HomeMy WebLinkAboutWTR2700853 W-853 WELLS U. #22 & #3 WTR-9 1 #1 Predes,:gn BEGINNING OF FILE FILE TITLE QY WlR9 Suf��y 5°uF�tiES PQ� de.s % 90 C� ) t Q WELL NOS. 1. 2, AND 3 REOEVFL3'MENT �► TABLE OF CONTENTS ' PAGE Introduction 1 1 Chapter 1 Emergency Supply and Supply Continuation 4 Chapter 2 Well Location 6 Chapter 3 Drilling Alternatives 8 Chapter 4 Well Field Protection 10 Chapt'rr 5 Building Architecture 12 Chapter 6 Utilities 14 Chapter 7 Power Supply Alternatives 16 Chapter 8 Permits and Schediling 18 Chapter 9 Automatic Control 20 Chapter 10 Mechanical 22 Chapter 11 Cost Estimates 25 Chapter 12 Existing Facility Demolition and 27 Park Reclamation FIGURES ' No. 1 Existing Site Plan No. 2 Existing Uti ity Plan No. 3 Building Site Plan, Option A ' No. 4 Building Site Plan, Option 8 No. S Option A, Architectural Perspective South View No. 6 Optioi, A, Architectural Perspective North View No. 7 Option 8, Architectural Perspective South View No. B Option A, Floor Plan and Mechanical Equipment No. 9 Option 8, Floor Plan and Mechanical Equipment tTABLE Preliminary Project Schedule 19A t 1 1 INTRODUCTION t The purpose of this Preliminary Design Report is to document the planning and logistic considerations, building alternatives, costs and schedule for redeveloping Well Nos. 1, 2, and 3 in the City of Renton. The City currently owns and operates these three wells in the Liberty Park area ' which is located west of Interstate 40d and north of the Cedar River. Well Nos. 1 : 2 are located to a single building in the southern area of the park, : r ween the Cedar River, and the City's municipal swimming pool . Well No. 3 is located in the northeast corner of the park at the intersection of Houser Way and the Maple Valley Highway. Existing Well Nos. I and 2 will be abandoned, while No. 3 will be used only on an emergency basis and these ' Wells will be replaced by three new wells in a single building, adjacent to the building that currently contains Well Nos. 1 and 2. This report contains the necessary detail to evaluate the well ' redevelopment projr--t and is organized as follows: SECTION PURPOSE ' Introduction Ove,view of scope of project and project background. ' Chapter 1 Fm-srgaccy Examination of impacts of Supply and constr.::ting new facilities on Supply existing water system operation. ' Continuation Chapter 2 Well Location Recommended well location and rite ' constraints. Chapter 3 Drilling Examination of alternative drilling Alternatives methods and recommendations. ' Chapter 4 Well Field Consideration of recent well field Protection protection study and corresponding impacts. Chapter 5 Building Presentation of two d,fferent Architecture architectural styles for City review and selection. Chapter 6 Utilities Examination and iden'.ification of interfering utilities and utility service. ' 1 ' Chapter 7 power Supply Examination and recommendation for Alternatives motor starting and power supply alternatives. Chapter 8 Permits and Listing of necessary permits ii Scheduling and anticipated project schedule. Chapter q Automatic Automatic control recommendations. Control ' Chapter 10 Mechanical Examination of mechanical options, configurations and recommendations. Chapter 11 Cost Construction cost estinmtes for each Estimates architec.ural option. Chapter 12 Existing Demolition of existing facilities ' Facility and reclamation of park property. Demolition an Park ' Reclamation well Nos. 1 and 2 (located in a single building) were constructed in the later 1140's. The wells were drilled and cased to a depth of approximately 100 feet and the casings perforated in the water bearing strata area with a mill's knife. well No. 1 produces approximately 2,00u gallons per minute and well No. 2 produces approximately 1.000 gallons per minute. Roth wells ' have operated relatively trouble-free, -nd in 1984 the City examined the station in detail to dcteimine the general condition of the equipment and the improvements to be made (if necessary) to produce an additional an years of reliable service. The following conclusions were reached: 1. The pumps and motors are near the end of their reliable service life and must be replaced. (In fact, well No. 2 failed in August, ' 1985, and was replaced with an interim unit). 2. The existing well casings show signs of significant corrosion and ' probably would not withstand an attempt to redevelop the wells. This corrosion is increasing the iron content of the water supply and will likely increase in the future. ' 3. The mill's knife perforations in the well casing have corroded and are now holes of 2 to 3 inches in diameter, inrreasing the probability of a well strata collapse and subsequent failure. 4. The existing well building is deteriorating and is in need of replacement. Rehabilitation of the existing structure is not ' ecnnomically justifiable. 5. The power supply and pump control equipment is a safety hazard and does not meet State and local codes. 2 Well No. 3 was constructed in 1962, and was drilled and cased to a depth of t approximately 100 feet. The well is located in a buried vault, and access to the station and operation of the equipment is both difficult and hazardous since power supply and switch gear is in an area where standing ' water collects. The City begat+ plans in 1983 to rehabilitate this structure and raise the operating components above grade. During eview if the design drawings, the Department of Social and Health Services stopped the rehabilitation project because the well is located too close to a ' nearby gasoline service station and was considered a contamination risk for operation on a sustained basis. The DSHS did state, however, that the rehabilitation project can be resumed if the well is moved away from the ' service station, possibly to the are,. adjacent to Well Nos. 1 and 2. As a result of the above events, it is recommended tnat three new wells be ' constructed to the east of existing Well Nos. 1 and 2. The scope of this Predesign Report includes some final design criteria, figures and calculations which are presented to illustrate an example of that which can be expected from a final design effort. Selection by the City of the ' preferred alternative will allow continuation of the design effort and the development of detailed plans and specifications necessary for construction of the selected alternative. It is emphasized that the primary objective t of redeveloping these wells is to minimize the risk of water supply contamination and/or failure. 1 1 ' 3 CHAPTER 1 EMERGENCY SUP1 T AND SUPPLY CO1R[MlAT ION ' Well Nos. 1, 2, and 3, which produce a combined total of 6.600 gallons per minute of potable water are the City's most important supply sources. During the summer months, the City must be able to operate Well Nos. 1, 2, and 3 to meet water system demands. One of the requirements of this ' construction project is, therefore, that the water supply normally available from these wells be replaced by or supplemented with supply from other sources if the well is out of service or the well must be kept in ' service and operational during the construction period. This chapter will examine the procedures and options for supplying up to 6,600 GPM of water to the distribution system during the construction of the new wells. ' EMERGENCY SUPPLY OPTIONS Three options exist for supplying water to the distribution system during the construction of these improvements. ' 1. Existing wells to remain in service and operational during construction. 2. Abandon existing wells during construction and provide additional supply through int,rties or other facilities. 3. Abandon existing wells during construction and do not provide ' additional supply, Option No. 1, to keep existing wells in service during construction is the ' preferred alternative. This option has the disadvantage of being the most costly of the three presented, and it is Passible that operation of the well during or after drilling may produce water with high turbidity. The impacts of this may be minimized, however, if the new well drilling is completed in the winter when the existing wells can be shut down. Restarting the wells after the drilling is complete should produce only several minutes of tur: :d cater and this can be discharged into the river ' or sands and silts can be settled in the Mt. Olivet Reservoir. This option has a distinct advantage in that the supply for the summer of 1986 is not dependent on neighboring districts. this option also does not preclude the use of interties if they are required for an emergency. ' 4 i 1 i 9ption No. ? to remove the existing wells from service and provide intertie supply for the summer of 1986. is not a preferred alternative. Although there is sufficient intertie capacity to match the supply from 1 Well Nos. 1, 2, and 3, the intertie supply is not automatically operated. It must be manually activated and constantly monitored since some of the adjacent syscros do not operate at hydraulic elevations (pressures) that are normally compatible with the City's. This option would also a, .e the i City dependent on thr reliability end supply capacity of neighboring districts for it water supply. ' Option No. 3 is unacceptable since it does not provide sufficient supply to meet system demands. iINTERTIES FOR EMERGE':--Y SUPPLY Even though it is the recommendation of this Report that the existing wells i remain in service, it is possible that the wells could be tenporarily or permanently damaged durioq construction of the new wells. The following interties may be used for emergency supply during this type of situation: 1. Seattle supply through Tiffany Park Pump Station to Rolling Hills 590 Zone, Supply Rate - 1,050 gpm, 2. Seattle supply through Fred Nelson Pump Statfcn to Rolling Hills 590 Zone, Supply Rate - 450 gpm. ' 3. Kent supply at Valley General Hospital to Downtown 196 Zone, Supply Rate - 2.400 gpm, ' 4. Seattle supply through Nest Hill Pump Station pressure relief valve to Downtown 196 Zone, Supply Rate • 2,600 gpm. S. District 90 supply though intertie at SE 128th and Union Avenue, Supply Rate • 2,200 gpm. Total potertial Intertie Supply Rate - 8.700 gpm t 1 1 5 CHAPTER 2 ' WELL LOCATION ' Following the decision that was made in 1983 to relocate and rehabilitate the existing wells, a site immediately adjacent to the wells was noted as a Potential location. Efforts since that time have proven that this location (approximately 40' east) is the best alternativ-. Efforts to identify a 'better" location have been unsuccessful considering the constraints o• the final location, and we recommend that the new wells be located adjacent to ' existing Well Nos. 1 and 2. (See Figures 3 and 4 for details). This location has the following advantages: 1. Adjacent to site of existing water rights. Therefore, there is no requirement to aply for new riq is in the restricted Cedar River Basin. ' 2. Area of known high aquifer yields. 3. Level construction site. ' 4. Site owned by the City. S. Few interfering utilities. 6. Adjacent to distribution system connedion. T. Pnol chlorination equipment may be relocated to new facility to ' meet code and safety requirements. ' SITE CONSTRAINTS It is intended that the following constraint will be considered during the final design effort at the proposed construction location: 1. The existirg maple tree in the southeast corner of the construction site is to be saved, if possible. 2. Well drilling procedures must not adversely impact the swimming pool. ' 6 3. Relocate the following utilities: telephone, pool power transformer, sprinkler piping, abandoned pool side sewer. ' 4. Maintain foot access to pool pipe gallery duriro the construction operations since access to this facility is required on a regular basis. ' 5. Oo not damage existing well facilities. 6. New well ca.:ings must be at least 12 feet apart. ' 7. Use existing driveway for construction access to minimize construction damage and disruption of park activities. 1 1 1 t 7 CHAPTER 3 ' DRILLING III.TE UTI11ES Recause the proposed site is a City Park, it is very sensitive to unnecessary damage and encumbrance. Also, because of the importance of ' maintaining operation of the existing wells, drilling procedures must be carefully monitored and controlled. Three drilling options are available at this site: ' 1, Rotary Drilling 2. Reverse Rotary Drilling 3. Cable Tool Drilling DRILLING OPTIONS ' Rotary drilling and reverse rotary drilling are both accomplished by producing a slurry in the cared ho +nd "floating" the spoils out of the casing by injecting water into ei wer the interior or exterior of the dri 'ing column and collecting the mud in a pit for settling. Both of then, drilling options can produce a large diameter hole for the least cost, and both have a very low probability of impacting the pool. In addition, the reverse rotary drilling method offers the lowest probability of producing high turbidity in the aquifer. Both of these options are unacceptable, however, because of the large amount of Park area required ' for settling mud and the quantity of water required for the drilling fluid. ' The cable tool drilling method, although offering a slightly higher probability for aquifer turbidity and surrounding structure damage, is the preferred drilling option. This method requires very little area for construction and no water supply for drilling. We recommend that the ' existing wells and the pool he carefully monitored during drilling for structural damage and that the wells be pumped to the sanitary sewer to clear the aquifer at the end of each drilling day, during the first well ' construction. This first well can then be pumped during construction of the remaining two wells to prevent fine material in the aquifer from migrating to the existing wells and reducing their yield. Since the adjacent swimming pool is of the double-wall type, and the water retaining t8 walls are not in contact with the surrounding soil , the probability of ' damaging this facility is very low. :f necessary, an independent structural examination and/or leakage test can be conducted prior to and after well drilling. HYDROGEDLOGIC CONSIDERATIONS ' Well Nos. 1 and 2 currently produce 5.000 gpm with less than 4 feet of drawdown in the aquifer. Because of this observed high aquifer transmissivity, we anticipate a high probability of obtaining 6,600 gpm from the new well facility. The following consideratiuns, Ivowocer. Oill minimize the potential for lower production rates. All of the wells should be drilled to -Pe bottom of the aquifer to minimize the drawdown effects that the wells will have on one another. We anticipate that this depth will be approximately 100 feet, the same as the existing wells. Minimum well spacing should be 12 feet to minimize well turbulence from influencing 1 adjacent wells. The wells should be equipped with 24" diameter casings, the largest normally available to minimize screen velocities, sanding problems, and interference between the pump and casing. During a television inspection of the existing w. ' iS in 1984, the material visible behind the .Rill's knife perforations in .ne casing appeared to be large rocks, 3 to 6 inches in diameter. We, therefore, recommend the use t of a reinforced drive shoe during well construction with a cutting edoe to penetrate this potential rock area. ' Because of the high yield necessary from these wells, each well should be pump tested as it is completed to calculate the interference effects of locating the wells with this spacing, and to examine potential well yields 1 and problems before the pumps are specified and ordered. 1 CHAPM 4 ' WELL FIELD PROTECTION ' Because of the transmissivity of the geologic strata in the existing %ell field and the high ground water level (20 feet below grade), the City is acutely concerned with well field protection. This chapter identifies the efforts to be taken to minimize the probability of adverse impacts on the aquifer at the existing wells and at the proposed wells. Recaase of the importance of the aquifer in this area to the City's water supply, these procedures should be strictly enforced. ' EXISTING FACILIIIES The following precautions will minimize the potential for contaminating the texisting wells during construction! 1. Do not allow vehicles carrying hazardous materials onto the ' construction site. 2. Limit the use of petroleum products and product storage during construction to that absolutely required. Store all products on ' leak-proof membranes with retaining curbs. 3. Do not allow constriction or other equipment on the site that leaks fuel or hydraulic fluid. 4. Remove the abandoned pool side sewer. 5. Abandon existing Well Nos. 1 and 2 per AWWA guidelines and DSHS directions if removal of the casings is unsuccessful. The wells should be backfilled with clean gravel to the static water level, ' then with bentonite clay to the surface. The top of the casing should be permanently capped. The City may choose to monitor water quality at the existing wells on a weekly basis during new well construction to identify and resolve quality oronlems as soon as possible. ' 10 i 1 1 PROPOSED FACILITIES The following precautions will minimize the potential for contamination of ithe new wells during their normal service life. 1. Locate the new well pumps and itors on independent. cast-in-place 1 concrete curbs to prevent surface water from entering the casing. The top of the curb and the pump control valve elevation should both be above the high water level point if the building is flooded. i2. Use a grout or clay surface seal for all wells. 1 3. Leave casings at least 24' above finished grade with a solid welded top after well drilling. 4. Place a solid, vandal-proof top on the exposed casing at the end of ieach drilling day. 5. nisinfect all drilling equipment and the casing as required to prevent contaminants from other drilling sites from entering the I, aquifer, through .he drilling equipment. U 1 1 1 1 1 1 1 1 1 11 CHAPTER 5 BUILOINC ARCNITECTURE ' This Predesign Report presents two distinct and separate architectural alternatives for the new well building. Because of the sensitivity of the project site (City Park, high traffic area, high visibility, adjacent to River) the success of this project will be determined to a large extent by the appearance of the completed facility. Each of the alternatives has been selected because of its desirable combination of operation And maintenance characteristic for the Water ' Utility and continuity of style with other Park facilities for the Park Department. The styles are listed herein as: "Option A" - a modified rectangular building that follows the style of the baseball stadium in Liberty Park, and "Option B" - a hexagonal building that follows the style ' of the gazebo in Liberty Park and all of the buildings in Coulon Park. Details of each building can be found 'n Figures 3 through 9, and Chapter 10 contains cost estimates for each facility. 1 We have investigated each style in sufficient detail to determine if the building is feasible and practical and to prepare a detailed cost estimate. It is the City's choice to determine which option is to be used for the ' final design effort. Although this Report states no preferred architectural style, we suggest all appropriate City departments be involved to the degree needed in the selection. ' During the development of each building type, the following constraints sere applied to each option: ' 1. Each building must contain three wells in a single room at a minimum spacing of 12 feet on center, ' 2. Provide a removable skylight/access hatch over each pump for minor pump removal and maintenance. Provide a double opening door opposite each pump so that a crane operator can see the pump and motor during maintenance work. 3. Provide a removable roof and wall section over each pump to permit a drilling rig to back over the well casing for major repairs or ' well development work. ' 12 1 1 a, Provide a minimum of 5 unobstructed, straight-run pipe diameters 1 upstream of the flow meter. 5. Provide 5 separate rooms in addition to the pump room for the 1 following: 1. Pool chlorine storage 2. Pool chlorine injection 1 3. Well chlorine storage a. Weil chlorine injection S. Well fluoridation 1 6. Al' flocr drains are to be connected to the sanitary sewer due to the possibility of chlorine or sodium fluoride contamination. 1 7. Eaty access to chlorine and fluoride rooms for chemical delivery. B. Use of low maintenance, non-combustible materials for construction. 1 BUILDING FEATURES, OPTION A - RECTANGLE 1 The modified rectangle (Figures 5 and 6) follows the stadium architectural style in Liberty Park with smooth, concrete columns and exposed aggregate walls. The builuing features a pre-formed corrugated metal roof deck and 1 relites for natural lighting in the building's interior. In this configuration, the wells would b> placed parallel to the River, and the interior piping plan would be symmetrical with 10 unobstructed, 1 straight-run pipe diameters upstream of the flow meters for improved accuracy. The configuration is the least expensive alternative. 1 BUILDING FEATURES, OPTION B - NE%A.GON The hexagonal shape (Figure 7) matches the buildings in Coulon Park and the 1 gazebo in Liberty Park, This compact shape uses the least amount of park area while maintaining easy access to the pumps and motors. The removable roof sections in this design contain no sealing surfaces perpendi G-lar to 1 the stormwater flow line for improved wee her protection. This building would be constructed with a brick exterior and pre-formed corrugated metal root decking. i 1 1 1 1 13 6 ' CHAPTER 6 ' UTILITIES lnis chapter will identify interfering utilities in the construction area, ! and provide recommendations for relocation and/or connection. Refer to Figure No. 2 for details. RELOCATED UTILITIES During the summer of 1985, a contract :vas executed to construct a portion ' of the City's 24" transmision pipeline tram Well Nos. 1 and 2 to the Wells Street Bridge. Prior to this work, them, were interfering utilities in the proposed construction area of the new well. The City had the transmission pipeline contractor perform most if the utility relocation in the planned ' construction area. This relocation included three water mains and a sanitary sewer pipeline. City-owned telemetry conduit was also relocated out of the construction area during the winter of 1984-1985 by a contractor ' doing other work in the City. These utilities are now reloc ted and operational, INTERFERING UTILITIES Some utilities have not been relocate' at the planned construction site for ' the new wells lhey include: 1. Tel•�,iione service to pool. This service is currently being used by ' both the bath house for voice service and by the Water Department for telemetry it the well . The new well facilities till not require telephone service and, therefore, the Park Department should request a new service when the old well is abandoned. 2. Gas service to pool. The existing service runs parallel to the south wall of the bath house and will probably not be affected by the new construction operations. Care should be Laren in notifying the well construction contractor of this service. ' 3. Sprinkler system piping. Sprinkler system as-built records may not be accurate and, therefore, no attempt has been made to relocate this utility. We suggest that the contractor be allowed to remove ' 14 al piping he encounters or damages during construction and to ' install new piping to fit the final landscaping layout. 4. Side sewer pipeline, Although the replaced section of s le sewer pipeline for the bath house has been abandoned, we suggest that this be excavated and removed. This will eliminate the possibility of trapped waste in the pipeline leaching into and contaminating the aquifer if this pipe breaks during the construction operations. UTILITY CONNECTIONS The well pump discharge piping should be connected to the 240 ductile iron pipeline at the tee provided as shown on Figure No. 2. This tee stubout was constructed earlier in 1985 and was placed specifically for connection to the new well building. It is anticipated that a new pump bypass pipeline will need to be constructed froh, the well building to the River since the condition of the existing pipeline is unknown and, therefore, its remaining life is unpredictable. Since it would be significantly less expensive to locate and use this pipeline, if possible, than to construct a new pipe to the River, this existing line should be exposed during construction of the new well building and a determination of condition made at that time. All floor drains should be connected to the sanitary sewer due to the possibility of fluoride, chlorine, lubricating oil or other chemicals entering the floor drains. Chapter 7 addresses power supply connection and requirements while telephone and gas service will not be required at the site. 15 i 1 � 1 CHAPTER 7 1 POWER SUPPLY ALTERMTIVES 1 This chapter discusses options and provide re.ommendations for pourer supply tc the new well facility. MOTOR STARTING OPTIONS 1 Four possible motor starting options have been identffied: 1 I. Start all motors "across the line 2. Use reduced voltage starters for all motors. L Use reduced voltage starters for some motors. 4. Use an engine generator set for load shedding (motor starting). 1 Option No. 1, "across the line" starting is the preferred motor starting alternative since it uses the least expensive and least complicated ' electrical motor starting equipment. In some cases, however, the power utility cannot accommodate the large in-rush current associated with starting large motors across the line. Although Puget Sound Power and Light Company has indicated that they can start three ISO horsepower motors 1 across the line if they are not started simultaneously, this arrangement would require a substantially larger standby power generator than motors using reduced voltage starting. Standby power supply to this and the other 1 well facilities ;s recommended by the City's Comprehensive Water System Plan; 80, therefore, the ability to start these wells from a generator is a prime consideration. 1 Starting loads can be reduced by either specifying a motor with a "better" NENA code rating or by reduced using options 2 or 3. It is advantageous to the City to ootain an improved NENA code rating because reduced voltage starter . shorten motor life and reliability, and improved motor NENA code ratings generally result in a higher quality, longer life motor. The better NEMA code motors are slightly more expensive to operate because of 1 an increase in rotating mass (higher electrical power consumption during running); however, the tradeoff in reliability and ease of starting is justified. 1 1 16 ' Optior. No, a would require that a >tandby engine generator be used to reduce utility loads during motor starting. Since Puget Power can accommodate starting the %rotors without load shedding assistance, this option is an unnecessary expense and complication. It should be ' remembered, however, that future utility rate structures may make this alternative feasible or even mandatory, and power supply equipment design must consider this eventual possibility. We recommend that t%- new facility be designed for 'across the line' starting, using meta, +ith a 'NENA Design R' code rating for minimized starting loads. This arrangement will minimize future engine-generator ' sizes. Control circuits should be provided with logic to prevent simultaneous pump starts under any conditions. TRANSFORNER OPTIONS Three options exist for locating and sizing power supply transformers for the new facility. 1. Use existing transformers (do not relocate) 2. Use existing transformers (relocate) 3. Use new transformers Puget Sound Power and Light has examined the existing transformers at the well site and have indicated they would not recommend reuse of this equipment. Replacement transformers are too large to be buried and must be located above grade on pads; therefore, we have located the transformers away from the new building to minimize visual impact. Recommended transformer locations are shown on Figure Nos. 3 and a. Power supply to the well and pool should be encased in buried, galvanized steel conduit to maximize reliability and minimize potential digging hazards. e e t e i 1 1 i ' CHAPTER 8 iPERMITS AND SCHEDMING 1 This chapter documents the permits necessary to proceed with construction i on this project and presents a preliminary design and construction schedule. 1 PERMITS The following list identifies the permits and approvals that must be 1 obtained before construction can begin on this project. Since we anticipate three separate construction contracts will be let for this project, the permits necessary for each are listed separately: Well Drilling Construction Contract Permit Name Agency Involved Time Involved 1 Drilling Permit Doc 4 Meeks Shoreline Mgmnt. Permit City of Renton 12 Weeks i DSHS Contract Document Approval DSHS 6 Weeks Well Facility Construction Contract Permit Name Agency Involved Time Involved i Building Permit City of Renton 4 Weeks Electrical Permit City of Renton 4 Weeks Stormwater Management 1 Permit City of Renton 6 Weeks Park Board Review City of Renton 8 Weeks Arts Commission Review City of Renton 8 Weeks 1 Demolition and Reclamation Contract Permit Name Agency Involved Time Involved Demolition Permit City of Renton 4 Weeks DSHS Project Approval DSHS 2 Weeks i18 1 ' The following schedule represents an estimate of the time require) to complete the project. The following assumptions have been made in preparation of this schedule: 1. Although we have previously estimated the shoreline management permit and DSMS contract document approval at 12 weeks and 6 weeks r respectively, we have based this schedule on early receipt of each of these items so that drilling construction can take place in the early part of 1986. All efforts should be made to secure these permits as soon as possible. ' 2. City approval of final design contracts will not delay the design phases of the project. r 3. Major equipment delivery (pump, motors, etc.) will not be longer than normal industry standards (12 weeks). r4. Permits can be obtained within the times noted previously. S. City review and approval of final design plans will not exceed rthree weeks. 6. City approval and acceptarce of this Report and architectural style rselection will be complete by January 30, 1986. r r 1 r 1 r r r r 19 TIME 1986 1987 WORK ITEM aW < a '< = � ^ a0 > u = m � � YZ � 0a ppLu x�t N 2 O IWi < •Oi -=i < tWH 2 O .fit A. DRILLING 1. DESIGN 2.REVIEW AND APPROVAL 3.CONSTRUCTION '• B. FACILITY CONSTRUCTION --j _t 1.DESIGN 2.REVIEW AND APPROVAL - II } }3.CONSTRUCTION C. DEMOLITION AND RECLAMATION 1. DESIGN 2.REVIEY!AND APPROVAL 3.CONSTRUCTION t I D. IN SERVICE (. 1 . CITY OF RENTON WELL NOS. 1 ,2 and 3 PRELIMINARY PROJECT SCHEDULE vw r r r r rCHAPTER 9 rAUTOMATIC CONTROL rThis chapter discusses the automatic control requirements of the new r facility. The new well facility should be operated as three separate remote sites (Well Nos. 1. 2. and 3) to allow individual flow rate monitoring and recording of each well at the master console. This procedure will require that the existing remote telemetry unit (RTU) at Well Nos. 1 and 2 and the unit at Well No. 3 be reused and an additional RTU be purchased for the third well. A new master pump unit and digital switch set will also be required at the master console for the third well r operation. The new wells should have the following control features: ' 1. Normal (automatic) start/stop fang Talbot Hill Reservcir level by remote control . 2. Low aquifer level shutdown (each pump) - locally controlled. r 3. Low discharge pressure shutdown (each pump) - locally controlled. 4. High discharge pressure shutdown (each pump) - locally controlled. S. Chlorination pacing - locally controlled. r 6. Ventilator control on temperature and humidity - locally controlled. 7. Motor fault protectors - locally controlled. N. Chlorine and fluoride ventilator control on leak detection and rbuilding entry - locally controlled. ALARMS rThe telemetry link with the master console should use the existing City-owned hardware. Alarm sequences should use the format currently in use by the automatic control system. rThe following conditions should be alarmed at the master console: r 1. Pump fail (each pump). 2. High/low discharge pressure (each pump). 3. Low aquifer level (each pump). r 4. Intrusion. 5. Power fail. 6. Low battery backup on control system. r20 7. Telemetry link. ' R. Data fail . 9. Fire alarm (any roam). 10. Chlorine gas leak (any room). 11. Low Fluoride concentration. 12. Low Chlorine residual. ' RECORDING (RECOROKEEPING) Since historical operation is the best measure of a facilities current ' condition and performance. the following conditions should be automatically recorded by the Telemetry and Supervisory Control System: ' 1. Flow rate at each well (master console). 2. Well level (Nell No. 9 telemetry room). 3. Total flow each well (motor control center). a. Number of pump starts (motor control center). 5. Running time of pumps (motor control center). 6. Fluoride lnjectior concentration (fluoride room). i21 ' CHAPTER 10 MECHANICAL 1 ' This chapter examines and detailsthe mechanical equipment required for the new well facility, including pumps and motors, piping and valves, flow meters, ventilation, and chlorination. and fluoridation chemical delivery ' systems. PUMPS AND VOTORS It is recommended that new pumps and motors be used since the existing wells are to remain in operation during construction. Further, the existing equipment is reaching its reliable service life and the capacity should be divided equally which is not possible with the existing pumps and motors. Each of the three pumps should have a design pumping rate of 2,200 ' GPM at 220 feet TDH for a total supily rate of 6,600 GPM. This capacity will match the existing total water right quantities. ' PIPING Although the three wells are being located in a single roan, for reasons of ' accurate recordkeeping and system reliability each well pump and motor are to be controlled and maintained as an independent well . In this manner, the performance and efficiency of each pump can be closely and individually ' monitored. In the event of a malfunction of a flow meter or pump control valve, this would ensure that the repair could be accomplished without affecting the operation of the other two wells. In view of the above, the following recommendations are made: 1. Use a pump control valve on each pump and pipe the startup flow to the river. 2. Utilize a check valve with opening and closing speed controls on each pump. 3. Use a 12-inch flow meter on each pump before the discharge piping is manifolded together, ' 4. Use an isolation valve on the system side of each flow meter. ' 22 5. Locate valves and meters in easy-tc-service locations. 1 FLOP METERS ' The piping plan should be designed to accommodate five pipe diameters of straight unobstructed piping upstream of each flow meter. This is a standard recommended minimum to ensure accurate meter recording, and is 1 possible with either architectural alternative. Each meter is to be 12 Inches in diameter and have a flow range of at least 0-2,500 GPM with a 0-20 pulse per second (PPS) output for the avtemetir control system. Each ' flow meter should S� a propeller type meter, since this design has the advantage of high reliability at tow cost. The flow meters are to be interfaced with a local and remote flow rate indicator and flow totalizer for monitoring of each pump, permitting a rapid recognition of pump problems should they arise. VENTILATION Pror^- ventilation design is an important consideration when dealing with potentially harmful gases. Each room including the chlorine storage rooms, shall have separate torced air ventilation to ensure that gases are not mixed from room to room and that equipment leaks will be contained to the ' room in which they originate. The fans shall be sized so as to fully exchange the air in each roan once every five minutes. From their location on the ceiling or high on the ' wall , the ventilators should blow fresh air into the room, with the exhaust leaving the room through louvers near the bottom of the doors. The relative location of all the ventilation equipment shall be si-ch that there ' is maximum air circulation throughout each room, thereby minimizing any areas of stagnant air. ' CHLORINATION Both building alternatives include two chlorine rooms in their design, one ' for potable water and the second for the swimming pool. Each facility is to be built and maintained separately. However, the same type of chlorine equipment can be used for both the pool and potable water systems. Each ' well is to have its own chlorinator and a separate injector downstream of the flow meter but before the header. The pool chlorinator shall have manual pacing controls. For safety reasons, the chlorine tanks should be stored in a separate room from the chlorinators. The cylinder storage ' roans are to have their o" heat controls as well as ventilation, ' FLUORIDATION The proposed facilities include a roan to be used for the well fluoridation equipment. The fluoride roam should he equipped with an emergency shower ' in case of sodium fluoride dos'. contamination. The room should be large enough to accommodate the fluoride equipment while providing an ample 23 working area, as well as a Storage area for one week's supply of sodium fluoride. It is ,recommended that a pacing system not be used due to its complexity, and the possibility of over fluoridating the water. The following recommendations are made concerning the fluoridation equipment tftsel f: 1. Use a bag feeder with dust control for sodium fluoride crystal transfer. 2. Size the saturator for the addition of one bag of sodbmn fluoride Der day at maximum well capacity. t7, The day tanks shall be sized for continuous solution makeup. 4. Provide two day tanks with the ability to use either one. 5. Provide a separate Injection pump for each well with one spare ' pump which is manifolded to pump to any well. 6. Use a water softener for the makeup water to reduce injector clogging from magnesium and calcium precipitates. ' 1. Use a dehumidifier in the fluoride room to help prevent the sodium fluoride from caking and, therefore, cut down on material waste ' and equipment cleaning. e 24 0 CHAPTER 11 COST ESTIMATES This chapter presents construction cost estimates for each of the architectural styles presented in this Pre-design Report, These estimates have been prepared using unit price estimates from recent projects that have been completed in the City of Renton and from preliminary quotes from Product suppliers. ITEM CONSTRUCTION COST OPTION A -OPTION B RECTANGLE HEXAGON A. Well Drilling $140,000 $140,000 R. Facility Construction Site Work $86,000 $66,000 Landscaping 4,500 4,500 Concrete 6 Masonry 60,000 52,000 Structural 61,000 94,000 Finishes 22,000 24,n00 Specialties 4,000 4,000 Mechanical 221,000 217,nOO Electrical 98,000 98,000 Automatic Control 34,nOO 34,DOO ' C. Demolition and Reclamation Demolition $18,000 $18,000 Salvage 3,000 3,000 Reclamation 1,600 1,600 Subtotal $753,100 $756,ICO Sales Tax 08,1% 61,000 61,200 CONSTRUCTION SUBTOTAL (A, B, C) S914,100 $817,300 25 n. Design and Administration Predesign Engineering S29,066 $29,066 Design Engineering 73,470 73,470 Construction Inspection and Administration 44,920 44,920 4 0 Legal Costs 4,000 Subtotal S151,456 S151,456 Contine' Subtota "l (D) $166.602 $166,602 ' GRAND TOTAL (A, 8, C. D) $980.702 $983.902 All prices noted above are in January, 1986 dollars. ',t is anticipated ' that these cost estimates will need to be increased for price inflation pproximately 4% to reflect a 4th quarter of 1986 bidding condition. Since this project will relocate the withdrawal point of Well No. 3, and is being accomplished for water quality as well as other reasons. the Department of Social and Health Services has indicated that this project will be considered for a 40% State grant. This funding should be pursued and the grant application submitted as soon as this 'eFort is approved. 1 t i 76 ' CHAPTER 12 EXISTING FACILITY DEMOLITION AND PARK RECLAMATION ' This chapter discusses the demolition of the existing wells I and 2 facility, the procedures for salvaging existing equipment and recommendations for the reclamation or the Park area. ' DEMOLITION As discussed in the introduction to this Report, the existing Well Nos. I ' and 2 facility is to be abandoned and demolished at the completion of the new well construction. The proc Mures for maintaining operation of the wells during construction have been outlined in other chapters of the Report. The purpose of the demolition effort will be to remove all parts of the existing Wells I and 2 facility that will interfere with returning the Park to a condition equal to or better than that prior to the construction of the well and includes removing the well building to below finish grade, removing the chlorination building, removing the power supply transformers, and removing the paved asphalt parking area. ' It is recommended that an attempt be made to remove the existing casings since this will minimize the possibility of iron bacteria contamination in the aquifer. We have reason to suspect, however, that the casings are too weak to be removed, and that this effort will be unsuccessful, if the ' casings cannot be removed, they should be abandoned by backfilling the holes with clean gravel to the static water level, and then filling to grade with bentonite clay. After the casings are filled, they should be ' covered by a welded steel cap. It is suggested that the floor of the pump station be perforated or broken to permit surface water drainage through the structure after it is covered. We do not recommend removing all of the old building foundation since the excavation necessary to do th-ls might impact the swimming pool and the new well building. The demolition and reclamation contract should be separate from the well construction contract, since many contractors specialize in this type of work and this allows the City close control over the scheduling of the ' contractors. The demolition Cont.ract documents shwld require providing pedestrian access to the swimming pool at all times. ' 27 ' SALVAGE Several items in the existing well facility are in good operating condition and should be salvaged and kept as spare equipment. with the exception of the fluoridation equipment and the telemetry equipment, it is our recommendation that the existing equipment not be placed in the new facility for the following reasons: 1) the existing facility must remain wholly operational during new facility construction, and 2) used equipment ' would not be covered under the warranty period provided by the contractor. It is recommended that the following equipment be salvaged and kept as a ' spare with the exception of 6 and 7 below which would be used in the new facility: 1. Well Dumps and motors. ' 2. Chlorination equipment. 3. Check valves. 4. Automatically controlled valves. 5. Motor starters. 6. Fluoridation equipment. 7. Automatic control (telemetry) equipment. ' The fluoridation and telemetry equipment can be used in the new facility sinw.e this equipment will be provided in 1986 under separate contract, and a failure of this equipment will not reduce the capacity to supply water to ' the distribution system. Previous discussions with the City have revised the question of rel neat;ng i ' the chlorination building intact to the West Hill Pump Station for chlorinating the West Hill area. Our discussions with va^ious contractors have shown that this is not economically feasih'.e, and therefore, it is recommended that the existing chlorine building be demolished. PARK RECLAMATION Since it is the recommendation of this Report to demolish the existing Wells 1 and 2 facility, that area of the Park currently occupied by this I` building will be available for use by the Park Department. Since the ' existingstructures are opposite the municipal DD D Pool. the Park Department maw wish to consider several options: ' 1. Return the Park to a lawn condition. 2. Provide grandstand or other seating for pool viewing. ' 3. Improve access to the swimming pool pipe gallery. 4. Expand the bath house. We suggest that the Park Department have direct input into the reclamation contract so that the area is left in a condition that will most benefit ' their future plan•, 28 I /1(jII ( L C LIBERTI PARK i SWIMMING POOL WADING IDOL i fSIDE, 4 .. _ [f Il�llltlli ' .._ PIPE 6ALLERY BELOW BATHHOUSE + AOCK WALL ��- EXIST.Tq[ES ' f} I i / ��J�1�^'�) 1 _ �A✓ EXIS7. WELL NOS. 1 R 2 J ' STEM TO POOL PIPE GALLERY GRASS ASPHALT PARKING 3' -- TRANSFORMERS J5Y - _ CHLORINATION BUILDING / O -- EXIST p'MAPLE ,�-^�y / •j� {(/ 4 DRIVEWAY TV EXIST.THEE ��-h.....lr 1 q �9h \ - , `!-` mob.. Yc l•\``�, _- `.L'� � ./� / F,�TI"SITE ELM sW+MMRa POOL f a�v O LIBERTY PAW -_ WADING POOL ..._�.. _ 1 ✓� ' �_ — ---•_—"'' ,_. ---- - - Do Nor asTuee D e P W ODE YEW SERVICE TO 1(I POOL AFTE11 CORST] y^JBl \\ wr C w I REMOVE RBMOOIED �/ � WBTMT6EWEN �� D m-GAPPED STUB FOR 3' NEw WELL C01111ECTIDN w s / •-\`- r \` T `\ 1 _—-WAITER -•\ `T N POWER(UNDERGROUND) TO ROE 1 P_—._ T--- TELEPHONE JUNDERGROUNO) .` j P / ti - GAS 1l a—_ cHLOM E SOLUTION FIGURE NO. 2 A WF—_._- WAITER TELEMETRY -- ET1511lM+UTILITY PLAN --S SEWER(UWANY) --0-- OR"(STORM) SWwr. �PDOE 1 BATH NOOSE A. �- - -NFW WELL BUILDING --T- UNDERGROUND TELEMETRY FLOOR DRAMS TO SANITARY SEWER \_ NEW PRODO UCTION WELLS / PAVED ' - WELL DISCHARGE PIPING PAVED ACCESS AND / PARKMNi AMA / j - ION I24'0.NE l �`• ` � PUMP BYPASS TO RIVER UNDERGROUND POWER POWER TRANSFORMEf:IOCA II / FIGURE NO. 3 / BUILDING SITE PLAN gill N A I _ urN NovsE 1�P 1 A. FLOOR DRAINS TO SANITARY SEWER CNLORNIE SOLUTION TO POOL �--- —NEW WELL BUILt11NG UNDERGRWNU TELEMETRY / I N W ODUCTION WELLS - WELL DISCHARGE PIPING I) PAVED� ACCESSAND PARKINGGAREA PRYED PARNMIO/ -/ +, -DISTRNluTON SYSTEM N CONNECTION(21 D.0 �. PUMP BYPASS TO RWEn t1 FIGURE NO. 4 }INMRGRWND POWER I `- BWL171NG SITE PLA[} PCW I TRAMSEORMERS LOCA OPTION ' �i PREFORMED PETAL ROOfIMO / r REWVA.LE RDDF PARFLS-EACH PUMP / REMO%ARI E SKVLIGHT FOR PUMP REMOVAL EACH ROOF SECTION S \ C I I' Ll M so S= -EXPOSED AGGNEGATF DONCOElE - / \ ACCESS ODORS TO EACH EYODTN FACED CONCRETE PUYI Gp011 t0 PUW ROOM ' � V REMOVABLE WALL RFCT10N4-EACH PUMP CONCRETE WALKWAY . WEST VIEW FIGURE, NO- ,�T�A�PERSPEGIlYE. V[MMATOa OPPOW — *LMS fO ,{,IWAL LIOIF 00 w -AW. , T ;l ERPOSED AGGpFOATE COMCaLTE DOOM TD cmwm Room \ r` SMOOTH FACFD COBCRFTL coaca[TE wuawAr EAST VIEW FIGURE a _ OPTKKA euLEANa vENruTOR REMOYAgLE ROOF FAMF.LS-EACH MAIN PIIEFOI'MED METAL RO CNG REMOYASLE SRYLN T FOR PUMP �\ 9EMOYA'.EACH ROOF SECTION-� \ REM I CTK V LE WALL MCTIF SEAoIS�EACN FIIIV �.. �+^• I w I w..��A��� � Cd AFTE WALWAY ' METAL OR CORCNETE CONKER POSTS ACCESS JOSTO EACH FDM/ / SOUTH VIEW F YII[ 7 ACCESS DOORS TO CNEUCAL M]dM 1 CN OIYRE mxvnON TO POOL- -._...... - i 1 FLOUA1 IIUECTION lME4 4 ° SNOOTWCONCRETE PO{T{ //'-�� I o Pox POOL WELL wELL PLUOI{ORTIOM 1 I mOmm R or o .col m Room oRAGE Room • {T: I � � I { X E P E{' ' I CNLOR{IE BUECTIDN LORE C.ZUO AGOaEOATE �� CONCRETE WALL{ - WIM)GW STORAGE ACCESS DOOM TO PUMP IgT011 COPRROL CERTM �WOMIB{MCR 1 `�� PIIII RDOY // CHUM V"w 1 I DASREo MMUG is s'I1r r-vmw COWTROL a_ )� }_ - T 1 u11oEa FLOOR B ALVE t I REYOYFJI6LE POOP I yy!!I4�—\ TO p{TR1{UDoa SYSTEtI A\ A �VLO1 NEM w WON 6 TE TOP aEcrloN U PUICUI BYPASS LM A TO MVER FIOY�M�R FLOOR PLAN AND MECHANICAL EQUIPMENT OPTM F...__ PL.AN n MKOAMCAL EOLRPBIENT r- FAIR TlD]TEFL CORNER POSTS I I i CORRWATED METAL OR 4 CC705 DOOM TO II ARCM CTIRAL RRIC%WALL$-- FLUORIDE EOUIPYEM — ,— cHEY1cAL AOOM$ WIMOOW CHLORINE SOLIIi%IN TO POOL "✓ I �- CHLORINE INJECTION UNF \\ POOL FLUORIDATION i WELL -� \ CNLORM ROOM O 1 \ ROOM 34•x W ROOM A aT' IA'% %14 1 A'x 1A'A 14 noomMM \ I I( NIJECTION CHLOFAS IJIIE] WALL ►OOL \ [OLAAIETTT i I C STORAGE r x lr x u• _ �--- t r— __y TO DISTRISlR10M SYSTEM \MOTOR CONTROL CIPHER $TORAO[ MORx R61CN DOOR TO POMP R / \ \ PUMP ROOM—� OASMED PIPING IS \\ \\ / \� UNDFR FLOOR IS MT WTT GRATICTOP P1T W1T11 GRATE TOP REMOV E ROOF SECTION ��PUMP P ROOT PL (3 ACEW _ \ RI x 71•%IN, FIY\\ COMtTICI T x T ACCESS DOORS \/�VALVE \ VALVE \�\ YD.] ��\i EACR PUMP MO MOTOR // l WELL ND.7 ~$YEAS$LINES TO MVER REMGVILASLE WALL FIGURE NO. 9 (3"CES) ----•_---_— —_— O 1! FLOOR PLAN AND FLOOR PLAN AND MECNAN&ALE9S M I MECHANICAL EQUIPMENT L-- - ----- __-- (20/29) Mifngkweving June 5, 1986 Mr, Richard 1, Houghton, Director Public Works Department CITY OF RENTON 200 Mill Avenue S Rrnton, WA 98055 Subject: Comprehensive Water System Plan Amendment for the ,' Reconstruction of Well Nos. 1, 2, and 3 and for the Fluoridation of the City's Water Supply 0ear Mr. Houghton: The City's Comprehensive Water System Plan prepared and adopted in 1983 d'd not contemplate the reconstruction of Well Mos. 1, 2, and 3, nor the Implementation of fluoridation of the City's Water Supply. To ensure that the City has maximum opportunity to secure DSMS grant funding for these projects, it is necessary to amend the Comprehensive Water System Plan, In accordance wltn our authorization, we have prepared the Amendment to the Comprehensive Plan addressing these items. Attached as Exhibit 1, the Amendment sets forth the changes in the Comprehensive Plan Engineering Report necessary to accommodate the projects as currently proposed, and provides background information explaining these changes. The cost of these projects results in a substantial impact on the City's Water and Sewer Capital Improvement Program. We have prepared an amended Water and ' Sewer Capital Improvement Program for the period ending 1990. Adjustments In previous scheduled improvements have been made to accommodate the changed cost of the Well Nos. 1 , 2, and 3 and the addition of the ' fluoridation project not anticipated in the original Capital Improvement Program, The adjustments to the Capital Improvement Program are illustrated in a 3-page tabulation attached as Exhibit 2. This Exhibit compares the original planned expenditures to the actual amounts budgeted and spent in the years 1983-1985 and then to the budgeted or proposed budget for 1986-1990. These proposed expenditures identified in the years 1986-1990 as budget or estimated budget constitute the revised Capital Improvement Program Proposal , Gt the end of Page 3 of Exhibit 2, we have compared the total Capital Improvement Program Budget for each of the years 1986-1990 to the funds available for capita' improvements based on the already enacted 17% water/sewer rate increase for 1986 and a proposed water/sewer rate increase of 12% each year for the years 1987-1990. This comparison illustrates that adequate capital improvement funds can be provided through the enactment of annual rate increases of approximately 12% through 1990. a 4 1410 Market Street,P.O.Box 1180,Kirkland,Washington 9OM(206)827-6400 k Mr. Richard C. Houghton June 5, 1986 Page 2 Ine required rate ;ncreases have Deen evaluated using the program Utility Plan by Microflex. Exhiu.t 3 contains the results of this analysis. The analysis is based on realistic parameters developed from a review of the Utility's historical operating results. Annual growth of the Utility is projected at 1.8% where historically the growth has exceeded this rate for the past it years. Water consumption which is used as the basis for the rate increase requirement has been projected cased on the per customer average of the past siy. years. Per customer water consumption data was examined for the past it years, but higher industrial usage in the early part of this 11-year period unreasonably skewed the average consumption figures; and, therefore, the use of average figure; for the past six years has resulted in a more conservative projection. Exhibit 4 presents for the Staff an annual listing of the capital improvements proposed for both the Water and Sewer utilities for each year beginning in 1987 and ending with 1990. Exhibit 5 is prepared for presentation to the Council Utility Committee and to the full Council in support of the Comprehensive Water System Plan Amendment. This Exhibit is a 2-page summary of the Water/Sewer Utility Capital Improvement Program as amended for the years 1986 through 1990. The tabulation presents the 1986 budgeted items and estimated budgets for 1987, 1998, 1989. and 1990. On Paye 2 we also compare the resulting total capital improvement budgets for each year to the total available for capital improvements based on proposed water rate increases in each year. This tabulation is a reduced and condensed form of the tabulation set forth in Exhibit 2. We are enclosing 12 copies each of Exhibit 1 and Exhibit 5 which can be used in presentation to the Council Utility Committee and to the full ' Council. I trust the items, as transmitted herewith, will be sufficient to proceed with the Comprehensive Water System Plan Amendment by the City Council. If ' we may assist further in any way during this process, please advise us. Very truly yours, RH2 ENGINEERING, P.S. Ronald R. Reinke. PE cc: Mr, Robert Bergstrom Mr. Ron Olsen i Exnlolt 1 1125.16 (18/21) CITY OF RENTON AMENOMENi 140. 1 TO COMPREHENSIVE WATER SYSTEM P;AN, 1983 PRE Amend the City of Renton Comprehensive Water System Plan prepared by RH2 Engineering, P.S., 1991. to modify and Change the improvements proposed to be made to the City's existing Wells 1, 2, and 3, and to provide for the installation of fluoridation equipment and related improvements at Wells 1, 2, and 3; Wells 8 and 9; and Springbrook Springs to allow continuous and reliable fluoridation of the City's normal sources of water supply. The amendments proposed affect the description of improvements and the identified capital improvements descrthed in Chapter 5, "System Improvements". The specific amendments are identified below. 1. Delete sub-paragraphs 8.2.G.1 ., "Wells : and 2" (page 1U41 , and 8,2.G.2., "Well 3" (page 104). and substitute the following: 8.2.G.1. WELLS 1, 2, AND 3 REDEVELOPMENT A. Redrill and develop three new wells to replace existing Wells 1, 2, and 3, at a location immediately adjacent existing Wells 1 and 2. The three wells are to be looted such that all three, along with all related equipment and appurtenances, on be contained within a single well house. ' B. Provide a single new, above-grade well house building of a design compatible with the Park location and the adjacent Park structures. ' C. Provide new pumps, motors, controls, piping, mechanical equipment, chlorinator, and other appurtenances necessary to the equipping of the new Wells 1, 2, and 3. D. Provide space within the new well house building for relocation of the adjacent Henry Moses Swimming Pool chlorinator. E. Provide site improvements necessary to the new wells' location, including: relocation of existing site utilities, connections to water transmission lines, construction of a well discharge by-pass, site and building drainage piping, and all other necessary and related improvements. Page 2 FTISTING WF11 < 1 , 9 ANO 7 A. Provide for maintaining reliable operation and service of existing Yells 1, 2 and 3 until the new wells have been drilled, equipped, tested, and are fully operational. B. Abandon Yells 1 and ?, including (1) salvage of usable equipment or spare parts, (2) removal or abandonment of the well casings in accordance with State regulations which pertain to proper protection of the aquifer, (3) demolition and removal of existing well building and foundation, and (4) reclamation for Park use of the area occupied by the existing facility. C. Convert Well 3 to a stand-by source of supply to be used only in the event of an emergency involving disruption of the supply from new Yells 1, 2, and 3. 2. In Table 5-3, Capital Improvement Projects, change the description and estimated cost for Projects 106 and 16 (page 133) to read as follows: PRIORITY PROJECT NINlER PROJECT NAME _ PROJE.Ci COST _ A 106 Redevelopment of f 925,060 w+lls 1, 2, 3 A 107 Demolition of Existing f 30,000 Yells 1 and 2, and Park Reclamation 3, In Chapter 5 "System Improvements" , "B. Facilities - Source of ' Supply", insert on Page 105 the following Paragraph 8.2 v.4, Paragraph 8.3, as follows: B.3 TREATMENT Provide for sodium fluoride treatment of the City's normal daily sources of water supply by the purchase and installation of equipment and related improvements at Yells 1, 2, and 3; Yells 8 and 9; and Springbrook springs as described below: Amendment No. 1 Page 3 a. Provide equipment for sodium fluoride treatment at each supply s Rc consisting of (1) an up-flow saturation tank and related controls. (2) day tank and transfer pump, and (3) fluoride solution metering pump, together with related auxiliary equipment, including operator testing and safety items. b, provide for temporary installation in the City's pool filter gallery for use at Wells 1 and 2 until permanently installed in the new Wells 1, 2, and 3 buildings in 1987. C. Install equipment at Springbrook Springs in the existing chlorine building and provide necessary piping, ventilation and monitoring improvements. d. Construct separate building adjacent to Wells 8 and 9 for installation of equipment including required piping, ventilation and monitoring improvements. e. Provide separate bulk storage room in conjunction with the Wells 8 and 9 Equipment Building for the Wells 1, 2, and 3 Building for proper bulk storage of sodium fluoride crystals. f. Provide operator equipment for safe handling, monitoring and testing. h. Provide maintenance truck vehicle of operator inspection, resupplying of chemicals and sampling and testing to assure proper treatment control . 4. In Table 5-3, "Capital Improvement Projects", add Project 122 (page 134) to read as follows: PRIORITY PROJECT NUMBER PROJECT NAME PROJECT COST ' A --122 Fldoridation equipment f 300.000 and related facilities (1985 for treatment of Wells dollars) 1, 283, Wells 8 a 9, and Springbrook Springs BACKGROUND 1, Wells 1, 2 and 3 Prepared in 1983, the City's Comprehensive Water System Plan provided for improvements to existing Wells 1, 2, and 3 to ensure that they would continue as the City's longterm, reliable and contaminant-free source of water supply. In 1984, the City initiated investigations of M Amendment No. I Page 4 Wells 1 and 2 to determine the extent of rehabilitation necessary for assuranre of continued `o item (40 years) i-liable service from rh�se wei'S. AS e rr,,il t or were reached: 1. The pumps and motors are near the end of their reliable service life and must be replaced. (In fact, Well No. 2 failed in August, 1985, and was replaced with an interim unit). 2. The existing well casings show signs of significant corrosion and probatly would not withstand an attempt to redevelop the wells. This corrosion is increasing the !run content of the water supply and will likely increase in the future. 3. The mill's knife perforations in the well casing have corroded apd are now holes of 2 to 3 inches in diameter, increasing the probability of a well strata collapse and subsequent failure. 4. The existing well building is deteriorating and is in need of replacement. Rehabilitation of the existing structure is not economically justifiable. 5. The power supply and pump control equipment is a safety hazard and does not meet State and local codes. In 1983 the City initiated the development of engineering construction plans for improvements to Well ;io. 3. The primary objective of these improvements focused on elimination of the below-grade vault in which the well equipment was housed, and construction of a new pump house with ' equipment and pump located above-grade. During a review of this -e-design, the Department of Social and Health ' Services stopped the rehabilitation program due to the proximity of the well to a gasoline station; the well's location was considered to pose a contamination risk to operation on a sustained basis. Improvements to gasoline storage facilities have eliminated immediate contamination concerns at this well . However, proximity to similar adjacent developments and arterial streets provides future exposure to similar contamination. The proposal to relocate Well 3 by drilling a new well adjacent to Wells 1 and 2 in conjunction with their redevelopment will increase the protection of source of supply by removing it from a location adjacent to potential contaminant survey. Existing Well No. 3 will be maintained as an emergency back-up facility in the event of facility failures at Wells 1, 2 and 3. rvnemmment No. t Page 5 As a result of these preliminary findings, the scope-of-work of the Pre-Design Study and Report for Wells 1 mid 2 was expanded to include Well t ' . Redevelopment, January, 1963 sets torin the aetailed recomnendaU ons, cost, and time schedule for the redevelopment of Wells 1, 2, and 3. The redevelopment will assure the City of a longterm, contaminant-flee source of supply at this location. The Amendment to the Water Comprehensive Plan as proposed herein is based on the findings of this Report. Implementation of the recommended improvements is essential to the City's continued use of this vital supply source. 2. Fluuridation "Fluoridation of the City's water supplies with levels recommended by the State Department of Social and Health Services with program costs funded through water utility rate adjustments" was supported by the voters of the November 5, 1985 General Election. The staff report of July 31, 11184. provided an overview of the public benefits and opposition to fluoridation, the facilities necessary to fluoridation of the City's water supply, and the capital and annual costs. The professional consultant engineer retained to design the equipment ..nd facilities necessary to fluoridation of the water supply has provided tie following recommendations: a, Process Chemistry - Sodium fluoride compound in a crystalline form to be used, h. Application Points - Application to be only those sources of normal water suppl., and that water supply sources only used intermittently or on an emergency basis, not to he equipped for fluoride treatment (treatment of Wells 1, 2 A 3; Wells 8 A 9; and Springbrook Springs). C. Application Method and Process Equipment - Application be by ' injection of a saturated sodium fluoride solution to the water supply by metering through r positive displacement pump. Equipment at each locatio-i to include (1) up-flow saturation tank with flow control , (2) day tank and transfer pump, (30 positive displacement metering pump, and (4) auxiliary equipment. d. Equipment Location - Equipment should be located at the new Wells 1, 2 and 3 Building; a new building adjacent to Wells 8 A 9; and in ti,e unused roan at the Springbrook Springs chlorination facility. Equipment at Wells 1 and 2 would temporarily be installed in the pool filter gallery until the new 5uilding is completed. Space for dry chemical storage can b- provided either at the new Fluoridation Building for Wells 8 A 9 or Wells 1, 2, A 3 Building. a a i Amendment no. 1 Page 6 - ^,ri•sl rn;fS _ r•ni�ai - S'S arp n5'.fmrr n.i i• Sinfi Mn including equipment ecyniii Clan dnu installation dmi coiCru.t:d:: i' of buildings, existing space modifications and related improvements. f. nperating Costs - Annual operating costs, including chemicals, labor supplies, materials, utilities and transportation are estimated to be S80,00n. ?n.. ,roposed Amendment to the Comprei•ansise Water System Plan providing for {..,::ride treatment of the City's normal sour^es of rater supply is -.:"srstant with the above recommendations. i } PS3�=LLL-sYR9i.Y+C!6sgY a:aY=YCSRRSH!SR!SFSSbk�!:�.- � Ig ��{ •bM !}`PfF: R ��r9'r-_•'Yst�I£Sa�ry��iFi'�_3yii �_PizI[= siif-_"32"::�f;� �{: � I- t - s � ��ir-r�={�;a•i 5S1-Fs-_�eli i=�^a��=s�i£is'rx4_v irg"s �i��- " i i - Y R � s - ES:TSSSSS F.SESESESE S.S.S SSESE2:8ESES:Sr.`kE Bx,�-.SSSSSSS6SSESbESSSSEEEEE Ii� ' S ESEESSSSSSESSSESLBLEEEESESESES3SSSS3EESESSESSSSSaSE S£SEeSLSEbBS '�� �� i ESQ:S�:ESSSSSSooSSSESSSSSSS�SSBSSaxLSSSSSSSSSSS££S:aSESELS£EBEE I•_ E ESEBESaSE SEEESS555=Sa5GSSE:ESESEEE.k..iabkaaEEEEFSEES3SESEaELESSSS iHy E BSESESSKS'E 8-SSSf,S XSS6G��SaSSSSSS=LLdEEY4S.L.eESYESbEESaSSSSSBLSES � '} � SESESSSSBSEESSSSSSSES8EE8EbCSESSB:S=SSSSSSSESSSSEEW ESSSaSSEBSSS ��� �' 4£ES�LE}'S GSSSFESSS£�EE£�=SEYSSYLESi}t6 EEYET•.SEESSS SC!SSSGEEESE Ex 'ice ' R} G bSSSSESIFE%6LaaIIEIIa!£a�SBK:Sas#s&raESaaaava5asakasaaisaaas:sasaaa !�p ig E� C' 8SSSSS'e 3=SSLSSoS!-.�.iE=rHE�EZSYS.�:abSSLEEL E.S.E SSECESLSSLSSS£SE 'x� �*8F 'w M BEFELL£SLPES8SE8L8Y9GS£aSEESaS8ESS888S SSE SESaEESEESSLLS'u SrEEIIsS lia i;�Y Ip .. iaa£LaaaafaLaaasa-n-'sEa�asaa'cEsasaasaasesaaasaasaa5asaasa'sE£saa �''dyypp i� S EEESLSSSE£S£SSEESESE8S8SLSSESSSE££SEEFBSESESSSSLEEaSEESSSSESSSa 's!E I R '� LESEaSLS E.SLE}ESSa�S�SSSSSYESEo:BESSEEaSSSSESSEEEFSLSSSS SL�SSS�S IYe �y E E£SSaSSBSoEEf 8SSSEk=ESS8ISE ESESGEaBSESSEYEHE%ESEoFSSE S.SESS�ESSSL �^y� J SSE££LSSSeS SSSFSBeSaSSSSBaSESSSSeS3ESRS:�SESSSSESSSSESSSSESS_ta �A6 fi SSSStiSS-o oSS LSESE58SLSSSELFSSSESLEESESSS�.�EEESaEESEESEEE6E'�-Sa!]E �� ' a ! pp( t F ESS EELSSoSi SSSSSEEEeS£SEEESSEEEES�S£EESLS LEL+ESSELiE SESSEEEEEEEE £} �� £ = FF Y SSBSSSEESSGSSSSSESSeSF,ES£SSSSSIISS EEESa SSESEEE=SaaE�aEEELESIISEE86 i�� � RR ryya EELLLEEaSSESE8SLE8S:£SSSEESSS8�SEESSSSSS£ESELESESSEESSSSaL4SH Sa :4� - EE£SaSSSoSR£SSSSiaB F.S SEE8SEEaESSESESS SS Sa£SE£ELSaLL£SSLSSS�L8S8 ��M # saaE;EaLa ss3sa3EL aa�i bra_::E&EEaas�saa5£bas ssaaas�8s£Ecsbs£aasaa ite i' R ESSS SBS�SS�S.F:S�oSS�S 81i�ESEEb�bEE�3�bESRSSSL=��SE8xC SSbSEyBbL S RsBLaEsfg�tsfFFeo SaF.�anL�4as�asrf=zY$5+s�Rk§ia$f9'�srEx��5zE5�e!w! � ��'-. f SSY:E:".L�6=LEEESE SI!5e=33:IIee.ES�S"'.E R�E�il6lii�EtEEBSSbad}SS{a L6x aSSSSSSESEES I (S�:^ >' }EE Eir.SEE�kE:f SPiSSItTL4Hk Cl EmSL� tTiy ib Its$_ �athk. FsS:F:is'�S,.izfts5aa-�sr_�Sfc&y8_3>,_�$�5..a'Yx�E&3R_`�F$�!�c:e's�Ma!Yz a___ x | ' m : { l pf r ■ 1 2 \ � ! § § ) 4 , l 1, .m�.�. at ■ \ jmm�_�.�mm. - .m.m�, � /; ���m a . � \ \ �mmmmmmA} j m �.\ � � ) �.��. a - -m�m�.��m.� { .m��.�� !■ \ mase i t ' ( {; mmBmmmm. { e. A§e4 .d- \ s rr is ?s a :r g-w_ Form •la 6 ?F i@ !' a>m ras3 �sfp 'S;a mf-;z.i.�'#q Sd� y i � rf ?s f Eg ��'-��f rr=�icP a6g �aa' 3�i A sa§ =ssaasasaaasaasassaassaEessa-s•G i�� i I ;- I" as a is aaz assasassasasasasassssasssaasas Iyygg » § *.E s is ssa aaasasaassaassssas saassaasssEs !8$ » F v X as; assssasssaasssaasssa§sasaa$as� i j In casssasassfisssasasEF»s i pp is a is Egg $sasaaaasasssasssfibssasasaasaE !y "a 3§ € is ass §Essasaasasaasssasssaaa?sxo:as c Is 1 IS SEE 3asasassssfi'sxugaEs avaasaasaa>i is 8 S it i8 ES5 RESSSESS SEEastkk:R EESaEE�:S S�! i}3 ! �'q a p r » 3z Y ie as"a »aassasssasaasasssaF`sa$ascagas l! fly a v a x lips If R iS Caassis' �ssaasasE-aaatcEsaaaassa i a a a is gas saasaasasassssaaasaasasasassas Iry G i 5 � i$ sai :saasssaaassassaaafi5s�£aga�cass ids i_ c a 3 e:�a�c � a � m �F $Ea ��&'�&as$ssisssasayaasaassasasaE !�' fV e ?a a I_ - - IS as$ BSSF.SSSSESSESESSSSSB SEHSBL eEE ! I m If vvssa $ s j a is sas" asssasasaasaasasasEgsa`aasszsaa � a 5 i�` `s is asa $aasaasasaaassaaasaass;e aasaass 51 _ffi p ?a a IG SSG A6S SEESSSESSSSEESS SS SS .,.KL3EE ' y Y t� :o ESE §Efi SSSSSSSaSESESSSfi ESES8a^-CSS I!€n I.. w�asa€ ?3 �� a 1z aaz aaaasaaEasaasaaaaaas EsEaz-="sas s I � iS E is 8SS SSSSSSLSSSSS8SSSSSE sasaEEEBSaE i� i� is E is a is Egg ssssasaassaaEEsasssssa sssasass ' � is � iR T!x as� zssssssasaassasasas"s-�zo»na"eak ? ��A i p in aim m n J Iil a9: aaC ail{ R;SSSSSESSSSSLSESSSS=ca�ta.'.a&s'ptls.�. I It pia sJu iaEESEEESSSESGBM-FaL EEE1:8E� i swim 5 E a ,y iK'll 5 Ii $iii ui; � SbSE 8SSLSSaaaNESYaBkE i`kkaa i na w i= p is � 3 91Kpig ce'ra$Eaaa& ssi:6s�F�ne�:aeiaai3sy ia���; I E 1 EXHIBIT 3 FundtooIs U T I L I T Y P L R N by Microflex Parameter Table 10 REALISTIC ITEM 1985 1986 1967 1988 1989 1990 Growth Assumptions Billing Unit Growth *+*++ 1.80% 1.80% 1.ao% 1.80% 1.80% Revenue Growth arwrr 7.00% 7.00% 7.00% 7.00% 7.00% Expense Growth rrwr* 7.00% 7.00% 7.00% 7.00% 7.00% Debt Factors ________________________________________________________________________ Bond Issue Month +ww** 2 2 2 2 2 Pond Maturities - Years wwaw* 20 20 20 20 20 Bond Interest Rate ww+w* 7.90% 9.00% 9.50% 9.50% 9.50% Bond Issuance Cost (%) ****r 3.00% 3.00% 3.00% 3.00% 3.00% Annual Debt Service Factor r*++* 0. 1011 0. 1095 0. 1135 0. 1135 0. 1135 Debt Service Coverage Rqmt ww**x 30.00% 30.00% 30.00% 30.00% 30.00% Maximum Existing Annual D/Sr**** 808 808 808 aC6 BOB Other Factors -----___________________________________________________________________ Investment Rate •*++* 7.90% 9.00% 9.50% 9.50% 9.50% Desired Ending Fund Balance***** 300 300 300 300 300 Bond Reserve Options -----________-----___________________________________ Expensed - M of Years arr** 5 5 5 55_ Capitalized - % of New D/S rrrwr 0.00% 0.00% 0.00% 0.00% 0.00% Special Options ________________________________________________________________________ % of Capital from Debt *rr** 0.00% 0.011% 0.00% 0.00% 0,00% Fixed Pond Issue Amount +rra+ 1800 -1 -1 -1 -1 Fixed Rate rwwwr $1.39 $1.56 $1.74 $1.95 $2. 19 i i y Fundtools U T I L I T Y P L A N by Microflox Cash Flow Prcrectionp Forecast Description: WATER/SF EWERTON CAPITAL 86-30 Forecast Date: 06/10/86 Parameter Table: REALISTIC ITEM---------------------------1985 1986 1987 1989 1990 ---- ---- ----------_- ---- - - WATER/SEWE units in 100 CUBIC 2780384 2830462 290971E 2991187 3074940 3161038 WATER/SEWE rate per 100 CUBIC s1. 19 $1.39 $1.56 01.74 s1.95 s2. 19 Percent Rate Increase 17% IGx 12% 12% 12% REVENUES Rate Revenues 3303 3934 4539 520� 5396 6923 Other Revenues - Pro,ected 172 223 239 256 274 293 Other Revenues - Estimated 43 25 30 35 �0 45 Interest Revenues 163 161 177 203 237 176 aa+ Total Revenues 3693 4343 4985 5699 6547 7437 EXPENDITURES O/m - prorected 2417 2428 2598 2780 2975 3183 O/M - Estimated 0 0 O 0 0 0 •aa Total Expenses 2417 2428 2598 2780 2975 3183 AVAILABLE FOR DEBT SERVICE 1276 191E 2367 2919 3572 4254 DEBT SERVICE REQUIREMENT New Debt Service-Full Year 182 195 285 326 100 Now Debt Service-Part Year 167 179 =61 299 91 New Debt Service-Cumulative 162 377 662 968 New Bond Reserve-Deposits 36 39 57 65 20 New Bond Reserve-Cumulative 36 75 1'2 137 Existing Debt Service 734 808 803 805 802 Soo Existing Bond Reserve Pmts 79 93 93 73 58 14 *** Total Debt Service 813 1104 1-32 1648 2018 2110 (Debt Service to Cover) 1119 1353 1675 2051 2127 (Debt Service Covg Ratio) 1.57 1.73 1. 79 1.77 1.77 2.02 Lest Other Operating Expense 45 50 50 87 87 87 CURRENT YEAR BALANCE 418 761 1005 1184 1467 2057 AVAILABLE FOR CAPITAL ' Prior Year Balance 965 570 847 300 300 300 Current Year Salanco 418 761 1005 1184 1467 2057 Grants 881 124 O 0 0 0 Other Capital Contributions 980 300 300 300 300 300 Bond Issue Gross Amount 2600 1800 1778 2512 287E 679 ' Loss Issue Costs -27 -54 -53 -75 -86 -26 Less Bond Reserve Deposits 0 0 0 0 0 0 w+a Total Avail for Capital 5817 3501 3877 4221 485E 3510 CAPITAL IMPROVEMENTS 5247 2654 3577 39PI 4556 3210 ENDING BALANCE Revenue 6 Construction Funds 570 847 300 300 300 300 Bond Reserve Fund 513 549 624 756 953 1170 Exhibit 4 CITY OF PENTON WATER/SEWER CAPITAL PROGRAM FOR 1987 REVISED JUNE 10, 1988 CPe- PROJECT NAME -------------- BUDGET 1987 MAJOR WATER PROJECTS _______ 9 Rehab Well 5 s200 44 Future Intertle W/ wd loa 46 Ma a valley plpeline-Portion at Sol' Gourse f070 6 60 Rolp ling Hills Reservoir Predesign s30 65 S Talbot ,Reservoir IZO f50 75 Downtown Pipeline TMT 81 Both Ave. pipeline-S. 132nd to Powell d Langston $75 85 Slackriver Reservoir $50 10 Telemetry e�y 1 Well i d 2 Improvement f732 114 6 14 HigMlands Site Booster f60 120 Sprbk Si • Acquisition (Squire) p0 Lind Ave Over-Crossing CrossinPRVsg $30 ShattCoda, River Ave. S. Course $50 Emarg River Golf Course Exp: Well Emergency Well Power 62'OS Well Field Protection 620 Chlorination at West Hill PS f75 Lk Wash Blvd. NE Pipeline-Derry' s to No. -__ f25_ Subtota: 1987 Major Water Projects $2,017 1987 REI WATER PROJECTS 107 'mprove We!1 e3 055 Prasident Park Steel Water Main Replacement-l'ka7 $150 Subtotal 1987 REI Wate, Prc)ects ---s2o5 Total 1387 Water Projects 12,222 1987 MAJOR SEWER PROJECTS ' Shattuck Ave So. Interceptor $75 Lk Wash Blvd NE Extention-Denny's to No. 0150 Renton Hill Alle Replacement $50 CBD Small Sewer Replacement $100 Kenn yy dale Lakefront Sewer Repair $50 NE 7th Sewer Replacement-Aberdeen to Edmonds $250 So. 2nd St. Sewer Rehab. -Rainier to City Hall $150 No. 1st St. Sewer Rehabilitation Phase II 6250 Subtotal 1987 Major Sewer Projects 01,075 1987 REI SEWER PROJECTS 1967 Sewer TV, Cleaning, d Root Treatmert s50- Subtotal 1967 REI Sewer Project, 050 Tot*! 1987 Sewer Pro]ects $1 125 1987 MACHINERY AND EQUIPMENT ALLOWANCE 55422g TOTAL 1987 WATER/SEWER CAPITALIMPROVEMENTS 5s3�5765 - CITv OF RENTON WATER/SEWER CAPITAL PROGRAM FOR 1068 REVISED JUNE 10. 138E CPN PROJECT NAME ______PROJECT_________________ EST. BUDGET 1383 MAJOR WATER PROJECTS ------- " Mov Creek Well 677 6 Remove PRV-N 28th $i 9 Rehab We:: 5 f261 64 S Talbot ?es Pipeline f362 65 5 Talbot Reservoir f1,266 105 Telemetry ff Mt. Olivet �:�mp y Well Power -_--$TS EmergencF _ Well ieltl Protection f20 Subtotal 1988 Major Water Projects $2.2,55 1988 RE! WATER PROJECTS - Miscellaneous REI f210 Subtotal 1988 REI Water Project, s210 Total 19SS Water Projects $2.465 l 988 MAJOR SEWER PROJECTS CBD SE Improvements 0210 CBD SW Improvements $281 CBD N Improvements s245 CBD N e2 Improvements 0105 Black River Improvement -- $180 Kennydals East Improvement 184 Subtotal i98B Major Sewer Projects $1, 105 1988 REI SEWER PROJECTS _--_ Sewer REI Projects (Allowance) f105 Subtotal 1388 REI Sewer Projects -__0105_ T,Dtal 1988 Sewer Projects f1.230 Machinery and Epuipment (Allowancel $245 ` TOTAL 1988 WATER/SEWER CAPITALIMPROVEMENTS �f3 323 CCTV OF FENTON WATER/SEWER CAPITAL PROGRAM FOR 1909 REVISED JUKE lU, i306 EST. CNN PROJECT NAME ---_ BUDGET ___ ---------------- BUDGE__ 1989 MAJOR WATER PROJECTS 5 Ma Creak Well 6600 4' Wall N10 $303 52 Cwar A a Pipeline-S. 7th to S. 9tn $49 G5 S Talbot Reservoir $1.354 105 Talemetryy $240 117 Emarg Intertles $168 Eme,genc Wel3 Power $75 Well Field Protection s20 Subtotal 1989 Major Water Projects /2.389 1989 REI WATER PROJECTS Miscellaneous REI $225 Subtotal 1969 REI Water Projects --_s225_ Total 1989 Water Pro)rcts $3. 114 19B9 MAJOR SEWER PROJECTS CBD SE Improvements s225 CBD SW Improvaments $185 CBD N Improvements $150 CBD N N2 Improvements $113 Renton Ave Improvements 6203 Black Rivsr Improvement $132 Subtotal 1989 Major Sewer Projects $1.067 1989 REI SEWER PROJECTS Sewer REI Pro,acts (Allowance) $113 ' Subtotal 1989 REI Sewer Prolacts -_-$113_ Total 1989 Sewer Projects 41. 180 Machinery and Equipment (Allowance) �iva63 TOTAL 1989 WATER/SEWER CAPITALIMPROVEMENT9 y ,2 CITE OF RENTON WATER/SEWER CAPITAL PROGRAM FOR 1390 REVISED JUKE 10. 138E EST. ---_ PROJECT N-ME BUDGET _ _ _______ _ 19g0 MAJOR WATER PROJECTS 8 Kennvdale Booster $635 76 Downtown Pippeline $821 S. 2nd St. 24" Wells Ave. 24" 105 Telemetry 110 Tiffany Park Booster $40 117 Emerg Interties $180 Well Field Protection 420 Subtotal 1990 Major Water Projects s1.764 1990 REI WATER PROJECTS Miscellaneous REI $241 Subtotal 1990 REI Water Projects $241_ Total. 1990 Water Projects s2.005 1990 MAJOR SEWER PROJECTS CBD BE Improvements $161 CBD SW Improvements $161 CBD N Improvements 0 R 12 CBD N i $161 Improvements $ Black River Improvement 161 Subtotal 1990 Major Sewer Projects $803 t 1990 REI SEWER PROJECTS Sewer REI Projects (Allowance) $120 t Subtotal 1990 REI Sewer Projects $120_ Total I9A7 Sewer Projects 0923 ` Machinery and Equipment (Allowance) T3$281 TOTAL 1990 WATER/SEWER CAPITALIMPROVEMENTS fi3 203 Exhibit 5 CIT D."! OF RENT 6f.F1i WATER/SEWER UTILITY CONE ,1G,t19GRI� --REVi 196i-1530 PPH 6%1J%8E 1906 1967 19" 1983 139•) - -- --_ _-._ ___-MATE__ --- --- -- EST BUD--GET---- ESTIMATED ESTIMATED ESTIMATED SUMET CPO PROJECT NAME ----- T BUDGET BUDGET BUDGET_ _ _ ____MATT__ ______MEET ---------- MAJOR WATER PROJECTS 5 May Creek We11-Relocated to Golf GmrSe SG SG t77 f600 f0 em 6 Rove pev-N 282h f0 M} ft f0 M 8 Mennvdaie Booster ♦O fG fG fO 5635 040 s2 9 Rehab Wall 5 So t2 So f0 f0 f0 s0 12 Aberdeen 24th-27th f100 SO 43 Well 410 SO f3so t0 44 Fui ure Interne./ WO BOB fir f6 W s0 f0 46 MaPlewlle• Vipatina-Port i..o at Golf Course S0 N0 V1 9 t0 52 Cedar ova Eipelt..e-S. 7th to S. 9th sG t0 to fSo SO SO 60 Rollin, H:11s Reservo tr Pred.s,.n *550 ${V t $0 f0 61 Ponderosa Estates Pipeline Transfer f0 y0 $368 s0 s0 64 5 Talbot Res Pipeline f100 ♦150 $1,266 $1,354 s0 65 5 Talbot Reservoir $0 f269 s0 so teal 75 Dcwnt.-n Pipai Lne f30 s0 s0 SO s0 Well, Ave 24^ so 00 t0 81 Both Avenue ViPal me-5. 132nd to Powell t Langston .20 1*0 $0 00 $0 84 Sunset Blvd SW Vipeline s0 S50 f0 to s0 85 Blackrwar Reservoir fib so so $0 f0 91 Grad, We plPeline $40 f0 40 $0 f0 95 S. Talbot Rd. E.t. $12 f0 fG t0 t0 104 Springbrook Chlorination •let f51 f143 t240 $69 I05 Wall ry �60 f740 40 w $40 So 105 Well 3 t 2 Improvement 110 Tiffany Park Booster {G f60 f0 f0 $0 114 Highlands Booster $0 t0 s0 si68 t100 117 Emma9 IMerttas Sq.0 re> $62 t70 so $0 f0 120 Sprbk Site Aggw sition ! yG so $50 s0 t0 Mt. OLivett Pump {q0 sJ f0 f0 PI Channel Relocation t30 fG f0 so Lind Ave Over-Crossing yG f0 40 Shattuck Ave 6 PRVe i83 f0 Cedar Ri•.er Golf Course E.pt well {i0 i225i f0 10 Eee, r.cyR,, Ue IJ Power $u f25 f75 $2g so Well Field Prot It'-' s2 f75 fy0 '$0 f0 rblor.tion at Waal Hill VS s, QS s0 t0 so Lk .ash Blvd. WE Pipeline to N— KC f8 fso s0 fG 40 Fire Flow Analysis 11300 {O $0 Go __ Flcuridat iun --- --- ---------- ---------- ---------- ---------764 - Subtotal Malor Water f1,383 f2.Vi7 f2,255 $2,Ba9 {1, RE! DATER PROJECTS 107 IMprove Well O3 f10 440 t0 t0 s0 WM Queen Ave NE-NE 6th to NE 8th $53 f0 .1 i0 40 WM NE 7th-Monroe to Queen t53_ f0 s0 fG tG UM NE BtM1-Monroe !o Olympia s.1.a '/ W. Vallev HuY-Orilla se` s0 V. s0 s0 Presider! Fvrk Steel Water Main Replacement-1?B7 So f15ri f•) Ki $441 Miscellaneous REI 00 ----- 00- ---_ ----- ---- s---- ----- - ---$I" $205 $210 $225 Sa4l ... Subtotal Water REI _____MEAT_ --------- ---- ----- ---------- _______ ------------------ —__ _ y ... TOTAL WATER PROJECT, N.571 {2..29 t2.46� aJ,114 f2,Mr✓ CITY OF RENTON CAPITAL WATER/SEWER UTILITY CAPITAL PROGRAM -- 1986 1990 [•AGE 2 ov 2 REVISED: JUNE to. 1986 RAH-6/10/86 ME IS57 1368 IJS3 1990 ESTIMATED ESTIMATED ESTIMATED ESTIMATED Cop [•ROJECT NAME E'JGGET BUDGET BUDGET BUDGET BULLET _ ---------- ---------- ---------- ---------- ---------- MRJOP SENEF PRUJECTS COD 6E IMP, $ nvemant+ tU $0 asl t225 161 COD SW LnoroveNenta t0 10 281 s165 $a61 0 i0 Seprn,svent+ t0 $0 $105 t150 L01 COD N s� irnoravntt 10 ir H f113 41 ZO COD N eme Penton Pvt ImP"oveme nts sCr fir 6 $192 91"k Rlvar IMvrovee,ent tV SO t1to s192 N61 berm tlale West IMP t0 1V C150 to W Kenftfydale East IMP 1$75 t0 tto s0 s0 Snatt uc: P.ve So. I..t.....to, tso t75 t0 so t0 Lk WatM B1Ytl HE Eetentlor.-Denny'+ to No. W SIS0 $0 to to Cascatle Saner- District Trar,+fer M j0 t4 $0 f0 Golf Course Sanitary Serer s;p s50 s0 60 s0 Renton Hill Alla Raae Placement s:00 $too s0 s0 $0 Ga ly9yct11t4cr»Sx�ith r�eAvelS.-So 19th to Talbot Spb $40 fto s0 f0 �0 1.NE n7tb Swwen RvplaP&mMnt�-Abervtleo. to Edmonds f0 s230 40 00 t0 So. Pntl St. Sewer Rehab.-A.In'er to CiG Hall s0 ISO f0 $0 t0 v f0 No. let St. Sewer R.habilttat:on Pnate II W 0250 _s0_ f0 ---------_ .... Subtotal Malor Sewer 0]5- --------- ---t1,06] ---- SEWER REI PROJECTS 'ALLOWANCE) 00 10 t103 f113 f110 1986 Sewer Jt Gr outmy f Stiltny-Iona, Creek Basin s50 10 $0 f0 fo 1987 Sewer IV, Cleanlr.p, ! Root Treatment to _-__-_f-<' $0 t0 ___--_--_- 05 --_ S113 .... Subtotal Sewer REI VIPJ.Pt! 150 f'0 ---- --- ----- -----t120_ _______ _ __________ _______`J_ _ TOTAL SEWER PROJECTS S915 st'lan f1,210 s1.180 f323 MACHINERY AND EWIPMENT {ALLOWANCE) ....fe268 ....�-.'9_ .O0 1245 .....6263 w..�f28l. ...mm..w..w...............w.m.www .:.. . GRAND TOTAL $Z,634 $3,577 s3,921 $4,556 f3,Z10 ESTIMATED WATER SEWER UTILl TY FUNDS AVAILABLE FOR CAPITAL :MPROVEMEO T-. F z wf�W�Batetl Dn Lropo+etlsWat ar/Sewer=Rate•Ir.P..... Of:��-�'� j17.00% Ia.00% 12.00% 12.00% Estimated Funds A,.tlable For Capital IMProVements $570 $817 $300 $30K, t30O Prior Year Dalai.. 1761 f1,oO5 ft,184 $1,467 $2,057 Currant Year balance 3ja4 i0 f0 t0 t0 Grunts Ot Der Capital C.ntrlb.t icrs 16evelopura) s3oo S300 $300 sr t9O!S s8 9 - - - B4rrtl ]asue Sr... AmPant t1.800 $11 770 t2,51L Leas issue Custf ff54) 1453) ff]5) }sBB) Total AYsalable For Capital I.iirovemants $3,503 13,877 $4,221 C4,856 ss,510 ENDING F FIL FILE TITLE I/ W,o