TRAFFIC ENGINEERING LABOR CASTS
April, 7982 g _
May
June 361.45
July 653.40
August 112.83
September _
October 139.01
November 139.02
December 430.95
January, 1983 453.70
February 193.73
March -
April
$2,484.09
r
ME toy. St.
d SLT.L Z.
S.I44.ZS
Lef.DL _
La1.oG --
363 399. 97
—_ 1
9/,236.9U Tz --
--.— _ L?RANO 7dr4t. 3&Z� k �1 124 z;c.Sf /c...7�c,_—
__p7 iz o n
SL4/.iv To�.rl
102/072/ 15.541.31 00 1,710.00
—_ —10210721 15.541.4C.00 BSS,00 `855"00_ 98.107 31
102107?/15.541.61.00 49,053 66 _ —,Ay'W-fiS—
2.097 80 _1.04g.9p _ 1.048-90_102 /072/ IS.ru41.62,00
102/072/ IS.541.63.00 --
7,282 44_— _ 3,641.22 3.641 22
_ 102/072/ 15 cei 64 00
_10?104/ I5 541 11 00
61000lSs�v io dS 2ygs/tnc__L4'535.00 _ 7,267.50
I1_267,50
SuStnLP_1_ Monroe Ave. Payment 1R0 38 ;
2 R1 _B0.i91.11 An 91.40
,
�I
Marnnt Amount Renton King Count)
102 /013 /15.541.12,00 593,75
102 /013 /15.541.31.00 1.187.50 $93.75
_-I2 /013 /15.541.32,00 11.317,35 5.658.68 5,658.67
102.1013 /15.541.33.00 '-
5 458.70 2,729.35 2,729.35
1,43/013/15.541 34 00
102/013/15,541,40.00 102/013/15.541.61.00 _ 63,079.03._, _93 31,S39.5i 31,539.52
-02/013/15 541 62 00 ,113.47 2,473.16
102 013/ __15,54� 1,6 3,00
4.042 73 2,021.36 2.021.37
102/013 115,541.64.00
102/013/ 15,50 71 00 `—"—
'3ib�.�S U�f•ro.bS•Zq r..c/s/7n,c ,
/
Subtotal NE 2nd St. Payment 9D.032.24 45,016.12
Total Renton Share Contractor Payment this estimate 05,016.12
Total King County Share Contractor Payment this estimate $175,207.53
Total Contract,, Payment this estimate 125,207.52
$250.415.05
06ARTFR 119, LAYVS OF 1966
CRY OF RENTON CERTIFICATION
4 M uh *ACA m M 1*awr Crn wt,,,fin p
MRun, ,w,M 6wnmY w,`n W. 1 + M MMn IC w Ca M{Afaa n�y p�o�
�M.UF A Mi M ,,W�j6p"""Co 0`Arb ran Mp ram 0 ao a,ut
www
Page 1 of 3 F
102 1 012/ 15.541.64.no.on* _ !�
132/072/ 15.541.71.0o.0o _
3/Y.lPoo/iS.S(t([.70.(K.n r _ 712.50 i 356.25 356.25
Subtotal Monroe Ave. Payment 8,388.70 4,194.35 _ 4,194,35
WARRANT AMDUNT Renton Vino County
102/013/ 15.541.12.00.00 62.50 31.25 _ _31.25
102 /013/ 15.541.31.00.00 595.65 297.83 297.82
102 /013/ 15.541.32.00.00 ,
102 /013 / 15.541_33.00.00 287.30 143.65
102/013/ 15.541,34.00.00
102 /013/ 15.541,40.00.00 —3.319.95 1,65S.97 1 _6.59.98
J
102/013/ 15.541.61,00.00 _260.36 — 130.18 _ 130.18
102 /013/ 15,541. 2 0. 0.00
102 013/ 15.541 z63.00.00
102 /014/ 15.541,64.00.00
102 /013 /15.541.71.00.00
Subtotal N.E. 2nd St. Retainage 4�738.54 2,369.27 _ 2,369,27 _
Total Renton Share Retainage this estimate — >t 6,%3.62
Total King County Share Retainage this estimate 6,563.62
Total Retainage this estimate 13,127.24
Page 2 of 3 r7p�
Contractor. -
Contract No.: CAG 058-82
protect: Monroe Ave. Nf 8 NE 2nA fit, Estimate No.-
Rrogram 0072 0013 i,ina1Z
Amount pre IOU;Iy retained �—
Amount Retained thl estimatt. $ 18�655..70
jto Ee Dated ram the oTToielny accounts;) ! 418.12
FufiD PRODRAM 0 OARS f Warrant Amount
Renton Klny County
102/072/15 54I.30,00_ 25.92
102/012/15,541.40-00 -- --- IZ.96 _ 12 96
I021072115 641 60 00 88�80 44,4D 44.40
152.88 76.44
_ 76,44
Subtotal Monroe Ave. Retainage
---- -- 133.80
109A13/15 541 30 00
�0:(013115 Sd— 1 qD Ib "49,95 7.29`�
1O2101( 0.00 — —__ .'''_ 24.97
42. 9
Subtotal N.E. 2nd St. Retainage 150.62
75 26' 4-
- 7�.. 5_Z6
Total Renton Share Contractor Retainage this estimate
Total King County Share Contractor Retainage this estimate : 06 --
Total Contractor Retainage this estimate =—20'0
S 41, 8.12
Total Cost (Program 072)
Total Cost (Program o13) S 247,607.14
Contract Items Total CHARTER 110. LAWS Of 1965 S 133,869,15
CITY OF RENTON CERTIFICATION Sale; Tax (Water) � 7,Ot � nr wa•,cfo oa ruo.curo. f 381,476.29
1AIl.. nut Mf WtMJ Wvfr,,gy.��M BRAND TOTAL ff•..cu n.ow�a rw ufon n�rcwfo a oMo,.fm $ •997.50
.E•!w MO MfI N P/.r a A M•.oVf u*Wwa
UwN%.vo n v.y, f 382,473.79
1m: ' Finance Departwa. + Date: 3/30183
f10M: Public Works Department
SUBJECT: Progress Payment
Contractor: Wry Merlido Constructjgn_Jq,
Contract No.: _CAG 058-82 (Kin9 Co. to RelnQyrse Ci[v for [o m v c argil
Project: _ Monroe Ave. NC_6 NE 2nd St. Estimate No,: 3 final)_
_ Program 1071 1013
Mount previously paid Contractor:
Amount due Contractor this estimate: f _7,944,22_
jEai be pa'13 rom the following accounts:)
FUND PROGRAM f BARS 0 Warrant Amount Renton King County
102/072/15.541.30.DO 492;48 _ 246.24 __ _.ZIL24_-
102/072 15.541.40.00 1,687.20 _ 843.60 _ 843.60
Ij2p72/ ,00 2,V4,62 _1,452.31 1.452.31 _
Subtotal Monroe Ave. Payment _5, 84_30 2,542.15 2,542.15 _
102/013/15.541.3D.00 277.02 _ 138.51 13R_gI
102/01�LIS.541.40.00 4.05 _—MZ 52--- ---4Z4.Si---
102/013/15.541.60.00 _ _1,633.85 li 15.43 81632
Subtotal M.E. 2nd St. Payment 2,859.92 1.42,9__96 1.Va g6
Total Renton Share Contractor Payment this estimate Z 7.9jy11_
Total King County Share Contractor Payment this estimate f _3,972.11 _
Total Contractor Payment this estimate S 7 944.22
R�a
tract No.: tAG 058-82 _
stimate No.: 3 (Final) _
roJect: Monroe Ave. NE 6 NE 2nd St. _
SUMMARY
otal payment this estimate - Monroe Ave. N.E. S 5,084.30
otal payment this estimate - N.E. 2nd St. (013) 2y859^92
ombined total payment this estimate (including sales tax) 7,944.22
for combined payment this estimate 355,45S.75
otal combined payment to date (including sales tax) 363,399.97
otal retainage this estimate - Monroe Ave. N.E. (072) 267.60
otal retainage this estimate - N.E. 2nd St. (013) 1S0_52
ombined total retainage this estimate 418.12
rior combined retainage amount 18 6_L 55.70
otal combined retainage to date 19,073.82
ales tax (water main) Ut this estimate C
rior sales tax amount 997.50
otal sales tax to date 997.50
NO TOTAL (a) + (b) 3R2�47 19
Contract No.: �Sd1G Il5fl-82
Project: Monroe Ave. N.E. a H.E. 2nd St. Estivate No.: 2
►naj!a& �072 /013
Amou�t previously retained 13 127.24
AmWnt retained this estimate: 5,528.46
M6e psIdIR-s f e1611orT69 accounts:) f —`—
MID PROGRAM_! BARS Warrant Arount Renton King County
102 / 072 / 15.541.30.00 1,863.61 931.81 931JM____._
102 / 072 / 15.541.40.00 (-38,20) _(-19.10) -19 1 L__
102 / 072 / 15.541.60.00 1,857.40 _ 928.70 928-.-?Q-_
102 / 0T2 / 25,541.70.00
102 / 012 / IS.S34.30,00
102 / 072 / -5.541.10.00 41.25 20.62 20,63
Subtotal Monroe Ave. Retainaqe 3,724.06 1,862�03__ 1,062.0.3
102 1 013 / 15.541,30.00 ^62t.20 _ 310,60 _ W,60
102 / 013 / 15.541.40.00 _
102 O13L15.541.60.00 9 84� 478.42 _ 178.42
10�013 / �5.541.70�00 i�05,10 102.55 _ 1D2,SS-
1. 02 / 013 l 15.541_ID.00
102. / 013 / 15.541.i0.00 _ 21.26 _ 10,,63
Subtotal N.C. 2nd St, Rotainage —ILM,94_, _g0P_20 _902.20_ _
Total Renton Share Contractor Retainaqe this estimate f ?-764.23
Total King County Share Contractor Retainaue this estimate 2,764.23
Total Contractor Retainaqe this estimate = •.�.�_
-.. Total Cost (Program 072) Z 242255.24
Total Cost (Program 013) 13a858.71 ___.
Contact Items Total $171113.95
Sales Tax (Water) 0 7.0% f _w,5y,_.___
GRAND TOTAL f y4i,45 _
TO: Finance Departme • Date:
IR:M: Public Marks Dent --
SUBJECT: Prowess Pa nt
Contractor: _ 4U--MMerllno Construction Co,
Contract No.: _CAG-058-82
Project: `__Monroe Ave. N.E. 6 N.E. St. Estimate No.: 2
Program 1012 1013
Amount Previously Paid Contractor:
s 250.415.05
Amount due Contrartor this estimate: = 105,04D.70_
jto3e pa la iro4i th`e following accounts;)
FUND PROGRAM I BARS I Warrant Amount Renton King County
102 Z.272 /15,541,30.00 5 408 6-1— _ 1�,7 4,3 17,704 30
_102 J 072 / IL54j.4,0Q ( 725.Q 1 _�.-362.901_ ( .362.901
102__f�7. / 15.54 .6 ,DO _35_290.62 _ __L7.,645._JL_ L.645.31
_jr,02_J 072 / 15.541.7Q.00
102 / 07E / 15.534,30.00
102 L,9ML15 541 j0 Op 783,75 391.87 391.88
Subtotal Monroe Ave, Payment 70,757.17 ` 5 78 58 35.378.59
�02 / 013_ / 541.30.00 _ _ 11.802.%i _ S 901.43 _5_90t.43
_.1D2J_DL1.( 15 541 1D.60 _
.1D21__D13,/_L5.591.60•oD le,leo-D�_ ._ a.o9n.m q,o9D-ol
1021 L 115.541 Z0.09__ 3,896.90 1.948.45 _ 3 48.45
1D21_O1LL LS34.30.00
_t 0?/ D13 / 15.64j10 00 403.75 201-M _ 201.87 _
Subtotal N.E. 2nd St. Payment 34.2p3.53 17.141 77 17-141.76
Total Renton Share Contractor Payment this estimate = 52.520,35
Total King County Share Contractor Payment this estimate l; 52,520,35
Total Contractor Payment this estimate S _j52,520.35
C•,:�„ie! Ili. 14�,j 0� lb:i
CITY Oi RCv4TGJ CERTiFi ANON
Contract Mo.: _CAG-0058-82
Estimate No.; 2
Project: Monroe Ave. NE 6 NE 2nd St.
Slrt1MARY
Total payment this estimate - Monroe Ave. N.E. (072)
Total payment this estimate - N.E. 2nd St. (013) S 70,757.17
Combined total payment this estimate (including34„'83_53
Sales ta
P-Y^�"nt this estimate
Prior combined . z) 105,049 70
a) Total combinee payment to date (including sales tax) «_ .415_(Lb
Total retainage this estimate - Monroe Ave. N.E. (072) 355,.45S.75724.06
53,724.06
Total retainage this estimate - N.E. 2nd St. (013) , 24.
Combined total retainan, this estimate h804_40
Prior combined retainage amount 5,528.46
Total combined retainage to date _13,127.24
Sales tax (water main) @ 7% this estimate 18,655.70
Prior sales tax amount -0-
Total sales tax to date
997.50
GRAND TOTAL (a) + (b)
$374,111.45
f�,-C
aMeMiWn�en •
�ya 1/anwtr
■WM TAX oan«o" Reg. No.r R0_113 243
opy+a w.Mifn teroa
Certificate of Payment of State Excise
Taxes by Public Works Contractor
Contractor:
Gary 7eYlino Conatt. Co.
9125- loth Ave. So.
Saettle, WA 981" i�tE�i P C '3?857
1 ��1
We hereby certify that taxes, increases and penalties due or to become due from the above named
contractor under Chapter 180, Iaws of 1935. as amended, with respect to he owing publ wor! ks
contract.
together with all other taxes, increases and penalties due from such contractor,have been paid in full
or Oat they are, in the Department's opinion, readily collectible without recourse to the state's lien on
the retained percentage.
This certificate is issued pursuant to the provisions of Chapter 60.28 Revised Cade of Washington
for the sole purpose of informing the state, county or municipal officer charged with the duty of
disbursing or authorizing the payment of public funds to said cont.,,ctor that the Department of
Revenue hereby releases the state's lien on the retained percentage provided by this Chapter for ex-
cise taxes due from said contractor.
This certificate does not release said contractor from liability for additional tax which may be later
determined to be due with respect to the above mentioned contract or other activities.
Date at Olympia, Washington, April..3t..._.,:99'
STATE OF WA.S/IINGTON
DEPARTMENT Or RrvENUI,
Certtivina opker,
ROTTING.white Capies—Disbursing oMcer.canary Copy—Cmtmetor.
POR"REV III mu,a-+e, Rink Cnpy—File.C,14d.nt Cppr—Special rlle.
Fs 325
Rae. 1O/11a/7O Contract No. C.A.O. 058-82
NOTICE OF CCMPIETIOK OF PUBLIC WORLS CONTRACT
To: Excise Tax Mvision Oats• Marco 30, 1983
Audit See e.ion
Tax Commission
Olympia, Washington
Ds Not Use
Fro; City of Renton Assigned to:
700 Kill Ave. So.
Renton, WA 9FU55 Data Assigned:
P.W.C. Numbert
Date'
Gentlemen:
Notice is hereby given relative to the completion or contract or project
described below:
Dasaripticv of Contract Monroe Ave. NE - NE 4th St. to NE 2rd St. A NE 2nd St.
Monroe Ave. NE to 860 feet east
Contractor's name i Gary Merlino Construction Co.
Contractor's Address t 9125-10th Ave. SO.. Seattle, WA 98108
Date Work Commenced : Oct. 25, 1982
to Work Completed Feb. 1, 1983 Date Work Accepted: Feb. 7, 1983
Surety or Bonding Ccnpany i United Pacific Insurance Co.
Agent's Address : Seattle, 1:'A
Contract Amount. b 155,552.70 Amount Disbursed t 8 363,399.97
Addition t 25,923.59 Amount Retained t 19.073.82
Sales Tax t 997.50 Total 382,473.79
Total 382,473,79
by
Disbursing Officer - Firanct Director
THREE COPIES OF TF'IS NOTICE MUST BE COMPLETED BY TF'E DISBURSING
OFFICER AND MAILED TO THE DEPAICTMENr OF MENJE AT OLYMPIA, WASNINGTON
-MMEPL1TELY AFTER ACCEPTANCE CF TF6 WORK DONE UtIIlEfl THIS CONTRACT.
NO PAYMENTS S}f.1LL BE !MADE b'OM FtETAL`�D FUND UNTIL HWEIPT OF
D S C : CA .., ACCORDANCE WITH SAID
CERTIFICATE.
f
n 325
M. 10/11^ Contract go. C.A.O. 058-82
NOTICE OF COMPLETION OF PUBLIC WORKS OONiRACT
To: Excise Tax Division Date: March 30, 1983
Audit Section
Tax Coesdssion
Olympia, Washington
ro Not ON
F2m: City of Renton Assigned to:
200 Mill Ave. So.
Renton, W4 98055 Date Assigned%
P.W.C. Numbers
Date t
Gentlemen:
Notice :.s hereby given relative to the ca¢leti.oc of contract or project
described below;
Description of Contract Monroe Ave. NE - NE 4th St. to Nt 'nd St. 5 NE 2nd St.
Monroe Ave. NE to 860 feet east
Contractorts Name s Gary Merlino Construction Co.
Contractors Address : 9125-10th Ave. So., Seattle, WA 98108
Date Work Connumuced Oct. 2E, 1982
Date Work Ceeipleted Feb. 1, 1983 Date Work Accepted: Feb. 7, 1983
Surety or Bonding C,-.party United Pacific Insurance Co.
Agent's Address : Seattle, WA
Contract Amount b 355,552.70 Amount Disbursed % $ 363,399.97
Addi•'xat : 25,923.59 Amount Retained t 19,073.82
Sales Tax : 997.50 Total a 382.473.79
Total 382,473.79
By
Disbursing Off'•er - Finance Director
THREE COPIES OF THIS NOTICE MUST 9E COMPLETED BY THE UISBUk313K1
OFFICER AND MAILED TO THE Da AR MINT OF REVENUE AT OLYMPIA, WASHINGTION
IMMEDIATELY AFTER ACCEPTANCE OF THE WORK DONE UNDER THIS CONTRACT.
NO PAYMENTS SHALL BE MAIZE FROM RETAINED FUND UNTIL RECEIPT OF
D S C OA .., H Y ACCORDANCE WITH SAID
CERTIFICATE.
57WEETIMPROvE TENTS 4 S'- 8UIL% 4F A,11)?OE VF_- '
MONROE Ale. NE2A-
2-1 B3 S710)�Al —
U`j-iury 466'r ' *S#r JAW, -a". w&Ev. PrSCRIvrI°N
M7' Di33`� ' 26 ; 365= 29 S0 337.70 S.Ry4
049' /0. 9'�3° 1 337-�S E.Risl
t4H A6492
g o i � .�33 E.IY/M
8? ; '� = n 3#eJ7 6/RiM
' i 3Y2.92`' I✓Riap —
CB 2�76' 2/1 B 335..90 W.fAM (w:9j
C8 2;76 3 201
C8 —
CB /0099?
rA /0A99-' -
2/-
CuRBSHCFr -
? CB. �3f0i4s1/ 21A 8 338.a3 83°' h!1PiM
i
i
i
Amot B ssocioles
' SMVE rops ICAGSWERS
M mr tro
�S BU�L7 df pyROE vE. i
" -S9NJ7-4Ry SEWER = WaTER — _ 2-/-83
OPLITy TW, -LEV Ei£v- aEscP�Pr�oN --
S9411rgRy 0/
" "N S�f20s✓ DN
l //,97-L /
i
W471Er oti'f ' 1,6
• 01-/6 i ps
29—
,, 13,U5 v' /6 i ✓ ' 341.01 N. RiM
13"111'✓ 335 341.8* N.RlM
1?1'41 ✓ /o 7wle?337.09 :W..A NRIN/
W47-E,y AICTEr 9+0ELN 27? 1
.• Ot22' ZC 3� i
8 Associates
" •• 3f23�` � 235 `��
., • 6�SS6 f 2�s
i
STOVI -- S4*174Ry IVITrj?
M✓ 2{97? i 76 36"=.327.20
MJ 6t NI ✓ ; 3 '✓ 4, ; ✓ .gf03
s = s
6�7I v 20 - 48"4.= 3ZS.60 3#s.0O
111IT9RY Ml ? (-)Ot 38s ; /=s -3V 9/ 3W 06 N,fle
+f9 9
W9rER W 6#959 ✓ , ?8—
-V 7;i26 /93
W9TER V4LVE /S3 4.1
CuRBZV�ET DfSO�/ , 8"=3M#71 -W/.82
C9 64SO°✓ /7a
Arm i 9 AENGMIFERssoNotesS S EYQRS/
MINmR. sMapNn R1111-PTq
srTEErlaPaivE�Ears cos I3uiLT IF / dVROE 4VC.
MONRoc Ive. ? NE2ji.Sr.
2- .S7 aR�l '
/63
07-IL i rY .sRM &r7- I )F(6yr -ZYvr. -a-v. vp&let/ DEs�irr�oN
My OiB± 26 i 36S z 329.50 337.70
337..3 E.RAM
/ l 2f77 8° ro 3xx E.�Piq
&4q9 3 --.36 77 3` -17 �✓RiM
/ /0+99-f /p n i a 3q.92 �✓RiM
CB 2t76'— 2p- M5.90 N/RiM (w.9s
CB a76-' 202 i
CB 614sl
GB 10}991- 2 rt
CB /O 999-1 21-° '
CURB?HCF1- 6f5/ Z/° � -
CB. /31ILWA 21a 8'=s38 33 3�p83 k!1PiM
i
i
i
i Arne»9 ssociores
SUPvfr [,K.MCERS
� IN-uo.WoNrq FlI)17.77q
/4S BwcT aF MoVA�E
5441/7-4Ry SEWET� = OTO? — _ Z/-83
&7—/1 ry &rr I )PI647- _T4W-SEV. T6P ELEd. DES�R/PT/Oq/ —
S4N/TgRy
M/ S�t20 b, ON
8;09` -3
l✓97E /qv o7,lq 1- 6
i
p/16-7 p_s
296
• � 3S°
76o,Z 337.1Y 341.84 N,RIM
/3f 41 � /� ToP/z'337,09 3�h46 41
W47•E)7 METER 9+6el 27? i
W47-ER V4,ZVE G>e/ /81 •
i
' Ot2Z 20 3 i
i
9f0/8 2s� ' �A nett s Assoclotes
.. x 94 9`+`6 zyj � N,N ,,rtoVfwnrM f 711,rsa
, S-,FU/LT 0F'2-A,S7
-5TOVI — .S4Ni79Ry
- - ---
ox ry JR77M &rr RlNr Zvv7 -EcEv. 7DP Et£v. DEsuP/arroN
S7DRM NJ O*OS ; 6? � 6y .341 v9 Y fj q
All eMk i 76 36"�3MO . ##-?0.83
t/RiM.
lNf 6t79 v ; 20Y �B`N.--2Wx0 3#3.20 E.,fiAl
S9N?9Ry M1 H c 38s /s R8.9/ jW O6 41 RiAJ
W47ER NI 6f959 , ZP 9
M1 7fi26 /93 -
6+576 /1
E• 3�`�'
cY,?e?n+cEr Of50 , 8'=339#7 NI82
i
d Assoclaes
S 06vR LNGMYEERS
�RIY1r. +MnV� Rl ll1.I/C
For Use By City clef" Office On"
A.I. Y --'—
AGEN A ITEM
RENTON CITY COUNCIL MEETING ...........����..e.�.......
SUBMITTING
Dept./Div./Bd./t.^mm. Design Engineeri00 F,,, Agenda Of_ Neeti ng Date
Staff Contact Agenda Status:
SUBJECT: MDnrog Ave N.E. & N.E. 2nd St, Consent
Public Hearing __
IaOrOVeaERtS CAC OV-82 Corres?ondence
_ Ordinance/Resol"Xion�__
Old Business _
New aJslneea
Exhibits: (Legal Descr., Maps, Etc.)Attach Study Session
A. — Other
B.
Approval :
C. Legal Dept- Yen__ No_ N/A_
An "Val of Finance Dept. Yes No_ N/A_
COUNCIL ACTION RECOMMENDED: P --
Other Clearance __—
final, pay estimate; request final acceptance
of project; benin 30 day lien oerirJ.
FISCAL IMPACT:
Amount Appropriation-
Expenditure Required S Budgeted S Transfer Required $
SUMMARY (Background Information, prior action and effect of implementation)
(Attach additional page. If necessary.)
This contract was completr! February 1, 1g83, and accepted by the Pdblic Works Department
February 7, 1983. It is r.:cammended that the City Council accept completion of the
contract as of April S. 1&93, If after thirty days, nc liens or claims are filed against
the project, it is recommened the retained annunt of R19,03.82 be paid the contractor. The
**Wl cost of the project is $382,473.79.
PARTIES OF RECORD/INTERESTED CITIZENS TO BE CONTACTED:
THIS COPY FOR YOUR FILES.
' //!d YITLj � !7iil..t yB.4� ni .Ji� W 9 �K.i'•Li g��.l ..:! u`�'11.'..J..
•r. e. :1 'u_, jl 1:2 hla ,.:ns.<. aca '_.P,�
l
F'�c�., - ._ /f....,. - J?riL.E to+„ Gu;� C/' rs•r, T<.-`c, C�.G _.
GFJD.Do rfry 4gncro ...
'7:33��
•
1L1I61, Greetwood MemorlA Park
67..j,
,�, -
ECtx,KEU I IVAE IIFEHATORS OP
('RET .,MR11']I RFI' )s
♦'D %1EM(M11L wORKe
COIL VRaRILI,
)iBl V.(. i1L I'll" LM,o/. fuLla/IaL iIBIL
July 23,1982
fi`ngineering Department
City of Renton
Renton,Wa. 98055
;entlesenl
ae at Greenwood Nexrial :ark ate putting you or. notice
We have reason o be:--eve that the under-gro%�nd :tllitiea
recently installed =7 Puget Power on the We*- and South
of our property, for the City of Renton, to s-.,^^Ply the
new Xing County Facility being constructed on the South
aide of our property, are in fact placed with-in our boun-
daries.
We Ash to have you substantiate your position in this
matter.
Very truly yours.
GREENWOOD MMRIAL PARK
Ryl
1 ZL t.FK1Il1S,Presldent
DER/rw
RECEIVIED
1 JUL 2 71979
2 k NG COUNTY SU-'
3 COURT CLERK'S
4
5 IN THE SUPERIOR COURT OF THE STATE OF WASHINGTON FOR KING COUNTY
6 GREENWOOD MEMORIAL PARK, INC. , )
a Washington corporation )
NO. 835278
8 Plaintiff )
STIPULATED JUD:,:,BNT
9 vs )
CITY OF RENTON, a municipal
10 )
corporation, and the COUNTY OF )
KING )
12 Defendants )
13
14 THIS MATTER having come on regularly before the undersigned
15 Judge of the above entitled court upon stipulation by all parties,
16 as evidenced by the signatures of their respective attorneys hereto,
17 Plaintiff being represented by WYMAN DOBSON of DOBSON, HOUSER 5
18 DOBSON, City of Renton being represented by LAWRENCE J. WARREN,
19 City Attorney, and King County being represented by DARREL SYFRED,
20 Deputy Prosecuting Attorney, and due cause appearing therefore, it
21 is hereby
22 ORDERED, ADJUDGED AND DECREED that title to the following
23 described real property be and the same is hereby quieted in
24 Greenwood Memorial Park, Inc. (See Exhibit "A" attached for
25 description), and it is further
26 ORDERED, ADJUDGED AND DECREED that the following described
27 real property in King County, Washington, shall De quieted in
28 The City of Renton; (See Exhibit "B" attached for description),
29 and it is further
30
31 STIPULATED JUDGMENT
32 Page 1
WARREN a KELLOGG
'm KlwtOn'W.,��yy gyp,\ w
UF�YI�
6
o
1 ORDERED, AD UXED AND DECREED that with this stipulated judge-
2 ment all other claims, causes of action, counterclaims, crossclaims
3 or otk.erwise brought by these parties shall be dismissed with
4 prejudice and without costs to any parties.
5
6 DONE IN OPEN COURT this 27 day of 1979.
v
9 ",MRT C0041IS:SON
10 Press d by:
11
1 i
a ence e 0
1 WARREN 6 K
Attorneys r City of Renton
14
15 Approved as to form and
Notice of Presencation Waived:
16
17 —
Wym n o son o
18 DOBS HOUSER 6 DOBSON
Attorneys for Plaintiff
19
20
arre e
21 Deputy Prosecuting torney
for King Coaity
22
23
24
25
26
27
28
29
30
31
32
Stipulated Judgment
P Y WwRR[Nw aw RFuNOGG
m wOwwrowY M.w+•warow bWbb Y
T
b�`
EXHIBIT "A"
The East 30 feet of the Northwest Quarter of the Northeast
Quarter of Section 16. Township 23 North, Range 5 E., W.M.,
LESS the North 30 feet thereof and LESS the South 30 feet
thereof,
and the North 15 ieet of the South 30 feet LESS the west
30 feet cf the Northwest Quarter of the Northeast Quarter
of Section 16, Township 23 N., Range 5 E., W.M.
all situated in King County, Washington
4
EXHIBIT "B"
The West 30 feet of the Northwest Quarter of the Northeast
Quarter of Section 16, Township 23 North, Range 5 E., W,M.,
LESS the North 30 feet,
and the South 15 feet of the Northwest Quarter of the
Northeast Quarter, Section 16, Township 23 North, Range 5 E.,
M.M., LESS the West 30 feet thereof
all situated in King County, Washington
1 ,
- - - - - -- N� _ � - --
ar
1
Irl I
e
J'•
1 •
C <
�,
.. �
s
i .. .,
... , ,.
. ..
47
W • ;ir'_F'c r p r
= --- 1 - .
I ,
OF
z PUBLIC WORKS DEPARTMENT
DESIGN/UTILITY ENGINEERING 0 235-2631
g MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.99055
0
Y%9Pb
,TEO SE PTf
BARBARA V. SHINPGCH
MAYOR November 12, 1982
TO: Don Monaghan/Bob Bray
FROM: Gary Norris
SUBJECT: Monroe Ave. N.E. Project Materials Approval
Please be advised this office has reviewed and approved the following listed
materials:
a) Hapco Poles
o) GE Luminalre fixture
Fisher Pierce photo call
�) GE Lamps, 150 watts sodium vapor
e) Service cabinet
The above submittals have been stamped and may be forwarded to the project
contractor.
Gary Nor.. P.E.
CEM:dar
Encl.
of eF,y
A T
PUBLIC WORKS DEPARTMENT
DESIGN/UTILITY ENGINEERING 0 235-2631
!-R
g MUNICIPAL BUILDING 300 MILL AVE.SO. RENTON.WASH.99D55
04rf0 SEPTE�o
BARBARI Y. SHINPOCH
MAYOR
February 22, 1983
U.S. Postmaster
Renton, Washington 98055
Attention: Mr. Mike Turner
Subject: Monroe Ave. N.E. & N.E. 2nd St.
King County Courthouse Mail Service
Dear Mr. Turner:
This letter is in reference to a conversation with Mr. Bray, of this
office, on February 18, 1983, regarding mail service to the new King
County Courthouse and King County Shops.
Please be advir , that Monroe Ave. N.E. between N.E. 4th St. and N.E.
2nd St. is a dedicated public street and right-of-way. N.I. 2nd St.
between Monroe Ave. N.E. to the Kina County courthouse is iiso a pub-
lic right-of-way with full street improvements.
Thercfore, mail service could be provided to the new courthouse and
the King County Shops from the above mentioned streets pEr their
request.
Should you have any questions, please call me at the above number.
Very truly yours,
Donald G. Monaghan, P.E.
Design Engineer
RLB:dar
M E M O R A A a U M
DATE: Feb. 15. 1983
T0: Don Monaghan
FROM: Gary Morris
SUBJECT: Monroe Ave. ME 6 ME Ind Street
Street lighting
Please be advised that all discrepancies on the final Inspection of the
street lighting on the above-referenced project have been corrected.
We hereby accept responsibility of the lighting system. The contractor
may be advised as such.
CEM!ad
Gree*wood MemoriaVPark
F.VDOWRD DARE }4` ,� .FFH.\ttHiti l,F
CRRNA'fVNIVPI 1 �
ADD V F:11 "Hi ll 111111KK
,OtA NIMARIUM
u\ ...... �<n1en. •ML,n�,nw YIIMe:z-e�ca—.av_m-zsc :__eo=._-cep
July 2).1982
Engineering Department
City of Renter,
Rerton,Wa, 980,5
Centlement
W= at ::reenwood &, wrial Park are putting you on notice
We hale reason to believe that the under-ground utilities
recently installed by Puget Power on the West and South
of our pr tarty, for the City of Renton, to supply the
new Ring County Fa--ility being constructed on the South
side of our property, are In fact placed with-in our boun-
daries.
We wish to have you substzntlate your position in this
Mattel.
Very truly yours,
GREENWOOD MEMORIAL PARK
Pyl \
�1 EL E.HOIMS,Presiaent
DuJ'{�xv
King County, state a wa.nrgm Atdbieture Division
Rand), Reve L:e, :er.cj F:xe<u w 320 aaq
Department of Planning and Seamwa:�ng,on 9e+w
Community Development
A. Richard Gemperle, A:A/AICP
Gary S. Tusberg wanagw
Dncty (206) 3445222
April 15, 1982
P.J. Capps, Manager
Renton Local Office
Puget Power and Light Company
620 South Grady Way
Renton, WA 98055
PE: RENTON DISTRICT COURT
MONRO£ AVENUE N.E. 6 N.E. SECOND STREET
RENTON, WA
PJGET POWER JOB NO. 672106
Dear Mr. Capps:
Robert Sparling forwarded the attached letter of March 23,
1982 to this office for action. We are in aareenent with
installation of the service mains and equipm_nt by Puget
Power as described. It is our understanding,however, that
final location of the service lines in Monroe Avenue and
Second Street are subject to approval by the City of Renton.
Don Monaghan, City Engineer, should be contacted to confirm
the City's requiremea•.ts.
The District Court project is currently out to bid with a
bid opening scheduled for April 29. With favorable bids,
we would like to have a contractor on-site by May 15, 1982.
An} further questions should be directed to Mike Oren in this
office.
Sincerely,
COMMUNITY/ DEVELOPMENT/ARCHITECTURE DIVISION
? u�
A. Richard ' ICP
Manager
ARG/MO/eoh
Attachment
cc: Ion Monaghan, City of Renton
Lz_ Ct1dx
KivsE�v
Aat/M/NYM
K • 1 3 [ F ♦ L V M IN U M • C HE M I CAL ! • L K 5. 1 N C
December 14, 1982
CERTIFIED--RETURN RECEIPT REQUESTED
NOTICE OF OUTSTANDING CLAIM O
TO: City of Renton CITY CLERK
City Clerk
200 Mill Avenue South
Renton, WA 98055
Notice is hereby given that the undersigned, KAISER ALUMINUM &
CHEMICAL SALES INC. has a claim in the sum of Th rt -nine housand
x Hundred went and 20/1O0 Dollars $39 620.20 against t e on
taken Un to ac icInsurance an U4 OS for the work
of L11e Monroe venue N. . street improvement project.
KAISER ALUMINUM & CHEMICAL SALES, INC.
BY
KAISER
ALUM/NUM
l00 ......... ... O.wL.MG C.L VOwNJ wO�a _
i
153908:
0-,.
City of Renton
City Clerk
2DO Mill Avenue South
Renton, WA 98055
w ---,�" CERTIFIED--RETURN RECEIPT REQUESTED
CAaCAOa TLiTN6 ATOR7V. INC
TNRrxu°e N�NYCTxs07 RM roEolJnY1R»
14120N.E.2/01TREET . EELLEVVE.IVA QM7 N0.16932
12MI"I M77 v I to.Tv
TO Citl-of Renton i219411T ilb uws - IUol1L it,lti_�
no hill Are South CRY OF RENTON CER
. _ •rNE u.ouuaxto 0o wawa. cun.r Y.oE
Lwuten WA 98055 RENALTr e. .e uu"r, N111
�E�M! ai11sw�'Cy�.Twt a"¢[a: 0a"la o" ew
- LAEOi�[.lOxYlolS��alo
♦♦Nl CUIY 1.d 1WT.NlC .Na YN«4Y O.L18.T�aN
Attn: Don Monaghan wu"A" ayNI rNa m7• or "a"To. ."0 Twar i u
g fN° I[a t04VT [Nrlt aNa ClaTlt' a�
MIa CLAIY.�
TOUR MMO N CATE EMIN"ED L EOINT Telr ...
? WANTITV DATE Sd11Rlp1 REPORT uM►loltt "Till
5 hour 12/13 Field Soils Sampling 10952 21 30 85 20
9 each Field Soils Density Tests 60 86 40
26 Mil Travel So 7160
_ TOTAL WH $179 40
PLEn
CUM d I%% ;J c I ( � b�
_ .
- ---- r ua--ty c
c e r. u-1 au it — _ wl H F kYMwT --
Ypned:a E'1;CN.,:_�dycar:ccaaM Rd Oad
ILI
30/ 072�s s4f/.9O.00-/79�0- /,coaz
LJAo►I��l�e,,,
. t
• SPEED LETTER •
TD- DATE: ,� �d fP _
/Y761"/111-v ":vz, -A 'P PROJECT:�/Ap .Ce 6-z NE"
SUBJECT: e. de— 2e,s.4<,a-. s Ij 111 �,f
r4 he,
-rr 2 , 2 "-AnLa-, S's � L,n dlat, ajr A, ,, N, E.
vne
ZANONI A SSMto a/bxtp oirpiws rJl� NO Cools
S O u a,r tnnn wunNy� `nwi� i ����♦uwM�w� Mwa
IlMI�>t►�Nt 83&21
t�ANI�L E. :�Ol.MBING.
wKD4 M'VOWAY A"MtDAC* fo PWFOUV Fl- +LITY
ON MowKot% Avg w.4.
IAIB AJEED '.WO PM"tgMMY A"MC 441E TD SVtVV ZNE
'--41FIOFcf rROJML r7. 9C44 O/W TO nE 24L&Wicm .
7}tB Lounor 15 OF Sal o J/W ApMZoAr#4 It) as
Fo�u..oW s
MEh6uRIV4 "OH TIt£ txiSnQc. +11.45 '
AT Tito W e;T rKo r'cRTY L4"G OF suQJtcr SJ TI
r"W69 ! am URLy AtoN& 1ueex P2ommvLIVE
A Cmrr, IGE of 240.O rT Tb rH+G Pfz, D.K/.�TH0�1cE
=.�-ITINUING ALON4 �,�MO {,11.!( IO,OorT Tb -htc worn IavV
of 24,ate Fr
s
i z �qw war
I
IN
I �✓1011R AVJ3 N.E 3or
P'-KTiM... 6Ir6 �erc,N
rot Tb
1 f
t£ 'o £�ytc ba 'ttF y� rb
/F -0 d 9'f•CF Lf 'it f ootb
di 'o bs't•t•E /f'ttF � SL r6
by o 6zYiF dE 'ttg n og ♦6
b/'o '9G£ bz 'i�F 57t8
bo' o 52140E 9/ 'ttE oor6
St 'v li '90£ 961E OF tL tL
I
SF 'O j 9o90F f#G �' oStL
ZI o IOA bS 'Z1i oSt9 •
6?'� Lb'lif. � tC oot9
ft% ( 1s "6FF ' 6L' �'F � osft
zt•o /t 6£f 66 d£F os�y
76'o /O•i£f bo'8Ff oor�
d/ O is ZFf 61'ZFf -
ST% ( 95154E /$'9£fe S2f£
I �
42V b2 'SF£ 4t'oE5 ootg
srr tb �S '1`oatF '�5 '3IY '►y' �ovlw,`' :�r�.'
/Z/Py..
Plro�.of : Monr,ot Avs. N.�, - &;Vc ,diet /ow
lei
A/.••� : /)r►o�irs .4-c. �/E. 3/.. 3*00 �. ski. 94as &N"f
OrWrlom SLOPS Top eaa® Nue QL. Cvr I FILL
7foo 33G• SP 336.3? o 0
3;Zs 33G. P/ 334. 74 0.05
3f so 337. /9 3391.Z4- 1.05
4400 339.04 339./0 /. o/
4f60 33Y•7' 33lio 0.6f
5400 339. Q9 340. /0 O.Z/
5.050 340.79 � 341• 04 0• 85
G;oo 341•G9 I34/. 75 o.OG
G4So 342. 59 34/.62 d.97
7-700o 343. 15 342.4G 0•(.9
7450 343. 7/ .343./7 O.5¢
74 75 343. 9G 343. 32 4.64
8-too 344. /G 343.G2 0. 54
8125 344. 29 344. 45 0./G
B+ .50 344.3 F 344. Z4 0.09
874 75 344. 4/ 345.no 0.59
9a o0 344. 37 344.3 F O•o/
9!ts 344• Z9 045./7 0.88
A : s.0, G✓i w.s f Ai..ew Assoc.
w rve..� . /Z-P-PL
�r,TrA�
All _ow
4 304
.4✓+ir.'' 4OW104 Al6d, N(5. 3Ol00 /V 54. %s 1 t
we. 4weW
57�77CIJ Sto1e Te ewas //u1 AC. 64T tee i.I,.
340 0 336.53' 335. 2f Az9
3v, 336•3/ 335. S6 4Z5
3t5o 337. t! 357. 97 0•/P
4400 338.09 331.C/ o•!L
4*30 331. 99 33l. 4/ 0.4Z
5♦ 0 0 339. &Q SM. Fp /. 0/
510-So 3¢o .79 ' 33l. 54 /.if
bfoo 34/. 49 341•97 0.sp
G450 34•Z. 59 d42.7/ 0• /2
7.0 o0 3¢3•/5 f 343 23 o•of
7r5o 3f3. 71 344•04 0.55
70 75 3,t3.96 344. 41 0. 45
9.seo 344. A. 344. 45 o .o9
04L5 3*4. Zf 344•10 0./!
9+ 50 3i4. 3P 344• t9 IO.m9
9 4 7� ?44.4/ 344.54 I o• /P
9400 34E. 37 3441•6P Q.3/
9tZs 344• =9 344•G3 0. 34t
t/ok : P�lts�i
OCIATES
ENGINEERS
(206) 747-2785
•t /y0N80E AJE. File No.
sit Line: Bk. No.r—ig. Job No.
.el Line: Bk. No.109 9. -- Date �.-
(�j rp BBC. �RB ComOuted by —
ffset
�JaV?aE 9vE. - 6+80
Along From//-''—To-- Chocked by
STATION SLOPE gk.7ao apa NW ELEV. CUT FLL BEMaNKI
MONROE 4 C. - /t00 - (0*00 - (R7 or k/437)
0{s�31('Ir) 337A7 70p EX/S-r Cori
/1*1 337±L 336 79 6Z
0 337 '3 .33605 /ad
-33685 33S02 /O 3
" L2Jf[S0 " 336 s7 ,33Y 6S /9z
" 2.7S " 33650 333yff /62
" 31.00 • 3%:L6 33S]E! /Z7
" 3+25 n ti 3a 7S
114M " 337§91 335'/ /2
-V8 6Z 339 072
Sy00 ^ �l -339`K 338 L QSZ
n Sf50 " s 340' .339 S'' 0 63
6,00 " J40 .3�/ 97 103
1811 - 125th Avenue Southeast
Bellevue, Washington 98005
ARNETT i ASSOCIATES
SURVEYORY i ENGINEERS
Ttlephone (206) 747-2785
Project — 40*ROE gdE file No.
Transit Line: Bk. No.---Pg. Job No.
Level Lin3 Bk. No. A Date /2-a-8z
rk Irv, �T/
Offset Computed by
Along d ! wE. fr vom o'� To —.— Cnacked Dy `Tw /2-8-8L
STATION SLOPE TOP CURB NW ELEV. CUT F14L REMARKS
IV 41ROE 4VC - 0050 6,100 (1-r,) 1r(Easr)
Qf#S!(CT) .337B6 Tqo ExisT
01,50 P) 33TE 338
iroo " I337�i 937!1 3z
/1-50 " � 337 i3 33709 Q o�
2�00 " 336 BS -335� /69
2,50 , 336 sE ZR5-A* v11
. 2t/,r • 3� 3% SD 335 0
3t00 4, � -3.36s6 ��,sa Q 02
336 7S 336 L6 Q of
iN-
33,
17
SUMO 33789 v SU9 1 •Z -
. 5430 -3.386z 339 Q98
• s,00 339 tF0 3g0'0 QLo
.' s"Sol. 3il0�7 3�Al 6Y / Z
6 000 3YO L` 3*1 L5
1811 - 125th Avenue Southeast
Bellevue, Mashingtun 98005
MP
ARNETT i ASSOCIATES
SURVEYORS i ENGINEERS
Telephone (206) 747-2785
Project 1110*80E ✓E File No.
Transit Line: Sk. No—fig. Job No.
Level Lin Bk. No. Pg. Date �z-BB2
s ` 7N/
Bk. C� 6
Offset M,, Computed by
Along /'dp iVr- From "5'0 To 6� Checked by
STATION SLOPE ToP CURB Nos ELEV CUT FILL NENNINS
/'9041R0E 4VE - (EsT)
)ki5-2(LT .337 x6
p{50 l�+ 337 az �36 se �.5�
/000 337 l ?3709 Q 3Z
/f50 " 101) 9371 37o9 o
" 2060 " 33695 3351— /69
2f50 33657 :T3jr7r1 QB3 11
2+75- 33584
3,�5 ^ ° 336 LS X6-L'f
3sS0 .3379Z 538z4 `
Y+00 337gY 339/O 7
" IbL50339 60 Q 98
" -,00 ^ .339V6 d�* p D
St50 • g�(e i7 3�/6v0 /1
6+00 7.5 Q 8/
1811 - 125th Avenue Southeast
Bellevue, Washington 98005
•
ARNETT i ASSOCIATES
SURVEYORS i ENGINEERS
Telephone (206) 117-2785
/y0NR0E f�uE.
Project File No.
Transit Line: Bk. No. Job No.
Level Li Bk. No./09 Pg. Date
Offset 7oP BK.
Along r�fA4'ROE ACE. From-9,4so To 6-10 Computed by --�/�.,/�—
/;�,,_ Checked by
S ATION SLOPE Bk 5?Ctg6 NUB ELEV CUT /-/LL REMARKS
MOH'ROE <JVE- Z/"o - (otOO (RT,) or(/t/EST�
6,"y3 33787 75P ErisT C,,r6
/1,00(R' 337 336 Z 0 6z
337 '- JU6°f 7aA
„ a-t ?36 es S!Y 83
w 2.so " 33657 33�t 6�5' 7 92
Zt7, i 3 sa 33yB8 /E
" �rQO ' —�3656 33S�9 IZ7
„ 3fZi, ti 75S 56 y
'Aso m 3371 33737- b O�K
yf00 337 339°—� /2
Asa ,�U8 6z 3391 07
" 5 0 33�40 338B8 wQSZ
sfso ,� 3'f0'? 339 s, 063
6*60 ^ 71/0 LIV .31�/1-7 103
1811 - 125th Avenue Southeast
Bellevue, Washington 98005
t
ARIETT i ASSOCIATES
SURVEYORS i ENGINEERS
)['@phone (206) 747-2785
Project File No.
Transit Line: Ilk. iMp���p9. Job No.
Level Li ilk. No/"v+'i i9. Date iZ-782
Offset ��•-Y°�-�7b Computed by
AIug 4 rde lve, ,Fr 1,54 To-L— Checked by
STATION HAIL SKIS tLEV cuT F/L1- R[MARN!
/YDNR4E 4VE. - 6,,SO - /3t0U ('rf ) a (A/Esr)
6+SO(*) 94/72 3Ye 7! (9 99
.3i2So 3y323 03
7+50 35c3z7 3 .06 0 L
„ 7+75 3w36= 3Y1/6 Q79
8+60 ' ) -j4
M B fjv
9000 :1`f�f i� 3ya,�69 J33
9,25- • 35 4,LO 3yi±.3 �33
9+SU i 76 3��69 C 53
/0+00 3Y3B3 .34yls 01s {
3'13.
%Z+CY) 35�Zs 3143±�
" 050 —q4/9/ 3d12 S* 063
.
/3 QU —� 3ie/3/ 310 v2 �g9
1811 - 125th•Avenue Soutneast
11erue, Washington 98005
ARNETT i ASSOCIATES
SURVEYORS i ENGINEERS
Telephone (206) W-2785
�fa.V116E Svc.
Project P11• No,
Transit line: Sk. No--Vg. Job No.
Level Line:��k. No.� Pg. Date i1� 7-82
Offset
(S) �o BF cwb
CAVute0 by
�t eNAaF 9vE, 6�3Q
Along Fr 3.o^r'—To Checked by
STATION SLOPE Sk/RaaT NUS eL9V. COT FILL REMARKS
110NR0E wE - 6450 - 13#00_(L7')ar(�557-
s 6•s0 3w 62 0f0 t/u6 �{F �Sjaff
%•GO 0oµ - a
7.50 3�i�z7 3*3E 0—
' Lo
�
7f7S _ 3%362 341Y 0 30
8•ap 2*3 9/ 343 62 0 ..,. .
/2 3 fs YS Q 33
_9*SO 3�/27 3y`f29 0o2
,9«7c 3iuf 3S 34S°0 Q 6S
003 t.
}30 34S2 067
9,50 2� L6 3!,4yc1 C ys Y
i0�S0 r - 3S0 &5 z Q62
//000 0. - 4317 -9�43 5' 0 z
oTL p3z
7e+00 a ��F�s/ 34349 016
12150 311/9l 3YZ 93 C.• t Q VZ
i3fo0 ay/sl 341A pas
1811 - 125th Avenue Southeast ,
Bellevue, Washington 98005
W .
L ASSOCIATES
TORS L ENGINEERS
;,hone (206) 747-2785 .
_ I
/fd#)IOE 'c.
jest file no. II
nsit Line: Ilk. No—fie• Job No.
l Line: k. No. AM F9• Date /1 7-92
—�--�-
'ate cw6 Computed by
ag MeaMt lcLF From—To-6. • Checked by 1
i
I
flow •tore ff*, 75v axB 1 law I LIE V. CUT F/LL ReYARKe
1Y01VR0E 4VE - 6+SD- 13fo0 - Lr.) �(&s-r)
I
••//,S//p (�� ,33`,y
7S
,00
3i 4 YS 7733
30 3`Y2�! 09 O —9
'7S
100
50 Off ,
-Ak? 3 ?#368 Q,S
3Su{_i27 t767
00 e. -?43-L 3fc3°S Q�L
16 3Z
J50 35F/9/ 3je.: 3 Q
k10 3tya6 QOS
125th Avenue Sout4&St r
ue. NaShtngton 99M
i ASSOCIATES
YEYORS 6 ENGINEERS
ephone (2t0�6) 7117-2785 'I
ro)ect M�R17E /�E file No. -
rensit Line: ek. Nop.�� pg.— -- Job No.
evel Li Lk. No.44 p �Z-7-P2
ffset B'�' aibg• Date Irv
onroe 91'e. fS0 /3 r Chocked
by —
long Fr To Cheockedcked by --
ATiON KOPE NAIL LIQy. CUT FLU R[YANKL
MONROE 9vE. — 6,50 /30-00 (k/ES7-)
6jso ) 7Z
7�00 • � 3�aa I
840
+
eiso• 1 —
,OF 7S
3y3B3 035 Y
,X 3i32 gyy39 /z2 1 .
JVe!L4 3�3� Qd6
+Q'I 3ie:Ll 3V3 6e /L 77
asp 41 .91 3yt'SY �e(3 . -- —
125th,Avenue Sout ast
evue. Neshtngton 90M
• /t/1/f/c.
FV%V 4 : Afonret Avo. N.E , - dAr.114 �t✓�'/ow
p,�s� : s ' •f„ b.�x .�cK� to.;�L.s rai,//Ps
04,. 3too 4p SAt. 9 ft L
STAT/p 540AC Top [vas NuC 6G. &or Fitt
-V-000 33G. SP 33G.i0 o 0
30Zs 334. P/ 334. 76 D.OS
31so 337. /9 339'.L4- /.o5 I
440e, 339.o9 339./o /. o/
40so 33f.99 33'160 0•&1
Stoo I 339. P9 ! 340, /o e•2/ II�
St6o 3¢0•79 34 of
/ef oo 34I.G4 34t 7S o.OG
(ot 5o i 349.59 34t/GZ 4.17
7-I00 j 3413. 15 342.4e, O.G9
?f5o 343. 7/ 343. /7 U•54
1-0 75 343. 9G 343. 32 444
8-too 344. /G 313.Gt 0.54
g it t5 344. 29 ?44. 45 O./G
a t 5 o 344.3 P 344, 24 0.09
8t 75 3.,<4. 41 346.00 0.54
i 9f ao 344. 97 344.3 F o•o/
i 97p2s 344. 29 345./7 0.88
1
• Mok As.f e,/ev- w.s .4�.rc!/ ,4sso4.
S.tvvt..i i /2-Aw.f
l i
I
762-9125, GARY MERLINO CONSTRUCTION CO, FEB 7 e'
i963
IIOOMMUUII�� -General Contracting �m.ec:wnn
9125 . 10fh Avenue South Seattle, Wuhingfon 98108
February Z, 1983
City of Renton
Engineering Department
200 Mill Ave.
Renton, Wa. 98055
Pe: Monme Ave. NE
Gentlemen;
It is our requeet to have a firaZ inspection of the above referenced
project. We have completed this project according to the specifications
of the contract.
Sincerely,
Cary MerZino, Partner
CARY MERLINO CONSTRUCTION CO.
• • Invoice No
309
CITT OF RENTON
200 MILL AVZNUZ SOUTH
RENTON. WASHINGTON 96055 "
_ RL'9LIC WCa KS ne Rye-yi4T
Department or Division
Date February, 1333
r 0. J. Saltarellt, Facilities Manager
King County Please mke checks
Department of Public 'Works payab+e to
900 King County Admin. Bldg. Finance Department
5)0 Fourth Avenue City of Renton
L Seattle, ':A 38104
Billing No. 1 ref. City/County 4greenent No. CAD 052-8 (Oar Co. 0rdinence No.
6064):
I
Joint project to construct aceass roads to Renton District Court, the new City
Shops and t'ia County Shops, with related water main Intertie.
Contractor ,-ent No. 1 Total $263,542.29
(copy attacned)
King County Share * 50t $131 .771.14
NOTE: 1) Expenn.ltures are towel by BARS Elements (1932 version; for use t
In Annual Street Expenditure Report to State.
2) Ratalnar,, funds are invested In an escrrw account - see copy of
Escrow �cree,ent attached.
t
r
(
!1j
Finance_Dept.
Depusit In Revenue Account as fnllows:
1171313.338.40.30,01 - 547.335.39 ('IE 2nd St.)
102/012.338.btS.00.00 - 576,762.00 (Monroe Ave. NE)
316/338.40.01.01 - S 7.623.75 (water Main)
Total Due 5131 .711.l4 .1
• Invoice No 3042
CITT OF RENTON
200 MILL AV$NUE SOUTH
RYNTON. WASHINGTON98055
DESIGN ENGINEERING
Department or Division
Date January 7, 1983
r
Meriin Construction Co. Please pm� ke chucks
9125 - IOth Ave. S. payable to
Seattle, WA 98108 Finance Department
L Attn: Mr. Gary Merlin City of Renton
Overtime Inspection on 12/23/82 Q 525.00 per hour (C hours) $200.00
FINANCE DEPARTMENT Please notify Don or Jean when
this bill is paid.
Total Due Un0, AA
M
ALa/M/MY
N 4 . ! ! R ALUMINUM • C M 6 M I C 4 L $ 4 L f 9. INC
December la, 1982
CERTIFIED--RETURN RECEIPT REQUFSTFO
19 Q
NOTICE OF OUTSTANDING -LAIM O
TO: City of Renton CITY CLERK
City Clerk
200 Mill Avenue South
Renton, WA 98055
Notice is hereby given that the undersigned, KAISER ALUMINUM &
CHEMICAL SALES, INC. has a claim in the sum of Thirt nineThousand
3 Nundred�went and 20 Dollars (S39 620. against the bond
to en rom Un ted acl7ic Insurance ompanv 4 05) for the work
of the Monroe Avenue N. E. street improvement project.
KAISER ALUMINUM & CHEMICAL SALES, INC.
8r
K.vsER
AIJ/M/NYM
.00 L4wurae oww[ o4«Ln«u uLrown i. ••e•a 4, _' � '
y
153908.i
City of Renton
City Clerk
?00 Mill Avenue South
Renton, WA 98055
�� CERTIFIED--RETURN RECEIPT REQUESTED
• Invoice No 3039
CITY OF RENTON
200 MILL AVSNUS SOUTH
RBNTON, WASHINGTONo8066
DESIGN N•IN RIN6
Department or Division
Date 9"ember t. 1982
rGary Merlin Construction Co. please k• checks
9125 - loth Avenue South
Seattle, WA 98108 pay& a to
Finance Department
L City of Renton
November 11, 1982 Overtime Inspectlan p $25.00 per hour - 8 Hours $200.00
F114ANCE - Please Notify Don Monaghan or Jean
when this bill is paid
�Y
Total Due
ZAPONI SSM!ATEb do GPIs
Y D 8.0 a1M nwen 80U'HEAST
Al.M MI.MIA�MINOTON N 2
io6)9=111 13►73W
i�bNi�1, E. �oG�S INS .
�4 r NOWAY AVMWtu++ To pRorGx27 P=W4(,n
eN M O'A K09 AVL I G-
W6 wFov -rwo pM y Rrrlacve rle To 3eRv� TnE
SUFO&cr PKo .er' . *WH Cry,/ TO P56 241'o"w1or-
.
T" L xATIGA t; OF sku
FR%.I.OW S
AT THE Wp--,�T ipKo a'WRTY LA" s OF 4a)tj6q- tTv-.
IHW6V Aou He?Z y L.:otoo vj9GT PKOPfazY I1 F-
A IP15 mice or 24 e�.0 TT TO 7l4S p+RST D,K/.J THelce
::ONTINU:NG M.094 4vkn0 Wu6 I0,00IFr TO rHe Norr r.,;K/
6F 24.GOPr
I C
d w6rn
I ,
I �plJrt:�s AVM tr E
y
fit
WOW
f� 1l HOP ckalnnq �101<. , 1.
Ac
J�'
OF Rg�
�a r
i PUBLIC WORKS DEPARTMENT
DESIGN/UTILITY ENGINEERING 0 225-2631
✓� MUNICIPAL BUILDING 20a MILL AVE.$O, RENTON.WASM.90M
b
bEP
BAR8ARA Y. SHINPQEH February 8, 1983
MAYOR
Gary Merlino Construction Company
9125 - 10th Avenue South
Seattle WA 98108
Subject: Monroe Avenue N.E. and N.E. 2nd Street
Final Inspection
Gentlemen:
Final inspection was performed on the referenced project February 4th, 1983.
The work as performed under your contract is approved as of February 7, 1983.
We are requesting some additional work to be done at the S.W. corner of Monroe
Avenue N.E. and N.E. 4th Street to be accomplished by change order. An
extension of time will be granted for this work. Bob Bray will contact you
to execute a change order and a time extension.
Should ycu have any questions, please contact Bob Bray at this office.
Very truly yours,
Richard C. Houghton
Public Works Director
RLD:ckd
i
,. _.R-.p_._...� T . _ .may., �L e.._ �/r •
' Alt
,yS ......i~.�W�1 �.
Airc _r...r
V � l
•. ---� --eas -----��- _ _ R OYES EX. CIfRD G71!.
I! .SA C/JT
�c}MtiTAt -JEPv C E2
I k S *ei R�iiP CUr n u,"
f� C�XJT7E�
I
C4/R5 RETtIRA' DA7-4� p k
—i 4 = 47.Z7'
i �yQ
AacE f .=o7v,
g pa pa Sna rt Quic ki-Letter
w:.e ai .;Fw wwpra EwYFIM[
IFrmn
Subiect J Date
Message
�!.'S1'- f(C'C. 71- L''Or�{'t ( f' (C=t' ��)`_•16 !'' (c„a..fia9<�•.
r
THIS COPY FOR PERSON ADDRESSED cc ""
SENDER RETAIN THIS COPY
MEMORANDUM
DATE: lbve*er 17. 1982
TO: Ted Bennett, Finance Department
F,tOM: Pu lit Work: Department
SUBJECT: Reimbursement to Current Fund
Ref: Design Engineering LID Expenditures
Months of July thru September 1982
Please arrange for the following fund transfers:
Re LID 322
From Account: 701/322/15.541 .12.00.00 S 9,654.22
Ref, LID 323
From Account: 701/323/15.541.12.00.00 610.00
UNTO REVENUE ACCOUNT: 000/338.32.20 510,264.22
CHARTER 1.6. LAV:S OF 19,55
CITY OF RENTON CERTIFICATION
L,rw[ L ale:cnlm c .1.11, ::r*n+ YYote
null. mitt L.:r
n[x,.
Luo[ 6
rY[ . IS . IVR. CL: •-J area[,0 OJV L�LOY
[a O""1nLl lM[ GI:, CI r u:O irv.Lt I M
xurn0a ttm i0 •uTwan llUi[ •«J cuhn t0
umo otnY,
ucntm
VL:ad
cc: R. Bergstrom
RE NORAR9tla
DATE: Nev. IB, 198f
TO: Ted Bennett, Finance Department
FROM: Public Works Department
SUBJECT: Rt.i"bursement to Current Fund
Ref: Design Engineering Project Expenditures
Months of July thru Septen6er 1982
Please arrange for the following fund transfers:
Ref; MC/Federal-Aid Projects
From Account:
ME 2nd Street 102!013/15.541.11.00.00 $ 1,450 91
Monroe Ave. NE 102/072/15.541.11.00.00 1,302—2
Monroe Ave. NE IC^./072/15.541.12.00.00 48.36
Puget Dr. S/Benson Rd. S 102/177/15.541.12 00.00 464.81
Unto Revenue Account: 000/339.32.20 S 3.265.',i
Ref: Forwa-d Thrust b LAB Projects
From Account:
NE 12th Street 301/028.15.541.11.00.0o S 286.38
NE 12th Street 301/028/15.541.12.00,00 6,610.31
Unto Revenue Account: 000/339.32.20 S 6,896.69
TOTAL CURRENT FUND REIMBURSEMENi $10.162.49
CHART6R 116,LAWS OF 1965
CITY OF RENTON CERTIFICATION
PRY: ONt+aIJY:O 0a wearer Ct ailr'/""a
atea lV e111M,Y TaT Inwl Tw, Ilar{alAla MIIs
a�lYIf wlC eYtO Aa U.Ri Al ala wl aAlw�agearaar
la A IV ar�pHr^ie YYNIa 0au411an M waMfr9`t�1• ow. Ae
Yfa GUM aY bawncesTli all
am rM Y
cc: R. Bergstrom
• • SIC
M E M O R A N D U M
DATE: Nov. 18, 1982
Ted Bennett, Finance Depa. tment
FROM: Pu61ic Vorks Department
SUBJECT: Reimbursement to Current Fund
Ref: Design Engineering Project Expenditures
Months of July thru September 1982
Please arrange for the following fund transfers:
Ref: 1/2t/Federal-Aid Projects
From Account:
NE 2nd Street 102/013/15.541 .11,00.00 $ 1,450.51
Monroe Ave. NE 102/072/15.541.11.00.00 1,302.12
Monroe Ave. NE 102/072/15.541 .12,00.00 48.36
Puget Dr. S/Benson Rd, S 102/177/15.541.12.00.00 464.81
Unto Revenue Account: `c /339.32.20 $ 3,265.80
Ref; Forward Thrr-ist 6 UAB Protects
From Account:
NE 12th Street 301/028.15.541.11.00.00 S 286.38
NE 12th Street 301/028/15.541 .12 00.00 6,610.31
Unto Revenue Account: 0001339.32.20 $ 6,896.69
TOTAL CURRENT FUND REIMBURSEMENT $10,162.49
CHARTGR 116, LAWS OF 1965
CITY OF RENTON CERTIFICATION
y".y;O On"'[OT O[.TlnL. yn0[[
Me
am'
M1em.s'V, f Cr�,TOi [.11w 1M10[n.1
.YiwO.,IM TO 4,. nD Vn.MHO OOu[.TIOn
.V[wLM1i�[.T[ YO ..[ 1 AM
To
UH pMY. Q I C[b pT t0
Vl:ad snn[m x t^�4/rL 4y/A(.t�
cc: R. Bergstrom
of Rt
U z PUBLIC WORKS DEPARTMENT
_ DESIGN/UTILITY ENGINEERING r 215-261
F MMICIPAL WILDING 200I LL AVE.50. RENrom.WAMH 9YCSa
010, v
4,p P
IJE Sf91E�
BARBARA Y. SHINPOCH October 14, 1982
MAYOR
Gar Merlinc Construction Company
9125 1Cn, Avenue South
Seattle WA 98108
Subject: Monroe Avenue N.7. 6 N.E. 2nd Street Improvement&
Notice to Proceed
Ge ,tlemen-
You are hereby authorized to proceed with the referenced project as of
October 25, 1982.
Enclosed for your files is a copy of the minutes of the >r•coubtruction
conference held October 12, 1982.
Should you have any questions, please call me at the number listed above.
Very truly yours,
Donald G. Monaghan, P.R.
Design Engineering
RL2:ckd
Enclosure
T9 r 0L v,
� o /
/`WMLE YOU yKtRE OUT S
LV
TELEv.a sco
CA LED TO SEt TRo WILL CALL R Ik
WA%T$ TO SEE VOL Flsb
4EtWHlO VOUR LA,L
MWi9.
Ow.w
E
/ 3374z -- M-- --
/
■ 1 i. z a
■
10, v
■
f
/
■
■
■
■
MONROE AVE. N.E. 6 N.E. 2ND STREET
PRECONSTRUCTION CONFERENCE
Date: October 12, 1982
Place: 4th Floor Conference R-.,m
Present:
Name Firm
Phone
Don Mona-,ha- City of Renton 2
BoL bray 35-2631
Elmer Shaver
Clint Morgan 235'2620
235-26 20
Cliff Batet
Ron Olsen 235-264
Larry Saviage 31
235-26
Ed Wooten 6 235-264
Melissa Hart Puget Power 25-2642
Karen Sharp 1�
464
Frank Forest Pacific N.W. Bell 251�9686
Gary K. Hall Group W Cable 3-3420
John Grover King County Publir Works 4-2547
Gary Merlino Merlino Construction Co. i62-9125
1. Ed Wooten, Fire Department, requested that two accesses to the County Shops be
maintained at all times, if at all possible. Contractor will begin construction
of storm manholes at intersection of N.E. 4th and Monroe Ave. N.E. first. Con-
tractor will maintain one-way traffic for King County to and from County Shops
and Courthouse.
2. Puget Sound Power 5 Light has two crossings, one . y conduit. Merlino
inquired about the possibility of having exposed conm. . oridging manhole.
Frank Forrest, (PNWB), said this didn't appear to be a problem, but it was
agreed to decide method during construction. Pacific N.W. Bell has two closures
to be moved on Monroe Ave. N.E. and N.E. 2nd St.
3. -L^ high pressure gas line-on N.E. 4th St. may have to be relocated. Contractor
will notify gas company if conflict occurs.
4. Working hours at intersection of N.E. 4th St. and Monroe Ave. N.E. will oe
8:30 a.m. to 3:30 p.m.
5• Merlino stated he would begin construction no later than October 25, 1982.
6. John Grover, King County Public Works Department, sai, e would check with
Mr. Sal tare]Ii to determine who will remove gates, contractor or county.
7. Group W Cable representative, Gary Hall, said their cable is in with P.S.P 6 L.
Co. conduits and they have no boxes at this time.
S. Contractor will have his landscaping subcontractor check with Jerry Lind before
starting.
9. Pacific N.W. Bell wants an inspector on-site when crossing their conduits. Con-
tan Frank Forrest, 251-9686.
Monroe Ave. N.E. b N.E. 2nd St. October 12, 1982
Pre-Construction Conference
10. Contractor suggested placing washed rock to top of perfora, d pipe, and then
cover with filter fabric. Filter fabric is extra and will be paid by the
lineal foot. A Change Order will be written.
RLB jft
i � •
XXXORANDUM
TO Michael Mulcahv. Finance Director DATB ZO /qPL
FROM Ds.c.. /j4e.,� ,sLr„�� F
��nCr,I'i K.L�ev
SUBJECT Warrant 12
Please prepare a warrant Payable as listed betty and return to me for further processirl,.
Poyea: State Department of Labor s Indu•.tries
Employment Standards Division
G_neral Administration Building
Olympia. Washington 98504
These funds shall bz charged to the following project:
Project:_Aff"51 r&.mya E mg Z .�51
Prime Contractor: `p/
Account No. ,30/ D72 /3 SQ/, 90.Oo.oc
Documents CO,,red:
Firm Name:
Intent to Pay Prevailing Wage
5�4.,v/may T
/7 Affidavit of Wages Paid --`
C"PITEA 116, LAWS OF IMS
cc: Vincent tee CITY OF RENTON CERTIFICATION
aec..o amemew
.ter;"n owe" ART,°�"a
• +rs are ewt...
ur 4.usaa+...,ern„n w our
UNUORANDUM
TO Michael Mulcahy Finance Director DATE
FROM D'do /// . ,'�izIaI Dfollf
51,83ECT warrant to St to -•Ment ;f Labor 6 industries
Please prepare > warrant payable as listed below and return to ne for further orocessing.
Payee: State Department of labor A Industries
Employment Standards Division
General Administration Building
Olympia, wash ington 98504
These funds ,hall be charged tc the fol .owing project:
Project: Alm-y.✓ .a-r n/F' i 6dE Zrw/S'/. CAG No. : DSP-f Z.
Prime Contractor:
Account No. 30/ 0?4f15.54/. 10.00.00 $IZ.50 CAG Osb'-PZ
Documents Covered:
Firm Name:
Intent to Pay Prevailing wage 4714n 4 I �
C�.IEN�'/G Trsc
/7 Affidavit of wages Paid
CKARTER 116. LAWS OF 1905
cc: Vincent Lee CRY OF RENTON CERTIFICATION
,re ur�arrle r"�sui w�'aloe twin ar
emros eaesen n se lAye wiw�i�aw�
q o
Y
'sA4 Ye+wr nw 4Ia1 e A i. w a �asuo..oA Ayay, MI or,r ae AIO erlwAy
nos
err =O#mrdA Y�Onw O eYe QAt
1 O O
ESCROW AGREENFh^.
TO: k T Escrow Account No. (, 7.�Ban or Trust ompany)
L� Agency CITY OF RENTON
Branc ,
and
P.O. Box 16188
( ress P^eject Nam Monroe Ave. NE
_Seattle. Wa._ 98116 _ Contract No. CAG 0-c; g, fja
The Undersigned, GARY MERLINO ,C'ONSTRUCTION CO.
herein referred to as t ntractos, has directed the t o Rmtaa
(and) �eina tar re erre to as
the Agency, to el ver to you its warrants or a ee s which shall M payable to
You and the Contractor jointly. Such warrmtc or checks are to be held and
disposed OF by you in accordance With -he following instructions and upon the
terms and conditions hereinafter set forth. These fund; are pr..ced in escrow
with the above-captioned bank by the City of Renton in pursuance of RCM 60.28.
O10(2)(b).
INSTRUCTIONS
1. warrants or checks ma.ta payable to you and the Contractor jointly upon
delivery to /ou shall be endorsed by you and forwarded for collection. The
coneys will then be used by you to purchase, as directed by the Contractor,
bonds or other sec,,, 'es chosen by the Contractor and approved by the Agency.
Attached is a list such bends or other securities acceptable by the Agency.
Other bonds or securities, except stocks, my be selected by the Cor.:rector,
subject to express written ..pproval of the Agency. Purchase of such bonds or
other securities shall be in a form which shall allow you alone to reconvert
such bonds or other s•..urities into money if you are required to do so by the
City of Renton as provided in Paragraph s of this Escrow Agreement.
2. When, and as interest o . the securities held by you pursuant to this
agreement accrues and is paid, you shall collect such interest and forward it
to the Contractor at its address designated below, unless otherwise directed
by the Contractor.
3. You are not authorised to deliver to the Contractor all, or any part of
the securj* s held by you pursuant to this agreement (or any moneys derived
from the sale of such securities, or the negotiation of the Agency's warrants
or checks) except in accordance with written instrutt"ns from the City of
Renton. Compliance with such instructions shall rel. . a you of any further
liability related thereto. The estimated completion date on the contract
underlying this Escrow Agreement :s San. i5, 1982 , subject to change as
provided for by contract provisions. . _
a. In the event the City of Renton orders you to do so in wiitin
shall, within thirty-five (35) days of receipt of Such order, reconverty into
money the securities ::old by you pursuant to this agreement and r^turn such
2ofl
money together with any other moneys held by yo•r hereunder, to the Agency at
the address shown.
S. The Contractor ag"as to pay you as compensation; for the services here-
under as follows:
Fees: None
Payment of all fees shall be the sole responsibility of the Contractor and shall
not be deducted from my property placed with you pursurat co this Agreement
until and unless the Agency directs the release of the Contractor of the securities
and moneys held hereunder whereupon you shall be iranted a fir lien upon such
property released and shall be entitled to reimbtrse yourself _.w snch property
for the entire amount of your fee as provided for herein above. In the event
that you are made . party to any litigation with respect to the property held
by you hereunder, or in the event that the conditions of this Escrow are not
promptly fulfilled, or that you are required to render any service not provided
for in these instructions, or that the" is any assignment of the interests of
this Escrow or any modification hereof, you shall be entitled to reasonable
compensation for such extraordinary services from the Contractor and reimburse-
ment from the Contractor for all costs and expenses, including attorney fees
occasioned by such default, delay, controversy or litigation.
6. This Agreement shall not be binding until .eecutad by the Contractor and the
Agency and accepted by you.
7. This instrument contains the entire agreement between you, the Contractor
and the Agency with respect to this Escrow and you are not a party to, nor
bound by any instrument or agreement other than this; you shall not be required
to take notice of any default or any other matter, nor be bound by, nor
required to give notice or demand, nor required to take any action whatever
except as herein expressly provided; you shall not be liable for any loss or
damage not caused by your own negliger:ce rr willful misconduct.
8. The foregoing provisions shall be binding upon the assigts, successors,
personal representatives and heirs of the parties hereto.
THE UNDERSIGNED have read and hereby approve the instructions as given a' �ve
governing the administration of the Escrow and do hereby execute this agreement
on this 14th day of October 19 82 .
GF,RY MERLINO CONSTRUCTION CO. City of Renton
Cogtractor Agency
ti
By: O t a By:
Title: Partner Title:
Address: 9125 loth Ave. South Address:
Seattle, Wa. 98108
3of 3
The above Escrow instructions received and accepted this 21et t
October , 19 82 — �r of
w �
By ua
Aut rir Ssgnatuzs
(sank or 'Crust Company)
Tessa Clark
Operations 6 Personnel Supervisor
The following is a listing of bonds at other securities acceptable by the City
of ienton, as referenced in paragraph sl of the Escrow Agreement:
BONDS, SECURITIES AND INVES79ffN1`_ AppROVED BY THE AGENCY (CITY OF RENTON)
1. Time Certificates of Deposit - commercial banks
2. Time deposits (savings accounts) - commercial banks
3. gills, Certificates, notes or ';onds of the United States.
e. Other obligations of the Unfteo States or its agencies.
S. Obligations Of any corporation wholly owned by the Government of the
Uni I States.
6, lnde, dness of the 1Fwderal National Mortgage Association.
ZZIB a gig.
i
OF Re l
T
o PUBLIC WORKS DEPARTMENT
v z
DESIGN/UTILITY ENGINEERING 0 235-2637
WIL
F MUNICIPAL BUILDING 200 MILL AVE.SO. REN10N,WASH.as065
ov e
P
1r60 SEPt Eo
BARBARA Y. SMINPOCM October 21, 1982
MAYOR
Gary Merlino Construction Company
9125 loth Avenue South
Seattle WA 98108
Attention: L.R. Guthmiller
Subject: Monroe Avenue N.E. 6 N.E. 2nd Street
Request for Approval of Material Sources.
Gentlemen:
The suppliers listed in your request of October 11 and 12, 1982, are approved
as material sources for Schedule "B" of the referenced project. The traffic
control plan is approved with revisions as noted.
Should you have any questions, please call me at the number listed above.
Very truly yours,
Ro>` .L L. Bray
Project engineer
:ckd
Enclosures
XZKORANDUM
TO _ Michael 4 Icahy Finance Director RATS ZO /9.f
FROM rn-4inC�y/N�_,72{�;
SUbJECT Warrant to State Department of `bor LU&M "I s
Ple,se prerare a warrant payable as listed below and return to me for further processin
Payee: State Department of Labor s Industries
Employment Standards Division
General Administration Building
Olympia, Washington 98504
These fends shall be charged to the following project:
!Project:—Akw iQ✓s!. /V5 >: M� Zl--1 5T _ CAG No.:_�
Pr ime Contractor. 4ati �/10 (�oerSr eo � _
CAccount No. 3a/1,671 /5.541. 90.cc-0a $ /Z.50 CAG OSb- AL
Documents Covered: Fi rm�Name;
47 d( Intent to Pay Prevailing Wage 24n A/
/-7 Affidavit of Wages Paid
CHARIER 116. IAV.S OF 1986
CRY Or RENTON CERTIFICATION
cc: Vincent Lee �M�MYM4MD oo+!am CJnn uMP ra.rn u
MaYr. two m( WIVvs w" mum nwAiO. M
MIMIQa Mantle,ea M MMdlllq Y aetl,�p
MMII Mp Twi he Cam,
I le a Yf Y 1Y0 wMY
atloaeaa� M " O
n!an M art i yr
MmMa�A WaMldln MO T'a)W OMl
Arw
1
al
,y.
�a lcJ« 7�oCU ,.act , 74 23S-�6y2
✓ r/1 ussA �Q,e7- eit
r7'ke 4W e T P n1 .ice• r3,e e L a y -f646
`/ f_�'lilQ� .0 ulLt, d/j4C.'P w r'03CE Cl�iai ' 9ciZp
✓ John �Tro✓� n'SG �r.�..`/� fKG/i/�Cs 3F-A zl'97
ZS'S•is-.31
v RON UT"ITy ,a.7
i✓ �-AnI�Y 5AY1,14L 2LYf,-
N.
/D-/Z-6z N.G- 2.+d ry �Y1�rsroe.
•
�? / - PC/u iKs >i.�o accesScS 41,111 rW,
LV7La.— cAc f. — Gail V. S.-�aF.-ei. '77
)e+ W.
•
•
• c.- �._Gas
4Yr7y-�2
e- F . � 44-
.
J J
V J�J ,t�•; L � C C �L� ilnw r��bs.�f_ '�
�e 1. .- �✓� � GOB � ^�V
r'_ l Gd
Monroe Ave' NE & NE 2nd St. Correspondence 2+
Aelf �� 4�tr f enY Gs� ✓�aGsc�P , GG-W
�/Cco�S�ir�r1��`O� C:OI71z�,�rax��
7G2- <j'i�s
A4
✓d4- g y-✓- a-s 4 7
3/30
MONROE AVE. N.E. G N.E. 2NO STREET
PRECONSTRUCTION CONFERENCE
Date: October 12, 1982
Mace: 4th rloor Conference Room
Present:
Name Firm
Phone
Don Monaghan City of Renton C35-2631
Bob Bra)
Elmer Shaver
Clint Morgan 235-2620
Cliff Bates 235-2641
Ron Olsen 235-2631
Larry Saviage 235-2646
Ed Wooten '35-2642
Melissa Hart Puget Power 255-2464
Karen Sharp 1' „
Frank Forest Pacific N.W. Bell 251-9686
Gary K. Hall Group W Cable 433-3420
John Grover King County Public Works 344-2547
Gary Merlino Merlino Construction Co. 762-9125
1. Ed Wooten, F re Department, requested that two accesses to the County Shops be
maintained at all times, if at all possible. Contractor will begin construction
of norm manholes at intersection of N.E. 4th and Monroe Ave. N.E. first. Con-
tractor will maintain one-way traffic for King County to and from County Shops
and Cuurthnuse.
2. Puget Sound Power G Light has two crossings, one with emp•y conduit. Merlino
Inquired aoout the possibility of having exposed conduit bridging manhole.
Frank Forrest, (PNWB), said this didn't appear to be a probler, but it was
agreed to decide method during construction. Pacific N.W. Bell has two closures
to be moved on Monroe Ave. N.E. and N.E. 2nd St.
3• 4" high pressure gas line on N.E. 4th St. may have to be relocated. Contractor
will notity gas company if conflict occurs.
4. Working hours at intersection of N.E. 4th St. and Monroe Ave. N.E. will be
8:30 a.m. to 3:30 p.m.
5. Merlino stated he woul+ begin construction no later than October 25, 1982.
6. Joh•t Grover, King County Public Works Department, said he would check with
Mr. Saltarelli to determine who will remove gates, contractor or county.
7. Group W Cable representative, Gary Hall, said their cable is in with P.S.P t L.
Co. conduits and they have no boxes at this time.
8. Contractor will have his landscaping subcontractor check with Jerry Lind before
starting.
9. Pacific N.W. Bell wants an inspector on-site when crossing their conduits. Con-
tact Frank Forrest, 251-9686.
Monroe Ave. N.E. 6 N.E. 2nd 5t. October 12, 1982
Pre Construction Conference
10. Contracto, suggested placing washed rock to top of perforated pipe, and then
cover with filter fabric. Filter fabric is extra and will be paid by the
lineal foot. A Change Order will be written.
RLB:jft
I
y'
N
u
r
/dr Ila °
�3 3 7 2
�; SShpi•er
�
3
J 4
Yl`
Sri 'G ' V
ti
_ Ff _
NZWORANDUM •
TO Michael Mulcahy, finance Director g 6AT9 19c.1 ZO /9PZ.
FBON na.c. /y/Ox�7�y �p oi�U ri reT�r�p,o► f
SUBJECT Warrant to State Deoartme t of l bo b 1 d t
Pluase prepare a warrant payable as listed below and return to me for further processing.
Payee: State Department of Labor b Industries
Employment Standards Division
General Administration Building
Olympia, Washington 98504
These funds shall be charged to the following project:
Project: /�/sns ,Q .. ,a,r ,a/.0 Z,aa/Sa/ CAG No. : O58 FZ
Prime Contractor: _ 1/H /�(.,+r•�qo �.a+rS� �o
Account No. _3oD7� /3. 541. Jo.ca.o0 $ /Z._S0 CAG 05A-8.'
--------------------
Documents Covered: firm Name: //Jul Intent to Pay Prevailing Wage _S.OA10/ ��t.rr,c '
—T
1-7 Affidavit of Wages Paid
CH"TEM 116. LAWS OF 1966
cc: Vincent Lee
CITY OF RENTON CERTIFICATION
I tte uaAer,Am W� n.uirr vaeet a ,,W
INUAW
"O tn" t memmu"tw uew.0110ay0. ....~
"Wa Aae emr ne Oar e A amt. te ntawm
me hem
eemAeq AaAmet tN a,v M erne,a i AM Ayre"Wess le Aar alw m ear peat
_ ) -�f-.,
� • SPEED LETTER •
TO: _ &O,- �r1Bu'I. WE:
PROJECT:_,jJgstCOG- .fjt. ol.
SUBJECT: ,em.. Y'CYrsloRs _ N� Zx.l Sf
----`err-c/�cc� ht.✓�.,��.L i5 �e ce�d.. o�p p�./i-.��.�/t-cyr
--
// • SVEO LETTER •
TO:�TCifj /J/%tom. . DATE:
PROJECT:
SUBJECT: Sir—
_ r✓� raa���,c-�.s � N E. ).,�'
n I1'�OMY.9
A/o
I
Siane -- . ..._.
�� RFti
a U Z PUBLIC WORKS DEPARI,4ENT
{ _ DESIGN/UTILITY ENGINEERING • 235-2631
`,� � aQ MUNICIPAL tiDILDING 300 MILL AVE.f0. RENTON,WASH.aagaa
`6
Pb
"'Eo sL v1E�
BARBARA Y. SHINPOCH
MAYOR
October 29. 1982
Mr. Gary Merlin
Gary Merlin Construction Company
9125-10th Avenue South
Seattle, Washington 98108
Subject: Monroe Ave. N.E. 6 N.E. 2nd St. Improvements
Change Orders Nos. 1 8 2, Revised Plans
Dear Gary:
Enclosed for your files is an approved copy of change orders Nos 1 and 2.
Also enclosed is a copy of revised plan sheets Nos. 4, 5, and 7 of the
contract drawings.
To avoid any misunderstanding the supplement page to change order No. 1
is as follows:
Item M2 (Change due to conflict with 16" waterline)
The lump sum price shall be complete compensation for labor, equipment,
materials, including trenching, backfill, tapping, Clocking, shackling,
testing, temporary blowoffs, connection to existinl lines and all inci-
dental costs necessary for complete installation. Pavement restoration
shall be paid by the appropriate bid items.
Item N3 (:.alvage existing 16" D.I. waterline)
The lump sum price shall be complete compensation for all labor equip-
ment and materials, including removing and salvaging the existing 16"
waterline and delivering same to the City shop, backfillinq trench,
compaction, disconnection from existing line, capping existing line and
blocking and shackling as required. Paveawnt restoration shall be paid
by the appropriate bid items..
Should you have any questions, please call me at the above number.
Very tru1Y yours,
R. L. Bray
Project Engineer
da._
OR 4,0ti
4 .
ci z
PUBLIC WORKS DEPARTMENT
_ DESIGN/UTILITY ENGINEERING 0 235-2631
MUNICIPAL WILDING 300 MILL AVE.$O. RENTON,WAEM.EE06a
•
P
lee sEeTE/
BARBARA Y, SHINPOCH
MAYOR
October 29, 1982
Mr. Gary Merlino
Gary Merlin Construction Company
9125-10th Avert* South
Seattle, Washington 98108
SubJect: Monroe Ave. N.E. 6 N.E. 2nd St. Improvements
Construction Staking
Dear Gary:
In accordance with Section 5-1.05 of the special provisions, the laser
method of establishing grade may be used provided grades are checked
at least once every 50 feet and at least 3 times daily by conventional
methods. On October 28, 1982, you requested a waiver of this require-
ment and agree to accept responsibility for the line and grade of the
storm drain pipe.
Please be advised that the City agrees to waive the requirement for
checking grades every 50 feet with the following conditions:
1. The City field inspector may request spot elevation checks where
he feels necessary.
2. Elevations at all manholes will be checked by conventional methods.
3. Any variation from established line and grade as described in
Section 62-3.02 of the standard specifications will not be accepted.
Should you have any questions, please call me at the above number.
Very truly yours,
Donald G. Monaghan, P.E.
Design Engineer
RLB:dar
7�! �r^ �6;•.e n
alk
i. +_,
Tnr s/ A¢
•
•
SPEED LETTER
TO: ��..�/-r�ri�ww ,.r "� ' DATE:
PROJECT:
SUBJECT:L
//i .. ------
90@ -
r �
Kim lbunty saaa.0.�
Department r.Planning and Community Development
Hem ud h, Ilmnn
October 29, 1982
Bob Bray
Engineering Department
City of Renton
200 hill Avenue South
Renton, WA 98055
RE: RENTON DISTRICT COURT
.)ear bob:
Subsequent to our meeting of October 26, 1982, I reviewed the
work program with McNeill Crd,..struction, Contractor for the new
district court building, and we have decided to install the
new extended curb and driveway asphalt paving under the dis-
trict court. contract. Therefore, we will not require a price
from your contractor for this work.
We would, however, like you to follow-up on the other items
from our previous discussion, namely:
1. Install curved sidewalk to avoid cutting down fir trees
in NE 2nd Street easement per attached drawing.
2. Locate driveway cuts along NE 2nd Street to coincide with
planned district court driveways per attached drawing.
3. Stake location and finish elevation of sidewalks at drive-
way cuts so McNeill Construction can install asphalt paved
driveways prior to completion of street work.
In addition, we would request that vehicular access to the dis-
trict court construction site be maintained open as required by
McNeill Construction while utility and street improvements are
being made to Monroe Avenue and NE 2nd Street.
We are rurrently working toward a Headline of December 31, 1982
to vacate the district court operations from the 5th floor of
the Renton City Hall. To achieve this deadline, delays as might
be caused by disruption of access to the site must be avoided.
aaaabM Ub*tr a =A,hmNnn bwkhnb Kla luadtaNraw..axau.,M'IIWMrn seta �
Bob Bray
Renton Dist,17, Court
October 29, 1982
Page Two
Thank you for your cooperation on these matters. Please
contact me for any additional coordination that may be
requited.
Sincerely,
ARCHITECTURE DIVISION
I
Michael S, Owen
Project Manager
MO:lrw
cc: Joe McLaughlin, McNeill Construction
O. J. Salterelli, King County Public works
�,JJ
/o t Ta 5
ilk
_PP t�{1npJlhl(r. '" ,4,{{ .1w1'•, ..
(D t25 00
/E 3AD,j7
Y I �r•n" -I
.55"T
� Y
I �
y /sE � Erarf 4 ,45^y A ✓"VM .
--��--- .III
y i
Qa lot �GUPvF Sig r•.wn At :V 1T
,.. R-r ij �� • J 1
_2y 9
- � ORi'✓G11/47 - �/
3 � 5
a
r �
OF RF
PUBLIC WORKS DEPARTMENT
Y DESIGN/UTILITY ENGINEERING 0 235 2631
MRp MUNICIPAL BUILDING 200 MILL AVE.SO. PENTON.WASH MM055
P
\lEp SEvr E�
BARBARA v. SHINPOCH October 12, 1982
MAYOR
Cary Merllno Construction Company
9125 loth Avenue South
Seattle WA 98108
Subject: Monroe Ave. N.E a N.E. 2nd Street improvements
CAG-058-82 Request for approval of Material Sources
Gertlemen:
The suppliers listed fr. your request of October 1, 1982, are approved
as material sources for the referenced project.
Please inform your subcontractor for the electrical portion of the contract,
Schedule "B", to request approval of material sources.
Should you have any questions, please call me at the above number.
Very truly Yours,
Robert L. Bray
Project Engineer
:ckd
� 0
OF Rat
z PUBLIC WORKS DEPARTMENT
_ DESIGN/UTILITY ENGINEERING 111 235-2631
MUNICIPAL BUILDING X0 MILL AVE.SO. RENTON.WASH,9WM
e
xP
TEO SEvtE
BARBARA Y. SHINPQCH October 12, 1982
MAYOR
Gary Merlino Construction Company
9125 loth Avenue South
Seattle WA 98108
Subject: Monroe Avenue N.E. d N.E. 2nd Street Improvements
Request for approval of Subcontractors
Gentlemen:
The following firms are hereby approved as subcontractors for the refer-
enced project:
Signal Electric Company - Electrical
M.A. Segale, Inc. - Asphalt Paving
Kaspac Corp. - Striping
Three Fire Landscaping - Landscapting
Should you have any questions, please call me at the number listed above.
Very truly yours,
Robert 1. Bray
Project .ngineer
:ckd
OF RE.
Al
C' Z
PUBLIC WORKS DEPARTMENT
_ 0ESIGNi.1TILITY ENGINEERING 0 235-2631
2
0 R 1LUNICIPAL BUILDING 200 ABLL AVE.SO, RENTON,WASH.W65
9
P
,'f0 SE11E0
BARBARA Y. SHINPOCH October 11, 1982
MAYOR
Gary I :rlino Construction Company
9125 10th Avenue South
Seattle WA 98108
Subject: Monroe Avenue N.E. S N.E. 2nd Street Improvements
Change Order 81
Dear Gentlemen:
Please be advised that you are authorized to substitute 12 gape aluminum
pipe in lieu of the 14 gauge as specified for Item 15, Schedule "A", of
the Standard Specifications, 48" dia. perforated Storm drain pipe, at
en additional coat of $5 per lineal foot. A change order is being pro-
cessed for your signature,
"hould you have any questions, please call me at the above number.
Very truly yours,
Robert L. Bray
Projec Engineer
:ckd
Journal o ommerce
(Ptl�b11�BW IBBB)
ba COLUMBIA ST. (306-_UU373) BSA'f TLE. WASH. Bslut
ty4___Sept. 7, 1982
City of Renton
Municipal Building
200 Mill Ave. So.
Renton, Wa. 98055 9/1 �ds'
Attn: City Clerk
Notice of Bid Call 4403-B
Street Project ;I
57 lines @ 1.00 per lime 57.00
57 lines @ 90c per line 51.30 $108.30
Published August 31,
Septebber 7, 1982
YISyF�BS--�
CITY OF hcNTON CERTIFICATION
t w�w.otgcla m uwr tam+ rartr m
IlwYl1. IWT M WryIBLLs IMM IIIOImW➢.Ml
kAlY.7 ty{mp f.Mf Y W II y OOO+!•m
MMm tNI TYT t+1f CAY M• WF ND MIMq
O�Irl.1CM.mMBf L6 OM1 W �O11�1 MC pN+ �.AI
N1W01YtFD A yI1MP11Ya1B•YD f�all" '/O MD pNY
46mi+ T'
Pbue ixludt At<eunl Number with P�ymeol
a •
44OB_D Affidavit of Publication
City of Benton
Street Prot
Rid Date,Sao.15 STATE OF WASHINGTON
S=jCALL 7URRIDg KING COUNTY---SS.
WAL YlapVOgRNT6
Sealed bids rill be received
until t'00 D m.• Se tem6tr 15.
>.•i• latl2,tit the Ctty CPerk's,farce
and will bit opeawd 'tdpMblicly The undersia!md, nn oath states that he is do
•'� read in the ,th F,.aor ,-onfer
row -.am Renton Yuniclwl authorized repre,nntativc of The Doily journal of Comnuacr.
Bulluana.W hill Ave.Soutfi. a daily newspaper, which newspaper is a Ie1;a1 newspaper
The work w be rformed
within 55 working dare from of genVal circulation and it is now and has haen for moo•
the ante of commencement llmr, six months prior to the dot,, of publication heronwftr
under this cuntnd Nall u- re(ertd to, published in the English lanqua;;e continuou�c
elude,but not be limited to.
Itutallstion of eurbe. Cut- as a daily newspaper in Seattle, King County, Washington.
ten, sMevalk, atom drain- and it is now and during all of said timt was
tented in ,ii
of
.a,. Illumination. landseap• maintained at the
ins,gredina.Paving end eOn- tluta newspaper The Daily Journal
of Commerce was on the
struction suiva ing for
Moaroe Ave N.B �mm N.I. roved as a legal newspaper by
atb 'o to IJ.¢. and St and IRth day of June, 1941, aPPCount
N.E. Ind St atom Warts the Superior Court of King y.
Ave.N.L to beg h.Fast.
The City reserve,the right to The notice in the exact form annexed, was published an
rejecasr,yand/ortlbidsandto which was
wuveany end/oral:iaformall- rreeg�ullvi�diatributedDtoil itsosubacribers during the below
tit. Plans and specin' , alanexed notice, a ---
cations and fom of contract stated P�°d -
documents may be obtslned at
the Public works Department I.......gp pE...4f
office at the Renton Muoici al ..............._.....•.•.
Building for a deooalt of$3 OC ...._. .............
Ob tocover t ........_.__._. ...__.._.....................-..
each set Dlw P°s- ..-_..-_....—.._. _.
ago,1:mail The deposit vtllbe --
w duD tM was publlghad On .Ad`Y ... — ...........
Plains and Kfctuuta ..
9eod caodltlon wpitenm to1My ..................._ _._ _.'$eeP-Cf L'TF'..��,..........__._..._......
day. after bed will nr ngbe ts ................
mania char/ ...._....._..._.--.....
funded
A cetufted cback or bid bond
In the amount of five percent
I5%)of the total amount of each L .........._,.._....
bidmusta mpany ach bid. ............
The Cny s rare Pmices_and �(� b(p� Ry pit
No,Discrimination Polaris' Snbarribed amid aM
:hall ayplyy.
MARIp E.MOTOR. SeIITsa~•IilcX..Z.... 2 ---------
ActingCR Clerk. .._....._.__..—....._......._ ,+^
Dias o�Publication in the / ��W
Seattle Daily journal of Cont.
mares. August 71 and Se lam- ...._ .......
bar',19br. ___ N B) Now►eNae�vuassuse. ..a-ptoa.
���� • 762-9I15
GARY MERLINO CONSTRUCTION CO.
General Conbacnng
9125- 10}h Avenue 5c t! $ea!}ie. Wesb;ng}on 96109
Attention: Bob Bray
Be: Estimated Budget for Monroe Ave. NE
October 1982 35,000
November 1982 150,000
December 1982 170,000
This is for the work period.
Anita
CUiTeaCI ►•CILK `� S,MUK Li
Title Monroe Ave. NE
►rn loci Mc:
Centred Avoid Note: Seote er c 19
Notice to proceed.
Working Mrs: TO Dave
MOBILIZATION TSNS 0 S 1 !y I] y0 )S •O45INSODa37 • y
7 0 3
• STORM DRAINAGE
MANHC'LES AND CATCH BASINS
EXCAVATION
CUM AND QQTTFR
10 STR`PING
INSTRUC71011S:
NOTE: C'se Shalt No. 7 it necessary for
1. S�.uv eve rd data end notice to proved data wre wrktng dare.
2. fill in pertinent item fhr the contract arch as clearing •
grubbing, grading • draining surfacing, CT•, levier or Contractor GARY Me RLINO CONSTRUCTION CO.
allies, bridle mcavatiom, bridge substructure, bridge
aupantructura, miscellaneous items. ♦y Partner
y. Sh" by pencil or color the number and sequence of working
days sllett&d is each item ehorn. Data Oc er 6, 1982
e. Submit 4 copies to City prior to startlag wrk.
CUNTgAC. ►IOt.gy°t S:n►Dllt
Title- Monroe Ave. NE —_
►react No
Contre't Award Mu: Se tember , 19
Notice to Prr.eN•
llorkiog Days: 70 Days
T[NS p S 10 IS 2S p )S 40 ply Nyp�53 • 3 )0 75 1�3�5 fib""
MOBILIZATION
STORM DRAINAGE
MANHOLES AND CATCH BASINS
EXCAVATION
CURB AND aUTTER
FLECTRTCAT
4G
• 10 STRIPING
1NSTROL'T I OHS
NOT[: Cee Sheet Na. 2 if necessary for
1. S'..lw sward date end notice to proceed data more working days.
2. Fill in pertinent its,, for t�. cent.... a'ch as clearing 4
grubbing, grading 4 draining, surfacing. CT1, paving or Contractor GARY MERLINO CONSTRUCTION CO.
oiling, bridge eauvatton, bridge substructure, bridge
superstrottvre, ■iecailaneoua ties& by Partner
). Show by pencil or color the number and squmcs of working
days allotted to each Item shown. Date Oc er 6, 1982
4, S"hnit 4 toptea to City prior to starting work.
f 762-9125
�IIVI� GARY MERLINO CONSTRUCTION CO.
IOMIGeneral Confrochng
9125 101h Avenue$oaffi SeeMle. W.sh,ngbn Moe
Attention. Bob Bray
Re: Estimated Budget for Monroe Ave. NE
October 1982 15,000
November 1982 ,50,u00
December 1982 170,000
This is for the work period.
Anita
0 1
cur+ucr patg,gf`c 3:KDtLe
Title- Monroe Ave. NE
►ro'ect No:
Contract Award bate: Seatember 7, 19 ..
Notice to ►rcreed
Working Days: 70 Days
ITEMS 0 3 10 15 73 )0 )3 {OYOl KING
ODAYS
33 { t3 70 7) D g3 {
MOBILIZATION
• STORM DRAINAGE
MANHOLES AND CATCH BASINS
EXCAVATION
[ STDFWALKS
CURB ANQ nUTTER
• 10 STkIPING
INSTRUCTIONS:
NOTE: Use Stitt No, 7 If necessary for
1. Sknr aw rd du• •nd notice to proceed data sons working days,
2. fill to partinant ttus for the contract such as clearing 6
grobbins, grading { draining, surfacing, CT{, paving or Contractor GARY MERLINO CONSTRUCTION CO.
Oiling. bridge excavation, bridge substructure, bridge \,\^
aaperatructvrA. sisrallansous ties$. If ' Partner
3. Show by pencil or Color the nueber and sequence of working
days 4710ttad to each it" shorn, Oats Occe er 6, 1982
A. Submit 4 topfea to city prior to starting work,
INTEROFFICE CORRESPONDENCE
Date 10/4/82
To: Robert Bray, Engir::-
FROM: Ma<1ne T . Motor, Actinq City Clerk
SUBJECT: CAG �,58-82 Gary Merlin Const. Co.
-----------------------------------------------------------------------
® We return herewith fully executed document (a). as above-
captioned, copy of which we have retained for our official
public records. Copies should be forwarded to
Gary Merlino Construction Cc
and the other for vour file.
Pursuant to your memo of we return herewith
document (s), as above-captioned, which have been signod by
City Officials and need to be forwarded for further execution
by
We return herewith recorded document (s), as above-captioned,
Q copy of which we have retained for our official public records.
Copies should be forwarded to appropriate parties and retained
as necessary for your files.
Please file a fully-executed copy with the City Clerk's office
'L—JI for our permanent records when received.
Thank you.
MEM:db
cc: 6
OF RE,
v` Q y. Z PUBLIC WORKS DEPARTMENT
,a F 'ALL
C HOIIGHTON • DIRECTOR
� MUNICIPAL BUILDING 200 AVE SO. RENTON,WASH,90M
SEPIE�
p 106 235-2569
wTFD
8ARIIARA Y. SHINPOCH
MAYOR
SePtember 30, 1982
King County Department of Public Works
900 King County Administration Building
500 Fourth Avenue
Seattle, WA 98104
Attention: Mr. 0. J. SaI[arelli, Facilities Administrator
Subject: Monroe Avenue N.E. and N.E. 2nd St. im r
P Ovrmenl5
Dear Mr. Saltarelli:
As you know, the contract for the subject project has been owardrd
to Gary Merlino Construction Co. A Preconstruction Conference is
scheduledfor October 12, 1982, with construction scheduled to begin
around the 18th of October.
in regard to the agreement between the City and County, in Particu-
lar. item 8-1 of Exhibit No. I, it was agreed that the City would
Pay any additional costs incurred for ov9rsizing of roadway storm
drainage. Since it was not discussed at length as to how the over-
sizing was to be determined, we are suggesting the following as a
method of payment:
1. A 12'' diameter pipe is to be used as a basic size to handle
the roadway drainage plus adjacent site drainage.
2. The City will pay the cost of all mainline storm drains in
excess of the bid price for 12" diameter (S15.00 Per L.F.),
3. Tfie cost For all appurtenances (catch basins, manholes,
bedding, connector pipes, catch basin relocations, etc.)
Will be splir 50/50 between the City and the Cn--nty.
T' _..on, Item B-8 of Exhibit AI should be clarified somewhat to
ee 1n conformance with work Element A-3. It is understood that the City
is to pay all costs associated with the extension of the water main south
and east (approximately 20001) on Monroe Ave. N.E. and N.E. 2nd Street,
September 30, 1982
Page 2
while -the City and County will share equally in the cost of the intertie
at N.E. 4th Street and %onroe Avenue V.E. and easterly from access road
to the Leisure Estates system.
If you concur with these proposals or have alternate propouls, please
inform us.
Thank you for your consideration in this matter.
Very truly yours,
Richard C. Houghton
Public Works Director
RB:ckd
OF RF
U Z.
PUBLIC WORKS DEPARTMENT
DESIGN/UTILITY ENGINEERING 0 235-2631
MUNICIPALBWLDINO 200MILLAVE.S0. RENTON.WASH.9sm
a
P
\ FO SEVTE-
BARBARA Y. SHINPOCH October 1, 1982
MAYOR
TO: Maxine Motor, Acting City Clerk
FROM: Robert L. Bray, Engineering Dept.
SUBJECT: Mourne Avenue N.E. and N.E. 2nd Street - Contract Documents
Submitted herevlth are the contract documents for the referenced project.
Please arrange for execution. A copy of the City Attorney's approval is
attached.
Robert L. Bray
k t�OkBIROtE
by of Renton Engineering Depa rt
235-2631
PRECONSTRUCTION CONFERENCE
DATE: October 12, 1982
TIME: 10:00 A.M.
PLACE: 4th Floor Conference Room
DEVELOPER / CONTRACTOR OR SUBCONTRACTOR / NAME OF PROJECT
Name: Gary Merlino Construction Co., Inc.
Phone: 762-9125
Project: Monroe Ave. N.E. 6 N.E. 2nd St.
Proj. N: CAC-058-82
NAME OF APPOINTED INSPECTOR
Elmer Shaver
'lease check departments to be notified and specify person to attend.
X Engineering Dept. Olsen, Bergstrom, Monaghan
X Fire Dept. Ed Wooten
x _ Police Dept. Lt. Perssons
X Street Dept. Don Miller
)! Traffic Dept. Paul Lumbert, Gary Norris
—X— Utilities Dept. Gary Morrison
X Water Shop Larry Savage
X Other- Gary Merlino
Additional outside departments you may wish to notify.
Department of Transportation
X Pacific N.W. Bell Company
X Puget Sound Power 6 Light Company
_ (X Teleprompter Cable TV Company
X Washingtor Natural Gas Company
X Other King Co. Dept. of P.W. (Salterali)
X Other W.I.S.H.A.
of RFti
OFFICE OF THE CITT ATTORNEY* RENTON,WASHINGTON
U Z roar MI non•x goo s x.a sr.ser • .snro..,ry..,nran samr ns-xs•
LAWRENCE J.WARREN, or,...o•nsr DANIF'- KELLOGG, wsaa*.nr a*r urpmer
P
DAVID M.DEAN, s4ar.n, enr.,,putr
?.to SEptE MARK E.BARBER, . r. c.,r w*,o.�.er
September 30, 1982 'LANETTh L :ONTES, .GVSsysru,l nr.
TO: Bob Bray, Engineering
FROM: Lawrence J. Warren, City Attorney
RE Monroe Ave. N.E. & N.E. 2nd Street - Contract Documents
Dear Bob:
The above captioned contract documents are approved as to
legal form.
Lawrence J Warren
LJW:nd
Encl.
cc: Mayor
CITY OF RENTON
Plan Holders List
I
PROJECT: MDNROE AVE. N.E. AND N.E. 2W2 zTRErT BID DATE: Sept 15, 1992
PR[CE:__D .00 + 55.00 Poe c,... PLACE: 4TH Floor Conferwo Rm. TINE: 2:00 P.M.
AMOUNT BATE DATE PLANS_UTFN�K
NAME PAID ISSUED RETURNED REFUNOED
7. Nees Constrpc_ Z - $35 00 9-2-82
P.O. Box 98340 _
Des Moines WA 98188 _
878-7126
. . . . . . . . . . . . . . . . . . . . . . . .
8. Tri-State Construction 9'2-82
959 108th Ave. N.E.
Bellevue WA 98004
455-2570
. . . . . . . . . . . . . . . . . . . . . . . .
9. CTM Electrical Contractors (Carl T. Madsen, Inc)S40"00 9-2-R7
1929 Tacoma Ave. So.
Tacoma WA 98402
. . . . . . . . . . . . . . . . . . . . . . . .
10. Renton Concrete Proeucts $35_00 9-2-82
115 South 7th Street _
Renton. WA 98055
255-1521
. . . . . . . . . . . . . . . . . . . . . . .
11, Rainier Assoc3afes Inc. $35.00 9-2-82
13747 Ashworth Ave. N. _
Seattle, Washington 98133 _
67-4874
. . . . . . . . . . . . . . . .
2. Land Construction Company S35.00 9-2-R2
General Delivery, Clearview Route Station
Smohomish Washington 98290
. . . . . . . . . . . . . . . . . . . . . . . .
YUNI i ASSOCIATES • PHONE 206) 641-2886
ENGtNF1Git3MTi
SURVEYING 1268 W LK SAMM. PKWr. N.E.. BEl_EVUE. WA,991908
January 13, 1982
City of Renton
Department of Public Works
Renton City Hall
Renton, WA 98055
Attn: Mr. Don Monaghan, P.E.
Re: Monroe Street improvements
Dear Don:
In accordance with your preliminary review of the above, I've made the changes that
i indicated.
Please note that the 12" extension to the storm drain is shown on the East side of
the street as that's where the existing manhole is.
Attached are the original drawings. Would you please perform the final review and
approve? When finished, can I purchase a set of sepias so that I can make drawings
to go to bid?
Sincerely
� yours,
�)"`n
Michael H. Yuhl, P.E.
Enclosure: 2 llylar Drawings
cc: Mr. Bill Belmondo with 2 copies of each
MHY:c
I
r �
OF Rt'
.,
R
o PUBLIC WORKS DEPARTMENT
_ DESIGN/UTILITY ENGINEERINI. 235-263:
0 JET MUNICIPAL BUILDING 200 MILL AVE.a0. RENTON,1rASK IPIPM
ro SEPTET`? INTER OFFICE MEMORANDUM
BARBARA Y. SHINPOCH
MAYOR
Date: April 14, 1982
To: Fire Department
Police Department
Street Department
Traffic Division
Utilities Division
Water Shop
From: Don Monaghan, Design Engineer
Subject: Monroe A,•e. N.E. Street Improvements
The Renton School District will be installing approximately 200'
of improvement on Monroe Ave. N.E., approximately 600' north of
N.E. 4th St. as shown on the attached plans.
The prime contractor will be Ron Scott, the concrete work will be
done by Buzzard Cement Co. and the paving by M.A. Segale.
Work is anticipated to start on Monday, April 19th and Eimer Shaver
will be the Inspector. The contractor will maintain a driveable
surface and two-way traffic at all times.
If you have any questions on the project or you feel an additional
conference would be needed, please advise.
l
DGM:jft ��t
Attachment
uj
of RFC •
� T
W i
THE CITY OF RENTON
MUNICIPAL BUILOINO 200 MILL qVE SO RENTON MgSK.9W56
o $ BARBARA Y. SHINPOCH, MAYOR CITY CLERK ♦ (206) 235-2500
90
�a,JFC SEct EyO�P
September 23, 1S32
Gary Merlino Construction Co.
9125 loth Ave.
Seattle, WA 98108
Attention: Gary Merlino
Re; City of Renton - Call for Bid
Morroe Ave. NE to City Shop Site Street Improvements
Gentlemen:
At its regular meeting of September 20, 1982, the Renton
City Council accepted your overall low bid on the above-
referenced project.
An undated performance bond and insurance certificate will
need to be provided for prepa.ation of the contract documents
along with proof of State and City licenses.
If you have any questions regarding this matter, please contact
Bob Bray, Contract Engineer, at 235-2631.
Yours very truly,
CITY OF PENTON
Maxine E. Motor
Acting City Clerk
MEM:db
CC: Bob Bray .
OF RF
o
PUBLIC WORKS DEPARTMENT
U � 7_
_ DESIGN/UTILITY ENGINEERING 235-2631
i
� $ MUNICIPAL BUILDING 200 MILL AWE.50. RENTON,WASH.9B056
%9a 0
Q''tEO INTER-OFFICE MEMORANDUM
SEor E�
BARBARA Y. SHINPOCH
MAYOR
Date: September 24, 1982
To: Larry Warren, City Att,,rnev
rrom: Bob Bray, Engineering
Subject: Monroe Ave. N.E. S N.E. 2nd Street
Contract Documents
Submitted herewith is a copy Of the contract documents for the
referenced project. Please review and comment as to legal form.
jft
Enclosure
• King County State Washington
9gfkk90NA County Enmutrve RANCY REVELLE
Oeparttne t of Public Works
James W.:wenther,Dirooror
900 King County Administration Building
500 Fourth Avenue
Seatne.Washington 96104
(206)3"2517
September 20, 1982
Mr. Richard C. Houghton, Director
Renton City Public Works Department
Municipal Building
200 Mill Avenue South
Renton, WA 98055
Dear Dick:
This letter confirms the September 17, 1982, transmittal of one
executed copy of the agreement between King County and the City of
Renton per your letter dated September 14, 1982.
We have reviewed the Bid Tabs for Monroe Avenue NE and NE 2nd
Street improvements. In reoards to an award, we do concur that
Gary Merlino Construction Company is the lowest bidder. We find
the contractor acceptable and recommend an award be -ade according
to the general conditions of the contract.
Sincerely,
q; J. ALTARELLI
_facilities Administrator
U S:mw
Enclosure
cc: P. Hooper
TRANSPORTATION COMMITTEE REPORT
Septemuer 20, 1982
MONROE AVE. N.E. - H.E. 4TH ST. TO N.E. 2ND ST. d 14.E. 2ND ST. - MONROE
AVE. N.E. TO CITY SHOP SITE STREET IMPROVEMENTS
The Transportation Committee concurs in the recommendation of the
Public Works Department to accept the low bid of Gary Merlino Con-
struction Co. in the amount of $355.552.70.
The committee also recommends that the Mavor and City Clerk be autho-
rized to execute the contract documents.
Thomas Trim, Chairman
Randy Rockhill, Vice-Chairman
oohin—Reed, Member
jt
TRANSPORTATION COMMITTEE REPORT
September 20, 1982
MONROE AVE. N.E. - H.E. 4TH ST. TO N.E. 214D ST. d H.E. 21D ST. - MONROE
AVE. N.E. TO CITY SHOP SITE STREET IMPROVEMENTS _
The Transportation Committee concurs in the recommendation of the
Public Works Department to accept the low bid of Gary Merlit,u Con-
struction Co. in the amount of S355.552.70.
The committee also recommends that the Mavor and City Clerk be autho-
rized to execute the contract documents.
Thomas Trimm, Chairman
andy oc 1, ce- ha rman
oTlinn—keed, Ffemtier
it
s s
OF RED
PUBLIC WORKS DEPARTMENT
RICHARD C HOUGHTON • DIRECTOR
MUNIclPAL BUILmIN0 209 MILL AVE.SO. RENTON,WASK 99M
yrEO SEPZE�
P` 206 235 2569
BARBARA Y. SHINPOCH
MAYOR
September 15, 1982
Councilman Thomas Trinn, Chairman
and Members of the Transportation Committee
Subject: Monroe Ave. N.E. - N.E. 4th St. to N.E. 2nd St.
and N.E. 2nd St. - Monroe Ave. N.E. to City
Shop Site Street Improvements
Dear Committee Members:
Ilse bid opening for the subject project was held on September 15, 1982.
The following is a tabulation of th, bids received:
R. L. Alia Construction Co. '�364,546.42
Land Construction Co. $373,165.10
:'Ierlino Construction Co. $355,552.73
Pitardi Trucking Co. S364,595.60
R. W. Scott Construction Co. $362,794.90
Tri-State Construction Co. $417,111.00
Valley Cement Construction Co. $421.056.40
West Coast Construction Co. $412,238.85
It is the recommendation of the Public Works Department that the low bid
submitted by Gary Merlino Construction Co. in the amount of Sj55,552.70
be accepted and the contract for the subject project be awarded to said
contractor.
Very truly yours,
Richard C. Houghton
Public Works Director
RLB:jft
OF Rt
i ti,
z R
PUBLIC WORKS DEPARTMENT
RICHARO C.HOl'"4TON • DIRECTOR
n lQ MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON.WASH.90M
LP
206 235 2569
,TEO SEP�E
BARBARA Y. $HINPOCH
MAYOR
September 15, 1982
Councilmaa Thomas Trimm, Chairman
and Members of the Transportation Committee
Subject: Monroe Ave. N.E. - N.E. 4th St. to N.E. 2nd St.
and N.E. 2nd St. - Monroe Ave. N.E. to City
Shop Site Street Improvements
Dear Committee Members:
The bid opening for the subject project was held on September 15, 1982.
The following is a tabulation of the bids received:
R. L. Alia Construction Co. $364.546.42
Land Constriction Co. $373,165.10
Merlino Construction Co. $355.552.70
Pitardi Truck;ng Co. S364.595.60
R. W. Scott Construction Co. $362,794.90
Tri-State Construction Co. $415,931.00
Valley Cement Construction Co. $421,056.40
West Coast Construction Co. $412.238.85
It is the recommendation of the Public Works Department that the low bid
submitted by Gary Merlino Construction Co. in the amount of $355,552.10
be accepted and the contract for the subject project be awarded to said
contractor.
Very truly yours,
Richard C. Houghton
Public Works Director
RLB:jft
' � � � •�crz l�et,�.sc.
Or kE• �� _ ,..
o PUBLIC WORKS DEPARTMENT
RICHARD C HOUGHTON • DIRECTOR
p MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.90055
c ?06 23y-7564
!E0 SEP�E�
BARBARA Y. SHiNP(CH Ser)tember 7, 1982
MAYOR
TO: Gloria Minnick
FROM: Richard Houghton
SUBJECT: 102 Fund - Project Listing Adjustment
(Ref. N.E. 2nd St.)
O--r negotiations with the Council on the Municipal Shops Project
oLdget included a recommendation that the entry road (N.E. 2nd St.)
should be funded using 1/2f Gas Tax (Fund 102) dollars transferred
from the existing appropriation for Talbot Road South. The Council
approved all of our recommendations. We need to arrange the follow-
ing adjustment of the listing in the 102 fund:
Revise Talbot Rd. S. 102/068.00.000.00.00.00 (reduce by $80,500)
from $116,922.00 to $36,422.00
Add N.E. 2nd St. 102/013.00.000.00.00.00 - $80,500.00
VL:pmp
•CITY UP RENTON - PINANCE416T. IiKCF_�
DATE: 9/1/82
CODE ADD NEW ACCOUNTS TO BUDGET:
190 102/013/00/000/00/00100 ,N IND T SHOP ENTRANCF _
15/000/00/00/00 PUBLIC RKS DEPT
4/ 541/00/00/00 PUB MKS/ARTERIAL ST CONST
1O/00/DO ENGINEERING
11/00/00 PRELIMINARY ENGINEERING
0 ' 12/00/00 CONSTRUCTION ENGINEERING
30/00/00 ROADWAY
31/00/00 GRADING
32/00/00 BASE
33/00/00 SURFACING
34/00/00 UTILITY ADJUSTMENTS
40/00/00 STORM DRAINAGE
60/00/00 TRAFFIC 8 PEDESTRIAN SERV
61/00/00 SIDEWALKS
63/00/00 STREET LIGHTING
64/00/00 TRAFFIC CONTROL DEVICES
70/00/00 ROADSIDE DEVELOPMENT
71/00/00 VEGETATION
90/00/00 CONSTRUCTION ADMIN.S2L.L
017 DO ODD 00 00 VO UUHNLIT AV $/S 2NU/S1bNAL
1
12 lb 000 00 CO UO PUISLIC HUNKS DLPf
0 15 "1 UO OU UO PUd WNb/STWEET CUNSIH
O 15 b4l lU OU UO ENUINLLN1NU
01 lb bAl 11 00 VO PWLLIMINAHY EN41NLLRING
15 SAl 12 00 UO CUN5THU1710N ENGINEERING
0 i5 b41 60 OU 00 TWAFh IC 6 PLOESTHIAN SEHV
0 ! 15 b*l 67 00 UU SIHLLI LIUHTING
0 15 541 64 OU UU TNAFPIC CONTROL DLVICES
i
EXHIBIT NO. 1
King County and City of Renton Letter of Understanding
A. WORK ELEME14TS
1. Monroe Ave. N.E. (N.E. 4th St. to N.E. 2nd St.) Road Improvements
a. Curb to curb road sections will be 44 feet from N.E. 4th St. to
N.E. 2nd St.
b. Provide a five foot walkway on east side only.
c. Provide street lights.
d. Power ducts for future expansion of King County and City of Renton
property to be installed.
e. Signal revisions and channelization revisions to N.E. 4th and
Monroe Ave. N.E. intersection.
f. Provide roadway drainage.
2. N.E. 2nd St. (S.E. 132nd St.) Extension
a. Extend existing roadway 433 feet east at a 36 ft. curb to curb section.
b. Provide 5 ft. walkway on south side only.
C. Provide power duct for future expansion.
d. Provide street lights.
e. Expand existing 28 ft. wide section to 36 ft. width.
f. Provide roadway drainage.
3. Water Mains
City of Renton to: extend water main approximately 2000 ft. east and south
with proper appurtenances. (Size to be determined later)
B. AGENCY RESPONSIBILITIES
1. City of Renton to prepare plans, specifications and cost estimates for work
elements Al, A2 and A3.
2. City of Renton to administer the construction bidding process.
3. City of Renton and King County will jointly review construction bids and
approve selection of successful bidder(s).
4. City of Penton to administer the construction contract(s).
5. King County personnel will be assigned to assist City of Renton personnel in
the construction inspection process. (Details to be arranged when scope
and schedule of construction operations have been fully detined.)
6. City of Renton and King County to share equally in the final costs of the
following work elements as detailed above.
A.1 (a) thru (f) Monroe Ave. N.E. (N.E. 4th St. to N.E. 2nd St.)
A.2 (a) thru (f) N.E. 2nd St. (S.E. 132nd St.) Extension
7. City of Renton to pay any additional costs incurred for over-sizing of road-
way storm drainaqe - ref. work elements A.1(f) and A.2(f).
8. City of Renton to pay all costs associated with work element A.3.
• Kily Co1XAy s Waahlrigton
xRoARwWxtpun+ rxwAd a RANDY REVEILLE
oa Grn it Put4W:works
Jannipsra W. uMrtlxr,dVar::fOv
9W Kira County Adrni i:stratror,Building
500 Fourth Av m
Snnle.Wuhnglain 98104
(20a1044 2517
T R A N S M I T T A L Septe^ter 1' 19 82
Public Works Dept. ---------
Municipal Fuilding
200 Mill A\rnue South
TO: Renton, WA 98055
ATTENTION: Richard C. Houghton, Director
We are sending: Herewith X _ _ By Separate Cover
Material prepared by King County and the City of Renton
No. of
Copies Drawing No. Description
1 Agreement , page 1 and 2
& Exhibit No. 1, page 1 and 2
This material is: For Approval For Your Information
_X_ _ Approved For Your Files
Approved as Noted K Per Your Request
Not Approved, please resubmit
REMARKS
Pursuant—to your correspondence dated September 14, 198', attached is one (1)
original copy of the Monroe Avenue NE and NE 2nd Street agreement.
DEPARTMENT OF PUBLIC WORKS
^ � a
By 'i't
a tare 1
FACILITIES AD'1INISTRATOR
• • CAG 052-82
AGREEMENT
THIS AGREEMENT made and entered into this 16th day of
September 1982, by and between King County,
Washington, a political subdivision of the State of Washington,
hereinafter referred to as the "County" and the City of Renton, a
municipal corporation duly auV -rized and existing by virtue of
the laws of the State of Washington, hereinafter referred to as
the "City".
W I T N E S S E T H
WHEREAS, the parties to this agreement each have power to
perform the terms and conditions of this agreement, and
ordinance
WHEREAS, the King County Council has by MmOs♦► No. 6064
passed on _July 29. 1982_ authorized the King County Executive
to enter into an agreement wito the City of Renton for the purpose
of improvement of access roads to the Renton District Court, City
of Renton new public works facility, and the Department of Public
Works' consolidated facility, and
WHEREAS, City of Renton has by appropriate legislative action
authorized this agreement, and
WHEREAS, it is in the interest of the public served by both
jurisdictions that said improvement be constructed,
NOW, THEREFORE, IT IS CONVENANTED AND AGREED AS FOLLOWS:
1. Purpose. The purpose of this contract agreement shall be to
construct access roads to the Renton District Court, the
City of Renton new public works facility, and the Department
of Public Works' consolidated facility.
2. Work. The County and the City agree to perform the above-
referenced project according to the terms and conditions
of Exhibit No. 1.
IN WITNESS WHERL: F, the parties hereto have hereunto set
_heir hand and seals the day and year first above written.
KING COUNT[, WASHINGTON CITY OF RENTON
STATE OF WASHINGTON
King County vecuttve Mayor 8
Signed this /G day of Signed this day of
1982 .Q.l✓-!� 1982
APPROVED AS TO FORM 6 LEGALITY APPROVED AS TO FORM 6 LEGALITY
D u y Prose sting torneAl-� Oi "' cue-�1GJ
Y malty Attorney l7�
Date T f/ —_ Date in��✓/�{
ATTEST:
-ty Cler ��
EXHIBIT NO. 1
TERMS i CONDITIONS
WORK ELEMENTS
Al. Monroe Avenue NE (NE 4th Street to NE 2nd Street) Road
Improvements
a. Curb to curb road sections will be 44 feet from NE 4th
Street to NE 2nd Street.
b• Provide a five foot walkway on the east aide only.
C. P:ovide street lights.
d. Power ducts for future expansion of King County and
City of Renton property to be installed.
e. Signal revisions and channelixation revisions to NE 4th
Street and Monroe Avenue NE intersection.
f. Provide roadway drainage.
A2. NE 2nd Street (SE 132nd Street) Extension
a. Extend existing roadway 433 feet east with a 36 foot
curb to curb section.
b. Provide 5 foot walkway on the north side oc.ly.
. C. provide power duct for future expansion.
d. Provide street lights.
e. Expand existing 28 foot wide road section to a 36 foot
width.
f. Provide roadway drainage.
A3. Water Mains
City of Renton to extend water main approximately 2,000 feet east and
south with proper appurtenances. (Size to be determined later) City
and County to share equally in cost of intertie of system at N.E. 4th
and Monroe and easterly from access road to Leisure Estates system.
AGENCY RESPONSIBILITIES
Bl. City of Renton tc prepare plans, specifications and cost
estimates for work elements Al, A2, and A3.
B2. City of Renton to administer the construction bidding
process.
B3. City of Renton and King County will jointly review
construction bids and approve selection of successful
bidder(@).
B4. City of Renton to administer the construction contract(@).
B5. King County will pay their fair share of costs for personnel
assigned to construction inspection activities. (Details to
be arranged when scope and schedule of construction activity
has been fully determined.)
EXHIBIT NO. 1 (Continued)
B6. City of Renton and King County to share equally in the final
costs of the following work elements as detailed above
- Al (a) through (f) Monroe Avenue NE (NE 4th Street to NE
2nd Street)
- A2 (a) through (f) NE 2nd Street (SE 132nd Street)
Extension
07. City of Renton to pay any additional costs incurred for
over-a`_zing of roadway storm drainage -- refe, ence work
elements Al (f) and A2 (f) .
BB. City of Renton to pay all costs associated with work element
A3.
KAIRBR
ALUMINUM
KAISER ALUMINUM a CHEMICAL 5 A L E 5. I N S
July 15, 1982
Bob Bray
City of Renton Public Works
200 Mill Avenue South
Renton WA 98055
Dear Bob:
Recently whm I visited your office. I promised to send you some in-
formation on perforation. I as, attaching a cc py of AASHTO ,pecifice-
tion for your review. Pages 13, 14, and 15 cover perforation and
gives you pertinent data.
Clark County uses our perforated pipe to exfiiterate the water in the
soil rather than using retention system. They require 50% more holes.
We add 50% more holes than what is showing on Page 15; i.e., 18-inch
diameter AASRTO requires six rows, Clark County uses nine rows.
The other possibility is to use the same rows as AASHTO except using
1/2-inch hole. We would like to avoid this because of 1/2-inch holes,
we can only hand drill while AASHTO 3/8-inch holes are machine drilled.
If you have my other requirements, please give me a call. I'll be
happy to discuss our capabilitiev with you. I hope this data will help.
Cordially,
RAISER AILMINUM 6 CHEMICAL SALES, INC.
Mike Harimi PE
Specification Engineer Manager
on
cc: Chuck Barnett
a.e ••e. .ve��e n c uuevoe w.e..i.le.ov ewoa eoei•ae-e.ee
• • Standard Specification for •
• CORRUGATED ALUMINUM ALLOY CULVERTS AND UNDERDRAINS ,
9ASHTO Designation: M 196-81
1. 5rnpE
1.1 This specification covers corrugated aluminum alloy pipe for use as culverts
and underdraine.
Note 1 - This specification is a manufacturing and purchase specification only,
and does not include requirements for bedding, backfill, or the relationship
between earth cover load and culvert sheet thickness of the pipe. However, ex-
perience has shown that the su:cessful performance of this product depends in
equal amounts upon the proper selection of the culvert sbeec thickness, type of
bedding and backfill, ontrol manufacture in the plant, and care in the field
construction work. The purchaser of the corrugated aluminum alloy pipe speci-
fied herein is cautioned that he must properly correlate the field requirements
with the culvert sheet thickness of the pipe and provide inspection in the
facricating plant and at the construction site. The purchaser is also cautioned
that he_ must properly correlate the corrosion and abrasion requirements of the
field installation with the culvert sheet thickness and/or appropriate coatings
of the pipe, and provide for adequate protection where indicated.
2. TYPES
2. 1 Pipe covered by this specification shall be of the following types as
specified:
2.1.1 Type I. Culvert pipes, circular section.
2.1.2 Type II. Culvert pipes, other than circular section.
• 2.1.3 Type III. Underdrain pipes.
• • 2
. MATERIALS
3. ALUMINUM ALLAY SHEETS
3.1 Aluminum alloy sheets shalt conform to AASHTO M 197, Clad Aluminum
alloy sheets for culverts and undardrains.
4. ACCEPTED ERA:YDS OF ALUMLNIN ALLOY
4.1 No aluminum alloy will be accepted under this specification anc nc bids
will be considered for the materials above dsscri"ed until after the sheet
manufacturer's certified analysis and manufacturer's guarantee have been passed
uponvby the engineer and accepted. Misbranding or other misrepresentation., and
nor.-uniformity of procuct, will each be considered a sufficient reason tz dis-
continue the acceptan_e of any brand under this specification and notice sent
to the sheet manufacturer of the discontinuanc. of acceptance of any brand will
be considered to be notice to all culvert companies which handle that particular
brand.
5. SHEET MANUFACTURER"S CERTIFIED ANALYSIS
5.1 The manufacturer of each brad shall file with the Engineer a certificate
setting forth the name or brand of aluminum alloy to be furnished, and a
statement that the material conforms to the specified chemical composition
:imits. The certificates shall be sworn to for the manufacturer by a person
having legal authority to bind the company.
6. SHEE_ MANUFACTURER'S GUARANTEE
6.1 The manufacturer of the sheets shall submit with the certified analysis
• a guarantee providing that all aluminum alloy furnished shall conform to the
3
• specification requirements, shall bear a suitable identification brand or mark,
and shall be replaced without cost to the purchaser when not in :onformity with
the specified analysis, sheet thickness or cladding thickness; and the guarantee
ohm!'. be so worded as to remain in effect so long as the manufacturer continues
to furnish material.
TABLE 1
Chemical Composition. of .Rivets, Angles, and Lugsa
Silicon b 0.2-0.6
Iron 0.35 0.35
Copper .0.10 0.10
Manganese 0.10
Magnesium 1.1 - '.4 0,45 - 0.9
Cbromiva 0.15 - 0.35 0.10
Zinc 0.10 0.10
Titanium 0.10
Others, each 0.05 0.05
• Total 0.15 0.15
a Composition in percent maximum unless shown as range.
b4, to 65 of percent magnesium content.
7. RIVETS
7.1 Rivets shall conform to the chemical composition shown in ASTM B 316 for
alloy 6053 - T4 as given here in Table 1 and shall have the following minumuo
mechanical properties.
Tensile Strength - 25,000 psi (172 (MPa)
Yield Strengtb - 14,000 psi (97 MPa)
Shear Strength - 15,000 psi (103 MPa)
Elongation - 16 percent
8. COUPLING BANDS
• 8.1 Coupling bands e.`.all be of the same aluminum alloy used in the p'pe,
except that plastic banda may be used for Type III pipe. Angles or lugs shall
• • 4 r
• conform to the chemical composition shown in Table 1, and the mechanical
properties given in ASTM B 221 for alloy 6063-T6 as given in Table
TABLE 2
Mechanical Properties of Alloy 6063-T6
b
Elongation
Yi@ld"Strength_ 2 in. (50 nm)
Thickness Area Tensile 0.2% Offset or 4 DL-.meter
in. Strength Min., '"in., M:�.
psi (MPa) psi (tjpa) Percent
0p tbri 0.124 (3.15mm) All 30,000 (207) 25,000 i172) 8
0.125 tc 1.00 (3.16 to 25.4 mm) All 30,000 (207) 25,000 (172) 10
a The thickness of cross-section from which the tension test specimen is taken
determines the applicable mechanical properties. For material 1-1/2 in (38 am)
• or less in thickness when not tested in full section, the tension teat specimen
is taken from the enter of the section. Spa-imene are taken parallel to the
direction of extrusion.
bFor material of such dimensions that a standard test specimen cannot be taken,
or for material thinner than 0.062 in (1.6 =) the test for elongation is not
required.
FABRICATION
9. TYPE I PIPE
9. 1 Pipe furnished under this type shall be full circle and shall be fabricated
with circumferential corrugations and .-_%etee lap
joint construction or with helical corrugations and a continuous lock seam ex-
tending from end' to and of each length of pipe.
s
9.1.1 Type 1A Pipe - Culverts furnished under this section shall be full
circle and shall be composed of a smooth liner and helically corrugated shell
Integrally attached at helical lock seems spaced not more than 30 in. (762 mm)
apart and ex-.ending from and to end of each length of pipe. For culverts of
this ty?e the sum-of i the base metal thickness of shall and liner shall equal
or exceed the base moral thickness of an equivalent pipe of identical corruga-
tions as the shell. The thickness of the corrugated shell shall be at least 60 per-
cent of she thickness of the equival.-.nt pipe.
TABLE 3. Helically corrugated Pipe requirements
Nominal Inside Corr. Pitch Depthb
Diameter Inches mm Nominal
• in. mm 'Max. Min. Max. Min. In.
6 to 10 152 to 154 1-7/8 1.3/8 47.b 34.9 1/4 6.4
12 to 21 305 to 533 2-1/4 1-7/8 57.2 47.6 7/16 11.1
12 to 21 305 to 533 2-3/4 2.1/4 69.8 57.2 7/16 11.1
24 to 84 610 to 2134 2-1/4 2-1/4 69.8 57.2 112 12.7
30 to 120 914 to 3048 3-1/4 2-3/4 82.6 69.8 1 25
48 to 120 1066 to 3048 6-1/4 5-3/4 158.8 146.1 1 25
TABLE 3A. Seam Pitch for Helically Corrugated Pipe
Nominal
Corrugation Pitch Seam Pitch
Inches am Inches mm
1-1/2 38 12 305
2 51 20 508
2-2/3 68 24 610
3 76 21 533
6 152 24 610
• y
6
• ^ TABLE 3B. Circumferentially Corrugated Pipe Requirements --
Nominal Inside Corrugation Depth Minimum With
Diameter Nominal of Lap
Inchea can Inches maa Inches mm
8 to 10 203 to 254 1/4 6.4 1-1!2 38
8 to 21 203 to 533 1/2 12.7 1-1/2 38
24 to 36 610 to 914 1/2 12.7 2 51
30 762 1 25 3 76
42 to 1027 to 2134 1/2 12.7 3 76
f30 cc 762 to 3048 1 25 3 76
a
Pitch Ss.the distance, center to center, to two adjacent corrugations, measured
at right angles to the direction of the corrugations.
b Depth is the perpendicular distance from the top of the corrugation crest to tht
br,tom of the corrugation valley.
!Longitudinal lap for riveted or resistance spot welded pipe.
• dThe average Inside diameter of circular pipe and pip& to be reformed into pipe
arches shall not very more than one percent or 1/2 in. (12.7 mm), whichever is
greater, from the nominal diameter when measured on the inside crest of the corugation_
a Seam pitch is the distance, center to center of lock seams, measured at
right angles to the dire i of the corrugations. A-tolerance of plus or minus
1/2 inch (12.7 mm) on seam pitch is allowed.
fFor 1 x 3 only, min. dia. for 1 x 6 Corrugation is 48" (1219 mm).
10. CORRUGATIONS
10.1 The corrugations shall form smouth continuous curves and tangents.
The radius of curvature of corrugations shall be at least one-half the depth of
corrugations. The corrugations stall be either annular or spiral, or a combi-
nation of annular and spiral. The crest and valley of annular corrugations
. shall form c!.rcumferential rings (complete or partial) about the axis of the
pipe. Spiral corrugations shall form helices about the axis.
7
• 11. DINERSIONS
11.1 Corrugations for helically corrugated pipe shall oe as specified
in Table 3 and the depth of the corrugations shall not underrun those specified
by more than 5 percent. The seam pitch for the helically corrugated pipe shall
be as specified in Table 3A. Corrugation sizes for Type 1A pipe shall be limited
to 2-2/3in. by 1/2 in. (67.8 by 12,7 mm) and 3 in. by 1 in. (76 by 25 mm).
The widths of longitudinal laps and depths of corrugations on circumferentially
corrugated pipe shall be as specified in Table 3B. Dimensions given for diameter
of pipe are nominal. Selecticn of sheet thickness shall be in accordance with
the curreat design criteria in the AASHTO Standard Specification for Highway
Bridges. For Type 1A pipe, where corrosion or abrasion are anticipated, the
thickness cf shell and liner shall be increased or suitable coatings shall be
• specified.
12. RIVETED SEAMS
12.1 Rivets shall be of the diameters for either the sheet thickness or
pipe diameter or both specified in Table 4.
12.2 All rivets shall be driven cold in such a manner that the plates shall
be drawn tightly together throughout the entire lap. The center of no rivet
shall be closer than twice its diameter from the edge of the metal. All rivets
shall have neat, workmanlike, and full hemispherical heads or heads of a form
acceptable to the Engineer, shall be driven without bending, and shall completely
fill the hole. Table 4, shows the requirements of the longitudinal rivet sizes
and patterns for different corrugations. The distance between center lines of
the two rive- rows shall not be less than 1-1/2 in. (38 mm). For 1 in. (25 mm)
• depth corrugations in lieu of shop riveting, pipe may be field assembled using
a
• 1/2 in. (12.7 me) diameter aluminized or galvanized steel bolts. Spacing =4
location of field bolts will be the same as spacing and location of shop rivets.
Circumferential shop riveted seems shall have a maximum rivet spacing ^f 6 in.
(152 mm) =assured on centers, except that six rivets will be sufficient In 12 in.
(305 mm) pipe.
TABLE 4
Minimum Rivet Diameter4
Corrugation Type
Nominal
1 2 3 Sheet Thickr.er 1/2 x 2 2/3 1 x 3 1 x 6
In. mm In. ® In. mm. In. mm
.048 1.2 5/16 7.9 3/8 9.5 1/2 12.7
.060 1.5 5/16 7.9 3/8 9.5 1/2 12.7
.075 1.9 5/16 7.9 3/8 9.5 1/2 12.7
.105 2.7 3/8 9.5 3/8 9.5 1/2 12.7
• .135 3.4 3/8 5.5 112 9.5 1/2 12.7
.164 4.2 3/8 9.5 ",2 9.5 1/2 12.7
1 One rivet each valley for pipes 36" (914 mm) and smaller.
two rivets each valley for pipes 42" (1067 mm) and larger.
2 Two rivets each valley for all diameters.
3 Two rivets each crest and valley for all dia.
4 Rivet sizes shown are minimum. Larger rivets or additional rivets are permissible
if necessary to increase seam strength.
13. LACK SEAMS
13.1 Pipes fabricated with a continuous helical lock seam parallel to the
corrugation may be used for full circle and equivalent pipe arch sizes.
13.2 Except for Type IA pipe, the lock seam shall be formed in the tangent
• element of the corrugation profile, with its center near the neutral axis of
the corrugation profile. The lock seem for Type 1A pipe shall be in the valley
9
• of the corrugation profile and shall be formed from both the lin• : and the.
shell in the same mann_r as Type I helical pipe. The lock seam shad meet
the following q-ality requirements.
13.2.1 The edges of the sheets within the cross section of the lock as=
shall lap at least 5/32 in. (4 mm) for the pipe 10 in. (254 ®) or less in dia-
meter and at least 5/16 in. (8 mm) or pipe greater than 10. in. (254 mm) in
diameter, with an occasional tolerance of minus 10 percent of 1. width
allowable.
13.2.2 The lapped surfaces s'�.11 be in tight contact.
13.2.3 The profile of the sheet on at least one aide of the lock seam and
adjacent to the .80 deg fold shall have a minimum retaining offset of 1/2 sheet
thickness as defined in AASRTO T 249.
13.2.4 There shall be no excessive angularity on the interior of the 180
• deg fold of metal at the lock seam which will cause visual cracks in the sheet.
Roller indentation shall not cause cracks in the sheet or a loss of metal contact
within the seas.
13.:.5 The lock seem shall be mechanically staked (Indented) at periodic
intervals, or otherwise specially constructed to prevent slippage. Tensile
spzcimons cut from production pipe normal to and across the lock seam develop
ens strength as tabulated below:
Pipe Sheet Thickness Minimum Lock Seam Strength
Inches (cm) lb/in(".'mm) of width
0.048 (1.22) 145(25.4)
0.060 (1.52) 170(29.8)
0.075 (1.91) 245(42.9)
0.105 (2.67) 425(74.4)
•
• 10
• 14, TYPE II PIPE
14,1 Pipe furnished under this type shall be of the pipe arch shape
consisting of corrugated aluminum alloy piep fabricated wit' a minimum radius
of curvature of 3 inches (75 mm).
15. LOSGIWDIHAL SEAMS
15. 1 The lapped longitudinal seams of riveted
pipe shall be staggered so as to alternate not less than ten percent of the
periphery.
16. DVIENSI0\S
16.1 Pipe Arches shall conform to the requirements of Table 5 in addit:in
to tha requirements of Tables 3 and 3A or Table 3B for pipe of equivalent size.
•
TABLE S
Pipe Arch Specifizaticn Requirements
Pipe Arches-2 by 1/2 in. and 2-2/3 by 1/2 in. to corrugations
Pipe Arch Equiv. Spann Rises Min. Corner Max.
Diam. In. In In Radius •In Bbin
17 x 13 15 17 13 3 5-1/4
21 x 15 18 21 15 3 6
24 x 18 21 24 18 3 7-1i4
28 x 20 24 28 20 3 8
35 x 24 30 35 24 3 9-1/2
42 x 29 36 42 29 3-1/2 10-1/2
49 x 33 42 49 33 4 11-1/2
57 x 38 48 57 38 5 13-1/2
64 x 43 54 64 43 6 15
71 x 47 60 71 47 7 16-1/2
77 x 52 66 77 52 8 18
83 x 57 72 83 57 9 20
11
TABLE 5 (metric)
Pipe Arch Specification Requirements
Pipe Arches 50.8 by 12.7 can and 67.8 by 12.7 mm Corrugations
Pipe Arch Equiv. Srana Ci se Min. Corner Max.
Size Dim. Radius
mm ma ® mm ima Bbmm
432 x jJG 380 432 330 76 133
535 x 380 455 535 380 76 152
61C x 457 535 610 455 76 185
710 x 510 610 710 510 76 207
890 x 610 760 890 610 76 240
1055 x 735 9 s 1065 735 90 265
1243 x 840 1465 1245 840 100 292
1450 x 965 1220 1450 965 127 343
1625 x 1090 1370 1625 1090 152 381
1805 x 1195 1525 1805 1195 178 419
1955 x 1320 1675 1955 1320 203 457
2110 x 1450 1830 2130 1450 230 508
• aA tolerance of plus or minus one inch (25 mm) or 2 percent of equivalent
circular diameter, Oichever is greater will be permissible in span and rise.
bB is defined as the vertical dimension from a horizontal line across the
widest portion of the arch to lowest portion of the base.
CA11 dimensions are measured from the inside crests of the corrugation.
TAIi" 5(a). Pipe Arch Specification Requiremat,-s
Pipe Arches-3 x 1 in. Corrugations
Pipe Arch Equiv. Diem. SDanl Risel Sin. Corner
Size, In. In. In. In. Radius, In.
53 x 41 48 53-2.4 41-+ 2.4 7
60 x 46 54 60-2.7 46 + 2.7 8
66 x 51 60 66-3.0 51 + 3.0, 9
73 x 55 66 73-3.3 55 + 3.3 12
81 x 59 72 81-3.6 59 + 3.6 14
• 87 x 63 !' 78 87-4.4 63 + 4.4 14
95 x 67 84 95-4.8 67 + 4.8 16
103 x 71 90 103-5.2 71 + 5.2 16
• • 12
• TABLE 5(a). Continued
Pipe Arch Equiv. Dim. Spam Rise Min. Corner
Size, In. In. In. In. Radius, In.
112 x 75 96 112-5.6 75 + 5.6 18
117 x 79 102 117-5.9 79 + 5.9 18
128 x 83 108 128-6.4 83 + 6.4 18
137 x 87 114 137-6.9 87 + 6.9 18
142 x 91 120 142-7.1 91 + 7.1 18
lA tolerance of plus or minus one inch or 2 percent of equivalent circular
diameter, whichever is greater, will be permissible in span and rise.
2All dimensions are measured from the inside crests of the corrugation.
TABLE 5(a), Metric Pipe Arch Specification Requirements
Pipe Arches-76 x 25 mm Corrugations2
• Pipe Arch Equiv. Diam. Spanl Risel Min. Corner
Size, mm mm mm mm Radius, mm
1345 x 1040 1220 1346-61 1041 + 61 178
1525 x 1170 1370 1524-69 1168 + 69 203
1675 x 1295 1525 1676-76 1295 + 76 229
1855 x 1395 1675 1854-84 1397 + 84 305
2055 x 1500 1830 2057-91 1499 + 91 356
2210 x 1600 1980 2210i112 1600 + 112 356
2415 x 1700 2135 2413-122 1702 + 122 406
2615 x 1805 1285 2616-132 1803 + 132 406 -
2845 x 1905 2440 2845-142 1905 + 142 457
2970 x 2005 2590 2972-150 2007 + 150 457
3250 x 2110 2745 3251-163 2108 + 163 457
3480 x 2210 2895 3480-175 2210 + 175 457
3605 x 2310 3050 3607-180 2311 + 180 45*
lA tolerance of plus or minus 25 mm or 2 percent of equivalent circular
diameter, whichever is greater will. be permissible in span and rise.
2All dimensions are measured from the insi. •sts of the corrugation.
• i
_0
13
11. Type III and Type IIIA Pipe '
• 17.1 Type III pipe and Type IIIA pipe are intended to be used for sub-
surface drainage or f,r underground disposal of water, as described below.
17.2 Type III pipe shall be of the full circle and shall conform to the
requirements for Type I pi;,, and in addition shall contain perforations con-
forming to one of the classes described in Section 17.3.
17.3 Perforations - The perforations shall conform to the requirements
for Class 1, unless otherwise specified in the purchase order. Class 1 perfora-
tions are for pipe intended to be used for subsurface drainage. Class 2 perfora-
tions are for pipe intended to be used for subsurface disposal of water, but pipe
containing Class 2 perforations may also be used for subsurface dra_aage.
17.3.1 Class 1 Perforations - The perforations shall be approximately
circular and cleanly cut; shall have nominal diameters of not less than,?/14 inch
(4.8 v®) nor greater chain 3/8�ineh (9.5 mm); and shall be arranged in rows parrallel
• to the axis of the pipe. The perforations shall be located on the inside crests or
along the neutral axis of the corrugations. Pipe connected by couplings or bands
may be unperforated within 4 inches (102 mel) of each e 3 of each length of pipe.
Tha rows of perforations shall be arranged in two equal groups placed symmetri-
cally on either side of a lower unperforated segment corresponding to the flow line
of the pipe. The spacing of the rows shall be uniform. The distance between the
center lines o5 rows shall be not less than 1 inch (25 mm;. The minimum number of
longitudinal rows of perforations, the maximum heights of the center lines of the
uppermost rows above the bottom of the inverts, and the inside chord lengths of
the unperforated segments illustrated in Figure 1 shall be as specified in Table 6.
17.3.2 Class 2 Perforations - The per;(jrations shall be circular holes with
nominal diameters of 5/16 to 3/8 inch (7.9 to 6.5 min), or slots with nominal width
• of 3116 to 5/16'�nch (4.8 to 7.9 mm). The perforations shall be uniformly spaced
15
Table 6
Rows of Perforations, Height "H" of the Centerline
of the Uppermost Rows Above the Invert, and Chard
Length "L" of Unperforated Segment`, 'for Class 1 Perforations
+r r ripe Rows a max• n
n. mm Perforations in. mn in, I nm
4 100 2 1 .13/16 46 2 9/16 64
6 150 4 2 314 ' 69 3 7/8 96
8 . . 200 4 3 11/16 92 5 1/0 128
10 "250 '' 4 4 9116, 115 6 7/16 160
12 300 . 6 5 1/2. 138 7 11/16. 192
.Is . 376 6 6 7/8 172 -9 5/8 240
• 13 450 b 8 1/4 207 11 1/2 288E
21. 525 6 9 11/10 24Z 13 7/16 336
24 and; 600 and (A) plj (0)
larger larror.
(A) 8 minimiar,, bet not over 6 in. or 160 mn spacing between reds.
(C) H brax) 0.460; L (min) • 0.640, whero
0 • internal disr,:etor of pipe, inches or 011111metres as appropriat
I,otric values.-are'approsimato.
14
• around the full periphery of the pipe. The perforations shall provide an openir.g
area of net less than 3.3 sq. in. per sq. ft. (229 cm per si) of pipe surf are
(based on nominal diameter and length of pipe).
Note 2 - 30 perforations, 3/8 inch diameter, per square foot (323 parfors-
tions, 9.5 mm diameter, per square meter) satisfies this require-
ment; or 43 perforations, 5/16 inch ..ameter per square foot.
17.4 Type ILIA pipe is intended to be used for subsurface drainage and shall
be fabri ated of an unperforated semicircular bottom section with a cop shield of
corrugated aluminum, both of nominal 0.060 inch (1.5 mm) thickness or greater.
The smooth semicircular ;,Odom section shall be approximately 4-5/6 inch (118 mm)
I
n diameter and shall have a continuous lip extending outward along each side; the
corrugated top shieid shall be approximately 6-3/8 inch (162 mm) wide including a
• 3/4 inch (19 mm) sloping overhang on each aide and shall be secured to the lip of
the bottom section by integral tabs spaced at about 3-1/2 inch (89 M) center to
center. The cop shield shall have corrugations approximately 7/8 inch (22 mm)
center to center and approximatel; 5/16 inch (7.9 mm) in depth.
f
i
f
l
a
•
16
18. EN'D FINISH
16.1 The inlet and outlet of all culverts fabricated of sheets laving
thicknesses of 0.075 inch (1.91 mm) and less shall be reinforced in a manrer
approved by the Engineer, when specified.
18.2 If a flanged and finish is used on the ends of individual pipe sections
to facilitate field jointing, the flange shall be uniform in width, be not less
than 1/2 inch (12.7 mm) vide, and shall be square to the longitudinal axis of the
pipe. The difference between the minimum and maximum flange diameter of circular
pipe shall n)t exceed lit inch (12.7 ®).
18.3 The ends of individual pipe sections of Type I and Type II helically
corrugated pipe 12 inches in diameter or larger may be rerolled to fors circum-
ferential corrugations extending at least tVn corrugations from the pipe end
and/or to form an upturned flange meeting the requirements is Section 18.2. The
• lock seem in the rerolled end, either with or without a flanged end, shall not
ontain any visible cracks in the base metal and the tensile strength of the lock
seam shall be not less than 60 percent of that required for the remainder of the
pipe. The diameter of reformed ends shall nit exceed that of c!e pipe barrel by
more than the depth of the corrugation. All t,,pes of pipe ends, whet.ier rerolled
or not, shall be matched in a joint such that the maximum difference in the dia-
meter of abutting pipe ends is 112 inch (12.7 mm).
19. COUPLING BANDS
19.1 Field joints for each type of corrugated aluminum alloy pipe shall
maintain pine alignment during ccnstruction and prevent infiltration of side fill
material during the life of the installation. -cumferential and longitudinal
strength shall be provided in accordance with the structural joint performance
• criteria cf Division 2, Section 23 of the AASHT.O Standard Specifications for
Highway Bridges. Coupling bands shall be made of material conforming to AASHTO
N-197. The bands shall be fabric ad iu a manner that will effect!vely engage
17
the corrugations of the pipe ends. Coupling bands and their connections shall
be of such dimensions As required to meet the structural joint performance
criteria in t 2 foresaid Section 23.
Coupling bands shell be no: more than 3 nominal sheet thicknesses lighter
than the thickness of the pipe -o be connected and in no case lighter than
0.048 inch (1.22 =) nominal sheet thickness. Bolts and nuts for coupling bands
shall be steel and conform to the requirements of AS1M A307, and AST"% A563 Grade A,
respectively. Steel coupling band connection hardware, such as bolts, nuts,
bars, And rivets, shall be galvanized by the hot dip or mechanical process to
provide a :catiag meeting the requirements in AASHTO M232, or may be coated by the
electroplating process as provided in ASZY A164, Type IS or A165, Type NS.
Coupling bands shall be so constructed as to lap or, an equal portion ut each
of the culvert sections to be connected. The ends of the bands shall lap of be
• fabricated to form a tightly closed joint upon installation. :he bands shall be
connected in a manner approved by the Engineer with suitaole aluminum or galvanized
steel fastening devices such as angles, or integrally or separately formed an..
attached flanges bolted with galvanized steel bolts, bars and straps, a wedge lock
and scraps, or lugs. Unless otherwise approved or required by the Engineer,
>oupling bands for Type i and 'Type II pipe shall be connected by 3/8 inch (9.5 mm)
diameter bolts for diaa.ecers through 18 inch(457 mm), inclusive, and by 1/2 inch
(12.7 mm) diameter bolts for all ocher pipe di,_-.ecers; for Type III pips by 3/8
inch (9.5 mm) diameter bolts; add for Type IIIA pipe by 5/16th inch (8 mm) diameter
bolts.
15.2 Type I and Type II pipe shall be field Jointed with locking Lands. The
corrugated bands shall be not less than 7 inches (178 mm) wide for'diameters 4 to
36 :aches (10- mm to 914 am), inclusive, and not less than 10-1i2 inches (267 mm)
•
la
wide for all other pipe diameters. Bands for •e on pipe fabricated with 1 inch
(25.4 mm) deep end corrugations shall have a minimum width of 12 inches (305 mm).
If flanges are provided on the pipe ends, the coupling m., _lso be made by interlockir
the f'.anges with a preformed channel bard or other band incorporating a locking thane
not less than 3/4 inch (19 mm) in width. The depth of the channel -hall be not less
than 1/2 inch (12.7 mm). The channel band shall have a minimum nominal sheet
thickness of (,.075 inch (1.91 mm).
19.3 Type I and II pipe less than :: inches in diameter furnished with
heli:al -orruga. :ons may be field jointed with locking bands as described above,
with hell ally corrugated ' ands or with bands with projections (dimples). Helically
corrugated bands shall not be less than 7 inches (178 mm) wide. Bands with
projections shall be at least 12 inches (305 a) wide and shall have two cirrum-
ferential rows of projections with one projection for each torte, eon of the
• helical pipe.
19.4 Type III and Type IIIA pipe may be field jointed with locking bands
as described above except that helically corrugated bands shall be not less than
12 inches (305 rm) wide for use on pipe 12 inches in diameter or larger. Type
III pipe or Type III.1 pipe may also be field jointed with a smooth sleeve type
coupler. The sleeve tfpe coupling may be either plastic or aluminum, suitable
far holding the pipe firmly in alignment without the use of sealing tt ,pcunda or
gaskets.
19.5 Other equally affective types of coupling bands and/or fastening
devices other tnan those described herein and which comply with the structural
joint performance cric:ria of Division 2, Section 23, of the AASHTO Standard
Specifications for Highway Bridge., may be used upon the approval of the Engineer.
r
19
SLENGTH AND PERMISSIBLE VARIATIONS
20. NET LENGTH
20.1 The length of pipe specified shall be the net length of the finished
pipe. If the average deficiency in lengt of any shipment of pipe is greater than
one percent, the shipner.t shall be rejected,
21. "CRKMANSHIP AND FINISH
2_1 It is the essence of this specification that in addition to cempliancs
With the details of construction, the completed pipe shall show careful, finished
workmanship. in all particulars. Among others the following defects are specified
as constituting poor workmanship ...:d the presence of any or all of then in any
individual pipe or in genera, in any shipment shall ccnstitute sufficiert cause of
refection:
21.1.1 Uneven 1a-,
• 21.1.2 Elliptical shaping
21.1.3 Variation from a straight center line .
21.1.4 Ragge or diagonal sheared edges
21.1.5 Loose, unevenly :fined or spaced rivets or spot welds
21.1.6 Poorly . .med rivet heads or improperly constructed lock seems
21.1.7 Improperly cut or badly burrid ends
21.1.8 Illegible brand
21.1.9 Dents or bends in the metal itself that damage its structural integrity
(Dents ur bends that are straightened out and returned to the original shape may be
considered acceptable.)
22. INSPECTION
22.1 The pipe fabricator shalt furnish a Certificate of Compliance for each
snipmenc for each project shosfi.g the quantities of fabricated materials. The
i
Certificate for Compliance shall state that representative samples of the listed
materials have been tested and that the test results conform to the requirements
20
• outlined herein. Test results shall be maintained and be made available ca
provided in Section 9.1 of dASKO M-197.
22.2 The Eagineer or his representative shall have free accesr to the
fabricating plant `�r inspection and every facility shall be extended to him
for this purpose. This inspection shall include an examination of the pipe for
the Stems In Section 21 including the corrugation depth, and minimum width of
lap.
22.3 On a random basis, samples may bd taken for chemical analysis and
physical properties for check purposes. Those samples will be secured from
fabricated pipe or from sheets or toils of the same na:eria. "ad in the
fabrication of the pipe.
•
FINAL DECLARATION OF NON-SIGNIFICANCE
.Application No(s) : ---
Environmental Checklist No. : ECF-058-82
Description of Proposal: Installation of curb,
gutter, sidewalk, paving,
storm drainage, wa_er
and illumination.
P 2poEient: City of Renton Public
Works Department
Location of Proposal: Located on Monroe Ave. N.I.
from N.E. 4th St. south to
N.E. 2n- St. 6 N.E. 2nd St.
714 feet East.
Lead Agency: City of Renton Building
a Zoning Department
This proposal was reviewed by the ERC on July 14, 1982, following
a presentation by Jerry Lind of the Building s Zoning Department.
Oral comments were accepted from: Gary Norris, Roger Blaylock,
Jerry Lind, Richard Houghton, David Clemens a James Hanson.
Incorporated by reference in the record of the proceedings
of the ERC on application ECF-058-82 are the following:
1) Enviror-rental Checklist Review Sheet, prepared by:
Donald G. Monaghan DATED: June 30, 1902
2) Recommendations for a declaration of non-significance:
Traffic Engineering Division, Design Engineering Division,
Utility Engineering Division, Policy Development Department.
:core Information: Fire Prevention Bureau, Building 5
Zoning Department.
Acting as the Responsible Official, the ERC has determined this
development has a non-significant adverse impact on the environment.
An EIS is not required under RCW 43.21C.030(2) (C) . This decision
was made after review by the lead agency of a complete environ-
mental checklist and other information on file with the lead
agency.
Reasons for declaration of environmental non-significance:
Will not adversely impact the environment or ad3acent properties.
Signatures:
i
bonald G. Nelson D _ omens
Building a Zon_ng Director Policy De� alopment Director
Richard C'. Houghton
Public Works Director
DATE OF PUBLICATION: July 19 1982
EXPIRATION OF APPEAL PERIOD: August 2, 198i
t
• Date circulated•m8
y 9, 19_ 2 `ommen due: July 14, 1982
EMYIRDMINEKIAt CHECKLIST RCVIEM SHEET
FCF - 058 - 32
APPLICATION No(s). --
PROPONENT: City Of Renton Public Works Department
PROJECT TITLE:Monroe Avenue N.E. 6 N,E, 2:d Street Improvements
Brief Description of Project : Installation of curb gutter, sidewalk,
paving, storm drainage, water and illumination.
Located on Monroe Aven. N.E, rem N.E.
LOCATION: N.E. 2nd St. and N.E. 2nd St. 714 feet East St. Bout to
SITE AREA: BUILDING AREA (gross)
DEVELOPMENTAL COVERAGE (S);_
IMPACT REVIEW NONE MINJP MAJOR MORE
1) INFO
it aphlr changes: x
2) . sect/Indirect air q,,nlity; x ,
1) Wale. 8 rater rournesi x
�) Plant life: x
'•) Animal life: x
o) uise: x
7) Light S glare: x
8) Land Use; north:
ease:
south:
Vest •_
I and use conflict.,:
tie obstruction:
9) Natural resource;: x
1.1) R-1sL of uPsrt:
11 ) Pupu!ation/Employc,c.it : g
12) No, t,er of Ducllings: x
13) Trip ends (111 ` : C
traffic impart-': Acceptable
14) Public servicru: g
15) Energy; x
16) Utilities; x
l7) Mumnn health: x
18) Aesthetics:
) Recreation:
20
20) Archeology/history:
CO" ENTS-
Signatures:
Ona G. Me .son
Building Official Dail, R. C em s
Policy Development Director
x711s6Bp1aNW Z',
STATE OF WASNrrf.T(A
DEPARTMENT OF TRANSPORTATION
Off"or Dt tMf 4o"~fdfM • D t 6431 Co x UP So C�a 1410 • Seine tt�Wtcv.;.8 tiAd
July 23, 1982
Mr. Richard Boughton
Director of Public Works
200 !fill Avenue South
Renton, Washington 98055
City of Renton
Monroe Ave. N.E.
(N.E. 2nd St. to N.E. 4th St.)
1/2c Gas Tax
Dear Mr. Houghton:
Enclosed herewith is one (1) approved copy of your Individual Project
Prospectus relative to the improvement of Mowroe Ave. N.E.. with the
use of 1/2C Gas Tax Funds.
We have reviewed the project in the field and checked it for conform-
ance with the intent of RCW 46.68.110(2) and 46.68.115 which authorizes
these funds to be used for construction, improvement, or repair of city
streets. We have also ascertained 'hat the proposed project '_s L-eluded in your current Six Year Comprehensive Street Program. This
approval Gas Tax Funds only. This does not con
is for the use of 1/2C
et itute the approval of Federal-Aid Funds on this pro tact
It is requested that the final construction costs of each project com-
pleted within the current year be reported to the District State Aid
Engineer at the close of each calendar year.
In addition, it is requested t„at the approved copy of the Prospectus
be filed in tte records of the city or tow for use of the State Auditor
upon auditing the cost records of each completed project.
Very truly yours,
J.D. 2IRYI.E, P.E.
District Administrator
D.L. ROFFMA44 P.H.
District Stata Aid Engineer
JD:nc
Ent.
cc: Stan Moon (v/attach,)
r
w.�SNINGTOp STATE OE►ARTMENT OF TRANSPORTATION
ONE-HALF CENT FUND PROJECT PROVECTUS
cnrrTerw eT
R. —_
"'R'C7 STATE AID ENGINEER
*A3HINGTON STATE DEPARTMENT �'12-32
Belt Cor.on Avenu[South OF TgANSPpgTATION
Se0n4,WA 98,08
•w04Cr lOC.1 T--C»prs[t-wYpb.N- a r[� w,�� ���
Monroe qve. N.E. _ y,E. 2nd St. to N.E. 4th St.
u w.rtwwrww»aro ..rr�.v»:Y—.wev[r,iw
19 To
Item Number
.u»rno»wccutununew:CC•256 Mi ies)
❑YES X NO
❑ rrinCiey ArWriel
[tunNo wewew.r wmr»[vtbti O �W�aROr A7br:el ❑ Min o Arterial
R:yb or Wer �: ❑ Aons.Strwt
❑ Crment Concrete CAtonaq Con< rr•`e••+arouo
etK.rl-���� rate ❑LIp1tDl +Ow61C»[CR O»t)
oN er•.orouo.., ❑6• 2:conrtructlon
❑ Impove.r,en
_ ere•w vereeT.we a»euuoiw r,erwaj,� t C R.7eir
- - _eras fists of r.sta'
atin
--=ge, paving and it lulninationof curbs, gutters, sidewalk, storm
TOTAL 3 -' :
rru.re.w•�'�ce 1/2=ntGiTa 3 - - 5^-
�r w,r«
w ®COntgot
r+-•ro^..rrwc.w[ounr a'.., Day LFCor=ry For,,,,wsomo».0 ce..r[wre •ew o[v,.r:ow ree[r»[w w..
El NO
50lSt project e,i t!; King County .=. d the City. Cost to be shared with a
0 split with an estimated total project cost of $2 be shared
00
...eras
it U."Tee 0r,
! Barba�ra�Y. Shinpoch
Ma Or TF •.
t. Jeeu a,. LNUIit••.ip'1 TW
e. 4urw,N M pIie uR.Ngr YU,M
M
WASHOTON STATE DE►AIITNENT Of TRAM•ATION
ONE-HALF CENT FUND PROJECT►ROSPECTUIS
ercr/Terw or
Yen ion
sw-[
DISTRICT STATE AID ENGINEEP, —
WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
8431 Cor,on Av.nue South
S.attle,WA 98100
IwOIICT lOCwl10N.1{T,Cr r NwY[I.I wM0 T[gYIMn -
Monroe Ave. E. - N.E. 2nd St. to N.E. Ifth St.
va.r{.w TwwN.rowTwTmNlYrwov[r{wT r,eewwr
19 12 TO 19 u 7
.,o;.cT�[NeTsu Item Nanpar 24
wwLLOOwO INVOLY[M[w1.
1,350 ft. (a.256 Miles) p yes
ruN.....w.ccw.Z '; Y� X No
❑ Principal A U,i l ® OCII.eter Artnim
W..n...oz.—. w,oTNl v[an. p Minor Art.riai p Ao,m Seaat
Right of W.v 60 :e e t ►av{m.nt - �) —_
Ulanw[Tvr[ol.ywlwe[IcrecN eeq, `��— Slloylden
Trn er r,eroue weww lewac,owq
❑ C.m.nt Concmo ❑ARJllalt Conn p Light Oil
Eh ❑GravN ❑Cona---- --- ❑ Improv.m.nt
O{KRIRION OI MOIO[[O WOw1{nNT,IyO[a CNwwO[[TO IgYIYaMt wNO{XOY60[N r,OTN{l� p R.a
Project consists of dr installation of curbs, gutters, sidewalk, storm
ainage, paving and illumination,
TOTAL j .we/[cT.Icy a +ceorru.N[e.n 285.O�o,ao ,na11TD■Ta.eloo aao 00 ® cuuii=
`n y •J• TeN nwr[enr ❑ Do, 40or ❑Ccunty Fora.
al[[,rr nwwewwsar
UI"Ip^,gr{wa gOy[Or IOw Of VIwT/01J rN[M[w 1YIrM/y.ryryOwtrM1 ❑ TES ❑ NO
wOOlTlrwwl ewYYaNTa�
Joint project with King County and the City. Cost to be shared with a
50/5'' split with an estimated total p: . ject cost of $285.000.00
•IIwoV{e
'°•Y"'•••`'2arbar,. Y. Shinpoch
pum{I sol.ua awuww Miyor
—_ mr
NC rc J. q,rn vKlnitr Yo U 1/i"�Ii"I -
J'
J -w.1Kn gowYO MCNwµ 5rtlew
' [rwll In irrll N,l
W'�•TON STATE DEPARTMENT OF TRAANS•TAnON
ONE.-HALF CENT FUND PROJECT►ROSVECTUS
CITT/Teww Op
— ^r
sXT¢
DISTRICT STATE AID ENGINEER
WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
8431 COnon A"X.*South
Saaelt•WA 98100
MOI\CT LOC.r... I)rn[ar X.Y\I)I I.YO Taw YIn1)
N.E. 2nd St. to N.E. 4th St.
vaT\.w Tw.w)rowT�ner IvwevavawT rweew.r
•wolecrcu�w-_ To1S a7 Inm Nump)r_
wuawo.r Iwvowavawr
1,350 ft. (0.256 Miles> ❑vE$Iuwrnow.I CLa)S,w1eaT,e,p������' NO
❑ Prir-NPal Anerial Q COIIII O Ar isl
sanTlws weaew. .Il ......TIC ❑ Mina ArtMisl ❑ A=,Straat
Riylt*tWaV c; *ea-
n er wwr.e\icX[ew aaa\1.
❑ Cam\ntC 111111 ❑Aaphalt Concha []Uyn OiI ❑GraTN LTTIi 0I II,Oq)[e wOw4 ICM------
eaacwlmow Or•Meroaae rew[❑wcweb cn.weu re rwr[rawT.wu Z.Q.'V mTYSM❑ -----nNnt
❑Ragir
Project dra consists Of installation of curbs, gutters, sidewalk, storm
inage, paving and illumination.
C)TI Y..r[O•wO1aCT CO)A
TOTALS I/j owtOnTaaS 100,000.00 'ww[cr wl��aa.<corlelaXm)T.
wleu wows eowre.wlrw r.)XlYorow>taT\r- 3 Contract ❑ Day Labor County ForM
I-'vo••,aTTwcX- -- rew o\v I.TIOw TOC ~aw¢VICAT.
.00.n.......Yawr) •1Tw luanw.>•laeq ❑ YES ❑ NC
,7oir.t project with King County and the City. Cost to be shared with a
50/50 split with an estimated total project cost of $285.000.00
••»wevao ��_
[uarnran ar"--.tars Y. Shinpoch
•ore 1. .nul v;um,r r•)p 11Y.t 1r n.
r. anv1,w•r•w wew.ar s.cua.,
a. )bnq m T.roiiwv
v � �
�I
r-- r
IvIONRVE AVE. N. F
Cross-nec,�on of Proposed Construction Ci. of Renton
Public Yorks Oepertment
fl
ay kph
MONRQ �ANE.¢
• �0WC" Statd�Wasmrgton
AArep.Courtly Execurrve RANDy REVELLE
Dilphrilssimst Jul 29, 1982 of Public Works
y James W.Guenther.0,n c or
9DD King County Admmist.ation Bmlding
500 Fourth Avenue
.r Seattle.Washington 96104
(2061 34-251 7
Public Works Department
Design Utility Engineering
Municipal Building
200 Mill Avenue South
Renton, Washington 98055
Attention: Robert E. Bergstrom, P.E.
Engineering Supervisor
Re: Road Improvemen._e to Monroe Avenue NE and NE Second
Street
Thank you for the July 14, 1982 correspondence regardin- the
subject road improvements. We have reviewed the preliminary
worKing documents you submitted per our ageeement. We note your
standards are similar to King County Public Works.
We have some basic concerns and they are as follows:
1. Removal of site entry gate across NE Second Street. We
recommend security be maintained until the District Court is
occupied.
2. Installation of the 36" storm main along Mj,1roe Avenue NE and
NE Secon-1 Street. We request that traffic and access to the
King County Publi^_ Works Facility and the District Court not
he impeded.
3. Entrance gate crossing Monroe Avenue NE will be removed and a
new configuration will be installed t- rform with the new
road imprcvements.
4. We noticed the increased size of the storm main fr Se to
49" perforated including the 0.10% slope. often cut..ng for
pipe placement at the .depth of 16 ft. may be difficult to
achieve. The exi..ting material is not the most desirable for
trenching. Do you plan to extend the 49" main in the near
future?
S. We recommend street signs as required.
We are pleased with the time frame you developed your design and
dorking installationmoft o . The first r the the water maineextens ionmistmost gratifying. This
guarantees fire protection for the Di
requirements. strict Court during
constructiun and establishes compliance with the Fire Department
Robert E. Bergstrom
July 29, 1982
Page 2
In the spirt of cooperation, We will be looking forward to your
completed contract documents and specifications.
Very truly yours, -
Aa-/I
3. J. SALTARELLI
Facilities Administrator
Y�OJS/asp
cc: James W. Guenther
Paul C. Hooper
WASN•TOle STATE DEPARTMENT Of TRA•ATIOM
ONE-HALF CENT FUND PR(JECT PROSPECTUS
urr,raww ee --
overt
DISTRICT STATE AID ENGINEER --
WASNIAGTON STATE DEPARTMENT OF TRANSPORTATION
6431 Conen Awnw South
Seattle.WA 98108
MaKr LOtw r\ow,1[rwaat Mwrgb wwe rawYrerl —'�
Monr:e Ave. N.E. - [;-E. 2nd St. to N.E. 4th St.
v avaww rwwxero+rwnew IrMovrrawr rwoowwr
19 i_ 70 19 d 7
n o.a<r LdetX kem Number
wwlcwewo Iw vowawawr,
?50 =2 (0.256 Miles) ❑YES runrnoXw�awmncwnew, ii NO
❑ Pril-dVN Arterial C011ectw Arterial
aanrrwa wewewwv carer M'°°/Artenal ❑ Accm Street
Xe IIa[rl'
Riy,totway 60 feet --
unrlwarr —.-- Pavement C:-ae) SI\VuIANt
Mee .........ow al,
lrla ee MOletae wewy ICXaGR ewa)
C3 O]men]Ca\enq'OMphNe Canenle ❑Lpbt O'1
eaK eN we I e ❑G awl ❑Co ]trutt o ❑ 1 q errant [3 Repair
wweuwaw oerwq,
Project consists of installation curbs, gutters, sidewalk, storm
drainage, paving and illumination.
aanrwr[o Me]ett ceev.
TOTALS t75.000, :,i ewelaC♦wuU ea Accorwu]•ao er
wntGeTezi 10 _0 000.00
wuu weww OOreV V veer-..vxmoron erwt[cnr ogrew nwwawww] ® Contrct ❑ Dr Labor L)Counry Forge
ear-w°'•.wrrweX veum rave eavlwnoX rew[rxa+wnX mornewnonl YES Q NO
woemarw�cerwawn.
joint project with King County and the City. Cost to be shared with a
50, 50 split with an estimated total project cost of $285.000.00
Lnwevae
1Oe]]'r^O°•'Barbara Y. Shinpoch
_ Dno'u sub vela c•u•Nr per Md VOr
aOrF 1 M\]cn v¢un\r u]s
]_ wlbN 40N,N wON�N 1eLnM
], tr1n11 In•r1e11Ceb
� L.9
11
r 3
iw
1
MONROE ICED
A✓E. N. E:
S
Cross-section!of Propose: Construction City of Renton '
Public Works D4.4rtment
3
-y ` -",Cat
r ;ry
M fl♦
]L4.1
YC
pi 7
I f ;
p"'ONROE AYE AIE
11:L 1N0arWN.E 4rh,Sr
1 \
OF Rp
� T
} Z PUBLIC WORKS DEPARTMENT
TRAFFIC ENGINEERING DIVISION • 235-2620
P M 'R MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH 99055
b
P
rp0 SfivtElo
BARBARA Y. SNINPOCM
MAYOR
Mr. Jack Olsen
Custumer Service
Puget Sound Power 6 Li ,ht Co.
P.O. Box 329
Renton, WA 98055
Attention: Hs. Kathy Pease
Subject: Supplementary Conduit/Monroe Ave. NE from NE 4th St. to
NE 2nd St.; Puget Power's Job No. 0373658P
Dear Mr. Olsen:
This letter is to confirm the Ci ty's request for two 2-inch conduits
to be installed jointly with Puget Power's installation at the above-
referenced location.
The cost as quoted in Kathy Pease's letter dated June 25, 1962, of
>4,940 plus tax may be directed to this office for disposition. The
cost will be applied to our street improvement project which will
follow y-ur conduit installation.
The conduits referenced above must be the last to be installed in the
trench s the street improvement contractor later may be able to cut
`nto the conduit and elbow it up to junction boxes.
me let us know when the work starts
Very
truly yours,
Gary A. ris, P.E.
Traffic Enqineer
CEM:ad
Enclosure
cc: Bergstrom
Monroe Ave. NE & NE 2nd St. Correspondence 3
s ,
PUGET
P�Off�F.4
June 25, 1982
City of Renton
200 Main St.
Renton, WA. 98055
Attention: Clint Morgan
Gentlemen:
Re: Renton District Court House
N.E. 2nd St. b Monroe Ave. N.E.
It was requested today by telephone that Puget Power furnish a
cost to provide And install two runs of 2" PVC in the primary
trench that will serve the Renton District Court House.
Referencing our work sketch 00373658R, of which you have been
furnished a copy, Puget can install from point "A" to point "B"
1.850 linear feet in length, two 2" PVC runs for S2,4i6 plus taz.
41 9✓'
If this is agreeable to you, please show your acceptance for
work to be done and billing by si0ning this letter in the space
Provided below and returning to our office.
Should you have further questions or requests regarding this job,
please contact me in our Renton office at 255-2464.
Sincerely,
�(,�t////
i
Kathy Frease
Marketing Consultant
Accepted
Date _
• CITY OF RENTON, WASHINGTON
ENVIRONMENTAL CHECKLIST FOV
FOR OFFICE_U_d_ONLY
Application No, _ -
Environmental Checklist No.
PROPUSED. date: FINAL, date:
Declaration of Significance Declaration of Significance_
QDeclarative of Mon-Significance a Declaration of Non-Significance
COMMENTS:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Intruduction INA State Environmental Policy Act of 1971. CnaD ter 13.2IC. RCA, requires
AT seta to and local govern me n•al agencies to consider environmental values both for their
own actions and when licensing private propoSa:S. The Act also requires that an EIS be
prepared for all major actions significantly affecting the quality of the environment.
The Purpose of this checklist Is to help the age.-cies Involved determine whether ur not a
Proposal is such a major action.
Please answer the following questions as cumpletely as you can with the information
presently available to you. Where explanations of Your answers are required, or where
you believe an explanation would be helpful to ilvernment decision makers, include your
explonatlon in the space provided, or use additional pages If necessary. You should
include references to any reports or studies of which you are aware and which are rele-
vant tG the answers you provide. Complete answers to these questions now will help all
agencies involved with your proposal to undertake the required environmental review with-
out unnecessary delay.
The following question-, apply to your total proposal, not just to the license for which
you are currently applying or the proposal for which approval is sought. Your answers
should include the impacts which will be caused by your proposal when it is completed,
even though completion may not occur until sometime in the future. This will allow all
Of the agencies which will be involved to complete their environmental review now, with.
out duplicat!ey paperwork in the future.
NOTE: This is a standard form being used by all state and local agencies in the State
of Washington for various types of proposals. Many of the questions may not apply to
your proposal. If a question does not apply. just answer it "no" and continue on to the
next question.
ENVIRONMENTAL CHECKLIST FORM
.. BACKGROUND
I. Name of Proponent _ City of Renton
2. Address and phone number of Proponent:
__ Pt blic corks Deoar n
Renton WA 9R055
3. Date Checklist submit ad �I;,r< In ' qg?
/. Agency requiring Checklist C,;-�, of •.,mto
5. Name of proposal, if applicable:
Monroe Ave :J.E. one. N.E end °t InprOve
6. Nature and brief description of the proposal (including but not limited to its
size, eneral design elements, and other factors that will give an accurate
undvrs ending Of its scope and nature):
Thg_r cone of work in I t, t t 1 .t th 1
3,t1LL_LGimnlotw inctalTat i.'+ f h
s nrm jra;naoe_ water an[. ;llrminat'
/. Eccation of proposal (describe the physical setting of the proposal, •f well
A% the extent of the land ar,a affected by any environmental inooc[s. including
any other information needed to give in accurate understanding of the environ-
mental setting Of the proposal):
-1be,&j_t.,=iF Mnn,-np Avy N E. from N.L. 4th St. south to
2nd S,214—'_..East_ _ .
d. Estimated date for completion of the proposal:
__ ile CeIDher ] 7067
9. Lis' Of all permits, licenses or government approvals required for the proposal
(federal, state and local--including rezones):
None
10. 00 you have any plans for future additions. expansion, or further activity
related to or connected with this proposal? if yes, explain:
_ No
11. Do you know of any plans by others which may affect the property covered by
Your proposal? if yes, explain:
10
1[. Attach any other application form that has been completed regarding the pro-
pOSal; if none has boon completed, but is expected to be filed at some future
date, describe the nature of such application form:
---.__ None
I1. ENVINOI1MENrAL IMPACTS
(ExplanatiunS of all "yes" and "maybe" answers are required)
(1) Earth. will the proposal result in:
(a) Unstable eartn conditions or in changes in geologic
substructures? X
YET NNW Rb—
(b) Disruptions, displacements, compaction or over-
,overing of the Soil? X
YET MBE Ro—
(c) Change in topography or ground surface relief
feat ure S?
X
YET RAPHF RT
(d) The destruction, covering or modification of any
unigm geologic or physical feature:? X
YET RMT RT
(e) Any increase in wind or water erosion of soils,
either on or off the site? X
( ') Changis in deposition or erosion of beach sands, or
e angts in siltation, deposition or erosion which
-lay modify the channel of a river or stream or the
bed 01 the ocean or any bay. Inlet or lake? X
E gel a�i�ti on: TIM RATU WV—
(t) Air. Will the proposal result in:
(a) Air emissions or deterioration Of ambient air
quality?
YES- F1IY6E
(b) The creation of objectionable odors? X
AAY nE Aid
(C) Alre,ation of air movement, molsturo or temperature,
or any change in climate, either locally or
regionally?
X
i€s AFryF AU"
EIanJL1Vn:
(3) Water. Will the proposal result in:
(a) Changes in currents, or the course of direction of
water movements, in either marine Or fresh waters?
YES NO
(b) Changes in absorption rates, drainage patterns, or
the rate and amount of surface water runoff?
YM -muff
(c) Alterations to the course or flow of flood waters?
(d) Change in the amount of surface water in any water Y NJ
body
YES MAYBE
Ni—
(a) Discharge into surface waters, or in any alteration
surface water quality, including but not limited to
temperature, disso Wed oxygen or turbidity?
YES' rfAPnE
(f) Alteration of the direction or rate of flow of
ground waters? x�
YES-" -MOO A3'
(g) Change in the quantity of ground waters, either
through direct additions or withdrawals, or through
interception of an aquifer by cuts or excavations?
Y€S— M Y FIi^
(h) Deterioration in ground water quality, either through
direct injection, or through the seepage of leachate,
phosphates, detergents, waterborne virus or bacteria,
or Other substances into the ground waters?
YM M YR
(i) Reduction in the amount of water otherwise available
for public water supplies?
YES— R"AYHF i�
Explanation:
(A) Flora. will Use proposal result in:
(a) Change in the diversity of species, or numbers of any
species of flora (including trees, shrubs, grass, crops,
microtlora and aquatic Dlants)1
YES' A)fYBT FO-
(b) Reduction of the numbers of any unique, rare or
endangered species of floral X
rM M1CV6Y A�
(c) Introduction of new species of flora into an area, or
in a barrier to the normal replenishment of existing
species? X
YES- Run Aa
(d) Reduction in acreage of any agricultural crop?
YES- A7I9SE Ai-
EXn Anati on:
•
(5) fauna. Will the proposal result in:
(a) Changes in the divers Ity of species, or numbers of
any species of fauna (birds, land animals including
reptiles, fish and shellfish, ban thic organisms,
Insects or micr,fauna)? xx
PiT k�iT p1"
(b) Reduction of the numbers of any unique, rare or
endangered species of fauna?
PST D7I1$� ni '
(c) Introduction of new species of fauna into an area,
or result in a barrier to the migration or movement
of fauna?
V-M MWV N�
(d) Deterioration to existing fish or wildlife habitat? v
PlT FA,'SC NL
Explanation
(6) Noise. Will the proposal increase existing noise levels? X
YCT N Y E NU
Explanation:
(7) Light and Glare. Will the proposal prodace new light or
9 art e
_ X
VCS F7"VHC
Explanation:
(0) Land Use. Will the proposal result in the alteration of the
present or planned land use of an areal
VE'S— MAPSC NTi
Explanation:
(9) Natural Resources. Will the proposal result in:
(a) Increase in the rate of use of any natural resources? X
7M MA-fl6F Div
(A) nei,lction of any nonrenewable natural resource?
P€I'- FIEVBC
Explanation:
(10) Risk of Upset. Does the proposal involve a risk of an
exp loslon or the release of hazardous substances (including,
but not limited to, oil, pesticides, chemicals or -adiation)
in the event of an accident or upset conditions?
PET illVFi
Explanation:
(11) Population. Will the proposal alter the location, distri- `
ution, density, or growth rate of the human population
of an area?
Prr mrvr �-
Explanation:
-5-
w (12) M usin . will thoreposal affect existing housingor
create a demand for additional housing? X
YE— P Y B
txplanatiun.
(IJ) fronsmortati On/Circulation. Will the proposal result in:
(a) Generation of additional vehicular movement? X
(b) Effects on existing Parking faciii LS NAY! WU
for new parking? ti , demand
X
(c) Impact upon en sting transportation systems? X
PC- Kly-BE AV
(it) Alterations to present patterns of circulation or
movement of people and/or goods? X
YES NFrVE 110
(a) Alterations to waterborne, rail or air traffic? X
YTS MAYBE
(f) Increase in traffic hazards to motor vehicles,
bicyclists or pedestrians? X
N
E xolanation:
(14) Public 5ervices. Will the proposal have in effect upon, or
resultn a ed for new or altered governmental services
in ally of the followiny areas.
(a) fire protection?
X
TS- nAiriiF i�
(b) Police protection? X
YTF Mei xT-
(c) schools?
M- MW
(d) Parks or other recreational facilities? }X(
YE5 h7YgE NO
(a) Maintenance of public facilities, including roads? X
YES MM' E RY
(f) Other governmental services?
qT- Mir
Explanation:
(15) Eneray. Will the proposal result In:
(a) Use of substantial amounts of fuel or energy? X
YET MAYBT AT-
(b) upuw exis Ling sources of energy, ur require
the development of new sources of energy?
VFt MIT wr
ix lana tlun:
-:,}II1t+es. Will the proposal result in a need for new
iYstams, cr alterations to the following utilities:
(a) ►owes or natural gas?
YM M-v u
'b) Cumm,nications systems?
yM FEY
(0) Water?
X
YES NAYgE NO
(d) Sever or slat, tanks?
sTf� MIfY6F �'
(0) Storm eater drainage?
(f) Solid Waste and disposal?
1'Em Nry—BE N-0
Expl!netion: �,t.p
arA�d •e i 1 d d in the onstruction
dravin s.
(17) Int.a. Ilralth, will the proposal result in thi any n e F ealtaurd or potential he p(
alth natard e creatleat on on
wants] health)?
rrs— al(raF �
ng
Cx ].nation:
(18) AesthetioS. will the proposal result in the obstruction of
any scan c vista or vier oiler to the Public, or Will the
proposal rtoYlt in the .?NLipn of on Aesthetically offensive
site open to public uteri
};
rEs MiP6T NF
E Aplanatian;
(19) YecrvatiDn. will the proposal result in an impact upon the
VuaT ty Or quantity Of existing recreational opportunities?
t-Wanattpn;
(21J) Arcneo lTgiul historic,I. will the proposal result in an --T—rltlon o ! s qn unt archeological or historical
site, structure, object Or building?
P �
ans tl oil
:
SIGNATURE
i, the undersigned, state that to the best of my knowledge the above inlorution
is true and complete. It is understood that the lud lgency may ritnd raw any decl!-
ration of non-n 9nificance that it m'ght issue in reliance uDan this checklist should
Uit re be any etilfuI misrepresentation or willful\lack of fu11 disclosure on my part,
Proponent:
sign
Donald
name pr me
WASHINGTON STATE OE►ARTMIENT OP TRANSPORTATION
ONE-HALF CENT FUND PROJECT PROSPECTUS
e.ra
r0.
DISTRICT STATE AID ENGINEER
WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
$431 Corwn Arenue South
Sea"W.WA 98100
.+eider LOCwrwn 16....I w.ralq dwe tawrlwo
Monroe Ave. N.E. - N.E. 2nd St. to N.E. 4th St.
ua-•GA.r..xerowewr!Ow l r.w ...er.+0a..r
19 d; To 19
lum Numper
ewo,ac,a«vw. A.nwo.o Iwve.varaxn
1,350 ft. (0.256 Miles) ❑vE5 X NO
.uernow.c euuowwns«:
❑ Prindpal Arterial ® Colla Artv!a1 Minor Arterial ❑ Access Strwf
awmnwe we.ow.v wmr»a;rur;
R;dlt of WaV Pavement -
Shoulder,
alllenx0 rv.a er suwr.c-I<.__'. rVn e.N,eI0ea0 YI,.A Icllacll ex\I
❑ Cement Concrete ❑AWhalt Concmta ❑Light Od ❑Grant ❑Conaruction ❑ ImWevtlMnt ❑ Rome,
Dt•Cwln,o«O...*"Sao weww l,wcwou c«wx•a•r0..v arawr.we H.euLOaw w\wrxp�
Project consists of installation or curs, gutters, sidewalk, storm
drainage, paving and illumination.
avr.rao.wenc,C..n __ •wenarw1.ua.ecorgm»a➢•V.
TOTALS _ 1/2wntGoTa.S_ -
' - - • - - ® Contract ❑ Dey l.atw ❑County Form
OIIL wOww COY,V V rlrM w.e.n M1ereM er.re CIrV OIeIOM arw MO.wolf
uw'xo^.....e»wawaar row owunow reeer»aw wl,»luerv�cA Howl O YES ❑ NO
.omnow.c corrawn.
Joint project with King County and the City. Cost to be shared with a
SO/50 split with an estimated total project cost of $285.000.00
ALwevu
•I,a"^`•••'6arbara Y. Shinpoch
Dl.enal sln.u.a•p•er pA — `flavor
,.na
J. fupwl\In,.!suuV
_. � .—....._�_. �.._r.. .ten _.---• ��.�—.-r .�.� _ _ _
/ j.w �1 941Y
� J \
// N .�•�P. S I / i It
1..�.��r.� .11hrJA�'e3 // L •. i e.� ��•
�• •. .I •. !�' � •. A. / 'fl F . W I � 1� wl.� MYI� I�
i
✓✓✓..YYY I1FY fDrf�� YWKI
'VH1 I ��' 1~iM• fAeICIMr
nH) 'r•+ eJ1
eIM nnlG r1 .-. .
X i-f )IX MIC
711-—_,Lf,
�'•'� is
I .
I IIR�
h�
Thu irAwmelwn n el a zr=,
IhMd6.p aal¢ r w wn
nXmra b e hwlh..eu Ir111
_ pwoprralaly ulpuudld �•u.I.o
21
i
_ �.r .�. .....�.,�.�.. _ ..\P ...+�. �u��.7 T. -ter. —-- -.. , _ - _. . ..�. ♦ u._ .�.
' .• �. .I L. -.plrA
.L 1
' /.', � Imo. ,..... I ..Iti.•.ems •n'M•�
• x MMnnJ 1
• n . � . vi � � I,I ,10 0.. ..I I r 1 n ta,. E E -
1Fn' ru. r�.av nv C itk'tr .�
5a N' ;)'• '.A MLN . al .y 1".MN. ' k � IVtl �� wt•ro
IM
Ll
•' �.v u® I I 1 11L Nmn.w ,.d .povw I1L—Auk—ws—•w.
•I•r.Ic Y.OarlK r+wA•..0 1.11 L—_
����pp�� I 1 , I I 1 .. .hwAd y..owowa�.ly..l.q.od.d f ✓.0
(O,MrIM
si,n tx a�sleeetrn
DEPARTMENT OF TRANSPORTATION
C)nr«nr Gunr�dnmr.•rM • D r 6fIMCa A,r So Cdrap • 'wank
RECEIVED
April 2e, 1982 Q.,,�(
l�NPAY 6 082
Mayor of the City of Rentot CITY OF RENTON
Mayor Barbara Shinpoch _MU YOR"S OFFICE
200 Mill Avenue South
Renton, Washington 98055
City of Renton
N.E. 2nd St. - Exte^lion
(Monroe Ave. N.E. to Dead End)
112C Gas I"
Dear Mayor Shinpoch:
Enclosed herewith is one (1) approved copy of your Individual Project
Prospectus relative to the improvement �f N.E. 2nd St. - Extension
with the use of 1/2c Gas Tax Funds.
We have reviewed the project in the field and checked it for comform-
ance with the intent of RCW 46.68.110(2) and 46.68.115 which author-
izes these funds to be used for construction, improvement, or repair
of City streets. We have also ascertained that the proposed project
Is included in your current Six-Year Comprehensive Street Program.
It is requested that the final construction costs of each project
completed within the current year be reported to the District State
Aid Engineer at the close of each calendar year.
In addition, it is requested that the approved copy of the Prospectus
be filed in the records of the City or tow for use of the State
Auditor upon auditing the cost reco«ds of each completed project.
Very truly yours,
S.D. ZIRKLE, P.E.
D rict Administrator
i.i. Mic EEOD, Y.E.
District State Aid Fng ear
OAC:nc
Enc.
cc: Keith Eggen (w/attach.)
0
WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
ONE HALF CENT FUND PROJECT PROSPECTUS
urv' ON er
RENTON
ex+e
April 15, 1982
To DISTRICT STATE AID ENGINEER
WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
6401 Corson Awn ue South
Seattle,WA 98106
POOISCT LOCATION ISTN[lT N11N91e1 AND r{w MlNll
NE 2nd Street Extension
(from Monroe Ave. NE to City Shops entrance)
ar R'y EAR TRANSPORTATION IMPROYCNCNT PROGRAM
19 82 TO 19 67 Item Numbe+ 2a (Anending Resolution e2442
PROrRCT LCNo++ •AuwoAOINvowaNa%T
0.13 miles p VES E NO
Pu• C•ZONAL CLAa)IFICAneN
p P,nHvHal Arsenal E Collector Arterial O Minor Arterial El At%afs StrNt
aannwo ReeorA+WIo+Ha PEEn
Right of Wp 60 f t. Pavement 36 f t. Shoulders
uonwo 11.4 oP SUIIr ACe ICNeeN ew El TV"
o—PRoroeeo wow.IewecN ol+e
❑ Cement Concrete ®AtpNlt Concrete ❑UqM Od ❑Gravel ❑Construction E Improvement ❑ Rem'-,
WSOIRIPTION Or PR0e9690 W4RN IINCLUDeS CNANGeS TO PAy CMeNT AND SHOULDER WIOTNSI
Wurk on NE 2nd Street will involve a 6 foot wideninq of the roadway with installation of
curb, gutter, overlay, storm drainage, sidewalk on south side, street lighting and duct
installation for future electrical expansion. Roadway will provide access to King County
Shops and Courthouse plus Renton Shops.
unMATao PRonc♦coalE PwencT HILL aE•cco Nrl,n HEn•v
TOTAL 120.000 V2 not Gat Tax 60,000 ® Contract ❑ Day Lebo, ❑County Forms
WILL WORN COVPLV WITHWA%Mt%QTON STATe CITY ouION STANDARDS? Rl YES NO
(Ir"NO ATTACH OCOUen POO 09VIAnON TOOCTHEw WITH JUSTFICAnOHI W ✓•
AOO1-mNwL cOYMCNra
Joint project with King County and City. lost It I.P shared with a 50/50 split with an
estimated total project cost of $120,000.
•PPROyaO � SUSNITTCON
Barbara-Y. Shinpoch, Mayor
IWOM sm.AM eRe1WI DMS TIIN
.Olt 1. Att.I-vmmur LIw la IR'P 11'1
2'An.11 R..AH r R*Khn aeowH
I. SWmlt M Ir1011[IIP
WI PONY INNr•
ap+
i --�_• -f mow_-••-_ '. l
S Be61
`!
Li
aLle
TV 6,--
S �
60 N ¢'
16 I
/8'
NE 2nd ST
s
Cross-section of proposed construc tior.
City of Renton
Public Works Department
WASHINGTON STATE DE►ARTIMIST of TRANSPORTATION
ONE-HALF CENT FUND PROJECT PROSPECTUS
ken'on
eA,e
7-12-82
.n DISTRICT STATE AID ENGINEER
WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
6431 Conan Aranut South
Seattle,WA 98108
P.0JaCT 40CATION I9Tw69T xAreltl A.a T...,.,
Monroe Ave. N.E. - N.E. 2nd St. to N.E. ath St.
na.ruw,ww«trowrw.w«ir.wov............
19;i TO 19 y" Item Number _
.woncT Laxa,x� wwnwo.o txvoLvaraw,. —
1,350 ft. (7. =( ': Tiles) ❑YES n NO
.u«rne«��e.uav\e.rler�
❑ Principal Anarial ❑ Cpllutor Arterial ❑ Minor Amrial
O Atsen Street
aennwe woworAr weerwt�nnp - —__
Right of War - = _ Psvame,f _ne) Sh"Idw,
....,..a _
al ,.«a rna ertvwr--- ........ rrq er.wa.OHe wow«I.«[c«e«t1
❑ Coma"Concrete ❑Asphalt Con<nte ❑Li9ht Oil Li Gruvelnstr &, El Impranmert Re❑ pair
eaK w�R10+or.worouo row«p:aGLuou c«axau,o rer[r[«v a«o a«ou6otw r,orxeh
Protect consists of installation of curbs, gutters, sidewalk, storm
drainage, paving and illumination.
CST"-Tan.went,coon:
.wont,w�LL v Accor.ua«ao ev
TOTALS?85,000.^0 1/1 ant Gr Taaf,. ?.500 _ 07 Connect ❑ Oer Ubor ❑County Parsee
WILL yew«eerKr vn«WAtxl«are.arATa u11 eeupw"A.D...,
-wa^..r,Ac«ww,.aaT row oar�A,.o+,eeaTwu wnw rwn.,c.newl YES ❑ NO
Aoo�no+AL cerra«n.
Joint project with King County and the City. Cost to be shared with a
50/50 split Witt, an estimated total project cost of $285.000.00
.aeeevts
-ear'^ae aSarbara Y. Shinpoch
oaum sul.u.ewer tJaR — "avcr
lltr
«Ora. 1. .IIK11 VICIOItY Yn le 1/�",\I"1
I. Att Kn«ppra goaa�,l S.CIIOn
t sYs•.n�.u�nma.
30' 30"
5 22 22_
V
I
MONROE A VE. N. E.
Cross-section of Proposed Construction City of Renton
Public Works Department
14
30
✓ T aIiELEti - T
- — *x-_?ND
;el .Mp o0! 1 B� • -- _
r 1 • •.oM@'rl�� J
MONROE 411E N,E,
N C 1N0 ST V NO. 4M-gr
. 1 �� \.J/'\ Fl ,SJ ram•-.. ♦' n
v�
. • i
WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
ONE-HALF CENT FUND PROJECT PROSPECTUS
amreW+e1
swTa
5'
TO
D1Si R1LT STATE AID ENGINEEII
WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
6431 Canton Avenln South
Saattte.WA 9810E
rwmaci\OCAnow.nrwOT Nwraln wwo T.wr,wq -- ---
Monroe Ave. N.E. - N.E. 2nd St. to N.E. 4th St.
.1."A.♦..rarowrwn OY irrwevarawT rwoewwr
f 19 ' TO 19- Item Number '
Iwon<r.a+err wA,\wewo•wveua arawn
❑YES X NO
•u«m ewwu CLweNnawnew� —
❑ Principal Anarlal ❑ Collector Aruosi ❑ Minor Anvlal ❑ Acpaa Sum
Csnnwe wewor• rleT+a uaan
Rlylt o/Way - Pa emant - Shoul7en
[ .IInYe TY1a O•f V wlwCl ICw[Cw ONaI- T.In eI Iw0✓JatO wow.IC."....at
❑ Cement Concrete ❑A.ahalt Conn% ❑LgPt Oil ❑Graval ❑Conan."". ❑ Impovemant ❑ Reonir
OaKwIRIOM OI Iw O10fa0 wow.II NC\LOta Cwwwata TO IwV tYawr wwo fwOV\O[w w101Ma1�
Project consists of installation of curbs, gutters, sidewalk, storm
drainage, paving and illumination.
pnrATao Iwo•ac•coax Iwo'8 f a[Accorr\nNe"a., —
TOTALS= - - - 1/2tentGnTawS_-
W act L 'Jay labw ❑County Foron
Contr
w•\\.Ow.... wlrw wwaxlw OtOw aTwra GIrT OaalOw aT Aw.Aw M<
-.a^.AT,'Ac"saou[aT Iom oa vunew TeoarNaw WITH.uenIIGATIOMI $ YES ❑ NO
Aoem...I cOrMawra.
Joint project with King Ccanty and the City. Cost to be shared with a
50/50 sp:it with an estimated total project cost of $285.000.00
A•Iwerw
Barbara Y. Shinpoch
a,cr
annq slna uO lwMww on" TRW
1. 411gn viVwpr Vq le lq".11"1
(. 411—r0
. ra woq�.Y f.<I�In
.. S.0-1.1.TIT.....
GO
30' _ 30'
5 '- - 22' 22' -
�3
r�
MONROE Q VE. Al E.
Croas-section of Proposed Construction City of Renton
Public Yorks Department
i � r
1000.
LOGAT( l ErgET�RY _
I L� 0�
woo f
L—
rs' 0 9ov
-
.12I , • .. .•J /
,
t .� . w r��t � M�NROE AE. N.E.
--�^� •� ::`. . . N.G. 2NC Sr IP NO. 4lN9T_
14,
t 1 •�
Y•'J1Jfr"--dam; ,-�� '�}� t .'. \.r't� ��
WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
ONE-HALF CENT FUND PROJECT PROVFCTW
ertr/TowN or
Ltcn
*ATE
Te. --
DISTIIICTSTATE AID ENGINEER
WASHINGTON STATE DEPARTMENT Of TRANSPORTATION
9431 Corson Avenw South
Saenle•WA 9910E
PROJECT LOCATION.Iarwl[T xw Na]al AND TWOMINII
torxr e ;eve. x.7. - N.E. 2nd St. to N.E. 4th St.
MIX YEAR TRANSPORTATION Ir PRe V aNCNT PROGRAM
19 9: TO 19 5 7 Item Number _
rwaucT uxe.w ww�Lwowo wvoLvtNaxr.
_ 1,350 ft. (0.256 Miles) ❑YES k NO
FUNCTIONAL CLASSIFICATION,
❑ ►nnipal Arterial E3 collector Artanal Cl Minor ArtNial ❑ Aoou Street
a NISTINP Ne/,eY/wr w1eTNa IraaTl:
Right of WMy 60 Sea- Pavement :•one-) _
$hOUldlq
Galan NO i ViN eI f V wrwc[Kale..eNa1. TTra er rweroaCo wOwN ICNac.!Oxtl
❑ COM"i CenCNW ❑Asphalt Conemte ❑Light 08 ❑Gravel ®Construction ❑ ImproreNNnt ❑ Re mir
eaaa wlPnoN or IPOPN O wewx hncwou c.ANeo Te PAYRAGM,Axo allocLOaw rmT+alp
Project consists of installation of curbs, gutters, Sid=walk, stor•.1
drainage, paving and illumination,
AP . eeaTa: _ R m
TOTALS_785 ,000.00 O
Ci Contrw ❑ Day Late, ❑County Fam
wnL wewN COMPLY III WINNINGTON a?AT.CITY OmON TANOAwo\I
uF-No wTtACN waoutaT row oavunox Tee.T,Iaw wnN YES ❑ NO
AOOmoru cowuaNTe �— �
Joint project with icing County .and the City. Cost to be shared with a
50/50 split with an estimated total project cost of $225.000.00
yF+erm sus"TTto are Barbara \'. 5h 1npCCh
O"I"It$At.AIR enOnMr W� tqw
NOTE. 1. AIINn VItIn11Y Mrr..o 111/I" 11")
a. AHKn r,e gO1a�,Y SNIIOn
1. tYa.nit In"T.10:1<r,P