Loading...
HomeMy WebLinkAboutWTR2700681(1) MOnroe Ave. N. E. & N. E. 4th St. Main Crossover to High W-681B P r c, u c, ntE'rt I t' BEGINNING n 1� A) ,r I'Aieu rr.,l,. " w.b?!-� a4w,ryx A%V. 3a b Lf. +In St. - Wat,,- —� nu l n c ruaaove r t?Mull n rtiI mre inWtW t .ec«w M--Je.4, X J y aI a •y I : w I I I 1 GY.K6 f. t3 r.N V. Lou I J r i 14 ^- � ,, • • ai C.O. / 3 CITY OF PENTON PUdLIC WORKS DEPARTMENT CONTRACT CnANGE ORDER AGREEMENT CONTRACT Monroe Ave. N,E.,�1{,g.lydymv�ve���9�AG-058-g2) CONTRACTOR Gary Merlin Construction Co. SUMMARY OF PROPOSED CHANGE 1. Lover existing 16" water line from Sta, 2+75t ,o cte_ 5+nn. to obtain 3' minimum cover. Lew sum office of $1.800.shall be full compenastion for all labor, _ material and agu ivmant !squired to lower rater line, includtrg but not limited to trenching, backfillins and testing inaccordance with the standard 9p-ciflcatlons. 2. Reconstruct existing sanitary manhole - L.S. - $`^.n• 3. Furnish and install 2 as std. monument, case and cover at $200!ea. $400. TOTAL CHANCE ORDER 43 $2,300.00 All work, materials and measurements to ue in accordance with the provisions of the Standard Specifications and Special Provisions for the type of construction involved. ZNATAACT— tORAFNTZTNTAX I— ESTTTHITfRAfi AMOUNT I AMOUNT I THISS ORDER I TOTAL AFTER CHANGE 355.552.70 370.690.60 2,300.00 172,990.60 SIGNATURES: CONTRACTOR DATE PROJECT ENGINEER ___ DATE APPROVED BY DATE .. (Public r S Director • • 6/30/93 Monroe Avenue N.E. 6 N.E. 2nd Street Final Costs Contract Costs: $382,473.79 euget P-rner Costs: 5,641.20 Engineering Cost ,: 20,478 18 Traffic Engin-ering Costs: 2,484.09 Water utilities Costs: __10V 9999 Total: $412,165.,5 Adjustment for oversixing storm drain: S 12,346.00 Renton Cost: $218,428.63 King :.ounty Cost: $193,736.62 ! � • �,��,.� G�� -� �� CITY OF RENT'ON WATER DEPAPINENT Pressure T.ast 6 Purification Test Form PROJECT 40. NAME OF PROJECT /1&A&, 'a 1.. �` 6/7-Er?7 PRESSURE TEST TAKEN BY ON AT A PRESSURE OF PSI, FOR MIN. TEST ACCEPTED ON PURIFICATION TEST TAKEN BYG- e; ANEW 'ON/ _/! PURIFICATION TEST RESULTS, SAMPLE 01 ZAl04e".'1- SAMPLE e2 Nf 0': SAMPLE e3 REMARKS: :'tom' ' - 4-1St, } /91r4 /A.' L-tnv r'I> • • CITY OF RENTON WATER DEPARTM"'T Pressure Test 6 Purification Test Fora PROTECT N0._._J -> NAB OF PROJECT ON PRESSURE TEST TAKEN BY MIN. _ AT A PRESSURE. OF PSI, FOR �.--- TEST ACCEPTED ON_ ON i2 ' fj'2✓. — u JEL PURIFICATION TEST TAKEN BYE c PURIFICATION TEST RES'1LTS, SAMPLE el — ' - —_ SAMPLE a2_ SAMPLE e3 ..,FC /t 1�ice- '_. CITY 0. RENTON WATER DEPARTMENT Pressure Test A Purification Test Fon W- CoB� g PROJECT NO. NAME OF PROJECT — 17 + ..5 rv' •. PRESSURE TEST TAKEN BY 4/ _ON �!•}D '�'e"L AT A PRESSURE OF SI, FOR MIN. TEST ACCEPTED ON Fig V PURIFICATION TEST TAKEN' B1' ON PURIFICATION TEST RESULTS, SAMPLE si SAMPLE e; SAMPLE eS REMARKS: 1 .44 • CITY OF RENTON NATFP DEFXRINENT Pressure Test 6 Purification Test Form PROJECT NO. — MANE OF PROJECT PRESSURE TEST TAKEN BY .„,_ ON MIN. AT A PRESSURE Of PSI, FOR TEST ACCEPTED ON PURIFICATION TEST TAKEN By_- ON PURIFICATION TEST RESULTS, SAMPLE 11 „�.--•--- SAMPLE a: SAMPLE 03 REMARKS: • CITY OF RBNTIA' WATER DEPAR. - � Pressure Test B PurifiCstim Test Fom PROJECT v0, NAME OF PROJER � s!e .Q � +✓G 2K�ST PRESSURE TEST T K{�E AIO?N BY ON AT A PRESSURE. OF' �' / <i PSI, FOR / ,S' MIN. TEST ACCEPTED ON PURIFICATION TEST TAKEN BY ON PURIFICATION TEST RESULTS, SAMPLE el SAMPLE e2 SAMPLE e3 REMARKS:—_-Nr c� Fe C�- • • .-2- Cj i G 27 tat, s, ok MONROE AVE. N.E. 6 N.C, 2ND STREET PRECONSTRUCTION CONFERENCE Date: October 12, 1982 Plae.e: 4th Floor Conference Roan Present: Name Firm Phone Oat Monaghan City of Renton 235.2631 Bob Bray Elmer Shaver „ Clint Morgan 235-26 Cliff Bata 20 235-26 s R" 0E9" " 235-2641 Larry Sovtoge 235-2646 Ed Wooten 235-264 Melissa Hart Puget Poorer 255-2464 Karen Sharp " „ Frank Forest Pacific N.M. Bell 251-9686 Gary K, Nall Group W Cable 433-3420 John Grover King Count, Public Works 344-2547 Gory Merlin Merlin Construction Co. 762-9125 1. Ed Wooten, Fire Department, requested that two accesses to the County Shops be maintained at all times, if at all possible. Contractor will begin construction of storm manholes at Intersection of N.E. 4th and Monroe Ave, N.E. first. Con- tractor will maintain one-way traffic for King County to and from County Shops and Courthouse. 2. Puget Sound Poser I, light has two crossings. One with empty conduit. Merlino Inquired about the possibility of having exposed conduit bridging manhole. Frank Forrest, (PNWB), said this didn't appear to be a problem, but It was ayrreed to decidr method during construction, Pacific N.W. Bell has two closures to be moved on Monroe Ave. N.E. and N.E. 2nd St. 3. 4" high pressure gas line on N.E. 4th St. may have to be relocated, Contractor will notify gas company if conflict occurs. 4. Working hours at intersection of N.E. 4th St. and Monroe Ave. N.E. will be 8:30 a.m. to 3:30 p.m. 5. Merlin stated he would begin construction no later than October 25, 1982. 6. John Grover, King County Public Works Department, sold he would check with Mr. SAItAre111 to determine who will remove gates, contractor or county, 7. Group W Cable representative, Gary Malt, said their cable Is in with P.S.P 6 L. Co, conduits and they have no boxes at this time, 8. Contractor will have his lonrscaping subcontractor check with Jerry Lind before starting. 9. Pacific N.M. Boll wants an Inspector on-site whom crossing their conduits. Con- tact Frank Forrest, 251.9686. Monroe Ave. N•E. i N.E. 2nd St. October 12, 1982 Pre-Construct{ .� Conference 10. Contractor suggested placing washed rock to top of perforated pipe, and then cover with filter fabric.. Filter fabric is extra and will be paid by the lineal foot. A Change Order will be written. ALB� �� . 14 -EADING-- OF FILE FILE TITLE � � •