HomeMy WebLinkAboutWTR2700681(1) MOnroe Ave. N. E. & N. E. 4th St. Main Crossover to High W-681B
P r c, u c, ntE'rt I t'
BEGINNING
n
1� A)
,r
I'Aieu rr.,l,. " w.b?!-�
a4w,ryx A%V. 3a b Lf. +In St. - Wat,,- —�
nu l n c ruaaove r t?Mull n rtiI mre inWtW
t .ec«w M--Je.4, X J
y aI a
•y I :
w I I
I 1
GY.K6 f. t3
r.N V.
Lou
I
J
r i 14 ^- � ,,
• • ai
C.O. / 3
CITY OF PENTON
PUdLIC WORKS DEPARTMENT
CONTRACT CnANGE ORDER AGREEMENT
CONTRACT Monroe Ave. N,E.,�1{,g.lydymv�ve���9�AG-058-g2)
CONTRACTOR Gary Merlin Construction Co.
SUMMARY OF PROPOSED CHANGE
1. Lover existing 16" water line from Sta, 2+75t ,o cte_ 5+nn. to obtain 3'
minimum cover. Lew sum office of $1.800.shall be full compenastion for all labor,
_ material and agu ivmant !squired to lower rater line, includtrg but not limited to
trenching, backfillins and testing inaccordance with the standard 9p-ciflcatlons.
2. Reconstruct existing sanitary manhole - L.S. - $`^.n•
3. Furnish and install 2 as std. monument, case and cover at $200!ea. $400.
TOTAL CHANCE ORDER 43 $2,300.00
All work, materials and measurements to ue in accordance with the provisions of the
Standard Specifications and Special Provisions for the type of construction involved.
ZNATAACT— tORAFNTZTNTAX I— ESTTTHITfRAfi
AMOUNT I AMOUNT I THISS ORDER I TOTAL AFTER CHANGE
355.552.70 370.690.60 2,300.00 172,990.60
SIGNATURES: CONTRACTOR DATE
PROJECT ENGINEER ___ DATE
APPROVED BY DATE ..
(Public r S Director
• • 6/30/93
Monroe Avenue N.E. 6 N.E. 2nd Street
Final Costs
Contract Costs: $382,473.79
euget P-rner Costs: 5,641.20
Engineering Cost ,: 20,478 18
Traffic Engin-ering Costs: 2,484.09
Water utilities Costs: __10V 9999
Total: $412,165.,5
Adjustment for oversixing storm drain: S 12,346.00
Renton Cost: $218,428.63
King :.ounty Cost: $193,736.62
! �
•
�,��,.�
G��
-� ��
CITY OF RENT'ON WATER DEPAPINENT
Pressure T.ast 6 Purification Test Form
PROJECT 40.
NAME OF PROJECT /1&A&, 'a 1.. �` 6/7-Er?7
PRESSURE TEST TAKEN BY ON
AT A PRESSURE OF PSI, FOR MIN.
TEST ACCEPTED ON
PURIFICATION TEST TAKEN BYG- e; ANEW 'ON/ _/!
PURIFICATION TEST RESULTS, SAMPLE 01 ZAl04e".'1-
SAMPLE e2 Nf 0':
SAMPLE e3
REMARKS: :'tom' ' - 4-1St, } /91r4 /A.' L-tnv r'I>
• • CITY OF RENTON WATER DEPARTM"'T
Pressure Test 6 Purification Test Fora
PROTECT N0._._J ->
NAB OF PROJECT ON
PRESSURE TEST TAKEN BY MIN.
_
AT A PRESSURE. OF PSI, FOR
�.---
TEST ACCEPTED ON_ ON
i2 ' fj'2✓. —
u JEL
PURIFICATION TEST TAKEN BYE c
PURIFICATION TEST RES'1LTS, SAMPLE el — ' - —_
SAMPLE a2_
SAMPLE e3 ..,FC
/t 1�ice- '_.
CITY 0. RENTON WATER DEPARTMENT
Pressure Test A Purification Test Fon
W- CoB� g
PROJECT NO.
NAME OF PROJECT — 17 + ..5 rv' •.
PRESSURE TEST TAKEN BY 4/ _ON �!•}D '�'e"L
AT A PRESSURE OF SI, FOR MIN.
TEST ACCEPTED ON Fig V
PURIFICATION TEST TAKEN' B1' ON
PURIFICATION TEST RESULTS, SAMPLE si
SAMPLE e;
SAMPLE eS
REMARKS: 1 .44
• CITY OF RENTON NATFP DEFXRINENT
Pressure Test 6 Purification Test Form
PROJECT NO. —
MANE OF PROJECT
PRESSURE TEST TAKEN BY .„,_
ON
MIN.
AT A PRESSURE Of PSI, FOR
TEST ACCEPTED ON
PURIFICATION TEST TAKEN By_- ON
PURIFICATION TEST RESULTS, SAMPLE 11 „�.--•---
SAMPLE a:
SAMPLE 03
REMARKS:
• CITY OF RBNTIA' WATER DEPAR. - �
Pressure Test B PurifiCstim Test Fom
PROJECT v0,
NAME OF PROJER � s!e .Q � +✓G 2K�ST
PRESSURE TEST T K{�E AIO?N BY ON
AT A PRESSURE. OF' �' / <i PSI, FOR / ,S' MIN.
TEST ACCEPTED ON
PURIFICATION TEST TAKEN BY ON
PURIFICATION TEST RESULTS, SAMPLE el
SAMPLE e2
SAMPLE e3
REMARKS:—_-Nr c� Fe C�-
• • .-2-
Cj i G 27
tat, s,
ok
MONROE AVE. N.E. 6 N.C, 2ND STREET
PRECONSTRUCTION CONFERENCE
Date: October 12, 1982
Plae.e: 4th Floor Conference Roan
Present:
Name Firm Phone
Oat Monaghan City of Renton 235.2631
Bob Bray
Elmer Shaver „
Clint Morgan 235-26
Cliff Bata 20
235-26
s
R" 0E9" " 235-2641
Larry Sovtoge 235-2646
Ed Wooten 235-264
Melissa Hart Puget Poorer 255-2464
Karen Sharp " „
Frank Forest Pacific N.M. Bell 251-9686
Gary K, Nall Group W Cable 433-3420
John Grover King Count, Public Works 344-2547
Gory Merlin Merlin Construction Co. 762-9125
1. Ed Wooten, Fire Department, requested that two accesses to the County Shops be
maintained at all times, if at all possible. Contractor will begin construction
of storm manholes at Intersection of N.E. 4th and Monroe Ave, N.E. first. Con-
tractor will maintain one-way traffic for King County to and from County Shops
and Courthouse.
2. Puget Sound Poser I, light has two crossings. One with empty conduit. Merlino
Inquired about the possibility of having exposed conduit bridging manhole.
Frank Forrest, (PNWB), said this didn't appear to be a problem, but It was
ayrreed to decidr method during construction, Pacific N.W. Bell has two closures
to be moved on Monroe Ave. N.E. and N.E. 2nd St.
3. 4" high pressure gas line on N.E. 4th St. may have to be relocated, Contractor
will notify gas company if conflict occurs.
4. Working hours at intersection of N.E. 4th St. and Monroe Ave. N.E. will be
8:30 a.m. to 3:30 p.m.
5. Merlin stated he would begin construction no later than October 25, 1982.
6. John Grover, King County Public Works Department, sold he would check with
Mr. SAItAre111 to determine who will remove gates, contractor or county,
7. Group W Cable representative, Gary Malt, said their cable Is in with P.S.P 6 L.
Co, conduits and they have no boxes at this time,
8. Contractor will have his lonrscaping subcontractor check with Jerry Lind before
starting.
9. Pacific N.M. Boll wants an Inspector on-site whom crossing their conduits. Con-
tact Frank Forrest, 251.9686.
Monroe Ave. N•E. i N.E. 2nd St. October 12, 1982
Pre-Construct{ .� Conference
10. Contractor suggested placing washed rock to top of perforated pipe, and then
cover with filter fabric.. Filter fabric is extra and will be paid by the
lineal foot. A Change Order will be written.
ALB� �� .