Loading...
HomeMy WebLinkAboutWTR2700747 19,7 Sunset Blvd. S.W. & Edmonds Ave. S.W. -W-7 BEGINNING OF FILE FILE TITLE 4YA.tAIfQ� soo 0005 ob Fdp% ,o ;% o ip A w . w-X 7 IIUIINOVITIMau Inv,!:Amunt 1000 Notion lhulJm,j BUILDING Devooiimcnl Snatllc.Wn:hnupOn48104 CORPORATION Manwjcmeni 12061 11611 tia May 4, 1987 City of Renton 200 Mill Avenue S. Renton, WA 98055 Re: Renton Center Gen'-lemen: we will be complete with the intertie of our water system loop to the main in Hardy Avenue and the sprinklerization of all tenant space in thu mini-mall building with the exception of the Happiness Is restaurant within the next 60 days. Work in the restaurant will be completed as soon as we are able to legally enter the space to perform our work. A temporary riser and coni.ection is being made tonight to energize the Gussini and Living Well Lady systems in the interim. To date Northwest Building Corporation has spent $100, 000 on the sprinklerization of the tenant shops and has approximately $42,000 remaining unpaid. We have also gent $100,000 to date on the water system upgrade with approximately $127,000 remaining. Based on our time schedule and our voluntary participation in general Life Safety Systems upgrades at Renton Center, I request that occupancy be granted to Gussini Shoes and Living Well Lady immediately. Sincer John Stoddard JWS/jad MAY, 5. 1987, 74 OF RF'L o THE CITY OF RENTON -P MUNICIPAL BUILDING 200 MILL AVE.$O. RENTON,WASH. 98055 BARBARA Y. SHINPOCH, MAYOR 235-2580 `0 9$9�TED SEPZ E��Pb ` MEMORANDUM DATE: November 29, 1984 TO: Dick Houghton FROM: Mayor Shinpoch Dear Dick: On Wednesday, November 28, the Joint Policy Committee approved Renton's request for $9,600 to cover the cost increase for the Rainier Avenue South project (1985 FAUS program). Additionally, Renton was awarded $165,960 for preliminary engineering and construction of the chi,nnelization and intersection work on S.W. Sunset Boulevard. It is my understanding that the Transportation Committee of PSCOG must give firal approval to these allocations, but several members of the Joint Policy Committee also vote with the second group, so it is a safe assumption that the award will be forthcoming. �w1 Barbara Y.Shinpoc�ur BYS:hh DATE CITY OF RENTON UTILITY ENGINEERING 200 MILL AVENUE SOUTH RENTON WA 98055 ATTENTION: ARLENE HAIGHT f SUBJECT: PROJECT NUMBER: W- -,S rJ WORK ORDER NO. : Dear Ms. Haight: fr You are hereby authorized to have the Finance Department bill: Name: Address: City: Attention: Phone: for time and material for the related water work on the above referenced project. The work is described as follows: Very truly yours, i / f NAME PRECONSTRUCTION CONFERENCE PROJECT: DATE: ADDRESS/LOCATION: PROJECT Y — S _ PERMIT w WORK ORDER it 7 THOSE IN ATTENDANCE NAME COMPANY PHONE y D d�VE at T U d� UJ A re A 1235'-.,:?G 31 ENDING F FIL FILE TITLE w e 7 4' ft se.. t '�lvd. S . 6✓ d+ � o( rnr ndf e4 vat S . We