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G., SIZE AND LOCATION OF ROADS, PIPES,
"« e --------
CHEWINGS RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES, ETC.).
CHEWINGS OR RED FESCUE 40 98 90 1 B A A B B A A B \ ,
FESTUCA RUBRA VAR. COMM41TATA OR \ 18
FESTUCA RUBRA \ ; : ' 1 SILT 2
2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT,
FENCE
ANNUAL OR PERENNIAL RYE 40 98 90
\ \ \ AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/ESC SUPERVISOR
LOL/UM MULT/FLORUM OR LOLIUM PERENNE UNTIL ALL CONSTRUCTION IS APPROVED.
Q �` \ 3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED BY A
REDTOP OR COLONIAL BENTGRASS 10 92 85 CONTINUOUS LENGTH OF SURVEY TAPE OR FENCING, IF REQUIRED PRIOR TO CONSTRUCTION. DURING
AGROST/S ALBA OR AGROST/S TENU/S ____ 477____ -___ THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED.
`47g_ THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION
g �\ OF CONSTRUCTION.
WHITE DUTCH CLOVER 10 98 90 <>�.
TRIFOLIUM REPENS 1,�TERIM CB \
4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED PRIOR TO OR IN CONJUCTION WITH
\ /(TYP) e ;i \-1 ALL CLEARING AND GRADING SO AS TO ENSURE THAT THE TRANSPORT OF SEDIMENT TO SURFACE WATERS,
- I + DRAINAGE SYSTEMS, AND ADJACENT PROPERTIES IS MINIMIZED.
`
------ - ---- �`-`--------- 19 NOTICE OF PROPOSED 5. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE
'
CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS CONSTRUCTION
C1 p° ACTIV" NEEDED FOR UNEXPECTED STORM EVENTS AND MODIFIED TO ACCOUNT FOR CHANGING SITE CONDITIONS
(E.G., ADDITIONAL SUMP PUMPS, RELOCATION OF DITCHES AND SILT FENCES, ETC.).
King County
I I ACRES) ' E F ) Department of Development
I Environmental Services 6. THE ESC FACILITIES SHALL BE INSPECTED DAILY BY THE APPLICANT/ESC SUPERVISOR AND MAINTAINED
900 Oakesdole Ave SW TO ENSURE CONTINUED PROPER FUNCTIONING. WRITTEN RECORDS SHALL BE KEPT OF WEEKLY REVIEWS
Renton WA 98055-1219 OF THE ESC FACILITIES DURING THE WET SEASON OCT. 1 TO APRIL 30 AND OF MONTHLY REVIEWS
PORAR j ` I j \ c Type of Action: Type of Permit DURING THE DRY SEASON (MAY 1 TO SEPT. 30).
I A A A A d I „ % co Project No: Lyy0000
1 RCEPT R ( I I C1 I `t Description: What Construction wll Be 7, ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED
S \ I t' Projected Completion Date: mm/dd/yy FOR TWO DAYS DURING THE WET SEASON OR SEVEN DAYS DURING THE DRY SEASON SHALL BE
! — -- --=--- Hours of Construction: Typical Hours of Operction IMMEDIATELY STABILIZED WITH THE APPROVED ESC METHODS E.G., SEEDING MULCHING, PLASTIC
King County's Contact: Assigned Staff
! Phone Number• (206) 296-0000 COVERING, ETC.).
II ,
Q V Q V Q Q Q Q I ; j j DevelP one Contact Developer Contact Person 8. ANY AREA NEEDING ESC MEASURES THAT DO NOT REQUIRE IMMEDIATE ATTENTION SHALL BE ADDRESSED
C1 j Pone Number. 000 000—DODO
I TESC Supervisor. �000) 000-0000 (24 hr. Contact) WITHIN (15) DAYS.
After Business Hours for
jEnvironmental or Safety
ap II % 9. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A
Related Emergencies: 1-838-437-4771 MONTH OR WITHIN FORTY EIGHT 48 HOURS FOLLOWING A STORM EVENT.
D1 D� D1 D1 10, AT NO TIME SHALL MORE THAN ONE 1)FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A
II C1 t CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING.
I I. THE CLEANNG OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM.
11. STABILIZED CONSTRUCTION ENTRANCES AND ROADS SHALL BE INSTALLED AT THE BEGINNING OF
---------- ---_ �. -------- ------ --- H
\ � III i � '" CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT ADDTIONAL MEASURES, SUCH -------- EA -LIMITS-476_____ ___ I
48 AS WASH PADS MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE
I \Ili iii ,
b „ e v ! DURATION OF THE PROJECT.
_.. _.-
\ C1
\ ' 12. ANY PERMANENT FLOW CONTROL FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED
10 ` / / WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY.
' IF THE FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION SYSTEM THE TEMPORARY FACILITY
III �
0 20 —407 80 I /j D\ D D1 , D1 D1 ' H MUST BE GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL
t-_ - T III o .\
GRADE OF THE PERMANENT FACILITY.
/, /
, ,I
SCALE 1�=40' j // i c1 c
K Q Q 6 (� Q III•, w} 13. WHERE STRAW MULCH FOR TEMPORARY EROSION CONTROL IS REQUIRED, IT SHALL BE APPLIED AT A
STREAM CROSSING \ _ MINIMUM THICKNESS OF 2 TO 3 INCHES.
INSTALL SILT FENCE TOE OF / I �_ _ _ _. _ Y----
_____: IX -- -- - _-------_- --!PoM�z4 -- _ i -III- - II�- �c E-40.t2 (8' I II 11=1 I_I IIII I I —I —III-1 I I-1 I I-1 I I_I I-1 I-1 11=1 I I-1 11=1 —1 II I I-1I_I'PROPOSED SLCPF. INSTALL ��`_ IS — 14. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE REVIEWED
-- __ '�., — I ifY WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS
PERMANENT CUL` E.RT & FILL TO j I ! o TO DENT I SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON, A SKETCH MAP OF
FINAL GRADE. STABILIZE SLOPES;' a I q ro N THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE
f AS NECESSARY. I zs �I \ I I/ C1 i DDES INSPECTOR. THE DDES INSPECTOR CAN REQUIRE SEEDING OF ADDITIONAL AREAS IN ORDER TO
PROTECT SURFACE WATERS, ADJACENT PROPERTIES, OR DRAINAGE FACILITIES.
1 1 1 I \
-IS
-----______=_____- ------ ---- -- _== till I NOTICE OF CONSTRUCTION ACTIVITY SIGN _
- -- ----- ------ ---
-- NTS CONSTRUCTION SEQUENCE
C C G . Q 1. HOLD THE PRE —CONSTRUCTION MEETING, v
2. FLAG OR FENCE CLEARING LIMITS.
1
A _I
3. POST A SIGN WITH THE NAME AND PHONE NUMBER OF THE ESC SUPERVISOR.
Io /\' " 4. INSTALL CATCH BASIN PROTECTION, IF REQUIRED.
�� 1 — — — —
5. GRADE AND INSTALL CONSTRUCTION ENTRANCE(S).
A
7. CONSTRUCT SEDIMENT PONDS AND TRAPS.
B A B B A A B I
jI ! I AV --- ----1 8. GRADE AND STABILIZE CONSTRUCTION ROADS.
LEGEND
TE PoiAR -4- x INKIRCEPT9. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR DIKES, PIPE SLOPE DRAINS, ETC.) SIMULTANEOUSLY
I; TEMP OR / I CB ,t g �y \\��\ _ —� TEMPORARY INTERCEPTOR SWALE WITH CLEARING AND GRADING FOR PROJECT DEVELOPMENT.
INTER ; (� 20 s 21 i 1 \
X EC ON O I `�x CLEARING LIMTS 10. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH KING COUNTY STANDARDS AND
I r1 \
\\\ ` \ ( ( MANUFACTURERS RECOMMENDATIONS.
' I SILT FENCE
� 1' � D I �' D1 p D1 I
!'„ \ \\`° \ i %, \T 11, RELOCATE SURFACE WATER CONTROLS OR EROSION CONTROL MEASURES, OR INSTALL NEW MEASURES
a a Q ; `� \ -��----x-- I , \ SO THAT AS SITE CONDITIONS CHANGE THE EROSION AND SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE
it lk\
INTERIM CB PROTECTION WITH THE KING COUNTY EROSION AND SEDIMENT CONTROL STANDARDS.
1 e\ \ \ 1 I I I \
- \�\\ ;\` ` I l 1 ' �\ TEMPORARY CONSTRUCTION ENTRANCE 12. COVER ALL AREAS THAT WILL BE UNWORKED FOR MORE THAN SEVEN DAYS DURING THE DRY SEASON
' 0 0 0 o 09 IOU
0 0 o OR TWO DAYS DURING THE WET SEASON WITH STRAW, WOOD FIBER MULCH, COMPOST, PLASTIC SHEETING,
' �1 \'" ` \ t ( OR EQUIVALENT.
\ \
13• STABILIZE ALL AREAS WITHIN SEVEN DAYS OF REACHING FINAL GRADE.
I I \
j " ` 14. SEED OR SOD ANY AREAS TO REMAIN UNWORKED FOR MORE THAN 30 DAYS.
/ I I 22 I , \ i \ \
\ �\ B TEM ORARY D1 D1 D1 '� - I \ / �� I \ \KING®UNTY D.Dm?,oSa 15. UPON COMPLETION OF THE PROJECT, STABILIZE ALL DISTURBED AREAS AND REMOVE BMPs IF
\ \32 12I \ — .� _ \ T p'` APPROPRIATE.
\ ��L1�Ii��EI���,E1I
COMMEMCUtL PPiEr, P ASTPROVAJ
\ - KING COUNTY D.D.E.S.
f-`1.T;, ENf'INE R1NG�DR �L CORRECTED PLAN
Di%'FE �i� SIGI`N"EA REVIEW ENGINEER COMPLETION DATE
?�/ SENIOR ENGINEER COMPLETION DATE
0Af
L I
_ _ — �. _ —��sN�� _ _ _. DATE: --"
WARTEING
TEMPORARY CONSTRUCTION Ef�TRANCE SILT FENCE \ OS DATE -Y- -- SIGNED JAMES H. SANDERS, P.E. APPROVAL DATE
\+�� Sp>aL� LO1°JDi05' APPROVED. DEVELOPMENT ENGINEER
k 1 1 f COMMENTS:
� I
I
DESIGNED JW
DRAWN DP
CHECKED
DATE 8 17 01
SCALE 1 "=4d
ENGINEERING, INC.
W.
a WAS
D VA,
b� ,,► w�
o g �1 w
jaxaL
EXPIRES: 05-24— f
OWNER/DEVELOPER:
PDSK PROPERTIES, INC.
621 PACIFIC AVE., SUITE 300
TACOMA WA. 98402
�
'""
N11161M
TITLE:
TEMPORARY EROSION/SEDIMENTATON CONTROL PLAN
10836 SE 190TH ST.
BELGROVE AT MNTON
KING COUNTY WASHINGTON
SHEET
9 OF 10
Y �5°,m
(253)565-4491 • Seattle (206)824-1205 • FAX (253)565-8563
Land Planning & Use • Engineering • Surveying
1910-64th Avenue Wes#, • Tacoma, WA 98466
JOB NO.
01-065
1
3/10/03
JW
CSDP REVISION
No.
Date
6
A r.
Revision
R-437824