Loading...
HomeMy WebLinkAboutWTR2701999 L.I.D. #314 East Valley Hwy. N.E. W- 16th, 19th & 27th Streets BEGINNING OF FILE flu Tffm ��59 i�^ -z�'- �J" �.A �f a c � �'"�, n ��� �� �� � � � ��' �" �/ 'd'� < � Lr`-t _ e �".' � �� �� � . X•C_ � -r `,1 � �, �tu-F�,;,,. CITY OF R[NTON • DEPAR1 MINT OF ENGINEERING /a MUNICIPAL BUILDING 200 MILL AVC SOUTH REN10N WA 90085093S•2031 I PROJECT t,1,9. "IA teal fallax Read PROGRESS PAYMENT ESTIMATE NO U 1 Final COntlatt NO cOty,QSa•!1 COn„atld _ _ CASCAOt "Tic tMI9CE 9 CIo7,n Date 2A•N I SM6a11.OljL N BYtC �I- PREVIOUS THIS NO N0 «>...•.v�Q`!0� Y�+ U_nt�llrot P.,< Eat P IOUS tOTA � 0lr .._. _ S ESitMATE TOTAL TO DATE OIYlA nowt Otr Anwunl Ctr Arnd.rN � 'sfN ,E A-7 Y•t-ott, I i�...`.� i i 1).I'S34. 1 1.ke Bank It,., C....1. Clu. S frrtnch) ITOMs 11 3.I Sol 10A.30 rowndatimt wat•rtq TONS 7.Vt, ISO S.i.m 12•Ineh OutNle Iron wabt I , Main, Class 32. T•ton Jeaat 'L.r, 25,00! 372 .lfill& M.660.00 1 4.L30 to-Ifth Untt lie inn, water II{19,9 40,450.00. Nat.. class $2, Ntch•nleal I I I Joint �L.r. 13.00 3% 40/,0 91616.00 40/.0 I9,41"M !•I.30 6-Inch 0uctilt Iron Wt" gain "ah.nital joint mt1.a lna shackle Rod• L.F. 71.00' S2 I 1}S.0 3,1}5.00 1 i I 12S.01•• .m 1:"Ynt Co,�t"tw Thntu 3.175.00 Slot kin, S.Y. 90.00 46.51,200.00 1 7,i,m 3/4.1"h Shotklt And• i1.R l.m 11600 4090.0, 1,920,ro 15.0I� 1,200.00 9.1.30 17.1nth . h-inth Vet Tar 't.. 1,3m.00 1 1.0 1.3pp.00 i109D.q I.Ti20.00 9-:-m 12-11ch 1 Io-imh k•t Tor G. 1,750.00 F 1.0 T. ( 1.0 1.m0,00 10.:. 000.00 , 6.0 I 7,0m.00 to Retonn tt Well.. sarwke Ta. 360.00 t 13.0 33M.00 13.0 1 3,900,0D I1. ,m btar ut.tin, sorWt. t., e50,00 ) 1 12. ,m 1mra fitting. •IA• 0.75. 7,30 11144.0 11.„m 10•tuth Galt V.N. 139.00 ills/,q }1},O0 3•. fm.00 a !.0 .„m 12-Inch 1,0 lx -into Cat* "lve, Y/eYMu, i IM0.00 I I /Vault L. 1.600,00, A 5,0 9,000,00 15,I.m Val" Mark., 9.d COMM fo• 35.00, 12 21.0. 735.00 Y1.OI 7l3,00 le, ,m AdjustYaltc got, the ludlnt 'al" OPeratinS out IStenoles Re 17,i. 10 , 3 "A"A2.100,00 m Ntd.ant A.awhlr. rrpa A a 000, .. 1,to ,% }9.q Y,f00.00 I9,�,m Ntdrant a1•wgT. Tp 1-1 1t•, 1,330.00, lO 9.01 /1.700.70 . 9,9J 11.100.Op it.i.m "Pont b"a61 1 1.0 I.3W.00 I 1, t,31p.0D r. Type 9a fa• 11330.00 1 j 1.0 1.M 00 M. .30 Guard Pats 1.0! 1.}10.00 ta, m.00I N 1 10.0 m9:00 1 10. 100.00 21, .m Ny6gnt Wrt ltal Taunxttm V.F. 200,00 6 i d1.1, 9,300,00 22. .m Tw mnrsr, 2-inch 11aw.Ofl I /l•� 6,300.00 An"kb to. MOO it 1 12.0 3, I 90D.00 1 IY,oj 2,000.00 s.ktot.l 7 102,132,00 i f09,l3i.00 1 ' N.S.S.T. . 1 Y.176.10 ! 7S� ' t N,S.S.T. .01 2,1 J6.1p 91/,90 911,90 +TOTAL SC a St 4.523.22 � TOTAL NtnOIf A•7 /,677.2} 117,1/6.97 IIJ,t/n,1} 1 ' I 1 I 1 1 I i � I i 1 I i I I I _._•_,_ I I I 1 j II II g0. CITY OF RIATON Et D1.11ARTMI-NT M ENGINEERING MUNICIPAL SUIIOINO 200 MIL:. AVE SOUTtc NLNTON WA 98056.935•91631 F � MOJLCT t.140. I716 [ere •�Ilr. tftl PNO9NESS PAYMENT LSTIMOE NO 11!I'M) treat No U" TH62 Cor•t tat to, eAWAOt Cbvn6 0a10 2.144 ShMitoi2L 9m: • L•1 P11Ev10U8 107'I THIS ESTIMATE TOTAL, TO DATE 710 Oo•r.,pnon un,r un•t ►r.a9 p1r 61r Awwnt Olr Atn0on7 Ctr At1te..ro 9 4MLI 1-2. vat., i. >D bM 9u.. Onwl, Clna a I ! <tt•ncnl T w 3,S0 Ne 117,{; 31{.{0 l 117.6� 516.50 /euM•Hw, Muria T6d 9,SW Too ' !. 10 It loco 9uoe 11e Iro,. Mar I I Min. rise, U. 'yn„ Joint I./. 2030 6155 16709.0. 108.691.00 S]02A 106,691.00 w.I,10 •10 Inch Ductile Iron water Mfn, Cie,. St. Mo Mnlcsl Joint 1 I.7. )LSO NI 111220' 14,123.00 , �1122A 211121101) S,,.36 6 Inch purtfle Iron Water 1 i Min, CIA., S2, H.rhenful ' Joint. lnefudlnp Sh.oklt Rode I.1. 20.00 190 1 21S,0 1.]00.00 1,100,00 I 4.j.20 C'.�,t Comma IN...t O.,*1 C.Y., 60.0oi 211 91.0 7,260.00 91,01 7.1e0.00 .10 11. inch Sh•ek• a,N I I. IJO' )700 'T511.0 J,616.00 i It 1,016.00 1.;.30 II Inch . 6 inch rtt Top to. 1.100.00, 2 ].0 J.100.00 I 3.0 3.100.00 '. .717 12 Inch a 10 In.h Wt Tev i to. 1,750.00 1 1.0' 1.750.00 l,h 1,750,W 10. JO 16 loth . 10 Inch Yet Too [.. 2d00.00. 2 2.0. 1,100,00 f. 1,100,OD Il.:,,50 Mcousnct -.i.tinc St"114 I to. )IN),001 ) 3.0: 90,00 ).� IDO.V it.,.M A.tap Gating Service I to. 1 610.00. 6 1.0 1.350 00 1,4 1.350.00 11. .10 Let's Tw IRI• Ih. .15�,10,000 I112e,o1 816.00 I 1126,0 N6.nn 16. .10 to inth "to vat. La. 510.00; 22 21.0 11,550,o0 21,d 11.610,On 15. .10 12 Inch Cat. valrr, Ni,h T"•at, vfth v.01 G, L/OO.00j It 6.0, 11,700.01, e. I1,200.00 16. .70 Val" Mrke. j G. 13,661 2? 10.0' 1,060.00 i 10.q 1.050,00 ..-.So Adjust vale. Lon, 9ncludine ' I . Value Orrnti.a Nut Eeteman' [A. 100.00' 12 55.0 1,S00.00 ]S,O', 1,500.0n 1/. .10 Nydrent A...nbly, Trr. A , La. 1.moo; 1S I 13.0 19.SO0,00 ( 15.O 19.600.00 19,'.30 Hydrant AA.f.bly. Tyvv 1.1 is. 11150.00' 7 ] 0 1,050.00 1 7.0 I,D50.00 20.i,10 Pydrent Assavoly. T7M 6.2 La. 1.)50.00 7 I { p 5,IOOAO ' 1.0I S.IW.00 21, JO IWrd bus 9s. $0.00, S6 7.0 l50,00 I 7.0 22. Ao Nydr vertical L.ton SW.QO am Hm, V.I.9.I. 200.00 U { i6.0 5.600.00 I 2e.0I 5.{00.00 21. .]0 Tarorny 2 inch alowol/ ! Movably La. 250.00 31 11.0 7,750.00 S1,01 7,750,00 I9MlAct Myd"At 6 Vat" 72.T0 I.S. 1.7011.09 1003 I,7N.09 loot 1,701,09 Su►taut 132,176.61 1 1.351140 2W.SE{,69 Y.S.S.T. 6.11 11,121 e1 10.76 I 11.e51.16 N.S.S.T. 7.01 1 1.2K 26 ],l60,M M,S.S.T, 6.6f , 2'1".84 4NTN1 On NOW ! 1 � .OTAI SCNIOULE 6-2 ; 1 ! � � 2N9,e/1.62 � � 1,159.]5 ; i l51,27T,97 1 1 i 1 1 CITY OF RF,`M DATER LEPARTMENT Pressure Test i Purification Test Form PROJECT 40. NAME OF PRWECT PRESSURE TEST TAKEN BY ` ., 'j ON AT A PRESSURE OF . __PSI, FOR -MIN. TFST ACCEPTED ON PURIFICATION TEST TAKEN BY :j 0^ PURIFICATION TEST RESULTS, SAMPLE #I SAMPLE e'_� B SAMPLE a3 REMARKS: "' CITY 01 M;NI { MATER DEPARTNEI.`f Pre41tlre 7,*:r 4 I1trif#estien Teat lore PROTECT NO. 1,,, •_'_ NAME 9F PRWRCT '✓ .t{ - PRESSURE TF.51 I'1UEN RY O.y AT A PRESSURE OF �....___r.«.—PSI, PON__.. "IN. TEST ACCEPTED ON PURIFICATION TEST TAKEN EY_, R ON PURIFICATION TEST SAMPI' "l SAMPLE RLWARF:S: "ITT O" "FRION '"ATRR DEPARTMEA^ Pressure 'n.;r g r,�pifles .ion Test Fore PROJECT Nf, t NA" '3F PR0.IECT.� PRESSuwR TEST TAKES BY AT A PRESSURE OF FAR TEST ACCk PTEO OV MIN. IURIFICATIO,Y TEST PAKP.N v r __ PURIFICATION TEST SAMP, �'—"'----- I _ Sr4Unt SAMPLI. -3 . REMAR+:S: x A G CT'FY 01 RE*\'TON ^'1I'ER DEPAMIENT Pressure Te<r o F�irifirntion Teat Fat* PROJEI:T NO. NAME 9P PROJECT s✓ J,.�1 PIESSUPt TEST TAKEN B1'_^ .:. •i,` > ON AT A PRESSURE OF MIN TEST ACCEPTED ON PURIFICATION TEST TAKEN PURIFICATION TEST rr,.uIT8, SAMPtr, el SAMPT@ eZ SAMPLE ON REMARKS: oc-laT'�a /� , /-13 4 .r ^ NOTICE OF NE W FIR[ HYDRANT Ifs-SERVICE NAME OF DEVELOPMENT ADDRESS 45. vt � v "_'-----�-.-- . INSTALLATION CONTRACTOR _ _ r. VIGIL.1 e7 WATER PROJECT NO. -_a�..�r TT fly ee NLMBER OF HYDRANTS-_--_'-------- I. (FOR FIRE DEPT. USE ONLY) I. 1 HYDRANT NO, 4. 6. INSPECTOR NOTICE OF NEW FIRF HYDRANT iN-SERVICC NAME 7F DEVELOPKNT ADORFSS INSTALLATION CONTRACTOR WATFR PROJECT ND. NLIPBER OF HYDRANTS HYDRANT �.00ATIQN15 (FOR FIRE DEPT. USE ONLY) HYDRANT NO, 1. S. 5. INSPECTOR tYJT U`. OF NEW FIRE HYDRANT IN-SEC.VICE NANE OF DE\ELOPWNT ADDRESS - ' _ INSTALLATION CONTRACTOR _ WATER PROJECT NO. NUMBER OF HYDRANTS .� _HYDRANT LOCAL IONS (FOR FIRE DEPT. USE ONLY) HYDRANT NO. 1. t. 3. _ 4. 6. I INSPECTOR ,_, _ I ITY OF RENTON WATER DEPARTMENT (PSI last 6 Purtficetion Teat Form PROJECT N0.W .d..L ....... NAME ;i! PROJECT__��,�_,��/ � PRESSURE TEST TAKEN BY ON AT A PRESSURE. OF _—PSI. FOR._ MIN, TEST ACCEPTED ON PURIFICATION TEST TAKEN BY 4 y. oW, PURIFICATION TEST RESULTS, SAMPLE el c<Q wo Jf, ").c)J SAMPLE e:,e ry 9Z6 00 SAMPLF 07 fi:> REMARKS: 6/>, SANITARY SEWER SYSTEM lnW PRESSURE AIR TEST PROJECT 43iLiL t „` • ATE MIN LOCATION I LENGTHI K C T1 LAF RESULT ILI _ M !' 1 IdtaaBEiL£ [ £Qa3 [$e2a$ IREa Do March 10, 14.t M Richard C. Houghton, Public Works Department ►oml Robert E. Bergstrom, Engineering supervisor L.I.O. 0314 The pertinent dates which follows: Mva been set with regards to L,1,0. 314 are as First My Of Advertising March 24, 1982 Bid Opening April 27, 1982 Start Construction July 26. 1982 Complete Construction December 2, 1982 Total Working Days 325 E o ergs .rom '—' DM:ckd cc: Gary Morris talon Olsen • t'C tCn�l lF•-.�. VAC k .4"CA4 cat) Ca•-..-.h fy L'' 6Ay �c (cost-7 V�IJ7{ VII�. plf, wo tf- 11M e•UtNy � u� S T�� �,.,it � c�.�Q Tit. > t faPypo, br/d•a.�f _ Co-,F� + L �" �. 'f}��.� • • A,;-4S-, COWUMOWE APPLICATION NO(s) t L.I.D. 314 DESCRIPTION OF PROPOSAL: I'ToP,;sed roadway improvements (installation, widening curbs and gutters, and storm drainage to East Valley Road) . PROPONENT: City of Renton, Public Works Department -OCATION OF PROPOSAL% East Valley Road (S.W. 16th Street, S.N. 19th street, and S.W. 27th Street). LEAD AG6"Cr: Public works Department DATE OF ERC REVIEW, Acting as the Responsible Official, the ERC has determined that the lequeated modifications to the initial proposal reviewed under ECP-633-80 on December 10, 1980 are within the scope of that original proposal and the environmental determination of non-significance is still valid. This decision was reached following a presentation by Richard C. Houghton of the Public Works Department. Oral comments were accepted fromt David Clemens, Richard Houghton, Ronald Nelson, Donald Monaghan, Paul Lumbert, Roger Blaylock, Steve Munson and Ed Wooten. Incorporated by reterence in the record of proceedings of the ERC on application L.I.D. 314 are the following, 1) Environmental Checklist Review Sheets, prepared J+y: None prepared WCRS's were submitted IT :several departments, however.) SIGNATURES; ✓� J.ex-- F �C ona Nelson U i< emena, nq Building Director Planning Uirectot . oug .tc Public Works Director Nuvamtar Is, 19a1 Date clrculn•; " duel E%VIRD►NIN1:11 "RCKILVI RiVllw SNEE"T E CF _ 633 80 APPLICA1l0N Na�c L. l,U, 314 P&11'JNENII CitY of Renton/Public WOrKs Department ProJJCCT IIIIE : L.L.D. 314 ------------- Rr+ef Dv,, rtptl.v; ur I'rt,(rr( o Pr oar:: rOaytwa im rovements (installation, widening curbs an nutter.;, an: storm drainacie to 6aaov R.ycjl t Aile" R yd S,K, lbth Street S,I sr rest, and 1 , to tree f• 19th i i1E ARI NUt AClpl ruble• dJ1l ee 11 -A ; nr Not Applicably 011E 1U1'H( \IAE . . :: Not ApPl1!•.lUlr '11 N1h! NAJtll: tIDNI. I IUpJ It 'phi. +X X - ,.1 Industrial/Vacant Inducer is l/Vrennt �� �""'—" I r -T---- .X +X dl t.tft:. _X I' R•e Diroctior J'S lmparta Raviewed !)y Of November itl, 1981 � "" SECTION 72 - PIPE FOR WATER MAINS 72-1 GENERAL All pipe sizes, as show on the drawings, and as specified herein are in reference to •nominal aiaeeter, unless otherwise indicated. All pipe shall be fabricated to fit the plan shown on the drawings. One type of pipe shall be used throughout the entire project except as necessary t0 match existing piping or as otherwise Specified by the Engineer. Where relcoation of or replacement of existing piping is necessary during construction, materials used shall match the existing, subject to the approval of the Engineer. All pipe, valves, fittings, and specials shall be for water working Pressure as described i, the following specifications and plans and shall conform to the requirements of the applicable sections of the A.P.W.A. Standard Specifications, as modified herein. 72-2.02 DUCTILE IRON PiPE Ductile Iron Pipe shall conform to ASA Specification A21.51-1976 (AWWA C151-76 Grade 60-42-10). Ductile Iron Pi;c shall be cement lined and sealed in accordance with ASA Specification A21.4-1980 (AWWA C104-54), 4" through 12" pipe shall be 1/16" Cement lined and 14" through 24" pipe shall be 3/32" cement lined. The pipe Joints shall conform to ASA Specification A21.11-1980 (AWWA C1114). Pipe ,Joints shall be Tyton Joint, Mechanical Joint or approved equal, as required by the bid proposal description, Approval must be obtained prior to bid opening. Pipe thickness class shall be as required by the bid proposal descrip- tion. 72-2.02A POLYETHYLENE EKASEMENT Polyethylene material, thickness, and width shall conform to ANSI A21.5 or AWWA C105. 72-2.08 PIPE FITTINGS Cast Iron pipe fittings Vthrough 12" shall be Class 250, as per ASA Specification A21.10-1977 (AWWAC110-77), and shall be cement lined. Joints for fittings shall be Mechanical Joint as per ASA Specification A21.11 (AWWA C111-80). The above shall ho-d true unless called out otherwise on the plans or in the Bid Proposal. 72-2.11 SERVICE CONNECTIONS Service line connection to the new main will conform to the Star,7ard Specifications of the City of Renton bound herein as applicable. The Engineer will indicate the location for the taps on tW new main for each service to be reconnected. The Contractor will direct tap mains for 3/4' and 1' services and use double stay service clamps for 1 1/2' and 2' services. The Contractor will use copper tubing for 3/40 and 1' lines and galvan- ized steel pipe for 1 1/2' and 2' lines. Connections to existing service line will be with Dresser type couplings for steel pipe and flare-type, three part unions for •opper tube. 72-2.12 RETAPS AND RECONNECTIONS OF EXISTING SERVICES As directed by the Engineer, the Contractor shall relocate existing service connections. This work may involve only relocation of the meter box, meter, and meter set, or it may require retapping of the main. The Engineer shall determine in the field if the service rvquires relocation and re:onnection or retapping from the main, and will direct the Contractor accordingly. sEcr !ON 73 _ tAENCH EKC 13 1 sENEltgl AVAt10N AND BACKF the rwatsnthexcavation !lt F cable Pr rlh And app , be< ll �tER 1(tINS 1. CA A11'v4r herein. Sectipta 3esApaW�b t n Prep dence�wfnd Deddln 9vantcontractor d SPecfficatl the APD)tr Shallity, and Of Shall "nf °rs. except des and19,'t grade dode fOrtmet Should f fo°IpT, satisfy, ;r f o be the n approved materfils,orl r In 40proo l he the Contra,, h�!a p hims fPosesvOte N0 r ter oen Placing9lneer Shall ed manner and Conditi CA a co t dd lineshan those . an hollit� Of meterjelition f allete contr on �'s own With Excar Nested at a site a used es eriti laOver the exc ex. to t es en�o f every Provided by t^e fill SAlll doteneinn9, R1ovin .tur sh! an^es and gad with crt tfon, c)essff Co^tractoru^suitable the su t ditch d as °des if f material °'feces Shall pindicated p^Cessory./��s Of the an on and Dne° � Of mee'Ing�r°^otipnto,)ed toNInte,c S. rem t°fpiP' sh II be ever sPerfo ub_ acted at a siteuiremenl^djtf of Pt rem , al, d St On °r Of ° Y dr ^9 an rmed hen separlinate a Provide or cyor backftlj work Aljrfoce watan drafna9e F`OAtlOphauiingxoanfpuleft fhea^�ntractp a)) excfssm°tetlialseshd1s Founda Ill vision$L°f Prepar pp RtionNANOBEGOINirwasteo/fexcavatedm4terjor Storing al 1 bottom of the on )3. A.Pell In . ant 0t the trench o ,P- .4. StadarCordonce wl tith n unstop De lhrou9h U shaped toSpeeific tfo he °pplf unste pro. ChSCOna t1 )3h2,pSgfofer'ultamre e0sLell ingfmat length,)V SupPOrie�^etNot ttwn m71 yylthconditf�3f11 not nec A.P w°A th« use ft encount A11 costs a Enyi^eer the e'en sser{)y �Stendard m°terlal 1ne ed at t select The Per per t n w°tery^9 sArmfr,eNtShall DeCdesw sultabfli aeredpasfetered one n°atioes°roan e Sectio Indic lie t n j3 ourc�dr f�"^jsAf^9 and I,14C 9 the 'be f ieCtrench rof te c he C01't toot Iton m°terial yp.eQutliol f1^ Excavated materials that are free from mud, muck, organic matter, broken bituminous surfacing, stones larger than 8 inches in dtmens1;,n and other debris shall be used for backfill except where otherwise regA red, 73-E.06 BACKFILLING TRENCHES Initial Backfill i Initial backfill shall be placed around the pipe in layers not exceeding eight inches in depth and each Dyer shall be thorouglly compacted by mechanical tampers to At least 95% of maximum dry density at optimum moisture content as determined by Standard Proctor Compaction Test, ASTM Designation D698-58T, Method D. All work related to the testing o• the canpaction, including proctor test and compaction tests shall be taken on the pipe trench areas. The locations of the tests shall be selected by the Engineer. If one or more tests do not meet the specifications As stated above, additional test will be taken as requested by the Engineer at the Contractor's expense. Subsequent Backfill All subsequent backfill under street and shoulder areas shall be placed In lifts not exceeding 8 inches in loose depth, and each lift compacted to at least 95% of maximum density at optimum moisture content as determined by ASTM Uesignation D698-58%. Method D. Inplace density determination shall be made in accordance with ASTM Designation D1556-56T, except as otherwise approved by the Engineer. Testing for compactions in the improved areas shall be to accordance with the testing as stated in the section on initial backfill. 73-2.08 BANKRUN GRAVEL FOR TRENCH BACKFILL Select trench backfill for the pipe shall consist of crushed or naturally occuring granular material from sources selected by the Con- tractor. The source and quality of the material shall be subject to approval by the Engineer. Select trench backfill shall meet require- ments for bank run gravel Class "B" as outlined in Section 26-2.01 of the Standard Specifications. 73-3 MEASUREMENT AND PAYMENT No separate or extra payment of any kind will be made for excavation, canpaction, wetting, drying, water, or nrDcessing of materials, but shall be included in the applicable unit prise paid for the waterline in place, complete. Select backfill shall be placed only in those places designated by the Engineer. Payment for "Bank Run Gravel Class "B" (trench)" shall be paid at the unit price set forth in the proposal by the ton, SECTION 74 - PIPE INSTALLATION FOR WATER MAINS 14-1 GENERAL T Pipe installation shall conform to Section 74 of the Standard Specifications except as herein modified. Jointing shall , form to the manufacturer's recommendations. Cut pipe with approved Pipe saws only. Keep pipe plugged except during actual pipe laying. The inspector will stop work unless an approved plug is on site and available. Minimum depth of cover shall be: Pipes 12-inch I.D. and larger, 48 inches; pies smaller than 12-inch I.D., 36 inches. p 74-2.03A INSTALLATION OF POLYETHYLENE ENCASEMENT The polyethylene encasement shall be installed on all appurtenances, such as Pipe laterals, couplings, pipe and fittings, and valves, in accordance with Section 5-4 of ANSI 21.5 or AWWA C105. 74-2,10 CONNECTIONS TO EXISTING MAINS Connections to existing Piping and tie-ins are indicated on the drawings. The Contractor must verify all existing Piping, dimensions installl and connect alluwet t re prop t(existing mait. The ts rinclud1n9actor 1anY rovide� fittings not called out on the plans. Prior to making connections to existing mains, the Contractcr shell notify the City of Renton Utilities Department of the date, time, and location of the tap to be installed, and shall submit a drawinr detailing the procedure and materials to be used in the connection. Materials for wet taps shall be all cast iron, and tapping valves shall conform to the specifications for other valves. The wet tap shall be Pressure tested after Completion of its installation, Connectio-s to existing water Pipelines other than wet taps will be made by the Owner. All necessary trench excavation, backfill, and su.face restoration shal' be performed and all necessary materials shall be supplied by the Contractor. Contractor shall furnish equipment and manpower to assist the Owner's crew for the connections. The Contractor shall remove existing and temporary plugs, r ,ncrete thrust block, and blowoff assemblies prior to the Owner making the connection. All materials shall be on-site prior to Owner notification to make the connection. The connection will be made after pressure test and sterili- zation, The Contractor shall be responsible for the protection of all existing Piping and appurtenances during construction, and shall take care not to damage them or their protective coatings or impair the operation of the existing system in any way. 74-2.12 FIELD TESTS Hydrostatic pressure and leakage tests on the new Pipeline shell be made 1n accordance with Applicable provisions of ANNA C-6DO-54T or C603-6t1' and Section 74 of the A.P,W.A. Standard Specifications, except as modified herein. All equipment necessary to m.ke the test shall be turn shad by the contractor, and the contractor shall conduct all tests under the super_ vision of the rigineer. Any PI eblby the Contractor blies which may a required f r testing shall a sup- Press�est pressure tested in accordance with APNA S be Prior to acceptance of the water stem tathe tire ndard The method shall conform to •2,12A Testing Section with Hydrants Installed`, Test pressures shall be as outlined for cast iron pipe, Ductile iron Pressures shall not be used, The Contractor shall provide all necessary equipment and shall perform all work connected rimwit the tests and conduct said tests in the presence of a Utilities Department Inspector, Insofar as practical, tests shall De made with Dipe joints, flttlnOs and valves exposed for inspection, Leakage Tests Leakage tests shall be made after the pressure tests have been satis- factorily completed on the new pipeline or concurrently with the Pressure test. The hydrostatic pressure for the leakage tests shall be equal to 100 psi, 74-2.13 DISINFECTION OF WATER MAIN completionffo1Lhe of' project new andashallter be�in shall accordance et A�,P P.W.A. Standard Specification C601-S4 and Sect ton )� fo the A,P,1' I, Stand 9ard DepartmentiOfsHealthha The ll Initiel concentrate n o acceptance Of f the State ofinathenline shall be SO parts per million and this solution shall be held for a period of 24 hours. Disinfection of the entire water system installed or disturbed under this contract, including pipe, Pipe fittings, valves and appurtenances, is required to conform with the specifications state,; herein, 74-213A DECHLOPINATION Upon Compietion of disinfection of the water system, the treated watered an disch•rgeptheved manner. In chlorinated waterrtain dlrectlyatoothe sentiary sewer. Howr•er, prior to disinfection of the system, the COntrartor shall obtaii. the approval in writing from the Municipality of Metropolitan Seattle sanitary sears. (METRO? and the City of Renton for discharging into � Should dir the ect discharge to sanitary sewers of chlorinated water not be accordance Contractor wit A the City of aRentonll AStandard Detaiilsiincluded int tthese specifications. Under no circumstances shall chlorinated water be discharged into storm drains, onto the ground. Into ditches or wetlands. 74-2.14 CONCRETE BLOCKING Provadel concrete blocking at all fittings end horizontal ` vertical g points. Conform to the Standard Detail zontal or Blocking hereto and the A.D.N.A. Standard Details for vertical blocksor f\ All fittings to be bloc.ed shall be wrrPPed with via Queen. Concrete block in v fermin m shall De properly formed with plywood Or other be strI materials and shall not be poured around Joints. T forms shall C installedewith prior usekof11sAeCkleAluase RoAllwhere r°Qulred,rshallabe t varninth Federaland shall be galvanized or coated with Atwolcosts rods of asphalt , installation Shallibeciiniaccordancevwith the Standard Detail. rod 74-3 MEASUREMENT AND PAYMENT The price per linear foot for installer the water i t Quantity listed in the Did schedule, shah const{tuts pipe, for the water line, 1n place, compiete, including; all pavement removal, excavation, trenching, native backitll, fa+ndetlon pre era compectlon, pipe, Pipe iaying and ,lointing� AiIy�LT^p s or e dewatering, connections to existing Dipe, furnishing and installing or ng. fittings, testing and disinfection of the completed installation, The price for six-inch pipe shall include sAackie rods. Concrete blocking shall be mersuvd and Paid for at the applicable contract price, per cubic yard; pa, ent Of which shall constitute full compensation for furniving the mate-141 in plate, complete. Shackle rods shall be measured by the linear foot of shackle rod Installed. The unit contract price per linear foot for " rod Rod" shall be full compensation for all labor, tools3/*ate materials epuipment necessary or incidental to the shackle rod installation is and However,as nonpayment will i made for shackle rods installed on 6-inch Pipe, as described 1n Section 70-3. - The unit contract Net taps for connections to existing mains shall be measured per each. necessary ensationp for pall er each for tools.l (Size) ets. aTa"eshall be full necessary or incidental to the wet tap construction including the tapping tee and valve, furnishing of the tapping machine, excavation and backfill, miscellaneous fittings, and testing. Service Connections shalt be measured per each. The unit contract price Per each for "Reconnect 1visting Service• shall be full compensation for ell lebnr, tools, materials, and equipment necessary to relocate and reconne.t an existing service to the main. Including remove and reset meters and meter boxes, furnish and install new water service pipe and connect to existing water service pipe. This does not Include a new service tap at the main, but does include a variable laigth of new service pipe, if required. The unit contract price per each for 4etap Existing Servica' shall be full compensation for all labor, tools, materials, and equipment necessary to retap and relocate (if required) existing water service connection. Any extra fittings due to field changes in the water system shall be measured by the pound. The unit contract price per pound for 'Extra Fittirgs• shall. be full compensation for all labor toots, materials, and equipment necessary or incidental to the lmetaliatlon of the extra fittings. <-- r Try 0 4,1, r, rw '.My`d v✓/1m•.. Yr.FIt'l i fr ~(Yifl!j.. r 1if1* it / . 14 J t SECTION 7S - VALVES FOR WATER MAINS 75-1 DESCRIPTION Gates Valves W throu0h 12•1 Gate valves shall be cast iron body, non-rising stem, full bronze mounted With double disc gates. Ail valves shall be designed for a minimum water operating pressure of two hundred (200) pounds per square inch and shall conform t0 AWWA Specification C-SOO-80 and any subsequent modification thereof. Each valve shall be 000 ring type, provided with ■ standard square operating nut, and shall open by turning counter clockwise (left) and valves shall be IDWA List le, Mueller A-2380, Pacific States, U.S. W.tropoliten, Kennedy, or M&H. { The 12• gate valves shall be furnished with Ovpass valves and concrete ' vaults, and shalt conform to the City of Renton Standard Plan included in these Specifications. 75-e.01 MEASUREMENT AND PAYMENT Measurement for gate valves shall be per each. The unit contract price per each for "Ton-inch Gate valve' shall be full Compensation for 411 labor, tools, materials, and equipment necessary or incidental to the installation, in place, complete for the valve and valve boxes, and valve stem extension (if required). *Valve Markers` shall be paid for per each. Ths unit contract price per each for 012-i ,ch Gate Valve with Bypass, with Vault` shall be full compensation for ail labor, tools, materials, and equipment necessary or incidental t0 the Installation, in place, for the valve, bypass valve, and vault. r SECT•?N 76 VALVE CHAMBERS AhD BORES FOR HATER MAINS 76-1 DESCRIPTION Valve chambers and vaults shall be furnished ant installed whart valves are installed. Ten-inch gate valves shall be furnished with standard valve boxes. Twelve-inch gate valves with bypass valves shall be installed in precast concrete vaults in accnrdance with the City of Renton Standard Detail. 76-3.07 VALVE BOX EXTENSIONS Where shown on the plans and as directed by the Engineer, existing valve operating nuts and boxes shall be extended to match new finished lgrade. Extensions shall be provided and installed in accordance with the it of Renton Standard Plan for *Valve Operating Nut Extension Detail• included in these Specifications, and shalt provide not more than 36 inches between the top of the operating nut and the finished surface. 76-4 MEASUREMENT AND PAYMENT No separate payment shall be made for valve boxes and vaults. Payment for Giese items shall be included in the unit contract prices for "Ten-inch Gate Valve", •Twelve-inch Gate Valve, with Bypass, with Vault•, described in Section 75. Valve operating nut extensions and valve box extensions shall be meaNutsured ting Ext per each. sMllunit be fullract compensarice tionar each forfor allV411patools. materials and equipment necessary or incidental to the furnishing and installing of the valve nut extensions and valve box extensions. l SECTIUN 77 - FIRE HYDRANTS 77-1 DESCRIPTION Fitt Hydrants shall be Corey Type (opening with the pressure) con- forming to ANNA C-504-80 with a 6" inlet and a minimum M.V.O, of S", two 1 1/2" hose nozzles with National Standard 7 1/2 threads per inch and one 4" Pumper nozzle with the new Seattle Pattern 6 threads par inch, 600 V. threads, O.D. thread 4,875 and root diameter 4.61263. 1 1;40 pentagon operating nut and opening by turning counter clockwise (left). Hydrants shall be constructed with mechanical Joint or flanged connections as specified on the plans and described below. Fire hydrants shall be of traffic type and provisions shall be made for drainage of barrel to protect units from freezing. Fire hydrants shall be of such length as to be suitable for installation with connections to Piping in trenches 4 1/2' deep unless otherwise specified. Fire hydrants shall be IONA, Pacific States or approved epual. Approval must be obtained prior to bid opening. Fire Hydrant Assemblies shall include: Type A - 6" Gate Valve (FL), 5" MVO Fire Hydrant (FL Connection) including riser, 8" x 24" C.I. Gate Valve Box, and Concrete Blocking. Type B-1 - 5" MVO Fire Hydrant (NJ Connection) including riser, 8" x 24" C.T. Gate Valve Box, 3/4-inch Shackle Rods with Accessories, and Concrete Blocking. Type 9-2 - 6" Gate Valve (NJ), 5" MVO Fire Hydrant (NJ Connection) including riser, 8" x 24" C.I. Gate Valve Box, 3/4-inch Shacks: Rods with accessories, and Concrete Blocking. 77-3 CONSTRUCTION DETAILS 77-3.01 SETTING HYDRANTS All of the hydrant assemblies shall be furnished with a satisfactory extension riser to allow for a connection to a main up to 4.5 feat deep. The hydrant shall be set so the top flange of the riser is a 0,3 foot minimum above adjacent curb elevation. Hydrants shall be set no 'arther than 12 feet from the face of the curb. 77-3.02C CAST IRON VALVE BOXES Valves and valve boxes shall be set such that the valve operating nut is not more than 36" below finished grade. 77-3.02D LANE MARKER LOCATION IDENTIFICATION Type 2 reflective lane markers shall be installed in accordance with Section 44-9 of these Specifications to permanently identify hydrant locations from the street. Reflective faces of lane markerr shall be blue both sides, and located as directed by the Engineer, with one marker for each fire hydrant. 77_3.D2E GUARD POSTS Guard posts shall be Installed at each hydrant location in accordance with the Standard Plan attached to these Specifications. 77-3.03 RELOCATING EXISTING HYDRANTS Existing hydrants are 0 , on the plans, and require horizontal and/or vertical adjustment to conform to new street grades and alignment. For horizontal relications, the Contractor shall install additional 6-inch pipe with shar.ling, fittings, and thrust block%. For vertical relocations, the Contractor shall install vertical risers. Existing auxiliary gate valves and valve boxes shall be extended where required with City of Renton Standard Valve Operating Nut Extension to provide not more than 36 inches from finished grade to top of extended operating nut. Valve box extensions shall be furnished with the operating nut extension. 77-4 MEASUREMENT AND PAYMENT 77-4.1 -IRE HYDRANTS Measurement for fire hydrants shall be per each. The unit contract price per each for "Type ( ) Fire Hydrant Assembly" shell be full compensation for all labor,-T-ouTs, materials, and equipment necessary or Incidental to the furnishing and Installing the hydrant, riser, auxiliary gate valve and valve boxes (if required), painting, miscellaneous fittings, and concrete blocking. 77-4.2 LANE MARKERS Lane markers for hydrant identification shall be paid for in accordance with Section 44-9. 77-4.3 GUARD POSTS Guard posts shall be measured per etch. The unit contract price per each for "Guard Prsts" shall be full compensation for all labor, tools materials, and t4uipment necessary or incidental to the furnishing,, Placing, and painting of the guard posts. 77-4.4 RELOCATING EXISTING HYDRANTS 77l4.4A HORIZONTAL RELOCATION Horizontal relocation of existing hydrants shall be paid for pe linear foot of 6-inch shackled, mechanical joint, ductile iron pip., actually installed in the relocation under the unit contract price per linear foot for 06-inch Ductile Iron Water Main, Class 52. Shackled% 77-4.411 VERTICAL RELOCATION Verticalfriser relocation shall be measured and paid for per vertical foot of riser extension Installed be The unit contract price per vertical foot for •Hydrant Vertical Extension• shall be full compensation for all labor, tools, materials, and equipment necessary cr incidental to furnishing, installing, disassembling and reassembling of the hydrato assembly. Vertical extension of auxiliary gate valve operating nut, if required, and the valve box shall be paid as described in Section require. • SECTION 79 - BLDW-OFr ASSEMBLY 79-1 DESCRIFTIDN Temporary blow-off assemblies shall be installed where shown on the plans, and shall conform to the City of Renton Standard Detail included in these Specifications. The temporary blow-off asemblies shall be measured per each, with no additional payment for extra length of 2' blow-off pipe. The unit contract price per each for •Temporary 2-1nch Blow Assembly shall be full compensation for all labor, tools materials and equipment necessary or incidental to the installation otil t the blow-off assembly, including length of 2-inch pipe as required to fit. I CONCRETC ROCKING SIZING ►IIOCCOUII[ • • i76t► ....r•w l........Hw N r!wll,N r.r, r, - «rNr rrrrw +aN wrwwl. wN,rN w w • raNNyrj.I.. .—w, Nor I M.qHN,I.�..:. • ; ti tt Dt! w# � IN HHY Hwbr11,1.11lrr HNirr•ryNl 4. .!r rr,•w rrNrr' wr MIn ♦ • tar NtN0 r r!Irr w Hrr!I! .•rr\w w. oft"rrl aim, YNHw.N. 1 jr.�l i .ww.x r r r n„W wrY N \Y•xY Y+•w• 1•\ewer.w. w}x n • rY\YM Iw uM - .rM\\\q•Y x wr •M•I\•ww•MY MI Mr Yr•rl w\Ir N rr Irw N Y rl. •xNr•\I}1 N•w wwl Yr.M M r •rr'}rN1rM Mrilri NI�r`r w M\•N•Y Y Mr 't',tNe �I V� 4. I n.r,rnr urnw, 11= ttNO 60• II(No r �. •.N N Irrlmr N�• 1• r�. FIGUIIE I r •rr Y.F I,•w,N•r•M1•t � .� ft...v I.. r.•r„ MOT[- PoY ODIVtk Vtllff LL KMR MtrYM, 1 x•,r N Irw IN,wI\w,. \=^`-sty 1•In,, , wly q[ YwA RW W10 RAN 110.Tl. .. wr.Irr•r N wr.11\rN lxl. ILL•� LEIE I _ /. M�rr�•,N IMrN M.•\.1.1rw,•xH..1ryH1.•1NY •Ir r,•.•11 r\\IIN Nw wNllll MI Y M1nur a rrY - xl rN 1•x Nw NM \I�IIr Il.l n' NN Ny Lr 1,\Y 1. r Y••r•Wr w w.� N error. ti N Hrr am I'w Y ,Y iTL»H Y 1 r•• r• rr rro r'.ray• r. •" r LIY LIw lea i.•w ql w LW q.r\ HH. • w a.l} 1 b`Y"Z' �•' _ IM 6.M wJw 6.w dw Lu H«,N rw•x�.a•1,Y� ,r Iw new .r 1 er n.w a r wi•ru.Nror \p N..fwr•r M•. \Y N\N,r,. 1••rNl.y NN,•r••I w wl,r w•••1 .w M'•rr N u,w rrM. �Y W q.w N.r N.M 'Lr Lw Y M INN 1' Iw1 1 NM w H r rHIN NN IY rNI rN Ywli I.M\w.IM-1,. 1•' w M.r 1.NI a.Y 1\.IY Y N Iyrr•1� r.}N 1 IJiH.H,rr MHIr N ,b•rr.rN M' w Y W pM M.w N,YI II.1M N•w•rq IY\I'M. xh\�M ihw�r N rY Nqr,«Iw Nru N i.NN � H woo, N1e0a U Ir 11 111 w lu-)N INw .Y 11.�N 1 .w H•N N Hnr1 M•1 M•1 M•• fr rq.Yr 1.1er �I,.,a 1 W q,w .r II•Yrr•Nrr•1r�•IN••11! N.Y•N Ir I�rl rwYllr� wl N\wrN 1.1• -44.raN 1, TASLE Z . wr riF N Yrr,b.r ,\i .ltil�ir r' •..�.�.r.•r,, xy x..�..wN ,. YNr N MN.r•Wu �w Nrl 4 rd.NHS^N�•p N.�. r H..',Ny x,^H� ,r .•,r•N N•� N ,rw .•.•NN u� onir,•r\,Hrn r � •N • • ' MIANw`1w»rl L�t rl.11 rl• wY 1•r\I•N YNri..M IYI. MH,.•r Hr. \rr Wr PH 1 a.r Ir Lw .LN I,. Mrw••r4, Nur �r r...r r!1•r Ir•.N•.w� r wa xr • I'm \plh •I�rn all .'"I'm ru'r. r.r orw.N• �. ql•rIM Llll r\Nw �.HYuw wrN'n•r1 aN'�r N.o~ .•N N N. mug • WATER STANDARD DETAIL CITY OF RENTON Y i • �\ rrr\ 11.11 � •'+ Iw(.Mry Ynr IrYrn IYIt wrn w Y YI rr a Itw1 ww ai M wn rruwlnw wm / ar�.ul. rl\rnri r w.rw1 /YY nwn rYY.r.•uM rry• t Ywl�u rYt yuln.. ��_ irYllr 1•uww- r. PLAN � ELEVATION FIRE HYDRANT GUARD POSTS � ry wY..+1 ICY Ywr11Mn ry IY I\�Y Y 1 Ymt .nl WI .Y qq N M.L M.+Iwlr � \Yw •q. M 11'w111YYfny W�rN \rrYY y14 1' MI.lyl(trw(rM1 M I.nl( w Y'��w11 nw wnl«W^ IIY nY�\ .wl.Yw.I�w w \jn\, unyrlwy YY\Y Yw. CU' 4 M1,II i 1 wl Immr i�1YY�Y1 '.MJiI[I YI, �M y w M• IW H I�t..Yn � � vrru r w art��'nw YWY Y\I\Ifni YNw w III .riYn YYYY (Y(Yn 11 M.�Y tw[YR YY. _ U\1 I.Y Ill,nw S �. P qYw YY MNr �•1�•••i rY11 Ww.IlIw11 Y(WIW war!.rl y 11t1 YRt IN ISM � wY1 w Yul\w,rl W-Il ran . �'w•u►Y.L...lywrn,( r�Y YW1 w r�Y.WY Ij.llrn Y. Iww ! 1 inn uwl•oow wm _J FIRE HYDRANT ASSEMBLY FILL FIRE HYDRANT LOCATION IN CUT OR FILL WATER STANDARD DETAIL CITY OF RENTON i TIE ROD SELECTION TABLE wv nl r 7 Iln wllw Ir Y ryyN Nr 1 I 1 { I Y Y O Y 11 r w Lw ✓r w I.Ir W - Y w I.w Ur 1T Nr �. w Il.w yr yr IT N' IR 1\.W yr ✓F 1T Ir 1r Y.W. ✓•- ✓✓' Ir W Y,Ir ✓r Y• YI q.W 1I1' ✓F 11' w :I.w L1• yr N• w y.Nl 1/r M w I.rJy - IA rRl 1 fe111 w\II•flt\Ylt Y•r Y 11\r4R 1'u Rn 14.w\ll Y 4Y. 1. \il 4R\wµl Yn Y\rY4�IM11 nYw t•R 1\11Yt M yl\ N 1 rl w N w IIt1yN•rY M. 1 1\•1•frl N VII�Y YI.YI NI•IY tll YN.trYIYN\W1 Y I w11[iNt ry rWYf\Y wY ry IY Ilry. 1. \II 1w\W1•1 W tYYl1 Y{YR•vi\•1{Yn✓YIItu tY1•n IY. I�tw\\Y yM In• nrtYlll. 1 IRII w IMtiw 1\R1W{VWrrY N YYtI t4\1•1 YY R{WI[\NO.rl YII r•YY•R I(\VIIfrW tIY\Y. 1 \rl w\ '�1{�1Yr Y 1✓II\IWWIr� IrY\Vr\r lWW\iY N IIY. Vf11Y 1WW\rIn N{NYl \r\1W(•V w\iY Y Ip111 CAST ON LUGS TIE SOLT 'OUL-LUO* RETAINER CLAMP FIRE HYDRANT AND G47E VALVE TIE ROD ATTACHMENTS WATER STANDARD DETAIL CITY CF RENTON NIIr yi• {Yr i r tr Y •r r�nrmlr l LYI n r.4 orYn««nN n«r rwrr 'r Wnu Nr nY I1N. lY \M PLAN na.•al mr�r Wn r, IVY•n nN...a er..NrYN � W«riNr�r �N N MY�Yr �N•Yr Y"WMIIN Ir IIN / n"Ny Y'Yn Wa.4YN. / wY n nwYr lrw r uw uN\I rr wr�m it«N «nru v Y nr uNn n rn ELEVATION TEMPORARY 2' BLOW-OFF ASSEMBLY WAI �R STANDARD DETAIL CITY OF RENTON wt ro rc•�r DEPARTMENT OF PUBLIC WORKS Ywnnu,nu Z S 1 Z'Z 1 r. I YIw pw l.O.IY Y Y WY IW w Y\lu t♦. .YY Y IW ml 1141 Y 1v11 T Yn.Yp. 1 MW Y YYNYi \ 14 Mr iM PLAN Y Ytll.r..YI I.w. r Wl.n.Mp 1p IM1tn IY t ' / tM pWl.\fin rl1 M'.W 11111\. (� A .Wl W1 YYW v!nr 8 Y'O '7 .YY aw r'.ntmu Y L aarn uwnr MII. �� 1 � IMF n Ylir trlYh .Y"tn.�fln p p.nY 1?•..rr 1.8°" �1 WI pn�r an tNMI..r.Y w1 .�In � Iw n Ynr<rvtn .Wlfn. p. M4, ScYtlgqJl. r uYr�w.r :••�•�'� •.•Y n.tNY..r lr.li:"�:'• \YMI. 1 WlplYYl WI. ELEVATION ELEVATION 12" GATE VALVE INSTALLATION WATER STANDARD DETAIL CITY OF RENTON i � X MIY NwnIR, pFN w{H \WIw Wlttl!wY\\IN IIYww Y LR n1 Yw\Nrn,,FYw INw WYn NM N w Rw ORN aNr.Y rx. MOTE: Nw W1 MVI\YN Y MIY,rx. f I ww n w LN w emu�.A w um\ �" F—K—J A\4\ tliwl A IlnrYr\ ynN R Ia.YI fRYN\M.IY \wYNll w.A r AIYU.ir wrlAalw wY wn rM1nalr nx lAw mnraww PLAN YIUW1 n rn A nu r nn �mY.0 .1 Iwn.w w.Ynr YYi W1 W A I RNnI�r.ar MMn IIM YI Alt w1 nw a n�Y N"! IInwYR\I\MR !R.Iw n Nnl,t IYN.tl w. WI nM1 Irn^I uOn rw R>I!'naNV\1 YRI N"IA wlr.N aY w.V W.nal INI\ lR{M\\\1rw.YYIx'mow\". �4 W1..W\w:N tYl nM1 rll rYU IN W nt•. rWwr\rIM1 Iw.M YI �- 1 V,nM Y yMryn 1 l\nn uw� Wwilll .,•a..1 W(w .n11W YRUry,W \Yw1 fRR I R{r\Anwuw rr tNr .ulu.�Yryl WAno w wnr w nln.l trrVnl .a\Ywa Iwn YAN rn w tRYw ql, L Y\r�aryl,N„{Ywl[! ,IU111,ryl lNlaiY Ya.YY\ 1 .N 1 iE 4 IRYw ssa w.Yl A tRan RMr 1W1 N \WNI rY j Nnr.in tRY YI n,l 1 S I I ELEVATION ELE MAT ON 169,181,20*AND 248 BUTTERFLY VALVE CHAMBER WATER STANDARD DETAIL CITY OF RENTON I WORKS .auu.. ww i .rr Y�.w ww rY1W wr\rq.nu. .•WN NewY\.Y .� .Nw fWl."'goo r.l.NTY. YnN Yw wwY Y\NI'n�u n YY N...'.1 •.wxIY r'MN�w IY.YI � I.11 Y.I1w IYw.r r WWII{..r Nw n.rU N Yn 1W1 YIItM\. III\t.4.w 1 tM Y�t.w Y YNIY\ .r Yr/ Vr n1. 1 .Nx W.�N YNI NW WN...Y11 •W..un M.Yr. w ItW n.w..�n ra u♦u r wow "Non., xlrmW nw lWn NN nwY r.r.•�nl. r-owl TI .wl.v.Yx -YYI - 4.'Ne'."•'r'•°I'�^ •'w•IIr x.nl '1" r wwnx Ir nn r'w �n Yexm ww 1r. . Iw .r\NI Ir\�w Irl.w r W nn In .r1.Y rn 1 Yw nn.rwY {x.Y Y IwY V Via G�'� .•4,1 '.0 I�p [:DD•C.q Ot'e r-r..l + \.n Irw•�i�i�w t 0 et: 1 o. -.e:a.r'!.;• .N.nNr J w•YY W 1"p'a1\IIY I'1 WWiYl.r Wm T.YIW. 1 NUN NW 11^�V Y..UY Y.' rY r...W.N W w.NYYI. nYI YY•-� to AIR 8 VACUUM RELEASE VALVE ASSEMBLY WATER STANDARD DETAIL CITY OF RENTON PARTMENT OF PUSLIC WORKS .O.t..l. �. .i .w r MI NTr,H\YY br Y W N{1V YJW Kw YYM. .J\It . NIIiw ItY.YY Y\IY1\{t IY I:MIe N:w N Ilr. 1 NY w NJ : I IWaY+IY Y\VY.IYw.Y r Ww:b\:W w'.YI.\41Mib MniYN:N•w Vy+H H. \J YWw IY 1\` YIw Y I IW1iY YYY tY 1 r w\Nm 1 r Yn.Y:la:_NN n H IrY� (Y(Yn YnY W WN N III.Y Y YWYI. Y� 1H11\YIYI•Vn Iw1' ITI.I\NJI:Y.YM w IIM NN l r:I Npn I.Nu M1u.r nl r»•w . b• Y(bMN NY W HI YM( r K nY r:r f V:YI:W.W Yw IYlwl MR Ww,YYY,\W 1•r M•YW WN bW NMI LMN YW r W W:w{:IY Ilw f lY Yip iIr Iwl IY WTI .� �}jy� MY H 1I11 Y.IY.. H NI Ir.wl WYI\Vw\.YY w • /1` WIY�b\ IW I W Kw ww _YYI•'w:n Y H f Y11i• V:I wYl H YYgI Y. Y. IYyt Y IYN. 2" AIRS VACUUM RELEASE VALVE ASSEMBLY WATER STANDARD DETAIL CITY OF RENTON uY.• n.o - Ir. an Nnt r wN �Ir141 rwl w N}Im Iw � \ /" Ilw w rrnm�W YN a. r Irw\W I L nr\Iur Ir wM rl\ Ir«..y p Ir.wy 1}Ir nwI rl W w.Iw Ir nr n-)rr r n WI wYYI w.V rl.Np IILY n rl wu n.rlpH NM aw\wu Y w11N\n w1Y\Nb Ilw W Im �� WYIw\IW Hw Y YYnr W Iw Y Y}IY\ �;NWrlb Iw IW IIN YI V IM N MYI. MIrH IIM.Yrw\ / Yw\,b rwr\ rlrm rl rl Yrl wr o / w'Yr,NrNI wwI IrIIw.Wn u Fwl N \I YMM1 Inal N InIW IYN NNHI IIN «'11 w. NYNI pY;• I NMn 11[M }• .r IIYNI wIYN 1[W IYI I oFt w4Y«r4[IIrH tb. wMl.11o 1 S 2" WATER SERVICE w vu•Yw \• \run tww\ E rYl u w o m z qw1 N rannl rM NY p- 4 jj IIN ■ rM w N=: n 4n tY11N IW n Mllll n IIIY E Y1.1 Nnl IN.,w 1M1 NN w • { In t wLL n M,III N. .INIII.—.._ L1 _ T a IIO Ir I,II wVY nn T 1Y1 llln MIY rw nlrll Ilbin IIIa n M111\ i\.nlpll MIYIII bYnP IM pT[I« Ir«W\ IY IIN III Ifn111 N YgIU«1Y[tll N Iboll IIY N NYN N N Y bpYlU,.M INW INIY\ IY11N Ir111 N Iw IIII IQYI nH Y.bl.WU MM N MINI« ..Ibll bn WIVIN i . IwW IVIm MII\YI1Yali W w INIY,IYI,4 VV11\Y T rKIW w I r41 Iwo Ina[I NN IW\ww N 11«tYIN b«n\ Nn I. Nwn WI\ tW .wrYftW lun[I I. aM Y1\ I� T S I' WATER SERVICE I«Ylrltll lw 111[rIN IHII, YN[M tlNr}Iw w`11 N INIY1 YMII\1YI 1N,•t11...1 IYN w Mw\r WATER STANDARD DETAIL CITY OF MENTON �4 j"wlw Ir\r.l Nrl 1.Iw'.rl/ Inu.un Ir.. YNw uwNH. ra.r.Mvv Iw n N..w./.1 PLAN Y, Mw�w xlw,n. tw n MUI\N..�111 1•,M.r Iwr0.1.m l'n.r.l. ~.I V1f IW n xun M HI/1 Ln �r ww r.!`.M•M r.YYI wl w M1 uu rµn t!,nNNY IIYII\�xl.1{nll Ir r'\I tuN II xn f, � •••I'.UIi41 Iln.µ.r p Yµ`µ WI M1 IµW N ./i\rl.~j. WII/IYI�M\Yrn. Ins.IINI.\.rn IW nI.\II Yr�H. .YMY nWININ/11 .1\ Iw n Y M^M w�WIN rltµ\IhrINIHH yy,IYI ••, �.� I.I.nI ••? Nlyl •IM IN IHHIt t1�Yn1 t' I♦ YN\1 IH •IYNtlY11\YY YI. •NI Or �nl Ir IWI 11 Hn.lin: n M ��� .1• _.•I--' til . k"F NIU y No-". Y YY. yl 1 4t11rIr,Y1 n qxl M YIOII\ n MNw. E L E VATfON 6..4. a Y COMPOUND METER FFRVICE WATER STANDARD DETAIL CITY Of RENTON I Iryr N1111Y tNn IW w WYYM Nw\�.YWY NrywY NI<\ _ NYt IA. I\Y\II INI.N Wn\ ' IW w wMY �w Yrlry\Y I In1Y11� I r1r1.Y�NYY i IN tr•^�N 4 MI M Y NY Ir WI.N } I 10' 11' DETECTOR CHECK Z wwl T I tN NI 1,rY .•rut \'"'N M11 Mn t NIlY\,YN�N t•W. �r.yVNr INYN rtltl{N, IN.IIw-1. 111•YntYY MU IW w YWY / \. YYIY-NYY�N Nwt 0.YN1Y / j NMY\lY•W rN PLAN •'XI" DETECTOR CHECK YnwY MI.YNt I.e. // Nw.YYMo Yn\YY 1 Ir. MIt NIM,t.1. y[t y Y hnM\Yt.0 1 Nn1.N\YU NY 1•Nn.IW N NI w IrIrM YN � NN Yr11�.1.YY�N YNt N. ri�•Ywl Ww.N.I41.. N.1 1. M.1.[. NIII�Y M{r YUY11. N11Yf 1't 1. Yn[7 MtY.il.1"YrY\. IrWt r YNN 1•Yn W N.1"Nnt W 1�bllr rYY r�Y Y\tWl NrIN YI IIINN YY.\I\IN1NI IWI1\, NNI ry.Y.\.• Y YNY\.I IW It YtINY Iw1YUW IIIYYIN.N 6'11' DETFC'fOR CHECK C 1'W\ Irt Wnw.N.I.1. .n' 1. 1Y11 IINI it NYnw W.M Y MW. 1. �NIYt YN YYN N�n.1U1 tW\NY YNIw YN�1Y 11YITN nY14+'Ilwjr W M wY • I'YN WN,N 1�\I NY YYN r M vl. MIY NW Yt IW Ylw Wlpl{I\ 1 r�N ry U NIIII IY IW111.IM11 I�Nr. V t�tYYt M YIr�N Ylrl'r\eU\MWI tWl 4IW�Yt Nt NINt 11 Y Y'IIW t N M ITV M YIIYYI�Y n,IYIIt IN YN�. } 1 \ ' ..Y M YRt1Y N1111 NIr�Y. rint lrliw w14WtY,YYN r�Mnr N Y riN M NYtYrt NrN Y11N1Y1 trNYw NIN. YI ' 1 iM r'Y�Ir I r'r�M IYYIy 1N N IW µ t \INY rltltMn\r IU M\ill Y ry 11t IW MVIW 11 IV(11t~t~I�MIr'I Mw NNI.YI rn.Y w�Y. nNg1 YN Imr.Y ii .'NN.Y.1 I.1�1 y .q. IN<Yn WIYI W IYYry1 rYr1 M�IY N N Yw UN \U VYII. NI rr11 1 ELEVATION 6'XI' DETECTOR CHECK IO"xI", ex I" d 60X IN FIRE DETECTOR CHECK AND METER ASSEMBLY WATER STANDARD DETAIL CITY OF RENTON i 1 Y AI'I�N�r�~�F�iIY w rttn. YIwN Ilwr.Mn r� wu Ww w Yw Ww.w 1Y.w ,� � w Y YYI Y IIrY ..F YrwYln Y Y �. r,r r 1•Yn W a .... � • . 'Y�Y.Y T Ih n y•�� L W.Y 4 . .r 1 rYnwYl tVVy Ih T IYIMu IY.�yr YYnt IMYn MR\.y Y".r.Y r n..1.1. nf.lY w rj r i aWl YyY Ww w1Y1.Ih n YI.w1.YYn�M IWI y tlrY \ W IYn W n. n tYl�a ar.w w•rw 1MW Ir 1Y.i�AlYin ��W4M WU W11L n. uY\nl NInn IMY Y.V.\n1 H W nn Ynt YYI Wn W�r YIIMwYIIa •�•tnYl YYy YI Yw\Y1 PLAN L hry4 1'+Yv'•J+r th w r..r 1«Yn ww�n, Ya. t l..yI L m.w�'un •. 1 u .Y i..n 1r Tw Mn.Yr w i W.Yn w\. n.JyN Iywn Ir.r..�y� '•,,• • J ELEVATION 10"x1%S"XI"a G.,XI" DOUBLE CHECK VALVE ASSEMBLY (CROSS CONNECTION NOT AT VAULT) WATER STANDARD DETAIL CITY OF RENTON r rr.l rtl rw wrr Iw w rM .��.�w r rn•ral tw Y rwr •vr IM rwNw rrY 1 /arN Ilnxr r rN rw r IurnM r rrM raw..w //+\/\rn w rl N•r w r Iwl Y Irw wrrtl Irlr r w w. r rm ar r+Yw Yrlr•r rrN lM rrr l«N lw wr.rl Irrw rrrM 1!rrM1.14 1 w. Y. 'Y' r rl w rN Ily •1r H M'YrYll r 4YWr Ir,-ti r wr. r tIw wM r•w.,w. Yl'','. IY•YIf M Ir N.w. '•'`:`� r rww Ilw r•m wYwr Q Iw Iwr-w.n. 1•m.w. ' Iwrn rrrr •..�?. wl trY rw'r' IMF rrw� ir1YiK AI.w. Y rw.Y Y.Y rYr1YY,w. w Nlr Ir•r 11'IW •'•.• M,1 Y r w.VA,rq Ll. N\r r 1•r1Y1 WY rw YY 'r Wr rY,rP.1'•n�r r'• •`r trr w Wr1•rY1r Y. Y m'r Yri ry~ r rW wJ y 1,`11.r r. �y.Nrl YrIM aY.wwtl.�N wr,IrMwN" r'tlr Ilr•fa raw.m•IrY w.iw MM11 Mlwlrllw Ir 1•Y.w1 IYY Nw r•Nm a Ir.u.rwr Ivan ra..M I.rY• r rx ow tYll rwi r uur.Nr'N`w Iw w I;IIIr w I yryr•WI Ialt wn Irl Irrlll rsx rM r••rwr I r.u..r.r.r.Iw w Irtrn rl. I,r,.Yw Yrlr r.rn rrr[n. x anl.r N.•Irl.,w PLAN rw IIY+rMrNIW NW.MN ( 1 1-r Irtll xr M ao w a wr �r, tlwn.•rl. 1 w"w^IVg1r wal r rwM1 rYr awl.r M„s a nnrunY ^t•.al ra rt„ .yr w 1N L • 1.tr�n rYrr�r YYw • IW.n w Mrl tirtrn w•Nr rr • an r`ww i r.w rrrw m Y w a I.r•{w Nt11Yw a Nr M '.•1 hNlnwl Ywrtr txrtlN IW M r q IwNnl��rr 1`hN Y ' NMx Iih w.Mi r,I�r N I w4. VwI�.W TtuY py' ,ry •r w w nn. 1 1• rY Yy11•iN w M rr�ll �r Ilrw.•rI1W111 r�N ;wN Nrlr MII Ira nl n W�r���w YYI wr.L L I'r•1111,w. L t •�•\GrNm WYIM wwr Nr IM. EN,. 'W 10"%Ill,all%1" 06"XI' DOUBLE CHECK VALVE ASSEMBLY 6" STANDPIPE WITH FOUR 21/2" NOZZLE CROSS CONNECTION• BACKFLOW PROTECTION ASSEMBLY WATER STANDARD DETAIL CITY OF RENTON '°""` DEPARTMENT OF PUlIIC WOIIKS W4 1� GENERAL MISCELLANEOUS DETAILS VALVE OPERATING POUT EXTENSION DETAIL R•\ qM 991 WOW 1 I! • out�•n. mfw. —� 1•w•Y 1Nf\ I 1wn a p+Ir: n•wl mfwu rlr W r•.w r mwH rN �_ti,W Now. IIgnITI W"Iw M N rpn N+ I pYryrp 1 W O1'1116 IMP[ w 1I INw1,w.OII INRIw N I w we ni W wx a 1!N w!r w1wH• 11n•r.+ wll , 11.111!On w n r WI 1'Yi:t Itt 1, IWI['NP r:\•.u' GENERAL NOTES 1•NAT r r ptrllp tY~YYYINpn a SHOULD SE ON ALL WATER PLAN SETS W11•i!0!0 VALVE PARKER POST I+rr•1 r1.!V•N`.=NIAr Ln w.1..rm.w. \r1L+� a Ir fI V Yr•rw+,w Iw m! IY+Il ELEVATIONS ""\wr•w w NRIIx1yw ! .1+ 1«•1•W N F1\\I�Y V\Illlm NW w[Iqr W!•q•Ii-Y 11 Y W W+.IIWN YyFNI�.1+111iY Wul\Y\YW[Mml •I NN t N+pY.W. Ip Y w Iw«4p[4uY 1 PM IMY.+N 1!M' YN 1 bP.\LIIN N NWI mlNw.H[Iml tl�\\Y t!1 NrM N A,."b+M p\Pw rY• +fWwI p Y MI 4 !IYII g N!N owl"rr+Y Y M t+w, 1 YY',N M M N Irywrw�1 M'MI Yrt144„!1�Y.IIMH Y w14P.1+.11" h Yb+l m!rM NI x111Y u Muy M M RW+eN \ .«•.Wool, i MW'vw IYn p Pllp «N•M[•vlgr W!I Yi.I w wu Y 1 +N 1\ YNIH,YIYI.wYIN N«+r+l,w YYIN 1 All NN N HMWwtIN YYNYu.NNY!Iw•NN .vY;M!Y grill.Irlll 111 rl«Y+v If IqW w lyr.\N11 w•I Y[•K WOW plw r«IN!p• pYN N•11U 111+I•N YM. iYlh wm w Y r IIYIYI Y 11rr 1 \li YY•WM W II M WIbN W W W NluYlw r.M«•NYI NI+ W IIIIINNI W\ppV IY t+ll el W W w H YN1YW!MI NNp W`MI hIM Yw1 try N W WN W+'w M u\Y lwpl•N 1 rY1rY 11•IlwmrlY pN .'WW1:L11w rlr-•vw r Yr+... w•w.Im hyr p[YN+Y « 1 11 W11 Y H M1•M W'\•MN1•+IU Y 1«✓•N'mNNN l,w�11 YI«Y IWVY Iwlgeu« N W N yHNY Nw•.YW IF•H.1.w Y1FI 1.M rIp Wwl rlI N\t r.Na+Y H[r•1 pIw11Np M w I+y N W W 11�1lw^[�I I r•+P Wry 1}�� V, WI M NINII YI 1P Ir M If 111[rnl\Iw Y N111+roo wIN M Y Nlwixy Y H I+11 N W w NIN w.Iy tll1?IYflKlll yyY`r 61 "WV Ww11Y w YWIN[Y p Yr11M Y H M\•N W w W[Vg01 M w1IMe1K rin q.{ r rN [r• Y"IV p Y YNpq\rK pr;+wlewpp�y MWr w.M llro N M rYr•rlw rK•M I wKI1rI rIt M`.YI.1• 11 IwY\n..1 Y«\wl,NwY 1 rymK�.IH 1.w coo •W wwno"It I.1 Ulf Wn p HN Y!' Y11rr1 h l,Wn Wwr N wNon+N•n• liwuh MI YIYN rNl N trR IiMtNR r M 1 yl w •r•«\W+IY Nr Wlr 1 YrIM�(Ir.rruw Yn4 Nln M),Itl 11 twVN1n p w•+R 1 ��r q tl.W111wrW10111W0 1Yrw11R N!n w vqr alpbN•hI«Y nNl lu+. MV•1 IM WATER STANDARD DETAIL CITY OF RENTON DEPARTMENT OF PUBLIC WORKS DECHLORINATION TMATwOrt PFADC t m uw OF ao ma t�-�.scorow«w F.w+w�s..r.+s seti +e.+ar wu..nh rw`ar rww.waw..ro.,.v.F M..M tO"MiF:hdF e F aOr'r dr aYtleN�w eta^ d F M.ph.rO n Oer.1M MY'I r h ttir.ta nP.M�.Ta h..w ra d eed�onoaen w+yYe e.tlr Yt r lt+yae•tl^rtr'eaYa tl�F aewa d aw w F�rw Ira+�4alla♦�+v.tn•wad woes w+�n F�q larnev gte�IDee eep rY TAM 1 /tY-M w m�ear 4r•r oisrvu.a.t oriw.r Fwrea a a.w.a r,o�.�I�It��leaq�er' irsai de' n C.TYrrwa b tMe r LLC Otra d+nt 4rner Nr—Ime W.w woe ww Qratrl w rr++.a.r nr.rl Irrr d+tlF Fanw. pW,. cd.wdr.. *awew law.• trww Ia0'v IPA �'erM� •eeb ��.. ' w an to o. ea to oe to to ee tY w n w an en Yaa Ywd.a...w wqn�wn a.An d F M.twyMn CM^•Y•rr 411y�aG 0.aarM�V W.1iC d adt IWn [..e�<a.fie n�Sb d Mt Mt.Varnry Re p.M F eMM1 W+A+b a04P M'F At w�vW�Au F d.d�b M MrUCATION LOCK MJIMLW .w trrr b.+n revel+aw..rnen w a Kti.a w�.ro F Nn fwr.w 4gre oaon.we.w n a edblwr++�w Garry Mr:..a�vu W A lltr W F tuna we/e d t YW+NMm+tim.r.n[a ed�an en Yr b a flllf+a tTlOm ICU d>Wnyr�y e1aT01 b wYy mY d tt. ! �r Iaa!lYlar bw CIwW e.e er r'P e�ea..aa Mw MNf+rwa r h duo.NYd wr• 1M 4rw v+an den ^MCN h MM1Y IY hapl a atd^nMMee MI aa�M idMr ra it a th tll b F YgrYYC ala.M Y YI M t Yrtw ww.n min N.'a1la M tl tlRNpYIYV.dtnr tlew eoenM Nd 4 eb+ao Cetla+M Caaumrr F b T'I w6 TY M Y e'rWP1Y q wN h rIY110waw aW^VY OrYUM. •ba(!'.1hM aN.ymIh ONOI .14)h!Wdw nOd10RhM FraenaM.rb hwhl�teMla Brhw yattyrlNa apY}a`r IMMOCM FLOW OMPAh: y I �tl�IerYw Ity eeal1111 drn'aleel.�eh r��a CnaherM a rAtla to l Prr ewi �� I WATER STANDARD DETAIL CITY OF RENTON OEP' RTMENT OF PUBLIC WORKS a PROPOSAL Schedule A-2, Water ITIM N ANTI o, Irtr e1TN UNIT MICeouANIT, NOW Poises to be •nueA IN 0161414) UNIT ►eNu AMOUNT 1 101 Tons Bank Pun Gravel, Class B (Trench) or ton 2 150 Tons Foundation material er ton 3 372 L.F. 12-inch Ductile Iron Water Main, Class 52, Tyton Joint per lineal foot a 396 L.F. 10-inch ductile Iron Water Main, Class 52, Mechanical Joint per lineal foot 5 S2 L.F. 6-inch Ductile Iron Water Main, Class 52, Mechanical Joint, including Shackle Rods per lineal foot 6 In.S C.y. Cement Concrete Thrust Blocking _ _per cubic yard 7 1.600 L.F. 3/1-inch Shackle Rods _ per lineal foot 8 I Each 12-inch a 6-inch Wet Tap Per each 5chetlule A_?, continued PROPOSAL ITfY A►►mOk NO, QuA!TITT ITfk1 (Yam hkee IITM YNR M11Of g 6 Each ~ ehmlaa ti peome) UNIT 1.0m7f l?' �nih x 10-inch Wet Tap AMOUNT each 10 9 Each Reconnect Existing Service —I`Or each 11 3 Each ReteD Existing Service 'r etch 2,500 Lb. Extra Fittings 13 6 Each 10-inch Gate valve la Per each A Each I?-In ch With Vault to Valve, With Bypass, 15 12 Each Marker each Valve Mark! ��. .`"'`--.__._Per each n Each Valve Operating Nut Extension ,_Per each PROPOSAL Schedule A-2, continued ITeal AppIIOk. NO. OUAN Ott,jrV IT11 WITH UNIT ►NICe (YeN hNee to ee WrItlee In Werael UNIT ►RICe AMOUNT 17 10 Ercb Hydrant Assembly, Type A ---- _-_-_____Der each IB 1 Each Hydrant Assembly, Type B-1 _—_.. _per each 19 1 Each Hydrant Assembly, Type 8-2 each 20 24 Each Guard vosts _per each V.F. Hydrant Vertical Eattnsion --.— _per vertical foot 11 ` Temporary 2-inch Blow-off Assembly per each Subtotal N S.S,T, 8,42 Subtotal, Schedule A-2 PROPOSAL Schedule B-?, Water ITEM APPROX. ITM weTN 11w1T MIW NO. QUANTITY (reil hbw to bear' uw1T MIOe AMOUNT wrmee it we 1 966 Tons Bank Run Gravel, Class B (Trench) per ton 2 7D0 Tons Foundation Material per ton 3 6,155 L.F. 12-inch Ductile ,ran Water Main, Class o2, Tyton Joint per lineal foo 4 897 L.F. 10-inch Ductile Irsn Water Main, Class 52, Mechanical Joint per lineal fooll 5 190 L.F . 6-incn Ductile Iron Water Main, Class 52. Mechanical Joint, including Shackle Rods per lineal fuo 215 C.Y. Cement Concrete Thrust Blocking Per cubic yard 3,100 L.F. 3/4-Inch Shackle Rod Per lineal foot 8 2 Each 12-Inc,- A 6-inch w Tap --_per. each PROPOSAL Schedule B-?, continued MO. OYAMTtTT ITIM WITH UNR Pasco (o" 1rMaa t• p, MINton IN W.d.) UN Y flake AMOUNT 9 I1 Each 12-inch x 10-inch Met Tap per each 10 2 Each 16-inch x 10-inch Mel Tap Per each 11 3 Each Reconnect Existing Service Der each 1- 4 Each 3rt6p Existing Service ---. . __ per each 13 10,00t) Extra Fittings Lb. Dcr pound 14 22 Each 10-Inc) Gate valve Per each 15 11 Each 12-inch Gate Valve, with Bypass, kith Vault Der each 16 21 Each Valve Marker -- __ Der each PROPOSAL Schedule 8-2, continued iTlM A►►ROi. ITEM WIT4 ' NO. OWMTITT (UeN ►rye4 to bew qt nl IN wereel AMOUNT OMIT PRICE 17 12 Each Valve Operating Nut Extension . .. per each g 15 Each Hydrant Assembly, Type YDe A Der each 19 2 Each Hydrant Assembly, Type 8-1 ---_Per each 20 7 Each Hydrant Assembly, Type B-2 Der each 21 54 Each Guard Posts - Der each 22 15 V.F. Hydrant Vertical Extension Der verti,al foot 23 nch Temporary 2-inch 810w4ff Assembly ---- _per each Subtotal M.S.S.T, 6.4% Suutdtal, Schedule 8-2 ENDING OF FILE FILE TITLE ��59