HomeMy WebLinkAboutWTR2700689 WATER MAIN IMPROVEMENT W-689
N.E. 12 th ST. AVANDONMENT OF WATER �1AIN
i
•
�� ,.
e �..5
I
Fr r 7V+
AN
,Y +' � ti
1 � rav•N � 1G •
nN
�SSnr) n� r.�7a7� �MJ Wr�1,C1
r.n V17
taws. awefLYu�tr .wo.w • • fRiR 4wraw
Sao ta4lrm�[rar
QVest boast 'on &.2 Inc.
3ENERAL CONTR AND ENGINEERS
1.R Rw 419 24"S•e"e.ilie-•rsekeatM Raw/
WOODINVILLE, WASHINGTON 98072
Octobw 11, 1902
City of Rattlers
Utilities Deportment
200 Mill Awnue Souh.
Renton, Washington 99055
Re; NE 12th St, hnprovetnenA
Cane. CAG 040-82 - Ex-to work
(replacing existing golvwlized
water service lines).
Attention: Ron Olson
Gentlemen:
Below is a summary of the equipment and labor used to replace the existing water
services back to the main as directed. The time and material used to relocate the
existing meters has not been included.
The fallOWina work was Performed on 10 d-82 and 10-7-82.
LABOR
Foremon 10 Hrs. Cy 28.14
Operator 10 Hrs. @ 28.04
Laborer 20 Hrs. 4 ?4.74
Teamster 3 Hrs. @ 2:.71
EQUIPMENT $1 ,139.73
590 Cose Backhoe 10 Hn. @ 29.68
20-H Ho Pac I lir. @ 63.6J
Mac-30 6 CV Dump Truck 10 Hrs. @ 27.63
1 Ton Flatbed Truck 10 Hrs. @ 12.77
764.43
Total cat for above referenced work $1 ,904.16
CHARTM 116, LAWS OF 1965
CITY OF RENTON CERTIFICATION
a 1.1 v.etn1ewae of.t+ e1 ca+urt v+et•
Mo.," e1 .telve1. 1.., 1.Z uyuut .41e
e ae r engwll,1.2 sa+one nwea+re o+ 1.
+�a.e+ete.eeuc+.us a.u+.•we r..y R[CEf YED re'ue,�./YU.evt •N e+eue v+,w•n.e T
.Mrs 1 1 m+ e1 nw1 •u 1.0 y OCI
.erwe+,rtt tZ +v wt+l.e.rl urs ea+eni ./ .}v„�
e+N 41,10. J $82
erewre "/DDC/6 64 37 is Ca)
VKrr..fKNu'K
ENDING
OF FILE
FLE Tm! 9
• 1 , ' ► i