Loading...
HomeMy WebLinkAboutTED4001896(13) PRO-i N. st fit. Improvements Burnett N to Park N-Internets& Affid. f 1 • • f w, BEGINNING OF FILE FILE TITLE 0040A& v I. y f i • f 4 i ,fkf,P S N � r, i A b V - -- @OBE .a3t9ap - 2r]9t bE-STcC•]I]Na ` GWIIir �est Coast 4 ction Co., Inc. GENERAL CONTRA AND ENGINEERS P.O.Be. 419 24205 Woedinrill.•Snohemi.h Ro. WOODINVILLE, WASHINGTON 9807E I oeo s �per f `.._... E :u, DEPT. TRANSMITTAL RECORD 011 °.dater f TO Cit Of Renton DATE ngineering Department 200 Mill Avenue South JOB N 1st St Burnett Ave. to Park Ave. CAG 029-87 Renton Washington 98055 LOCATION N. let St. Bur t Ave. to Park Av City Of Renton t ATTENTION Joe Armstrong - Project Engineer We are sending Herewithlo Separate cover by_ Drawings prepared by NO. PRINTS DRAWING NO. DESCRIPTION 1 /BA"N AF1.01►v:f e� UA45Rr -b:o 0GA: 151,7.4E S.c. For Approval Approved, as noted Approved Not Approved - Please resubmit REMARKS ,nw. X c ore WEST COAST CONSTRUCTION CO. , INC. .: . a Copy to; BY 'Z�-' •`:fy Tim Buchanan 87-9 F1 Title Secretary 3' tj 1 F 1\ �r .Jx A � gBeaawww.;e7- ' MAIL To: `�✓ AFFIDAVIT OF 1 INDUSTRIAL STATISTICIAN E1V WAGES PAI s E� Department of Labor A Industries FA`/fv1G�i1 17LCEIV T T •' Employment Standards Di,ision ON PUBLIC WORKS CO CI' General Administration Building 1MV 11; rib'i Olympia, WA 985114 R061 753-4014 OIYMAA wa Contract Number CAG 02 —87 h Date Bid Was Due of Contract Awarding Public Agency Date Contract Awarded 6187 ti City of Renton Date Work Completed in/n/ 2/R� Af >3 Address . County in Which Work Performed King ��a�ayyyY, Renton, WA 98055 Prime Contractor Telephone Number 235-2620 Was a Statement of Intent Filed For this project? Yes ® No 0 In compliance with RCW 39.12.040 1, the undersigned, being u duly awthurlunt representative of Signal Electric Inc 9012 South 208th Street Kent WA 98031 _— tCau.v saGrmvauwl t—r—, do hereby certify that the following rates of hourly wage and hourly fringe benefits have been paid to the laborers, workmen and mechanics employed by me upon the project described above and that no laborer, workman or mechanic has been paid less than the"prevailing rate of wage" as determined by the Industrial Statistician of the Department of Labor and Industries. List below each classification of labor employed by you upon the project described above and the rate 4. ,ourly pay and hourly fringe benefits paid to cnch classification. PLEASE NOTE If apprentices have been employed on this project,provide this additional infornwtion:tome, registration number and stage of progression. Cnit Rate of Wre at Itow1Y Bawdy pay Fuse eeaenn NJ Cable Splicer Foreman 22.63 $3.25 + 3.5% of Gross Wage- Line Crew Foreman 21,25 " " Journeywan Linemen 19.11 " " Head Groundman 14.49 $2.55 + 3.5% of Gross Wages Groundman 13.63 " A Naa. Assets Addiam,ai shmil as Needcd SIGNAL ELECTRIC, INC. P1,N 1 �J//�7 Subscribed and sworn to before me g _ ^Y ) Lz�r -rf�'+ R, Gul bm es, President 'T"A+ this 13th day of November , 198?. tat tw ay "—) 1 MmbY avufy,hat a<aordme m the ware ram ar-0 frmre wrefill heron sworn / to the prcwlbng wade regammmenn of RCw l9.12040 have been v11"ast Naary Public as and rtf the Sul,W Washn'tm,nardina INDUSTRIAL STATISTICIAN in washiaatan. DEPARTMENT OF LABOR AND INDUSTRIES pp INSTRUCTIONS: t, y�1 _ Dan. DEC 02 t07 L Pursuant to RCW 39.12,040 copies of this form must be completed by the contractor and each of his sub- contractors. 2. Complete this form in triplicate and have it nosarized. 3. Submit all forms for approval to:Employment Standards Division.Department of Labor and Industries,General Administeation Building, Olympia, Washington 98504. 4. Mail an approved copy to the Contract Awarding Public Agency CONTRACTORS ARE RESPONSIBLE FOR OBTAINING AND FILING AFFIDAVITS of the SUB- CONTRACTORS.This is required by law and payments can not lawfully be made until such affidavits are filed, trAal A.A Wyw tlaall 9a.e1 �a - eI_ t _ i� 13061 .e3.,fao *0VV'AND g33-01 WfST6•373ND est boast chop �o. Inc. GENERAL CONTR ENGIN ER-$., P.O.Bo. 419 24205 9loodierill.-Seoh emi. Read WOODINVILLE, WASHINGTON 9&072 DEC 8IM _,T. TRANSMITTAL RECORD ' TO Cit Of Renton — DATE 12-8-87 ngineering epartment 200 Mill Avenue Sorth JOB N 1st St Burnett Ave, to Park Ave. CAC 029-87 Rentont Washington 98055 LOCATION N 1st St'. Burnett Ave. to Park Av itlf nton ATTENTION Joe Armstrong - Project Engineer We are sending Herewithlo Separate cover b;_ Drawings prepared by --- NO. PRINTS DRAWING NO. DESCRIPTION / BX,V Aow•�� •C LLM.7�t AL,o leig: i For Approval Approved, as noted Approved Not Approved - Please resubmit .. REMARKS lr n WEST COAST CONSTRUCTION CO., INC. Copy to: By Q� Tim Buchanan 0.7-0 F'le Title Secretary -- J j f .. MAID.TO: AFFIDAVIT OF INDUSTRIAL STATISTICIAN ? e WAGES PAID { Iry Ewiplsnrcm of li6or ` vision Industries :,AYIALNI nEN'i;'I �`' 1. ��t• ('C j Gmploymeos Standards Division ON PUNLIC WORKS CONTRACT twnveral Administration Building '+OV 1) 1987 Olympia. WA 9A%4 'tY. (206) 753-4019 Lnt5K CAG 029-87 d vaNA WA Contract Number _ Data BM Was Due 5/27/87 •^ ►rt Contract Awarding Public Agency Date Contract Awarded 6/15/87 City of Renton Ih,lc Work Completed _ 10/31/87 Address 200 Mill Ave, South County in Which Work Performed King Renton. Wa. 98055 Prime Contractor West Coast Construction CO.. Inc. Telephone Number 235-261 Wax a Statement of Imcm Filed For this project'' Yes ® No ❑ In compliance with RCW 39.12.040 I, the undersigned, being a duly authorized representative of CHANDLER E GINEFM P. 0. BOX 72 FMIOND, WA. 98073-0072_- Ic..nw r 4sm11..+v1 IA4wa+, do hereby certify that the following rates of hourly wage and hourly fringe benefits have been paid to the laborers, workmen and mechanic employed by me upon the project described above and that no taborer, workman our mechanic has been paid less than the "prevailing rate of wage" as determined by the Industrial Statistician of the Department of Labor and Industries. List below each classification of labor employed by you upon the project described above and the rate of hourly pay and hourly fringe benefits paid to each classification. PLEASE. NOTE If apprentices have been employed on this project,provide this additional Information:name,registration number and stage of progression. crcn R.I'.r Rrte M tevly Lowly Pet I'elge 4—nu P.M Party 4hiof II.'(l 1.50 ins'_runantperson 11.Or 1.00, Chainpernon F.:, .70- Nw Alt.ra A4dil,aul Sxeel. .+ Needed C'I1Av L/1! NF in Subscribed and sworn to before me By C y���r Vaal thisss�4- .L.L day of 1l1L IL-r--. 19_rZ ^ n 1.41 tar oab /J (� 1 a.ner vvI,,fv tv LC.<wms to tar..nr RCW now.n,1 rrayr erm'n„ s uti I. prrv.iLry Syr rpu,rcmrnu W RCW 3*12 rr. P.vr seen ...I. Nwa mused far q�,6t.rflr w.,x,ry�an.:wN,p INDUSTRIAL STATISTICIAN ,s WW,pca,. DEPARTMENT OF LABOR AND INDUSTRIES INSTRUCTIONS: ay ff`ss'(f au, DEC O2 r87 I. Pursuant (o RCW 39,12.040 copies of this form must be completed by the contractor and each of his sub- cllnlractorst. 2. Complete this form in triplicate and have it notarized. 3. Submit all forms for approval to: Employment Standards Division,Department of Labor and inclustrim,General Administration Building, Olympia, Washington 98504. 4. Mail an approved copy to the Contract Awarding Public Agency CONTRACTORS ARE RESPONSIBLE FOR OBTAINING AND FILING AFFIDAVITS of the SUB. CONTRACTORS.This is required by law and payments can not lawfully be made until such affidavits are filed. u.+to+ xar.e a wy. tool oxsr atQ., e. i2oat .sa.,aoo • 2234n WEST-06.373NO Vestit ��� Gooast chop Goo., Inc. GENERAL CONTRA AND ENGINEER P.O.lea 419 24205 Weediavilla.Sa.hemish ead - WOODINVILLE, WAS14INGTON 98 72 i NOV 11 1987 TRANSMITTAL RECORD TO Cit Of Renton DATE i/- �o- 87 gineerin$ apartment 200 Mill Avenue Sonth JOB N. 1st St.,Burnett Ave. Ave. AG 029-87 Renton, Washington 98055 LOCATION V 1 t SC Burne Ave, to Park Av ity f Renton ATTENTION ..oe Armstrong - Project Engineer We are sending Herewithlo Separate cover by Drawings prepared by _ I i NO. PRINTS DRAWING NO. DESCRIPTION i /. ,a('F'on.�'L .t W^3ws A%,o 1CAz ^1.09 .5eyw4 For Approval Approved, as noted Approved Not Approved - Please r.submit REMARKS WEST COAST CONSTRUCTION CO., INC. Copy to: By 6.4,j Tim Buchanan 87-9 Pile Title Secretary r $. i RECEIVED Complete & mail entire set PMNI W neitt-w- NOV -9 07 7510 WITH APPROVAL FERustn TO: OCTAffida 231987 PREVAILING Yit of WAGES PAID Depnonent of labor a InAtatrin FSAC Division HC-710 lcicsac (Public Works Contract) 925 Plum Street INSERk'WC`MRON PAPER OI Wa. 98VM-0631 206 7534019 BEFORE G (Type or print eiearly---lhla Is your mailing label) CmsacVBPW No. APPROVED FORMS TO BE RETURNED TO: CAG 029-87 5W.avmraaw M. A. Segale, Inc. 5-27-87 f 6-2-87 ark P. O. nor. 88050 King une connector Tukwila, WA 98138 West Coast Construction Was a rutement of went : or s pro' ice— a Yes g No CONTRACT AWARDING phone no. me work conrpkud PUBLIC AGENCY City of Renton _'_'-35-2631 10-20-81 20u'Mill Ave. Renton WA 96055 SEE INSTRUMONS ON REVERSE SIDE 1 CRAFTi2.APPRENTICES: Herne,Tegutntion Y, 3.RATE OF (4.RATE OF HOURLY wage of progression a time of hire HOURLY PAY FRINGE BFNEFyf'S Screadman 2 18.04 4.21� Roller Operator on Plant Mix 2 17.68- 4.21 I Paving Machine Operator 1 17.68- 4.21 t Dump Trucks: 5 to 6 Incl. 12 Yda. 6 17.63 - 3.71 ' Dump Trucks: 16 thru 20 Yds. 4 17.74 3.71 t Water Trucks: 3000 Gals. 6 rrer 1 17.74 i 3.71 General laborer 1 15.21/ 3.43 / Raker 2 15.69% 3.43 Plugger 2 10.76-' 3.43 I Y I I hereby certify that the above iniotmation is correct and that all workers I employed on this Pubhc Works Project were paw for lass than the Prevailing Wage Raw as determilxd by the Industrial Statistician of the Deearrment of Labor and industries. I untlpYtd that contractm who violate Prevailing Wage taws are subject to C ; m .ny tor's Signs Hoes ard�'or debmmcnt. Nernc .� Complete this form In trlpllrate and have each notarized M. A. Bagels* Inc. STATEOF WASHINGTON ors -.'w�............ P. O. Box 69050 King .-..._............� _._.._...�..�.,._..__._-...._.. Camry of City Store Tip ":Canarenoe's Rejutmtiun No. Tukwila WA 98138 '.223-01-SE-GA-LM-A372NO S ignW or stowed before tre on October 22 1987 (Signmmeofamerypu Use Only APPROVED My appomanent expires -10-90 Department of Labor&Industries 'f CONTRACTORS, MAIL AN APPROVED COPY T'O THE L"',) ,/ U ,H NOV 05 '81 CONTRACT AWARDING PUB WC AGENCY By F700-007-000 affidavit of wells;4-87 f of rar' i l 40;- 1. all II 4(�4 22"1 wE.sT�Cc.•]7]NO Vest %`-.oast f; ction C90., Inc. GEPERAL CONTRA AND ENGINE P.O.Bort 419 24205 Woodindlb-Snohomish Ro d WOODINVILLE, WASHINGTON 980712 NOV 30 1W 1 TRANSMITTAL RECORD t TO City Of Renton DATE 1/-I5-07 Engineering Department 200 Mill Avenue South JOB N. 1st St..Burnett Ave park Ave. CAG 029-87 Renton, Washington 98055 LOCATION N 1st St. Burnett Ave. to Park Av ity f Renton j ATTENTION Joe Armstrong - Project Engineer We are sending HerewithtZ Separate cover by Drawings prepared by i NO. PRINTS DRAWING 140. DESCRIPTION i d19cN �oCl,a„�',� of wages 15W;o OGR: D, 0 erto,j C-Sift.rlr:. Xt . For Approval - Approved, as noted Approved Not Approved - Please resubmit REMARKS ..e ywa vse. WEST COAST CONSTRUCTION CO. , INC. Copy to: By 71—, '6-,� Tim Buchanan 3 87-9 File Title Secretary MAIL TO: AFFIDAVIT OF , INDUSTRIAL STATISTICIAN ° WAGES PAID Deparnment of labor 6 Industries Employment Standards Sections "+��•"t ON PUBLIC WORKS CONTRACT 925 Plum Street Olympia, WA 98504-0631 T RECEIVED tza41751JUIq PAYMEN L,- 1997 Contract/BPW Number CAG+ 029-87 Date Bid Was Due 5/27/87 Contract Awarding Agent avleas tWva` City of Renton Dote Contract Awarded 6/87 -- Date Work Completed 10/24/87 Address -- County in Which Work performed — King Prime Contractor W^sT Cnact CariRtnKition.ITI _ Telephone Number Your Contractors Registratw, Certificate No,OFNNII-201D4 Was a Statement of Intent .'iled For this project? Yes !U No 0 In compliance with RCW 39.12.040 1, the undersigned, being a duty authorized representative of Dennis R. Craig Construction, Inc. 7710 - 185th Ave NE Redmond, WA. 98052 IC„-,mw,.S„mwv,cm,l (Aasroet do hereby certify that the following rotes of hourly wage and hourly fringe benefits have been paid to the laborers, workmen and mechanics actually employed by me upon the project described above and that no laborer,workman or mechanic has been paid less than the "prevailing rate of wage'as determined by the Industrial Statistician of the Department of Labor and Industries. List below each classification of labor employed by you upon the project described above and the rate of hourly pay and hourly fringe benefits laid to each classification. PLEASE NOTE .. I If apprentices have been empbycd on this project,prmide this additional information:name,registration number,stage of progression and date of hiring. crap a,m of Raw,1 nowt. ` Ilourir 1•q In., Bowan Nml Landscape Laboccir Nam. Attach AJdn w l SR is o. Nndod Dennis R. Craig Construction Inc. Icaa,ra w� l Subscribcd and sworn to bcforc me By this 29th _ Jay of Oc tolsr rnat 19 Q7 Lao lb Onh Ih th:by0sa6fiumt,cmdinyaInt or CW +M!.W han bums tj,woo �ja(�, to the pevait)t raao rWwrctalk r RCW I4.,_Mrs Isnw peen nr , 1�11nn one,ra w�wj la`rn`sou„r w.,mIn- ro,d,M INDUSTRIAL STATISTICIAN DEPARTMENT OF LABOR AND INDUSTRIES INSTRUCTIONS: By: p/�'/jr, ,,. Na 8'87 - 1` I. Pursuant to RCW 39.12.040 capics of this form must be completed by the contractor and arch of his sub- contractors. 2. Complete this form in triplicate and have it notarized. 1. SUBMIT ALL FORMS ALONG WITH APPROVAL FEE FOR CERTIFICATION TO. Department of Labor and Industries, Employment Standards Section, Olympia, Washington 98504-0631. 4. Mail an approved copy to the Contract Awarding Public Agency CONTRACTORS ARE RESPONSIBLE FOR OBTAINING AND FILING AFFIDAVITS of the SUB- CONTRACTORS.This is required by law and payments an not lawfully be made until such affidavits arc filed. I.,a m nGWw W wy,+ MAT, VA A: i i . - 1wa .es,aoo Vest *tAND T22MI wE.sTCc•n]NO Coastcoon 00.1Inc. GENERAL CONTR ENGI ._ P.O.Bea 419 24205 Woodinville-$no6omi.h ead �R., WOODINVILLE, WASHINGTON 98 72 NOV Y im PMa+Ft m go. TRANSMITTAL RECORD TO Cit Of Renton DATE II/3/8T ngi peering apartment 200 Hill Avenue South JOB N. 1st $t.,BOrnett_Ave, to Park Ave. G 029-87 Renton, Washington 98055 LOCATION N. 1st SC..BuineSS.L1ve. to Park Av ity f entun ATTENTION- Joe Armstrong - Pro j,_ct Engineer We are sending HerewithW Separate cover by Drawings prepared by _ NO. PRINTS DRAWING NO. DESCRIPTION 1 E,ch Prev,iling Wnge Certi Bc-tion for Period ending ll/3/87 For Approval Approved, as noted _ Approved Not Approved - Please resubmit REMARKS For your sue_ WEST COAST CONSTRUCTION � 'CO.`, INC. Copy tot By_—�`^ Q Tim Buchanan 87-9 File Title._yecretary 7 s CERTIFICATION BY GENERAL CONTRACTOR Ref: Payment of Prevailing Wages To be submitted to the City with each Progress Payment Request. Date: 11/V87 PROJECT: NORTH 1st. Street CAG No. 029-87 1 This is to certify that the prevailing wages have been said to our employees and our subcontractors' employees for the period ending 11-3-87 in accordance with the Intents to Pay Prevailing Wage fie wl t METi [hc Wash mgton State Department of Labor 6 Industries. West Coat cons'•uction c.o -C. Company Name iyned Ti[l�j"max SL.C.CERTIFICATION/DRT:MB �yl i. .:�.: .rP, 'd .:dr � rai+e_ ,i'ti:.; '� :ua,. ` ,. .fie+'c +..ew •q+5^*" ryr,, :#°n#, 7 i 12061 w3-0g00 r ` 22341 WE STCG•l7]NO est Coast ; action Co., Inc. GENERAL CONTRA ANC' ENGIN WOODI r' A ��� NVILLE, WASH'INIGTON 98002 OCT T 188T 1 � � �'t JF :o�r. - ) TRANSMITTAL RECORD .. .... TO Cit Of Renton DATE 10/8/87 ngfneering epartnrent —' 200 Mill Avenue South JOB N. 1st St—Burnett Ave, to nark Ave. i - ? CAG 029-87 i Renton, Washington 98055 LOCATION N lat St. Burnett Ave, to Park Av ity�nton -- ATTENTION Joe Armstrong - Project Engineer We are sending HerewithRl Separate cover by ^4 Drawings orew.ed by NO. PRINTS DRAWING NO. DESCRIPTION 1 Each Prevniling Wog,Certif icrtion for period ending 10/6/87 v For Approval Approved, as noted Approved Not Approved - Please resubmit REMARKS_ For your use. WEST COAST CONSTRUCTION CO., INC. u 1 Copy to: BY 'C/' 'Q-�...[.-�J Tim Buchanan ° 87-9 Fi7 _ Title Secretary y y . Y ZZ,- E lA � CERTIFICATION BY GENERAL CONTRACTOR Ref: Payment of Prevailing Wages To be submitted to the City with each Progress Payment Request. A' Date: 10/6/87 s . PROJECT: NORTH Ist Street _ CAG No. 029-87 .q This is to certify that the prevailing wages have been pad to8gur employees < y. and our subcontractors' employees for the period ending 0-6 in accordance with the Intents to Pay Prevailing Wage fi ed with the ashington State Department of Labor & Industries. i West Const Cc tructlon Co.r Inc. Company Name wed Secretary tT' le i 5L.C.CENTIFICATION/DRT:MB I CERTIFICATION BY GENERAL CONTRACTOR Ref: Payment of Prevailing Wages , To be submitted to the City with each Progress Payment Request. Date— PROJF i : ic%ff / f F Sf. CAG No. This is to certify that the prevailing wages have been paid to our employees and our subcontractors' employees for the period ending q�Z in accordance with the Intents to Pay Prevailing Wage fil ed with the ashinyton State Department of Labor 6 Industries. ompany Name :)T-gnedf Title IIOE1 q Im ��+v II]Ol WESTCC-•])]NO �L test boast s coon U'o., Inc. GENERAL CONTRA AND ENGINEERS P.O.Bo. 419 ].., 105 Road WOODINVILLE, WASHINGTON 98072 TRANSMITTAL RECORD TO City Of Renton DATE 9/14/87 Engineering Department - 200 Mill Avenue South JOB 1st St„Burnetr Ave t park Ave. CAG 029-87 Renton, Washington 98055 LOCATION N. 1s[ St, Burnett Ave. to Park Av City f Rene ATTENTION Joe Armstrong - Project Engineer We are sending HerewithRl Separate cover by Drawings prepared by NO. PRINTS DRAWING NO. DESCRIPTION 1 E•ch Prevailing Wrge CerYr'c,t'on �o oe iod a dino 9/8 87 For Approval _ Approved, as noted Approved Not Approved - Please res bmit REMARKS Far your use. 'f"B��V SEP 16 1987 vFFRING RB>T. WEST COAST CONSTRUCTION CO., INC. Copy to: By 'Q-.+..tj - Tim Buchanan 87-9 Fil Title Secretary r v, CERTIFICATION BY GENERAL CONTRACTOR Ref: Payment of Prevailing Wages To be submitted to the City with each Progress Payment Request. I Date:_ 918187 PROJECT: North 1st Street CAG No. 029-87 Tuns is to certify that the prevailing wages have been paid ur employees and our subcontractors' employees for the period ending 9/8/ 7 in accordance with the Intents to Pay Prevailing Wage filed with the Washington State Department of Labor 6 Industries. i� I 1 We t Coast Construction Ca, Inc. ompany Name 7 fined 1 Secretary i i tT'tl e 1 I I r. S SL.C.CERTIFICATION/DRT:MB 1 � CERTIFICATION BY GENERAL CONTRACTOR Ref: Payment of Prevailing Wages To be submitted to the City with each Progress Payment Request. —7 A Date: PROJECT: /V —/ '`/{ ST• CAG This is to certify that the prevailing wages have been paid to oyr employees and our subcontractors' employees for the period ending ;3/,/ in accordance with the Intents to Pay Prevailing Wage fiTe—r—witV the ash4ngton State Department of Labor 6 Industries. War COA%'T Cam Co. Company Name gne Title SL.C.CERTIFICATION/DRT:MB d • 12a81 aelt 90a � 221u1 WE,STCG•311140 i[Mf�v' est l�OaSt chop �o., Inc. GENERAL CONTRACt SAND ENGINEERS P.O.Bo• 419 24205 Woodinville-Snohomish Road WOODINVILLE, WASHINGTON 98072 I I AUG 3 3 1987 TRANSMITTAL RECORD ` r'I>Nu PIN^,DEPT, ._s "N1ON TO Citv Of Renton _ _DATE 71�31/87 ;. Engineering Department. 200 Mill Avenue South -JOB N. 1st SC Burnett Ave. to Park Ave. a, CAG 029-87 i< Renton Washington 98055 LOCATION N. 1st St..Burne�ve. to Park Av City elf Renton ATTENTION Joe Armstrong - Project Engineer We are sending HerewithW Separate cover by Drawings prepared by _ NO. PRINTS v DRAWING NO. DESCRIPTION I Each Statement of Intent to Pay Prevailing Wage for: M.P. Segale Inc._- 1 Each Statement of Intent to Pay Prevailing Wage for: Signal Electric Inc. For Approval Approved, as noted Approved Not Approved - Please resubmit REMARKS For your use. Ttiis is the lost of them -- WEST COAST CONSTRUCTION CO., INC. Copy to: By Z74, ��� Tim Buchanan 87-9 File Title Secretary a, e`y ds y°` .,,aPf. ,i '�y1s1'9 {E M ! ORIGINAL DI,TL: 87 } REVISION I_ DATE: TO: Accounts Pnyanle FROM: Public Works SUBJECT: Construction Contract GC I GZ9-g% f Project Name: �i/i^rt� .li>1jvnvr ivs�S Prime Conractor: MIST r t PRIMR CONTRACTOR r !:UPCONTRACTCRC DATE RECEIVPD DATft RECRIVPJ/ INTRWT TO PAT APPIDAVIT OP ,i PREVAILING WACIIS WAGES PAID �! 4- - 67 12-6 - 87 ti v I i i signed // t fact enginee act !reject file Pora:f 1/15/85 ✓ I/ ` / h� Cgrrlt A/ c"r,tfigo / 7� Ca�O ri q r �T +f v y t i a r � a 1. 04 's .,r ( .d 'rvae ry •.L� .%+{e rt r r x. .nH r .y� a MAIL TO. nn n r Statement of I� (a INDUSTRIAL STATISTICIAN t D _ INTENT TO PAY Department S Labor s Division PREVAILING WAGES Employment Standards Industries .r� q General Administration Building JUL� 1' 0671 (Public Works ContrgSt) Olympia, WA 98504 (206) 753-4019 y` West Coast C—' tion Co. Ina �� s 2 Contract Number CAG 029-ti7 I Date Bid Was Due 5-27-87 - Contract Awarding Public Agency Date Contract Awarded 6-ls-R7 T �j r City Of Renton County in Which Work Performed KM Address Location Within County-North ]at Rtrpt R1` ` R<,.rort WilAllington 98055 Prime Contractor W ss r CO.Jne Phone S- 6T1 Contractor's Registration Certificate Nu.�3Np De You Intend To Use Subcontractors? Yes 50 No ❑ `j 1 In compliance with RCW 39.12.040 L, the undersigned, being a duly authorised representative of West Coast Cogqurrion o Inc Post Office Box 419, Woodinville WA 98072 ICatmu.w 9u4cnu«vwl tAedsl do hereby certify that the following rates of hourly wage and hourly fringe benefits will be paid to all laborers,workmen and mechanics employed by me upon the public works project described above and that no laborer,workman or mechanic will be paid less than the"prevailing rate of wage'as determined by the Industrial Statistician of the Department of Labor and Industries. PLEASE NOTE: If apprentices are to be used they must be registered with the State Apprenticeship Council or they must be paid prevailing journeyman wages. CRAFT 109TINATED NUMBER RATE OF OF WORKERS HOURLY PAY FR INGE NOB BHH6F1TS I.. Operating Engineers 3/4 or 1} Backhoe (1) 18.011 4.21 ' Loader 2 CY Overhead (1) 18.D4 4.21 Case Backhoe 52RP (1) 17.68 . 4.21 r. t� Oiler Gradesmn (1) 17.38 4.21 Teamster 5 to 12 Dump Truck (2) 17.53 3.71, " Laborer Pipelayer (2) 15.69 3.43' General (2) 15.21, 3.43 Cement Masons General (2) 18.16 3.45 Nort Attach Additional Sheets an Needed, --Welt. Guns+ Construction Co., In (e..W,N.m<) By a y Subscribed and sworn to before me I'rnl,l this 22nd day of Tit _ For L a I 1".. Only 192;1 9 APPROVED Y 'v C /, � Department of Labor & Industries r27k� Indurtrial Statistician Nawy public m end/o ly r the Stote of WaahtM. raid. iy in WuhiyfMBy Da i BEFORE FINAL SETTLEMENT can be made on any public works project,the prime contractor and each and every subcontractor must submit form L1-700-7"Affidavit of Wages Paid"to the officer charged with the disbursement of public funds. EACH AFFIDAVIT OF WAGES PAID MUST BE CERTIFIED BY t THE. INDUSTRIAL STATISTICIAN OF THE DEPARTMENT OF LABOR AND INDUSTRIES BE- FORE IT IS SUBMITTED TO SAID OFFICER. PROGRESS PAYMENTS: F.ach voucher claim submitted to an owner by a contractor for payment On a project estimate shall state that prevailing wages have been laid in accordance with the prefiled statement or statements of intent to pay prevailing wages on file with the public akency. COMPLETE AND MAIL ENTIRE SET FOR APPROVAL. TO: Employment Standards Division, Department of Labor and Industries, General Administration Building, Olympia, Washington 98504 .� [O:T RACTORS, DISTRIBUTE APPROVED STATENE "AS FOLLOR-SIK COPY) ORIGINALCONTRACTWARDINGAGENCY REEN COPY( DUPLICATE—INDUSTRIAL STATISTICIAN (R<tained by Ikpaammtll UE COPY( TRIPLICATE—PRIMP.COCTORMLOW COPY)QUADRUPLICATE—SURCONTRACIOR A 1' 1. t� MAIL TO: Statement of INDUSTRIAL STATISTICIAN w�'i� INTENT TO PAY Department of Labor f Industries ✓ C' F Employment Standards Division �p�9 r�f9 PREVAILING WAGES General Administration Building , �, tip/ i� `y (Public Works Contract) OIY.Pia, WA 98504 `/ J (E06) 763-4079 Contract Number CAG 029-87 Date Bid Was Due 5127/87 Contract Awarding Public Aguncy, Date Contract Awarded 6/87 ci ry r)�— " Couht;ht *hick Work Performed Kirin Addrea iiotcil 2st 9t. Location Within County-Jk;L=LLA)M_tli_k=L.&W Penton _ Prime Contractor Ue^t n Cnn<i f`n ..r• Phone Contrtef'e _ Registration Certificate No. �G-NN-T T�70:ft4 -- -.-- _ Do You Intend To Use Subcontractors? You ❑ No In compliance with RCW 99.12o40 I, the undersigned, being a duly authorised representative of ICauanv r suYaaYrMrl �� ♦dd.) do hereby certify that the following rates of hourly wage and hourly fringe benefits will be paid to all laborers,workmen and mechanics employed by me upon the public works project described above and that b, no laborer,workman or mechanic will be paid leas than the"prevailing rate of wnge"as determined by the I Industrial Statistician of the Department of Labor and Industries. r' PLEASE NOTE: If apprentices are to be mind they must be registered with the State Apprenticeship Council or they must be paid prevailing journeyman wages. RanXL0V'RD NVMBRR RATE Or or wORRaata RWRLY PAY aATa OI "M Varying BMry1Ta r Landscape Iaboiei / 3 8.46 3.33 Nolr, Attach Additional Sheets as Needed, Subscribed and sworn to before me By this _ 4to day of Lmp For L a I Use only 19 _87 APPROVED Department of Labor & Industries Industrial Statistician R idiN�n4W I dent/W the Stan of wmhi"ton, y I ne B a (T Detel - ). J BEFORE FINAL SETTLEMENT can be made on any public works project,the prime contractor and each and every subcontractor must submit form LI-700-7"Affidavit of Wages Paid"to the officer charged with the disbursement of public funds. EACH AFFIDAVIT OF WAGES PAID MUST BE CERTIFIED BY f. THE INDUSTRIAL STATISTICIAN OF THE DEPARTMENT OF LABOR AND INDUSTRIES BEFORE. IT IS SUBMITTED TO SAID OFFICER. PROGRESS PAYMENTS; Each voucher claim submitted to an owner by a contractor for payment on a Project estimate shall state that prevailing wages have been paid in accordance with the prefiled statement _,. or statements of intent to pay prevailing wages on file with the public agency. COMPLETE AND MAIL ENTIRE. SET FOR APPROVAL TO: Employment Standards Division, Department of Labor and Industries, General Administration Building, Olympia, Washington 98504 CONTRACTORS, DIRTRIBUTE APPROVED RTATRMRNTS AS POLLOw3: If (PINE (:OPY) ORIGINAL CONTRACT-AWARDING AGENCY ICRBRN COPY) DUPLICATE-INDUSTRIAL STATIRTiCIAN Uktalmd br Ikpann,en0 IBLUP.COP I) TRIPWCATE-PRIME CONTRACTOR a IY6ILOW COPY)QUADRUPLICATE-RURCONTRACPOR i.w:a Per,"an RY A,1 -ra n t..J MAIL TOT Statement of INDUSTRIAL STATISTICIAN INTENT TO PAY Department of Labor • Industries PREVAILING WAGES Employment Standards Division 00 (Public WorkyyntracU General Administration Building Olympia, WA 98504 (206) 763-4019 �S9S1 r w 1 ,".Contract Number Date Bid Was Due 5/27/87 ^c`!."_ Contract Awarding Public Agency Date Contract A'arded 6-15-87 ' City of Fenian County in Which Work Performed KirlO Addrw 200 Mill Avenue South Location Within County CDR ttAL Renton, Washington 98055 Prime Contractor West Coast Ca c r- CO-. Ino. Phone-23i2611 Contractors Registration Certificate No. C373NO Do You Intend To Use Subcontractors? Yee 9 No ❑ In compliance with RCW 39.12.040 1, the undersigned, being a duly authorized representative of .}IA1•IDIER IIJGINEEPS. P. O, BOX 72 REIDIXID. WA- QAQ71=0072 Nr.r..�so4one.eru.r IAddm�, do hereby certify that the following rates of hourly wage and hourly fringe benefits will be paid to all laborers,workmen and mechanics employed by me upon the public works project described above and that no laborer,workman or mechanic will be paid less than the"prevailing rate of wage"as determined by the Industrial Statistician of the Department of Labor and Industries. PLEASE NOTE: If apprentices are to be used they must be registered with the State Apprenticeship Council or they must be paid prevailing journeyman wages. CRAM' ESTIMATED NUMBER RATE O FRINGE OF WORaRaR HOURLY PAY BENEFITS Party Chief 2 11.50 — 1.50_ InstrtRrentperson 2 11.00 - 1.00 - C1lainperson 2 8.25 — .70 NOTE: Attach Additional Sheets as Needed. 41 Subscribed and sworn to before me fly nr this 96th day of .111NE br L a 1 Use Only _ 19 R7_ APPROVED Department of Labor & Industries *, . r,d 3� _ Industrial Statistician Na.,Nbh<in and fw the Jrete of Waahinrlun,....d ly In WnrA,r,pon. [n� N� By / y �j� Date JUL 15 eV7 BEFORE FINAL SETTLEIAENT can he made on any public works project,the prime contractor and each and every subcontractor mAst submit form LI-700-7 "Affidavit of Wages Paid"to the officer charged with the disbursement of public funds. EACH AFFIDAVIT OF WAGES PAID MUST BE CERTIFIED BY THE INDUSTRIAL STATISTICIAN OF THE DEPARTMENT OF LABOR AND INDUSTRIES BE- FORE IT IS SUBMITTED TO SAID OFFICER. PROGRESS PAYMENTS: Each voucher claim submitted to an Owner by a contractor for payment on a project estimate shall state that prevailing wages have been paid in accordance with the prefiled statement or statements of intent to pay prevailing wages on file with the public agency. +-- COMPLETE AND MAIL ENTIRE SET FOR APPROVAL. TO: { Employment Standards Division, Department of Labor and Industries, General Administration Building, Olympia, Washington 98504 CONTRACTORS,DISTRIBUTE APPROVED STATEMENTS AS POLLOW'S: (PINK COPY) ORIGINAL CONTRACT--AWARDING AGENCY ICREEN COPY) DUPLICATE--INDUSTRIAL STATISTICIAN (ReUmM by r*p n.m "O WLVH COPY) TRIPLICATE—PRIME CONTRACTOR (YRLLOw COPY)QUADRUPLICATR--SUBCONTRACTOR u.rss rm,n,..r•..a+,uc e» •41D.e A -p i41e 4 n. PAYMFNT PUMIV"104 Complete St mail entire set LV WITH APPROVAL FEE TO: JUL OG 1987 Statement of Delaiminerit of LAM&Industries INTENT TO PAY 7510 ESACM,isim.HC-710 PREVAILING WAGES 925 Plain Smat lt- INSERT CARBON PAPRR Public Works Contract) Olympia,W& 911904401 (206)7534019 BEFORE COMPLETING (Ty" sr eassarly-4kis Is your mailing label) CWW=LSPW No. APPROVED PERMS TO BE RETUR NED 70: CAG 029-87 mmmad FM- A. go Zft. 5-27-87 6-2-87 P. warkpalianned O. Box 880s0 ---- Kin,% WA 98180 West Coast Constriction Yall, No CONTRACT-AWAKUlNG rums phs--number PUBIK AGENCY_cIty-of 235-2631 adds city lap 200 kill Ave. Renton WA 93055 SEE INSTRUCTIONS ON REVERSE SIDE CRAFT Z ESTIMATED NO, 3ALATEOF 4.KATE OF HOUKLY' OFWORKERS HOURLYPAy FRINGE BENEFITS Screeduaron 2 18.04- 4.21 Roller Operator on Plant Mix 2 17.68- 4.21 Paving Machine Operator 1 17.68- 4.21- Dump Trucks, 5 to & Incl. 12 yds. 6 17.63 3.71- Dump Trucks: 16 thru 20 Yda. 4 17.74 3.71 - Water Trucks: 3000 Gals. & Over 1 17.74� 3.71 General Laborer 1 15.21 - 3.43 Raker 2 15.69 - 3.43 r1agger 2 10.78 3.43 223-01-Sf,-GA-LM-A372NO I hereby cartify,that the above intrumnation is Correct and that all workers I employ on this Public Works :'rOjmt will be paid no Ica, than the Prevailing Wage Rate as deLemn fined by the Industrial:tatisliciall Of the Department of Labor and industries.I understand I that contractors who violate Prevailing Wage L i subject to fines and/or detaturnent, (C-MPI*C- all 4 r.ples, and h.1. gash n.t.,I,,d) Pon rnpany ame STATE OF WASHINGTON M. A. Segale, Inc. County of------xAjlg--- P. O. Box 88050 City Jul v 3. 1987 Tukwila WA 98189 223-01-SE-GA-LM-A372 (Signature 01"s"y I ) My P'narr.pir., 0-90 r L A I Ust Tft� APPROVED CONTRACTORS, DISTRIBLITll AP OVED COPIES Defartnient of Labor Industries AS FOLLOWS:'oni- WoAI V Carl.. DUILx l,II , .187OANAW "111x TT.Ar.,, F 1 !QUADAUNrTTs By 23 F701D.,YD-000 i1h,ru 1.Ty 4 97 V" MAIL TO: Statement of INDUSTRIAL STATISTICIAN of © INTENT TO PAY Department of Labor ! Industries PREVAILING WAGES Employment Standards Section T. 925 Plum Street h/,y6 (Public Works Contract) ( Olympia, WA 99504-0631 (206) 753-4019 ^.f(f "Vontr ctlEIPW Number CAG 029-87 Date Rid Was Due 5.4I-89 Contract Awarding Public Agency Date Contract Awarded June, 1987 City of Renton County in Which Work Performed King Address 200 Hill Avenue South Prime Contractor Halt Groat Cunatnmtf.o! Renton, MA 98055 Your Contractors Registration Certificate No. SIGRW321g7 Phone-235-2620 Do You Intend To Use Subcontractors? Yes ❑ No C1 ` In compliance with RCW 39.12.040 I, the undersigned, being a duly authorized representative of Signal Electric, Inc. 9012 South 208th Street, Kent, wA 98031 ICbnu.rm.,.s.e...,u.ew„ lAdd.1 do hereby certify that the following rates of hourly wage and hourly fringe benefits will be paid to all 1 laborers,workers and mechanics actually employed by me upon the public works project described above and that no laborer,worker or mechanic will be paid less that,the"prevailing rate of wage"as determined by the Industrial Statistician of the Department of Labor and Industries. PLEASE NOTE: It apprentices are to be used they must be registered with the State Ap- prenticeship Council within 60 days of hiring or they must be paid prevailing journeyman wages for time preceding the date of registration. CRAB ESTIMATED NUMBER RATE OF RATE OF HOURLY OF WORKERS HOURLY PAY FRINGE BENEFITS Cable Solis_ Yoreman 1 $22.63 ' $3.25 + 3.5% of Gross Line Crew Foreman 1 21.25 Journeyman Lineman 1 19.21 �/ " " Head Groundman 1 14.49- $2.55 9"3.51 6f Gross Groundman 1 13.63, " r NOW: Attach Additional Sheets as Needed. Signal Electric, Inc. ' B inwl Subscribed and sworn to . uF aer, r`esicenrnr before me ' this ]Oth day of June For L♦ I U., Only APPROVED 19 87 Department of Labor ! Industries N .n, / Industrial Statistician JS hoot ryPoElie,n o�rd the 4ate of Wmh�irytlonl6n/n,d vM m Nasbnrlon /I VT— HY t ) BEFORE FINAL.SErLEMENT can be made on any public Works project,the prime contractor and each and every subcontractor must submit form LI-700.7(F700-007-000)"Affidavit of Wages Paid"to the officer $''•_` charged with the disbursement of public funds.EACH AFFIDAVIT OF WAGES PAID MUST BE CFRTI. i. FIF.D BY THE INDUSTRIAL STATISTICIAN OF THE DEPARTMENT OF LABOR AND INDUS. TRIES BEFORE IT 1S SUBMITTED TO SAID OFFICER. 'j. PROGRESS PAYMENTS: Each voucher claim submitted to an owner by a contractor for payment on a project estimate shall state that prevailing wages have been paid in accordance with the prefiled statement ' - or statements of intent to pay prevailing wages on file with the public agency. COMPLETE AND MAIL ENTIRE SET WITH APPROVAL FEE FOR CERTIFICATION TO: Employment Standards Section, Department of Labor and Industries, Olympia, Washington 98504-0631 CONTRACTORS, DISTRIBUTE APPROVED STATEMENTS AS FOLLOWS: WINK COPYI ORIGINAL CONTRACT-AWARDING AGENCY D,. (GREEN COPY) DUPLICATE-INDUSTRIAL STATISTICIAN (Relaieed by Depsr m m) (BLUR COPY) TRIPLICATE-PRIME CONTRACTOR (YELLOW COPY)QUADRUPLICATE-SUBCONTRACTOR i "•'a+an. ...y xn:r.. _ _.. ,. el fg ATI .,. r .. _ 12061 03 Isom 220-01 WE STC '])]NO Vest boast chon �o., Inc. GENERAL CONTRA AND ENGIN P.O.Be. 419 24205 Wood iavill*-Snehemi.A Rod RECEIVED WOODINVILLE, WASHINGTON 9807 JUL 16 1eaT - Iw nrvr TRANSMITTAL RECORD TO Cit Of Renton DATE 7/15/87 ngineeringDepartment 200 Mill Avenue South _JOB N. 1st St. Burnet_ Ave. to Park Ave. LAG 029-87 Renton, Washington 98055 LOCATION N. 1st St..Burnett Ave. to Perk A amity f Rem nton - — ATTENTION Joe Armstrong - Project Engineer We are sending Herewith), Separate cover by Drawings prepared by NO. PRINTS DRAWING NO. DESCRIPTION 1 Each St,,tement of Intent to Pay Prevailing Wages for: D.R. Craig Const. Inc. For Approval Approved, as noted Approved Not Approved - Please resubmit REMARKS G For your use. WEST COAST CONSTRUCTION CO. , INC. Copy to: By 1�71 Tim Buchanan 87-9 File Title Secretary 12061 483.19W i Rf�I/ 22341 WE STCC'373NO �4 Vest Coast �, coon C0o., Inc. GENERAL CONTRA AND ENGINES P.O.Bo• 419 24205 Wood:nvilb-Smhomish Rosd WOODINVILLE, WASNINGTON 98072[,t�tL�iGc., iesz . TRANSMITTAL RECORD Nl011 TO City Of Renton DATE 7/20/87 gineering epartm tnt 200 Mill Avenue South JOB N. 1st St. Burnett Ave t park Ave. 029-87 Renton. Washington 98055 LOCATION N 1st St. B meAve. to Park Av city bf enton ATTENTION Joe Armstrong - Project. Engineer We are sending Herewithlo Separate cover by Drawings prepared by NO. PRINTS DRAWING NO. DESCRIPTION 1 Each Statement of Intent to Pay Prevailing Wages far: Chandler Engineers. For Approval Approved, as noted Approved Not kpproved - Please resubmit REMARKS For yo 1r use. WEST COAST C,,/ONSTRUCTITIION CO., INC. Copy to: By 'C4, 4 Tim Buchanar 87-9 File Title Secretary i A 11L 1]0 NO a91190D I , s *1ANCDt*( G ] C�']1]QVest CoastonCInc.GENERAL CONTNINEERS P.O.Boa 419 24205 Woodinville-Snohomish Road WOODINVILLE, WASHINGTON 98072 XLLL uL.L JUL 8 1987 TRANSMITTAL RECORD fl C;an'd oRIRC BENT. C iir 4EN70N TO Cit Of Renton DATE 7/6/97 •ngi near ing eparcment 200 Mill Avenue South JOB N. 1ac SL..Burnett Ave. ,.,park Ave. CAC 029-87 Ren[on Ylashirtgton 98055 LOCATION ry�l� „Burnett Ave. to Pack Ave City Of Benton ATTENTION Joe Armstrong - Project Engineer We are sending Herewith® Separate cover by Drawings prepared by NO. PRINTS DRAWING NO. DESCRIPTION 1 Each St teme t of Intent to Pay Prevailing WoRes' West Coast Construction Co. , Inc. d Far Approval Approved, os noted -r Approved Not Approved - Please resubmit k REMARKS For your use. s WEST COAST CONSTRUCTION CO., INC. .. Copy to! By Vt" Tim Buchanan y 87-9 File PS Title Secre Cary — t t yl 4 1 k a:1. tl I,