TRIP GENERATION ASSESSMENT
Renton Daycare
Renton, Washington
March 5, 2025
HeathTraffic.com
Renton Daycare – Trip Generation Assessment
2
Renton Daycare
TRIP GENERATION ASSESSMENT
Prepared for:
Christhian Arcila
425-299-8913
Prepared by:
Heath & Associates
PO Box 397
Puyallup, WA 98371
(253) 770-1401
Heathtraffic.com
License:
03/05/2025
HeathTraffic.com
Renton Daycare – Trip Generation Assessment
3
RENTON DAYCARE
TRIP GENERATION ASSESSMENT
1. INTRODUCTION
Heath & Associates has been engaged to prepare a trip generation assessment for
the proposed Renton Daycare development. This report will summarize the project
and provide trip generation, distribution, and assignment information.
2. PROJECT DESCRIPTION
Proposal
• Renton Daycare is a proposed daycare facility for a site located within the City
of Renton, Washington. Currently, a ~1,312 square feet (sf) commercial office
building and a 504 sf single-wide trailer exists on-site. These will be
repurposed for the proposed daycare. Additionally, the development is to
include a 790 sf fenced outdoor playground for daycare use only.
Location
• The subject site is situated on 0.45-acres within tax parcel: 102305-9117.
• The site address is 4508 NE 4th Street, Renton.
• The site is bordered to the south by NE 4th Street, with an existing access
connection via two driveways extending north from NE 4th Street.
A vicinity map is provided in Figure 1 below. A conceptual site plan is shown in
Figure 2.
Figure 1: Vicinity Map
SITE
NE 4th St
Br
e
m
e
r
t
o
n
A
v
e
N
E
Du
v
a
l
l
A
v
e
N
E
N
HeathTraffic.com
Renton Daycare – Trip Generation Assessment
4
Figure 2: Site Plan
N
HeathTraffic.com
Renton Daycare – Trip Generation Assessment
5
3. TRIP GENERATION
Trip generation is defined as the number of vehicle movements that enter or exit the
prospective project site during a designated time period, such as a specific peak hour (AM or
PM) or an entire day. Trip estimates were derived from the Institute of Transportation
Engineers (ITE) publication, Trip Generation, 11th Edition. The ITE land use for the proposed
development was defined as LUC – 565 (Day Care Center) using square footage as the input
variable. The ITE land use for the previous development was defined as LUC – 712 (Small
Office Building) using square footage as the input variable. ITE average rates were used to
determine trip ends.
Table 1 below highlights the trip generation for the previous use and the proposed Renton
Daycare.
Table 1: Project Trip Generation
Land Use Variable Size AWDT AM Peak Hour PM Peak Hour
In Out Total In Out Total
Proposed Use
Day Care Center
(LUC 565) KSF 1.82 87 10 10 20 9 11 20
Previous Use (Credit for trips)
Small Office Building
(LUC 712) KSF 1.82 -26 -2 -1 -3 -1 -3 -4
Total Net New Site Trips 61 8 9 17 8 8 16
Based on ITE data, the proposed Renton Daycare is estimated to generate 61 net new daily
trips with 17 net new AM peak hour trips (8 entering, 9 exiting) and 16 net new PM peak hour
trips (8 entering, 8 exiting). It should also be noted that ITE considers 40% of daycare trips to
be in the form of pass-by. Consequently, out of the 16 net new PM peak hour trips, 6 could
be pass-by and are not considered new trips to the city system.
4. TRIP DISTRIBUTION
Trip distribution describes the process by which project-generated trips are dispersed onto
the roadway network surrounding the site. Figures 3 and 4 on the following pages illustrate
the estimated AM and PM peak hour trip distribution and assignment. Given the site location
and use, project trips were split 50% east & 50% west at the site driveway.
FIGURE 3
AM PEAK HOUR TRIP DISTRIBUTION & ASSIGNMENT
RENTON DAYCARE
SITE
50%50%
4 5
44STOP
AM PEAK HOUR TRIPS
INBOUND: 8 VPH
OUTBOUND: 9 VPH
N
NE 4TH ST
BR
E
M
E
R
T
O
N
A
V
E
N
E
DU
V
A
L
L
A
V
E
N
E
Renton Daycare – Trip Generation Assessment
6
FIGURE 4
PM PEAK HOUR TRIP DISTRIBUTION & ASSIGNMENT
RENTON DAYCARE
SITE
50%50%
4 4
44STOP
PM PEAK HOUR TRIPS
INBOUND: 8 VPH
OUTBOUND: 8 VPH
N
NE 4TH ST
BR
E
M
E
R
T
O
N
A
V
E
N
E
DU
V
A
L
L
A
V
E
N
E
Renton Daycare – Trip Generation Assessment
7
HeathTraffic.com
Renton Daycare – Trip Generation Assessment
8
5.CONCLUSION
Renton Daycare is a proposed daycare facility for a site located within the City of
Renton, Washington. Currently, a ~1,312 square feet (sf) commercial office building
and a 504 sf single-wide trailer exists on-site. These will be repurposed for the
proposed daycare. Additionally, the development is to include a 790 sf fenced
outdoor playground for daycare use only.
Based on ITE data, the proposed change in use is estimated to generate 61 net new
daily trips with 17 net new AM peak hour trips (8 entering, 9 exiting) and 16 net new
PM peak hour trips (8 entering, 8 exiting). As this is under 20 peak hour trips, no
further analysis is identified at this time. Additionally, ITE data indicates that 40% of
peak-hour trips may be pass-by trips, which do not introduce new traffic to the city's
roadway system.
Please contact me should you have any questions or require further analysis.
Thank you,
Aaron Van Aken, P.E. PTOE
avanaken@heathtraffic.com
HeathTraffic.com
Renton Daycare – Trip Generation Assessment
9
RENTON DAYCARE
TRIP GENERATION ASSESSMENT
Appendix
ITE Trip Generation Sheets
11/2/22, 2:49 PM https://itetripgen.org/query/PrintGraph2?code=565&ivlabel=QFQAF&timeperiod=AWDVTE&x=&edition=639&locationCode=Gener…
https://itetripgen.org/printGraph 1/1
Day Care Center
(565)
Vehicle Trip Ends vs:1000 Sq. Ft. GFA
On a:Weekday
Setting/Location:General Urban/Suburban
Number of Studies:27
Avg. 1000 Sq. Ft. GFA:5
Directional Distribution:50% entering, 50% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GFA
Average Rate Range of Rates Standard Deviation
47.62 12.12 - 211.06 29.78
Data Plot and Equation
T
=
T
r
i
p
E
n
d
s
X = 1000 Sq. Ft. GFA
Study Site Average Rate
Fitted Curve Equation: Not Given R²= ****
Trip Gen Manual,11th Edition Institute of Transportation Engineers
0 5 10 15 200
100
200
300
400
500
Renton Daycare - Trip Generation Assessment
10
11/2/22, 2:50 PM https://itetripgen.org/query/PrintGraph2?code=565&ivlabel=QFQAF&timeperiod=TASIDE&x=&edition=639&locationCode=General…
https://itetripgen.org/printGraph 1/1
Day Care Center
(565)
Vehicle Trip Ends vs:1000 Sq. Ft. GFA
On a:Weekday,
Peak Hour of Adjacent Street Traffic,
One Hour Between 7 and 9 a.m.
Setting/Location:General Urban/Suburban
Number of Studies:89
Avg. 1000 Sq. Ft. GFA:5
Directional Distribution:53% entering, 47% exiting
Vehicle Trip Generation per 1000 Sq. Ft. GFA
Average Rate Range of Rates Standard Deviation
11.00 1.79 - 57.02 6.08
Data Plot and Equation
T
=
T
r
i
p
E
n
d
s
X = 1000 Sq. Ft. GFA
Study Site Average Rate
Fitted Curve Equation: Not Given R²= ****
Trip Gen Manual,11th Edition Institute of Transportation Engineers
0 5 10 15 200
50
100
150
200
Renton Daycare - Trip Generation Assessment
11
Renton Daycare - Trip Generation Assessment
12
Renton Daycare - Trip Generation Assessment
13
Renton Daycare - Trip Generation Assessment
14
Renton Daycare - Trip Generation Assessment
15
HeathTraffic.com
RENTON DAYCARE
TRIP GENERATION ASSESSMENT
Appendix
Site Plan
Renton Daycare - Trip Generation Assessment
16
EagleView Technologies, Inc., King County, King County
0 40 80 120 16020
US Feet
Subject Property Parcel: 102305-9117
King_County_Parcels
Approximate Data Plot Locations
Approximate Stream 1 Type Ns
Approximate Wetland A Cat. III
Approximate 100' Wetland Buffer
Approximate 15' Building Setback
A-1
A-4
OHW1-6
OHW1-1
DP#1
DP#2
50' Stream buffer located
entirely within wetland buffer
NEW RAMP
A 36-inch tall concreteblock retaining wall
designed for stabilizingslopes and preventingsoil erosion. Constructedwith 6-in H x 15.6-in L x12-in D Gray ConcreteRetaining Wall Blocks
SITE PLAN
SCALE: 1/16" = 1'-0"1
N
A0.1
45
0
8
n
e
4
t
h
s
t
RE
N
T
O
N
,
W
A
9
8
0
5
6
DA
Y
C
A
R
E
CO
S
T
U
M
E
R
:
O
A
S
I
S
H
O
M
E
D
A
Y
C
A
R
E
L
L
C
45
0
8
n
e
4
t
h
s
t
RE
N
T
O
N
,
W
A
9
8
0
5
8
Renton Daycare - Trip Generation Assessment
17