Loading...
HomeMy WebLinkAboutAddendum - 4AMENDMENT NO. 4 TO AGREEMENT FOR CAG-20-340 THIS AMENDMENT, dated for reference purposes only as November 18, 2025, is by and between the City of Renton (the “City”), a Washington municipal corporation, and Western Systems, Inc. (“Consultant”), a Washington Corporation. The City and the Consultant are referred to collectively in this Amendment as the “Parties.” Once fully executed by the Parties, this Amendment is effective as of the last date signed by both parties. Whereas, the City engaged the services of the Consultant under Agreement CAG-20-340, dated October 7, 2020, to provide necessary services for the additional SCOOT licenses and services (referred to herein as the “Agreement”); Whereas, the Parties wish to amend the Agreement to change the scope of work, and change the compensation] in order to implement SCOOT adaptive signal control for additional intersections. NOW THEREFORE, It is mutually agreed upon that CAG-20-340 is amended as follows: 1. Scope of Work: Section 1, Scope of Work, is amended to add work as specified in Exhibit A-4, which is attached and incorporated herein. 2.Time of Performance:Section 3, Time of Performance, is amended pursuant to the schedule(s) set forth in Exhibit A-4. All Work shall be performed by no later than December 31, 2030. 3. Compensation: Section 4, Compensation, is amended so that the maximum amount of compensation payable to Consultant is increased by $123,200.00 from $254,066.94 to $377,266.94, including any applicable state and local sales taxes. The additional compensation shall be paid based upon Work actuallyperformed according to the rate(s) or amounts specified in Exhibit B-4 of the Agreement. 4.All terms of the Agreement not explicitly modified herein shall remain in full force and effect and such terms shall apply to Work performed according to this Amendment as if fully set forth herein. IN WITNESS WHEREOF, the Parties have voluntarily entered into this Amendment as of the date last signed by the Parties below. CAG-20-340, Adden #4-25 PAGE 2 OF 2 CITY OF RENTON By:_____________________________ CONSULTANT By:____________________________ Armondo Pavone Mayor Kai Antrim Sales Manager _____________________________ Date _____________________________ Date Attest _____________________________ Jason A. Seth City Clerk Approved as to Legal Form By: __________________________ Shane Moloney City Attorney Contract Template Updated 06/17/2021 ________________ 10/22/202511/18/2025 Approved by Cheryl Beyer via email 10/22/2025 CAG-20-340 EXHIBIT A-4 Page 1 of 7 SCOPE OF WORK PROJECT: SCOOT licenses and services CONSULTANT: Western Systems, Inc. A. PROJECT DESCRIPTION In 2018, City of Renton (City) installed a real-time Adaptive Signal Control (ASC) system, ‹ŕīĖťϙƅèīôϙiƯŜôťϙOptimization Technique (SCOOT), to reduce ťŘÍƯĖèϙèĺIJČôŜťĖĺIJ and maximize ťēôϙôƯĖèĖôIJèƅϙĺċϙťēôϙŘĺÍîϙIJôťſĺŘħ. ASC ÍīīĺſŜϙťēôϙŜƅŜťôıϙťĺϙŗŪĖèħīƅϙŘôŜŕĺIJîϙťĺϙ èēÍIJČôŜϙċŘĺıϙîÍĖīƅϙƲŪèťŪÍťĖĺIJŜ, incidents, or special events that are not accounted for in ƱƄôîϙťŘÍƯĖèϙŜĖČIJÍīϙtiming plans. This Agreement provides additional SCOOT Licenses and Services to expand the existing ASC system. The City can use available capacity ſĖťēϙ‹ϙ to ÍèēĖôŽôϙČŘôÍťôŘϙIJôťſĺŘħ-ſĖîôϙôƯĖèĖôIJèƅ, other ťēÍIJϙÍîîĖIJČϙèÍŕÍèĖťƅϙťēŘĺŪČēϙŘĺÍîſÍƅϙ construction. The City has ĖîôIJťĖƱôî projects and future programs for the expansion of the existing SCOOT system. B. PURPOSE The City is requesting services from Western Systems, Inc. (Consultant) for the SCOOT ASC expansion project. The project scope includes the development and the integration of IJôſϙ intersection(s) to the existing SCOOT system, as outlined in the project’s fee section. The ċĺīīĺſĖIJČϙProject Tasks ſĖīīϙæôϙĖıŕīôıôIJťôîϙin this scope: 1. Project Management Support 2. Detection Layout 3. Concept of Operations (ConOps) Coordination 4. SCOOT Communication Server ϼ‹‹ϽϙĺIJƱČŪŘÍťĖĺIJ 5. Node Architecture and UTC/SCOOT Database 6. Preliminary System Operation and System Diagnostics 7. Calibration and Validation of SCOOT Model 8. Fine Tuning 9. Schedules, CASTs, and Region Settings 10. System Inspection Support 11. 30-Day System Monitoring 12. Project Close Out C. GENERAL ASSUMPTIONS “ēôϙĺIJŜŪīťÍIJťϙſĖīīϙèĺĺŘîĖIJÍťôϙſĖťēϙťēôϙCity for on-call or site support, as needed, to perform the ŕŘĺĤôèťϙťÍŜħsϟϙ“ēôϙĖťƅϙſĖīīϙıÍħô available throughout the project to support the Consultant, if requested, ÍŜϙîôƱIJôîϙin Project TÍŜħŜ. īīϙſĺŘħϙıÍƅϙæôϙèĺIJîŪèťôîϙ æôťſôôIJϙ͕ϙaϙÍIJîϙ͖ϙ„aϙîŪŘĖIJČϙſôôħîÍƅŜϙÍIJîϙſôôħôIJîŜ as agreed upon by the City. “ŘÍƯĖèϙŜĖČIJÍīϙèĺIJťŘĺīīôŘϠϙèÍæĖIJôťϠϙÍIJîϙîôťôèťĖĺIJϙŪŕČŘÍîôŜϙÍIJîϯĺŘϙŘôŕīÍèôıôIJťŜϠϙÍIJîϯĺŘϙ communications infrastructure necessary for SCOOT deployment are in place prior to the implementation of SCOOT. “ēôϙĺIJŜŪīťÍIJťϙſĖīīϙèĺĺŘîĖIJÍťôϙſĖťēϙťēôϙĖťƅϙċĺŘϙŜŪŕŕĺŘťϙĺIJϙ CAG-20-340 EXHIBIT A-4 Page 2 of 7 issues, if any, involving non-SCOOT, communication, and/or detection that are not provided by the Consultant in this contract. “ēôϙĺIJŜŪīťÍIJťϙſĖīīϙŕŘĺŽĖîôϙŜĺċťſÍŘôϙīĖèôIJŜôϙÍIJîϯĺŘϙŪŕČŘÍîôŜϙÍIJîϙŜĺċťſÍŘôϙĖIJŜťÍīīÍťĖĺIJϟϙ The cost for any additional license(s) and/or upgrades for this project shall be included in the fee section ſēôIJϙŘôŗŪĖŘôî. “ēôϙĺIJŜŪīťÍIJťϙſĖīīϙèĺĺŘîĖIJÍťôϙſĖťēϙthe vendor, YUNEX (formerly Siemens), ťĺϙŘôŜĺīŽôϙÍIJƅϙŜĺċťſÍŘôϙĖŜŜŪôŜϠϙĖċϙÍIJƅϟϙ“ēôϙĺIJŜŪīťÍIJťϙſĖīīϙŕŘĺŽĖîôϙ sŪŕŕĺŘťϙîĺèŪıôIJťÍťĖĺIJϙċĺŘϙ‹ii“ϯ‹(„ϙŜĺċťſÍŘôϙŪŕČŘÍîôŜϙÍŜϙſôīīϙÍŜϙŘôıĺťôϙŜŪŕŕĺŘťϙ and/or training to the City, if requested. “ēôϙĖťƅϙſĖīīϙŕŘĺèôŜŜϙŕÍƅıôIJťŜϙċĺŘϙĖIJŽĺĖèôŜϙæÍŜôîϙĺIJϙèĺıŕīôťôîϙťÍŜħϙĖťôıϼŜϽϙÍŜϙĖîôIJťĖƱôîϙĖIJϙ the fee section. Project meetingŜϙſĖťēϙťēôϙĖťƅ ſĖīīϙæôϙēôīîϙÍťϙ‡ôIJťĺIJϙĖťƅϙFÍīī or virtually via Teams as an option to the City. Project èĺĺŘîĖIJÍťĖĺIJϙĺŘϙèĺııŪIJĖèÍťĖĺIJϙæôťſôôIJϙťēôϙĺIJŜŪīťÍIJťϙÍIJîϙťēôϙ City may be in-ŕôŘŜĺIJϙÍťϙ‡ôIJťĺIJϙĖťƅϙFÍīīϠϙ“ŘÍƯĖèϙaÍIJÍČôıôIJťϙôIJťôŘϙϼ“aϽϠϙŽĖÍϙ“ôÍıŜϠϙ conference calls, or email, as appropriate. D. DELIVERABLES All deliverables to be prepared and produced by the Consultant, as part of this scope of ſĺŘħϠϙÍŘôϙĖîôIJťĖƱôîϙÍťϙťēôϙôIJîϙĺċϙôÍèēϙťÍŜħϙīĖŜťôîϙæôīĺſϟ D. SCHEDULE “ēôϙĖťƅϙÍIJťĖèĖŕÍťôŜϙťēĖŜϙŕŘĺĤôèťϙſĖťēϙÍϙťÍŘČôťϙĺæĤôèťĖŽôϙèĺıŕīôťĖĺIJϙdate ſĖťēĖIJϙĺIJôϙϼ͐ϽϙƅôÍŘϙ from Notice to Proceed (NTP). For the purpose of this scope, the project duration is ÍŜŜŪıôîϙťĺϙæôϙŪŕϙťĺϙťſôīŽôϙϼ͐͑ϽϙıĺIJťēŜϟϙ“ēôϙĺIJŜŪīťÍIJťϙŜēÍīīϙŕŘĺŽĖîôϙťēôϙĖťƅϙſĖťēϙÍϙ project schedule that meets the project duration after this contract has been executed. Upon mutually agreed ťēôϙŕŘĺĤôèťϙŜèēôîŪīôϠϙťēôϙĖťƅϙſĖīīϙĖŜŜŪôϙÍϙb“„ϙĖIJϙſŘĖťĖIJČϙto the ĺIJŜŪīťÍIJťϙťĺϙæôČĖIJϙťēôϙŕŘĺĤôèťϙſĺŘħϟ ˜IJīôŜŜϙĺťēôŘſĖŜôϙIJĺťôîϙĖIJϙťēôϙŜèĺŕôϙĺċϙſĺŘħϠϙťēôϙ èĺıŕīôťĖĺIJϙîÍťôϙċĺŘϙÍīīϙîôīĖŽôŘÍæīôŜϙîôŜèŘĖæôîϙĖIJϙťēôϙŜèĺŕôϙĺċϙſĺŘħϙſĖīīϙæôϙîôťôŘıĖIJôîϙæƅϙ the project schedule. “ĖıôϙĖŜϙÍϙıÍťôŘĖÍīϙèĺIJŜĖîôŘÍťĖĺIJϙĖIJϙťēôϙŕôŘċĺŘıÍIJèôϙĺċϙÍīīϙſĺŘħϙæƅϙťēôϙĺIJŜŪīťÍIJťϙŪIJîôŘϙ this contractϟϙ“ēôϙĺIJŜŪīťÍIJťϙŜēÍīīϙèĺıŕīôťôϙĖťŜϙſĺŘħϙÍIJîϙŜôŘŽĖèôŜϙſĖťēĖIJϙĖťŜϙèĺIJťŘĺīϙťĺϙ meet the agreed upon schedule. The Consultant shall provide to the City updates to the ŕŘĺĤôèťϙŜèēôîŪīôϙťēÍťϙĖîôIJťĖċƅϙťÍŜħ(s) and deliverables that require time extensions due to ŘôÍŜĺIJÍæīôϙÍIJîϯĺŘϙŪIJċĺŘôŜôôIJϙèĖŘèŪıŜťÍIJèôŜϟϙ“ēôϙĖťƅϙŜēÍīīϙIJĺťϙŪIJŘôÍŜĺIJÍæīƅϙſĖťēēĺīîϙ ſŘĖťťôIJϙÍèèôŕťÍIJèôϙĺċϙťēôϙťĖıôϙôƄťôIJŜĖĺIJŜϟ F. SCOPE OF WORK The SCOOT expansion project ĖŜϙîĖŽĖîôîϙÍıĺIJČϙťēôϙċĺīīĺſĖIJČϙťÍŜħŜϠϙſĖťēϙťēôϙċôôϙæŘôÍħĺŪťϙ ÍŜϙŜēĺſIJϙĖIJϙťēôϙċôôϙŜôèťĖĺIJϟ Task 1 – Project Management Support CAG-20-340 EXHIBIT A-4 Page 3 of 7 The Consultant ſĖīīϙŕŘĺŽĖîôϙĺŽôŘÍīīϙŕŘĺĤôèťϙıÍIJÍČôıôIJťϠϙèĺĺŘîĖIJÍťĖĺIJϙſĖťēϙťēôϙCity project manager, and provide the progress reports and invoicing throughout the duration of the projectϟϙ“ēĖŜϙôƯĺŘťϙſĖīīϙĖIJèīŪîôϙťēôϙċĺīīĺſĖIJČϙôīôıôIJťŜϟϙ 1.1 – Administration, Coordination, and Supervision: x Initiate project set-ŪŕϙĖIJèīŪîĖIJČϙôŜťÍæīĖŜēıôIJťϙĺċϙèŘôÍťĖĺIJϙĺċϙŕŘĺĤôèťϙƱīôŜϙϼôīôèťŘĺIJĖèϙ and physical) and scheduling of Consultant ŕôŘŜĺIJIJôīϙſĺŘħϙÍèťĖŽĖťĖôŜϟϙϙϙ x ĺĺŘîĖIJÍťĖĺIJϙſĖťēϙ the City ċĺŘϙÍIJƅϙıôôťĖIJČŜϙťēÍťϙıÍƅϙæôϙŘôŗŪĖŘôîϙċĺŘϙťēôϙſĺŘħϙťĺϙæôϙ performed in this contract. x Supervision of Consultant, including sub-consultants, personnel and activities to ôIJŜŪŘôϙèĺıŕīĖÍIJèôϙſĖťēϙèĺIJťŘÍèťϙŜèĺŕô, schedule, and budget. x aÍIJÍČôϙťēôϙŕŘĺĤôèťϙťÍŜħŜϙťĺϙèĺIJťŘĺīϙèĺŜťŜϠϙıÍĖIJťÍĖIJϙŜèēôîŪīôϠϙÍIJîϙŕŘĺŽĖîôϙŗŪÍīĖťƅϙ product appropriate to the goals and completion of the project. x Conduct internal communication or coordination meetings ſĖťēϙthe vendor or sub- consultants, if necessary. 1.2 – Invoicing: x „ŘôŕÍŘÍťĖĺIJϙĺċϙĖIJŽĺĖèôŜϙſĖťēϙŕŘĺČŘôŜŜϙŘôŕĺŘťŜϙťēÍťϙĖIJèīŪîôϙťēôϙċĺīīĺſĖIJČϡ o „ŘĺŽĖîôϙĖIJŽĺĖèôϼŜϽϙċĺŘϙèĺıŕīôťôîϙťÍŜħϙĖťôıϼŜϽϙÍŜϙĖîôIJťĖƱôîϙĖIJϙťēôϙċôôϙŜôèťĖĺIJϟ o Summary of budget, expenses to date, and expenses for invoice period. o ‹ŪııÍŘƅϙĺċϙſĺŘħϙÍèèĺıŕīĖŜēôîϙċĺŘϙťēôϙĖIJŽĺĖèôϙŕôŘĖĺî and project updates. 1.3 – Project Schedule and Updates: x "ôŽôīĺŕϙÍϙŕŘĺĤôèťϙŜèēôîŪīôϙſĖťēϙÍŜŜĖŜťÍIJèôϙċŘĺıϙťēôϙCityϟϙ“ēĖŜϙŕŘĺĤôèťϙŜèēôîŪīôϙſĖīīϙ ĖIJèīŪîôϙôÍèēϙŕŘĺĤôèťϙťÍŜħϙÍIJîϙcover the entire timeframe of the project from NTP to project completion. x Provide bi-ſôôħīƅϙŕŘĺĤôèťϙŪŕîÍťôŜϙÍIJîϯĺŘϙÍîîŘôŜŜϙĺŪťŜťÍIJîĖIJČϙĖŜŜŪôŜϟ Deliverables: IIJŽĺĖèôŜϙſĖťēϙProgress Reports to City Project Manager. Project Schedule – Delivered to the City ſĖťēĖIJϙĺIJôϙϼ͐Ͻϙſôôħϙfrom contract execution. Bi-ſôôħīƅϙŕŘĺĤôèťϙUŕîÍťôŜϙſĖťēϙOutstanding Issues, if any. Task 2 – Detection Layout “ēôϙĺIJŜŪīťÍIJťϙſĖīīϙŜŪŕŕĺŘťϙťēôϙîôŜĖČIJϙťÍŜħϙċĺŘϙîôťôèťĖĺIJϙÍIJîϙîôťôèťĖĺIJϙƏĺIJôŜϙôĖťēôŘϙĖIJϙ ÍîŽÍIJèôϙÍIJîϯĺŘϙÍťϙťēôϙťĖıôϙĺċϙťēôϙŕŘĺĤôèťϟϙ“ēĖŜϙťÍŜħϙſĖīīϙĖIJèīŪîôϙĺIJŜŪīťÍIJťЍŜϙassistance for ĖIJťôŘŜôèťĖĺIJϙîôťôèťĖĺIJϙƏĺIJôϙŕīÍèôıôIJťϙÍIJîϙèĺIJƱČŪŘÍťĖĺIJϙċĺŘϙťēôϙŕŘĺĤôèťϟϙ Deliverables: Intersection Detection Zone Schematics Layout in PDF format. Task 3 – Concept of Operations (ConOps) Coordination “ēôϙĺIJŜŪīťÍIJťϙſĖīī ŜôťϙŪŕϙÍIJîϙċÍèĖīĖťÍťôϙÍϙŕŘĺĤôèťϙħĖèħĺƯϙıôôťĖIJČϙſĖťēϙħôƅϙCity and project team personnel. “ēôϙŕŪŘŕĺŜôϙĺċϙťēôϙıôôťĖIJČϙĖŜϙťĺϙîĖŜèŪŜŜϙħôƅϙôīôıôIJťŜϙĺċϙťēôϙŜèĺŕôϙĺċϙ ſĺŘħ and project schedule timelines. “ēĖŜϙťÍŜħϙſĖīīϙēôīŕϙťĺϙČŪĖîôϙťēôϙobjectives for CAG-20-340 EXHIBIT A-4 Page 4 of 7 èĺĺŘîĖIJÍťĖĺIJϙÍIJîϙîôťôŘıĖIJôϙťēôϙťŘÍƯĖèϙıÍIJÍČôıôIJťϙîôèĖŜĖĺIJŜϙÍIJîϙČĺÍīŜϙċĺŘϙŕŘĺČŘÍııĖIJČϙ SCOOT. Deliverables: Concept of Operations (ConOps) Coordination Meeting Minutes in PDF format. Task 4 – SCOOT Communication Server (SCS) ConƱguration “ēôϙĺIJŜŪīťÍIJťϙſĖīīϙŕŘĺČŘÍıϙťēôϙ‹ii“ϙĺııŪIJĖèÍťĖĺIJϙ‹ôŘŽôŘ (SCS) for the intersections ſĖťēĖIJϙťēôϙŕŘĺĤôèť ÍIJîϯĺŘϙŘôèĺIJƱČŪŘôϙťēôϙôƄĖŜťĖIJČϙ‹‹ϙċĺŘϙťēôϙĖťƅЍŜϙ‹ii“ϙŜƅŜťôıϟ This ťÍŜħϙſĖīīϙèĺŽôŘϙÍIJƅϙŘôŗŪĖŘôîϙcoordination or assistance from YUNEX to the Consultant for the system. Deliverables: (SCOOT) Additional SCOOT License(s), if applicable. (SCOOT) Installation of SCOOT Upgrade, if applicable. Task 5 – Node Architecture and UTC/SCOOT Database “ēôϙĺIJŜŪīťÍIJťϙſĖīīϙŕŘĺČŘÍıϙťēôϙťŘÍƯĖèϙŜĖČIJÍīϙťĖıĖIJČϠϙŕēÍŜĖIJČϠϙÍIJîϙĺťēôŘϙŕÍŘÍıôťôŘŜϙĖIJϙťēôϙ City’s existing ôIJťŘÍīϙîŽÍIJèôîϙ“ŘÍƯĖèϙaÍIJÍČôıôIJťϙ‹ƅŜťôı (TACTICS) as required for the SCOOT operational programming in the ˜ŘæÍIJϙ“ŘÍƯĖèϙĺIJťŘĺīϙ(UTC) and SCOOT databases. City uses TACTICS Phase BÍIJħϙ͓ϙċĺŘϙ‹ii“ϙŕŘĺČŘÍııĖIJČϟϙ“ēôϙĺIJŜŪīťÍIJťϙſĖīīϙèĺIJƱČŪŘôϙ ťēôϙ„ēÍŜôϙÍIJħϙ͓ϙand SCOOT module in TACTICS for intersections in the project. In ÍîîĖťĖĺIJϠϙťēôϙĺIJŜŪīťÍIJťϙſĖīīϙèĺIJƱČŪŘôϙa node architecture schematic for this project, ſĖťēϙ consideration for future SCOOT expansion. Deliverables: (SCOOT/TACTICS) UTC/SCOOT and TACTICS Data Loaded into Databases. Preliminary UTC/SCOOT Database Design Spreadsheets in Excel or PDF format. Node Architecture Schematic in PDF format. Task 6 – Preliminary System Operation and System Diagnostics “ēôϙĺIJŜŪīťÍIJťϙſĖīīϙæŘĖIJČϙôach of the intersections ſĖťēĖIJϙťēôϙŕŘĺĤôèťϙĺIJīĖIJôϙſĖťēϙ‹ii“ϙ ĺŕôŘÍťĖĺIJϙċĺŘϙîĖÍČIJĺŜťĖèŜϟϙ“ēôϙŕŪŘŕĺŜôϙĺċϙťēĖŜϙťÍŜħϙĖŜϙťĺϙèĺIJîŪèťϙæÍŜĖèϙîôťôèťĖĺIJϠϙ èĺııŪIJĖèÍťĖĺIJϙÍIJîϙŜƅŜťôıŜϙîĖÍČIJĺŜťĖèŜϠϙÍIJîϙſēôŘôϙĖŜŜŪôŜϙôƄĖŜťϠϙcoordinate for support ſĖťēϙĖťƅϙÍŜϙIJôèôŜŜÍŘƅϟ Deliverables: (SCOOT) Completion of System Diagnostics. Task 7 – Calibration and Validation of SCOOT Model “ēôϙĺIJŜŪīťÍIJťϙſĖīīϙæôČĖIJϙťēôϙƱôīîϙèÍīĖæŘÍťĖĺIJϙÍèťĖŽĖťĖôŜϙĖIJϙťēĖŜϙťÍŜħϙċĺīīĺſĖIJČϙťēôϙ îĖÍČIJĺŜťĖèŜϙťÍŜħϙÍIJîϙÍŜŜĺèĖÍťôîϙŘôŽĖŜĖĺIJŜϟϙIIJϙťēĖŜϙťÍŜħϠϙťēôϙĺIJŜŪīťÍIJťϙſĖīīϙadjust the SCOOT model for individual intersections based upon on ƱôīîϙĺæŜôŘŽÍťĖĺIJŜϙto create a more accurate representation of real-ſĺŘīîϙèĺIJîĖťĖĺIJŜϟ “ēôϙĺIJŜŪīťÍIJťϙſĖīīϙıÍîôϙťhese CAG-20-340 EXHIBIT A-4 Page 5 of 7 ĺæŜôŘŽÍťĖĺIJŜϙîŪŘĖIJČϙťēôϙaϠϙıĖîîÍƅϙÍIJîϙ„aϙŕôÍħϙŕôŘĖĺîŜϟϙċťôŘϙĺæŜôŘŽĖIJČϙťēÍťϙťēôϙ‹ii“ϙ ıĺîôīϙĺŪťèĺıôŜϙÍŘôϙŘôÍŜĺIJÍæīôϙÍIJîϙèĺIJŜĖŜťôIJťϙſĖťēϙťēôϙĺæŜôŘŽôîϙťŘÍƯĖèϙèĺIJîĖťĖĺIJŜϠϙťēôϙ ıĺîôīϙſĖīīϙæôϙèĺIJŜĖîôŘôîϙ«ÍīĖîÍťôîϙÍťϙťēôϙĖIJťôŘŜôèťĖĺIJϙīôŽôīϟ Deliverables: (SCOOT) UTC/SCOOT Database Updates. (SCOOT) Completion of Calibration and Validation of SCOOT Model. Task 8 – Fine Tuning ċťôŘϙťēôϙ‹ii“ϙťŘÍƯĖèϙıĺîôīϙēÍŜϙæôôIJϙ«ÍīĖîÍťôîϙĺIJϙÍIJϙĖIJťôŘŜôèťĖĺIJϙæÍŜĖŜϠϙťēôϙƱIJô-tuning ťÍŜħϙſĖīīϙæôϙŪIJîôŘťÍħôIJ by the ConsultantϟϙIIJϙťēĖŜϙťÍŜħϠϙČŘĺŪŕŜϙĺċϙ‹ii“ϙĖIJťôŘŜôèťĖĺIJŜϙſĖīīϙ be brought online together from the SCOOT system for observations of platoon progression, congestion and other issuesϟϙ“ēôϙĺIJŜŪīťÍIJťϙſĖīīϙÍîĤŪŜťϙťēô SCOOT system ŕÍŘÍıôťôŘŜϙťēÍťϙŕŘĺŽĖîôϙċĺŘϙĖıŕŘĺŽôîϙŕŘĺČŘôŜŜĖĺIJϙŽĖÍϙĺŕťĖıÍīϙæÍIJîſĖîťēϠϙĺƯŜôťŜϠϙ congestion settings, and other parameters. Deliverables: (SCOOT) UTC/SCOOT Database Updates. (SCOOT) Completion of Fine Tuning of the SCOOT Model. Task 9 – Schedules, CASTs, and Region Settings “ēôϙĺIJŜŪīťÍIJťϙſĖīīϙdetermine ťēôϙċĺīīĺſĖIJČ SCOOT settings: x Schedules (SCOOT Timetables) to implement various ťŘÍƯĖèϙŜĖČIJÍīϙtiming, phasing (SCOOT Stages) ÍIJîϙťŘÍƯĖèϙôIJČĖIJôôŘĖIJČϙŜťŘÍťôČĖôŜ, x SCOOT Commands Actioned and Stored Together (CASTs) for the SCOOT program to implement these strategies, and x SCOOT Region coding for the groups of signals ťēÍťϙſĖīīϙæôϙĺŕôŘÍťôîϙŪIJîôŘϙ‹ii“ϙ control at the same common signal cycle time. “ēôϙČĺÍīŜϙċĺŘϙťēĖŜϙťÍŜħϙſĖīīϙæôϙæÍŜôîϙŪŕĺIJϙťēôϙĺIJiŕŜϠϙťŘÍƯĖèϙĺæŜôŘŽÍťĖĺIJŜϠϙÍIJîϙ èĺĺŘîĖIJÍťĖĺIJϙſĖťēϙťēôϙĖťƅϟ Deliverables: (SCOOT) SCOOT Timetables (Schedules) for ſôôħîÍƅŜϠϙSaturday, and Sunday. (SCOOT) SCOOT CASTs programming. (SCOOT) UTC/SCOOT Database Updates for SCOOT Region settings. Task 10 – System Inspection Support TēôϙĺIJŜŪīťÍIJťϙſĖīīϙèĺīīÍæĺŘÍťôϙſĖťē the City to complete this tasħ. “ēôϙĺIJŜŪīťÍIJťϙſĖīīϙ adjust SCOOT programming to satisfy the ťŘÍƯĖèϙĺŕôŘÍťĖĺIJal needs per City’s discretion and complete the SCOOT Display Maps or Graphical User Interface (GUI). Deliverables: (SCOOT) Completion of SCOOT Display Maps. CAG-20-340 EXHIBIT A-4 Page 6 of 7 (SCOOT/TACTICS) UTC/SCOOT and TACTIC SCOOT Module Databases Updates. Completion of City Inspection Punch List items in PDF format, if any. Task 11 – 30-Day System Monitoring “ēôϙĺIJŜŪīťÍIJťϙſĖīīϙIJĺťĖċƅϙťēôϙĖťƅϙſēôIJϙťēôϙ͒͏-"Íƅϙ‹ƅŜťôıϙaĺIJĖťĺŘĖIJČϙŕôŘĖĺîϙſĖīīϙæôČĖIJϙ and expire. After the System Inspection ‹ŪŕŕĺŘťϙťÍŜħ ĖŜϙèĺıŕīôťôîϠϙťēôϙĺIJŜŪīťÍIJťϙſĖīīϙ place eÍèēϙĺċϙťēôϙĖIJťôŘŜôèťĖĺIJŜϙſĖťēĖIJϙťēôϙŕŘĺĤôèťϙĖIJťĺϙÍŪťĺıÍťĖèϠϙŜèēôîŪīôîϙĺŕôŘÍťĖĺIJ in SCOOT for a 30-day burn-ĖIJϙŕôŘĖĺîϟϙ“ēôϙ‹ii“ϙŜƅŜťôıϙīĺČϙſĖīīϙæôϙŪŜôîϙťĺϙîôťôŘıĖIJôϙÍIJƅϙ ŕŘĺČŘÍııĖIJČϙèēÍIJČôŜϙϼĖϟôϟϠϙæŪČϙƱƄôŜϽϙťēÍťϙıÍƅϙæôϙIJôôîôî. “ēôϙĺIJŜŪīťÍIJťϙſĖīīϙèĺıŕīôťôϙ diagnostics ſĖťēϙÍŜŜĺèĖÍťôîϙèēÍIJČôŜϙıÍîôϙin the SCOOT system as necessary from the ƱIJîĖIJČŜϟ Deliverables: (SCOOT) Completion of SCOOT programming and system diagnostics. Task 12 – Project Close Out “ēôϙĺIJŜŪīťÍIJťϙſĖīīϙèĺıŕĖīôϙÍϙSCOOT èĺIJƱČŪŘÍťĖĺIJ summary to document the project. The ŜŪııÍŘƅϙſĖīīϙĖIJèīŪîôϙÍϙreport memorandum ťēÍťϙſĖīīϙèĺŽôŘ a short description of SCOOT operations ϼĖϟôϟϙſôôħîÍƅϯſôôħôIJîϙŜèēôîŪīôϠϙŜťÍŘťϯôIJîϙťĖıôϠϙÍŘôÍϯŘôČĖĺIJϽϠ observations of the system performance recommendations for future detection changes, and potential programming variables that could be explored for improving operations. In addition, the èĺIJŜŪīťÍIJťϙſĖīī provide the documentation of the SCOOT îôŜĖČIJϙèĺIJƱČŪŘÍťĖĺIJ settings and parameters/commands (i.e. Timetables, Regions, and CASTs, Translation Plans, UTC settingsϠϙîôťôèťĺŘϙıÍŜħŜϣ) ſĖťēϙÍϙŜèēôıÍťĖèϙĺċϙbĺîôϙŘèēĖťôèťŪŘôϙϼĖϟôϟϙ‹ii“ϙ„ēÍŜĖIJČϡϙ IIJťôŘŜôèťĖĺIJϙbĺîôϠϙ[ĖIJħϠ Outstation, Junction, Stage) ċĺŘϙĖIJťôŘŜôèťĖĺIJŜϙſĖťēĖIJϙťēôϙŕŘĺĤôèt. Deliverables: x SCOOT ĺIJƱČŪŘÍťĖĺIJ Summary – îôīĖŽôŘôîϙťĺϙťēôϙĖťƅϙſĖťēĖIJϙĺIJôϙϼ͐ϽϙıĺIJťēϙċŘĺıϙťēôϙ completion of SCOOT programming and system diagnostics, including: 1. Project Report Memorandum in PDF format. 2. Final Schematic of the Node Architecture in PDF format. 3. Final SCOOT Database Design Spreadsheets in Excel/PDF format. For each intersection, the îôŜĖČIJϙŜŕŘôÍîŜēôôťϙſĖīīϙinclude: location name, node, junction, outstation; IP address/SCS port; signal phasing/overlap, EPAC minimums, SCOOT stages, UTC Stages, inbound/outbound îôťôèťĺŘϙϼīĖIJħϠϙ ıÍŜħϠ position), minimum split times and cycle lengths, translation plans. 4. Final UTC Settings Spreadsheets in Excel/PDF format. 5. Final Timetables in PDF format. 6. Final List of Parameters/Commands for each assigned CAST in PDF format. 7. Final List of Cast Names in PDF format. 8. Final List of Regions ĖIJèīŪîĖIJČϙīĖŜťϙĺċϙĖIJťôŘŜôèťĖĺIJŜϙſĖťēĖIJϙťēôϙ‡ôČĖĺIJŜ in PDF format. x (SCOOT) Final IntersectionϠϙŘôÍϠϙĖťƅſĖîô Maps or Graphical User Interface (GUI). CAG-20-340 EXHIBIT A-4 Page 7 of 7 ADDITIONAL SERVICES “ēôϙĖťƅϙıÍƅϙŘôŗŪĖŘôϙÍîîĖťĖĺIJÍīϙŜôŘŽĖèôŜϙĺċϙťēôϙĺIJŜŪīťÍIJťϟϙ“ēôϙŜèĺŕôϙĺċϙſĺŘħϙċĺŘϙÍîîĖťĖĺIJÍīϙ ŜôŘŽĖèôŜϙſĖīīϙæôϙîôťôŘıĖIJôîϙæÍŜôîϙĺIJϙÍIJťĖèĖŕÍťôîϙĺŘϙŪIJÍIJťĖèĖŕÍťôîϙŕŘĺĤôèťϙIJôôîŜϙĺŘϙĺťēôŘϙ èĺIJŜĖîôŘÍťĖĺIJŜϙÍťϙťēôϙŜĺīôϙîĖŜèŘôťĖĺIJϙĺċϙťēôϙĖťƅϟϙ“ēôϙſĺŘħϙıÍƅϙĖIJèīŪîôϙĖťôıŜϙĖîôIJťĖƱôîϙĖIJϙ ťēôϙèŪŘŘôIJťϙťÍŜħϙÍŪťēĺŘĖƏÍťĖĺIJϙÍŜϙſôīīϙÍŜϙĺťēôŘϙĖťôıŜϠϙſēĖèēϙıÍƅϙĖIJèīŪîôϠϙæŪťϙÍŘôϙIJĺťϙ IJôèôŜŜÍŘĖīƅϙīĖıĖťôîϙťĺϙťēôϙċĺīīĺſĖIJČϡ x Transit Signal / Bus Priority (TSP) x iťēôŘϙŜôŘŽĖèôŜϙIJĺťϙŜŕôèĖƱèÍīīƅϙŘôċôŘôIJèôîϙĖIJϙťēĖŜϙŜèĺŕôϙĺċϙſĺŘħ “ēôŜôϙŜôŘŽĖèôŜϙſĖīīϙæôϙÍŪťēĺŘĖƏôîϙŪIJîôŘϙÍϙċŪťŪŘôϙèĺIJťŘÍèťϙÍıôIJîıôIJťϙĖċϙIJôèôŜŜÍŘƅϟϙťϙťēôϙ ťĖıôϙťēôŜôϙŜôŘŽĖèôŜϙÍŘôϙŘôŗŪĖŘôîϠϙťēôϙĺIJŜŪīťÍIJťϙŜēÍīīϙŕŘĺŽĖîôϙÍϙîôťÍĖīôîϙŜèĺŕôϙĺċϙſĺŘħϙÍIJîϙ ÍIJϙôŜťĖıÍťôϙĺċϙèĺŜťŜϟϙ“ēôϙèĺIJŜŪīťÍIJťϙŜēÍīīϙIJĺťϙŕŘĺèôôîϙſĖťēϙťēôϙſĺŘħϙŪIJťĖīϙthe City has ÍŪťēĺŘĖƏôîϙťēôϙſĺŘħϙÍIJîϙĖŜŜŪôîϙan NTP. Rev # Phone: Contact: Phone: Fax: Email: Qty 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Subtotal Shipping Tax* 10.30% Grand Total $6,300.00 $6,300.00 $6,300.00 $6,300.00 $0.00 $7,000.00 $7,000.00 $7,000.00 $7,000.00 $7,000.00 SOFTWARE SCOOT ADAPTIVE; PROJECT MANAGEMENT SOFTWARE SCOOT ADAPTIVE; DETECTOR LAYOUT CONCEPT OF OPERATIONS COORDINATION SOFTWARE SCOOT ADAPTIVE; SCS CONFIGURATION Node Architecture and UTC/SCOOT Database CONSULTING SERVICES / SCOOT FIELD TUNING & VALIDATION PRELIMINARY SYSTEM OPERATION AND SYSTEM DIAGNOSTICS CALIBRATION AND VALIDATION OF THE SCOOT MODEL FINE TUNING SCHEDULES, CASTS AND REGION SETTINGS CONSULTING SERVICES / SYSTEM VERIFICATION SYSTEM INSPECTION SUPPORT 30 DAY SYSTEM MONITORING PROJECT CLOSE OUT $15,400.00 $15,400.00 $15,400.00 $15,400.00 $15,400.00 $0.00 TERMS AND CONDITIONS See General Conditions below for exceptions and changes to freight and lead time policies Delivery: Material lead time date is based after the release of the order. Purchase Order: All purchases require a written purchase order. Email or verbal communication does not constitute an acceptable purchase order. *Line Items in this proposal are not taxable Date 10/21/25 1122 Industry Street, Bldg. B, Everett, WA 98203 Phone: (425) 438-1133 | Fax: (425) 438-1585 Quote # Q-20786 Address: City/State: Net 30 $0.00 3555 Northeast 2nd Street Renton, Washington 98056 Description 4740050459 4740050457 0000000000 4740050464 0000000000 NOTES 0000000000 0000000000 0000000000 0000000000 NOTES 0000000000 $123,200.00 Freight Terms:FOB DstFrt PP&ADD Material Lead Time: $123,200.00 Prepared For:To place an order: *This order is subject to the terms & conditions 0000000000 0000000000 $15,400.00 $15,400.00 $15,400.00 $15,400.00 $15,400.00 $0.00 $6,300.00 $6,300.00 $6,300.00 $6,300.00 $0.00 $7,000.00 Terms: Quotation Contact: Company: Email: Project Agency: City of Renton, WAMaple Valley Highway SCOOT +1 4255309017 (425) 438-1585 City of Renton, WA Part # NOTES Unit Price Kai Antrim kantrim@westernsystems-inc.com Ext. Price $0.00CONSULTING SERVICES / SCOOT PROJECT MANAGEMENT $0.00 $0.00 1 of 2 Exhibit B-4 *This project does not require new SCOOT licenses. FOB Destination and FOB Destination, Prepay & Add terms as quoted imply that the customer will be available to receive material deliveries. Any repeated delivery attempts, trucking reroutes, enroute cancellations or product factory returns which incur additional shipping costs shall be billed to the purchaser. This quote is based on the current prices being paid by Western Systems for parts and components. It assumes delivery within a normal time frame after acceptance (in any case within 90 days). If delivery is delayed or postponed beyond normal delivery time frames at no fault of Western Systems, it reserves the right to adjust the pricing based on its estimate of increased costs and expenses resulting from the delay, unless contractually obligated otherwise or contrary to applicable law, Warranty: Products are sold subject to manufacturer’s warranty. Products manufactured by Western Systems carry a one-year warranty. For additional information on Western Systems warranty, please send an email to info@westernsystems-inc.com. Return and Restocking Policy: Western Systems will be the sole source in determining whether any item is eligible for return. To be eligible the item(s) must be standard product models, new and unused, in the original packaging, and invoiced within the last 90 days. Restocking fees are applied to all returns and can vary between 20-50% based on annual sales activity. In no case will Western Systems be obligated to take returns for items that are obsolete, custom orders, or past the 90-day invoice period. Delivery Inspection: All materials deliveries must be inspected upon receipt from freight carrier. Any freight damages must be reported to the carrier at the time of receipt of goods. Any materials shortages or inaccuracies in shipment must be reported to Western Systems within ten days receipt of goods. Thereafter, any discrepancies will be considered incidental and the responsibility of the receiver. On-Site Services: On-site services such as signal or video system turn-on support shall be scheduled three weeks in advance. If services need to be cancelled or postponed, any non-reimbursable travel expenses will be billed to purchaser. This quotation does not include nor imply any on-site support services unless expressly stated herein. If on-site support services are required, and not included as part of this proposed scope of work, please contact Western Systems for a revised quotation. 2 of 2