Loading...
HomeMy WebLinkAboutWTR2700676 12" Wat&main Ext. Maple Valley Hwy. W-676 BEGINNING OF FILE FILE TR4F Y • NMvw �Z „ wafter MR •� VO V0, Me ,. Nj9 � way OF RED BUILDING & ZONING DEPARTMENT i RONALD G. NELSON - DIRECTOR 0,9 MUNICIPAL BUILDING 200 MILL AVE. SO. RENTON.WASH. 98055 • 235-2540 o I to SEP15'40 e BARBARA Y. SHINPOCH MAYOR 30 December 1987 Robert E. Bergstrom, P.E. Engineering Supervisor City of kenton Department of Public Works Renton, Washington 98055 RE: Suostan;.ial Shoreline Permit Application - Cedar River Water Main (SM 015-87) Dear C b: The Building and Zoning Department has received the application for a Substantial Shoreline Permit for the Cedar River Water Main Project. In reviewing the application materials, staff has determined that the following information is required before we can officially accept this application: 1 . A description of the ways in which access to and through the area will be managed during project cr,istruction. 2. A description of locations where fill is to be stored during construction activities. 3. A description of methods to be used to control erosion during construction activities. 4. A description of systems for containment of contaminated soil during and following the construction project. 5, A description of measures to be undertaken to control contaminated waste (e.g. asbestos) from pipes during removal and tra,)sport from the construction site. As soon as Building and Zoning receives the requested information we will resume evaluation of this project and begin scheduling for ERC me_tings, If you have questions concerning the completion of the application for this rra,ject, please contact our staff; we will be pleased to assist you. S' rely, Donald K. Erickson, AICP Zoning Administrator ENDING F FIL NFILE i1RE _ • 6 / V M 4 icr aP �� VAIlty Way