Loading...
HomeMy WebLinkAboutWTR2700835(1) BEGINNING OF FILE FILE TITLE w . g35 4b o V k,4, PUBLIC WORKS DEPARTMENT DESIGN/UTILITY ENGINEERING 0 235-2631 MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.98055 9 �o' 409,Tf0 Se vt L�e�P BARBARA Y. SHINPOCH MAYOR June 26, 1986 M. A. Mortenson Co. Post Office Box 1867 Bellevue, WashingLon 98009 Attention: Neal Ruud Subject: Water Installation at Renton Vocational Technical Institute Water Project W-875 Ladies and Gentlemen: Currently, a requirement for polywrap encasement of the watermain, was required on the watermain for the above mentioned project. This was either done by virtue of using an old Specification, or a direct require- ment by this office. In the field it was determined by the Inspector, Martin Lundy, that the soil conditions did not warrant the installation of this polywrap encase- ment. This requirement was removed from this Project per Mr. Lundy's request. If you have any further questions regarding this matter, please contact me at 235-2631. Very truly yours, Ronald L. Olsen Utility Engineer :mf OF RF 41d K �{o�7 PUBLIC WORKS DEPARTMENT DESIGN/UTILITY ENGINEERING 0 235-2631 MUNICIPAL BUILDING 200 MILL AVE.S0. RENTON,WASH.88055 . b. 091P40 SEP11.0e BARBARA Y. SHINPOCH N E M 0 R A N 0 U N MAYOR it1 DATE: November 26, 1986 I '0.- Ray Sled FROM: David Tibbot SUBJECT: ABERDEEN AVENUE N.E. f Ray: Please count the services on Aberdeen Avenue N.E. from A.E. 20th to N.E. 28th and give me a count of copper vs. galvanized services for contract on the ratermaln replacement project. 1 H.05.13:DRT:mf c 1 26-�- 3 ill � y Zll VA � pDf 2 ' 1 OF R�� 1�i0 QCo17 PUBLIC WORKS [DEPARTMENT DE1,1LSIGN/UTILITY ENGINEERING 235-2631 p MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON.WASH. 98055 $SATED SEPt EMO�P BARBARA Y. SHINPOCH M E M O R A N D U M MAYOR DATE: November 26, 1986 TO: Ray Sled I r FROM: David Tlbbot SUBJECT: ABERDEEN AVENUE N.E. Ray: Please count the services on Aberdeen Avenu,, N.E. from N.E. 20th to N.E. 28th and give me a count Of copper vs. galvanized services for contract on the MateImain replacement project. Gf 1 H.05.13:DRT:mf -- 1 ESM, INC. LETTER Oo CF ��3G1G'5OWTUL asi S.W. iotn St., 9106 RENTON. WA 98055 .{ O1T[ JOB NO F9wrle 2MV*n .TT[NTi Z - 01 TO I �,1 ra of k«, Tz. 4 !�ryyo CQa.eft� WE ARE SENDING YOU "l Attached ❑ Under separate cover via_ __the following items: ❑ Shop drawings M Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change order ❑ copin DATE No. DE5CR1'TIDN 1 i THESE ARE TRANSMITTED as checked belay: ❑ For approval ❑ Approved as submitted ❑ Resubmit_ __copies for approval ❑ For your use ❑ Approved as noted ❑ Submit--copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints $,For review and comment ❑ _ ❑ FOR BIDS DUE__. 19 J PRINTS RETURNED AFTER LOAN TO US REMARKS I rjL Ra OWN c cJ t{ copy TO _Gpo` 2 G7c—Lt7 SIGNED: �lud/tc'.fCJC J(�i�,Je.s�'tX �[IrW®`c.Yrlt lr rwn 11 oncbmm�n rwr n nw�e, YInOIY Jronry u[[I onto. , e i i ,