HomeMy WebLinkAboutWTR2700718(7) W-718 WELL #9 PUMP HOUSE WTR-9 1+
#7 Pay Estimates
BEGINNING
OF FILE
FILE TITLE
0,00, 7/ 5�p�y vac es
UIR,? IJ�L'k91�mAWa��
:W7 F�yEsFrmafeS
• For9e By City Clerk's Office Only
I . _
AGENDA ITEM A. 1 /
PENTON CIIr COUNCIL MEETING
................................................... .........................................
SUBMITTING 4, 19H
Dept./Div./Bd./Comm. Public Works/Utilities Eng. For Agenda Of January
Meeting Date
Staff Contactfljtj ;Oyyh�[f on Ol .er�
((Name)) Agenda Status:
SUBJECT: Final Pavmunt for W-665 (('A6 04R-8'; Consent
Public Hearing
.'Jr' II 'n,, of Wall N.,_ 0 and Ohavr,.at'n
Correspondence
-II - Ordinance/Resolution
Old Business
Exhibits: (Legal Descr., Map;, Ltc.)Attach New Business
Study Session_
A. Summary Sheet for Final P,) It h.,r
Estimate
B.
APproyel:
C.
Legal Dept. Yes_ No_ N/A_
COUNCIL ACTION RECOMMENDED:- A,^reval of Finance Dept. Yes_ No__ N/A_
Other Clearance
Prnlact and FIgi1 P-ymerl a thnr'ied
FISCAL IMPACT;
Expenditure Required $ Amount $ Appropriation- S
Budgeted Transfer Required
SUMMARY (Background Information, prior action and effect of implementation)
(Attach additional pages if necessary.)
Tne Public Works Department recommend the Project and Final Pay Estimate be approved and
that the retaincge of E2,870.21 be released after thirty days if all taxes have been paid
and no liens have been filed.
PARTIES OF RECORD/INTERESTED CITIZENS TO BE CONTACTED.
SUBMIT THIS COPY TO CITY CLERK BY NOON ON THURSDAY WITH DOCUMENTATION.
f Dater i� ¢
Projectf/f_ n i8 CAD No.
This Is to certify that the prevailing wages have been paid to
our employees and our subcontractors' employees for the month
Of ¢ In accordance with the Intents to Pay
P revu ng age i ed with the Washington State Department of
Labor s Industries.
Company Name
By
Title
CONTRACTOR/SUBCONTRACTOR `-Y
REPORTING PERIOD
MONTHLY MANPOWER UTILIZATION REPORT �' �' Month: fy7- 1 i® Year: Ey4¢
be submitted to the City's Project Goals and Timetables as committed
anginater during the 1st week of following ��� in Contractor's Affirmative
nth while contract is in progress. Prime •N Action Plan t
Contractor is responsible for obtaining and
s in all Subcontractor Re rt or per City's Plan 9.1
To: (seen WA lacatien of ts@Iie o Agency aqi i From: (asms and Imstien of aaastatten)
17.35 E. 4'^ Pue
This report is required by Executive Order 11246, ection Z03. t-ail.re to ttport can
result in sanctions which include suspension, termination, cancellations or debarment of
contract.
i. f• 1. u• % 5•
wino- fetal total
Mork Hours of suplcyment (See footrota) racy number uot.,"'
of of
CLui e• •• /h of minorit Empk
a Xis- sew. Arian/ ohl total fn to eee
CoePany's Hare (I.C.1 -mle Lions Tots Black Hanle ndi" Paie wIn ees y
Tr
ITr
C
n
- t
A
rr
C
Av
Tr
Tr I it it it
- -.wary Ur:::r:'a ,tt na t-.re an ...♦ at. - ;•{...rye '-.mD r.
11.-- I-.Males a Fenales• ••Minorities s 1.. -...:•r_: :1 ,.
P.t t<`
7/80 (Submittal Requirements 6 City's x t1:. iin t111e -
• • Pepe
City of Wor S17146.W
Wei: No. 9 Pew Ste•loe
Cmtratw - Puget Cmt'uttors
PPY ESTIVATE NO. 1 DATE ISSUED: 15-GE1-64
PAY ESTIVATE PERIOD: 17-SEP-61 thmr *,OCT-&,
&MOP
PREVIOUS PAYOD75: TOTk CONTRACTED M)AT: 0213,667.52
(imluoieg sales 'A,)
TCTk PREVIOUS PAYMENTS: 66.0
TOTR EAMU tiY,iib.dt
YkE OF I MTEAIAS ON NAND s6.dP
WOTRL u4,6R6.W
SkES TA! IB.M $1.9k.66
S b"T0. kli,592.68
LESS RETAIN*E I11,E36.6P s
LESS PIGIOS PAYOWS so.AY1
PAYMENT TO 1 «DE 1n:5 ESTIVATE ti`5,36&.u
tAetalmn rot nt"lo Pe Sales ta.
• • Pape 2 of a
C:tr of Fenton SIy1K.RE
ael: No. 9 Pw Station
Contractor . Puget Constructor
PAY ESTIMATE W. 1 DATE IMM: 1S-0CTi4
PAY ESTIMATE KRIM: 17-SEP-64 through 11-0CT-14
WIN W LM
BID BIENtaMW — 1 WN MOLE ED
I Total
It" %wA I Pm Estis This Period Total Aoount Earned
1
Bonds a Insurance I s ELI$ 1 0.81% 10.0 111.I0% ss,W.NN
1 1
Sen1on 111N; I I
6e 1: Aecuireeents I s2,M1.N I 1,116 101.11% IN.Bas s2,11a.dd
I I
Section 121:5 I I
Move in arc Site Proration 1 $2,@W.11 I L81% AAft 10.0% %E,w.Q
Sect ton rm 1 1
Earthmor. I s36,ONA I Lob 11.00t 11.11% $3,Sm.Be
Sction "I I 1
Store Somers i 1151m.00 i 1.IIs GN.M% 6a.aa% a9,0.aN
I I
Section 133s: I I
Reinforce[ Cornete 1 U1,se1.01 1 1.111 B.BN% 1.NP% Q.NN
i I
Section 1423N I 1
Reinforcer pit: Unit Masorry : sle'".ald 1.18% N.NN% t.&I W.NN
1 1
Swum.15W 1 I
Fap. htaimpra arc Castings i s2,1d1.11 I a.01, 1.aN% N.NN% W.Na
i I
Section I61B1 i I
Canmtry W 011.a1 1 N.Na% N.NN% 2.NN% W.aN
I I
Section 17M 1 I
Tnena! and Moisture Protection, 52,011.01 1 O.Net 1.1e% e.NN% Q.BN
Section 674:2 1 1
Preform Metal goofing I s10,101.01 1 O.W1, 1.W% /.NN% WA
I 1
Section IBM I I
Boon arc nupwre 1 65,001.11 1 N.Be% 1.Nas 1.12% WJW
I I
Section 1972: I I
Seamless iooay Flooring I $a,aal.0 1 e.at% 9.Q% 1.it; WA
Section Im I I
Painting I s2,Ia1.N 1 1.0% V.Pas a.//% Q.w
I I
Section In" I
Misoellaflem Specialties I s2 NLN I Lu% N.NNs a.Na% k.aN
. - • • Pace 3 of s
City of Renton S17146.A2
del: Ro. 9 Paso Station
Contractor - Puget Constructors
PAY ES-I*'E NO. 1 DATE ISM: 15-x--B4
PAY ESTIVE PER:DD: 17-5E?-6e through 3-M--81
...................
roRn CDRP.FTED
BID BW W A ig0.{ CDp TED
Tota:
Itu Awint I Prev Estie This Period Total Aeount Earnec
Section llBdv
Vertica: Turoiv Paeo 617,YAN i B.M% B.BO's B.Bat ld,K
Section 11368 1
Chloriwt ion EAuio. arc Pccess.1 $B,BBB.! ; 0.B0s B.ait d.a0s td.di
Section 15N3 ;
Dactiie Iron Plx Inc Cast I
Iron Fittings %,@N.ea e.eds 50,Qkh 50.80s Ba,M.aO
Section 15156 t
Fire ryerant Asseeo:y f2,Baa.H E.001s B.kv, 8.dds ea.da
Section 15166
wives arc !o ters e;a.dM.dO a.aPs e.Ras 0.w:L Ir.x
Section 152N I
Ventilating Systes 1 $8.w-0 a.das f.ON 0.ltb ed.Pa
Section ;54*
P;ae610g and 01sce:laneous I
P:Pin: Systess 1 ev,W.0 d.0a1* d.00 0.Res sd.0?
1
Section I6ele I
Electrical - 6erera; A ov. I VI kv.dd 0.90% B.Bas 0.ddt K.da
Section IWA I
Basic Raterlals am Retnods 1 $6.M.0a d.dos B.Vs d.ikt
Section 16110
Rse.ays 1 u,PtV`.00 0.A1+Y 0.Nds B.d0g
Section 16120 1
Corcuctors I H,Bad.as 0.tlas d.das P.dds fd,dd
Section 16155 I
_ae Voltage Rotor Control 1 $3.M.as 0.ads B.Bds e.Bds IA.Ba
Section I61Q 1
SNA"ooarts I e3,aa0.(N e.0es 8.gas B.Bds 10.dP
Section 16450 I
6roattding 1 e2,KV,w an B.pas B.Bas $8.00
Section 165" I
Lignting 1 H,Bda.Q 0.aes 6.ws P.us le.N
I —
TO-A, 1119?,61vt.60 124.W.80
• • Page/ of 4
City of Renton S17116.AP
Mel" No. 5 Peq Stu im
Contactor - PNoet Ctmtruct"
.MY ES';RP-E NO. i BRIE 3Si5-OC--64
PAY ES':M'E PERIOD: !7-SE�81 thmup ;/-CC-84
INTERIPLS ON W
-- IM9ICE - I—IMDOCIATED IA WN—IMW Wg
SPEC SECTION Ul' INVOICE I M THIS I OF 111TESIRS
:';P DESCRIPTION UIT PR;:E MAN WA i WIN PEWm TM i ON 00
I
I 1
I I
'OTiL VkLE OF M.M
114'ER;A-5 ON hYS
• DATE Otober 16, 1984
TO: FINANCE DIRECTOR
FROM: PUBLIC WORKS DIRECTOR
SUBJECT: PROGRESS PAYMENT
CONTRACTOR: Puget Cnnctr,,rjnrc ESTIMATE ice__
CONTRACT f CAG 062-84 PROJECT: Ii-718 - Well a9 P mo S acinn
1. CONTRACTOR EARNINGS THIS ESTIMATE S 2a fAn An
2. SALES TAX P 8.1% 1 A92.fiO
3. TOTAL CONTRACT AMOUNT THIS ESTIMATE $ 26.592.60
4. EARNINGS PREVIOUSLY PAID CONTRACTOR $ 0 '
5. EARNINGS DUE CONTRACTOR THIS ESTIMATE $ 23.37n On
G. • (95% x Line 1) SUBTOTAL - CONTRACTOR PAYMENTS f 23,370.00
7. RETAINAGE ON PREVIOUS EARNINGS $ 0 -
8. ' RETAINAGE ON EARNINGS THIS ESTIMATE I1J20 UU
9• SUBTOTAL - RETAINAGE Z 1,230.00
10. SALES TAX PREVIOUSLY PAID S o
11. SALES TAX DUE THIS ESTIMATE I 4T, Ell)
12• SUBTOTAL - SALES TAX $ 1,992.60
GRAND TOTAL
FINANCE DEPARTMENT ACTION:
PAYMENT TO CONTRACTOR (Lines 5 and 11):
ACCT. Y 4ll/DOD/15.S01.37 % 25A62 60 f_L
ACCT. f S r
RETAINED AMOUNT (Line 8):
ACCT. ! I, cm 17 fig If;) S_ f
ACCT. r _ $ If
�,� TOTAL THIS ESTIMATE E
CHARTER 116, LAWS OF 1985 -
ITY OF RENTON CERTIFICATION *RETAINAGE: 5% of amount.
M ,,Pcpw' w MAY'Lflnl.l IYW A n Q
M, It WR1w� ,MN{M MV.Mf M
WlY AilYD M M u6 W�1►{1M,0 Y O�iCn:�
Mlp 1,Mt Iryl iL4M•1 y{I.OYI IJO MM4C
1011 KM/�� M OM1 p Y11p1 YO 11M1,.y�
1110111m q Yn11pKJR YO iMIM1Y p NO CNY
Eng-eers
Manners
' Eccnomrsts
Scienns+s
October 16, 1984
517146.A2
City of Renton
200 Mill Avenue South
Renton, Washington 98055
Attention: Ron Olsen
Gentlemen:
Subject: Well No. 9 Pump Station
Pay Estimate No. 1
Enclosed is Pay Estimate No. 1 for Well No. 9 Pump Station.
We have reviewed the Puget Constructors pay request and
agree with the amounts noted in this estimate.
The total earned to date by Puget Constructors is $24,600.
The amount recommended for payment this month, including
adjustments for sales tax and retainage as noted in the
enclosed estimate is $25,362.60.
Also enclosed are the contractor's monthly Manpower Utiliza-
tion Report and Certification of Payment of Prevailing Wages
for this payment period.
Payments should be made only after the contractor has made
submittals in accordance with RCW 39.12.040.
Sincerely,
James A. Uingfiel
les/se556y
Enclosures: Pay Estimate No. 1 (2)
Monthly Manpower Utilization Report
Certification of Payment of Prevailing Wages
cc: Puget Constructors
Barney Ruppert
CN2"L,.!NC Sev*Neprrre 1600 It/MA.SE.laew WaV gp 206453."0
PO 8U 915M OWE„ WMMIU ,vamc zaso
UOETCONSTRUCTORS
t7i5 E1It uh Rvehoe oiymp W"hmpron r501
Phone�1061/Sa-96)i
October 23, 1984
Mr. Ron Olson
City of Renton
200 Mill Ave So.
Renton, WA 98055
Dear Ron:
Re: Renton Pump Station No. 9
Enclosed is the Statement of Intent to Pay Prevailing Wages which
is required for the Subject Project.
Sincerely,
PUGET CONSTRUCTORS
Dena.:, A. Burke P.G.
President
Enclosure
¢y-)., --
ENGINEERING CONSTRUCTION MANAGEMENT
/ Date: / /I i, Q
Project A",") CAC No.
This Is to certify that the prevailing wages have been paid to
our employees and our subcontractors' employees for the month
of R /(< " /1J tti% in accordance with the Intents to Pay
Preva+ling Wage +led with the Washington State Department of
Labor 6 Industries.
Company Make
by
T I t lc'�/Lr7lL�'/'
AM CITY OFAENTON • DEPARTMI7bLT OF ENGINEERING
• .• MUNICIPAL BWDIWG. 200 MILL AVE SOUTH WON, WA 98055.235-2531
/A ,
PROJECT Nell No. 9 P.S.. N-)l8 PROGRESS PAYMENT ESTIMATE NO 2'
C,j,f No CAG 019-83 Conrraclor Puget Constructors t/i4 �
Closing Da1e_i �`-i—SbH,_o/=
it top rKs PREVIOUS TOTAL THI5 ESTIMATE TOTAL TO DATE
No Oesc l•p Lpn Price Qty Am .0 , Qty I Amount 1 Qty I Arrq„v
1aeEs 1 IffiWarce M,NLN IMe M,IN.Is 11 14.11 IMe M,NL11
victim silo;
General llpoitesents 121NLN IMT $2,No.to a N.N IMs 52,MB.w
Section W115
Nm
WIN In
Site Pr!{Nratim ' 12^0 10% e2,ON.N 1i Ais 111s I W,add,N
Earttlislri /36tNLM la 43,600.01 71s s25,2011.W Me e26,W,M
WIN "I
stom sown 115,MI.M 6a 19,QVd.N 21s s3,QIMAV Ms (e141w.L11
sectim"I
winfmced Concrete sts^w ai w.N a w.M a sLM
WlN N231
blefortrd Iblloe Unit wsmry I INI,NLM a w.M i h N,N a W.M
1 6wtim 1351P
Fat Ileta;am4 and Castings I2,NI.N a w.N ( gs ed.N a WAV
j Wim 1611/
carpentry N,MI.M a wale
a WIN 1s w.dd
WIN 17Mi
T6erael and Ilolctev omtectim tL,NI.N a w.a/
sectim 17412 N.N
Prefined Metal Awful WON It 1P.aN 11 1N.LM a N.M
WIN NM8
Dwrs and IIvdllare 1S,NLN a 14.0 1s W.N 1s SO.IV
Sect im 19721 i
Sealess EpDey Flowing 11101I,116 a
sectim 19912 N•M a N.M a N,w
Painting NLN a N.M
6ectim I1999
MIscv1;&aous specialties N.NLM a 11.40
M 14.10 a N.a1
IJII
1
CITY OFgVNTON • DEPARTME,&T OF ENGINEERING
• -1C • MUNICIPAL OWDiNG. 200 M16L AVE SOUTH OWON, WA 08055e 235-2631
PROJECT Well Bc. 9 P.S.i M-718 PROGRESS PAYMENT ESTIMATE NO
Com.act No CAG 119-83 Com.acto, Puget Constructors oa , /r
—��- Cl ,ny Date ' </e+ Sneena at
uaO e
n I L SW PREVIOUS TOTAL THIS ESTIMATE TOTAL TO DATE
N. De3[npL on Prig Oty Amoum OtY Amount QIv Amo,.
Section 11M+
Vertical Turbire Puao 417,W.M K 41.M
Section 11361
Ohlorinlatim EguIP• art kciss. 1/,M1.M K M.M K M.11 K 1 $6.It
ect Sion 1503
Ductile Iron Noe am Cast
Iron Fittings I 18,MB.M 5" I ta,W.M 3K 12,tM.M Bfa 46,{M.ld
Section 1515F !
Fire hydrant nsnoly W,MI./1 K wSo 90% {I,W.M 9h I {1,IM.Id
Sectlor, 15!W
Valws +nd Floeaelers 111,111.N h W.1/ K W.M K W.lt
Section 1268
venti:ating Srstm I 1&MB.dE i K W.M K N.M K I W.II
Sat inn 1sw
P1Veolm +m MtsalLro rus
Ptoing Svstetrs
Section 16411 i
I
Eiectrlca; - 6ewral Prov. , 42,M0.M K so.W 5K 4t,M1.M Sh si'm W
Section 16/54 I 1
I Basic Materials and Metnoas 16,0.0 h W t2 K W,M K 110M
Section !;At I I
Racveays 12,Mg,ws h W.& Is 1a,M isl 66.011
Section 16l tl
ctnd cco N,W.M I K {l.M K SO." Is W.IN
Section :6!55
La Voltage Motor Faontro: I 43,N1,M K so.N h so.* i K W-W
sect:on !6:65
sctmwarcs
43.iM.M i K I W.A' K t0.M I li W.is,
Section IMSI i
6rourdino 12,M A K W.to I K 111.1/ ! K W.II
Section i6 w
LlMting I N,m.MI K N.41 Is N.M K W.UI
TD1PL �4197,W.M I Qt,6M.M W,M4M ',{5B,m.N
I ,
t
1,
�1
1
Page I of a
City of Anton 51714LR2
ill hi. 9 POP Station
Cortratto - Pipet Custrwtos
pay ESTIMi7E 41 2 RATE IBM: I6 N
PRy ESTIMATE PERIOD: H-OCi-84 thro o. 1410V-44
9 my
pE IM PRYOWS: e5,362.w fora COrtRRCTEP mWi
hnolsdmg sale tail
1oT0. PMY1016 p1UEMi5: 125,362.W
TOTAL EAW ou,W.a
Val[IF ARTERIALS a au a.M
SUBTOTAL pB,la.a
SAES TAX (8.1f) M,69La
91RTOTa K2,696.a
LESS RETRIMGE Ie2,90.10,s
LESS PREV1DA PQVMWS 1429,762.6R,
PRYPW TD K PACE THIS ESTIMATE 934,435.M
a4taimp rot oltWwld Pn Sales to
Pape 2 of
City of Ammon SOIV.A2
Yell Ko. 9 P"Station
Cartractm -Pow Comtrwiom
PAY Er,I111TE la 2 WE 1smi 16�Od�
PAY ESTIIMTE PERIM: 11-i-I4 throw 14-MV 4
Ipk NNASTED
110 PENU M I 1Dh. CMUTM
Total
It" bomm I Peso Estis This Prrioo Total hount Expo
1
lads P Inwave 1 N,MI.M I IMP K In% N,MLM
1 I
Sectim IIMI I I
arwal Requirements 1 12,MI.M 1 10% a IMs 12,IM.M
I I
sactim M/15 I 1
11ove In x4 Site Premratim 1 102,001.11 I IMP h IM1 12,POP.it
sntim 1221E I I
Earthemk I 13s,M1.M 1 18% 71/ My ktw.k
Serum NMI I I
Storm Sags I 115,IM.M 1 Pat 21+ Mh t INN.*
I 1
Sort im"I t I
Pe nforced Cacrete I 11/,MI.M I It n K so.al?
1 I
Section%231 I I
PeinforceC Xol lei Unit Knanry I 11ko.16 1 /t 0% Io OR.Re
I I
sectim 19M I I
Knaleo ad Castirgs 1 e2,M6M 1 PK h K 1P.M
I I
sectim 1611P I I
Cam-,ry 1 M,MI.M j 1% Is 01 tA.Pe
1 I
sectim 17MP I I
Thermal and Koisturm pmtectiml 12,M.M I M 1t Ba ae.iP
sactnm 17•I2 1 1
PWormed Ketai Rmfiq 1 111,MI.0 1 It 1% 11 at*
I I
Sectim am I I
Drop and Kvdam 1 1S,MI.M I $1 1% R so.a1
I I
Seim/9721 I I
SwIKS Epo.y Plomiaq I M,M/.M I 1% 1% K ill.PP
sectim Vm I
Painttrq 1 $2,MP.M I 1a h 1s a1.1P
1 I
sxtim Im I I
Rnsrmllanroas sWldlties 1 12,MI.M 1 tl 1% fa W.M
Gage 3 of e
City of kmon SI7116.A2
Ile!I ND. 9 pop Station
Contractor - part cantrtcton
PRY WIIIATE NO. 2 DATE ISMi 16 10-4
MY ESTIMATE PERIM: 11-6{T-N thr" 144MV-N
im(I)OWED
BID NF KO& I wDw CXLETED
I Total
itea Amount I prey Ettim This Period Total $round Enna
� I
S¢tior II04 I
Vertical Tetin 4Lp I SIT,NR.N I n Is n t1.N
section 113N 1 1
Chlorination EAaip• ant kcn I N,NI.N I Is h Is Sto
seal 19M3 1 I
lowult Iran pine ed Cast I I
Iron Fittings I N,NLN 1 Us 30% Nt 6614J/.N
Section 13131 I 1
Fire Itorant 11mem61y I It,NI.N I It 99% 91m s1,BIB.Be
Smctim 15161 I I
Valva and Flaw "em I I11,mN 1 n a It N.ge
Section lum 1 I
Ventilating Systems I N,NI.N I It n Is N.w
Section 150 1 1
pla bang ant N;stellaneous 1 I
Piping System I 64,NI.N 1 N n /e N.Be
I I
Section, ]SO13 1 1
Electrical -6eneral Nov. I /t,NI.N 1 n Sn Sn s1,I0.N
Section IM I
&sic Asterials and Mrtnadt I N,NI.N 1 n n h N./B
Section 16114 I 1
Ratwys I /2,NR.N I It R n N.N
Section 16128 I 1
Caroumom I /a,W.N I n n Is so.OF
Section 16165 I 1
Low Voltage Rota Control I $3,N/.11 1 It n /e N.N
section 16163 1 I
S.itrnmards 1 $3,NI.IS I Is h n $0.00
Sort ion 16451 1 1
& vrd,ip 1 $2,101.1/ 1 Is n n w x
SWIM 16M I I
Lighting I Ia,NI.N I It M n V.BB
I
TDT76 1197,061.411 am,ON.
Page 4 of 4
City of rmdw S171V5 Q
Well Mo. 9 Pm 9tat:m
Comractor - %W cmtrwto
PAY ESTIVATE 16 2 DATE ISM: Ifi-W- 1
PAY ESTIVATE PEAIM: II-W-44 th o* 14-10V-&
VATERIILS ON 00
I INVOICE I—IIfA MTEDD IN IpM-101AE11T ALIE
SPEC SECTION I EMIT IMJOICE I DIEV THIS I OF MATEAIAL9
ITEM CESCAIRTION 1 UNIT PRICE 20 MOLINT I ESTIM PEAIM TOTAL I ON 00
I I I
I 1 I
I I I
I I I
i I I
TOTAL MJE SE 0.10
IATERIPLS ON 00
CONTRACTOR/SUBCONTRACTOR ; Y fJ�� REPORTING PERIOD
MONTHLY MANPOWER UTILIZATION REPORT �' Month:c.>r Io Year:
To be submitted to the city's Project ,r Goals and Timetables as committed
Engineer during tho 1st weak of following r�,N J in Contractor's Affirmative
nth while contract is in progress. Prime Action Plan t
Contractor is responsible for obtaining and or per City's Plan 9.1
submittingw all Subcontractor Re r s. — -
To: fear and Iacatten of Cawlieno aseacy eqt.) From: (am1e,,,�ewqlwatlea of eaeerettw)
��t2.♦
This report is required y Executive r er ect lon O3. a ure to report can
result in sanctions which include suspension, termination, cancellations or debarment of
contract.
k. 5. In
Total tal
mlrw Mork Hours of 6nploymenL (See foo tno ta) rlty number umberof of
Claaal e. . .. : V/h of alnorlt emPby
flea a Rla- or. Ae 1aN atal total Gaploy- sea
Cemparp�'a wma (I.r.l rnda Llone Tote Black panic ndlan rao�tl re le V/X see
A.
Tr
Tr
ll
S.va, A
Tr
P..
I Na
Tr _
C Z-�u
A
T.
t 't Tr
C
A
Tr
A.
Tr
Tr
Tr
j. Con fficlal's nature an a Pate signea 9. a ephone I:umber
(Include Area Code)
Rev. 11/77 (*males 6 Females, --minorities s Non-minorities) Page _ of
7/80 (submittal Requirements 6 City's Goals/Timetables)
INSTRUCTIONS FOR FILING EMPLOYMENT UTILIZATION REPORT (CITY OF RENTON)
The Employment Utilization Report is to be completed by each subject contractor
(both prime and subcontractors) and signed by a responsible official of the
company. The reports are to be filed on the day required, each month, during
the term of the contract, and they shall include the total work-hours worked on
the project for each employee level in each designated trade for the entire reporting
period. The prime contractor shall submit a report for its work force and shall
collect and submit reports for each subcontractor's work force to the Compliance
Agency that is funding their construction project.
Reporting Period . . . . . . . . . . . Self-explanatory•
Compliance Agency . . . . . . . . . . City of Renton (administering department)
Contractor . . . . . . . . . . . . . . Any contractor who has a qualifying
construction contract with the City of
Renton.
1. Company's Name . . . . . . Any contractor or subcontractor who has a
qualifying contract.
2. Trade . . . . . . . . . . . . . . Only those crafts covered under applicable
EEO bid conditions.
3. Work-hours of Employment . . . . . The total number of hours worked by all
employees in each classification; the total
number of hours worked by each *minority
group in each classification and the total
work-hours for all women.
Classification . . . . . . . . . . The level of accompilshment or status of
the worker in the trade. (C - Craftworker -
Qualified, Ap . Apprentice, It . Trainee).
b. Percent of minority work-
hours of total work-hours . . . . The percentage of total minority work-hours
worked of all work-hours worked. (The sum
of columns b, c, d and a divided by column a.)
5. Total Number of Minority
Employees . . . . . . . . . . . . Number of minority employees working in
contractor's aggregate work force during
reporting period.
6. Total Number of Employees . • • • Number of all employees working in contractor's
aggregate work force during reporting period.
* Minority is defined as including Blacks, Hispanics, American Indians and Asian
and Pacific Islanders - both men and women.
. • DATE: 11494
70: FINANCE DIRECTOR
FROM: PUBLIC NORRS DIREC-M
SUBJECT. PROGRESS PAYNEAT
COMI'NACTOR: Puget Constructors ESTIMTE No. 2
CONTRACT MO CAG 029-83PP LLT, Well No. 9 P.S.
W-718
I. CMAACTOR EARNINGS THIS ESTIMTE $33,400.00 '
.. SALLS TAX 1 8.1E 2,705-40
X. TOTAL CONTRACT AMOUNT THIS ESTIMTL $36,105.40
4. EAMIN 5 PREVIOUSLY PAID CfWMACTOR f 23,370.00
S. •LAMINGS DIAL C0ITTRACTOR THIS ESTIMTL 1131,730.00
p, SUBTOTAL - CONTRACTOR PATNF:NTS f 55,100.00
`. RETAINAGE ON PREVIOUS EARNINGS f 1 230.00
B.••RETAINAGE ON EARNINGS TNIS ESTIMTE i, T0.50
2,900.00
g- SUBIOIAL - RETAIMAGE f� -
10. SALES TAX PREVIOUSLY PAID f 1,992.60
IH, 5ALLS 1'AX DOL TIIS E51'1M1E 2,705.40
8URIUTAL - SANS TAX 1 4 698.00
•(95 . Line 1) GRAND TOTAL f 62,698.00
••RETAIAA3E 5-.
FINANCE DEPARTMENT ACTION:
PAYMENT TO CONTRACTOR (L1Ml 5 AM M;
ACCT. 1 f 1
ACCT. 0 411100,O,J1;.5H1. x7.k;i eirl f_ 34,435.40 1 2
AM, 1 i +_
ACCI. 1 S +_
ACC1. 1 i +_
BETAINEB NOW (LIM 8):
ACC?. + ! +
AMT. 1 47_11000/1s.5U1 . 1,670.00 f 2
AccT. f f 1_
ACC1. 1
KCT. f f 1�
CN TER 116. LAWS OF INS TOTAL THIS ESTIMATE S Sh�t15.40
CITY OF REN70N CERTIFICATION
MYr w. Yl4r,r„Y,Yid 4
Y.w[Y YMD t.nr W�I,YfYilp Y,YiM>
YMYiY1MOIYM•WrNiYW
44,0 W\,Ye„Y�r\Y�r
Engineers
Pionners
• Ec:�nornlsts
$dentists
Nov;nber 20, 1984
SI�146.A2
City of Renton
200 Mill Avenue South
Renton, Washington 98055
Attention: Ron Olsen
Centlemen:
Subject: Well No. 9 Pump Station
Pay Estimate No. 2
Enclosed is Pay Estimate No. 2 for Well No. 9 Pump Station.
We have reviewed the Puget Constructors' pav request and
agree with the amounts noted in this estimate.
The total earned to date by Puget Constructors is 658,C00.
The amount recommended for payment this month, including
adiustmer.ts for sales tax and retainage as noted in the
enclosed estimate is $34,435.40.
The contractor's monthly Manpower Utilization Report and
Certification of Payment of Prevailing Wages fur this payment
period have not yet been received from the Contractor. We
will forward them as we receive thee.
Payments should be made only after the contractor has made
submittals in accordance with RCW 39.12.040.
Fincerely,
Barry Barnes
cic:se5545rr
Enclosures: Pay Estimate No. 1 (2)
cc: Puget Constructors
Barney Ruppert
i_H)M Mr.f.V" 5pp,15 OJ1 . 15M-11^AM S E.ft#ft I Y.CRhK.AW 205.JW Y.IIk�
co aw o5M aeie Wwn.rva ,*"2e50
• DATE: 0/84
TD FINANCE DIRECTOR
FROM: PINLIC bALS DIRECTOR
SUBJECT: PROCJASS PAYMENT
CONTRk-m Puget Constructors ESTIMATE M0, 3
CUNTMACT w.CAG 029-83ftwlo Well No. 9 P„$.
W-718
I. prTOCTOR fA m*is THIS fume s 15,600.00
.. SALES TAX P S.1% 1,263.60
S. TOTAL CONTRACT MOM THIS ESTIMATE s 1_6L86L60
4. EARNINGS PREYIOWLY PAID CONTRACTOR $55,100.00
S. +LARNIRCS OUL. CONTRACTOR TAMS ESTIMATE 114,820.00
R. wnmAL - CONTRACTOR PAIMENTs f 69,920.00
7. RETAIMCE ON PALVICUS LARNINGS S 2,900.00
A.A-RETAIAACC ON EARNINGS THIS ESTNATE 780.00
9. SUEIOIAL • RETAIOGE f 3,690.00
10. SALES TAX MIEYIOUSLY PAID 3 4,698.00
ll. SALES IM ISM TILLS L511M IL 1,263.60
L'. wMIMTTAL - SALES To f 5,961.60
•l95 . Lim 11 CIIAND TOTAL f 79,561 .60
^RETAINAGE. 5t
TINANCE DEPARTMENT ACTION.
PATMLNT TO CONTRACTOR (Linn S And ll):
ACCT, f S f
ACCT, f s — f
ACCT. f I +110001 lt.tal. ;- Dal tnl S 16��13
ACCT. f $ f
ACCT, f 1 r^
RETAINED AMW (LIM R); —
ACCT. f L 1
ACCT. f
ACCT, f Jrl fnn1141t tnl 3' t, rj S 780.00 13
ACCT. f S r
ACCT. f ! f,
CAAREM $%tAWS OF ION TOTAL THIS ESTIMATES ID„�'yS-hll
CITY OF NENTON CERTIFICAT"
rw�• r,v ru,.,.Y,Y r�� M
MnaY YYYY[,w. W rYlY�i Y M.M�rP
�Y�Y,� �Y G,Y�,M.M YO r•M
Q I� C
CITY OF RENTON • DEPARTMENT OF ENGINEERING
MUNICIPAL 9DING 200 MILL AVE SOUTH. *ON, WA 99055r235�2631
PROJECT uol: rvc. 9 P.S.; M-]IB PROGRESS PAYMENT ESTIMATE NO -,
Com,acl No fAG u19-d3 Cowaclu, P-Wt Conetrpclors
CiMNq Osee)z 6
n Z'�
Dgcr�p Lon EVIOUS TOTAL TMS ESTIMATE TOTAL TO DATE
� Prim
_ Qty An l sillyAmoum Qly Amp„v
bws 1 Insurance 14,01.0 In% 14'"ll III N.N Im se,W.So
SR•t,on IINI
Snaal Nouneeols 12,IN.M 1Ns 121 lK 11 h w.11 lob $2,1%.11
Section 12115
Dove In ak Site Preparation 12,N1.N IN% 12low" Is so.1tl w% 12,IN.1B
SWUM am
Sarthowk 1301V.11 11s s21,B1tl.1P Ih 13.hd1.P1 91s 132,w1.dd
SWUM WAI
Stan sews s:5,dV,tV N1 112, 11.N sh 112,N1.N
Sect Ion 133i1
bintoete0 Concrete /:d,118.c; Is 1f.11 SIs 4,r IM.11 SK IS,11B.dtl
SWIM M231
b,nformiI nolloe Unit 04sunvT 11tl,B01.11 K WN 1s w.1d K w.Ar
SWIM 85w
Pah, IktilwrM aM Gst ingf I� t2,Id,.Bb K w.x1 27i 13R1.N 2!s 15/d.dill
Sect l on vim
carorntry I w,AV.dd M w.11 1s W M Is w.N
Section 17W
Tt*MI arc ,bistur! Protectlan y�,9A1,11 Is w.N1 Is w.od Is N.dtl
Section 17412
2retor99d RNa: lading 4;1,tl1V.1: Ia w.11 K w.N n w.1tl
Sett ion"W
}I Ooo am No " 15,tldtl.41 K W.B1 Is N.N N M1.,V
I Sactlon 19721
Sealess Exry 1im" N,N1.d! K w.Po Ia w.r11 11 W.It
Section 19%2
Paintllls 12,OW.tl1 1s w.1e h w.dd N 10.N
Section 11999 i
•iscel;urous Saec:,ll,es ti,a1V.11 as 14,00 11 w.11 I n W:M
l fll
I!
I
I
z`A CITY OF JENTON • DEPARTME T OF ENGINEERING
• • MUNICIPAL WINO. 200 MILL AVE SOUTH, PwON, WA 980 .3.235 2631
PROJECT Well No. 9 P.S.i W-716 _ PR06RESS PAYMENT ESTIMATE NO 3
CAC 039-e3 Puget Costructors IZ F+/V4 I
Contract No Com.ac for n Cloamp Date SMe,� af_
ry LI/a Sir JPREVIOUS TOTALI THIS ESTIMATE I TOTAL TO DATE
�. D••<npt.en Prim I Qty I Arnounl O,y Amoum I Otr I Amo,nh
Sec.1m 1lNv
Vert ica; iuroin Pueo Il�,ldi.N K 04.0 K 4.0 K /B.OP
&cltun 113b!
Chlorination Eguio. am Access. MS,BK.N K N,N K WIN K Q.N
Sect IV, 1503
Ductile Stun Pipe ato Cast
Iron Fittings Ifi.W.W Nt 16,NI.N K W.N N% f6,4N.N
Seclian 15150
V ire hycrant PaseeatY k,PBS.N 9K {I,NB.M K /1.N 1 91% /1,BBP.BB
Sectim 15160
Valves am Floaeeters I f:B,KB.N 11% N.N 25% $2,5K•0 25% $2,50.N
Seals, IUW
Venti:atlm Systw I $6.NB.16 K N.N B% 'B•K K %P.N
Sect Ion 15W
Piuealna arc PlscelianinIus
Plcing Systees I N,BdB.N I K N.Ptl SK e2,0PV.PP 50% t2,dlP.PP
i Section 16a:1 I
Eiectrica. - BPI PQ
6eerrai Prov, i M2,W. 5K fI,BN.BP 51% fI,f1A.11! : f2,BdB.
isecuor. ;wo
basic IUterials am Rooms j 06,W.N K $0.N K W.N d% I fP.N
sect," !6:Ii
Bacways I 12,1N.N K 4P.tY SP% sI,NP,PP SK fi,NP.PV
section 161[B
Corituctors I K,N1.M K I W.N K I tO.dB K WIN
Section *55
LM Voltaoe NO, Contra: L;,NB.N K fB.IN 1% Q.'v B1 1i.N
section t6163
sa::[hoOirCa 13,NB.N P% >Q.BP I K fIB.BP I Ba fP.PP
Sect ton 16450 i
6muminc on.a, K tB.BV K fe.N it K MB.PB
sect ton 165PP s
Licntinq MS,IN.N K fP.PP K 10.PP K N.PB
--------- _ ---
T010. s197,e6B.N 158,W.PP Iits,61k.N f73,69d.PB
I
i
• oATr �/84
TO FINANCE DIRLCIOR
FNOI. PURLIC A1RNS DIRCCTOH
SUBJECT. PROGRESS PAIMENE
cw"cTOR. Puget Constructors ESTIMATE NO, 3
CUNTHACT No.CAG 029-83,wie, Well No. 9 P.S.
W-718
1. CONTRACTOR FARNINI:S 11115 ESTIMATE 115,600.00 _
-. SALLS TAR 1 6.11 1,263.60
1, TOTAL CONTRACT AMOUNT TDIS ESTIMATE 1 16,861.60
4. EARNI".5 PRLVICUNLY PAIO CONTMACT01 i 55, 100.00
S. DLARNINGS VOL CLINTILAC708 TIIS ESTIMATL Li4,820.00
e. SUBTOTAL - CONIRACTUA PAIMLNTS 3 69,920.00
7. RLTAINAGE ON PREVIOUS EARNINGS f 2,9_00.00
B.••RETAINACL ON EARNINGS TMIS ES7IRATE 780.00
9. SUBTOTAL - NITAINAGL i 3r690.00
10. SALES TAX PREVIOUSLY PAID 3 4,698.00
El. SALLS TAX OUE TI15 LSTIMAIL 1,263.60
1'. SWAVIAL - SALLS TAR 1 5,961.60
•(94 D Line 1) GRAND TOTAL 1 79,561.60
••RE 141N4G[ 5:
I'INANCE DEPARTMENT ACTION:
PAYMRNY TO CONTRACTOR (Lines S and I1):
ACCT. F S /
ACCT. P S
ACCT. a 111/000/15.S01.','.LD'L',O1 i 16,083.60 3
ACCT. 1 f 1
ACCT. 1 $
RETAINED AMOUNT (Line 8):
ACCT. P i 1
ACCT. I
ACCT. a 1 `I Iu0f1/I : snl u`! ;tal f 790.00 F 3
ACH. F _ S.
ACCT. /
CMAMTEM 110. LAWS OF INS TOTAL THIS ESTIMATE
CITY OF RENTON CERTIFICATION
y Dq.Yq)eD .�Y.Ym.YMD Mn a
Y„[Y YgYD fr 1Y IYf�INMV�Y Y WpYD
YY�Y Dry 1A(AY,N•• Y u0 rr
Y.V.P Y.IY y TD Y qA�q YI�YI
YniyD O YY�IYIN Y�iY,q y p,YA
1
I
1
Oate:
pro)eet"j4L1� CAC No.
This Is to certify that the prevailing wages have been paid to
our a loyee% and our subcontractors' employees for the month
of 1141
Q _ in accordance with the intents to Pay
Prevailing Wage filed with the Washington State Department of
Labor 6 Industries. f
by
Trtr:___ i7 '
CONTRACTORISUBCONITTACTOR Y
♦ r�� REPORTING PERIOD
MONTHLY MANPOWER UTILIZATION REPORT Month: *,J,,) 10.'Lk e (,oYear: 9
be submitted to the City's Project ` Goals and Timetables as cc •eitted
Engineer during the lot week of followin'a Y� l' in Contractor's Affirmative
nth while contract is in progress. Prim ma
Action Plan t
Contractor is responsible for obtaining and or per City's Plan 9.1 '1
submitting all SubconlEactor Ra r
To: (o)onm a" location of Qaartinca aeon" Dart Erom'_ 1!ome sma Iocatlon of a rwtw)
lt ���
o
This report is require ,y Executive Order lIZ46, Section 201. Failure to report can
result in sanctions which include suspension, termination, cancellations or debarment of
CC. !Tract. t f 5. 4.
1 Totai tal
n
work N=u ra of employment (See footw tel city nuaaer Der
v/n of or of
Cl a. . e . whorl eapby.
P'e_ er. as ten( at: total fn loy- sas
Coapany'a Nave (t.r.1 -reds fie�a ?ota7 Black nd tar he�tRr pal v,T see
C r>S
Tr
ar)> An
kAn
An
Lkr
a �
p
l
An
AAll
A.
Tr
An
Tr
CemgatyY.! rlcla 'a N ure and 71il, F. :at, >lBned WArea
Rev. 11/77 teMales s Females, --Minorities 6 Nun-minorities) Page of
7isc (submittal Requirements a City's Goals.'Timtables) ---
4 4 M - . *
INSTRUCTIONS Pon FILING EMPLOY4ENT UTILIZATION REPORT (CITY OF RENTON)
The Employment Utilization Report is to be completed by each subject contractor
(both prime and subcontractors) and +igned by a responsible official of the
company. The reports are to be filed on the day required, each month, during
the term of the contract, and thev shall include the total work-hours worked on
the project for each employee level in each designated trade for the entire reporting
period. The prime contractor shall submit a report for its work force and shall
collect and submit reports for each subcontractor's work force to the Compliance
Agency that is funding their construction project.
Reporting Period . . . . . . . . . . . Self-explanatory
Compliance Agency . . . . . . . . . . City of Renton (administering department)
Contractor . . . . . . . . . . . . . . Any contractor who hag a quallfving
construction contract with the Citv of
Renton.
1. Company's Name . . . . . . . . . . Any contractor or subcontractor who has a
qualifying contract.
2. Trade . . . . . . . . . . . . . . Only those crafts covered under applicable
EEO bid conditions.
1. Work-hours of Empioyment . . . . . The total number of hours worked by all
employees in each classification; the total
number of hours worked by each *minority
group in each classification and the total
work-hours for all women.
Classification . . . . . . . . . . The level of accomplishment or status of
the worker in the trade. (C - Craftworker -
Qualified, Ap . Apprentice, Tr a Trainee).
4. Percent of minoritv vork-
hours of total wo:'k-tours . . . . The percentage of total minority work-hours
worked of all work-hours worked. (The sum
of columns b, c, d and a divided by column a.)
5. Total Number of Minority
Emplovees . . . . . . . . . . . . Number of minority employees working in
contractor's aggregate work force during
reporting period.
6. Total Number of Emplovees . . • • Number of all emplovees working in contractor's
aggregate work force during reporting period.
* Minority is defined as including Blacks, Hispanics, American Indians and Asian
and Pacific Islanders - both men and women.
Engineers
Pgnners
Economists
Scientists
December 6, 1984
S17146.A2
City of Renton
200 Mill Avenue Siuth
Renton, Washington 98055
Attention; Ron Olsen
Gentlemen:
.object: Well. No. 9 Pump Station
Pav Estimate No. 3
Enclosed is Pay Fstimate No. 3 for We! 9 Pump Station.
We have reviewed the ruget Constructors' pay request and
agree with th,• amounts noted in this estimate.
The total earned to date by Puget Constructors is $73,600.
The amount recommended for payment this month, including
adjustments for sales tax and retainage as noted in the
enclosed estimate is $16,083.60.
The contractor's monthly Manpower Utilization Report and
Certification of Payment of Prevailing Wages for this pay-
ment period have not yet been received from the Contractor.
We will forward them as we receive them.
Payments should be made only after the contractor has made
submittals in accordance with RCW 39.12.040.
Sincerely,
Barry Barnes
cic:se5545rr
Enclosures: Pay Estimate No. 3 (2)
cc! Puget Constructors
Barney Ruppert
:Nc .ffw ON.ce f500114M Ave SE..&Wevee WasFvrpton 206 4535000
PO 8 a 91500 80pvu WosNn9 +WOxi 2050
CONTRACTOR/SUBC0 CTOR ; Y REPORTING PERIOD
MONTHLY MANPOWER UTILIZATION REPORT U Month: f7 ; -> /<' Year. f /
To be submitted to the City's Project Goals and Timetables as committed
Engineer during the 1st week of following in Contractor's Affirmative
nth while contract is in progress. Prime ,N Action Plan 7
(t ntractor is responsible for obtaining and or per City's Plan 9.1 A
submitting all subcontractor Re rts. —
ro: (Baca and loeation oe caglhmca aria y ser 1r er 1 Fmm: (Nees and location at aeseraatv)
CITY OF RENTON PUGET CONSTRUCTORS
WELL 09 PUMP STATION OLYMPIA, WA. 98501
This report is require y Execut lve O1246, ectlon 203. Tallure to report can
result in sanctions which include suspension, termination, cancellations or debarment of
contract.
1. 3. k % Total Dial
mtno-
kerk Hours of Employment (See footnote) rity number un tar
w/h or or or
C heal a• .a e. a mi no rlt Empby.
His
mer. As tan/ otcl total Fm to as
company's Name (LC) 'raa_ tione TotQ RLek Pan,: nd lan hLhr ?ale v.T, ^ee Y-
Tr
AD
°i
.1
Tr
AD
�(C
Tr
Ap
Tr
A
T
— C
AD
Tr
AD
Tr
An
Tr
A.
1'r
7. CompVvycrficia1 a . nature on , a pate Stoned 9 a ephone Number
/ (include Area code)
/f1 — /Y/T/fF0 %id `I17�
Rev. 11/77 (*males 6 Females, eaMinDrities a Non-minorities) Page of _
7/80 (Submittal Requirements L City's Goals/Timetables)
INSTRUCTIONS FOR FILINC EMPLOYMENT UTILIZATION REPORT (CITY OF RENTON)
The Employment Utilization Report is to be completed by each subject contractor
(both prime and subcontractors) and signed by a responsible official of the
company. The reports are to be filed on the day required, each month, during
the term of the contract, and they shall include the total work-hours worked on
the project for each emplo;•ee level in each designated trade for the entire reporting
period. The prime contractor shall submit a report for Its work force and shall
collect and st�mit reports for each subcontractor's work force to the Compliance
Agency that is funding their construction project.
Reporting Period . . . . . . . . . . . Self-explanatory
Compliance Agency . . . . . . . . . . City of Renton (administering department)
Con actor . . . . . . . . . . . . . . Any contractor who has a qualifying
construction contract with the City of
Renton.
1. Company's Name . . . . . . . . . . Any contractor or subcontractor who has a
qualifying contract.
2. Trade . . . . . . . . . . . . . . Only those crafts covered under applicable
EEO bid conditions.
3. Work-hours of Employment . . . . . The total number of hours worked by all
employees In each classification; the total
number of hours worked by each *minority
group In each classification and the total
work-hours for all women.
Classification . . . . . . . . . . The level of accomplishment or status of
the worker in the trade. (C - Craftworker -
Qualified, Ap - Apprentice, Tr - Trainee).
4. Percent of minority work-
lours of total work-hours . . . . The percentage of total minority work-hours
worked of all work-hours worked. (The sum
of columns b, c, d and a divided by column a.)
S. Total Number of Minority
Employees . . . . . . . . . . . . Number of minority employees working In
contractor's aggro µate work force during
reporting period.
6. Total Number of Employees . . . . Number of all employees working in contractor's
aggregate work force during reporting period.
• Minority is defined as including Blacks, Hispanics, American Indiana and Asian
and Pacific Islanders - both men and women.
. DATE; 165
TU FINANCE UIIUC111R
f ROM. PUBLIC MOMS DIRECTOR
SUWLCT: PROMSS MYMENf
CONTRACT% Puget Constructors ESIIMOE W. 4
CONTRACT No.CAG 029-83PRu¢LI. Well No. 9 P.S.
W-718
1. CONTRACTOR EAPNMN TVIS ESTIMATE t 8.600.00
SALES TAX IF 8.11 696.60
3. TDTAA CONTRACT AMOUNT THIS ESTIMATE t 9,296.60
R. EAMINCS PREVIOUSLY PAID CONTMCTOk $69,920.00
S. -LARNIN3 WL CONTMCTOP 'THIS FSTIMIL 1_8,170.00
e, SUAIOTAL - C@.OAACIUA PAIMINTS $78,090.00
T. RETAINAIIE ON PREVIOUS EARNINGS t 3,680.00
I.•• RETAIMCE ON EANNINCS THIS LSTIMR 430.00
9. SDAIDIAL - RLTAIMGL 1 4, 110.00
W SALES TAX PREVIOUSLY PAID S_5,961.60
11. SALLS IAA UUL TIIS LSTIMIL 696,.60
12. SUR'IDTAL - SAItS TAX t 6.658.2C
•(95. A Lme 1) GRANT TOTAL $88,858.20
••RETAIMCE. 5.
FINANCE DEPARTMENT ACTION.
PAYMENT f0 CONTRACTOR (Lines S And I))
ACC7. / 421/000115.501-37.65 (36) f 8,866.60 /4
ACCT. 1
ACCT. /
ACCT. I S
ACCT. / S 1_
RETAINED AMOUNT (Line 8):
ACCT. P 421/000/15.501-37.65 (36) i 430.00 _14
ACCT. I
ACCT. /
ACCT. I
ACCT. / S 1_
CHARTER IU, TAWS OF 1965 TOTAL THIS ESTIMATE S_9.296.60 _
CITY OF RENTON CERTIFICATION
M�[Y MYo[,Iq Y��1ygY,1,Y WiJ
On G. W
Y.4,Y YMN M�.. YiW Yl N,., Y1
Y�,1Y.uYlY.Y r rHIN tt W Y,Y
I
. DATE:
T� IINAACL WILLOW
PYdM. PUBLIC WORKS YIBLCTOk
SUUICT. Pk6NLSS PATMLMI
cIRQRALTUN PuOet Constructors k5TIY1E NO. 4
Cq,T T NO,CAO 1�vkwtCT. Well No. 9 P.S.
tIL 1 .4 W-718
I. CM1,TNACTOA tARMIM,:S THUS ESTIwTE s_,600.00
.. !ALL$ lAl Y 8.11
696.60 Y
d. IUTAL L,Iklh it A t YT11S L511MAIL $9,296.60
A. EAANIN:S MVIOUSLY PAID CWMAOJ 169,920.00 -
S. LX,,ik:s TAIL CYF[TkACTm Tll1s LSTIMAIE 1 8,170.00
6. SUBTOTAL - CUNIkAQJk PAIMt M11 $78,090.00
1. RLTAINALL ON PREVIOUS EARNINCS 1 3,680.00
B.^AtTAINAa OR EARNINCS THIS ESTIMATE 430.00
9. SUBTOTAL - RLTAI NAGS s 4, 110.00
ILL SALES TAX PREYILIUSLY PAID S 5,961.60
11. SALES TAX DW TIUS LSTINAIL 696.60
IL SUYIOUL - SANS TAX s 13 658.20
•(95 . um 11 GkAND TOTAL Sj18,858 .20
^REIAINALE. 5:
FINANCE DEPARTMENT ACTION:
PAYMENT TO CONTRACTOR WIDIS 5 And ll).
ACCT. I 421/000/15.501-37,65 (36) 1 8,866.60
ACCT. I 1 1_
ACCT. t 1 I_
ACCT. I 1
ACCT. 1 1
RETAINED AtOUNT (11m 8):
ACCT. / 421/000/15.501-37.65 S36) 1 430.00 /4
ACCT. / 1
ACCT. I s 1
ACCT. I 1
ACCT. t s 1
CWMTEN I14 LAWS OF 1656 TOTAL THIS ESTIMATE 1 9,296.60 _
CITY OF RENION CERTIFICATION
.�,rn,Ye Y wA•usn r,,r..n a
WnW W rlii 4
�.Y YYe[[r yMM,wry Y YYY.
N�wzWY.. Yn V Y1r r.YI W
rnarc Y r�.n r Ynn M w[W I I.
I OF RENTON • DEPARTME T OF ENGINEERING
• MUNICIPAL E#Ir* 200 MILL AVE SOUTH.i w WA 28O55-235 263,
i
PROJECT ' Mo. 9 Y.S.; Y-litl PROGRESS PAYMENT ESTIMATE NOS
Co""Ct No CAC 0,4mal COm"CII, Puget construct,,, Clump Dar '2LI e 5nat,L Qt2.
ry llslp SrJPREV.OUS TOTALI THIS ESTIMATE TOTAL TO OAT(
Dascrp, on Rite Qty Amow,l j Q,y Ana,.n, Q,r An ,I
�iwds ( ( /1,wlw 1101 t1,00.W at $0.04 IWi t/,WO.DJ
Srtt to 11w I
Geleal 1owmimMs ! a,w.w IOC: /2 i004.OL Ol t0.W IWl ! /2,OW.W
EOrtiw K115
FOR In ad Sl to proparat to a,M.w 101 /2,0U.W O7 10.0 11001 12,00.00
EOCttm nNi
Eu1No IY,M.M Ml 132,40.UU IS 10.f•0 901 112,I66.W
Wttm WV!
Btwis$own HS,Iw.w 401 112,00.0' 01 $0,00 101 I I12,W0.00
WIM 1171 !
Ymtat3C cocrett I Hl,w/.w 501 15,W(.Oo 252 42,5uo.0 751 11,54F.W
Elate 0Q31
ktnfwc{0 blla lh,t 1ltdilYl' I I111,Iw.w 01 IDA 01 10.0 01 6.0
EEcttw 17511 I I
FAO. MAIvI m0 Castings I 112,w1.w 251 1540.0 01
6{r.T.w 16118
I
Carpentry 01 I0.110 01 WOOD 11 I $0.0
Stet tw 1701N
T7en.l w blslun O,vttct1/0 /2ttN.w 01 /0.0 101 I 120.00 101 I 120.00
b ct I 17412
Pldn oec Mal Roofing I0RAw1.w 01 so.ou 01 `` 10.04 01 It.0
6pctim VAN
Won nd hu*,irt 01 $0.00 01 s0.W Ol I 14.0
Sactiw 14121
Gamins Epo y Flowtng 1y06M 01 I4.00 01 $0.Ou Ol ! 10.04
6c:1w 19w2
panting Ot,N.w 01 10.0 OS tO.W Oi 10.00
1etlw Irm
ltlnilanaus Specialties «/M•w at /U.a' Ol I 10.0 Ol $0.DO
I
I I
CITY OF RENTON • DEPARTMEN��11T OF ENGINEERING
• • MUNICIPAL DING 200 MILL AVE SOUTH. ON. WA DOOS5.235-2633
PROJECT Well No. 9 P.S.; M-718 PROGRESS PAYMENT ESTIMATE NO
Cw•ect No LAG 0:9-03 Com,acto, Pu"1 Cwrstr uc wle Cio ,% Dale 12 =I L? SMet�pl�
l,ao SW PREVIOUS TOTAL THIS ESTIMATE TOTAL TO DATE
I1 Deear�Pl.o� Amo.v
Price O+r Amovm O1y Amount 'b
Section IIW
Verbal 1er0im D,rp H7,161.bf vi W.o 01 IO.W 01 {O.o
Sect ton 113W
'I CTiar inatlM E09t0 and haesl. 11,1M.11 of {4.04 O1 W.W Ot t0.0
Secwa. ISN3
Ductile Iran Pipe and Cast
Iron Fittings k,M1.M Sol 1a,/40.OU 151 11,200.0 %1 U,144.0
Section 15151
f lne IryOrant Gssnol7 12,IN.M {01 1t,0U4.0 101 11204.0 1001
Sect ton 15161
Wives and fiammetem I 611,M1.N 25i 1?,5Uv.04 251 s2,544.o SOt sS,0v0.o
Sect lM 15M
VentilatIm Sysiw I M,M1.N I Ot 14.00 01 s4.0u 41 solo
Sect ton 15WP
PluAolm am 111sn1ianovs
Piping Seslees I N,MM.10 501 12,60.00 01 $0.00 501 12,00.64
SKtion 16111
Electrical -Gewli Pm,. S2,MM.10 Not q,Wv.o 01 .I /0.1A tool 112,00.0u
Sect ton :6150
basic RAIm'141s am Rtws i t6,NP N 01 $6.0 43 10.04 01 /0.0
Section !6:11
ilateaays I I 12,MM MP SOi I 61,040.00 01 $0.00 S4I II,40.0v
Section 161ea
farductors 64,N1.11 01 10.u0 01 solo 02 14A4
SKU01 *55
La V4aape IWtur Conlro: I I U,p11.M3 Ol /4.00 Ol 14.44 I 01 10.0
sectia.. IMI&1
S.�tcn0oares 13 00.goo pl {4.04 OS tU.o 01 I 10.04
Sect lob :NSP
6rourdi np i 12,110.N 01 /0.04 IOOI s2,o0.0 1001 tI,00o.0i
SKttun i65N
llgnl ll1l I N,MLM Ol /0.0 Ol /0.00 OS /4.OJ
------------
T070. It197,1M1.N� /73,a04.N tts0.o It:,14i:o,
I
t
I
December 31, 1984
517146.A2
City of Renton
200 Mill Avenue South
Renton, Washington 98051,
Attention: Ron Olsen
Gentlemen:
Subject: Well No. 9 Pump Station
Pay Estimate No. 4
Enclosed is Pay Estimate No. 4 for Well No. 9 Pump Station.
We have reviewed the Puget Constructors' pay request and
agree with the amounts noted in this estimate.
The total earned to date by Puget Constructors is $62,200.
The amount recommended for payment including adjustments for
sales tax and reta+nage as noted in the enclosed estimate is
$8,866.60.
The contractor's monthly Manpower Utilization Report and
Certification of Payment of Prevailing Wages for this pay-
ment period have not yet been received from the Contractor.
We will forward them as we receive them.
Pa..nents should be made only after the contractor has made
submittals in accordance with RCW 39.12.040.
Sincerely,
Barry Barnes
kw:se5545ri
Enclosures: Pay Estimate No. 4 (2)
City Progress Payment Form 121
cc: Puget Constructors
Barney Ruppert
Contractor: Project No. 517146.A2
Puget Constructors Project: Well No. 9 P.S.
1235 East 4th Avenue owner: City of Rento:.,
Olympia, Washington 98501 Washington
Date: January 24, 1985
CHANGE ORDER NO. 1 To THE CONTRACT
FOR THE CONSTRUCTION OF WELL NO. 9 PUMP STATION
CITY OF P.ENTON, WASHINGTON
This Change Order covers the changes indicated below to the
subject Contract. Upon r=ceipt of an approved copy of this
Change Order the Contractor is hereby directed to perform
the work in accordance with the provisions of this Chanqe
Order. Itemized additions or deductions are exclusive of
Washington State sales tax.
1 . Raise station. ine foot to create a more effective
pollution control berm.
Addition: $ 7,670.71
2. Delete polyethylene encasement of ductile iron pipe.
Deduction: 324.00
3. Provide 1-gallon junipers in lieu of specified
2-gallon plants.
Deduction: 262.00
4. Perform exploratory excavation to locate 12-inch storm
sewer at 42-inch Metro crossing and propose construction
changes.
Addition: 2,507.75
5. Provide access road subdrain south side to parking lot
due to excessive groundwater.
Addition: 898.00
6. Break up, load, haul , and dispose unanticipated concrete
building footings.
Addition: 1,670.57
7. Provision of job shack for City Inspector shared with
Contractor at $64.69 per month during active construction
wort-.
se5550hl CHANGE ORDER NO. 1
1
Nov. 16, 1984 through Dec. 15, 1984 @ $64.69
Dec.16, 1984 through Jan. 15, 1984 @ $0.00
Jan. 16, 19F.5 through Feb. 15, 1985 @ $16.17
Addition: 80.86
B. Modify probe tubes to accommodate revised facilities.
Addition: $ 1,362.66
Total increase in Contract amount
(exclusive cf sales tax) �C 13i612_5_
The amount of the basic contract is therefore increased in
the sum of Thirteen Thousand Six Hundred Twelve and 57/100
Dollars ($13,612.571 , and it is agreed that this increase
constitutes full compensation to the Contractor for all work
added, and full credit to the Owner for all work deducted,
by this Chanqe Order.
The contract time shall not be increased from the originally
specified completion date of May 22, 1985.
Except as herein modified, the terms of the basic contract
shall remain in full force and effect.
Original Contract Amount $197,860.00
Net increase this Change Order No. 1 13,612.57
Contract Total inclusive of this Change
order but exclusive of Sales Tax. 211,472.57
Sales Tax (8.1 percent) 17,129.28
Contract Total including Sales Tax2 ¢f601,,�5
Endorsed by Puget Constructors
By Date
Title
Approved by CH2M HILL, Inc. Authorized by City of Renton
Title Title I.,�+�• ��i'< ��, ..
Date J = d ��' 1 A L A Date JON. r-IF . --_
• ♦ R
se5550h2 CHANGE ORDER NO. 1
2
Contractor: ^roject No. 517146.A2
Puget Constructors Project: Well No. 9 F.S.
1235 East 4th Avenue Owner: City of Renton,
Olympia, Washington 96SPI Washington
Date: January 24, 1985
CHANGE ORDFP NO. 1 TO THE CONTRACT CAC. 04Z-84
FOP THE CONS-RUCTION OF WELL NO. 9 PUMP STATION
CITY OF RENTON, WASHINGTCN
This Change Order covers the changes indicated below to the
subject Contract, and the Contractor is hereby directed to
perform the work in accordance with the provisions of this
Change Order. Itemized additions or deductions are exclusive
of Washington State sales tax.
1. Raise statinn one foot to create a
more effective pollution control
berr. .
Addition: $ •',678.71
2. Delete polyethylene encasement of
ductile iron pipe.
Deduction: S 324.00
3. Provide 1-gallon junipers in lic:i of
specified 2-gallon plants.
Deduction: $ 262.00
4. Perform exploratory excavation to 1.,-
cate 12-inch storm sewer at 42-inch
Metro crossing and propose construc-
tion changes.
Addition: $ 2,507.75
5. Provide access road subdrain south
side to parking lot due to excessive
ground water.
Addition: $ 698.00
6. Break up, load, haul, and dispose
unanticipated concrete building
footings.
Addition: 6 11610.5"
se5544AA'
7, Provision of job shack for City
InLpector shared with Contractor at 00.96
S64,69 per month during active con-
strurtion work.
Addition: 2- etinede
nn naalrka+'
Gattma to
S. Modify probe tubes tc accommodate
revised facilities.
Addition: $ 13t2.Fe
Total increase in Contract amount
(exclusive of Job shack and sales % i3, (oi2.57
tax)
The amount of the basic contract will therefore be increased
in the sum of Thirtcen Thousand Three Hundred Forty and
91/100 Dollars ($13,340.911 , and it is agreed that this
increase constitutes full compensation for all work added
and full credit for all work deducted by this Change Order.
The contract time shall not be increased from the originally
specified completion date of May 22, 1965,
Except as herein modified, the terms of the basic contract
shall remain in full force and effect.
Approved:
CH2M HILL, INC.n
By ..,. ` Jr---+ Receipt acknowledged and terms
and conditions agreed to by
Title FM*,=E v nw_..Aec2 Puget Constructors this " ` day
of /,
Date ,7.a. - 30 0A9S
Authorized tor:
City of Renton Title
/v
BY �.c....�w-... -i . ..,�,��L`s,.. Date '/�('
Title Pukic wuAtS DiRfyt.C.
Date FFg 2o'" 19K,
icl/se5544AA
se5544AA2
aRTIricATioR RT %W CONTRItcfolt •
ref: Payment of Prevailing Wages
to be submitted to City with each Prop ress Payment Request
DATE:
PROJECT Well f9 Pump Station W-718 cMl No. 062-84
This is to certify u 'he prevailing wages have been p,i,d,/�to our o
and our subcontractors employees for the month of /fill- I 0 J
in accordance with the Intents to Pay Prevailinq Wage with t
Washington State Department of Labor 8 Industries.
Puget Constructors
to;ipany—Tlame —'
(owner)
CONTRACTOR/SUBCO CTOR G REPORTING PERIOD
MONTHLY MANPOWER UTILIZATION REPORT IJ Month;
To be submitted to the city'9 Project Goals and Timetables as committed
Engineer during the 1st week of following N�1 in Contractor's Affirmative
nth while contract is in progress. Prime ,►V Action Plan 4
Contractor is responsible for obtaining and
submitting all Subcontractor Re rts. or per City's Plan 9.1 11
To: (rasa aM locatim of Cagllance AgwtY eep 1 From: (Nose and Iocatim of tamtaattae)
CITY OF RENTON PUGET CONSTRUCTORS
WELL 09 PUMP STATION OLYMPIA, WA. 98501
(hi, report is required by Executive Order 11245, Section 20t. Failure to report can
result in sanctions which include suspension, termination, cancellations or debarment of
contract.
2. k.
f' 7. } Total total
mino-
Mork Haure of Fmplopment (?•e foo motel HCY number iumber
v/h of or of
Chest a• ° - minorit Empby-
Nfe- \men melon/ ota] totol
Trade ftp° Tot.] Rlao'[ ndlan P.rtRe ?e_ Employ- tee
Cacpagv'e xeme (I.r.) tlane panic It IDnd ,air v 11 •.n
C /
1 JAD
�!f'! '/ Tr
s.
`I A
ell Tr
pr /
Tr
A I A
AD
Tr
AD
T'r
C
A
1'r
C
A
T
C
Tr
An
Tr
62
C.
Tr
7. Ccn^any Offlrlal� :.tpha ure kn , . pate Signed 9 Telephone AunD er
(Include Ar.a Code)
Rev. 11/77 (-Males 6 Females, ••Minorities 6 Non-minorities) Page of
7/80 (Submittal Requirements 6 City's Goals/Timetables) —
• •
INSTRUCTIONS FOR FILING EMPLOYMENT UTILIZATION REPORT (CITY OF RENTON)
The Employment Utilization Report is to be completed by each subject contractor
(both prime and subcontractors) and signed by a responsible official of the
company. The reports are to be filed on the day required, each month, during
the term of the contract, arl they shall include the total work-hours worked on
the project for each employee level in each designated trade for the entire reporting
period. The ,+rime contractor shall submit a report for its work force and shall
collect and submit reports for each subcontractor's work force to the Compliance
Agency that is funding their construction project.
Reporting Period . . . . . . . . . . . Self-explanatory
Compliance Agency . . . . . . . . . . City of Renton (administering department)
Contractor . . . . . . . . . . . . . . Any contractor who has a qualifying
construction contract with the City of
Renton.
1. Company's Name . . . . . . . . . . Any contractor or subcontractor who has a
qualifying contract.
2. Trade . . . . . . . . . . . . . . Only those crafts covered under applicable
EEO bid conditions.
3. Work-hours of Employment . . . . . The total number of hours worked by all
employees in each classification; the total
number of hours worked by each *minority
group in each classification and the total
work-hours for all women.
Classification . . . . . . . . . . The level of accomplishment or status of
the worker in the trade. (C - Craftworker -
Qualified, Ap - Apprentice, Tr • Trainee).
4. Percent of minority work-
hours of total work-hours . . . . The percentage of total minority work-hours
worked of all work-hours worked. (The sum
of columns b, c, d and a divided by column a.)
5. Total Number of Minority
Emplovees . . . . . . . . . . . . Number of minority employees working in
contractor's aggregate work force during
reporting period.
6. Total Number of Employees . . . . Number of all employees working in contractor's
aggregate work force during reporting period.
• Minority is defined as including Blacks, Hispanics, American Indiana and Asian
and Pacific Islanders - both men and women.
DATE; Feary 20, 1985
TO. FINAtkL DIAECIOR
FIOI. PUILIC YOIIES DIRECTOR
SUUICT PROGRESS PAYMENT
CONTNACTOR Puget Constructors ESTIMATE W. _ 5
CORTRACT ND.CAG 029-83PRunn. Well No. 9 P.S.
W-718
1. CNIRACTOR kARNINCS nIIS ESTIM IL 1 22,142.97
.. SALES TAX P 8.11 1 ,793.58
A TOTAL Ct\TRACT AMOUNT THIS ESTIM.TE 1 23,936.55
4. EARMNGS PYEVIOUSLI PAID CONTNACTUR 1 78 090-00
S. -EARNINGS OUL COCTRAoON 1111S ESTIMTE S 21,035.82
6. SUBTOTAL - CONTRACTOR PAIMENTS E 99,125.82
7. RETAINAGE ON PREVIOUS EARNINGS S 4,110.00
A.••RLTAINAGE ON EARNINGS THIS ESTIMTE 1, 107. 15
9. SUBTOTAL - RETAINAGL 1 5,217. 15
10. SALES TAX PREMUSLi PAID 1 6,658.20
11- SALLS TAX DUE 71I15 E511MIL 1.793.58
12. SUBIOIAL - SALLS TAX 1 8,451.7@
•(95 • Line 1) cRARU TOTAL 1 112.794.75
—RETA:NAOE'. 5,
C -
FINANCE DEPARTMCNT ACTION:
PAYMENT TO [ONTIUCTOR (lines 5 and 11).
ACCT. / 421/000/15.596:38.65 (36) 1_22,829.40 / 5
ACCT. I 1 1
ACCT.
ACCT. / 1
ACCT, 1
RETAINED ANOUNT (LIM 8): _ —
A[CT. I 421/000/15.596,-38.65 (36) _ f 1, 107. 15 1 5
ACCT.
ACCT.
ACCT. I f I_
ACCT. I
TOTAL THIS CSTINIVE 1 23,936.55
CHAPTEM 111. LAWS OF IbI
CITY OF RENTON CERTIFICATION
w.Y 4 aY.Yew J�„YI1 Y
Wei Y�M IYnW ye YY Aer� \,
W.aY�e0(.IY A uee AN\�YYN\\I L
eW ,Y�yOW• Y.Y.\,lel JU11�5
,IYO YeYAYY,R•r M,IW =I 1
CITY C&ENTON • DEPARTM&T OF ENGINEERING
• 1l+ • MUNICIPAL ILDINS 200 MILL AVE. SOUTH, NTON. WA 95055.235-2531
PROJECT Ne11 No. 9 P.a., N-711 PROSRESS PAYMENT ESTIMATE NO
t pHact No GAG CCmractor Yu1•t Constructors c".N Date Z 1.5 .°" SNN Lot
VIOJS TOTAL THIS ESTIMATE TOTAL TO OATS
No Oeev"pt o- R6R Qfy AEEI ofy Amount Oty I Am t
Yams 1 Isaeane 11tNLN ills K,1{2.12 R I N.it lNx s..i{i.ii
Slit Im 1101
Bafferal b"I'vo fts It•NI.N :{h 12.N2.{i h It.di :Ih 12.17:.22
Ssctlm{HIS
" la W4 site/rwratlm tI,N1.N :Alt sc.iN.ii h si.22 :eA si.i22.22
Yct ion N2M
Earthvl {36.MI.N 9h 1 LW.1e h I St.N 9h su.•e2.ei
Sattlm WA:
le
Stan y,�.7 11S,MI.N NL 1:_.i2i.to h .it I bit s.c.W.is
I
SMIm"I
Ylaford CaN+ete 111,111.N 1R /7.S17.N I h tP.M I T.s {'.`Ri.tY
I
Sactlm N231
Ylnform tEllm Unit lasmry ! i{MINLN h 1i.22 h R.22 tt /tri.
6attlm CGP I
Gas letaiamt aid tns,.q+ I tt,N1.N a!% fSN.ii IN fe.2i. 2.t
Yttim 06ME
Ctrpmt ry M,MLN ¢> {2.is a Id.11 h sl.N
I
Yet lop 871M
}larval od Rolston erotoolon 'I wN�N i .ts UN.e2 I h
beam 17411
Mfwwd Fatal koflp 111fM{.N h i 1Q.N 1+ R.2: 2t
V
Yetlm MIN '..
Sews anm NarMn
Yetim 19721
balms Epory clwifq N,IN.N I {{ M.et h i te.ei
Ytilm WW
Wlnttt{ 12.M1.0 i h' R.2: h I k.ee f•
I
Wim 11999
{ucell&gn" Spcultlas I2,NLN I h 1e.22 h
1
1
I
i
CITY O#ENTON • pEPAR7Ml OF ENGINEERING
• ♦ MUNICIPAL BUILDING 200 MILL AVE SOU" R NTON. WA 88055-235-2631
PROJECT N♦11 Nc. 9 T.S.r N-718 PROGRESS PAYMENT EBTW4TE NO F ?
��nfraet yb.It" 02e•e3 Com ncro• Yu9r: Cons r:urt crs C1oe.np Oot♦cn r5 h: yN♦♦tyo}�
Wearyr on L�sQ EVIOUS TOTAL TIME pTIM•:TE TOTAL TO DATE
Qty A^ -, t Qlv A.4wM 011 AIr10
011Rleli EIMb
Vvtiw Task"FM fps6il61 et U.h Sh fA.!U.N Sh smu.,i
%clia 11360
CAimiiistim Eoa:o. MI occoss. 0141M.11 h �•ti h N.tt h si.t2
I+ 9RWor 13M
bacilli Iron PIN ene Ent
Iran Flttirss ( qyIWI,N 95s e'.6ei.tt h VA4 9;s s•.62i.12
Srctim 1515e
Fire lyorent kmaly st,IM.M AN f:.tet't2 t` si.ti .62v fi.iii.22
1 Sectim 15:E4
V+Iv" eM Floeerters
i Serum ISM emti:etirc, Systa g4gqx,M h I 11.12 Es W.12 I h Q.22
SKUt 15W
Olutlinc ew s,smll# a,
D12,nq System W.W6.N SA I u.m.22 Is ►t.:2
i
Secilm i6e;P 6c.e2i.t2 h
Eiertr,u, - liners: 2.ar. I k,M1,M :� RR2 ar t,.;;: ,
Sect,m :6E5! ( �
basic phials am Mtnoos e6'"o.0 h s2.22 !+ l t1.11 h
Seatlm %ne
RacMys k,Ne.N uh s:. N,et 1% 8.22
WIN 16110 12.11 h si.t:
Caduttom w,6ee.ee h
battim 16:55
La 2o:149e Motor Cw4ml sd.tW.e1
Sortlon 16:63
SeitenoOMt s,.W N h I 12.ti h i kRt 8 t:.12
Wish AAA
6remdtnq k.6111".tv .8ts
9ertla AM
L pt it>q
t0T0. 's:3;,6e1.62I sk..2N.e7
::Iy: CiciS
N.ak1HN\N4KakKNNUYkNINNNNNNkM4N\a\\kak\NkKa\\NNaakkk\\k\\a\\NNN\KNk.Na\a1aNN\NNa'.Q}
16•ttiv-ds:�... 0-2 CAA eee.Ee
:6-M-6.W. A-;FA-15
CPAs C?k?
$1YIr
aaawa.aaw..«ww.w.wwawa..w.ww.wwaawaaan.w.w w...ww.aw.aaaww.wwwwwawwwwwawwawnw
d iP1 d:^d:P •., w.."P.: :' Sd.lS q•
. hit 2oe4
:lte 0 Form $: AkA2
mi. no. S hm rattan
:arnrtor -PUM CoMt.vGtcM
iav Es-:mP t SE. S DPrt SS.EDt :54r-B5
7RM c5-:•P-E a:1:2: 22-R,-44 tnroua% :54:3-9
im
N\Ya1N11KJaNia4N4NM1aNHM1NKYKNN\KM•NKYKKKN\KN.YnNN\KK\KY\KNK\NNNYH4MY\a\\\\NlM1
wu sum Arevious-o:i: -tis Es:imsu 'oral 'o Date
.tn kid , Ohli Asau . Otv, t Awun: �tv. f Amour:
9Maf i :Munw:e M,k3.t7 i2P% N,tat.ti P% it.72 '1tP% eF.Pk.tt
SK::oc 2:k:
Sews: iK.."ean:s k.tti.ti -.ks f2.t�t.tt to Q.k :N% X.Pti.i2
vGve :r i': S::e %*s�irr.::• A.k2.22 :22% >r,t2t,ii P% h'.2t !k% k,tt2,tt
Sr::c• P25t2
a•:'•: MM.?? 90% t32.IN.k P% U.k 9P% 032.ak.C2
Sec:::' t2v
S'.rm Sews 4:5.kt.t7 k\ $ 2.W.tt IN M.72 Bt% s:2.Pk.22
SKt:�r t322.
+r.•`:-^:ec :orc^e:e i:P.Pti.k 7% $7.M.P2 t% W.2i 75% C.MIN
�. SK::t• PY:32
i4.'`:RK -:..ir : +i6 •"� M.W.22 T et.0 t% W\22 ON It,R —�
2551i
=ao. %e:a:mml. aY Gr.:r:6 i:.PP2,tN 27% CIN.k P% Selo 2'^% tULU
Se;:::• P6Pi't
:i^untw tE.Ptt.0 b SP.tt P% Id.I? 2%
P7ki
^er.a: a^c ^..s:.w k::x:::• k.Pk.Pt :P% M R ?% N.tt .r tiadi
Y`••re: +ta. °:•: U.M.k t% k.k 2% B.Pt t% ti.ii
:K:.:• t522i
Sec::o• P5?2'
Ser.ess Eaasv -:an•:..: sY.ki.Pt t% ft.tt t% 12.22 to k.i:
19902
......: t:.P2i.t2 t% k.N P% sett 2%
5K:.:• .?-?i
i7.ca::ia a2.tit.t2 t% ft.ii
w:: %c. 9 Res 5tr:r
:M:rir:M- F,pe; :4M:neL;:n
V, EE•:.L E %:. 7 WE .%XL .5,0-0S
:r, :�.C.E 7Ei::'8: 22-2:44
wawa.aaaaawwnwwwwwwwwnawnawwwa.a.+wwawwawnwaw awnwww awnwwa....ww na aana....nw an..
L :
Lm: hie kevios 'ou: 'r;f Efaecf 'c:f: 'e :t:e
;:e? Ar:tt P:y. 1 flora: iety. 1 Am:l•: ::y. 1 �v,•r:
Ver::tt: %,=n f 7.P52.0 e% R.te Se% $E.Sy 4 RN Q.131.4
S¢::L• ..3d
:^:o•:v::c�Eo.:o. Inc Asess, U.W.22 P% f2.2. P% 11.22 P% R.e2
Sec:.oe :P2i
u:a ie �L• $M i^C :AS:
:ro• =�.::*.if tE,2Pi.22 9`.% f'.E2i.22 e% 12.22 Y% 67.ui.22
A:n' 5-3:
rvtrr-. hee::v LE.P LN .R% K.M.21 e% 12.12 :P2% K.M.P2
warts f s F:ace:en t:2.eP1.22 R% 1:.PP2.22 P% ti.e1 52% t`,.e22.V
-
Yr:t'xm Sntee M.M. P% Le.22 h ti.ei P% 12.21
Sttt:ar .%a
�:YS:any e'i v.uv:aneLls
C" F:s:fr$yGR3 11.M.1i :1% t2.M'.12 2% t2.0 R% C.iIL is
_.f::•:Cd. - :E'.e-a. :r•v. Le.M.PC :P2% Q.PPi'.2i 1% fe.0 Mh LE.P2i.22
Ser.:r .WN
Sasx. !rr.a.% rc ye^xs IE.222.V e% fie e% 12.Pi P% 8.N
5r.: . .E:.1
:ace,avf SZ.M it UN I..Rl.e2 P% $2.21 W% S..222.11
1P.ee P% Ie.22 P% 12.22
a:e ::•'r:. SLUM, P% i.2P r It.el 612.P2
Ser::• .E.
5.:::•::a•.! ti,222.22 P` 1e.22 P% Q. 2% ti.22
,e3•e.•:.•�' t1.P22.22 .P2% c w.P2 P% f2.22 A% %E.W.22
e% W.N P% Cie P% C.22
1:i7.SS2.S1 $W.M.t2 $MR.42 t92.7u.a2
14\Mnuuu\hNN\u\NN\M1u\MMNNNN1uMNNNM\•4NN\N\Kh4hK\KN4N�KryYyK1qµYY1eW1��\K4u4NN1MMNN\M4Mu
LA:" 5 WEf:ks
RX
C a N..
vS.N\M1\N nµMnvNµu\\Nµh\N4\N\NnN\N\\\µu4\\1\NnuNvuvvvti\Nu55vn\N4\hh4µ\4n\11uv5Nu\µv4,\,\\
64 _
.-r. F;9 Mn3 Oi�Ea ,:.. Ys.3.f.L•.'
ON)-jig
Ergn:eers
Manners
• Economists
Scientists
February 15, 1985
517146.A3
City of Penton
200 Mill Avenue South
Penton, Washington 98055
Attention: Ron Olsen
Gentlemen:
Subject: well No. 9 Pump Station.
Pay Estimate No. 5
Enclosed is Pay Estimate No. 5 for well No. 9 Pump Statior.
The total earned to date by Puget Constructors is $90,73O.40.
The amount recommended for payment, including adjustments
for sales tax and retain3ge as noted in the enclosed estimate,
is $22,829.40.
The contractor's monthly Manpower Utilization Peport and
Certification of Payment of Prevailing wages for this pay-
ment period have not been received from the Contractor. we
will forward them if we receive then on brnalf of the City.
Payments should be made only after the contractor has made
submittals in accordance with PCw 39.12.040 and after execu-
tion of Change Order No. 1 has been completed by the City.
Sincerely,
Barry Barnes
1w:se5545rr
Enclosures: Pay Estimate No. 5 (2)
City Progress Payment Form (2)
cc: Puget Constructors
Barney Ruppert
C'11M W1k INC SB: O",CO 1500 11J Ava5[ aelbvrRWmWVW X5 45.35=
P 0 aa.915X aglgv We V"ftr 9aa7P10M
CONTRACTOR/SUBCO MaCTOlt y
f REPORTING PERIOD
NONTMLY MANPOWER OTILIZATION REPORT l.` '
� Month:-;?K _ i/t« Year: P_
TO be submitted t,, the city,. Project
Engineer during the let week of following Goals and Timetables as Committed
nth while contract is in progress. Priese 1't Contractor's Affirmative
N Action Plan
contractor is responsible for obtaining and �
submitting all Subcontractor Renort. or per City's plan 9.1
To: (M mm W keens of ea,ttemea Ammer Alt.) From _
(Must see immlm of amteraw)
CITY OF RENTON WELL I9 PUMP STATION PUGET CONSTRUCTORSOLYMPIA, WA. 98501
This report is regm re y Executive Order 1 dt, Section M. ailure to report can
result in sanctions which include suspension, termination, cancellations or debarment of
contract.
i. r. S.
k• f S• a.
York sours or Employ aant (See teetnot•) vino- Total Total
rltr Metal umber
Clara! s• WAof of or
Nis- er. Aetan/ ,oul ei nertt Employ.
Cee psnY'e gene ;I,n,) 7rode Ties- Tote BLek total
tlone Panle Indian rseme ae- hpley- qe
talon•1 al• wA� rem
r
AP
ff
rt
OF
Tr
! , A
Tt
c —
A
I
A-
T
An
Tr
AD
Ir
Cenpa Ticl I's na re .n Date signed
9. • epbone Auwber
fl r (lnaluse area code)
Rev. 11/77 I•Males 6 Females, '-Minorities L Non-minorities)
1/80 (Submittal Requirements a city's Goals/Timetable,) Page —of
CERTIFICATION 8T OE& CONTRACTOR •
ref: Payment of Prevailing Wages
to be su§m Lkt d to C`yt with each Progress Payment Request
DATE: 7O FS
PROJECT Well #9 Pump Station W-718_ WW; No. 062 84
This is to certify that the Prevallii,# wages have been paid,,,ttto our en);
oyee
and our subcontractors' employees for the month of P./j �� �
in accordance with the Intents to Pay Prevailing Wage it d-witTi t
Washington State Department of labor 8 Industries.
Puget Constructors
cnipanyTfame —
(Owner)
Title
1 -
CITY OWNTON 0 DEPARTMIK OF ENGINEERING
• • MUNICIPAL ING, 200 Mill AVE. SOUTH ON. WA 88055•235-263-
PROJECT N•11 No. 9 P.S., N-)lai PROGRESS PAYMENT ESTIMATE NO
Cowact No CA6 eP9wDT Contractor Puget Constructors Clounp Dtl•4 70•8 Sn••, L of Z
11 pep Se 1PREVIOUS TOTALI THIS ESTiMATEJ TOTAL TO DATE
O•acnp, on Aria I Gty Am t I Oty I Amount O,y I Amo✓.
Bank { urea $f4wo INs M,M.N I K N,N IN% ♦ai,M N
suctim IINI
Bewail Y IrsorAs 12tN1r11 IN% 1Ni tIt /2,M.M
YelimMIS I ,1s /2.IIe./P P.• w.Pd I IMs j tQ,M.N
N" In ad Site Pneesratim s2,M.N
/grwN AA Sm,4N.Bt issB.Ot 92t /L"'1B1.N
Ysiim12511 /1S,M.N Its k12,Ar'.22 K N.N Ns si2,Nl.N
Nae SaitRrs
YiMtimdlfatante 75% I /1,WIN EK /2,N2.QP 95% s3,5/7.IC
Yclim W3!
Yinfwced IblIm unit Molry I I111,M.N K si.17 95s i 431 5/2.N Mai s3,5/2./I
1ai/t&on� Y rd rastifgs I I /2,M.N 25% M.fe W% /1,W.OI 75%
Ydtim If11/
Cairplltry N,M.N K St.it � BPt se,ai/c.N M/ 96,1A2.012
Ydiell BIM
1/anl ad Nolstwat pmtectim /21M.N IK sm.ea? :2s S2aC.N M $01.K
ad ion R112
PNfWWd Mail bo/ I/11,M.N K w.w /% f2.fe K w.ee
•olio NM
Boas at Ilairdeairt '� IS,M.N I K s2./d i G/s f3.228./2 6K t3.222.tY
I i
I i I
Yet am"721
balms Epory fleaip I M1M.N K N,N K s2.N K N./2
be am rM
Aintifig NtM.N K M.N K se.N K I fP.P2
Yclim 1""
Hiscellaimws Bmcialties 14,M.N K M.M K KIN K
I
I
I
CITY OdWNTON • DEPARTM� OF ENGINEERING
V I,
♦ • MUNICIPAL OUILDING. 200 MILL AVE SOUTH. PENTON. WA 90055.235-2531
d
i r
l
PROJECT Nell No. 9 P.S., N-718 pp0GRE55 PAYMENT ESTIMATE NO
Cem,act No CA' 029-B3 Com.acto, Puget Constructors Date y-ZD- 65 5neet Zot Z
It LM So EVIOUS TOTAL THIS ESTIMATE TOTAL TO DATE
Desc,Pt.o^ Priem Oty Aso nt Qty I M„punt Qty I A,Nau,
Section 1104
Vertica: Turbim Roo , 11 SK 06,ML44 1K 61,786.98 6K 611,236.46
Sedw, 11366
hlorination EQUIP, aid kms.CSw7l�W"
.11 K M.M K K•N K N•N
Sec::on 15005
Ductile lrm Pipe and Last
Iron Fittings I tiO,MB.N 95% $7,60.0 K M.W 95% t7,6N.N
Section 15151 1
Fire hydrant Assembly QMm.41 IN% SE,W.N I K N.N '. IN% SE.ev.eP
Section 15161
Valves and Flareters 5:4,6N.11 5" 15.BN.N 4K N,Nit.N 1 9K 65.W.N
Section 15261
Ventl:atlm System f6.BSB.i11 K 4P.N K 6P•N K tie.N
section 154W
Piaabing and rismlianrou%
11171ng Systems i M,"La 5K 62,W.N 1L In K.N SK � 62.NCN
Section 16818
Eiectritai - General Prov, I 1 S2,MI.N Iltf 42.14e.N K se.N 'm I 12,6VA
sect:m 161e.4
j Basic ist""I% am lietnobs I f6,M1.M K St.N 2K lll.m.N 2K U,DN,11
section !6:10
RiRNays 1E,M1.M 5K U,BN.N K 4P.N SPt• S:.N2.Pt
Section 1612e
coductrs 11sN1.M K fP.N K 6Q.N K I.i >Q.P:
Sect Im :6155 1
BeK SQ.N
LN Vo:tage actor Control
I 41,1M.M K 6P.N K 4P.
Sectic, 16!Q
6a;tcnooarcs I 43,MI.N K SP.N K se.to I K
Section 16450
BrovdinP S2,NI.M 1M% 42,NP.N K 1P.N wit SE.NQ.PP
Section 165N
Licnting I N,MI.M i K 0.11 is fe.N K 1P.N
TOTAL 1197.W.IP II $99,739.44 $29.h>m I I 4119.736.48
sssss•s.+s
Daw_ORDERS
CXA'+fiF MR 10. I
too sue $13,531.71
Job Snack
16—NN-84 thru I5-DEC-44 $64.69
16-DEC-84 thru I5-JPA-85 it.IN
16-0Ph-AS thru 15'EB-15 016,17
TOTAL FOR DRa ORDER 10.1 M$13,611257.57
i
OAT : May 6, 1985
70: FINAIAE DIRECTOR
FROM: PUBLIC NONtS DIREC10N
suRTE:.T: PROGRESS FAYNENr
COIITMACTOR. Puget Constructors ESTIMATE NO. 6
cuwrNAI.T NOCAG Q79-" PNOILCT. Well No. 9 P.S.
ed-t4 ^N-718
I. CMIRACTON EARNINGS III1S ESTIMATE 6 29,006.08
.. SALTS TAX a 8.11 2,349.49
T. TOTAL CUNIRA-r PUMNT 11115 ESTIMATE 3 31,355.57
A. EARNINGS PNLVILUSLY PAID CWNACIOA S 99,125.82
S. ALANNINGS INIL CONINAk TUN THIS ESTIMATE S 27,555.78
a. SUBTOTAL CONIRACTOR PAINLNTS E 126.681.60
T. RLTAINAGE ON PREVIOUS LARNI KS f 5,217.15
A.••RLIAINAGL ON EARNINGS THIS ESTIMATE _ 1,450630
9. SUBIOIAL NETAIMAGL F 6,667.45
10. SALES TAX PREVIOUSLY PAID F 8,451.78
11. SALES IAN UUL 1111S LSHMA1E _2,349.49
12. SUBTOTAL - SALES TAX L I0,801.27
•(951 A Line 1) GRAND TOTAL 6 144,150.32
A4EIAINA6E: 5:
FINANCE DEPARINENT AtIIOW
PAYNENI 10 CONTRACTOR (Lines 5 and 11):
ACCT. R 421/000/15.596-38.65 (36) S 29,903.27 e 6
ACCT. F S e
ACCT. a S 1
ACCT. 0 { 1 --
ACCT. t
REIAINED AMOUNT (Line 8): —
ACCT. R 4.11/000115.596-13.65 (36) j 1,450.30 B 6
ACCT. 0 f 1
ACCT. B S
ACCT. P _------'— _ 3 _�_
ACCT. / ---------'------ S E_
CN.ARTFR 116. LAWS OF 1966 141AL THIS ESTIFNTE f 31,355.57__
CITY OF RENTON CERTIFICATION
w..Au wa.,c c,,..uw.A wwwe u ewwu �a.Oi14 r,AMuw r fYA,V W fl/Y ♦
M
Engineers
Pianners
• Econo-^Is
Sciencs•.
May 6, 1985
S1'146.A3
City of Renton
200 Mill Avenue South
Renton, Washington 98055
Attention: Ron Olsen
Gentlemen:
Subject: Well No. 9 Pump Station
Pay Estimate No. 6
Enclosed is Pay estimate No. 6 for Well No. 9 Pump Station.
Tne total earned to date by Puget Constructors is $133,349.05.
The amount recommended for payment, including adjustments
for sales tax and retainage as noted in the enrlosed estimate,
is t29,905.2'.
The contractor's monthly Manpower Utilization Report and
Certification of Payment of Pre:ailinq Wages for this pay-
ment period have not been rece ved from the contractor. We
will forward them if we receive them on behalf of the City.
Payments should be made only after the contractor has made
submittals in accordance with RCW 39.12.040.
Sincerely,
Barry Barnes
pa:se5545ri
Enclosures: Pay Estimate No. 6 (2)
City Proqress Payment Form :2)
cc: Puqet Constructors
C"2vm I WC Se OMce 15W 11Mn Are SE Bwhwv W® ,qmn 206453 SM
oa am"500 Bwww Wohnia-9ORW-20W
CITY OF RENTON • DEPARTMEW OF ENGINEERING
0 • MUNICIPAL*DING 200 MILL AVE. SOUTH W
ON. WA 08055-235-2631
PROJECT Well No. 9 F.5.1 W-710 PROGRESS PAYMENT ESTIMATE NO +_
Cewlgae 910 CAG 02/•/7 c"I•ecte. Puget Constructors Co,,no Oetr S-28-e 5 Snee•-L of
Lao S,P EVIOUS TOTALI THIS ESTIMayE TOTAL TO DATE
Descr.Plw� Peace Oty I Am M I Oty Ameuet O,, I Amo,
Iwde/ IrreHEe KKM f/a e%"Leo a 10.41) am ee,000.00
5latlm e1M1
j p,M,cl NMI„te IQ,K• l/a 1yI10.a Is 1t10 lea /t,aoo.00
Ac 1� bm site Peeomratlm 04M.ee tea V.000.00 e1 W.00 lea eE I ,W0.w
am Sectem
w wml i 155,K11 NF tue,wo.aD r ee,Iw.w to gS,1ID.aD
Seattm$2511
Stan 5e.•a Ifl,KM Ice agaD.00 a W.00 I ea /12,0w.00
Wi
elrinforceE l[aIt*Ne /Ie,KM as 6%500.00 I is ISw.00 lea 110,0m.00
1
Sect Its,%251
%tnfwced Hollow m:t lllm ry , IIle,11P.M $ e1,500.00 Y /Sw.OD I IOa u0.aw.w
w1m am i I
FM Rttal,c.a wd FAet In1. Q.MP ee 755 11,500.0D p1 M.W am I IE,ew.w
G'�teNee M,ele ee ' we P/,wo.w I epl u,/oD.ao i lace 1e,aa.00
i
Seatlm elm
rlflr.Ii and blstare anetectlm $2,W. 101 ON.00 ql /I,W0.00 Iawl 1t,owoo
luctlm 17412 '
Mforted Mal OWN% til,I/e.e! a w.00 lea /IO,Oa.w IOOe I/10,MO.00
�low9amarld Martl.w/ 1s,eeele 6% 13,000.00 4" 11,000.0D 105 /S,Da.w
Sectlme9721 I
metes Eeory Flamlp I 1t,M1.M a /0.10 a w.w a w.00
ictlm 19912
eslntlp ( 12,M1•08 I a 10.1/ to /1,6m00 ' Ice 11,10D.00
f I
FwRIm I19?9 i
ielecellaKOIN SacI91t Ie9 II I a,M.M I all I /0.e0 qa q,N0.10 lepl /E,000.00
III I I'
I I' ail
I I I I
CITY OF�NTON • DEPARTMED& OF ENGINEERING
tt�b
MUNICIPAL iNO. 200 MILL AVE SOUTH N. WA 98055•2352631
PROJECT well No. 9 P.1.1 11-1I6 PROGRESS PAYMENT ESTIMATE NO -7—
No
CAG 029-83 Cet,,tr.etor ►u9e4 Conetrueton Clow.0 pet.5-L8. _s Show,
Lw Sue EVWUS TO TK TN1S ESTIMATE TOTAL TO DATE
It Oe.er•pl-en O,IL! Qty A,nppt I Qty I Al I Qty Avm„+t
No
91cttOn IIW a Ka 6a 110,236.+6
Vertical Tt1r61n Pon
W 10 Ila
I thlorinatimf E6uIo. IN oanf. k,N1.N • Ma at 61,W0.06 1N 41,920.00
I Sartwe I1013
1.-t:le Im oin art Last
iIr6nFt!t1:ys N,NI.N N6 n,aaa ! 6100.a IOa 6ao00•GO
Nf n IrytrMt k mly 6111N.N IOUN,a0.a IS i woo la/ I 6z,000.00
Sett ion IS160 I 60,660.a la 61,000.00 IV. 110.000.L0
o+lvn nd flawters I sls wM
Seetlee 120 I
Ventl:ati.6 Systa a 60.00 i1 M6 +6,100.a I at 66,900.00
Section 150
ola61e6 Pd Ilyscrli+teovu $2,000.00 II NK I 61,000.W IOa M,000.00
61mtq Syat6e N.a6.N
soctten 16616 �I 6z,a6.a I Loa 92,000.0o a I 00.00 loot 12,ow.00
Electrical -6etrn+l otov.
milt KI+Is um altMM I 16,6a.a 200 41,200.00 ' W N,NO.00 � 1M I a,000.0o
Soctwn 1611t
gK.R,eye $2.aRa 11,000.00 N< I 61,a0•o0 tM0 a,o00.00
sectiort CenOxtae26 N 116.a 01 60.00 tw 64.w 00 too 14,000.00
Section '6155
LIP volume btor Control 53,2N6.a a i 1C.00 lab 61,000.00 IOa 67,000.a
Satlm, :6:6i 1,V a WOO I a/ 6t,a00.00 6a $2,f00.00
}tl tCl10eartf
6rol trdtngN lab 11101 a $0.00 10a se,000.00
soctl9n 16511
sr,p{M.a.I a 10.a lal N,000.00 cal N,000.00
t itntlq
'0T0. (1t91 11111,731.4111 660,100.60 U79,676.46
j
c �, ¢ a1a6
N\\n\n\nnu
Ca"r,2 J6C+o vC. t
,.li-tr)v-ms tnru 15-DEC-64
th" :5-NIN-61 QX
:6-i0�-65 Wu 15-cm-6S 6',i•:1
'CA cr; C1NG Milk 00.1 6:3.6:2.17
N\\N\'.'•nN
Poe I of 4
City of Ammon S1714LP42
will Ip 9 Poop Station
CentraPtor -P4t1et Constrwtora
PAY ESTIMTE t4 7 part ISM: "Y-AS
PAY ESTIMTE PEPlm, 21-MR-C t*o* "Y-K
91PPAP+
Wu PAnorts,
PM ESIIIATE IL I us,W.60 TOT1L E91Twm Nw, 1213,687.52
PAY ESIIIATE 14 2 931,M 40 IIW]Qdlp"in to)
PRY ESTWE PO. 3 916,osi60
MY ESTIMATE M1 4 04l,66.60
PAY FBTIIATE ML S $22,m 40
PAY ESTIMATE M1 6 N9,905.27
MTPL MIMS PAYTEIP'S: 4137,42.61
TDTk EAPMD (From Pap 31 6179,4136.46
1ALJ 6 OTEPIA S ON Hft IFq Pap 4) W.60
MTAL 04W WXR 10. 1 (From Poe 41 013,612.57
MTOTAL 4t93,449.05
wis TAI Id Ic $15,661.37
UTOTPl ko%I1&42
LESS WTAIMA6E (49,fim4S)i
LESS MIM PAYIFIfTS (e137,4A2.6T1
PAYIW ID E MAE THIS ESTIMATE 161,963.to
HWAIMP rot ntW*ld on Fiala to
hp2ofa
City of Renton 517146.A2
Se11 Mo. 9 Reg Statim
Cmtractm - Part Constructors
DAY ESTIMATE W. 7 DATE 19SLO: 29-IpY-m
DAY ESTIMATE IEAImi 21AA11.15 thrown al-w-K
WX CORFTED
BID I EWDOM I ww CDIRETED
Lao Be 1 11micus Total I This Estleate I Total To Date
Its Rio I Ky. I Aiomt Ity. 11 Aeount I Sty. I Aaomt
Bords l lw 4r M,000.00 I IW% $4,000.00 I of woo 100% $4,000.00
1 I
Section 01001 ,
/aaral fyulrrnts 1 W,000.00 ; 100% OF,W0.00 : 0% woo 1 100% Ii,DOD.00
Section 02015 1 ,
Move In an% Site Rewatim 1 I000.00 100% W,000.00 I 0% $0.00 : IW% 62,000.00
Section Dem 1 I
Earth DK t /I6,000.00 I 90% W400.W 1 If I2,5w.00 1 90 t1 80.00
Section OP501 1 I
Store Senora 1 $15,OW.00 IOi 012,000.00 1 09 $0.00 : s0% $12,000.00
I I
Section Owl I
Reinforced Corcrste I s10,OD0.00 : 95% pe,500.00 I St W.00 1 100% $10,000.00
I I ,
Sectim 0"
Reinforced lblloe Unit Masonry 1 $10,000.00 1 95% s91 500.00 1 71 $W.00 I 100% $10,000.00
I 1
Sactim 0MW 1 ,
Fa0. Metalwork ant Castings t s2,000.00 1 7% s1,5W.00 I mg aw.W 1 IW% Wt ODD.00
I I ,
Sect lon 060W I
Car0entry I II,000.00 s0s $6,400.00 1 20% 61,60 OO 100% sI,ODD.00
I
Section 07000 I
Tleraal aft stilt" orotecttml W,000.00 : i'0% M00.00 I Wit s1,600.W 100% it,OW.00
Section 07412
Refoi Metal Amflep I 010,000.00 0% $0.00 IW% 610,O0D.W 1 100% $10,0W.00
Section OW 1
Doors am wrdoare I i5,000.00 1 60% A1,000.00 a0t 62,Wo.00 1 100% SN 000.00
I
hit lon 09721 1
Sealess Epo.y Flooring I 04,000.00 1 0% 11.00 l 0% W.00 Os 60.00
Section 09902 1 1
Painting 1 $2,000.00 0% 60.00 W% $1,600.W 1 W% I1,W0.00
I ,
Section 109" t
Misollarrous Specialties I 11,000.00 1 0% WOO 1 IW% $2,000.00 100% 64 O00.00
I
page a at
City of A cm 617146.A2
SeII 6b 9 PIMA Nation
Contractor-port Cownetort
PAY ESTIMATE t67. 7 DATE 19Mt t9-MY-65
PRY ESTIMATE 110100t 2l-DPIFa'tfwo* 26-IgY{$
WE mRETED
DID DDEmDaw am CODIETED —
Lao 6r I pmiats Taal This Estivate i Taal To Date
lies price 1 ay. a Awont &Y. 6 anent 1 Dty. 6 p1mm
9actlm 11004 ,---
vertial Turbine arp i $17,060.60 60a 610,tx46 : a W.00 60% 610,M411
Sean" 11.160 ,
Chlorination Equip. ad Access.: 66,600.00 1 0% 00.00 90s 67,920.00 9D1 671920.00
Section two ,
Ductile Mon pipe and Cut
Iran Fittings 66,000.00 9D1 67,600.00 1 96 saw.00 100% 60.O0o.00
Seotlm 151W i ,
Fire*,*&A Aonply 62,000.00 1 I0D6 62,ODD.00 I Oa $0.0D 100% 62,000.00
Sect IN INK i ,
Valve aed Flmrters 1 610,000.00 1 901 ^000.00 1 10% $1,000.00 1 10% 616,000.00
Section 19260 1
,
ventilating sywtu 66,000.00 1 01 woo 601 16 40D.00 : 601 66,400.00
Section 15W
Piabing and Nieallayoue I i ,
Piping Systees 61,000.00 ; 90% 6,000.00 1 !Os $e,000.00 1001 64,000.00
, I ,
9aatim 16010 ,
Electrical - BNeral Pm. 62,000.00 I 100% 62,T00,00 : 0% 60.0D 1 100% 62,000.00
goat IN IWA I I ,
Basic Materials and Setnads *000.00 1 2% 61,200.00 : W% 61,600.00 I 1006 se,ON.00
Bectror. 16110 ,
Raceways I 62,000.00 1 50% $1,000.00 90s 61,000.00 ; 10Da 62,000.00
Section 16120 i ,
Conaucrtort t N,000.00 1 01 MOD : 100% 04,000.00 1 100% 64,ODD.00
Smion 16195 i ,
Ca Voltage Notes Control i 63,000.00 Os 00.00 ; 100% 60,OOD.00 : 100% 63,000.00
Section 1616J
Switchboards 1 a ODD,00 a woo 1 601 Wt w0.Do 6Da c2,400.00
gKttm 1EA50
trading I 62,000.001 1001 624 000.00 : 0% W001 100% $2,000.00
9ectlm 16900 I
Lighting I 04,000.0D : 0% MOD ; t00s 04,000.00 1 100% 04,000.00
1
1
I
1DTk I 6197,660,60 1 6119,736,46 1 %0,100.0D 1 $179,636.a6
• • PMp' t of 1
City of Rmtw 617166R2
all MD. 9 Dap Station
CuMnctm - RIW Lostrato
PAY ESTIMATE IO. 7 DATE ISO; 29-m-45
PM ESTIpTE PEAM 21NRF05 twv*2&m-M
MATERIALS OI at
1 IMAICE -- — ICW MATB IN ION—I M W A&
WQ,SECTION 1 UNIT INMIIE 1 PREY THIS 1 O MHERUES
ITEM DESCRIPTION : LIMIT PRICE GLAN M W ; WIN PERIOD TOTAL 1 IN 00
1
WOO
TOM YALAE OF
MATERIALS ON MPD
000 ORDERS
Up" ORDER M1. 1
---- 013,531.71
lap$SA
Ja Suck LW.69
16-UL-04 t6 m WOO
16-0E1-64 Sera 15-514-05 416.17
16-J" t" 154M1-C
TOWL FOR OIMH ORDER M11 $13,612.37
DATE'
>fapO, 1985
TG P m4a DIRECTOR
FROM PUILIC IIORAS DIRECTOR
SUUECT'. PROGRESS PAYMENT
r.wv,kCT011 Puget Constructors ESTIMATE W. 7
CDATRALT No. CAC O?9`F7'9aEn'. well No 9 P
� : 1• w-718
60. 100.00
1. CTPn1uCTM FARMIxLS Tits lSTIwTE f 68. 0
SALES TAX P 811
S TOTAL COATTIAR AMMNT THIS ESTIMATE f 64 968. 10
,6
,. EARNI xGs PREVIOUSLY P+10 CONTRACTOR26 81 .60
TRACTOR i O9S.OO
S •IARNINCS DUE CONTRACTOR Tills ESTIMATE ! 57, 183,776.60
D SUITOIAI - CONTACTOR PAYMENTS 3
1. ■ETAINAGE ON PREXIOUS EAANINGS 16,667.45
00 005.
e.••AETA)MADE ON EAPX IMCS THIS ESTIMATE 3, 9,672.45
9, SUITOTAL - RETAINAGE 1
10, SALES TAA PPE%IOUSLT PAID f 10,801 .27
4,868. 10
11, SALES TAX DUE THIS ESTINAIE 15,669. 37
I, WDTUTAI - SALES TAX ll�
•195' . floe 11
GA MU TOTAL 1 209, 118.42
••REUINAOE ST
FINANCE DEPARTMENT ACTION.
PATIENT TO CONTRACTOR IL tree S /n/ 11);
ACCT. 1
421/000. 15.596-38.65E361 { 61 ,gf, 10 1_
ACCT. 1 1
ACCT. f {
S 1_
ACCT. 1 /
ACCT. f —
RETAINED MOUNT (LIM {): ,. 3,005.00 1
ACV. I 421/000/15.596-38.f, { _
A[U. I _ 1
ACC1. 1 f
{ 1—
A[C1. / 1
f —
ACCT. 1 64,968. 10
TOTAL iMIS ESTIMATE tom_
CHARTER LEE LAWS OR 1Ree
CITY OF RENION CERIIEICAITON
,M,AYYY�!yY.twT i•,N•�l[Y
y,... •.'WA Y Y Nx�i ti
Y•4Y Mn [•M ui/A,�•Y 01•
�Y1 ~ H O/Y x• w�.�Y
NayN��YA�N•1•�j Y,M Y� t
CERTIFICATION BY GEIA CONTRACTOR
ref: Payment of Prevailing rages
to be sUln-i ed to CI with each Pro___gress Payment_Re1uest
DATE:
PROJECT Well 09 Pump Station W-718 CAO No. 062-84
This is to certify that the Prevailing wages have be4n pa to our t
and our subcontractors' employees for the month of f$ —d, �7g
in accordance with the Intents to Pay Prevailing Wa ed oy
`r1L�i t
Washington State Department of labor 8 Industries.
Puget Constructors
�onpany flam/eJJ�� ------
(owner)
Title --- —
CONTRACTOR/SURCONTnCTOR ; Y (j
REPORTING PERIOD
MONTHLY MANPOWER UTILIZATION REPORT V �� Month: S.Vl fl Year: f
To be submitted to the City's Project Goals and Timetables as committed
Engineer during the 1st week of follor rxr ��, 1 in Contractor's Affirmative
month while contract is in progress. Prime '% Action Plan !
contractor is responsible for obtaining and ---
submitting all subcontractor Reports. or per City's Plan 9.1 4
To: (mar end lotatlen of CMVLiM a Aaeeq aqt / From: (acre end lerattae of s,m/rmtw)
CITY OF RENTON PUGET CONSTRUCTORS
WELL 09 PUMP STATION OLYMPIA, WA. 98501
This report is require) y F.xecuU ve Or er ]12a6, Section 203. Failule to report ran
result in sanctions which include suspension, termination, cancellations or debarment of
contract.
1. 7. 3• e.
t 5. b.
n.ina- total atal
Work Ncurs of Employment (See footnote) rlty number umber
or or
Cla eIt a. c. . • of minorlL ampb)•
free- • Nf e- .v. 4e tan/ total ,ohl
Con peny'e Fame li.r• :role done Tote Rleck pan lc ^d len Aee PUe u�i ee slut- ere
} C 7
Tr
tr
Tr
y I4 - Ap -
Tr
4 AD
Tr
C
A
1'r
A
IT
C
AD
Ti
It
Tr
AD
Tr
T
7. C..0srp 0 oL a fan turf in , e pate Sta neu q. a _phone Fueber
e / (Inelude area Coda)
Rev. 11/ (•Males 6 Females, "Minorities a Non-minorities) Page of
7/80 (Submittal Requirements 6 City's Goals/Timetables) --
Engineers
POnne/s
• : Economists
Sclen11st5
May 29, 1985
517146.A3
City of Penton
200 Mill Avenue South
Renton, Washington 98055
Attention: Ron Olsen
Subject: Well No. 9 Pump Station
Pay Estimat= No. 7
Encl sed ib Pay Estimate No. 7 for Well No. 9 Pump Station.
The total earned to date by Puget Constructors is $193,449.05.
The amount recommended for payment, including adjustments
for sales tax and retainage as noted in the enclosed estimate,
is $61,963.10.
The contractor's monthly Manpower Utilization Report and
Certification of Payment of Prevailing wages for this pay-
ment period have not been received from the contractor. We
will forward them if we receive them on behalf of the City.
Payments should be made only after the contractor has made
submittals in accordance with RCW 39.12.040.
Sincerely,
Barry Barnes
tc:se5545rr
Enclosures: Pay Estimate No. 7 (2)
City Progress Payment Form (2)
cc: Puget Constructors
,'rI.Al 44L IM ,kgMe Ofte i6W t1AM Ave SE 9oNey Wx ,Wk 2(U 463 5000
00 9w 9,50a"Wl Wo Nr q"99009-20W
MDAB, 10, 1985 —
Ut I INANCE RIRELIIN
I MIR IMMLIC WARS DIRECTOR
cnNli rRW:Atss PAYle'NY
irMtRM-RM —Puget Constructors __ I.STINATe Me. 8
aWIRM:T MI._C_AC-9P_!a'n rAwecr: _Nell No. 9 P.S.
`N-7 ---- —
1. ClpnNM11N IARNIM:S FRIS ESTRMIE s 10.CA
!. SALES TAX M A.I'
A. vRAI.LIMMM:T AMRRIr THIS ESTINATTI' s. 11�242.40—_
4. IARMMS IWINIQNI.Y PAR) ('MINK.IIR 1183i76.60 _
c, q:ARNIM:5IAR: IYMTRM:'IIIN 11115 ESl'IWII'. t. 9.880_00 _
e. StIRIHIaL - COTRACTOR PAIMENTS s 193,656.60
1, M'IAINACA W 1'AFVIWS LARRIMS 1 9,672.45 _
A.,.RETAINMA. W C.ARNIWS 1111S CSTINAR: �520.00
R. MINIMAL - NETAIM14; '-- — t 10,192.45
10. SALI,S TAX I41I:VIOIISI.4' I'AIII t_15c669-37_
11. SALES 1AX IAA. MIS ISIIMAR'. 042_40
12. 14I1iIIRAI. - SAILS TAX t _ 16,511_77 . _.
•(95 r Ilse 1) 61M,'MtAL
••PITAINMH: ',
FINANCE DEPARIMENT ACTION:
PAYMENT TO CONTRACTOR (Fines 5 And 11):
ACTT, I 421/000/15.596.38.65(36) s 10,722.40 18
ACM I f f
ACCT. 1 f
ACCT. 1 s /�
ACCT. I IT
RETAINED ARM (ELM 8): I—
RETAINED
I 421/000/15.596.38.o5(•'6) { 520.00 f 8
ACCT, f l 1-
ACCT. I $ f_
ACCT. I _ $ _ I_
ACCI. I _ f 1 f_
IIMIE 1_,- ,1,.z4.�,1]Q^
(R.ART(R 1/Q IAwS OF 1916 TOTAL THIS EST I
CITY OF RENTON CERTIFICATION
w,w��.'o W iwu•Wu�w��n a
6'
CITY OF NTON • DEPARTM� OF ENGINEERING
;A • MUNICIPAL ING. 200 MILL AVE SOUTH. ON, WA IiISO55.235.2631
i
PROJECT Well No 9 P S_ W-718 PROGRESS PAYMENT ESTIMATE NO _L
Contract No Contractor Puget Constructors Ctoanp Gt of
4
hw LWaste, PREVIOUS TOTAL THIS ESTIMATE TOTAL TO DATE
No Descr,,I,on Una Price
Otn i Amo�m Qty Amount Ory Arrwnt
Songs 1 :Hivance N,M AI INA N.Ml.M M N,M W% N,1".M
Section 11M:
Serena: bou:neents f2,W.M INf s2,W.IN n N.M IMA k,W
Section Vol'
More In and Site innovation $2.to. 1Nt 12,NI.N /1 N.M IMt {2,M.M
Sect lP Kv.
Earttw-- 136,NI,N 9" 139.2N.0 21 I $728.11 IMs 136,/M.M
Section K'41
Sion Selers t15.NB.M WA 112,0.0 2" $3.M1.M IMA {IS.w.M
Section 133@1
Relnfitnew Cownte 111.IN.M 1NA U/,NB.M 1A so.It IMs {I8.W.
Section 14231 I -
Rel•fonceo *Loa Unit Raswy 1111Ne.N IMs III.NI.M es N.M 1M1
Section 155M
fah. 14talaora are castlrbs $2,W.M INK 12,NI.M h {1.M IMt
Section KW
Earaentrr N,NI.M 1NF N.fa1.M 1A N.Be 111s 16.MP.M I
Section 17W
intro: and - Stun Rrotectich 12,No.so !NA 12,IN.M K W.M !1MA W.I1e.M
Sect Inn 17412
RreforRO Metal Rooflnt 11 4KIN INS SAWN 1A W.M IN,
1114.NI.M
I
Section MMP
Daces -d WrpRn 15,IN.M INa is,011.M 11 W.M 1M5
Sect for 19721
Seaeless Eooey Iioorltlq N,NB.M /s N.M INa 14'Ne.N IN% N,M1E.11
Section 19M2
Ralntlno SE.IN.M MT {I,6M.M 21A {NB.N .Ms 12.eE1.M
Sectiw 1""
11sttllawnis Soectaltir, 62.W.N INA W,NI.M 9% M.M IMA 1:.Ne.M
i
CITY O NTON • DEPARTMIW OF ENGINEERING
e MUNICIPAL IW3 200 MILL AVE SOUTH. ON. WA 08055-235-2631
�t. l
PROJECT G'ell No. 9 P.S. . L-719 pR0CyRE5$ PAYMENT ESTIMATE NO
Contract No, CAG 0:9-l9 Contra.ctw Puget Constructors _ Caw g DeteL 11 SewW,=ot?
Is Latex Sue I PREVIOUS TOTAL THIS ESTIMATE TOTAL TO DATE
;tee Unn WIC! I 01, An , Ory Am f Gty Am I
5lction 1INA
yr%Ica: 'urtane cur 6:7,IH.N 615 oil,23E.Q It N.N 6h 1:1.236.4e
sat:" 1136!
Uiur:oatim Eovio. anc kcess.l M.NI.N 9h VAN.N IR 1BN.N A`t N.W.N
sechv 15M3
Ductile Iron Root ITO Gst
:ron Fitt lnC5 11,MI.N 181/ 1B,NI.M h If,op 1115 62,W.I'
sect:an 1515F I
Fan Nydrant kmety 121MI.M 18s f2.MI.N 1I/ aP.N 1115 ti.lPl.N
Section 151fA
Valves ant Fiorrtrs Ill.MI.N fN1 I s:1,N2.00 /s so 19h cs,N1.N
Sacticr 15261
ventiiatinc Systw fl,Ml.N Ih ii. 4v N IM Iia*.N 91% V.2*A
SectIv 15W
RluMlnC aT eistvilaw4s
DIrik Systws N.W.NI IMs 64,w.N 1s N.N 1*% $4.M.N
sect for 16010
Eiectrlcai - 6"'ai Drov. K,M. IMs 12.Nl.N It N.IP Ills 12,IM.N
6ection IWA
Basic Materials ant Iktnces *IN.M 11Ms 16.Nl.N I isso,w INs 16,NI.N
Section 16111
Ratwuys 12,NI.N IMs k,N1.N Is 1/.N INs 62.on N
SectiM 16121
ConEuctm I41MI.11 ins $a,— h N.N iMs N,M'!.N
section 1617
LW V01tAp eeta CGntrri $3,W.N INa 63.IN,Be N :Nt s3.w N
Action 16161
Switttltica•cs OIL MI.N Ms 62.WN 2" /6N.h :N+ 4i.10.N
Sactior 16/S1
6rouneinc 12.W.1! INs Q.W.to 1% se.A? INs k.N1.N
sRt:on Of*
aloof inr I N,Nl.N INa N,W.N la W.N :Ns N.No.IN
�6:97,MI.B! I C791B36.45 1619,4N.0 s;*A6.4E
D06E DAOERS
Dom DICER t0. 1 'I
Liao Sr $13.531.71 1 8�
Joe shwa U 1
16-044 tnru 15-DEC-BA 1164.69
16-DEC44 t6ru 15-JW85 WIN
16-JAN-K tnru 1.-M--85 $16.17
TOTRL FOR DOM ORDEP NO.1 113.612.71
CONTRACTOR/SUBCO CTOR `Q Y Q
REPORTING PERIOD
MONTHLY MANPOWER UTILIZATION REPORT Months�f ..� 7�c Year: Fs
To be submitted to the City's Project Goals and Timetables as committed
Engineer during the 1st week of tol lo�inq ��.��� in Contrutef'Y Affi natiVO
nth while contract is in proq rea5. Prime ACti.on Plan
%�ntractor is responsible for obtaininq and pi per on y's Plan q.l h
submittingall Subcontractor Reports. _ P
To: Iaten tad lattta of fgll.n<. Agency bPt.) From: ((tta. tad leeetime of .aenreat.r)
CITY OF RENTON PUGET CONSTRUCTORS
WELL 09 PUMP STATION OLYMPIA. WA. 9R501
This report is require y Ezecutive r er I46, action 03. Failure to report can
result in sanctions which include suspension, termination, cancellations or debarment of
contract.
). o a. f S.
Htto- Total total
Mork N ura of Employaent (see footnote) rity nuabor umber
of or
Ciaetl a. • .e w/h of atnortt EmPloy.
N i•- tae r. blen/ .o tal LO tal
company-I !:ame (I.C.1 Tndt fitLiana Tota BLct panic ndten heSRe te_ w!b nF.nlw. • eee
la Lnd .ale
f! Y [c
f /
A y A
Tr
Tr
� s �
A
Tc
C
An
Tr
C
Tr
A
Ap
Tr
C
Tr
Tr
A.
Tr
Tr
7. company Cfrtelal't Signs ure and Tttll Cute signed 9 Te ephom Nunbe:
IInalud♦ Area Codtl
r
/V 7�!/�
Rev. 11/77 I-Males s Females, -tNinorities a Non-minorities) Page of
7/80 (submittal requirements s City's Goals/Timetables) —
INSTRUCTIONS FOR FILING EMPLOYMENT UTILIZATION REPORT (CITY OF RENTON)
The Employment Utillxatlon Report is to be completed by each subject contractor
(bolt, prime and subu.uractors) and signed by a responsible official of the
company. The reports are to be filed on the day required, each month, during
the term of the contract, and they shall include the total work-hours worked on
the project for each employee level in each designated trade for the entire reporting
period. The prime contractor shall submit a report for its work force and shall
collect and submit reports for each subcontractor's wc-k force to the Compliance
Agency that is funding their construction project.
f
Reporting Period . . . . . . . . . . . Self-explanatory
Compliance Agency . . . . . . . . . . City of Renton (administering department)
Contractor . . . . . . . . . . . . . . Any contractor who has a qualifying
construction contract with the City of
Renton.
1. Company's Name . . . . . . . . . . Any contractor or subcontractor who has a
qualifying contract.
2. T-ade . . . . . . . . . . . . . . Only those crafts covered under applicable
FIFO bid conditions.
ti r
3. Work-hours of Employment . . . . . The total number of hours worked rll
employees In each classification; toe t� it
number of hours worked by each *minority
group in each classification and the total
work-hours for all women.
Classification . . . . . . . . . . The level of accomplishment or statue. of
the worker In the trade. (C Craftwurker -
Quallfied, Ap - Apprentice, Tr - Trainee).
4. Percent of minority work-
hours of total work-hours . . . . The percentage of total minority work-hours
worked of all work-hours worked. (The sum
of columns b, c, d and c divided by column a.)
5. Total Number of Minority
Employees . . . . . . . . . . . . Number of minority �-yees working In
contractor's aggre„ •e work force during
reporting period.
6. Total Number of Employees Number of all employees working In contractor's
aggregate work force during reporting period.
• Minority is defined as Including blacks, Hispanics, American Indians and Asian
and Pacific Islanders - both men and women.
C(RWICATION 8Y AAI CONTRACTOR •
ref: Payment of Prevailing Wipes
to be_submf CLeJ to City with_each_Progress Pataeat Request
OfATE:�/�
PROJECT Well Ng Pang Station M-118 CAr, No. 062-84
This is to certify that the Prevailing wages have been ipaid our e�
5
and our subcontractors' employees for the month of ym� O in accordance with the Intents to Pay Prevailing Wage wfih [h�.
Washington State OePartment of Labor 6 Industries.
Puget Constructors
Co�any Fame /%J��y//
(Owner)
Title -----------------
M
Engineers
Pbnneo
ECOnoml sts
sc,er/Rq
July 11, 1985
S17146.A3
City of Renton
200 Mill Avenue South
Renton, Washington 98055
Attention: Ron O'sen
Subject: Well No. 9 Pump Station
Pay Estimate No. 8
Enclosed is Pay Estimate No. 8 for Well No. 9 Pump Station.
The total earned to date by Puget Constructors is $203,849.05.
The amount recommended for payment, including adjustments
for sales tax and retainage as noted in the enclosed estimate,
is $10,722.40,
The contractor's monthly Manpower Utilization Report and
Certification of Payment of Prevailing Wages for this pay-
ment period have not been received from the contractor. We
will forward them if we receive them on behalf of the City.
Payments should be made only after the contractor has mad,:
submittals in accordance with RCW 39.12.040.
Sincerely.
Barry Barnes
njg
Encic,sures: Pay Estimate No 8 (2)
City Progress Payment Form (2)
CC: Puget Constructors
CHIM HILL.INC Sean.*Omce 1500114th Aye E.BWIW+ WO Ir,a^ Io54535000
'O.BW w.700 BWAv�Wwh,gM,98NC 2050
0 • Pop Iofl
City of Bmton SITI W.P2
wll ND. 9 NW Station
CmMrator - Puget EMatrurtora
PRY ESTIVATE b. 9 (FiMul) DATE ISOEC: &A"
PAY ESTIVATE PERIM: II-31L-45 through 5-0.6-AS
MARY
PIEVIDA PRYIOIIS:
PAY ESTIMATE NO. 1 KS,W.(A TOM CONTRACTED NWi fa13,BB7.52
PRY ESTIVATE NO. 2 134,435.44 11WIuPing uln taa`
PRY ESTIMATE 41 3 116,063.60
PRY ESTIMATE NO. 6 1B,B66.6B
PAY ESTIVATE 10. 5 122,129.41
'10Y ESTIMATE NO. 6 fa9,915.27
MAY ESTIMATE IG 7 %1,963.i1
PRY 3TIMITE WM B 1U,722./1
TOIIL PREVIOIS Po"WS: 1211,168.37
TOTPL :AMM (frw Pip 3) 1197,B61.aB
l9LIE R WHIM ON NW IFrm Paps al a.*
TOTAL DONAE ORDER MD. 1 IFry Pap C 113,612.57
TOTPL OWT ORDER NO, 2 (Fry Pape al $2,547.67
9ETOT(L 1214,121.24
DAPS TRI I&111 111,3.T2
92'0NL fa31,356.%
LESS METRINME 1111,L1.161•
LESS PREVIOG IAYVFMS (fall,16L 371
PPYIEIR TO% WA THIS ESTIMATE 111,467.53
fkrtcM qo rot .it"IJ m Salsa taY
Bole 2 of s
t City of Banton 617146.02
Wit No. 9 pw Station
CwAr¢tm - Wget Canatrunt
BAY ESTIINTE WE. 9 (final) DOTE iSM: I-QJ&-15
PAY ESTIIEITE PEP( : 11-At-t5 tArou*5-p6-65
M [aBtM
BID IIEAIIDQM --I— MA; MO EM
Era Sr I Dmim Total I This Estimate I Total To Dote
Itr Pace I Bty. 1 Yount I Ny. B Alert I Bit. 1 Baount
----- —1 I —1 I—
Bords 1 Insereree 1 11,w1.N 1 twit KULM 1 11 N.N 1 10P $4,4116.00
I I I 1
Sect)m $lot I 1 I
6n 41 Aevalrernts I l2,NLN I IM 414M.N 1 1% 0.11 1 101t $2,MLN
I I I I
Section eels 1 1 f
Rose le man Site Prpnatlon 1 $2,M.N 1 IN% 12,wLM 1 1% 11.N 1 INs 1LM.N
SKtton SM I i I I
EartivwE I *A,M.M 1 10s WM.N I ft IL It I 1M Miles."
W. a 02511 1 1 1 1
Store Sens I N5,M.N 1 10e 415,NLN I at N.N I INP SIS,M.N
I I I I
Secllon MI I 1 t
Balnform Cone+ete I 11/,NLM I IN% 61I1006.11 1 K N.M 1 lM III,MLN
I I I
SW iam 04231 I I I
bWorca tail IM Unit Nsowy I gI,M.N I IM sIRM.M I 1% N.N 1 IM% 111,0118.0
I I I I
section IM I I I I
fae. vawwY red Castings 1 14NC.M 1 Joe l2,NLM 1 9% SLM 1 INt 62,M.N
1 1 1 1
SKI Ion 16111 I 1 I I
Carpentry I N,M.N 1 I011 N,MLw I It N.N I IMt sksm.fe
I 1 I I
Sect lore OM I 1 I
Thereat and Roisture " tionl 12,4LN 1 INe 12,M.N 1 M N.N 1 10t $2,NLN
$Ktlon 17412 1 1 1 1
Preform New Roofing I 111,M1.N I Intl III,M.M 1 N 0.01 1 IN% g1,MLN
I I 1 I
Sect ion NM 1 1
Dcore and Igr'dNR 1 MM.N I IM/ 4M.16 1 1% 09.011 INs IS,M.40
I I I I
Section 19721 1 1 I 1
Seaelps Eposy flowing 1 14,NLN 1 INt N,M.N I N 0.81 1 10s 14,M.N
sectlon"M I I I I
Painting s2,091.00 1 IMe $2,08111.91 1 le N.M 1 INs 12,M.N
I I I I
wtim 11995 1 I I I
e�scel lanws specialties 1 s2,0111.01 1 10% 12,1111.A 1 N N.N 1 III% S2,1M.N
I I I 1
• Pop 3 6f 6
City of Irmm S17146.A2
N11 No. 9 Can Station
Compactor - Cow Cmetrwtor
PRY ESTIOVE 10. 9 (rim,I DATE I99FJ: B,4f C
PAY EF110- PERIM: It-JUL-65 through 54t
MW CONPLETED
DID 9fxm — I wx Ci/nIETED
Lao So I aerloes Total I This Estivate I Taal To ate
Its a1Ce I illy. I hcmt I Ity. 6 Ammt I Sty. I hunt
61et1m 11084
Vertical Turtle Deep It1,161.N I N% I11,236.66 I tlY 16,824.32 I INs I17,161.M
Satlm 113N
alorlrotlm FANG• am 0.crcc. %I,MR,is I to N.W.as I% KN I ;Ms tB,M6.IP
i I I I
S6e110n ISM
Decade Iron CAP and Cast i I
Iron Fittings I M,IN.M I 10% tt,IM.M 1 " KM 1 10% I6,W.a
Sectlm 15151 I 1 1
E1n Nytlrent Assisit;y I $1,111.N I INt 112,4111.01 1 0% KM 1 IM% %2'1Kw
SI im 15161 1 1 1 1
9alrea and flwAWtM t16,IN.M INt piling." I " AN I INS 1161014A
Section IUM I I
Vemllatlrq Systse ",ng.M I pis 11,2M.a I IM two 1 iMt 16,ng.M
Section I" I I 1 I
Clattrq aM 6lscellanout I I I I
Picing Systm 61,011I.010 1 f0% 64,W.N I It KN I INs M,"I.M
I I I I
Sectlm I6416 I I I
Electrical - Seewal Pm. I 62.NI.N 1 10% 62,01111.00 1 " KM 1 1Nt 12,06.16
Srtym 16651 1 I I I
SnIC 14tw1ale ad fethods I 16,ng." 1 10% 16,ng.I6 ' It KM I Is" 16,ng."
Sectltn 16116 1 1 1
Nceyys I 12,141.011 I Ing 12,016.11 1 h KN I IM% s2,N0."
SeA1m 16126 1 I 1 1
Cmd,ctors I N,ng.M ! IN% 14,W.N I It KM 1 1N% M,MI."
Sectlm 16135 1 I 1 1
lnt voltage eotor Control I 63,011,0 1 IM% 63,0110.01 1 M ".M 10% ci wilw
Serum 16167 I 1 1 1
Saltchtoards I N,ng.N I 1Ns U,ng.M 1 " KM 1 1111% 111,M1.M
Swum 16156 I 1 1
g-ourdlnp 1 f2,ng.N I IM% 12,ng.M 1 " KM I IM% %2,IKM
Sectlm 165M ! I I I
Lighting I M,ng.M 1 IMt H,ng.M I " KM 1N% N,MI."
I i I 1
1 I 1 1 ^--
I
TOTAL I S197,IM.N I 619Iy236.46 I 67,626.32 I 6197,MI.M
Pap 4 of
City of AW4" 617116.I2
WI No. 9 Rap Titatloe
Cons- tar - RN¢t Ctrlmrwtw
PM E. ANTE 16 9 Ifimll DATE I9MI ►fib-65
PITY ESTIMATE PERIM: IFSLL-9 throw S-RE45
RTTERIRLS ON 00
I IMAICE 1—IN O MTED IN im-Im"m AA
WE SECTION I WIT IMAICE I PEV THIS I a VATERI LS
ITEN DWIPTION I XT PRICE am NEW I ESTIN PERIM TOTAL I ON 00
I I
I I I
I 1 I
1 I I
MTRL WL E or M M
NAUR U ON ICED
Clow UPKIS
Ch&N@ Don No. 1 $13,612.57
ChAnw Rtkr No. 2 02,547.67
TDTAI FOR 009 ODER6 $16,166.44
CITY OF RENTON • DEPARTMEW OF ENGINEERING
'e MUNICIPAL WING. 200 MILL AVE. SOUTH, wN. WA 96055-235-2631
PROJECT Well No. 9 P.S.; M-710 PROGRESS PAYMENT ESTIMATE NO 2�(FIWAL)
Com.ect No Cat: 079-83 CCNreclor Puget Conctructnr• Clou_y �- 5-85
Dete Skeet_ol 2
Loop S�w
PREVIOUS TOTAL, THIS ESTIMATE TOTAL TO DATE
Desc npt,per Prim Qly An nt I Qty Arn Qty An ,t
birds f Lwalm N,NLN iM1 N,NLN N ILN tIN N,MI.N
Scam I1N1
sv ral Mlulnamtt I2,NI.M IN/ fteMLM N N.N IMI i 12,MLM
Scam f2115
bye In ad Site w"atim 12,M.N INI B,11LN N ILN 111a I IB,NLN
Sctim f22N
Eu ftmk $A,M.N 1 INt 04OLN N N.N INI I]S,III.M
filetim ml
It"5etare I1S,NP.M INd fIS,NLN N M.N M MI I."
I
Swaim "'
binfinew Calc*ale 411,NLN 11M1 p1,NLN N N.N INI IlI,N1.N
Swaim%2J1
RinfacN lollop Wit Memory I 1111,NLN tw f11,N1.N N KN 1N1 111,N1.11
I
SWIM IM j
Fas Walpmy atl Ostringe I K.MLN INI IP,NLM N ILN !NI N,NLN
Scum 16fN
Ca.Pldry II,MLN 1M< N,NLN N
I ILM 1NI N,NLM
Scum I7Nf
Thrwl and Mature Petwtlm /t,N1.N
Set am 17412 N+�'N pF N.N INI j 12,NLM
Inforwd Netal bofinl IfII,MLN IMd f11,MLN N Will INi III,MLM
Swaim No
Doan am mrd"u 15,NLN ISM
1{,NLN N N.N INS N,MLN
Swaim 14721
Srina Epoxy Fltimiro 111,01.0 INN
Scum fv51e N,NLN N ILN NN %ULM
punting I It,NLM IMI 11eNLM N ILN Ills /t,NLN
Swum IM
NIMI lanww Sgculge Nw1M+N ►IN I1,NLN N 11160 INf I I&ALN
I
i
I
I
I
OF RENTON • DEPARTMENT OF ENGINEERING
• MUNICIPAL 200 MILL AVE. SOUTH. R�N. WA DSO55.235 253'1
Z,T PROJECT Well No. 9 P.S.; N-TIB pgOpRE55 PAV ME NT ESTIMATE NO �ptJAl
Contract No CAG 029-e1 Contraclo, Puget Constructors Closing Oalee-5'a`5 Shwlt—'&
It Lao Sam EVIOUS TOTALI TH15 ESTIMATE I TOTAL TO DATE
No Dvise, ton pelrn Qly III I Sty Amount Oly Amonnl
Section 1104
Vertical Turbine PWD g7,N1.N 6N $11,M4,1 N1 ll IMP 117,66La
Section 113W
OIIorlratier Eo,ic. and kcsi N,6N.0 16M N,MLN M 61N 1N/ u,MLN
Section 15113
6urtile Iron Pipe and Fast
Iron Fittings 111.14111.111 lIM NeM1.N M ILN NN N,MLM
Section 1515@
fine Bydrant gssembly $2,MI.M INt N,NLN . N M.N NLN
Section 15161
Valves and Floueteri 11I,91.11 IN6 MI,IILN N 6LN IN1 S16,10.411
Section 15266
Ventilating System I N,NLN N1 NeMLM 0 own MN M,MLM
section I"
pl Uabillg and Ills"llatmdA
i piping Systems I 11,MLN I6M M,NLN « MiN IN1 I N,NLN
I
Section 16110 I
Electrical - genera Pray. 12,6N.N too *,NLN « N.N All I 14MLN
151 Section :b
Pasic A!eruls and who" I i 16,1N.N NM N,NLN N N.N 11N 16,61LM
Section 1611p
Raceways 12,MLN ► ll M,NLN N N.N 10% 1P,NLN
Section 16121
Ocmeucto.s 11,M.N IN1 I Ig,MLN N MN !IN i 04,NLN
Section ;6155
Lm Voltage R r Control I U.N1.N IMP 13,6M.N N 6LN iM1 I L1,MLM
Sect lon 16163
SwitCbpparps , 13.MLN IN6 13,NLN N N.N 1N1 13,01LN
Section WISP 1
lrovrdlne i /2,NLM I 11M *,NLN N N.N I10 12,NLN
Section 165N
Lienfinq I 4g,M1.M IMl M,MLN N N.N UPS $4,40111.0
TOM1197,NLMj 1191,2]6.a1 17 i11.>r ,i 1197,16LN
Ic
1)11fE 111/1616
0"order No. 1
113;612.57 tl�)jj''ts ,
CMW Dider No. 2 12,511.6]
IMFL FUR O11111 OImEA6 116,W6LN
CFRT1f ICAT1ON BY GF& CONTRACTOR
ref: Payment of Prevailing Wages
to be submitted to City with each Progress Payment Request
uATE:. fj__
PROJECT Well #'9 Pump Station W-718 CAG No. 062-84
This is to certify that the prevailing wages have been pai to our a 1pye
and our subcontractors' employees for the month
in accordance with the Intents to Pay Prevailinq wage'fiVeTwith the —
Washington State Department of Labor & Industries.
Puget Constructors
Coapwny—Fame`-`—` ——
(owner)
Mt e
CONTRACTOR/SUBCO M CTOR
REPORTING PERIOD
MONTHLY MANPOWER UTILIZATION REPORT �' �' Month: 'fh y C Year: (F''
To be submitted to the City's Project Goals and Timetables as committed
Engineer during the 1st week of tollowin in Contractor's Affirmative
nth while contract is in progress. Prime N Action Plan _%
Cuntractor is responsible for obtaining and or per Ci[y's Lian ?.1 t
sulmti to all Subcontractor Re rts.
To: (mew Dad locatlr or(111ants Asamcr Dart 1 From. (ors aaa leeatlaa of corrsater)
CITY OF RENTON PUGET CONSTRUCTORS
WELL #9 PUMP STATION OLYMPIA. WA. 98501
This report is required by Executive Order 11246, qectinn 203. Failure to report can
result in sanctions which include suspension, termination, cancellations or debarment of
contract.
1. F• ). Y. f 5. a.
sin:. Total otsl
York Hours of Fmployment 0o, footne te) rite taster .brr
w/h of of of
C Leal a• C. a ' ' ninortt Empby.
f Sea- His- er. As .etal total
Corpany'a Same (I.n.; -ra lr [tone Teta Block pan lc Indian earirte Ye. vR m 0Y' ere
b and .ale
C
A _
Tr
A
7r_ l
f
1
Tr
A,
It
C
A _
It
C
A
Tr
Tr
Tr
7. cc Pffiela a .tans are an -iItle is algned 9 Tr eph ona 1•usmer
(Inelude area Cad
✓�/i1,1 l/� ,w, ¢/�/f ��E Aso :tip
Rev. 11/77 (-Males 6 Females, --minorities 6 Non-minorities) Page of
7/80 (Submittal Requirements a City's Goals/Timetables) —
m - -
a11At1 pu bL 1 -U
1U: I IMAIKk UIRkL'iQ
111d: PINLIC NUR&) OIIILCIUII
SURIII'I 1`10ALSS PAYMNI
araRAom Puget Constructors tsilm t No, 9 (Final)
LINItNACT MI. CAG-4112"IP-atl.Cc Well No. 9 P.S.
N-718
1. (xRerA ITOR ♦AIMIMS 'UIS ESI1 AtE t 10,172. 19
SAW N.•• 023.95
T. ILIA: I ,Harr I/11S rsTTMAn. IS 10,996.14
+ I.ARMIMIS I'R1.SIUIGI.T PA10 CUR WIQR ti93,656.60_
S. •I:AMIIM3 MR. ftMIRr1rTM 11115 TSTIMIIE f-�•fi6; ;j�--
A. 011110TAL - COM RAQOR PAIMNNIS f 203,320. 18
RrTAIMICA US MEVIOIIS EAMIJWS f 10, 192,45
I.«RETAIN&;. ON EARN/NOS 1111S ESTIMATE 509.61
9. 91M101AL - IEIAIIAGL t 10,701.06
19. SALES SAX PKIPIOUSLY MIN ; 16,511.77
It. MUS IAA SAX, 1111S tS'IIIA12 _ 823.95
I'. 510191AL - SANS TAX f 17,335.72
•(95• . UNe 11 CAI&IU TOPAL f 231.356.96�
••at1AINar4 s
f INANCI OEPAAIK14T ACTION:
RAYRNT TO COMTRACIAI (LAMS S fR4 11):
..0. f 421/000/15.596 - 33.61 ( li) t 10,4;7.53 19
ACCT. 1
ACCT. 1 i 2=
ACCT. I $ !
ACCT. f _ t f—'-
RETAIIIEO AIg1RR (I+RI B); •�
ACCT. f 421/CO0/15.596 - 39.65 (11) ; 598.61 f 9
ACC]. I t
ACCT. f 1 f`
ACCT. IS _ t _f—•
ACCT. 1 t 1
CHARTIR IH. LAWS OF INS TOIAL THIS Ey ANTE
City CF RENIUN CERTIFICATION
.\wryr m•w••,w..r.r\Iron p /
4
4WL Y\,tiP. rIi,r YIry eZI
M •
Contractor: Project No. S17146.A2
Puget Constructors Project: Well No. 9 P.S.
1235 East 4�� Avenue Owner: City of Renton,
Olympia, Washington 98501 Washington
Date: August 8, 1985
CHANGE ORDER NO. 2 TO THE CONTRCCT
FOR THE CONSTRUCTION OF WELL NO. 9 ^UMP STATION
rlTY OF RENTON, WASHINGTON
This Change Order covers the changes indicated below to the
subject Contract. Upon receipt of an approved copy of this
Change Order the Contractor is hereby directed to perform
the work in accordance with the provisions of this Change
Order. Itemized additions or deductions are exclusive of
Washington State sales tax.
1. Revisions to chlorine room exhaust fan
Addition: S 682.00
2. Survey work at 42-inch Metro crossing
Addition: 699.20
3. Revision to piping at connection to existing
12-inch pipeline
Addition: 964.08
4. Power company requirement for panel over-current
protection
Addition: 309.60
S. Removal of existing concrete thrust block at connection
to existing 12-inch pipeline
Addition: 275.70
6. Additional top soil and sod at entrance gate to meet
park department requirements
Addition: 1,174.60
7 Revisions to surface contours south of pump station and
provision of additional top soil and sod
Additions 769.32
se5550g1 CHANGE ORDER NO. 2
W-718 WELL #"9 PUMP HOUSE WT
„�� #7 Pay Estimates
0 •
S. Addition of pump room ceiling hatchway
Addition: 129.33
9. Painting of concrete wall bond beams throughout station
Addition: 334.68
10. Provision of job shack for City Inspector shared with
Contractor at $64.69 per month during active construc-
tion up to original contract completion date of
May 22, 1985:
February 16, 1895 through March 15, 1985 @ $64.69
March 16, 1895 through April 15, 1985 @ $64.69
April 16, 1895 through May 15, 1985 @ $64.69
May 16, 1895 through May 22, 1985 @ $64.69
Addition: 209.16
11. Deducti i for deletion of drain to river
Deduction: $3,500.00
12. Revisions to M.C.C. wiring to accommodate
a U.S. motor.
Addition: 500.00
Total increase in Contract amount exclusive of Seles Tax
€ik�iZAU
The amount of the basic contract is therefore increased in
the sum of Two Thousand Five Hundred Forty-seven Dollars and
Eighty-seven Cents (t2,547.87) , and it is agreed that this
increase constitutes full compensation to the Contractor for
all work added, and full credit to the Owner for all work
deducted, by this Change Order.
The contract time shall be increased from the originally
specified completion data of May 22, 1985 to June 12, 1985.
Except as herein modified, the terms of the basic contract
shall remain in full force and effect.
Original Contract Amount $197,860.00
Previous Change Order No. 1 13,612.57
Current Contract Amount -
inclusive of previous change orders 211,472.57
Net increase this Change Order No. 2 2,547.87
se5550g2 CHANGE ORDER NO. 2
M •
Contract Total inclusive of this
change order but exclusive of
sales tax 214,020.44
Sales Tax (8.1 percent) 17,335.66
Contract Total including Sales Tax
Endorsed by PPuuu Co Pst PC ors
By
Title_
Date
Approved by CH2M HITL, Inc.
By L n S.-, ._ • __
Title P2e7EC-r MAOMat'/L
Date 8 Anus, 1985
Authorized by City of Renton
By A It, t.,l �� 1-�- `�4 C
Title (emu'^'t wh.'~ti tlw�tfol:
Date put,-`I Iris\
e • .
se5550g3 CHANGE ORDER NO. 2
EngineersPlonrx _
rs
� Economists
Scientists
August 9, 1985
517146.A9
4liQ 1 2 1985
C1Ly of Renton
Utility Engineering
200 Mill Avenue South
Renton, Washington 98055
Attention: Ron Olsen
Sub;ect: Well 9 Pump Station--Pay Estimate No. 9 (Final)
and Change Order No. 2
We enclose herewith Pay Estimate No. 9 (Final) and Change
Order No. 2 with copies to Puget Constructors so that the
figures therein and the contents of this letter may be
agreed by all parties. Su) ject to the City's agreement on
all items and stipulations mentirin^d in this letter, we rec-
ommend payment be made to Pugec Constructors in the a-ount
of $10,487.53.
The meeting at City Hall on J;.ly 17, 1985, a subsequent
letter from the Contractor dated July 23, 1985, of which you
have a copy, and our further discussions have enabled us to
prepare Change Order No. 2 to cover all additional and de-
ductive payment amounts. The Chanqe Order, copy enclosed,
has been sent to the Contractor for his approval and signa-
ture, Final execution by 1',c City will confirm that all
parties agree to the payme s stated in the order.
As of August 5, 1985, the following items were still
outstanding:
o Access ,oad paving had not been cored for de'er-
mination of thickness.
o The roofing guarantee had not been received.
o The required pumping equipment certificates had
not been received.
CN:M MI L.Mc Secmk off" I W' .I UM A"SE ae�ie,ve WCShunjbn hb 4535000
P 0&N 91WO 60*N I Wa 1r,91 n oB00 20M
r w
City of Renton
Page 2
AuOnSt 9, 1985
S14146.A9
o The remaining lock core for the access gate pad-
lock had not been received by the City.
o The missing fire hydrant bolt had not been
replaced.
o The meter vault ladder required three additional
bolts to secure it to the concrete wall.
It is recommended that Pay Estimate N 9 (Final) be proc-
essed by the City but not be paid nor -he retainage of
$10,701.06 be released until CH2M HILL certifies that all
outstanding items of the Contract have ueen corrected. In
addition, all affidavits cf wages paid by the Contractor and
his subcontractors must be received by the City. Addition-
ally, the City must be assured that there are no outstanding
liens against the project. It is understood that liens have
been filed. General Condition 70 of the Contract Documents
addresses the conditions to be met prior to final payment
and release of retentic,n.
The pump station construction was inspected on June 12,
1985, and equipment performance tests were run. With the
exception of vibration slightly exceeding the contract spe-
cification, the pumping equipment met specifications. The
vibration has since been corrected. The station has been
available to the City since the inspection and has now run
800 hours because of the loss of Well No. 2 pumping
equipment.
Extra work was added to the Contract, and the Contractor
experienced delays in the work over what he had no control.
We therefore recommend that the contract completion lime be
extended from the original date of May 22, 1985 to June. 12,
1985, as stated in Change order No. 2. Under the circum-
stances of the project and the fact that the station was
available to the City at a critical time, we recommend that
ligridated damages not be assessed. The 12-month warranty
period should operate from June 12, 1965, the date when the
City had beneficial use of the station.
r
City of Renton
Page 3
August 9, 1985
Sl?146,A9
We will certify completion of the contract as soon as we
receive notification from the Con-ractor that all outstand-
ing items have been corrected and we have approved them,
Sincerely,
Barry Barnes
Project Manager
les/se5524co
Enclosures: Pay Estimate No. 9 IFinal) with City forms
(2 copies)
Change Order No. 2 (for information, not
executed)
cc: Puget Constructors with Pay Estimate No. 9 (Final)
sa f»w ! 77-3�0
plwn6 �
�aaaM l� �d��S ,BIL
31111 3llj
ONIaN3