HomeMy WebLinkAboutTED4001896(21) PRO-- N. ist Improvements Burnett N to Park N-Work Zng Days
. . .
M
Y 4^\
k
4.
Y 1 i
. r
-s
of
RF
do PUBLIC WORKS DEPARTMENT
1 Z DESIGN/UTILITY ENGINEERING • 235-2631
U tY MUNICIPAL BUILDING 2DO MILL AVE.SO. BENTON.WASN.O"r'35
0 MAL
— s
O9 e
P
b*,IrEO SEeZE�
BARBARA Y. SHINPOCH
MAYOR
October 27, 1987
West Coast Construction Company. Inc.
P.O. Box 419 +4
Woodinville, WA 98072
Subject: CAG B7
t02It 95Street
Gentlemen:
Enclosed is the 87Meekly Statement of Working Days for the week ending
October 23,
Please note there are 0 working days remaining on the referenced Contract
as OF October 23, 1987.
Very truly yours, +
Joe Armstrong
Pr,.,',ect Engineer
:ckd
Enclosure
1
's
Pow
TV
WEEKLY STATEMENT OF WORKING DAYS:
CONTRACTOR West Coast Construction Co. Inc. _.
ADDRESS Post Office Box 419
CITy _ Woodinville STATE Washington DATE
Gnrr«t NumMr Fd.r.I.A ld P..I.0 NuwMr Z-0/1 Na.v C..«y
CRG 029 87 hJ `'Y 7—
The following statement shows the number of working days charged to your contract for the week
ending 19_.
a... n.y w«th..C..dnNen I W.61.p De, unw.A.0.Dey
C....d b,
w.erh.r C.ndlttse.
Monday
Tuesday
Wednesday
Thursday
Friday
z
Days this week......._.........._...._........._............._...........................
Days previously reported...._.............................._._,.__......._............
.. '.
Total day,to date ._........._........................._..........._...............
__..
CURRENT STATUS
Working Days Specified in Contract...... ._. .._.._......... 75
....
'Approved Extension of Time—......................................_................
Total Authoria.d Time of Contract ...._.............._..............._......._.........
75
Less Working Days Charg............................................................
"W«king Days Remaining............_.............._..................................
Summary of Weeks Activities:
Pnl.n Ens ln..r ,
'Show only.xt...ion, approved by letter from H.adguort.,,
**Us*negative totals to show overrun in time
NOTE: The contractor will be allowed 10 days from date of this report in wi:ich to protest in writing the correctness of
staNm.nt, otherwise it shall be deemed to hove been accepted as correct.
DOT �°bW iain
.n.
��11NBI145rn1..---.
OF RF L
� T
t"t y z PUBLIC WORKS DEPARTMENT
_ DESIGN/UTILITY ENGINEERING 0 235-2631
oMUNICIPAL BUILDING 200 MILLAVE.SO. RENTON,WASH.BBO55
A Qe
0
�rED SEP�E�
BARBARA Y. SHINPOCH
MAYOR
October 19. 1987
West Coast Construction Company, Inc.
P.O. Box 419
Woodinville, WA 98072
!) Subject: North 1st Street
CAG 029 37
Gentlemen:
Enclosed is the Weekly Statement of Working Days for the week ending
i October 16. 1987.
iPlease note there are 4 working days remaining on the referenced contract
as of October 16, 1987.
Very truly yours,
, Joe Armstrong
Project Engineer
:ckd
Enclosure
f:
y • • - WEEKLY STATEMENT OF WORKING DAYS:
CONTRACTOR _ West Coast Construction Co. Inc.
ADDRESS __Post Office Box 419
CITY Woodinville STATE Washington -
PATE i
C.nn«t Nu.eb. F.Lu$.Ald P..I.m NemS.r Nlehoy H. «Cewq Sut•..ar N..ebe,
CA 6 029-87
The following staterrent shows the number of working days charged to your contract for the weak
ending .mac Lo bdr z - , 19ftz.
D.r. Dey w..lh.r cm.dolmr w«hires D.ys ue...bk 1.D.y
c.v.d by winch..«
seethe,c«.aN«..
9 Monday
/0-20 Tuesday -
/..z / Wednesday
ca Thursday
h+- Z'D Friday
Days this wook»»...........»..............................._..........................
_._ 4
Day. proviuusly reported»»...._.......................»................................... 7//y_
Total day.to dw. ....._..........................................»»................_.... r
CURRENT STATUS
Working Days Specified in Connect_....._.»..._._. 75
�APpr...d Emonsion of Time...._...................._..............._................ 6 ;
Total Authori..d Ti.. of Ciwi ....»..................._.............». 75
Loss Working Day.Charges....................................._....................... 7 5
"Working Days Remaining..........»..... .......»........_.......«..»__. ; i
Sueelory,of Wwk's Activities: /
0z -/(57
/A S/r/(c-Y).yl 4isGY ACGP�j�II.-G _
n
'Show only eel...I., approved by I.11«tram H.acquarl.r. - --_.
"us.negative$.role to.how ov«r un in lira.
NOTE: The connaclw will be allowed 10 day. Lam date of this report in which to protest in writing the correctness of this
.labment, olh«wise it .hall be doomed to have been accepted as corrode
F.—q]a]t
'DOT nea..a"'re
.a
a
x �fk Lt tiyy..
t
1
o WEEKLY STATEMENT OF WORKING DAYS:
,s
CONTRACTOR West Coast Construction Co. Inc.
ADDRESS Post Office Box 419
CITY_ Woodinvi'1n STATE Washington DATE ,,'-/ -15ZA;
Cenu.er N.wbr F.J.r.LAid prel•rr,N.wb., Korth., N...r Cway ...em.nr�wbv
LAG 029-87 r ''
The following statement shows the number a( working days charged ro your contract for the week t
ending ��F re-✓ / G, , 19LI.
D.r. Dq W.A.,C.edbtav W.rbtne D.y. Un.wk.bl.D.y -
C.u..d by W..rhw.r
W..Ih.r C.ndUt.e.
lei-le Monday ✓ '
/0-/3 Tuesday
/O-14- Wednesday "
10-/S Thursday '
/m"/b Friday
5
Days this week...............«..............«...Y.........._.............................
-, Days pwiously reported........._.........................._......_...
.«......«__....
Taal days re car. ....................................................................._....
CURRENT STATUS
Working Days Specified in Contract-..-..«..................._....._.._.._._..««•• 75
/1
Approved Extension of Time.-.«__.............................._.......
...._....
Total Aathorl..d Tim.of Contract- 75
Less Waking Days Charges......._.............................._............. 71
a
"Waking Days Remaining................«__.....«...... _...............
......«.._«_. ,.
Summary of)seek's Activities:
Y
l.ep.r eww
•SLow only extensions approved by let,., Irom Headquarters
"Ls.negative totals to show avenun in tim.
NOTE: The contractor will be allowed 10 days from date of this report in which to protest in writing the comclMee
statement, otherwise it shall be doomed to hove been accepted as correct.
DOT n
,m.}}a>]
.rn.d Ivre
3
OF R,,
lrL PUBLIC WORKS DEPARTMENT
DESIGN/UTILITY ENGINEERING 0 235-2631
0 g MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.98055 1
94 i
,+n P
ITED SEP�E�OF' M
BARBARA Y. SHINPOCH October 9, 1987
MAYOR
West Coast Constr,:ctiao Canpany, Inc.
P.O. Box 419
Woodinville, WA 98072
Subject: North 1s1 Street
CAG 029-87
Gentlemen:
Enclosed is the l,eekly Statement of Working Days for the week ending
October 9, 1987,
Please note there are 9 working days remaining on the referenced contract
as of October 9, 1987.
Very truly yours,
Joe Armstrong
Project Engineer
:ckd
Enclosure
.i�
t
I
P,
a
WEEKLY STATEMENT OF WORKING DAYS:
CONTRACTOR Nest Coast Construction Co. Inc.
ADDRESS _ Post Office Box 419
CITY Woodinville STATE Washington DATE AV - 9 -87
Genv.t New or F J.,.I Atd Pmi•u N•wber N�ohw.y N•.ar Csvnry Stnw••m Nuwb•r
CAG 029 87
The following statement shows file number of working days charged to your contract for the week
ending �C /i ,—, �z , 1962. t
Der. D.y w..rh.,C.oduten w.r4lne D.y. Unw.nal.D.y
Cwsed by w..lh.r a
we.th.,C.nditlen.
/O—S Monday GL E4.2 1
/0•/. Tuesday
/0"7 Wednesday
70"8 Thursday t' f
. /0-9 Friday
+
Days this week_......................................................................_......... ,
Days previously reported.................._.............._...................._.............
Total days to date ._........_................_................................._.... �O 'r
CURRENT STATUS
Working Devi Specified in Contrac ........_.... 75
. ..
'Approved Extensi.,of Time._._.._................. ..._.._. $• "'
Total Authorised Tim.of Contract ...................._..._........................... 75
Less Working Days Charges----------..._......................__......—------_---- G�
"Working Days Remaining..............................................................__.....
• Summary of Week',Activities: -
• Pni.et Enoin.•.
'Show only extensions approved by letter from Headquarters
"Use negative letols to show overrun in time
NOTE: The contractor will be allowed 10 days from dale of this report in which to protest in wriliry the correclo.ss a
statement,otherwise it shall be deemed to have been accepted as correct.
WTI sd1
r
all
S
s't
S
OF RFC
C«f o PUBLIC WORKS DEPARTMENT
7- DESIGN/UTILITY ENGINEERING • 235-2631
7, $ MUNICIPAL SIRLOINO 200 MILL AVE.SO. RENTON,WASH."M
0 1;-R
% b.
Ep
OqIrEO sEVTEOO
BARBARA Y. SHINPOCH September 28, 1987
MAYOR
West Const Construction Company, Inc.
P.C. Box 419
Woodlrvllle, WA 98072
Subject: North 1st Street
CAG 029-87
Gentlemen:
Enclosed is the Weekly Statement of Working Days for the week ending
September 25, 1987.
Please note there are 19 working days remaining on the referenced contract
as of September 25, 1987.
Very truly yours,
Joe Armstrong
Project Engineer
:ckd
Enc'.osure
i
> � WEEKLY STATEMENT OF WORKING DAYS:
CONTRACTOR West Coast Construction Co. Inc.
ADDRESS Post Office Box 419
CITY Woodinville _ STATE Washington DATE ` ' 2e' 7
C.nrn.t Nwbr Fduet-AW P.y.a Nvwee. Nishwq N..a,C..ny Anwe.m Neves,
CAG 029-87 5 ".T
The following statement shows the number of working days charged to your contract for the week
ending tsCLJ2',,,Gc,/ 2 , 19s2.
_
e
D.I. D., We.,he,C.ednbe Wobq Dq, Un..re.el.Dry
C...d ey W.., .,w
W e.lh.r C.n1111«. � 3
2- Monday
Monday fort l '
9-17. Tuesday
Wednesday
:�•=�- Thursday O.G, N1•9'�• /
9-LS Friday
Days thu week..................
Days previously reported................................................... 5
w
Total day. to dab ..........................................................
CURRENT STATUS
Working Days Specified in Contract._........_.............»...-,._...»__«.__.. 75 '
Approved Extension of Time................... ....I....-.......«»...._....___
Total Authori.ed Time of Contract ....___......................................»_ 75
less Working Days Charges...................................... 5`
**Working Days Remaining..........._...-.-........._...._....._.....
_.____»_.._. '
Summary of Week's Activities:
I
p.lest leet..er
oor
'Show only*.lens Ions approved by letter from Headquarters - - --- - - -
"Us.negative total.to show overrun in time
NOTE: The contractor will be allowed 10 Joys from date of this report In which to protest in writing the c.wectirmis of this
statement,otherwise it shall be deemed to have been accepted as correct.
DOT n'—e inie
t
e
e
�6
re
OF RF
+t o PUBLIC WORKS DEPARTMENT
DESIGN/UTILITY ENGINEERING 0 275-2671
pZQ MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON.WASH.99055
9 a
$��jf0 SEPtE��P
September 22, _997
BARBARA Y, SHINPOCH
MAYOR
West Coast Construction Company, Inc.
P.O. Box 415
Woodinville, WA 98072
Subject: North 1st Street I
CAG 029-87
Gentlemen:
Enclosed is the Weekly Statement of Working Days for the week ending
j September 18, 1987.
7lease note there are 24 working days remaining on the referenced contract
as of September 18, 1987.
Very truly yours,
/ N
Joe Armstrong
Project Engineer
:ckd
Enclosure
M
,
vd"
r �•� WEEKLY STATEMENT OF WORKING DAYS:
` CONTRACTOR West Coast Construction Co. Inc.
ADDRESS host Office Box 419
'- CITY Woodinville STATE
Washington DATE -LZ-87
.:..,,..: ' '
C•ntua Nemb, Fedx.1 A14 Pr•I••r N..•M, Nghr.y H.. c.any bmwent Nwnbr
CAG 029-B7 / 5 7- ✓i '
The following statement shows the number of working days charged to your contract for the week
ending r _ -
Dete Dry Wexhx Cendbl•n W.Alne Der. cavwd 61 Wu hu x
Wurb.•cend Nix..
Monday
�f-I$ Twaday
q-/b Wednesday
q-t-) Thursday r
q-16 Friday q r
5
Days this week-_....»_»..« ___»»........._-»-----------......«..._...._......
Days previously reported««...........«.............................................
r
... . Total day.to date ._«_.._......_....«....««-........_««««......._..._».....»_..
CURRENT STATUS
Working Days Specified in Contract.«......._................................».......... 75
•Approved Extension o!Time.........._._...........................»....«....«» -
75
Tmal Av,horised Tim•of Contract ........... ...............
r�
Loss Working Uoys Charges....... .................-.«...............».
:.- ••Working Data Remaining...................-.».........._............»..........-..........
as
Summary•1 Week*,Activities:
f
i . h•Na EMMw..
_ i •Show only e.,snalona approved by lat,.r from N.adgvarters
•a Use negative total. to show ov.,,.n in time
NOTE: The contractor will be allowed 10 days (rum date of this report in which Io protest in writing the correctness of this
ppyyii.�,,element,otherwise it shall be deemed to have been accepted as correct.
'pr IWYee stllE
r '
i
QF RF
41T
z
t`y .�
PUBLIC WORKS DEPARTMENT
DESIGN/UTILITY ENGINEERING 0 235-2631
0 8 MUNICIPAL BUILD:NG 200 MLL AVE.SO. RENTON,NASH.98095 9$ e
9 EP
4rto SEPTET
BARBARA Y. SHINPOCH September 14, 1987
MAYOR
West Coast Construction Company, Inc.
P.O. Box 419
Woodinville, WA 98072
Subject: North 1st Street
.. � CAG 029-87
Gentlemen:
Enclosed is the Weekly Statement of Working Days for the week ending
September 11, 1987.
Please note there are 29 Working days remaining on the referenced contract
AS of Seprember 11, 1987.
Very truly yours,
Joe Armstrong
Project Engineer
:ckd
Enclosure
4
f
i
t
�. MEEKLY STATEMENT OF WORKING DAYS:
CONTRACTOR West Coast Construction CO. Inc.
ADDRESS Post Office Box 419
'•CITY Woodinville STATE Washington DATE—�
• Ne.«Cw•r Sb.em.nr He"-
::- i
C«tr«m Numb. Fdud-Aid prel.vr N.mb. NteFw I Yr /!
CAG 029-87 '
following statement shows the number of working days charged to your contract for the week t
r.ld rrtq
-14,f 7 1/e'i // I98Z.
Du. Dq WeerF«C«Jul.n WrWne D.Y. C....a ky W.�M«
We.ther Condition.
i
9- 7 Monday Meet,� I
9_8 Tuesday
a Wednesday ,! !
�_ yp Thursday Qveac�s /
9_ Friday
. Days this w«k......_.............._..........__»_......»_.........._».._......
.....
Days Deviously reported....................
...»»_.»...._......_.».»......__...... r
.: Total day. to dot. ._.....................u....................».........-_.-»......--.. a6
CuRRENT STATUS
75
Working Days Specified in Contract_._»»._......_.»........._._..........«.......
Approved Extension of Time....................................
»»»..»».._..»__..
75
Taal Authen.ed Time of Contract ...._...........................................
Less Wanking Days Charges_-.........._.-.....»................._-......_............. a -
2 /
..Worklnp Days Remaining..........»....__.-.........._... ....._.........»..........».»
Suetm«y of Week's Activiti.s:
"Tear,IIMM.er
she.only •xIen.i.ns approval by beer from li.adguarl.rs »— _
`Use npalive totals to show overrun in time
i
NOTE: Th. contractor will be allowed 10 days from dab of this report in which Io pretest in writing the correctness of this
statement, nlherwise it .hall be doomed To have been acc.pt.d as correct.
Form 11]42] Me
DOT
i'
TIZ
A+ ° +
wF '° SAM +y.
OF 1CF
U ,.y_ °z PUBLIC WORKS DEPARTMENT
4 _ DESIGN/UTILITY ENGINEERING • 235-2631
MUNICIPAL BUILDING 70e MILL AVE.SO. RE-TON.WASH.9WS
e
P
�rFO SEVYF�
BARBARA Y. SHINPOCH
MAYOR
September A, 1987
West Coast Construction Company, Inc.
P.O. Box 419
Woodinville, WA 98072
Subject: North Ist Street
CAG 029-87
Gentlemen:
Enclosed is the Weekly Statement of Working Days for the week ending
September 4, 1987.
Please note there are 33 working days •emaining on the referenced contract
as of September 4, 1987.
Very truly yours,
i
Joe Armstrong
Project engineer
:ckd
Enclosure
1
-1
f
r WEEKLY STATEMENT OF WORKING DAYS:
CONTRACTOR West Coast Construction Co. Inc.
ADDRESS Post Office_ Box 419
CITY Woodinville STATE Washington DATE_ ! f 5
ConH«s Neob« Fd«ddi, p..pm Nvwbr Nlehwq N..«Cwmy Sbtwn.nt H.ob«
The following statement shows the number of working days charged to your contract for the week
ending -:(L'U 4c^'-'7 4-
Dot. Do, W..th«Condition W'•rbns Doy. Une.A.bl.Dey
C....1 by
weeth«Conditions
Monday v k'g�-
9 -/ Tuesday
9- Z Wednesday "
- Thursday I
�- 47- Friday '•
r
Days this week__...._...-................_.............._........._............ ✓
Days povieusly rowed........._._..................................................... 37
Total day. to dab ._....................,...._......................................_.... ¢-
CURRENT STATUS
Working Days Specified in Contract......................... ...... 75
Approved E.tenrian of Tim..................................................
..._..
4
Total Author..ed Time of Contract 75
Less Waking Days Charges............._.................... QZ
�J..Woking Days Remaining..............».............__..............................._.., f
Sueenary of Week's Activities:
i�ar9c�� r
lineln.«
Show only extension,apprewd by loiter from Headquarters
Us.nsgativ.totals to show ov.rrun in time
NOTE: The conbaclor will be allowed 10 days Irom dote of Ibis report in which to protest in writing the correctness of this
statement,olhorwise it shall be doomed to have been accepted as correct.
MIXIM
DOT nf«Ned tine $
u � a
I t
OF RF
ti
PUBLIC WORKS DEPARTMENT
DESIGNiUTILITY ENGINEERING • 235-2631
I
Og MUNICIPAL BUILDING 2110 MILL AVE.a0. AENTON,WASH.a805a
g e
h cP
�rEO SCPlE
BARRARA Y. SHINPOCH September 5, 1987
MAYOR
West Coast Construction Company. Inc.
P.O. Box 419
Woodinville, WA 98072
Subject: North 1st Street
CAG 029-87 t-
Gentlemen:
Enclosed is the Weekly Statement of Working Days for the week ending
or- her 2, 1987.
i .ease note there are 14 working days remaining on the referenced contract
as of October 2, 1987.
Very truly yours,
1
i
Joe Armstronrg�
Project Engineer
:ckd
Enclosure
r
yl
l
<t
t
Y
r ♦ WEEKLY STATEMENT OF WORKING DAYS:
CONTRACTOR West Coast Construction Co. Inc.
ADDRESS __ Post Office Box 419
CITY_ Woodinville STATE Washington _ DATE/l7 . f5
C.naeu Nsbr F.d...4Md Prei..t Ns.. Hlehw.y No. r Cmml, e.... ...
The following statement shows the number of working days charged to your contract for she—week �
ending 01--7'/O Ales Z 19$7
Der. Dq w..th.r C.nUa.n we$lns D.y. Unw«lesl.D., i
C....d oy
w..rh..Ceedhl.n.
Q-Z LT Monday �i.Nw-✓ /
9-Ly Tuesday h /
Q--40 Wednesday /
/O -/ Thursday r� /
/c) -Z Friday /
sl
Days this wnk.................
Days previously reperted..,_.•._,.................._._....».„......__.„.»«........ !J/o
Total days to dote ._..._«»._._._»__.......__...__"....„...._..«.......
.__..
CURRENT STATUS
Working Days Specified in Contract_................ 75
a
'Approved Extension of Time._...«.._..._.,....«.._..__......__„„�.»»„.».._ .:
Total Authorized Time of Contract ..„„„»»».._...._.M__�.�„»_�..•. 75
Los Working Days Charge.«.__.,................. 61
'Working Day Remaining«..............„„_._.»»„.»._.....,......„.. �¢ ,
Sweaters,of Week's Activities:- .
i .. h.iut Egleor
I
Show only extensions approved by leDe. from Headquarters
..Use negative totals to show overrun in time
NOTE: The contractor will be showed 10 days from dale of this repair in which le pretest in wriling the correctness of Ihi
statement, otherwise it titall be deemed to have been accepted as correct.
DOT M si wivii
. i
OF RFti
z PUBLIC WORKS DEPARTMENT
DESIGN/UTILITY ENGINEERING 0 235-21331
QR MUNICIPAL BUILDING 300 MILL AYE.SO. RENTON,WASH.98a55
9 O'
y� P
yD'TFO SEPTE�
BARBARA Y. SHINPOCH September 2, 1987
MAYOR
West Coast Construction Company, Inc.
P.O. Box 419
Woodinville, WA 98072
Subject: North Isr Street
CAG 029-87
+ Gentlemen:
! Enclosed is the Weekly Statement of Working Days for the week ending
I August 28, 1987.
Please note there are 38 working days remaining on the referenced contract
as of August 28, 1987.
Very truly yours,
Joe Armstrong
Project Engineer
:ckd
Enclosure
III
1 •
n
WEEKLY STATEMENT OF WORKING DAYS:
/.�
CONTRACTOR Nest Coast Construction Co. Inc. —
Post Office Box 419 Nashingtnn DATE-- ---'"--
ADDRESS STATE sl.\»•.1 ^s•'
Woodinville �y
CITY N°.n., Hi,h.q r
F d.rd.AH Pnl•' �- •� - week T.
c.nl..'11+ °•• - --- s charged to You' contract for the
CAG 029-87 19J
TM following et°tsnla°t shows,th° ^°1Ab�°=ol working day, U..wk°'L D.r
ending f w.,ki.s D.y. C.°..d kv
we°\IN•CMdlllen wMlhel CMaIIIM.
D.I. D•,
zi4 Monday
Twadey
:B-2L Wednesday a /
o,-Z1 Thursday ..
.GJ+ Friday
Days his week................
Days pr.viously nporled........•-.»....................
- Total days I.dote .»••-•••^•"""'»'
...r...».....
,. CURRENT STATUS
7
Working Oats Sp.cili.d in Contract...............
•jlpproved Eelenaton of Time._.................................
............».
7� .�
1
Total Aotherls.d Time of Contract ........
-........
Les,W«king Days Chargss...
••Working Days Remoinlnq.......
Summary of Week's Activities
P..t..r E.el•°"
I
•Show onI eeunslons vad by
I.11.r(Iom
ePP•o 1{eadyuml«+
••Us.n.gotiv.telals to how overrun in time 1 in which to p
rolni In wrNinq IN,cOIndlleu of Mle
NOTE: The conl•acty will be allowed 10 day+Lam date el this rep«
slotsmenl, .1herwtse 0shall be doomed to hove bean accepted as correct.
she
Form
DOT n«uwl Will
]�Sx
ti
Y 1
p
4r
1
OF RF
PUBLIC WORKS DEPARTMENT
z
i DESIGN/UTILITY ENGINEERING • 235-2631
9 $ MUNICIPAL BUILDING Zap RILL AYE.SO. RENTON,WASH.9a0a6
y� o
�TEO SEPTET
BARBARA Y. SHINPOCH September 2, 1987
MAYOR
q
i west Coast Construction Company, Inc.
P.O. Box 419
Woodinville, WA 98072
Subject: North 1st Street
CAG 029-87
Gentlemen:
Enclosed is the Weekly Statement of Working Days for the week ending
9 August 21, 1987.
Please note there are 43 working days remaining on the referenced contract
as of August 21, 1987.
t
Very truly yours,
r
Joe Armstrong
Project Engineer
:ckd
Enclosure
m
t
t
,
y WEEKLY STATEMENT OF WORKING DAYS:
CONTRACTOR West Coast Construction Co. Inc.
ADDRESS Post Office Box 419
CITY _ Woodinville STATE Washington DATE R'3&,R7
C.na«t Nwebr Fdoe6Aid Prof...H..ms.r
CAG 029-87 S...w.nNvmso
swZr u. 7-The following statement shows the number of working days charged to your contract for the week
ending '` ga/-S t-, Z/ r 19ju. i
Dap as, berhw C.ndUlw. werslns Dqr U..4 It,st.D.,a.d sr we w w
«thv C«.dblen.
B- 17 Monday
B-/d Tuesday
6-/9 Wednesday
8- 2 o Thursday
Friday x'
Days this w.ek -''
Days previously ren.Med................ ............................................... zZ_
Total day.to date ........................._.................................................... t ,.
CURRENTSTATUS
Working Day.$pecilmd in Contract_.............................._........._......... 75 ;.
'Approved Extension of Time..........................._.................._._..._............
Total A.thtrised Time of Contract ....._.................._...._........_......__ 75
Loss Working Day.Charges......_._...............................
.........._.... 3L
"Working Days Remoinirp.._..... ..-..-.._..........__.._................«......___...
Summary of Week`.Activitiesx
i
�Pr.Iwr[nFlewJ.., .
I� G/
1 -Shew only ut.nsion. approved by I.Her from Headquarters -- - -
t ..Use negative total. to show overrun in time
� 1
NOTE: Th. contractor will be allowed 10 days from date of this refract in which to protest in writing the correctness of this
statement,otherwise it shall be deemed to have been accepted as correct. -
Facet txsau
DOT
1 1
�J
t
_..ww9b...^
OF RF Y
o PUBLIC WORKS DEPARTMENT
DESIGN/UTILITY ENGINEERING a 275-2671
Q $ MUNICIPAL BUILDING 200MILLAVE.SO. RENTON,WASH.911055
9 e
�P
rF0 SEPtEV'e
BARBARA Y. SHiNPOCH August 17, 1987
"YOR
West Coast Construction Company, Inc.
P.O. Box 419
Woodinville, WA 98072
Subject: North 1st Street >
CAG 029-87
Gentlemen:
Enclosed is the Weekly Statement of Working Days for the week ending
August 17, 1987•
Please note there are -8 working days remaininr ^n the referenced contract
as of August Id, 1987.
Very truly yours, ....
Joe Armstrong
ti Project Engineer
:ckd
Enclosure
aY;,
i'Al ;
. � Y
A$d
T A
1 �'^ "* +y4 �+ e. • '.I • roe ¢ R e 1'� � a t r r
I I
Afk
o • WEEKLY STATEMENT OF WORKING DAYS:
CONTRACTOR West Coast Construction Co. Inc.
ADDRESS Post Office Box 419
CITY Woodinville _ STATE Washington DATE- 8 -12-B 7
C.nbou New 6eo"I6eof•de..LAid P.el••r Nvwbe. NLhwo,Ns.er C...1, stwoo.nr N.wbv
The following statement shows the number of working days charged to your contract for the week
ending ' ' �r_ 19A7
Do's 0., •oorhor Condition Workl.s Dry. Unw.Adl.Do,
Co.s.d sy wurb.r in
*.,he,Codaton.
d-/O Monday
0-// Toe-day
,Y-/Z Wednesday O•C; .
8'o Thursday O.v. e_'A .t�oiq
�-/a Friday
Daysthis week_............_............................._..„......„_..„.»........... S �)
Day.proviou.ly r.ported..................................._.._............_............ Z Z
Total days to dote .„.....„„................................................................... 27
CURRENT STATUS
..•..:� . . WorkingDays 5 15 -- --
Ypacified in Contract._._............._._.............„........_.......
*Approved Extension of Tim..___.._._................I.......................... $-
Total Auihori..d Tim. of Contract 15
Loss Working Doys Charge s..................................... 27 '.
..Working Days Remaining...............__„.„................_...............„_.......... it
of Wwsk's Activities:
iL!l1��2�
� Prof
*Show e Show only..I...Iona .,proved by I.u.r Irom H.adquoner. ---Enetn... ..
o U..n.yyl,.e lutol. to .I.o. ....... n� lirn.
NOTE: The contractor will be allowed 10 days from data of this report in which to protest in writing the correctness of this
statement, otherwise it shall be doomed to have been accepted as correct.
GOT IMMse 1N,
i
o }
4
I ^
OF RFC
1
T
C«f o PUBLIC WORKS DEPARTMENT
DESIGN/UTILITY ENGINEERING 0 235-2631
l4 MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.e8055
0, e
P
rED
BARBARA Y. SHINPOCH August 11, 1987
MAYOR
r
West Coe- '-rsiruction Company, Inc.
P.O. Boa
Woodinv', MA 98072
Subject: North 1st Street
CAG 029-87
Gentlemen:
Enclosed is the Weekly S .atement of Working Days for the week ending
Ausust 7, 1987,
' - - - - ' ` - Please note there are 53 wurking days remaining on the referenced contract
as Of August 7, 1987.
Very truly yours,
Joe Armstrong
Project Engineer
:ckd
Enclosure
r
i
V
F,
S� -R
r WEEKLY STATEMENT OF WORKING DAYS:
CONTRACTOR West Coast Construction Co. Inc.
ADDRESS Post Office Box 419
CITY Woodinville STATE Washington
DATE
Consul Nwb• 1'dud.AlJ Pr.par NumM Niah..r N..r Cwnty Sr.amenr N.A.
The (allowing statement shows the number of working days charged to your contract far the week
ending ` U 19�7
D 1. Do, Wee,her Ce.Jl.lee W.W.e Don ,..r
U rkd.et.D.y
.. by Weelh.r
W .r
..'kMe.C.nJul.n.
I
"` { I Monday GMnr i
5-4 Tuesday
9- 5 Wodmsday .
6- Thursday
Friday
Day this week..................................... S
Days previously npxtod...._.«�_. / 7
.............
Total day.to dot* ......_._...................
Z
CURRENTSTATUS
Working Dcys Specified in Contract.«..... 75
"Approved E.tonsion of Time_............................„
Total Authwi..d Time of Contract 75 i
Los.Working Day,Chore........................................... ..
"Warking Day. Remaining...................,,,„ 5 3
Summary of Week',Acliviti,,:
c..
C
Show only e.bn.Ion, approved by lots., from Headquarters _
Use negative total. to show av...an in time -
NOTE: Th. conlraclor will be allowed 10 days from data of Ihis r.Port in which to protest in writing the coneclnest of this
I .1omonl,otherwise it shall b.deemed to have been accepted as correct.
DOT Farm 122W, x
M.Im 1U)e
M
-^v� �elwltere6
• A `tll S'•
i"
r:
1 x,.
of $E,L
J �
PUBLIC WORKS DEPARTMENT
DESIGN/UTILITY ENGINEERING 0 235-2631
0 mil S MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.SWISS
9 e
0P
�rf0 SEPT
BARBARA Y. SHINPOCH August 4, 1987
MAYnn
West Coast Construction Company, Inc.
a. P.O. Box 419
1110011"vIII,, WA 98072
Subject: North Ist Street
CAG 029-87
Gentlemen:
Enclosed is the Weekly Statement of Working Days for the Week ending
July 31, 1-87.
Please rote there arc 58 Working days rwain'-g on the referenced contract _.
as of July 31. 1987.
Very truly yours,
4Jo e Armstrong
Project Engineer
:ckd
Enclosure
1
� A w
OF RE
� T
° PUBLIC WORKS DEPARTMENT
DESIGN/UTILITY ENGINEERING 0 235-2631
IN
09 8 MUNICIVALBUILDINO 20011ALLAVE.SC. REN e0
TON,WASH.95s
b'
0P
N�1E0 SE o1E�
BARBARA Y. SHINPOCH
MAYOR August 4, 1987
Nest Coast Construction Company, Inc.
P.O. Box 419
Woodinville, WA 98072
Subject: North 1st Street
CAG 029-87
Gentlemen:
Enclosed is the Weekly Statement of Working Days for the week ending
July 31, 1987.
Please note there are 58 working days remaining on the referenced contract
as of July 31, 1t87.
Very truly yours,
)oe Armstrong
jProject Engineer
i :ckd
Enclosure
,
fI
id
L_.
i
�Yu
�~r
�1
/ e • WEEKLY STATEMENT OF WORKING DAYS: ,1
CONTRACTOR West Coast Construction Co. Inc.
ADDRESS Post Office Box 419
CITY Woodinville _ STATE Washington DATE
Cenu.cs Nwb« F.de..1.AW Praj.m Nvws.. Nlstv.,N..«Comm, Sretseent N.mbsr
The following statement shows the number of working days charged to yuur contract for the week
ailing
D.I. D., W.erh.r Cenditlen ■.Am,D., U...,b.bl.Its,
C....d Is,wowh««
Weerher C.nJlrlen.
_ 7.27 Monday (—�O"rI, � ,r
"7- zP Tuesday ���--
7-L9 Wednesday
7-3o Thuraday "
7-3/ Friday C ice✓ i
5
Days this week.............................._..... ..».............._....................
Day. previously reported..........._................ 1 2—
Total doy. to Jar. ........................._.........._..._................................... 17
CURRENT STATUS
Working Days Specified in Contract._..............._...._................... 75
•Approved Extension of Time—...... .........................................»»..»» '-
'otal Authori..d Time of Contract ....................... 75
Less Working Days Charges......_.................................... 17
•.Working Day.Remaining..................»»....................
....«..........»...».._»,_
Summary of Wee.i's Activities:
r
lglees
I
•Sit..oniy e.lenslot.approved by letter from H.adgumtors - - --•
' •Us. negative total*io show ov.,,.n in time
NOTE: The contractor will be allowed 10 days from date of this report in which to pretest In witbtg the cornctm.s of*k
statement, otherwise it shall be deemed to have been accepted as correct.
DOT ra�ux os j
n«ww 1 vre
l;'
i
of RF
ti
z PUBLIC WORKS DEPARTMENT
DESIGN/UTILITY ENGINEERING • 235-2631
n wdl Q MUNICIPAL BUILDING 200MILLAVE.S0. RENT011,11/ASH."M
O b,
1,
1P4'r O SEP'S-0
P
BARBARA Y. SHINPOCH
MAYOR
West Coast Construction Company, Inc.
P.J. Box 419
Woodinville, WA 98072
Subject: North Ist Street
CAG 029-87
Gentlemen:
Enclosed is the Weekly Statement of Working Days for the week ending '
July 24, 1987.
Please note there are 63 working days remaining on the referenced contract
as of July 24, 1987.
Very truly yours,
Joe Armstrong
- Project Engineer
v1 :ckd
Enclosure
S Ai
.X
9! f }
Y'
v M
X� t
.1a
, 4
.100^..eMN!#11Yald
,➢ `w • WEEKLY STATEMENT OF WORKING DAYS:
CONTRACTOR West Coast Construction Co. Inc.
ADDRESS Post Office Box 419
CITY Woodinville STATE Washington DATE
CwNwt Newk., FdoeLA;1 P.aj.et Nvwb. Nyk.q N..w Cwmy Sretwwwt W dw
CAG 029-81 N / �'
The following statement shows the number of working days charged to your contract for the week '
andi
nq
D.I. Dq woske,CwJDI.n Wwkint Dey. On..,kdt.D.y
C.v.d by Wwth.r or
W.A.,CwdiNw.
7-L o Monday
-) - D t Tuesday
2 2 Wednesday
-�. 23 Thursday
_JA Friday
Days this week......_................ 5
Days previously reported................._...._....................................... 7
Total Jaye to dot. ..................._................................._..................... i Z
CURRENT STATUS
Working Days Specified in Contract......._................................................ 75
Approved Extension of Time..............................._..................................... `�;_ t
Total Authoritod Time of Contract 75
Less Waking Days Charges...................._................................._......_..... 7�
"Working Days Remai.ing.._..............................._..........._........«............... h�
Summery of Week's Activities:
'Show only obnslons approved by letter front Headquarters
"Use negativ.total.to show ov.rrun in Ijwe
NOTE: Thor contractor will be allowed 10 days Iron date of this report in which to pretest in writing the correctness of this
statement, otherwise it shall be doomed to have bon accepted as correct.
DDTfarm 111011
a.rba frets a
6 I
pF RFL
z PUBLIC WORKS DEPARTMENT
_ DESIGN/UTILITY ENGINEERING • 235-2631
n UAL F
D MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.BB0a6
9 e-
P
rED SEPtE�
BARBARA Y. SHINPOCH
MAYOR
J,k 21, 1987
1
I
West Coast Construction Company, Inc.
P.O. Box 419
Woodinville, WA 98072
Subject: CAG 029-87
North 1st Street
r A
Centlemen:
Enclosed is the Weekly Statement of Working Days for the week ending
July 17, 1987. i
Please note there are 68 working days remaining on the referenced contract
as of July 17. 1987.
Very truly yours,
y
Joe Armstrong
Project Engineer
:ckd
Enclosure
t
i ,
�.
1
IN
WEEKLY STATEMENI"OF WORKING DAYS:
CONTRACTOR West Coast Construction Co. Inc.
ADDRESS Post Office Box 419 S
CITY Woodinville STATE Washington DATE 7- 2-o ' 8
r C..rrer4 Nvwbr F.dwddlJ N.i.r,Nvmb., High..,No.a.Co.." bwm..nt H."., y
j CAG OY9-81
The following statement shows the number of working days charged to your contract for the week
ending I Irle / 191
Do,. Do, worh..C.ndirl.n w.Al.e D.F. U.r..k.b I.Do,
oolk W bF wNN1.r w
«rh.r Cendbl.n.
Monday /toy
7_ 4- Tuesday C/la.y
?-I S Wednesday C/Gar
7-14P Thursday —4�LjS j r
,7- t7 Friday G/daa y, r
Days this week__............_ 4
Days previously reported.........Y_................._......._............._.............. Z
Total day.to dot. ._..........................„..........._.................................. 7
CURRENT STATUS
Working Days Specified in Contract......_............__...... 75
ADprovoa Extension of Time............................................................. '6-
Total Authoris.d Time of Contract .............____......................... 75
Less working Doy.Charges..............._................._.__-._........._..... _
•.Woking Days Remaining....................„._...........„....................
......_......_. G4g
Summary of Weeks Activities•.
hMeet 11ye.em
Show only dens Ions approved by letter tram Headquarters - .._.
"Use negative total. to show overrun in time
NOTE: The conaactar will be allowed 10 , I,om date of this report in which to Probst in writing the correctness of this
statement, otherwise it shall be deemed to have been accepted as correct.
DOT Farm 4}}O]}
«
L�
CITY OF RENTON
.� PUBLIC WORKS DEPARTMENT
Barbara Y.Shinpoch,Mayor Design/Utility Engineering
July 14, 1987
West Coast Construction Co., Inc.
P.O. Box 419
Woodinville WA 98072
Subject: CAG 029-87 Weekly Statement of Working Days
Project: North First Street
Gentlemen:
Enclosed is the Weekly Statement of Working Days for the week ending
July 10, 1987.
Please note there are 73 working days remaining on the referenced contract
as of July 10, 1987.
Very truly yours,
t, Joe Armstrong
Project Engineer
21.2.7/JA:ckd
Enclosure
a
200 Mill Avenue South- Renton,Washington 99055 - (206)235-2631
x
r
f- 7
r
��� 'N;. ,a i - # namWh•� °5et•,:unh 5 5���+r..>Ji�s#Ffl� r�'
Ir
T
i
r WEEKLY STATEMENT OF WORKING DAYS:
CONTRACTOR West Coast Construction Co. Inc.
ADDRESS Post Office Box 419
CITY Woodinville
STATE Washington DATE 7-/3_ 8 7
C""jA Nwobr F.brd-AIJ Pnlem Nud.• Nieh..y N.,«C.
Srsummt NvoMr /CAG 029-87
The following statement shows the number of working days charged to your contract far the wank
ending �i� 4i /p
Dist. Dq Worhv Condition W«kiwis D.'. • 1961,
iser d ky wot'ipain".r
Wo.. «C.nlmon•
Monday --
7- T Tu..da- 'e
7- f Wednesday
7- 7 Thursday
Ova✓�4s f 1
-1- IO Friday G/tar
Wdr ry /
Day.'his week
Days previously raPxled..........»_.._....................__»........................
'a
Total day.to date
CURRENT STATUS
Working Day.Sn. tat._•__-._.. 75
•Approved Esternu n . ,ate
Total Authori.•d Time of Contract ...._................. 75
Lou Working Day.Chargos........_.......... Z
Workhog Day.Remaining....__......... -7
feetrwf of Week's Activities:
if
/� Pnlon En.i
r I 'Show onl exten•lon.a Y Pprw by Iein Iron Neadnaarter•
Uss negative iota 1. to .how overran in time
NOTE: Th. contractor will be allowed 10 d.y. Gam date of this report in which to preteal in writing the correctness of thle
statement, otkawiss it shall be deemed to have been uccopted as correct.
nOT
1
k
• WEEKLY STATEMENT OF WORKING DAY'-
CONTRACTORWest Coast Construction Co. Inc. <}
ADDRESS Post Office Box 419
CITY Woodinville SME Washington DATE 1-/3 -87
C.ew•,Nuwbe, F.bwldH Nei..,Nuel.r Inghw.,No.w C.wnt b.lwu,No".. /
i cac oz9-a7
The following/ m how stateant slims the number of working days charged to your contract for the week l
ending— G<Z"/ /o , 19,i1.
D.I. D., w..,h.r Candid. W.rybe list• Un.erbsl•Dsy
C....d by W.mon w
weeli cenam.'.
G Monday
-!- T Tire day
-t - l' Wedr.sday .B
7- 'I Thur,day Cv<rc ns < I
0- I d Friday C/o-
Days this week.............._......._........_............._............
_._...._.. 2
Days peviously reported............................._.................................... 9
Total days to date ...........«........_._._...._......................................
CURRE4Y STATUS
Working Days Specified in Contract._................_.................................. 75
'Approved Extension of 1 im................................................_....... .e.
Total Authorized Tim.of Contract .............. 75
Loss Working Days Charges..........................................._........
...._ 2
..Working Days Renaming..................___.....................................__....... '73
SunwAry of Wask's Activities:
�/� ! ►,elaCn•l
'Show only exlonslon, approved by letter from t',adyvort.rs
Use negative totals to show overrun in time
NOTE: Th. c-MI-11a,will be .11...it 10 day,Irom dote of this report in which to protest in writing the correctness of this
,lolem.nt, oth ,.lsa it shall be deemed to have been accepted as correct.
DOT :.w10