Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WTR2700695
W-695 Renton West Business Ctr. Grady Wy & Seneca SW 4 BEGINNING WO. &95 FILE TME 1 f r %fee / (� ` ruf , so 0@ r Fbm ON&"To inrrn a,�,,� tl.,«w•.ee b..coot, W -.a»atleaw.rea.onwrt Filed for aftoW r agifoeft d 10_ _ 111)" eYUMnrALKAM '11r04 PECD F 4.00 •qS�g g f1I)MIM,•A MM{ CASHSL Ya,w w4,00 22 m U7 O BILL OF SALE ere` a"' ~ [NOW ALL MEN Sly Tvccw FIIf CEPITS: TLt EUGENE C. SPROUT and 0R. PHILIP IAWIN d/o/a GRAOy "ASSOCIATES, a :'ar..nership Couoty of King, of Renton lotaM ie comideeatiM a' m ONE (SLOG) •tbt Must of • . . ♦•Scab Of 0.'ash. . .the Ply of the lost pan. • • • • • • • ♦ . 4wlul nxnry Ofl4 United Stud of America,to them Dollars u Wad Paid by the City of Renton the pan of 14 I'd Part. the ntapt wDsao! ishereto barpia,all and dd'M into the rid west .; of the y do by these pteamu Knot boated at 607 gW Grady Way, weaad PL't, the I-1101ft described penoas) pmpwy stow in t4 City of Renton ,County d King and Stare M WaYitrFtea, to-teit: W-61J5 Approximately 480 l.f. of 12• ductile iron pipe, 160 l.f. of 10' ductile iron pipe, (2) 5" Fire Hydrant assemblies, (3) 6• Gate Valves, (1) 10• Gate Valve, and all appurtenances pertaining to said "terms- any expenses, n, expressly warranting said watervialn against herein. costa or liens hereto incutred thereon by, through or under seller s e RECORDED iHt,;j),j TO HAVE AND TO HOLD the same to the rid put y of the wood -= its n� �.''��yae a edcutom ad and ataigv forever. AM rid pan. of the &U4 jkrps!!1 63 ereutrcq admieietrnon, cDvesaot> r and Am p t, for 'to eaautora, adminiatratws and aripte, that aagr v to Puny M the r _ �e Ol r '•!OF PfODeny,Node sad rbutal,aed W Party M the first put is the t .' rrdwe t'�e.I )ddj j, wiE wunet sad defend t4 rle hva6 r t sod full authority to r0 [4,sine, atd that rflr� NHS :stators, adminktraton aid y +de tmto t4 said D ' of the "case pen, its clam t4 new, :rise,spwt a0 sad envy Pence or Persons, whanstever, lawfully cuunt'if DI to IN WITNESS VYPStEDF,T4 said Party of t4 Am m awl thh 23rd day of Pact Ws 9a as its hand Oct 13 artner (star) (ataz) (aast) STATE OF WASHINGTON, (MAL) COUIty of M. j a to aw hooves tobe thejayvtduu bdre ns EUGENE C. SPROUT and PHILIP IRNIN aekboWiMilged datcrmad Isabd wiseatlittrd the wrtWa W knignot am and PmDem dieselsdieselsro's ass• ':booed vow the MM tl their free sed volabtsey set eaa GIVpi l R "4 nq Wad abd cffidr Mal tYie 26 toter, 1983 v' •r c. ` r �� A MYYt<t1R w, • Project No. W-695 o s Sor _ -Wa 1" � J- C .� • - AGREEMENT AND CONVEYANCE C' --z RE: UTILITIES SYSTEMS " THIS AGREEMENT made and'ente�ed into this 7r. day of (/te�. JA�_ 19& by and between the CITY OF RENTON, a municipal corporation of the second class under the laws and statutues of the State of Washington, hereinafter referred to as "CITY" and Grady Way Assoc fates, a partnership hereinafter referred to as "DEVELOPER"; ct W I T N E S S E T H! WHEREAS "The Developer" is desirous of Installing certain water snxxomeix lines and appurtenances thereto at, near, or within the hereinbelow described property and to connect same to the City's Utility System so that such improvements will constitute an integral pa-t thereof; and WHEREAS no her property owners or users are presently available to share in the cost and expense 4 construction of such improvements and the parties 7ereto having in mind the provisions and •erms of Chapter 261 of the 1959 Sessions Laws, generally referred to as a "Municipal Water and Sewer Facilities Act, (RC% 35.91.101 at seg)"; and WHEREAS "The Developer" is willing to pay all the costs and expenses for the installation of said improvements, NOW THEREFORE, IT IS HEREBY AGREED AND COVENANTED BY AND BETWEEN THE AFORESAID PARTIES AS FOLLOWS: I. The "Developer" hereby acknowledges and covenants that he is the owner of the following described property, to-wit; Lots 1 through 5 incl., and 26 through 28 Incl., Block 28 C.D. Hillman's Earlington Gardens Addition, as recordeu In Volume 17 of Plats, page 74 rec)rds of King County, Washington. and the "Developer" hereby agrees and covenants to cause to have installed the following described imp,ovemnts, to-wit: Installation of approximately 572 L.F. of 12" D.T. waterline and approximately 155 L.F. Of 10" C.I. waterline and all appurtenances per approved water plan W-695, on file with City of Renton, Washington. and such installation to be made in full compliance with all applicable codes and regulations of the City of Renton. The "Developer" further covenants and warrants that all expenses and claims in connection with the construction and installation of the aforesaid improvements, whether for labor or materials or both have been or will be paid in full, all the "Developer's" expense, and the "Developer" covenants and agrees to hold the City of Penton harmless from any liability in connection therewith. 2. The "Developer" further certifies that the total estimated cost of said construction as hereinabove specified will be in the sum of $ 22,000.00 See Exhibit "A" attached hereto for the legal description of the lands affected by this lateconer agreement or a map showing in outline the land affected by such additional charges per the terms of this agreement. Per RCW 65-08.170(3) (RCW 35.92.025). FILED FOR RECORD Al RM DF nur11 CRY ME �G7 MM �Y� ad Sheet 1 of 4 * Based on said total amount of cost, tYece�alfx>IelxTrttyt7ttz(ft%j,Yf the cost per front lineal foot W,,Uke out the inappLicabte pas.tl of said improvement shall be employed to determine the pro rata reimbursement to the "Developer" by any or:ner of real estate, who did not contribute to the original Lost of such improvement, and who subsequently wishes to tap into or hcok unto or use said facilities, which tap or hookup shall include connections to laterals or branches connecting thereto, all subject to the laws C1 and ordinances of the City of Renton and the provisions of this Agreement. It is hereby further agreed that in the event the total actual cost of the afore,esuribed improvement shall be different from that set forth hereinabuve, then this Agreement will be duly amended to set for the total actual cost thereof. The pro mta coat m per lineal front rrvet is v" 17.319425 _ j. It is hereby found and determined that the construction and installation said aforedescribed improvement is in the public interest and in furtherance of pub is health and sanitation. 4. The "Developer" hereby agrees and covenants to convey, transfers and assign unto Citr all right, interest and title in and to said improvements and all appurten- ances and accessories thereto, free from any claim and encumbrance of any party whomsoever; City agrees to accept and maintain said improvement as part of its present Utilities Systems upon approval thereof by the City Engineer and after inspection of said construction. The "Developer" further agrees and covenants to execute and to deliv:r unto the City any and all docw+ents ir.cluding Quit Claim Deeds and Bills of Sales that may reasonably be necessary to fully vest '.isle in the City and to effectuate this conveyance and transfer. The "Developer" further agrees and covenants to pay unto the City such service or other charges as may be imposed by the Ordinance of the City of Renton from time to time applicable to like users of the same class. 5. City reserves the right, without affecting the validity or terms of this Agreement to make or cause to be made extensions to or additions of the above improve- ment and to allow service connections to be made to said extensions or additions, without liability on the part of the City. 6. No person, firm or corporation shall be granted a permit or be authorized to tap into the facility for water or sewer service during the period of 10 years from date hereof, without first paying unto the City, in addition to any and all other costs, lees and charges made or assessed for each tap, or for the main facilities constructed in connection therewith, the amount required by the provisions of this contract except such charges shall not apply to any extension of the main facility. All amounts so received by the City shall be paid out by :t unto the "Developer" under the terms of this agreement within sixty (60) days after receipt thereof. Further- more, in case any tap. hookup or connection is made into any such contracted facility without such payment having been first made, the legislative body of the City may cause to have removed such unauthorized tap, hookup or connection, and all connecting (title or pipe) or related accessories located in the facility of right-of-way, and dispose of such unauthorized material so removed, without any liability on the part of the City whatever. It 1s further agreed and covenanted that upon expiration of the term of this Agreement; towit: 10 Years from date hereof. City shall be Sbeet 2 of 4 under no further obligation to collect or make any further sums unto the "Developer". The decision of the City Engineer or his authorized representative in determining or computing the amount due from any benefited owner who wishes to hoop up to such improvement, shall he final and conclusive in all respects. 7. It is further agreed and understood that the aforedescribed imp,ovements to he undertaken and paid for by_Develooer _ have teen or are about to be connected with the Utilities System of toe City, and upon O such connection and acceptance by th.. City through its legislative body, said extension M and/or improvement shall be and become a part of the municipal utilities system. QD 8. This agreement shall be placed for record with the King County Auditor's Office immediately upon execution thereof and all costa of recording shall be the responsibility of the "Developer". DATED THIS __7 pAy OF_,__IL CITY OF RENTON, A MUNICIPAL CORPORATION DEVELOPER- BY: bMW �. S(IIILDOL�V BY C7'Q�7C../st'f 7y� MAYOR yt �, BY:+t+�5� ���rt- BY: - - , CITY CLERK CITY OF RKNTON DEVELOPER_ STATE OF WASHINGTON ) STATE OF WASHINGTON ) ) as ) as COUNTY OF KING ) COUNTY OF KING On this day of i 191!l On [hi --a personal ly'eppe beforebefore me personally appears ___ - / /llnhy . . e! 7c ioa _, to me known to (Grantor(s)be the-C Mayw, City Clerk - r vr-eeher-snlherteed ""'06 — agent, +e-Ehe-eaaeay- be) of the municipal corporation that executed the to me known to be the individual(s)�descrlbed within and foregoing i•istrunent, and in and who executed the within and fore- acknowledged said instrument to be the free going instrument, and acknowledged that he and voluntary act and deed of said semicipal (she or they) signed the same as his (her corforation, for the uses and purposes or their) free and voluntary act and deed, therein mentioned, and on oath stated that for the uses and purposes therein mentioned he was authorized to execute said instrument Given rider my hat and official seal this an�l that the seal affiAed 1s the corporate '/�/ day of ) j, 191'' aea1 of said municipal corporation. IN WITNESS WHEREOF, I have hereunto set "1 _ my ppnd and affixeA my official seal the riv"turl of officer a ffi cial seal day and year.first above written. Notary Public in and for t State of Signature title of Off icef 1 9 Washington, residing at ld 2-' ,e7L' Notkry Public in and for the State of Washington, residing in ,,///�,,,, � EXHIBIT "A" NOTICE OF ADDITIONAL WATER OF SE419R FACILITY TAP OR CONNECTION CHARGES REQUIRED BY RCW 65.08.170 (3) (RCW 35.92.025) MUNICIPALITY - CITY OF RENTON, WASHINGTON ADDITIONAL. TAP OR CONNECTION N CHARGE PER: latecomer Agreement W-695 PROJECT NO. : W-695 to RECIPILNT: Grady way Associates a partnership BkIEF PROJECT DESCRIPTION: Installncion of approximately 572 L.F. of 12" D. I. waterline and approximately 155 L.P. of 10" C 1 waterline and all appurtenances per approved water plan W-695 on file with the City of Renton Washington TOTAL ASSESSMENT COST: $22,000.00 TOTAL ASSESSABLE FOOTAGE: 1 ,270.95 (Front Footage or Square Footage) TOTAL COST PER FRONT FOOT $17.319425 If there is any question regarding the paid or unpaid status of the following assessments, please call the City of Renton, Utility Engineer- ing Department at 235-2631. LEGAL DESCRIPTION ASSESSABLE FOOTAGE ADDITIONAL CHARGE 1.oL 1 City of Renton Short Plat 50.00 front ft. (VTTI) /138-81 Rec. AF #8105149003 $865.98 Lot 2 City of Renton Short Plat 296.53 front ft. (Johnson-Leiber) Y138-81 Rec. AF 08105149003 $5.135.73 Lot 3 City of Renton Short Plat 225.47 front ft. (Wells) I138-81 Rec . AF #8105149003 $3.905.01 C.D. Hillman's Earlington Gardens 100.00 front ft. (Holmes) Add. Vol I7/Pg. 74 $t ,731.94 Block 27; Lot 31 C.D. Hillman's Earlington Gardens 100.00 front ft. (Developer) Add. Vol 17/Pg. 74 155.00 front ft. $1.731 .94 - 10"Block 28; Lots 1 thru 5 incl. $2,684.51 - 12" C.D. Hillman's Earlington Gardena 343.25 front ft. (Macris) Add. Vol. 17/Pg. 74 $5,944.89 Block 28; Lots 6 thru 16 incl. TOTAL 1 ,270.25 front ft. $22 ,000.00 Sheet 4 of 4 Si RESY yV� "_cr-a: ti 'F'-.•.1 '. n:_. OIILIIISS DIVISION '- M lau A". NO. . .'tC•...`:._c., _•a3: cad, RYATON WA 9E055 ATTENTION: ARL9tE RAIGHT WE: Oct. 23, 1"3 ._ COST DATA AND INVRNTORY SUBJECT: KLMTON ^'EST BUSINESS CHMtBR CITY PROJECT NUMBERS: W. 19: 607 a_H. Gzadv qav S- 0-4�22 -^_ MANS OF PROJECT --- —."—= Dear Me. Haight: �p Per your request, the follwimg information is fumished concerning costs for �t improvements installed for the abwa referenced project. �T WATER SYSTEM: Length Sire Type 480 L.F. OF _lam" 2 WATERMAIIi 160 L.P. OF 10 5Z_ WATERMAIN L.F. OF _' _ WATERMAIN L.F. OF WATCRMAIN _ WH OF 5 y_ FIRE HYDRANT ASSEMBLIES _ _ 3 EACH OF 6 " QTE VALVES 1 EALd OF 10 " -- GATE VALVES _+ EACH OF _' GATE VALVES Other: b" Double Check-Valve Assembly (Fire Svrinxler Svete,,,) TOTAL COST ''OR WATER SYSTEM $ 13:3t 5.00 SANITARY SEWER SYSTEM: Length Size Type L.F. OF _" SEWER MAIN - _ L.F. OF _' _ SEWER MAIN L.F. OF SEWER FAIN EACH OF _,DIAMETER MANHOLES Other: Sewer Connection Fee TOTAL COST FOR SANITARY SEWER SYSTEM $ 200.00 STORM DRAINAGE SYSTEM: Length 420 L.F. OF _ I2 CKP STORM LINE 305 L.F. OF 24 CMP STORM LINE _ L.F. OF STORM LINE L.P. OF ' STORM LINE Other: (2) Type 11 54" O Flow keatrictor M/H (7) 'Type I CM Basin M/H TOTAL COST FOR STORM DRAINAGE SYSTEM S 14,851.75 STREET IMPROVEMENTS: (Including Curb, Cutter, Sidewalk) 420 l.f. Curb/Gutter/Sidewalk; 10,000 S.F. off site paving TOTAL, COST FOR STREET IMPROVEMENTS -- S ILLUMINATION: TOTAL COST FOR ILLUMINATION $ 45,83i.75 Very truly yours, i r' SUVINO i ZONING OEPARTM T PRE-OCCUPANCY INSPECTION RE ORT DATE D90MER 13. 19U TO: DESIGN ENGINEERING DIVISION BUILDING FINAL UTILITY ENGINEERING DIVISION 11 FIRE DEPARTMENT TRAFFIC ENGINEERING DIVISION 01 4ADSCAPE/PARKING FROM: BUILDING 6 ZONING DEPARTMENT l_1 RE INSPECTION SEE ATTACKED SUBJECT: �pnoor cOUF' PERMIT NO. _ B_g33z 507 S.W. ;RADY WAY OFFICE BUILDING TYPE BUSINESS The subject project is nearing completion, Please Investigate your area of responsibility and indicate below either your acceptance or corrections necessary by DELEMBER 10, 1981 r order that a Certificate of Occupancy may be issued. I no comment Certificate will be Issued, s are received by the above date, the ny� p TO: BUII DING& ZONING DEPARTMENT DATE �LEC III 1(p } !_ FROM: This project Is approveC by this department subject to the following corrections: s.d;st C<sl Js�u�brr�j�ov oil' {. Yu/Fad DO YOU HAVE ANY OBJECTION TO ISSUANCE OF TEMPORARv :ERTIFICATE OF OCCUPANCY? YES ®NO Authorize Signature BUILDING • ZONING DEPARTMENT PRE-OAPANCY INSPECTION REPORT ..M...+ DATE NUVENBCR 16, 1983 To; 91DESIGN ENGINEERING DMSION �BUILDING FINAL OUTLRY ENGINEERING DPAS:ON FIRE DEPARTMENT ❑TRAFFIC ENGINEERING DIVISION LANDSCAPE/PARKING FROM: BULDWG 6 ZONING DEPARTMENT SECOND INSPECTION SUBJECT: SPROUT GROUP PERM'T NO. B-9332 607 S.M. GRADY WAY TYPE BUSINESS OFFICE. BUILDING The subject project is nea7ng completion. Please investigate your area of responsibility and Indicate below either your acceptance or corrections necessary by NOVENBER 23-1993 In order that a Certificate of Occupancy may be issued. 1 no comments are received by the above date, the Certificate will be Issued. TO: BUIDAVG B ZONING DEPARTMENT DATE . 9 FROM: This project is approved by this department subject to the following corrections. i 5ea� issl�r d' es" � r ., a. a-. l Y /T. WAX' 4-:1, CAd .k-'f �' ten.-.-.•..�'--� �ucc.-.�-.1 DO YOU HAVE ANY OBJECTION TO ISSUANCE OF TEMPORARY CERTIFICATE OF OCCUPANCY? YES El NO Authorlied Signature • SPEED LETTER • TO: DATE: 3 PROJECT: 141- SUBJECT: Le✓ ar6Ln Uro�- -_ 14110 G6 ' ' A:.c 7r _ lO1 (5{ ) •UILIPG • ZONING DEPART1111E16 PRE—OCCUPANCY INSPECTION REPORT Er DATE JULY S, 1983 O: E DESIGN ENGINEERING DIVISION 11BULDNG FINAL ' OUTLITY ENGINEERING DIVISION FIRE DEPARTMENT ❑TRAFFIC ENGINEERING DIVISION ❑LANDSCAPE/PARKING BUILDING 6 ZONING DEPARTMENT JECT: SPROUT GROUP PERMIT NO. B-9332 607 S.M. GRADY MAY TYPE BUSINESS OFFICE. BUILDING The subject project Is nearing completion. Please lnvestlgafe yow area of responsibility and indicate below either your acceptance or corrections necessary by JULY 12, 1983 in order that a Certificate of Occupancy may be Issued. II M comments are received by the above date, the Cartdlcate .01 be Issued. O: BULDING 6 ZONING DEPARTMENT DATE ROM: This project Is approved by this department subject to the following corrections: f40! M:A 4L46414- 9i�'r4 (.vr"8-J �44. S.GI. U41'C ws�r -+5fv> �;L%J Art 1 �zti �1D C i�pHrcA AlK W a d Oa� 4 �+ltt� 4�4C� SEJ CJ � f dj lri A TioH . �Gd E►�T' ulA}[r rlull Pt:-.1 c,Wt Itc /al ..J/ biT✓Hn Ji od' ClCa _ alrr�M rn/I(,KY e✓� ✓t Va JI� III%A1 slaFlp� b/.w eI'f ✓.A/rC To Su/fie to P"L "(ve wikr Aeer LIVW 6� OJk ex .f- pt xel111 .. i d' 4� r plecc uodr 4& ea A,G, d.>h.,c 1b N.d. a., »7 d. of. �.,... y„t, DO YOU HAVE ANY OBJECTION TO ISSUANCE OF TEMPORARY CERTIFI ATE OF OCCUPANCY? el/t•'�'='Tt'ES ,..4 coticnk. (rlx N, s:de bid'' W�,�7�yle lL...JJr / Authorized Signature At� 6tol"41 i ZOWNO DEPANTAW PRE-OCCUPANCY INSPECTION REPORT DATE JULY S, 1983 TOC DESIGN ENGINEERING DIVISION EISIRDNG FINAL �UTLITY ENGINEERING DIVLVON Ej FIRE DEPARTMENT aTRAFFIC ENGINEERING DIVISION ❑LANDSCAPE/PARKING " FROAQ BOLDING 6 ZONING DEPARTMENT SUBJECT; SPRMM GADUP PERMIT NO, B-9332 607 S.N. GRADY NAY TYPE B)'SNESS O"ICE RUII.D.Ita.' The subject project Is nearing compiellon. Pkase Investigate your area of responsbi lty and Indkato below either your acceptance or corrections necessaty by JURY 12, 1963 _ in order that a Cartttkata of Cccupancy may be tssued. / no comments are teceNed by the above data, the Ce"Mcate will be tssuad. TO: BOLDING 6 ZONING DEPARTMENT DATE FROM. This pro)6c Is approved by thN depad ent subjeet fo the follow"cortedttonsl DO YOU HAVE ANY OBJECTION TO ISSUANCE OF TEMPORARY CERTIFICATE OF OCCUPANCY? aYES ❑NO Authorized Signature QOF RENTON NkTER DEPARTMENT Pressure Test i Purification Test Form PROJECT NO. w _ 69s + NAME OF PROJECT: PRESSURE TEST TAKEN BY— .( +-•4 DN AT A PRESSURE OF PSI, FOR MINUTES TEST ACCEPTED ON PURIFICATION TEST TAKEN BY ON C / PURIFICATION TEST RESULTS, SAMPLE 01 _ SI 1 &1), n �O SAMPLE ►'2 SAMPLE F3 PRESSURE COMPLETE AND PURITY COMPLETE Q No connections to me ins or meter permits issued until above box is checked by Inspector . REMARKS: PC 4 .231 X © `� 0 CITY OF RENTON UTILITY DEPARTMENT PROJECT FORM PROJ CT � ,E'i by WA Ii/ _IYS 0 zog/oyon n CAN me `�-�-�- -0EYELOPER- 17 W ENGINFER _ p,�Lu> �D.UrTA- �uf 27©n: �r�[.Pw L•!G �7/-.. �5<i CONTRACTOR gi/cL . 6t6 ��#ie/ ,�.�ir;; /,_ ; -i CITY INSPECTOR LEGAL: 3 Tf T'1 L HG NREARIZ A=D. 3 FRONT FOOTAGE _ SYSTEM DEYEL. FEE SPECIAL ASSESSMENTS PROJECT NO. COST _ Latecomer Agreement Special Assessment Area Charge PERMIT NO. P- _ (See attached permit for other fees) REQUIREMENTS DATE/RESULTS Pre-Construrti a Conference Pressure Test Purity Test _ Bill of Sale Cost Data Easements _ As-Built Drawings DATE/STATUS Final Inspection & Apprcv�l Hydrants Other ` xrLdr (�Lt-.+.LGG �c.lytlLhcl.,f METERS SIZE COST Moos SOds . Domestic Fire Protection _ Irrigation Other: Temp Hydrant Meter _ Sewage exempt Meter POCKET FILE NO. Project: Renton lest business Center AnLI»s!: S on.M.Re 11 Moy s Rent , M Wilding Code: 1979 U.B.C.. Rnilding Use: office 4 Business Occupancy: R.2 Type of Coast.: Type V-v/Sprinklered occupancy Wad: 184 zoning Cnde: City of Unto 2onin! Code zoning, 3-1 ' Project valuation: Sr 2,000 Site Arw: Parcel A • 0.348 Acre Parcel B • 0.2n1 Acre Total-Ss9 Acre Ming Ana• Gross Elnv. , Stair Net Parking Req'd tech. Etc. arking Level Stor. 7571 3u� 2C68 1/1500 Sc. 1.34 int Floor 5341 S55 49b6 •21.n3 _90 Floor 5374 q7. 4397 1200 •26.87 trd Floor 3"1 332 3565 1/2B0 •10.49 Not Accountable enthousa !4C 36 $Cd For Parkin -- ota otal 17A23 2nn3 1SR20 i Req'd• 69 St al la Parking Stalls Kennels - 2nn S.F. a 1/W .13 Provided: Carpet Store - 1600 S.F. P 52 Standard 20' x 9' 1/Soo 3.20 17 compact 16' x B' office - 3541 S.F. a 1!200 •1'. .70 otal • 1.0, LEGAL OESCRT►TION: Parcel 'A' Lois IS—rough S. Block 28, C.D. Hillman's F.arlington Gardens Addition To The City Of Seattle Division No. 1 According To The Plat Recorded In Volume 17 of Plats, Page 74. in King County, Mashingt on Parcel 'R' Ta is _6 rough 28, Block 28, C..D. Hillman's Farlington Gardens Addition i To The City Of Seattle Division \o. 1 According To The Plat Recorded In Volume I- of ylats, ' Page 14. In King Countv, Mas`nington Structural Design Wads: Live Wad Dear Wad Partition Total I Ff rs no _ 33S PSF Parkin 2S0 PSF 95 PSF First Floor 4 Offite so FSF 95 p5F 20 PSF l55 PSF Second 6 Third Floor 50 PSF IS PSF 20 PSF BS PSF Roof 25 PSF 15 PSF 40 PSF �EKZ , SeA1c Zone: 3ti' Mind Load: 25 PSF Concentrated Loads: As per Table 23-A 1979 l.'.%.C. Project: Rental Was' usin.-s Center Address: 607 S.M. W May • Renton, y m 1diag Code: 1979 U.B.C- building Use: Office R Business Occupancy: a-2 Type at Const.: Type V-u!5prinklered Occupancy load: laa _Doing Code: City of Renton '-oning Code :oning: 0_1 Pre)ect Valuation: $712,000 Site Area: Parcel A • O.346 Acre a&Mel a • 0.AI Acre Total . 0.549 Acre . ilding Area: Gross Elev., Stair Net Parking Req'd `!ech. Etc. i arkinit Level Star. 'S'1 303 "62 IMIN) 5F* I.SR irs♦ Floor SNl 35A 4986 .21.03 _ and Plaor 5574 977 4397 1 200 •26.6- ird floor 3897 332 3565 I/200 •10.49 Not Accountable enthouse NO 36 "4 For Parkin nta -68. otal 17823 2nn3 ISR20 Req•d• 69 Stallsl Parking Stalls Kennels - IOn S.F. a 1/S00 -13 Provided: Carpet Store - 1600 S.F. P 52 Standard 20' a 9' I/500 3.20 17 Compact 16' a 9' Office - 3S41 S.F. a 1/200 y 17.70 i Totat`.21-7 LFGAL DESCRIPTION: Parcel 'A' Lots T lI' rough 5, Block 28, C.D. Hillman's F.arlington Gardens Addit �n To The City Of Seattle Division 90. I According 1b The Plat Recorded In Volume I' Of Plats, Page 'a, In F.ng County, Warhington &net 'It' is �6 TFMUgh 28, Block 2R, C.n. Hillman's Fx rlington fardens Addition To The City Of Scattle Division Ca. 1 According To The Plat Recorded In Volume 17 of flats, Page 74, in King County, Washington Structural n Desi n Wads' Live Wad Hear Load rartition Total First Floor SSS FSF Parking 2S0 PSF a5 PSF First Floor Office 50 PSF a5 PSF l 20 PSF 155 PSF Second 6 Third Floor SO p5F 15 PSF 20 PSF 15 PSF q • Roof 25 PSF 15 PSf _ /0 PSF E:.t i P^PC Sesaic 'one: 3 �-- Wind Load: 25 PSF Concentrated Wads: As Per Table 23-A 1979 U.B.C. prey ; Renton West Business Center Address: 607 S.M. May Renton, Ww 0 Building C066: 1979 U.B.C. Building Use: Office A SuAness occupancy: B-2 Type of Const. : Type V-w!/Sprinklered Occupancy load: 184 'Acting Coda: City of Renton ±oninP Code Zoning: %-I project Valuation: $712.000 Site Aroa: Parcel A 0.346 Acre - Parcel S 0.2n1 Aere Tof• 0.549 Acre _ •ileing Area: Gross Elev., Stair Net Parking Req'd Mech. Etc. ark inn Level •�1 303 ±P0 1/ISPO ST• 1.36 St or. iret floor $341 355 4986 •21.43 _ono Floor 5374 977 4397 1 100 •26.87 ird Floor 3697 33' 3565 1/2P0 •19,49 Not Accountable enthouse 640 36 SO4 Por Parkin otac ntol 17823 ±nn3 ISR20 Req'd• 69 Stallsl Doak Sng Stalls Kennels - ?no S.F. 4 I/S00 .13 Provided: Carpet Store - 1600 S.F. s S2 Standard 20' x 9' t/SOO • 3.20 17 Coapact 16' x B' Office -•SS41 S.F. • 1/200 otal • LA LEGAL DESCRIPTION: Parcel 'A' Lots C�Through S, Block 28. C.D. Hillman's Earlington Gardens Addition To The City Of Seattle Division 90. 1 According To The Plat Recorded In Voluae 1' Of Plats, Page 74, in King County, Washington parcel 'B' to 6 rough ±B, Block 24, C.n. Hillaan's F.arlington Gardens Addition To The City Of ;cattle Vivision No. I According To The Plat Recorded In Volume I- Of ylats, f + Page 74, In King County, Washington Strut turn] --1 Desi n Wads: Live Wad Dear Wad Partition Total First Floor 335 PST Parkin 250 PST 85 PST First Floor '0 PSF 355 PSF Office 50 PST 65 PST Second R Third Floor SO PST IS psF 20 PST BS PST �E41.OV� goof 25 PST 15 PST 40 PSF !yUN✓ Sewic Zone: 3 �'+J Hind Load. 25 PST ooncentrat ' Wads: As Per Table 23-A 1979 U.S.C. SP[10 Lf?TER S' TO; - ___ DATE: SUBJECT 7. ;n -"— vROJECT: --------------- Siqned CITY Of RENTON TBQOWY WATER SFRVICR ACREDMT DATE 1, We Grady Way Assoc. owner(s) of AddrMs 607 S.W. Grady Way legally described so follow: Parcel "B" Lots 26 through 28. Block 28, C.D. hillman's Earlington Gardens Addition to the City of Seattle Division No. 1 according to the plat recorded in Volume 17 of plats, page 74, in Ring County, Washington. for and in consideration of the Renton Water Department granting a permit to connect a tompsms"/permanent water service and/or mein in S.W. Grady Way for the above property. The owner(s) of the above described property, their successors, heirs and assign•, hereby agree and covenant to participate in, s';n a petition in support of, and accept any Local Improvement District (L.I.D.) or City-initiated propose'. other than L.I.D., and pay their fair share therefore, for the extension of the water main in S.W. 12th Street when required by the Renton Subdivision Ordinance, or as directed y the Director o Public Works. IN WITNESS WHEREOF I (We) haw hereunto set my/our hand(s) and se&1 the day and year first &bow vitten. (SEAL) (SEAL) STATE OF WASHINGTON) ) SS COUNTY OF E I N G ) a Notary Public in and for the State of Washington, residing at , do hereby certify that on this day of 19_, personally appeared before me -- �— to me :own to be the individual(s) dascribe herein end who executed the within instrument and acknowledged that signed and sealed :he same as free and voluntary act and deed for uses and purpose herein mentioned. WITNESS my hand and official seal the day and year In this certificate first above ritten. Notary Public in and for the State o Washington, residing at D BUILDING & ZONING DEPARTMENT p RONALD G. NELSON - DIRECTOR O MUNICIPAL eUILMAIG 2W MILL AVE $O RENTON.WAf4 9W55 a 23S-2540 n `OS4,ED SEVlkoll" BARBARA Y SHINPOCH rf% MAYOR July 29, 1983 Sprout Group - 607 S, W. Grady Way Renton, WA 98055 RE: JOB ADDRESS - 607 S.W. Grady Way, Gentlemen: The following Items must be corrected or completed And approved before this department can Issue a permanent Certificate of Occupancy: I P're Department (235-2643) (A` Permanent tailings required on rear exit stairway. (Bl W l est side of print room shell be closed to exitway. 2. UtIL'tles Engineering Division(235-2631) /(A) ,-Regdre es-batit water plan,.-- (B) Require cost data and Inventory (water line). (C) Require Bill of Sale (water line). 3. Design Engineering Division (235-2631) '�- �--Hart-+wis�aplsett pvtefi en -Raysnend Ave nu- S.W. where Wit"er>tnd atnrm lines are. (B) Clean up Seneca Avenue S.W. and patch street after square cutting, edge and calling for subgrade Inspection (C) Mud east water vault. Paint shackle rod with bituminous paint. (D) Clean excess concrete out of vault. (E) Rabe east blow off valve to swfaca. (F) Place valve market near blow-off boutheutk paint yellow with hbtanee to B.O. Stetictled In black; clean hot valve box; place cap seed.tbalu.na.B.O. (G) Rabe hydrant valve boxes to surface; stencil on distance to hydrant dlrhydaentt paint guard posts yellow. Sprout Group luly 29, e933 Page ) iH) Cut exPamion loint into concrete driveway on north aide of building. (1) Pave parking lot and alley. (1) Complete off-rite lmp'ovements on S. W. 12th Street. e. Building A Zoning Department (135-2540) (A) Gate at ]at floor stairway to parking garage to be self closin& (B) lmtall thresi.olds on i hour door. (C) Second floor and penthouse not to be occupied will completed and/or tenant Improvement permits are obtained. (D) Copy of State Blevator Certificate required. (B) Fmlab rear exit salrways. (Fl Finish exit corridor to rear exit on 3rd floor (G) tnsts:l exit sigas on 3rd floor. (H) FWA bathrooms and kitchen on 3rd floor. (1) Complete striping of parking lot and complete landscaping. The above Items must be corrected and approved before the expiration of any temporary Certificate of Occupancy or the bond posted will be collected. It you have any questions Concerning these matter, pleue contac department or our of(ice. t the concerned Sincerely. 'Kenneth C.�Emdara -CC �' Lead Building Inspector KCB:se 07a)B ENDING OF FILE FILE TITLE 95 9" 0) NX a ,