Loading...
HomeMy WebLinkAboutWTR2700877(4) W-877 WELLS #1, #2, & #3 DRILLING - WT. #5 Const ucti on Correspondence & Pa_ymeilts - 0- - BEGINNING OF FILE FILE� �gU kftf,. 75upply sduRees l3kiLLi'toG dP al Statement of 1 U RIAL STATISTICIAN rq yMF INTENT TO PAY soot of Labor A Industries N7 PREVAILING WAGES E p yment Standards Section M� REC£+VE0 (Public Works Contract) General Administration Building Olympia, WA 9@W-0681 2 198T (WO) 753-4011 nt s�'rzV,• "' Pro ect # W-877 ' • ContractBPW Number � — Date Bid Was Due 9-26-86 _ Contract Awarding Public Agency Date Contract AwardedlO-13-86 CITY OF RENTON Courtly in Which Work Performed King Address 200 Mi11 Ave. .$_Q. Prime Contractor Armstrong Drilling- Inc. Renton. WA 98055 - Your Contractor's Registration Certificate No. 0012 Phone (206) 23S-2501 Do You Intend To Use Subcontractors? Yen 0 No 10 In compliance with RCW 39A2.010 1, the undersigned, being a duly authorized representative• of ARMCTRONC DRT TNr 1O71S 66eh Ava_ Eaa1- nuy lln� Wa on373 a otMrW a 8x4s1Rl".1 IAddb do hereby certify that the following rates of hourly wage and hourly fringe benefits will be paid to all laborers,workers and mechanics employed by me upon the public works project described above and that no laborer,worker or mechanic will be paid less than the "prevailing rate of wage"as determined by the Industrial Statistician of the Department of Labor and Industries. PLEASE NOTE- 1. apprentices are to be used they must be registered with the Slate Ap- prenticeship Council within 60 days of hiring or they must be paid prevailing journeyman wages for the time preceding the date of registration. CLAR r41IMATED or WOREErraNF.R HOURLY PAY FRINGE BENEFITS WATER-WELL DRILLING + •OWNER-OPERATOR iC 1."{7i"J,pPp'0-5USC0NTRxMORS ^'*•-"."^p. L'-._...- _ . I I� a� I No•re: Attach Additional Sheets as Needed. Al 'SONG IL_INC. IN_q* By TWi Subscribed and sworn to before me OHN E. ARMSTRONG-PRESI Psr L• 1 Use Oaly this 20th day of M r , APPROVED 87 r Department of Labor & Industries Industrial Statistician t _ Qa ILARri W Nhrsw'o/1arAnyfixl.rrld- tt/r n W-AWtw. . . Ry- D�11��_Y• BEFORE FINAL SETTLEMENT can be made on any public works project,the prime contractor and each and every subcontractor must submit form LI-700.7(F700-007-000)"Affidavit of Wages Paid"to the officer charged with the disbursement of public funds.EACH AFFIDAVIT OF WAGES PAID MUST RE CERTI- FIED BY THE INDUSTRIAL STATISTICIAN OF THE DEPARTMENT OF LABOR AND INDUS- TRIPS BEFORE IT IS SUBMITTED TO SAID OFFICER. PROGRESS PAYMENTS: Each voucher claim submitted W on owner by a contractor for payment on a project estimate shall state that prevailing wages have been paid in accordance with the prefiled statement or statements of intent to pay prevailing wages on rite with the public agency. COMPLETE AND MAIL ENTIRE SET FOR APPROVAL. TO: Employment Standards Section, Department of Labor and Industries, Olympia, Washington 985N-0631 CONTRACTORS,DISTRIBUTE APPROVED STATEMENTS AS FOLLOWS: (PINK COPY) ORIGINAL CONTRACT—AW.ARDINC AGENCY (GREEN COPY) DUPLICATE—INDUSTRIAL STAnsrrIC1AN (RoUinee by Depvtni (BLUE COPY) TRIPLICATE—PRIME.CONTRACTOR tYRLLOW COPY)QUADRUPLICATE—SUBCONTFACTOR FA�t•, Iw+r b I'W tlr MT a W- MAIL TO: p0 AFFIDAVIT' OF INDUSTRIAL orr`sIledu�6e, VMENtRE�LtV WAGES PAID Employment Standards Secttan PP QR� Olympia, W'A 98$p4-11631 rd,- ON MIMIC WORKS CONTRACT 12061 753-4019 �VV sscsaC. Comract/BPW Number Project# W-877 Contract Awarding Agency Date Bid Was Due 9-26-86 City of Renton _ Date Contract Awarded 10-13-86 Address —200 Mill Ave_ so. Date Work Completed 7-14-87 Renton. WA 98055 County in Which Work Performed Kino Telephone Numberl2061 235-2501 _ Prime Contractor Arlastrono Drilling, Inc,__. Your Contractor's Registration Certificate No. 0012 Was a Statement of Intent Filed For this project? Yes M No ❑ In Compliance with RCW 39.12.040 1, the undersigned, being a duly autho ized representative of ARMSTRONG DRILLING INC. 10715 66th Ave East Puyallup, WA 98373 (Cam.a Sa..i IA w ) do hereby certify that the following rates of hourly wage and hourly fringe benefts have been paid to the laborers, workmen and mechanics employed by me upon the project described above and that no laborer, workman or me. chanic has been paid less than the -prevailing rate of wage" as determined by the Industrial Statistician of the Department of Labor and Industries. List below each classification of labor emplo,td by you upon the Project described above and the rate of hourly pay and hourly fringe benefits paid to each classification. PLEASE. NOTE; If apprentices hnre been employed on this project,praride this additional information:name.registration number,stage of progression . A date of hiring. (on xur of Nue rl Ilmrcl. nWm vg rrlsgr aemnts ram Water-Well Drilling Owner-operator ✓ _ _ _ ._ No Sub-contractors SEP � 1 198T B:GIt1�INf� _. fxfYOfRBfTOR NYr AnnM Addaiutl lhaeu es rYRurd. _A BONG D LING, INC. _ C twraLI L_ Subscribed and sworn to before me By, this 21st day of August hn E, Armstrong-Presi T' 19 877 . �. 1.a1 V.or. t J / I hercbr�enify rhat anmMieg w e8e wage rat,act rnsga brnrna hems awom e t.the prtraJmg rage regmrtmrm.M RCW 301_`No have tern rat"A. r,v1. e p(t an0 ah of wy �„di„s,re,b;is INDUSTRIAL STATISTICIAN EPARTMF.NT OF LABOR AND INDUSTRIES INSTRUCTIONS: SEP 15 W Rr wk I. Pursuant to RCW 39.12.040 topics of this form must be completed by the contractor and each of his sub- contractors. 2. Complete this form in triplicate and have it notarized. 3. Submit all forms for approval to:Department of Labor and Industries,Employment Standards Section,Olympia, Washington 98504-0631. 4. Mail an approved copy to the Contact Awarding Public Agency CONTRACTORS ARE RFSPONS-BLE FOR OBTAINING AND FILING .AFFIDAVITS of the SUB- CONTRACTORS.This is required:.v law and payments can n-n lawfully be made until such affidavits are filed. rwiana pones.. rrar tn/au W-v g Gj6a al o ommerce env 1105t, Seattle, U'.4 98111 Phone Q06q 622-9272 se t. 19 1986 Date....P ......?....... ....... City of Renton Offiee of City Clerk 200 Mill Ave. So. Renton, Wa, 98055 Notice of Bid Call 4223-B Water Production Wells 49 lines @ 1.10 per line 53.90 49 lines @ 1,00 per line 49.00 $107 ,90 Published September 12, 19, 1986 �I Pieu.e mdude {rcuunl %um,,wlih paSment 'Y 142:3-B Affidavit of Publication City of Renton Water Production Wells Bid Date.Sept.rs STATE Of WASHINGTON A�ty�vtti BIDS KING COUNTY—SS. MA7SR BODUC110% WELLS Sealed bids will be reeiva until.:80 p.m beplember 85 lags,•t she City Clerk's OMa+ The undersigned, on oath states that he is an end will se opened and t ool, authorized representative of The Daily Journal of Commerce. rnd In the ith Floor Cnnfer ence Room. Benton Nunn'pa a daily newspaper, which newspaper !s a legal newspaper Building. '200 Mill Avenw of general circulation and it is now and has been for more south than six months prior to the date of publication hereinafter Tue work to he psfnrmn within ro calendar duos fron refered to, published in the English language continuously the date of commencement on as a daily newspaper in Seattle, King Ccunty, Washington, der this contract shall Inc:ude and it is now and during all of Said time was rimed in an bet noise limited to. g P Drillintf, logging, tesnn office maintained at the aforesaid place of publication of and development of three 2� this mwspaper. The Daily Journal of Commerce was on the Inch diameter water prvduc y roved as a legal news a r by lion wells. 121h day of June, 1941, approved g p pe The Cit reserve..the right to the Superior Court of King County, w ve anvand orallinfnrcmall The notice in the exact form annexed, was published in Approved plans, sperlltcs. regular issues of The Daily Journal of Commerce,which was lions. and Corm of contract regularly distributed to its subscribers during the below, tions. n may be obi aintr at the Public Works Department period. The annexed notice, a at the Renton Municipal Build ix -- Ins for a fee Ot$25.N each set plus $5.00 to cover ooatagc It ...-...................._.... ....atOtlCi. matted. Amrtffled rhmk or bid ound ..._...................._.._..._._....................._._................__ ...... in the amount of five(57z;per- cent of the total amount of each waa pu6lNbed oD ..... � �,.... '.. .1.y._:1986 bid must&"in anv each bid. � i'�� i The Cily't Fair Pradtces and Non-Discrimination Poli iet .'^'—"'.—._.._..._.. ....._..........._....._.................... .. ... shall aapppp yy Cityy Clerk _ Dates of publication in the Seattle Daily Journal of Co., r coerce, September 12 and 19. 1986. 4225 A) ♦ ......_ .....___._. Sal mAbod and swam to before me On .. Stptseber..19�,•1986 . .. fx. t.�f_, lltLfl�[.. ........... ._._...._ IaMM tw u� ase�a wtMwaaaW+oa t.wsa,u,r �Journa � � "on 11050,Seat City of Pent. 0ffiee of Ct J 200 Mill Ave Renton, Wa. ! Notice of Bid Cell 4223-B :Dater Production Well# 49 lines @ 1.10 per line 53.90 49 lines C 1.00 per line 49.00 $102.90 cnrc,n 111, InWS UI IC 6 PgltMDpA[Niept8fi8iiFla@j�0I9, 1986 .xF �nxr^dC.�iB Bn anm o:^•,rY UNBFr '�fyM�SwB, tM Mr nC:S Mx"_"B d1 rM I v-,w MMawBCO .6 w^G.�rre wr"�1. IV' MA\ ,uar B•'- .x0 1M+'� Ow�OI.r\BC .r.CM\f [M City a< tfxi0w. MD ixAr � � � ��y -- wtwnK.rt[ wY0 CGwrIA K uqt 4 SI 00 4zl/ow/\S.S`w. s4.ws(Is) Plrov iw.IMk %mm"t \wmtw with P➢)m "I BID TABULA-T ION 'JHEET PRv J EC T : ,iATfR PfCDL rlaa WENS DATF = SEP1TTi8FFR 26, 1986 BIDDER AA AA il;, 510 ARMSI 4DW DRILLING INC. $158,101.65 incl. tax 10715 - 66th Av� Fast Ivyallup, WA 98373 NAW WELL DRILLING, 1W. $158,635.05 Incl. tax 19782 N.L. Lincoln F" PaulsLo, WA 98370 FE'3INEER'S Ib"rII9 M $162,000.00 Incl, tax CALLED'AY-. CM OF RENT04 • DELLS 1-2-3 PRODUCTION DRI SEPTFTRFR 26, 19N6 - 2:30 PM DID TABULATION ENGINEER'S ESTINITE BURT HELL DRILL, INC. AktSTR.OG CRILLIfG, INC. ITEM ITEM DESCRIPTION QNNTITY UNIT UNIT PRIG APONT T MICE AN(W UNIT PRICE WU.1Hf _-_---------------------------------,----------_----------------------_----____-------------- _______ 1. KYUL11ATIO000NOBILIZATION Lim S1M $5,000.00 S5,ODO.00 S15,000.OD S15,OOD.OD SITE PREPARATION AND GFANP 2. GRILL FOR 24-INCR CASKS 300 LF $12n.00 536,000.00 5110.00 S33,000.00 (3XIO0 LF EAI '. FURNISH AND INSTALL 225 LF 532.00 $7,200.00 $32.00 S7,2X1.CU 24-IN(N CASINGS 13X75 LF EA) 4. 24-INCH(RIVE SHOES 3 FA S1,210.00 $3,840.00 $1,000.00 $3,000.00 5. 30-I1171 SANITARY SEAL 3 FA S4,000.00 $12,000.00 t2,500.00 $1,500.09 6. RRNIM AN INSTALL ME 75 LF $449.10 S33,682.50 $529.00 $39,675.00 24-INCH WIL SCREENS AHD (3X25 LF EA) ACCESSORIES. INCLUDING PACKER AM NAIL BOTTO4 7. FURNISH AM INSTALL 15 LF MOO $525.00 $42.00 $63C.00 24-HUH RISER PIPE (3X5 LF EA) A. FURN19i, INSTALL AND 3 EA $1,500.00 $4,500.00 $1.800.00 $5,400.00 REMN1 TEST PUP FOR INDIVIDUAL WU PIWHG TEST 9. TEST PLW VELL FOR 150 H71RS $75.00 $11.250.00 $65.00 $9,750.00 INDIVI0ID1 YELL PIPING TEST 10. FURNISH, INSTALL. AM KAM LOP 9M $6.500.00 S6,500.00 S6,000,00 $6,000.00 THR1F TEST PLWS FOR RUIPLE WELL PLWING TEST 11. TEST PUP WILL FOR 10 KOS S150.00 $1,500.00 S21D.00 S2,000.OD HLTIPLE V41L PUPO6 TEST 12. r(VELU KNT AND OTl(-P ?25 ICIRS 590,00 S21,250.00 S60.00 S13,500.00 NHHRIZED WORK 13. DISPOSAL E( WSTF kWk FOR LIW 9)1 $4,500.0D $4.500.00 $3,600.00 S3,600.00 INOIVI01A1. WU PIWIN', TESTS "TOTAL $142.000.00 1146,747.50 S146,255.OD SALES TAX IA 8.1% S11,886.55 $11,846.66 IWA1 f. SIiH,6yI.U5 $156,101.Ei6 -Addition error of S.01 corrected. CAU_rD SY: CITY OF BENTOR ' YELLS 1-2-3 PR(OUCTICN FRI% SEPTEMBER 26. 19H6 - 2:30 PM BID TOHIEATION ENGINEER'S ESTIMATE BURT WELL DRILL, INC. ARMSTRONG DRILLING, INC I T94 ITEM DESCRIPTION DWITY LIMIT UNIT PRICE AMUlT LINT PRICE AASSMT UNIT PRICE AMOW 1. "ILIIATICN/DDOIL1UITION LL P SUM S5,000.00 $5,000.00 $15,000.00 f15,000.00 Sl,E PREPARATION ANT CLEW 2. FRILL FOR 24-INCH CASINGS 300 LF S120.00 SX.000.OI $110.00 S33,000.00 (3XIOD LF EA) 3. RRNISH AM MALL 225 LF S32.00 $7,200.00 $32.00 $7.200.00 24-1" CASINGS (3X75 LF FA) 4. 24-IN(}1 TPNE SHIES 3 EA S1,2R0.00 S3,840.00 $1,000.00 S3.000.00 S. 30-INCH SANITARY SEAL 3 EA S4,000.00 $12,000.00 $2,500.00 $7,500.00 6. M. SH AN i4STALL THREE 15 LF $449.10 $33,682.50 S529.00 $39,675.00 24-1NCH WELL SCREENS AM (3X25 LF EA) ACCESSORIES, 14MLDING PNXER NG RAIL ROTT(M 7. RRN194 AM INAALI 15 LF S35.00 S525.00 S42.00 $630.00 24-!N(N RISFR PIPE (3X5 LF EA) R. RRNISH, INSTALL AM 3 EA S1,500.00 $:,500.00 $1,800.00 $5,400.00 RPM TEST PUP FOR INDIVIDUAL YFLL PIMPING TEST 9. TEST PUP WLL FOR 150 HMS $75.00 $11.250.00 $65.00 S9,750.01 INl1YITXIAL WFILL PUMPING TFST 10. EYMNISH, INSTALL, AN) REMNE LUMP SUM S6,5M.00 S6,W_00 $6,000.00 S6,0I0.00 THREE TEST PIMPS F(R MLTIPLE WELL PIMPING TEA 11. TFST RMP WELL FOR 10 HOMS $150.0T S1.5(10.(Y) V00.00 $2.000.00 MLTIPLE 1ELL PMPING TEA 12. OEVEL(PMENT AM OTTER ?A YOLKS w.00 S20.250.0) $60.00 S13.500.01 4 MM17ED NPK 13. DISPOSAL (T WASTF WATER FOR LUP slim S4,5O A) S4.500.01 S3,601.(O S3,600.00 INDIVIDUAL YELL PUMPING TESTS SUBTOTAL S142,DX).(JDf* S146,747.R) $146,255.00 VIES TAX N R.1% SI I;nt6.55 $11,846.66 -Addition error of S.01 rr. rected. HK Z"_6 107'/,UL!-u4Zr. OiO 17XOWS .WF, Of// RECENED PUBLIC WORKS DEPT. CITY OF RENTON Octnber 1, 1g86 51125.16 (G8/251 Eoyineerung CITY OF RENTON 200 Mill Avenue South Renton, Washington 98055 Attn: Mr. Richard Houghton, nirector of Public Works Subject: Water Project No. 877 Wells Nos. 1-2-3 Production Well Drilling Recommendation of Award of Contract Dear Mr. Houghton: This letter is a recommendation of award for the Well nos. 1, 2, and 3 Production Well Drilling, Sealed bids were opened for the project on September 26, 1996. Armstrong Well Drilling, Inc., was the low bidder on the project, with a bid price of 5146.255.00 excluding Washington State Sales Tax. The enc neer's estimate for this Project is $142.000.00. We have worked with Armstrong Drilling in the past, and have found their work to he of the highest quality. Reco ndation We recommend that the City accept the bid of Armstrong Drilling, Inc, for the following: Subtotal E146,255.00 Sales Tax @P.I% 11.846.66 Total $158.101.06 I have enclosed for your information a copy of the bid tabulation. Please contact me if you have questions regarding this recommendation. Sincerely, RH2 `NCh#I):ERING, P� naniel R. Ervin, PF cc: Mr, Ron Olsen Mr, Bob Bergstrom 1410 Marke-Street,P.O.Box 1180,Kirkland,Washington 98033(206)827.6400 For Use By City C;....s Office only AGENDA ITEM RENTON CITY COUNCIL MEETING SUBMITTING Dept./Div./Bd./Comm. City Clerk For Agenda Of 10/6/86 Staff Contact Maxine E. Motor Meeting Date Name Agenda Status: SUBJECT: Bid JpeninR 9126/86 - Water Consent X Y rnd urtfw Well: Public Nearing Correspondence Ordinance/Resolution Old Business Exhibits: R^Oal Descr., Maps, Etc.)Attach New Business A. Bid 'EaDalatlon Sheet (2 bids) Study Session Other B.___Engineer's Tabulation _ C. Approval: Legal Dept. Yes_ No_ N/A COUNCIL ACTION RECOMMENDED: Refer to Finance Dept. Yes_ No N/A Utilities Committee Other Clearance JSCAL IMPACT: Experditure Required $ Mount S Appropriation- -dgeted Transfer Required $ SUMMARY (Background Information, prior action and effect of implementation) (Attach additional pages if necessary.) Engineer's Estimate: $142,000.00 PARTIES OF RECORD/INTERESTED CITIZENS TO BE CONTACTED: SUBMIT THIS COPY TO CITY CLERK BY NOUN ON THURSDAY WITH DOCUMENTATION. RENTON CITY COUNCIL October h, 1986 Regular Meeting Monday, 8:00 D.m. Municipal Building MINUTES Council Chambers CALL TO ORDER Mayor Barbara Y. Shinpoch led the Pledge of Allegiance to the pai and called the meeting of the Renton City Council to crde.. ROLL CALL OF COUNCIL NANCY L. MATHEWS, Council President; )O MEMBERS STREDICKEI KATHY A. KEOLKER, EARIHN W. REED, TRIMM. MOVED BY TRIMM, SECONDED CLYMERy K , THOMAS µD M COUNCIL MEMBER ROBERT J. HUGHES BE EXCUSEDR CARRIED. CITY STAFF IN AB$ENT ATTENDANCE BARBARA Y. SHINPOC!{ Attonmen R,MAXIN'E E. MOT O Mayor'DCit) C' KEl LOGG' Assistant City PRESS T. CLAUDE EVAN$, Polite APPROVAL OF Tony Davis, Daily Record Chronicle COUNCIL MINUTES MOVED BY MATHEWS. SECONDED BY APPROVE THE COUNCIL MINUTES OF SEPTEM ER 22, PRESENTED. CARRIED. COUNCIL SPECIAL 1986, AS PRESENTATION Tukwila Mayor Gary Van Dusen, re Seattle-King �ounry Economic Development Council (Eresenting the Seattle-Kin Economic Development introduced EDC President Penn and South Kin g County Council of the ECD, formed in } Peabody and g County Task Force, January of 1985, to Dan Flynn. He reviewed gook economy for cities and make the E achieve its second CD a true a much stronger local expended year 00 operation, the EDC public/private partnershi$540,000 to date, with has an eight person staff and haP In sector dues and Dubj sector contracts source Of mono cents per capita y split between private task force pica or at n 03. He invited all Council merrently contributing 10 meeting at poop on October 30 members to attend the next Penny Peabody reported that at t at Horpurs Res Hill, the ECD formed he request of ik courant in Kent. County land use a panel to identif g Count) Executive Tim permit process and recommend xutrng Problems with the King As a result, several changes have been mend improvements to the sysirm permit dills,on !mm downtown PruPosed including Renton and Bellevue, com Seattle to a more i relocation of the staff trainin Pute�izing the convenient site be, g, and hiring expedilors to permit process, providing aAtli[ional permits. It is anticip ate d that work with applicants in [racking when these changes art adopted omits will be issued in made it alive investments total he County. To date,more timely manner jobs. Ms. PeaboA B S36 million resulrin EDC°bents have Directors ado le y also advised that in September, 1986, gin 800 direr new for a fiv D Framework (or the Future', the Board of e-year economic drvelo Boats, objectives and coalition. tr was Doted that a vitleoetz action Plan for the strategies obtained by contactin pe providing Er I entire EDC AUDIENCE 8 Mr. Flynn. background can be COMMENT William Jens, 1136 S. 231rd Vi;tori- Hills FPUD and Sam Simone, 112 $tree[, Renton, George Post, 1122 oat-BS, Phase 11 Group, developer of the ''. Street, referenced re S Beth Place, one year exlension of the ict ria Hills Phase request by the Bennett D Project, for asix-month to soils and steep slopes it'construction is started pose fiat hazard from referred to the Administration on 9;22/86,1 N of unstable lapsed since original master 8 rain)•xason. (Request Plan a Not] that eight years have members to deny the re approval of the project, the further extensions he ld request due to understanding y urged Council Council President Mathew gamed followingg by residents that no until October , 3 advised that a report Council approval of 7/1a;B6. co" e. ro allow Council members thee[ on the matter would b spondence, including confidential lever from Portunity to review all held Mayor Shin the Ciq Attorney, for the record o2viewed a letter from Zoning Administrator Ro letter cited Provide c{atification for interested residents. higet Blaylo`k City Code settions pertaining to expiration of Plans and PUD ordinance abandonnenr cited Blaylock's wherein Council determined the six Council minutes p(�final for the Phase 11 project would month Period for substamial constr 86 begin that date; reported building • W- 877 October 13. )986 Rentonr' r r y _..__ 41 _ Utilities Committee Utilities Committee Chairman Clymer presented a report concurring in the Wells Production recommendation of the Public Works Department to accept the low bid of Drilling, W-877 Armstrong Drilling, Inc, in the amount of$158,101.65 fo. Wells 01, 02,and r3 production drilling (Water Projtct rW-877), Committee also recommended the Mawr and Cm Clerk oe authorized to execute contract documents. MOVED BY CLYMER, SECONDED BY STREDICKE, COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED. Utilities Committee Chairman Clymer indicated that, due to time restrictions At tonight's meeting, the matter of the Service Linen Water Latecomer Agreement would be held over until next week's meeting. Iransoortausn Transportation Conmitl�c Chairman Trimm resented a rep ort port recommending GreenCZMML=CRiver Council concur in the Green River Valley Transportation Action Plan project Green River Valley prioririn6017 listing which will be presented to the Puget Sound Council of Transportation Actior. Governments as Renton's priority list (Copy attached). MOVED BY TRIMM, Plan SECONDED BY CLYMER, COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED. LID 329 Letter of Transportation Committee Chairman Trimm presented a report re:omnsending Credit Requirtment Council concur in the recommendation of the Finance Director to remove the Letter of Credit requirement on the owners of the One Valley Place property as a condition to the budding of LID .329, upon the following conditions: 1. The prorerty owner will provide the City with different security' satisfactory to the Finance Department and City Attorney's office. 2. Vatley Medical Center must agree not to prepay the bonds for a pericd of time acceptable to the Finance Director MOVED BY TRIMM, SECONDED BY KEOLKER,COUNCIL CONCUR IN THr COMMITTEE REPORT. CARRIED. ORDINANCES AND RESOLUTIONS W_�^'�a�vs�a�ndeans M Ways and Means Committee Vice-Chairman Keolker presented a report commillec recommending the following ordinance for second and final reading. Ordinance *40:0 An ordinance was read changing the zoning classification of property located Valley Rezone north of 1-405, south of the Pacific Coast Railroad right-of-wa;, east of he Phase 11 Burlington Northern Railroad right-of-way, and east of Maple Avenue SW, if extended, and eliminating certain parcels therefrom(Area-wide Valley Rezone - Phase 11). MOVED BY KFOLKER, SECONDED BY TRIMM, COUNCIL ADOPT THE ORDINANCE AS READ. ROLL CALL: ALL AYES. CARRIED. Ways and Means Committee Vice-Chairman Keolker presented a report recommending the following resolution for adoption Resolution 0' 51 A resolution was read setting the public hearing date of I],10,'86 for Pan Abode Cedar Proposed vacation of public right-of-way at 1-405 and the Kennydale exit, Homes Street Pan Abode Cedar Homes (File rVAC-003-86). MOVED BY KEOLKEC, Vacation, SECONDED BY TRIMM,COUNCIL ADOPT THE RESOLUTION AS VAC-003-86 READ. CARRIED, Leadg;Parker Final Ways and Means Committee Vice-Chairmaq keolker presented a report Planned Unit recommending the matter of the Leady%Parker request fur time extension ar.d Development, phasing (File •FPUD-024-85) be referred to staff for a report back to a FPUD-024.85 joint meeting of the Nays and Means Committee and the Planning and Development Committee. MOVED BY KEOLKER, SECONDED BY TRIMM, COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED. Vouchers Ways and Means Committee Vice-Chairman Keolker presented a report recommending approval of vouchers 17669 through 18052 in the amount of $1,224,944.96, having received departmental certification that merchandise Ind'It services have been received or rendered. Vouchers !7683 and 17684 mach+ne voided. MOVED BY KEOLKER, SECONDED BY TRIMM, COUNCIL APPROVE THE VOUCHERS AS PRESENTED. CARRIED. Israeli Prime Minister ShUmm more the Palestinian issue,then we summit"a"powitive step We hope "We(Ate .Ss+ items met with Egyptian Resident will send Ihad):he ambassador," N will pave the way for a hrundet inolderior f Hreni Muharak Thursda the Milbank said ate in the region" make an e first eummil between th� na The embasrador was recalled ubanI said a major pan of To% hrael whd Lions m Gve years, and II , ram from Tel Aviv in 1982 to protest the Ling wnh Pens was d-voted to said."The s said his country will return its Israeli Invasion of Leturlon sold the the palemiNan problem 'We con the Jorda ambassador to Israel massacre of Palestinians In Relrut centrated on the Palestinian issue. meat put . After a IhTee-hour private meet by Israeli backed militiamen which n vital and important for the On what ing me-th Peres at the presidential "I think it is now time to send the peace Process!'he said negcti&I0 palace in the ancient Mediterernit artinudor There is no problem;' Muhenk was critical ofadecismn "Whenev resort of Alexardna,Milbank said, said Muberak,whedecllned ton ame by Yasser Arafat s At Fatah group, ward with "Everything is going the proper the new envoy the maivtream branch of the Pales complicated way"' An Israeli spokesman de Mubarak said a second round of tint Liberation Organization. to impose s In scribed the talks as 'extremely talks would be held Friday,to be freeve a 19" policy coordination We mum - friendiy" followed by a joint statement pact with Jordan In Alesa Thesuno t wasarranged in haste The roniWncement that Ecr pi will Under the agreement.Jordan and Mubarak after an Israeli FAlp an agreement return its ambassador to Israel must the PLO agreed to pursue a very fneM was signed 12hoursearlieron terms naled a breakthrough in Penis negotiated settlement w;th Israel on phere'with fin sending to Puernatwnal arbit-a quesuo"reach a meeting 4 minds' the basis of exchanging Israeli variety of men a dispute wet the Sinn border on thaw.ng the "cold peace" bat occupied territory for peace Jor- meeting he r on or Tabs wren the two commies dan,citing PLO intransigence,can Egyp and 1 "I stated one year ago that In Washington,the White Hoase celed the joint effort for A settle. slot Ltw Public Notice Public Notice Public Notice PU CITY OF RENTON of Simhwaar, 19g6 el'W I m m oa SECTION I EwswVChalaw!9.I2.ia, on"fimool CALL FOR BIDS Cw Crwna my RerMek% w W 15,17,tgandsad Tine llAdmnKhalrvel ICI MMamon WATER PRODUCTION WELLS Imm," 200 ENI A,, n S o, RRnlon. d OrOnblq No 1628•Mined"Cone of Iemla MC SA~sells moor be recwved w W 2 00 mammalian.u low now a.a pace Imo ns GWWW Qdnwe•a at M Car ,Rw cow daew anti PM Sepenaw 26 IMF. mo row ON IOWA" lstlladNed ColnmRea of M aM wool wgaayd a ow enwNy ID)mepar• Clerk's Olae well wit be epwad arms W" aawV.Dnmopawd awn SaalenaN SECTION I Ewawlg Sedan 6-'201 d .00W will.mo pub" d In most me Floor CalMvwme wit 1 eg6 Tay R IDapwaellaa)d 04n No eww ro snow 1100m.RAMa1 MFIegI&Al g,20o Ma The Ialvweg manna wa as danmM Im •lwaal Cede d (k.0 Ord of M City.. AvwM•SUAh 1)AMeraatem PN"FM owlu•a M Cnr d RlsMon'w himbey LEI Pwpw•, The work m as Wwmad water 20 21 Malpwntalrwann MCprlelNaaraA amll a knows law a cAMMw day+t kom MeaFNw WrMnArea sl Spore Need! iAtkan knows law wl. ESTAB oitM morel unds,Inn wwaa rhea slcllMA tall Al Arty dls hems alw was lAlweM LISHNIENT OF DEF'ARTMEYET AND IFI reel h NM•d Ip Cala DIRECTOR wr ! DUTIES OF DECTOR.Thera y bees, Deelala. "ON NHIry, and ds+elop 1111Arw a0 Pwlaa an vwyd In a1yM. "M aM H1a1rllatlad a'DApwarwe d AR rt I. `K wi UI Mtae 2A nr ven dwayr I- A CITY OF FENTON Fwlwe•'wlYet ahaabaV I Maupmmos w^dwdkm went Mas+yE Max.CMC won d"De OF•annrtlar•eaI (G)Sup, This Csy eamwi, we earn M repot City Cleo, MMkM;aaM DalaaYnwl a4t ennwm IHls wheat anew wbeh and in verve wry"o,all Ponliewda"Emil ddCnror.cN donewmpedMlvaaM awry Mlwrs n'alenaY. wawM•wwe Serrlalr'aer 12,Has RINI }udlenpbrwaAkel anysmoldkllledaRn pxdbyamr Apprc+ed par lPwlmalarrl. arvl Re Ina Deecsor Tay dwmlrww Adm wont Ws'•t^^w'n loom of Cconsist docaenere l most,to Is, Nr Such polars.may erJuda M SECTION M ,seemed Al Yee TO WMY,DepM1mw11 N CITY OF P NTON,WASlsINGTON Iommew, to col TnNe Ill it Pra Renton Mrmeyal Bwkwrg 1w a fair of ORDINANCE NO.4016 IAI Budge)and Acmurrp p etwe, I" e 112S M seen w pile i5 by all new AN ORDNANCE OF THE CITY OF 181"Cii D V-l.l notes of it pdalaae d etwyd RENTON. WASHINGTON REPEALING ICI Powsomrp DV,voe arlweldad u A Cmnrd c1ect, pI lad bond a low CERTAIN CHAPTERS OF TITLE 1(AD, IDI CAR Prorsle,,Drvaeon Secunn J. amaws d low S%)sasceM d Ma mow MNISTRATIVEI OF ORDNANCE NO TM Deaaw of M Daparnme! of CLERI(DMS wnouMdewnped muw e[:ArwwlyeaM 16"ENTITLED"CODE OF GENERAL Forster vom be r•lponsay lea most CLS 1w ! bed OPONANCES OF THE CITY OF RE- Pawmx all dwsvH And sass rove" Tre Cory% Fax Prances wad Non Ill AS THEN RELATE TO GET laloseon aulwa, a'nwla ntwe.o I'mal 00 wore, DmiV,e%rrnan Polled saw stony DATE aEFEPENCES TO CITY DE. most,Kane esaep mod a hie by 1rIA Mayor alga Alma aa E MMor CM Ck+H PART, 1 15 EMPLOYEESANOFL N wave Cray CwM m s tram lie 1e harm.in IAI Serve M Pdarsrrd m ow Daly neccld Cell w,i TKDNS Ass,AMENDING A PORTION OF me rasellw Allot Sep"'nloe 12 arms 19 IW Fili CHAPTER r OF TITLE in (DEPART IA)Cmalle 1r Amon NA"wad w bnaY will MENTSI OF ORDINANCE NO 16" work veladenW Mwem Aanlaue•a! n"TING TO OUTDATED DEPART IBi SuPwyix Rims MresPprlctYe l^rM 181 Ra r CITY Or RENTON MENTS WITHIN THE FINANCE DEPART nLlwePnwM or as evemes! AM low! Army esteem COMMITIFEOFTHEWHOL.EMFETNG MENTANDREPEALINGSECTION.T IN rreernoVwaeeererdiVenx,nwwe Mal pocreMryy ua RENTON CITY COUNCIL THE City COUNCIL OF THE C IV rN' b,exw era rra excAadRd ICI RPrMd n "Cr IS HERFBY GIVEN Mt Pew RENTON WASHINGTON, tame` .11OAN arms A$olvevU•povAed try Uw ant sae• axon, a1. or RpnkN Gn Cewece list M1led aw 25M day AS FOLLOWS rnhm a. ICIH IH IRCIH IDII IRIEUND RENTON AREA SERVICES UTILITIES COMMITTEE COMMITTEE REPORT October 13, 1986 WELLS 01, s2. AND sl. PRODUCTION DRILLING. WATER PROJECT • W-577 (Referred: 10-06-86) The Utilities Committee concurs in the recommendation of the Public Works Department t0 accept the low bid Of ARMSTRONG DRILLING, INC. in the @mount of $158,101.65. The Committee also recommends that the Mayor and City Clerk be authorized to execute the contract documents. E /��y/mer,/,Cha� ne� Jonn Reeds, Vice-Chairman Richard Stradicke, Member OF RF . • �fhv� THE CITY OF RENTON MUNICIPAL BUILDING 200 MILL AVE SO. RENTON,WASH 9a055 p rY BA.RBARA Y. SHINPOCH, MAYOR • MAXINE E.MOTOR, 9'O0 0� CITY CLERK 0 (206)235-2501 ��rED SEPtl� October 15, 1986 Hr. George Burt, President Burt Well Drilling, Inc. 19782 N.E. Lincoln Road Paulsbo, WA 90370 Re. Bid Award for Water Project No. 8)7 - Wells No. 1, 2 and 3 Production Drilling. Dear Mr. Burt: Al its regular meeting of October 13, 1986, the Renton City Council accepted the low bid submitted by Armstrong Drilling, Inc., in the amount of $158, 101.b5 for the above-referenced project. Thank you for your interest and your bid. Sincerely, CITY OF RENTON ..�r- Maxine E. Motor, CIVIC City Clerk cc: Project Engineerv- OF R4� o THE CITY OF RENTON MUNICIPAL BUILDING 200 MILL AVE SO. RENTON,WASH 96055 0 Ai BARBARA Y. SHINPOCH, MAYOR • MAXINE E.MOTOR. 0 ^ CITY CLERK 0 (206) 235-2501 P 9 TE0 SEP,E October 15, 1986 A1r, iohn E. Armstrong, President Armstrong Drillinq Inc. 10715 - 66th Avenue East Puyallup, WA 98373 Re: Bad Award for Water Project No. 877 - Wells No. 1, 2 and 3 Production Drilling. Dear Mr. Armstrong: At its regular meeting of October 13, 1986. the Rentcn City Council accepted your overall low bid on the above-referenced project in the amount of S158,101.65. To enable preparation of the contract documents, please submit an undated performance bond, insurance certificate and proof of City and State licenses to Project Engineer Ron Olsen, Enqineering Department (235-2631). If you require further istance in this matter, please feel free to contact either the Project Enylnw:r or Engineering Supervisor Bob Bergstrom at !;,e same extension. Sincerely, CITY OF RENTON Maxine E. Motor, CMC City Clerk cc: Project Enginaer- INTEROFFICE CORRESPONDENCE Public Works Director Date November 10, 1986 ATTENTION: T0; Ron Olsen, Utility Engineer FROM; Maxine E. Motor, City Clerk SUBJECT; GAG-064-86 - ARMSTROhG DRILLING, INC.-Production Wells 1, 2, and 3 - "ter Project OW-877 ______________________________________ ________________________________________ a We return herewith fully executed document(s), as above- captioned, copy of which we have retained for our official public records. Copies should be forwarded to and the other for your file. Pursuant to your memo of we return herewith a documenUe), as above-captioned, which have been signed by Citv Officials and need to be forwarded for further execution by We return herewith recorded document,$), as above-captioned, copy of which ve have retalne' for our official public records. Copies should be forwarded to appropriate parties and retained as necessary for your files. Please file a fully executed copy with the City Clerk's office for our permanent records when received. Thank you. MEM;4b/ gn cc; Enclosures (5) Shordlee Tree Service, 1 fts 11460 WASIi1NGTON TREE EX i DA.ECOWL TED� _ 20057 BaYYen Rd. N.E. V O J kWAX T _ _. Seatrie,Writ blaf. n"155 7777 ((tom (206)]62-"40 uuxcEORPAID 7 / sr ,�-- ADDRE55_ J rl C I , /.. DATE___ _. 'ADDITIONAL VJM AND ANCIIATT (rl}OItE _ r DATE CALLED BDIBK:NAI$ RI.LM ADDRESS a"BY.. 0~ae Atd,ursell Dasraee+aw All Quotes. BI&wed Eatimates good for 30 days. a All work paid upon completion. unless prior arrangements are made. a 1 hereby authorize the above work to be performed. a I agree to pay the cunit t poke set forth above. a 1 agree m pay 1% per month service charge on all past due accounts. e If payment for wrvicv it not Tererved.Washington Tree Experts has the right to file a lien ag..itnn the property a I agree that in the event it becomes necessary for Washington Tree Falwrts to institute suit to enforce any right. hereunder, the successful patty shall be entitled to court cults and a reasonable atiorney's fee. a Stump kills are not guaranteed. This is a legally binding contract. Read all proNalona before Bolitg .AWNER _ __... kSTOIATOR zu'*jj ✓. // DALE e_ __19 DATE '� 19-4 / CUSTOMER COPY AMMION COMFZRIWR PROJECT: .a� r'..� 4t-Z✓.V PGt1CLG dRSE: _ //-/�- �G ADDRESS/LOUTIOM: PROJECT P ��' - ' PERMIT 1 WORK ORDER ! �" G ffffffffff•fffff fffff••fffffufff•fff»ffffffffffffufff•fffnfffffffffffuffffffff THOSE IN AISENDANCE MANZ COMPANY PRONE Y Cak+dations #AdRYOWWSE* Page job H, -A2.6 -- - P.o/err. lw SC/e.n�R�� /'�WQllspp.��_��� �^��. oar.(ak Wafans h__.doc._1-1L� Maaa DY x �— QP+wP,YA.►��OrB a..nIL f1},r � - O Bw .P,y wan ,;r1r sq Yv W /O- 'O. Y \ V y - Io o ° ,�cleyl�nd great u. z7. � = ero 0 � � d...k broa++ll�Gr tied e n' I3YO�N�r Sow(( J:I G�VEVGOMC 0 Yr` I hA S� - Brown trees fl y S1Np IP^v;e- // K- Fn.r.kCfI3L♦•rilylo�,t � a-j'„ll Am f4 {a 40 n a 69 •�-ec-S cwr�a.- yo _ IO'0 80J _ to _' (ertr or�.7' v Fast bl�k a0' cebbly GC�C �' qI -- 9ANP SrUNF 96 W/ bail ►w'wIo Scrg,e.,.� ¢o �,,, LY " 'fe(Pscojric s�o.l..IPss See/ 0--- - 1 City of Renton Engineering Depa nt • 235-2631 w PRECONSTRUCTION CONFERENCE DATE: Friday, November 14, 1986 TIME: 10:00 A.M. PLACE: 4th Floor Conference Room DEVELOPER / CONTRACTOR OR SUBCONTRACTOR / NAME OF PROJECT Name: Armstr�og Well Drillino John Ar-strong Phone: 845-1672 Project: Well', No. 1 , 2, A 3 Production A Well Drilling Liberty Park Proj. N: NAME OF APPOINTED 13SPECTOR RR2 Engineering Please check departments to be notified and specify person to attend. Design/Utility Eno. x Fire Dept. x__ Police Dept. x Street Dept. x Traffic Dept. x Sewer Maintenance x Water Shop Park Dept. Building Dept. Other —_—_---__ -------.� Outside Depts. Department of Transportation x Pacific N.W. Bell Company x Puget Sound Power A Light Company Group N rable TV Company A Washington Natural Gas Company _� Other ------------. - 11/14/86 1125.11 (IAV36) CITY OF RENTON WATFR PROJECT N0, W-877 WELL NOS. 1, 2, AND 3 PRODUCTION WELL DRILLING PRECONSTRUCTION CONFERENCE - FRIDAY, NOVFMRFR 14, 1986 1. General Issues A. Interferring Utilities and Coordination 1. Power 2, Telemetry Cable 3. Water 4, Sewer �L::•�<^�- 5. Drain Lines 6, Other Utilities 7, Park Department a. Parking Area Storage h, Site Preparation c. Other 0 R. Project Schedule -e, ,k. It utt •� i— C. Completion Time/Liquidated Damages D. Site Access F. Working Hairs F. Contractor Joh Facilities G. Pay Estimates H. Insurance Certificate 1. Affirmative Acti no Plan J. Inspection/Contract Administration K. Change Orders IT. Technical Issues A. Well Locations - Staking B. Tree Interference/Removal C. Waste iterial/Wastewater D, Materials E. Reports/Logs/Samples F. Disinfection G. Existing Wells H. Testinq/Samples (23G/161 CITY OF RENTON WATER PROJECT W-977 WELL NOS, 1, 2, AND 3 PRODUCTION WFLL DRILLING MINUTES OF PRE-CONSTRUCTION CONFFRENCF HELD FRIDAY, NOVEMBER 14, 1986 Persons and Departments Notified: See attached Engineerinq Dept. Pre-Construction Conference Form Parties In Attendance: Sae attached sign-in form Sumna ry of Items Discussed: 1. General Issues A. Interferring utilities and Coordination Utilities required to be marked were discussed including the power feed to Well Nos. 1, 2, and 3, tolemetry cable, and existing ab,mdoned sewer. Contractor will call to obtain marking of power and other outside agency utilities that may exist, the City will mark its utilities including its power cables located within the drillino site. Contractor will locate and remove existing son-Lary sewer that has been abandoned. B-C. Project schedule and completion time. The time required for completion of the job was reviewed with the contractor. The Contract provides for completion within seventy calendar days of Notice to Proceed. The contractor had not prepared a project schedule for review at. the Pre-Construction Conference, However, the Schedule was discussed in some depth. The contractor identified a time requirement of approximately five days for the drilling of each well. He pointed out that if each well was to he drilled, developed, and test pumped prior to the drilling of the next well , he would be unable to perform work on the contract white the screen for each well was being ordered. After some considerable discussion, the following schedule for performance of the work was agreed to as the most efficient and expedient: 1. Drill Well No. 1 2. Evaluate and order screen for Well No. I and order identical screen for Well No. 2 3, While screens are being evaluated and ordered, drill Well No. 2. Pre-Construction Minutes November la, 1986 Page 2 a, Evaluate and order screen for Well No. 3 hased on material in Well No. 2. S. Simultaneously with evaluating material in Well No. 2 and ordering screen for Well No. 3, set screen in Well No. 2, develop well and test pump, 6. If equipment is available concurrent with the screening and development of Well Na. 2, set screen in Well No. 1, develop Well No. 1. If equipment is not available, perform this work after completion of Welt No. 2. 7, Drill , set screen, develop, and test pump Well No. 3, R. Perform such additional , multiple well testing as determined necessary by the City in accordance with the bid items as set forth in the Contract. 9. Complete cleanup and restoration of the site and all required contract paperwork, reports. samples, and submittals. Critical to this schedule is the time required for obtaining the screens. The contractor was requested to research with the screen manufacturer the time for fabrication and the most efficient means of transporting the screens to the job site. If additional costs for transportation are required to meet the performance of the schedule, the Citv mill consider a change order for this purpose. The contractor indicated that he would start in approximately three weeks. Work would begin on either Monday, December I or Monday, December 8. The contractor to notify the City and RN2 Fngineering a minimum of two full working days in advance of this start. D. Site Access and Preparation The City pointed out that access needs to he maintained to existing Wells 1 and 2 for the City maintenance crew. Also, the City has awarded a contract for fluoridation of its water supply and the contractor will require access to Wells 1 and 2 and will perform saw site work which could interfere with the well drilling contract. The contractor was reouested to coordinate with the fluoridation contractor to avoid conflicts in the scheduling of work. The contractor proposed to use a waste pit located central to the three wells an an adjacent smaller overflow pit from which he would pump excess water to the sanitary sewer system. Fencing of the site was discussed, and it was concluded that the contractor should fully fence his working area including removable sections to allow access during working hours. These sections will be replaced at the conclusion of each day's work and at week's end, The City pointed out it was important to restrict access to the work site and the contractor's equipment as well as to contain the project working area within a confined space. Pre-Construction Minu"es November la, 1986 Page 3 F. Working Hours The contractor advised that at this time of the year the hours of daylight limit his working hours, and that working hours would probably he confined to a maximum of 7:30 AM to 5:DD PM, The City had no objection to these hours. F. Contractor Job Facilities The contractor will provide a dry shack, and it was agreed that electrical heaters would be used in order to limit any potential contamination to the aquifer. Power is available at Wells 1 and 2 for the contractor's use. The contractor indicated his equipment will consist of the drill rig and service truck which will he located within the site. He also indicated that a minimum amount of materials would he maintained on site and probably only those necessary for the Current day's work. In any case, all materials and equipment left on site would he confined within the fenced area. G. Pay Estimates The City provided 'he contractor with the schedule for payments by the City, and RH2 Engineering indicated that the City would process Payments once monthly and that the request for payment should be in the offices of RH2 Engineering two Wednesdays before the payment approval date of the City Council . H. Contract Documents The contract documents suhmitted by the contractor and executed by the City were reviewed, and all documents required including the Certificate of Insurance and Affirmative Action Compliance were in order. A copy of the executed contract documents were provided to the contractor, J. Inspection/Contract Ad rinistration The contractor was advised that the contract administration will be handled by RH2 Fngineering with Ron Reinke being project engineer responsible. Ail contract administration decisions including scheduling and coordinating of inspection personnel, testing, and contract compliance will be handled through RH2 Engineering, Hart Crowser, and Associates, subconsultant to RH2 Engineering, will be responsible for the hydro-geolonical evaluation of the (trilling and recommendations in regard to the screening, development. and testing of the completed wells. Lor: Herman of Hart Crowser and Associates will be the party responsible for this effort. Personnel of RH2 Engineering will also participate in the observation and inspection; these persons will inclode Mark Pre-Construction Minutes November 14. 1986 Page 4 Semrau and Ron Heinke. K. Change Orders The City's procedure for change orders was reviewed with the contractor. Any work performed for which payment in addition to that provided by the contract is required shall be agreed to verbally by the responsible City officials In advance of its performance. Written change orders will be issued at the conclusion of the project for the extra work performed and payment made as part of the final compensation of the contract. II. Technical Issues, Well Locations, Staking A. The proposed well locations were reviewed based on the preliminary configuration of the layout of the pump house and mechanical piping. The locations will be finalized and accurately staked in the field using rebar and appropriate reference stakes. The contractor was advised that it is critical that the wells be drilled as closely as possible to the staked location. Attached to this memorandum is a copy of the site plan showing the well locations and identifying them by number, R. Tree Interference and Removal The City advised that the maple tree located within the drilling site will be removed by others. The interference of the tree roots was discussed at length, and it was concluded that the contractor should excavate by hackhoe and remove any tree roots that may interfere with the sanitary seal or the drilling operation prior to proceeding to drill each well. This method was agreed to hn preferable to removing the tree stump and roots which would unduly disturb the drilling site. C. Waste Material/Wastewater The contractor's plan for handling of the wastewater was discussed, it was pointed out to the contractor that them wi l l pr&ably he a substantial amount of material that the contractor must remove from the site, and he indicated that he would have trucks available to perform this work. D. Materials The contractor was reminded of the contract technical specifications requiring certification of materials as meeting the specification requirements. The well drill shoe was also discussed. The contractor explained the type of drive shop that he would have fabricated to use in each well. Pre-Construction Minutes November 14, 1986 Page 5 E. Contract Specifications in regard to Reports, logs, and Samples These were discussed including the contract requirement for the compiling of a model of the well strata. The need for video taped inspection of the wells after completion was also addressed. F. Disinfection The contractor was reminded of the contract provisions requiring the disinfection of all equipment and materials used in the drilling and devlopment of the well . RH2 Engineering requested notification in advance of the well rig disinfection in order that they could verify that this had been accomplished. RH2 engineering expressed its concern about contamination of groundwater by transport of bacteria between sites. G. Existing Wells The City proposes to not operate Wells 1 or 2 while the contractor is performing drill work or development work within the aquifer. However, if the City encounters a problem; it may be necessary to use this well and the contractor was advised that he would have to cooperate to meet the City's needs in this respect. It was concluded that the activities could be coordinated to the best interests of both the City and the contractor. H. Testing/samples Pump testing was discussed at some length. It was concluded that the full requirements of the pump testing program needed will not he fully known until the initial well is pump tested. it is the intent that the fir>t well will be given a complete step test and 24-hour pump test. The testing of subsequent wells may be reduced in scope. Hart Crowser pointed out the desirability of being able to monitor one of the new wells while the first well was being pump tested. It was, therefore, agreed that the schedule previously :iscussed which would allow for pump testing Well 2 first would be the ideal condition, particularly if water levels In Well 1 could be observed concurrently with this testing. Screening of Well 1 would allow this, but if not, it may also he possible to observe water levels by not closing off the aquifer to the drilled casing. WATER AMU SEWER PR0.IMTS PRESENTLY UNDER CONSTRUCTION IN n THE CITY OF RENTON WATER PROJECT /!tip 7 SEWER PROJECT /T A DATE - t _ �•(r WATER PROJECT TITLE __, ,.((y J, ,2 7< .i i 1•! -�L' tt t +t t ' PROJECT LOCA11644 UCLA -------------- DEVELOPER LtTY pF Rcwr" ADDRESS .'?pp t1RL AX- S vA. %elJ PHONE �j� •, 3� EMERGENCY nn•• PHONE Icy------------------ Sll:/) 7Zg^ 190E CONTRACTOR /'l+eri�=�_�M I / ' ADDRESS PIIONE EMERGENCY PHONE FOREMAN PHONE EMERGENCY PHONE City of Renton Inspector,.` Other Insncrt nr `� AUTHORIZATION OF SPECIAL BILLING f DATE: PROJECT NAME: -f�Go- /, ,iL ✓ ,� �/,Lrrr r. n.b� Y /a�j ([� � ta llr.. PROJECT NUMBER: W- �7tl(J WORK ORDER NO.: 5 O It is the intent of this letter to authorize the City of Renton to bill the undersigned for all costs incurred relative to the above-referenced project, by the City of Renton for the following work: BILLING TOBE�SEN' TO: Name: Address mar r City State �Z.G.PY373 Atten I� Phone No.: �p4t"r�q•� 4hAuLoed r/Deed oper, Contractor or riz Agentt AUTHORIZATION OF SPECIAL BILLING y]�� DATE PROJECT NAME: �r�.ua /. ';L 1K PROJECT NUNBER: w_ WORK ORDER NO.: S C` It is the intent of this letter to authorize the City of Renton to bill the undersigned for all costs incurred relative to the above-referenced project, by the City of "enton for the following work: BILLING TO BE SENT TO: /t Name: 4r,+.e7,-- Address /n.yzS I< A'� City states4a..:.C.2ml Atten� — Phone No.: 2?4S- &23, OoWriDeveloper. Contractor or Au horized Agent WATER AM SF.WFR PROJECTS PRESENTLY UNDER CONSTRUCTION IN THE CITY OF RENTON WATER PROJECT 114/ P1 SERER PROJECT 1` DATEL/!_/'`-7 J�7 WATER PROJECT TITLE i PROJECT LOCATION DEVELOPER LRY OF �NTdN ADDRESS ,'ADO MA4. Ail: . S (44;b- ,,,X '403J PHONE aYj' EMERGENCY PHONE RAY CONTRACTOR_:!f ' ADDRESS ,.t-- PHONE EMERGENCY PHONE FOREMAN PHONE EMERGENCY PHONE City of Renton Insnectoc Other inspector --I of 1q • • �•f ° PUBLIC WORKS DEPARTMENT DESIGN/UTILITY ENGINEERING 41 235-2631 o MUNICIPAL BUILDING 200MILLAVE.SO. RENTON,WASH.98055 O,P$A,rEO SEeT L�q�? BARBARA Y. SHINPOCH MAYOR MEMORANDUM DATE: November 20, 1986 TO: Richard C. Houghton, Public Works Director Police Department, Traffic Division Lee Wheeler, fire Department Jack Crumley, Street Department Ray Sled, Water Department John Stein, Street Department Gary Morrison, Sewer Department John Ralston, Traffic Engineering Gary Norris, Traffic Engineering Bob Bergstrom, Utility/Design Engineering Ron Nelson, Building Department Don Monaghan, Design Engineering rROII: Ronald L. Olsen, Utility Engineering SUBJECT: Project Under Construction PROJECT: Water Project 1Y-877 Yells 1, 2, and 3 Production 6 Well Drilling Liberty Park DEVELOPER: City of Renton 200 Mill Avenue South 235-2631 Renton, WA 98055 Emergency No. 235-1902 CONTRACTOR: Armstrong Drilling Inc. 10715-66th Avenue East Puyallup, WA 895-1672 Emergency No. 847-6346 INSPECTOR: R142 Engineering P.O. Box 1180 Kirkland, WA 98033 453-0241 S1125.11 (G23/1. Engineering November 21. 1986 Mr. Ron Olsen NOV 2 4 lcx CITY OF RENTON 200 Mill Avenue South Renton, WA RRO55 Subject: Wells 1, 2, and 3 Well Screen Delivery Dear Ron: )aul 0uerna of Johnson Well Screen fmpany called at the request of John Armstrong to advise me of the methods for quick delivery of the initial screens needed in the drilling and development of Wells 1, 2, and 3. Apparently, the screens of the size needed for Wells 1. 2, and 3 would be manufactured by Johnson Well Screen Company in Minnesota. Two methods of quick delivery from Minnesota are available: 1. Same day air freight. The estimated cost is $6,500 for one screen, I presume by "same day air freight", they mean that the screen will be delivered from Minnesota to Seattle in the same 24 hour period. Truck delivery of the screen after arrival in Seattle will likely take another day, 2. Dedicated auto freight. The estimated cost for the dedicated transport of two screens from Minneapolis to Seattle is $1.800. Dedicated auto freight will require approximately twn days to reach Seattle from Mirnesota. We believe that this method will meet the City's scheduling requirements at an economical cost. We recommend the City con,ider authorizing John Armstrong to nsp this method of shipment of the initial two well screens, and agree to a contract change order for the increased freight cost. Mr. Ouerna indicated it will take two days to fabricate the screens. He also indicated that sore of the paperwork requir-d for the order could be processed ahead of time to avoid any delay in the fabrication schedule. Assuming two days to determine the screen size required, two days for fabrication and two or three days for shippping, it appears the screens can he on-site within six or seven days on completion of drilling of the initial well . This schedule will allow the drilling of the second well to be completed before arrival of the screens. Roth wells could he screened and developed simultaneously, giving us the opportunity to moritor one well while we test pump the other, 1410 Market Street.P.O.Box 1180.Kit kiand.Washington 98033(206)827-6400 Mr. Ron Olsen November 21, :986 • Page <" Subject to your approval , we will proceed on the above basis end work with Joh Armstrong and Hart-Crowser to assure that we maintain this schedule as closely as possible. There is some risk in ordering two screens simultaneously before the second well is drilled, but I believe the risk is small in comparison to the time saving accomplished. Very truly yours, RH2 ENGINEFRING, P.S. 1. ' Ronald, P. Heinke, P.E. ca Mr. John Armstrong, Armstrong Drilling Company Ms. Lori Herman, Hart-frowser Associates OF i z PUBLIC WORKS DEPARTMENT DESIGN/UTILITY ENGINEERING • 235-2631 o MUNICIPAI BUILDING 200MILLAVE.SO. RENTON.WASH.98055 9q 0' O 4Q 99TE0 SEPTE� BARBARA Y. SHINPOCH December 16, 1986 MAYOR Mr. Bob Cormick Title Operations Manage, TicOR TITLE INS. CO. 1008 Western Ave. Suite 8200 Seattle, W.. 98104-1032 Re: Title Policy establishing owner through Right-of-Way Search Legal Description: TAX LOT 12; STR172305 Dear Mr. Cormick: In the near future the City will be installing a new waterline east of Liberty Park. In order to obtain crossing rights of the above referenced subject property for the water line, we need to establish true ownership of the parcel. If your company will accept +pis request please order the search and policy and bill the City of Renton under P.O. #09212. If you have any questions, or if you cannot accept this order, please call me et 235-2631. Very truly yours,,s / Ronald L. Olsen ya Utility Engineering AH:jw OF Rp • PUBLIC WORKS DEPARTMENT �py � DESIGr U';L!7v EN G!NE_R'N G 0 235-2631 MUNICIPAL 8WLOING 200MLLAVE.SO. RENTON.WASH.99 Mo% m G P 9q rEn SEPtE BARHARA Y. SHINPOCH MAYOR Fehruary 12, 19R7 S1125,11 (18G/371 ARMSTRONG GRILLING, INr, 10715 66th Avenue Fast Puyallup. Washington 98371 Subject: Notice to Proceed Well Nos. 1, 2, 3 Production well Drillino Gentlemen: Effective March 2, 1987, this letter is your official Notice to Proceed with the work under the above subject contract for the drilling, logging, testing, and development of three 24-inch diameter water production wells. Your contract with the City of Renton provides under "Call For Bids" that the work under this contract shall he completed within 70 days from the date of the Notice to Proceed. Therefore, the date of coIpletion of all work established in accordance with the above provision is May 11, 1987. I f you have any questions or comments regarding this Notice or the establishment of the late of completion, please advise. Very truly yours, CITY OF RENTON 6".3�W- Robert Rergstrim Engineering Supervisor cc: RHP Engl neering, P.S. Ron, �cstoMhy �' 9df/,�7�ivrlu/ 7'oP�y Yic�n��y VON 1. Z,►3 i • I N 10 Jj i e „ 1 v � 4 F e" r � t z� ti° db� r , `a8 c�oa b io[ .M�v\ _Ne Jac zoom "BB£ µp i drC i ' ORIGINAL DATE: 04/15/87 REVISION I DATE: TO: Accounts Payable FROM: Public Works SUBJECT: Constriction Contract CAD 1 064-86 Project Mamie: _W-877, Well Nos. 1, 2, and 3 Production Well Drilling Prime Contractor: Armstrong Drilling, Inc. DATE RECEIVED DATE RECEIVED PRIMR CONTRACTOR a SUBCONTRACTORS INTENT TO PAY APPIDAVIT OP PREVAILING WAGES WADES PAID Armstrong Drilling, Inc. 03/24/87 9-21_87 Signed Project Engineer ce: Project File Form: 2/15/85 t�. ' • • ORIGINAL 51125.11 G25/49 N E N 0 R A N 0 U N DATE: May 1, 1997 FROM: Pon Heinke, RH2 Engineering ( RECEIVED TO: (1) City of Renton Ron Olsen MAY 4 1987 Ray Sled EPI (Y) Hart Crowser and Associates EN1r,Of RE TON CIi1 Of Ap10N Russ Prior (3) Armstrong Drilling Company John Armstrong (4) R42 Engineering staff Mark Semrau pan Ervin SUBJECT: Status and Schedule for Completion of Drilling and pevelopaent Wells 1, 2• and 3 A. STATUS As of Friday morning, May 1, 1987, the Contractor had completed the drill- ing, screen placement, development, and test pumping of Well No, 1, and the drilling, screen placement, and initial development of Well No. 2, At the time of visitation to the job site, the Contractor was preparing to place the surface seal for Well No, 2. The work remaining to be completed on Well No. 2 includes the installation of the test pump. step test, and 24 hours continuous test, and final completion of well development using the test pump. No work has been accomplished on Well vo. 1. R. SCHEDULE The recent perind of dry and warm weather has accentuated the need to develop a schedule for the completion of the work which allows for the City's use of existing Wells 1 and 2 within 24 hours of notice to the Contractor, 1410 Market Street,P.O.Box 1180,Kirkland,Washington 98033(206)827.6400 i Memorandum/Status* Schedule/Wells 1. 2, aril 3 . May 1, 1987 Page ? Ray Sled advised that the pump testing and surge development using the test pump produced substantial'y more turbidity at Wells 1 and 2 than the actual drilling of new Wells 1 and 2. However, he indicated that a time period of 24 hours was sufficient to clear the turbidity from the existing wells prior to discharge to the system. Rased on these considerations, the following schedule was agreed upon between John Armstrong, Jr., of Armstrong Drilling Company, and Ron Heinke of RH2 Engineering: 1. Contractor is currrently in the process of installing the surface seal for Well No, 2, which should he completed on May 1st. 2, The Contractor indicated he will work this weekend, Saturday, May 2nd, and Sunday, May 3rd. During the weekend, he will set the test pump in Well No, 2 and do initial pumping to further develop the well if time allowed. Once the test pump was installed, the drill rig will be moved over onto Well 3 in p,-eparation to drill Well 3. 3. On Monday, a decision t0 proceed with the test pumping of Well 2 will he made by RH2 Engineering and the City Staff, based on the weather forecast for the remainder of the week. If it appears that the weather is going to became dry and warmer by mid-week, the test pumping will be delayed unt;l the weather becomes wetter and cloudy. Approximately three days will be required for test pumping, including allowances for two separate step tests, and a 24 hour continuous test. if test pumping of Well No. 2 is delayed on Monday. May 4th, the Contractor will proceed with drilling of Well No, 3, which is expected to take five days to complete. The Contractor may also initiate drilling of Well 3 concurrent with the test pumping of Well 2 on Monday, May 4th, if he has suffi- cient personnel to accomplish both activities. The schedule for work beyond the week of May 4th through May Rth will be addressed during that week. Again, it is agreed that the Contractor must be prepared to suspend all operations which would impact the water quality during the use of existinq Wells 1 and 2 upon 24 hours' notice. It is also my current understanding that the Renton Park Department desires that the f.ontractor he permanently off the site at the time the swimming pool at Liberty Pare is open. We will confirm this requirement within the next week. Rased on the constraints of the City's requirement to be able to use existing Wells I and 2 if the weather creates water demands that make it necessary and the Park Department's desire to have the Contractor nff the site by approximately the end of the month, it may became necessary to suspend work on the drilling contract prior to the completion of drilling, development, and test pumping of all three wells, if this becomes necess- ary, we hope to have completed the drilling, scream installation and initial development of Well 3, the installation of the screen and the initial development prior to the Contractor moving off the site for an extended period of time, N_ I CONTRACTOR/SOBCONTRACTOR Y r REPORTING PERIOD MONTHLY MANPOWER UTILIZATION REPORT ®eti �'� .} Month: , Year: To be submitted to the City's Project Goals and Timetables as coam<itted Engineer during the 1st veer, of following �tN� in Contractor's Affirmative month while contract is in progress. Prime Action Plan ! Contractor is responsible for obtaining and r City's Plan _ 9.1 ! submittingall Subcontractor Re or Reports. y� To: (aeOW and loeatlm of CE*ltance Afeac, Dept,) From: (Mane and 1 tim of eeetraetar) City of Renton Armstrong Drilling, Inc. 200 Mill Ave. South 10715 66th .Ave. East Rento WA 98035 Pu allu NA 1- 311 This recott Ss required y Executive Order 11246, Section 03. ailure to report can result in sanctions which include suspension, termination, cancellations or debarment of contract 2. 1. c. % 5. b. miro. Total .otal Work Hours of Employment (See footnote) rlty number =bar of of C.anel e. '. • o. . u/6 0.^ mlrorit Ee;by. flu• HIs- ner. Asian/ .^aL l total ComDary'a Name (I.D.1 -ra:e Ciona Tota Pla_k Dan tc nd Lan M1eL1e Ppie v T Employ' eea Ie len l Armstron5 Drilling C < A, Tr A Tr A Tr A� 7'r C A� IT C A Tr r T r IT Tr Tr Ccnparq Cfficial'e lgnat'Fe and 71LIe Date Signed y. Te ephone Lumber. 1 (include Area Cocei Rev. 1 /77 (-Males 6 Females, --Minorities a Non-minorities) P.1 t,, o; 7180 (Submittal Requirements a City's Coals/Timetables) ---- -- CONTRACTOR/SUBCONTRACTOR Y 1 GR. REPORTING PERIOD MONTHLY MANPOWER UTILIZATION REPORT V ,} Month: 5/2i87-6/12, Year: 1987 To be submitted to the City's Project �"� Goals and Timetables as Committed Engineer during the 1st week of fol loving �' Q in Contractor's Affirmative nth while contract is in progress. Prime Action Plan $ Contractor is responsible for obtaining and submitting all Subcontractor Reports. or per City's Plan 9.1 $ To: (seem and 3ncetlrn of CoWitence yaary apt.) From: (Verne and location of contractor) City of Renton ARMSTRONG DRILLING, INC. 2;1D Mill Ave. South 10715 66th Ave. East Fenton, WA 98055 Puyallup, WA 98373 This report is required by Executive Order 11246. Section 203. Failure to report can result in sanctions which include suspension, termination, cancellations or debarment of contract. 3. 2. 3. V. % 5. 6. m Sno• Total Total Vo-k Hours of Employment (see footnote) rlty muof uofar of of C laea� a• c. a .. Tr w/n of mi.o"tj Empby flea- r His er. Asian/ .etal total Col;arwla %are (LD.) Tre ie tfona .o to Black pa,.it ndlan A<ffie ?e_ wT Eee.loy- tea talani ,ale Armstrong Drilling, C A Tr C A Tr A Tr A 7' tA tr V — I A T IT C Tr Tr Cr.vary C cla l'a lar , a1 ,ature e b. :ate` S neo la T^lep.^^.one t.umbtr (Inolude Area Code) , (206)845-1672 Rev. 11/77 (*Males 6 Females, **Minorities i Nor.-minorities) Page of 7/8C (Submittal Requirements L City's Goals/Timetables) — Date: Project - f.AG No. This Is to certify that the prevailing wages have been paid to our employees and our subcontractors' employees for the month of in accordance with the Intents to Pay Prevai ng Wage filed with the Wash.ngton State Department of Labor 6 Industries. ARMSTRONG DRILLING. INC. Company Name By l John E.-Armstrong TWO President CONTRACTOR/SUBCONTRACTOR tIc Y r REPORTING PERIOD MONTHLY MANPOWER UTILIZATION REPORT J�1 �''E�Y •y Month: Year:.. To be-submitted to the City's Project � � Goals and Timetables as committed dngineer during the 1st week of following in Contractor's Affirmative month while contract is in progress. Prime N� Action Plan % Contractor is responsible for obtaining and submitting all Subcontractor Reports, or per City's Plan 9.1 % To: (Name and location of Cmmpirance Apacy Dept.) From:, ;Name end location of contractor) This report is required y Executive Order 11246, Section 203 Failure to report can result in sanctions which include suspension, termination, cancellations or debarment of contract. 2. 1. 4, % 5. 0. mino- Total rotal Work Hours of Employment (See footnote) rlty number iumber C la sal of of C. _ /� e. • N"1 of minority Er.ploy. Hie- Aa ian/ :o tal C ocp arp"s `:ems (L p.) Trade tica-tione Tota Plaek ante n er, total dian Pee L'S< net Employ- sea P re]anJ .a.e x/n sea C A Tr A _ Tr A Tr C A Tr 7- AV Tr C A Tr A T AD Tr Ap Tr C AD Tr AD Tz 7. Cerpany Cf Llcla l'a Signature anatu a b. .to 5 ned 1B g Telephone 6amb er (Include Area Code? Rev. 11/77 (*Males 6 Females, --minorities 6 Non-minorities) Page of 7/80 (Submittal Requirements 6 City's Goals/Timetables) — Date: 6-18-87 ProjeCt Renton-Production Well CAC No. 064-86 Drilling, This Is to certify that the prevailing wages have been paid to our employees and our subcontractors$ employees for the month of 5/2j87-6/12/87 In accordance with the Intents to Pa,, Preve nq age lied with the Washington State Department of Labor t Industries. ARMSTRONG DRILLING INC. Company Name k By L V, _y Tltla_ PREEIDENT ZJJ DATE July 1r'l987 TO: FINANCE DIRECTOR FROM: PUBLIC WORKS DIRECTOR SUBJECT: PROGRESS PAYMENT CONTRACTOR: ARMSTRONG DRILLING ESTIMATE I I _ CONTRACT M CAG 064-96 PROJECT: Wells 1-2-3 Drilling 1. CONTRACTOR EARNINGS THIS ESTIMATv S 106,792.00 2. SALES TAX @ 8,650.15 3. TOTAL CONTRACT AMOUNT THIS ESTIMATE S 115,442.15 4. EARNINGS PREVIOUSLY PAID CONTRACTOR S -0- 5. EARNINGS DUE CONTRACTOR THIS ESTIMATE S 101,452.40 6. ` (95% x Line 1) SUBTOTAL - CONTRACTOR PAYMENTS S 1011,452.40 7. RETAINAGE ON PREVIOUS EARNINGS S 0 B. • RETAINAGE ON EARNINGS THIS ESTIMATE 5,339.60 9. SUBTOTAL - RETAINAGE S 5,339.60 10. SALES TAX PREVIOUSLY PAID S -0- 11. SALES TAX DUE THIS ESTIMATE 8,650.15 12. SUBTOTAL - SALES TAX S 8,650.15 GRAND TOTAL S 115,442.15 FINANCE DEPARTMENT ACTION: PAYMENT TO CONTRACTOR (Lines 5 and 11): ACCT. N 421/000/:5.596.38 65(151 5110.109.55 M ACCT. M S RETAINED AMOUNT (Line B): ACCT. M 421/000/15.596.38.65(15) 5 5,339.60 I ACCT. B _ _ S TOTAL THIS ESTIMATE S CHARTER 116. LAWS OF 1965 CITY OF REN;ON CERTIFICATION `RETAINAGE: 5% of amount. /yr L M[ w0((SCYa oo...Wl cUL.,0. .ft Y ft w 4 /! M NJAI. lw\ M( w\[1M11 wK LitA MV:MIO. M[ � uL ,�, H(Nf.LL MM(MO w M(U:RM\MW1W10 Y D[NA(!fl I qMn. ylp \wl IN( [yJM q n Jql. Wl •NO w,40 . MVG\ION LWw[t M[ PF w xl,l\OM,MW 1\M\ 4\ DATE 4l\,gNl[O�VM \�(Mlel\O M9[UM_ 4G,[O CITY OF RENTON • DEPARTMENT OF ENGINEERING • • MUNICIPAL BUILDING. 200 MILL AVE. SOUTH. RENTON. WA. 98055.235-2631 PROJECT WELL NOS, 1. 2, 3, PROWCTION PROGRESS PAYMENT ESTIMATE NO.= Contract No 'AG 064-96 Contractor Ap6TROMG DRILL�NO, INL. Cloaing Date 6/ 2187 SHeet2 0} 2 M Eat. PREVIOUS TOTA,.' THIS EST IMATEI TOTAL TO DATE Dzsup4 on Unit Um.t P.,ce� Qty, QtY. Amount Cry Amount Oty 1 Amou," I MOBILIZATION-DEMRILIZATION LS 5:5.000.00 IODS I OS $0.00 SOS $7.500.00 50% $7,500.00 SITE PREPARATION AND CLEANUP 2 DRILL FOR 24-INCH CASINGS LF 5110.00 300 0S I $0.00 j 281 1530,91U.00 281 530,910.00 3 FURNISH AND INSTALL LF $32.00 225 0 $0.00 I%.5 $5.968.30 86.5 SS.%8.00 24-INCH CASINGS A 24-INCH DRIVE SHOES EA 51.000.00 3 0 SO.00 � 3 53.000.00 3 $3,000.00 5 30-INCH SANITARY SEAL EA ( S2,SOO.00I 3 0 10.00 3 $7,500.00 3 57,500.00 6 FURNISH A INSTALL THREE 74-INCH LF 1529.00 75 0 I $0.00 62 $32.798.00 62 $32,798.00 WELL SCREENS S ACCESSORIES INCLUDING PACKER 6 MIL BOTTOM i 7 FURNISH A INSTALL 24-INF.H LF 542.00 ISt 0 10.00 33 U,3R6,00 33 51,386.00 RISER PIPE R FURNISH, INSTALL A RENOVF. IN $1.800.00 3 0 ( $0.00 3 $5,400.00 3 SS,40D.00 TEST PUMP FOR INDIVIDUAL WELL PUMPING TEST 9 TEST PUMP WELL FOR INDIVIDUAL HR $65.00 ISO 0 $0.00 48 53,120.00 48 $3.120.00 WELL PUMPING TEST 1 10 FURNISH, INSTALL A REMOVE THREE i LS S6.UN1.00 1001 OS 50.00 0 10.00 01 50.00 TEST PUMPS FOR MULTIPLE WE,L PUMPING TEST 11 TEST PUMP WELL FOR MULTIPLE HR $200.00 10 0 50.00 0 SO.3G 0 $0.00 WELL PUMPING TEST 12 DEVELOPMENT AND OTHER HR $60.00 725 0 SO.DO ( 93.5 55.610.00 93.5 $5,610.00 I SUTHORIZED WORK I 3'SYO5AL OF WASTEWATER FOR EA SI,200.00 3 0 50.00 i 3 13.600.00 3 I S3.6W.00 ,.3!V:DUAL WELL PUMPING TESTS LF 5236.00 33% I 0 f0.00 0 - 50.00- 0 SO.00 1 LnAN'E ORDER W. 1 SUBTOTAL (ITEMS 1-I4) i I- MOD I 5106.792.00 SI06.792.D0 SALES TAX (8.15) $0.00 I $8,650.15 58,650.I5 TOTAL I SO.DD 5115,442.I5 $115,442.15 RET&IMAGE (St OF SIATOTALI I I 1 SO.OD I SS,339.60 $5.339.60 ___-__ --- ____________ _ SUBTOTAL I I { $0.00 $110.102.55 $110,102.55 i Tl1an I{ I 1 Date: Protect - - CAC No. This Is to certify that the prevailing wages have been paid to our employees and our subcontractors' employees for the month of 1 .1 in accordance with the Intents to Pay Prevailing Mage f1led with the Washington State Department of Labor i Industries. Company Name' 9y1- Titl �,., ._..r� . CONTRACTOR/SUBCONTRACTOR REPORTING PERIOD MONTHLY MANPOWER UTILIZATION RCPORT : .y ♦ Month; 7a I -,- Year: t•� To be submitted to the City's Project nil Goals and Contractor's blesAffirmative as ive committed Engineer during the 1st week of following A'� �� in Contractor's Affirmative month while contract is in progress. prime Actior Plan $ Contractor is responsible for obtaining and submitting all Subcontractor Re ports. or per City's Plan _ 9.1 $ To: (Naas am location of coomitance A8, apt.) From: (Nam, and location of ce- .wt") (Zi{.F o>< L'e.:rr �. _. ,. rAC,(fm STI t,G .e,U;.f �a,< This report is requiredy y Executive Order 11246, Section 203. Failure to report Can result in sanctions which include suspension, termination, cancellations or debarment of contract. .. a. 3. u. F 5. b. min.- Total .otal York Four@ of Employment (See footnote) rity number caber of of C lane• a. c. . F. °1' of minorit E-.pby- tiea- _ • PS a_ er. Ae ion/ .otal total Compoty'a Name (I.D.) :ra de bone ote Black anic ndian Pacific Re- employ- eee p Inland .ale wlh ees I1t3TE0A)E :lL:u) C A• Tr A Tr C n Tr C. Tr C A Tr C A Tr C A _ Tr C An AD Tr C AD Tr Tr Cc r.pagy Ctfl.lal's SSE nature :.. e —Da 91E nee 9. ?e le ph one Kumar. (Inelude Area Code, Rev. 11/77 (-Males 6 Females, --Minorities s Non-minorities) Pig f 7/80 (Submittal Requirements s City's Goals/Timetables) ---- Date: Project Pro + � • F'./c`uc'� � CAC No. ` C el- P� This Is to certify that the prevailing wages have been paid to our employees and our subcontractors' employer, for the month of In accordance with the Intents to Pay Prevailing Wage ; led with the Washington State Department of Labor 6 Industries. Company Name By C Titla -• y,.7- w—t77 RH2 ENGINEERING, P.S. METTEEM T 4fAiG1G'1MOTTAL I410 Markel S*reet P.O.Bux 1180 KRKLAND.WASHINGTON 98033 a�n r08/04/87 Jee�125.11_ Ron Olsen CITY OF RENTON To City of Renton 200 Mill Avenue South Wells i, 2, and 3 Renton, WA 98055 WE ARE SENDING YOU 4 Attached G Under sepants cover vie hand del iyery the Following Rams; Shop drawings ❑ Prints ❑ Plans ❑ Samples 0 SpedReatlana J Copy of letter L: Change order ❑ CAAL3 DATE No. p18C111RIp1 1 DOE Water Well Report for Wells 1, 2, and 3 1 DOE Water Well Report for Renton Gn' Course Irrigation Well THESE ARE TRANSMITTED as cnecked below. U For approval Approved as submitted ❑ Rmtsmit_cowes for approval For yc.r use -- Approved as noted ❑ Submit copies for dntrlbubon ❑ As requested Returned for corrections ❑ RMum__mrrxted prints 0 For review and comment ❑ FOR SIDS DUE El PRINTS ...TURNED AFTER LOAN TO US REMARKS-- COPY TO SIGNED: Mary. L. Senrau ,.uN+v, .MFb:.e.,r . 11.-o- ..n,...eel.r mt",hM ,eon,„,ar era. Ink I ��"ile,.,.u'cYpr.Im WATER WELL REPORT E Copr-0.mr Cep> rn�m coor-Dmler. ow STATIC OF WASIMIOTON (I)'OWNER: Njx,_ 01T4_..0-lt-RcA.Tawi! .A*.R.hl:e a6k dt ,R%442ttltlal�asr�_ (2) LOCATION OF WELL: cowo,,_....._Kt•N-ry Sir.Nf11 sk-LY r23N_.S�E.w.Y. Be.,',kof ale.rd'e[rem reuon«.dndlrlWn comer (I) PROPOSED USE: Homan. ❑ Coako d ❑ Ydr.lpal p (16) WELL LOG: De Uoe❑ Trt Mal D Olnr ❑ yZ..kow,M Irwa rwo.;a n. ..�i.:Irrn +r.11w r'r�i� (4) TYPE OF WORE: Dwn ."wee..os wa 1 1f Ut.wr.uue wi...._S1t ll 1 NATXXIJA naDY To New w.H M aru.a:Dw a abed a D.mm.d ❑ Crta ■ mwr D 'wJ a.t _ a.m.mn.n.a❑ it1.rTD s.NH a (5) DIMENSIONS: Dwo.t.r of wH_._^�'/_._Mae. .q Defied V6 _ e Doptn of—PWwI .n__`j(N - - (6) CONSTRUCTION DETAILS: CnieQ installed: 9-'� '• aw,tsa+?a r 1L n. TnmMM,n - Dlun.fl.a.�._a•—a e Perforation: Ym r' Noy Type of Irrtanbr weE _. SIYC or mrf....ov ___......_—►,tw r e (_ �. 110 nrroe.uoe, $CreeDL' Ya M. .No ,�1 Y.nd wrorer'.N.idDl.._ 4!.A• Tyr CL{_._. ......- . .._Mail N._ -' IN. - Slot..0 Gravel packed: Y.D Noq aY,r _ Gera p1.M crew__—_.....____a r_._.�-._..._a , , SUtia anal: Y.p No pp To whit dapW-._� — ._a ` T YaaeY INr m ww-.S_k.�n.e-T. Did r1' faraw voetw ..1- weelt Yn D M II 'lyp.r N.r.rr._____..._._..__ r pth of.tr.0 Yel..e r...Hna ae.r eN (7) PUMP: Trm:.._.______._.... (6) WATER EAVE($. - ' new:1-11 _ ._______n.n.mw loll of wW �— T�__ Aee.un prle«n ,.._.._....._......ItN Iwr ara Well IMr.._...._....._.... Arleen wwr%conlrollM fir-. IC.0.wow.elt 1 _ Dnwaow 11.mod 1 wed rr l b --- - --- -- (9) WELL TESTS: _ c.. bwere0 eel btb 1«a wort.unM. It. lti.4. CapMlr..�".._l.�r __.IIJSJ_ wn Ont mMar Ta N No p N ra.by wnomt Uc).�r -- Ylea:J,rroselmmywnh 11 -n d"wdown.ntvs_ __n.e WELL DRILLER'S STATEMENT This wall wall drilled under my Jurhkhet:on aM this repee is true to tan best of my knowledge and belief. Reonvery o Ykm Y mm wnm m M w pup fumed I Iw.1p Nl.... •<l t ma ur.ea fro. ll tell t- ..k,N 11 Ymme w In teat i TI fewer G 1 T N fa!MI NAl/i df3/y2Ar.eyy.. a JM SS ._.. } 1 1' (�JI f'`` tM..l..Ilm,a eaO.mWnir tTYpw a prlatl.. 1�i1 I�WT . YpP (.aS ...C.. YS... . Il J 'llllll _ _.. flow.of fee Baler 1 t ... -Xfa a.wen_ n.ar.waow.etr (�gnedl........: ....�... _I. .. .... .... weea.n now pr^. Dm Tempest.,of erw___._W...m.mle.l me>a.mMel Ya❑ No❑ Urerse No-_�..t�0l.elea........ Da6L.'/...�.,Ay..y..........UR-l. US[ADDI"ONAt SHa6T9 Ir N7Ct1aANY1 [Ce of ,. ��• WAT$BLL�WE REPORT S..om sear-ow .toad cow>-Dnu.r. •oar dTATL OF tiaW ne. .. (1) OWNQ: x _(�.Z•..i.. a ._Qt 1s11.-i_�_ ...,Q.61.. .41.11Gy.1..,�_.1 {3.6nn7�..r . 9s•nss (2) LOCATION OF WELL, Ceeob K1 N� -.t/T_yy jlBlty Na_I1_T-2.3.N_a .E bas. B..nfe _re aLY�,r Oar rrWe ey n,wMllr err. (2) PROPOSED USE- berme ❑ weuw Cl rve.tatlp (16) WE2L LOG: lnlaepen❑ Tat wan ❑ Over O sways Osar e.b.,aw.eu. .w a,ruw.l r.brae.r Ma.tM.l.er N w w Irn.�r r,n.a w Mnr r ern 4 : :>•"e••r bol e1 e1ir`perl.trte, a Na.,ea at+a fee week enure a terrrr.e. ( ) TYPE OF WORK .0 men u.n oar.�'S!a! y wTWAl - rwr . TD New wall ® WNeE:DO, ❑ Mee ❑ O D«a...E 7 cable IC Dyom❑ — aawemtre.e❑ as w`❑ Jewel ❑ /I (S) DD/ENSIONS: Dumas of beu D.tuee I"J n nau ,e rwmvtaae wR_.._f1'�—a (6) CONSTRUCTION DETAILS: - - casing 10st"": 2 N -Dlan town -t?.._s r_1LL Of L 91• T, t _ rer..e..1 C Duo, tram ...._ —"7�- weta.e N "rnwn Dam ear - Perfont6m Two Nat .l1, r TYae r rMaerr are.. -. sizz Of,arawarar-- _._ to by __....—._- 1M� — P>alaalWw _.wseerr mom.,_._ __n r—___n. f - � +s •IF,' Screens TrC ME) w.r,w.a.ar.Mna___1aDP-2sknso0_._—._ tYM .�.tf•�Cb-� initial N...j". S,�T Dom ..�.:.Me Me 1aQ,tee Z6 n.a `lO n S A�f&U64p -- Dum aw me_.--lase, - D.to _ _tt. __-:--- Gravel packed: ra G No m so.m roowl Gr—1 mares Irmo N.r Surface seal: R me D Te.�t Berne w.nrul we.::" atl _lCr. e.,\..ben DIE m> a4a+a roman rNNyle wral TOO❑ no if T,,w.1 Nate„ DQr N elfall...�,__.. •_ reln.m m aeon rams ea__ (7) PUMP' Nenuuaurt..Nr-.._ _......... VIP (9) WATER LEVELS: �V,rLLaue ..b.level suuE N.el __.22...._____st.Mlow,uo m well Date 11 :'_+• --- Ar+aun 1.._..____._Jte.any W.I.Irel D.0 ... Arrean bra Y anMOM ar 16V.valve. (9) WELL TESTS: Drat4a.as.e.ere..u,[...11. 11.1..E aww yeaut laver wora.unea. d wee a 1•emo tat made, ra® No❑ tr Ya.ray wnanfar;l(a. rand .(37y aar rmm .tu n^areweewn.Me n.._ WELL DRILLER 'S STATSIMMBNT: This w,.l waz drilled under r1 lurhdlctrn and flux report is _ true to the beat at my knowledge cad belief. .-over' d.+ — k. eao .hart eano rumen air, bole, level m e. I( wan We Y boe.,level 1 �� root w 1.0.11 T,ar •.r., to 1 Tom. w ,- utee. NAEIE.f�.v'�F1u N.1._. ,(! 1!4 7 .TA C. tM1,w.r a rraaetrwl!/ tTM f.w� Addta JD-7R.S...... Dot 1 IM ..• /.. 1 L _-`- n.+N.,M r.11nee w11L.. N.Enweewn an., ..M. (�) �• Mail AnM.o M _. _.. _ ._..._ear du... __ __-- remea.an. of .tar. . ter a ieml Ytl e.l wolo mbar Yr O NO❑ Lke Na_._ .D-�(.. _ ._._ Date r7 IOS•ADDTONAL stoma A N6■59A11Y1 !� yet.1 so Zq,. w%�n�1�or� coo>.lu WATER WELL REPORT Appb..Uon No. rru.a coax--n.�irn coar F{ATY OF WASNDKrrON a..r¢No (1) OWNER; N �a.--- :rR 1iQ--T->x (2) LOCATION OF WELL: co..wr 1Ca. D.ah.y u.e ert•we rear ..mam.w.n.w.rr (3) PROPOSED USE,* Dorm. ❑ ,nmwDm a Nwewr M (10) WELL LOG: I..teJ ❑ T Won ❑ Oa.w O Y.rmrf..:Dvwwa. . a.nn..=M..Jr.,•f a r.a.r.n,M Jw..Hl.twr M .Y fY vra W..fa•.M N..v..rvrf.l r afa of .e inns war w°lYcl(H, w,elr.MMM"aa ra ke. ov•wa 1.a.e a�.1 f�• (4) TYPE OF WORK: - arAYouL own ro N...•11 ;a u Doe a•..m uoow C a•r.Y c 400,10 ,., (5) DIMENSIONS: m....u,of wn :i Y rfea Dnl!,d &I D (6) CONSTRUCTION DETAILS: _ n ^' Casing installed: .Z`I. -moo, r.om Z A!A- -.n r cA)ue.. ' ,Mdoe❑ .. Dun tram w.ld.d 9 ., ix... from D.r—_R f I Perforations: rr C No Q _ r-ine.f wxonm.usoo j fi sae.f w.nnoon. r be — w w.rombaM n n. ) .. wrnntba raw K.r Ie _ wrrr.waa Man.._._,_.n.r A _ SerMMM Yr Q it a rm..e.n.ve(.N UD�NS Trw n.rl.r•s U."w_..3 .— uwo /.I- sw r...Ad?Q ns,31.n.r=/.1...a. DWn slot Jr_.___Man ...__......rem __R Gravel peeked: r. o No p a,a w gn of -- Gra•J.i...e bans n r_. b. Surface seal: re.w N. ra" tie aAhr. A'� n. -- MM*Mal o..e in rJ �v. _...L�I..Ouic _T Dte .nr .b.r W. unwex wMr V.❑ No W rn.od w eung Lars d_ _...___..._-... f--- (7) PUMP: (R) WATER LEVELS: �•ne+••M+Je..uon _ — rove w.o, trvJ b. h to,ww. r wN Da. 5 Al-YI Artnu. I.- lao w.An NwE Dot. ArVa.n 1.eunb.uM fie.._..._.__. .._ ---'— Ib►. (9) WELL TESTS: D...d.w a.rount..nr i..J t. lore fieloe au b (� wrY aurL_�.fe_�_.bQ f. Caoplet•e.(p 1(- .ltir/ wWas,pump tM maeel Yr'.) No 0[] If Y..or.,.m? H,1 I,✓' " Yi.ta'JJQn_AJaow_.th ,_N d...mw,ftn ran. WRLL ^rn.s ER'S STATBIIBM'i` 77W WH ataa drilMd Molar MY )411adiction and this report is wee to she ban of MY kMMbd9e SO Dell.l. N. .1, d.t. (N.w Me.. r ..ro .fi.n p.mP lo...d off, ;.J.. me..u.zn fwm wu toa W rM.,kv.11 ram. wJ..40.1 ram. mare. LnrJ r,m, wm.. i..wl NAl16�I[M;f.'.rPv_. ..tL��.a •'a. ..d�L'_....___. _.__....._.. lawaa.�.•r raaa.twl IYYw tr a.rall uu iSC'17 f e.De.MU ._. -N.Dr...tbm...._. n.dr..dow.her m.. [SiNedl ,_.. Axoean five---. ...._.-__-_evm. Dote Temwr,b�n of wtx.._-_.....ww.M•m1eJ,nJrau male.Yn n No❑ Geenae No._._--._QQ.1.T...._.......mu......_7 i USE ADOMONAL silattl A NeCLLAaYI et,ow,fo �.a DATE August 17, 1987 TO: FINANCE DIRECTOR FROM: PU6LIC WORKS DIRECTOR SUBJECT: PROGRESS PAYMENT CONTRACTOR: ARMSTRONG DRILLING ESTIMATE # 2 CONTRACT / CAG 064-86 PROJECT: Wells 1. 2, and 3 Production Well Drilling 1. CONTRACTOR EARNINGS THIS ESTIMATE $ 16,245.00 2. SALES TAX @ 1,315.85 3. TOTAL CONTRACT AMOUNT THIS ESTIMATE S 17,560.85 4. EARNINGS PREVIOUSLY PAID CONTRACTOR $ 101.452.40 5. EARNINGS DUE CONTRACTOR THIS ESTIMATE S 15,432.75 6. ` (95% x Line 1) SUBTOTAL - CONTRACTOR PAYMENTS $ 116.885.15 7. RETAINAGE ON PREVIOUS EARNINGS $ 5,339.60 B. • RETAINAGE ON EARNINGS THIS ESTIMATE $ 812.25 9. SUBTOTAL - RETAINAGE S_6_,151.85 10. SALES TAX PREVIOUSLY PAID S G.650.16 11. SALES TAX DUE THIS ESTIMATE 1.315.85 12. SUBTOTAL - SALES TAX S 9,966.00 GRAND TOTAL S 133,003.00 FINANCE DEPARTMENT ACTION: PAYMENT TO CONTRACTOR (Lines 5 and 11): ACCT. M 4 1/000/15,596,311,65 (.li) S_ 16,746.60 R 2 ACCT. ! S RETAINED AMOUNT (Line 81: ACCT. M 421/000/15.596.38.65 (15) S 812.25 1 2 ACCT. d' 5 d CHARTER 116, lAW5 OF 1985 TOTAL THIS ESTIMATE S 17,560.85 CITY OF RENTON CERTIFICATION `RETAINAGE: 5% of amount. S,h1SA F M[ wasc.a D 1a w l u..a.rewn or u. [[nvCy M,u[YD M Ml V.:.pl HWIWN/3'NW.F[D NFI n. MD iwi 1M( (yu[ q F y{l. pV( Fb WFM OFUGiUY tGwF F\ M[ C\M1 p Fit\OR 49 nMl i M� FU MDnv[D ro Fumunrwn.wD cumn\o �.� CITY OF RENTON • DEPARTMENT OF ENGINEERING • • MUNICIPAL BUILDING. 200 MILL AVE. SOUTH, RENTON, VVA. 98055.235-2631 ��•ti' ' VELL NOS. 1.2-3 PRODUCTION Z PROJECT PROGRESS PAYMENT ESTIMATE NO Contract No. Clo 'mg Date CAG 064-86 Contractor ARi1STRONG DRILLING, IkE. 7i28/87 Sheet ct_ PREVIOUS TOTAL THIS ESTIMATE TOTAL TO DATE I D4'aC"-plion Vnrt Unit Price QI Y. Qly Qty. Am nl I I I 1 M081 LIZATION-DEMOBILIZATION LS I $15.000.0 100% 50% $7.500.00 50 17.500.00 It $15,000.00 SITE PREPARATION AND CLEANUP 2 DRILL FOR 24-INCH CASINGS LF $110.0 300 ( 281 130,910.00 0 50.00 281 $30.910.00 3 FURNISH AND INSTALL LF $32. 225 86.5 55,968.00 0 $0.00 186.5 $5,%8.00 24-INCH CASINGS 4 24-INCH DRIVE SHOES EA 51,000. 3 3 $3.00O.00 0 SO.00 3 13.000.00 5 30-INCH SANITARY SEAL EA $2.500. 3 3 17.500.00 $0.00 3 $7.500.00 6 FURNISH A INSTALL THREE 24-INCH LF I $529.Oa 75 62 532,798.00 0 $0.00 52 532,798.00 WELL SCREENS A ACCESSORIES INCLUDING PACKER A BAIT BOTTOM 7 FURNISH A INSTALL 24-INCH LF $42.01 15 33 $1,386.00 0 50.00 33 SI.386.00 RISER PIPE 8 FURNISH, INSTALL A REMOVE EA $1,800. 3 3 $5,400.00 O 10.00 3 $5.400.00 TEST PIMP FOR INDIVIDUAL WELL PUMPING TEST 9 TEST PUMP WILL FOR INDIVIDUAL H. I S65.D 150 48 53,120.00 7 $4,745.00 121 $7,865.00 WELL PIMPING TEST 10 FURNISH, INSTµL A REMOVE THREE LS $6.000. 100% O1 SO.OD 66.611 S4.OGO.00 67 $4.000.00 TEST PUMPS FOR MULTIPLE WELL PIIN^ING TEST 11 TEST PUMP WELL FOR MULTIPLE N0. I S200.0111 10 0 SO.00 0 50.00 0 $0.00 WELL PUMPING TEST 121 DEVELOPMENT AND OTHER HR 160. 225 93.5 I 55,610.00 c $O.00 93.5 55,610.00 AUTHORIZED WORK 13 DISPOSAL OF WASTEWATER FOR EA $1.200. 3 3 $3.600.00 c 50.00 3 $3.600.00 INDIVIDUAL WELL PUMPING TESTS CHANGE ORDER NO. 2 LS $1,018.4 100% 0 $0.00 $0.00 0L $0.00 14 CHANGE ORDER NO. 1 LF $236.0 33 0 $0.00 $0.00 10.W SUBTOTAL (ITEMS 1•14) 3106,792.00 $16,245.00 $123,037.00 SALES TAL (8.15) i $8,650.15 - $1,315_85 $9,966.00 TOTAL $115.442.15 $17.560.85 $133.003.00 RETAINAGE (5S OF SUBTOTAL) 55,339.60 $812.25 $6,151.85 SUBTOTAL I $110.102.55 516,148.60 1126,851.15 M`r i A a CITY OF RENTON • sheet I _:of.1 PUBLIC WORKS DEPARTMENT Date 4 CHANGE ORDER Order _ OB/1 /�.Z. N,,.eer 1 OOrdered by Ing}nfer under Ceres of S<uion 4-1 of the Conn¢t Nn, faf, nea_Standard Specification% (AIVA) $6— CIchange proposed by contractor To- ARMSTRONG DRILLING, INC. 1071E _ EEth Avrn o Fa ci AR TRIIG DRILLING, INC Puyallup, WA 98373 uaonsa-ar: _'� an ire w l' '1 Sign Route Federal Aid No. Titi PrO9ldent Project Title Well Nos, 1- 2- 3 Production Well Drillin Conte 9aven by SWUy: IWhta etgwsedl Water ro ce Tt Wo. N-877 sr: . . . . . • . • • • . • • • . . . . . DESCRIPTION OF WORr • . . . . . . . . . . . . . . . . . . . . Yoi are ordered to prrfore the following described work upon receipt of an approved cop, of this change order 1. Substitute Stainless Steel Riser Pipe for Iron Pipe. Increased Cost = $236.00/Foot Total Length of Pipe = 33 Feet Increased Cost = $236.00/Foot $7,788.00 8.1' Sales Tax $ 630.83 $8,418.83 All wart, uteri.[, and as onraefnt to be In accordance with the provisions of the Standard Specifications and Special Provisions for the type of construction involved. ORIGINAL CONTRACT cull ENT CONTRACT ESTIMATED NET CHANCE7ESTIMATED CONTRACT AlgUNT AMOUNT THIS ORDER AL AFTER CHANCE $ 158,101.65 s e 5;,418,83 CENCY USE AGENCY USE AH RECWiEVp APPROI'ED: O / ff[ le rsgan<en < ifib�(`o'"�oAFi�it etc a+ APPROVAL RECtRRRROED APPROVED D STRICt STATE-AID ENGINEER BY: Date I - CITY OF RENTON . sneer j or • PUBLIC WORKS DEPARTMENT uanrr pale CHANGE ORDER yips, 2 _ Da714L8L. OOrd,,e.l by InPnttr unJar terms of Sect 1. 4-1 of ❑r, Corn rat, No. fdr, n6d $t.tJarJ Specif,catkons (APNA) +�1-- Chant, p,opumd by Contractor To: ARMSTRONG DRILLING, INC. _ 1715 - 66th puunno Eatt F End ea by: 4STRONG DRILLING, INC. — vallup, WA 98373 G 9 ,•7 ide ,lure Federal Fa de rai wad No. Tit e President P.,act Tlti, „ell Nos. 1. 2. 3 Production Well Driliin CO"Int Hacrn by Sut[ty: Imal A<ywacdl —Water ro,7ect 10. 'd- ty: . . . . . . • • • . . . • . . . . . DESCRIPTION OF WORK • • • . • . • . . . . . . . • • • • . . You art ordered to perform the follovin, described work upon receipt of an approved copy of this than,, ardor. Drilling anD Development of Irrigation Well at Maplewood Golf Cause for _Park Department 1) Mobilization & Demobilization L.S. $ 500.00 2) Sanitary Seal L.S. 1,200.00 3) Drive Shoe L.S. 330.00 4) Drilling 56' ? 41.00/ft. 2,296.00 5) Casing 36' @ 16.25/ft. 585.00 6) Well Screen 7' @ 215.50/ft. 1,515.50 7) Hourly Work 22 Hours @ 70.00/hr. 1,540.00 8) Teat Pump - Install & Remove L.S. 650.00 9) Test Pump - Hourly 4i Hours @ 65.00/hr. 292.50 10) Extra Materials: 12' of 10" Casing @ 11.40/ft. 136.80 6 sks. pea gravel @ 2.10 Each _ 12_60 TOTAL $ 9,058.40 WASH. STATE SALES TAX, 8.1- 733.73 TOTAL DUE $ 9,792.13 All work, materials and measurement to be In accordance with the provisions of the Standard Specifications and Special Provisions for the type of construction lnvulved. ORIGINAL CONTRACT CURRENT CT)NT RAC- ESTIMATED NET CHANGE ESTIMATED CONTRACT AMOUNT AMOUNT THIS ORDER TUTAL AFTER CHANGE s 158,101.65 s - - $ 9,792.13 s - AGENCY USE AGENCY USE APP L 0.[NSN j[ 0�ggsunlC[JNN ?pS AP PROVE : f�����e CD APPROVAL RECUaENDED APPROVED DISTRICT STATE-AID ENGINEER a : Cate' w-p» G27/i G27S � August 17, 1987 l7n Mr. Ron Olsen, Water Utilities Engineer CITY OF RENTDN Public Works Oeoartment 200 Mill Avenue SoutIr Renton, WA 44055 Subject: Well Nos. 1, 7 and 3 - Production Well Drilling Contract CAG 064-86 C.wrtraotr pietton fsn.,..rees aRt Dear Qon: Armstrong Drilling Inc, has completed all work on the subject contract in accordance with the contract plans and specifications as modified by change orders No. 1 and No. 2. We recommend the City's acceptance of the contract and the disbursement of final payments to Armstrong Drilling ;nc. in accordance with the contract conditions. Attached to this letter are the following items for your use in ompleting the contract documentation and processing the final pay estimates for Armstrong Drilling Inc.: 1. City of Renton Monthly Manpower utilization Report for time period of June 13 through June 21, 1987. 2. City of Renton Monthly Manpower Utilization Report for period of July 1 through July 14, 1987. 3. A copy of contract change order No, 1, substituting stainless steel riser pipe in the screen asswmblies installed in Wells No. 1, 2 and 3, for iron pipe as provided in the contract specifications. Contract change order amount is $8.418.83. The original change order has been forwarded to Armstrong Drilling Inc. for signature and will be forwarded to the City when returned by the contractor, 4. A copy of contract change order No. 2, providing for the drilling and development of a 56-foot, 12-inch diameter irrigation well on the City`s Maplewood Golf Course addition as authorized the Park Department. Change order amount - $9,792.13. The original change order has been sent to Armstrong O: illing inc, for signature and will be forwarded to the City when received from the contractor, 5. Contract Progress Pay Esi.;�wte No. 2 covering the final payment to the contractor for all work pe-formed under the terms and conditions of the contract including change orders 1 and 2 above. 1410 Market Street,P.O.Sc x 1180,Kirkland,Washington 98033i2061 82 7-6400 Mr. Ron Olsen August 17, 1987 Page 2 6. Supplemental Worksheet to Progress Pay Estimate No. 2 showing the allocation of the pay estimate amour's to the Park Department for the irrigation well and to the Punlic Worxn Department for Well Nos. 1. 2 and 3. 7. The State Fxcise Tas Department's Notice of Completion of Public Works Contract. All items of the notice have been completed except the formal date of work acceptance which should be inserted by the City when the foetal date of acceptance is established. We have requested Armstrong Drilling Inc. to forward to the City their affidavit of Payment of Previaling Wages. The original contact amount, based on the es-imated quantities of work contained in the contract bid documents, including sales tax is S158,101.65. The final Well Nos. 1, 2 and 3 contract amount, excluding the work performed for the Park Department, is S141,121.83. The lower final contract amount is primarily attributable to a reduced requirement for development and other hourly work and for pump testing. Also enclosed is the final report of our sub-consultant Hart Crowser 8 Associates, detailing the final construction of the well, the test pumping conducted, the calculated well yields and the recommendations for pump capacity and placement. Sincerely, RH2 ENGINEERING. P.S. Ronald R. Heinke. P.F. Enc. cc: Armstrong Drilling Inc. OF RE, � tiT PUBLIC WORKS DEPARTMENT DESIGN/UTILITY ENGINEERING 0 235-2631 0 , MUNICIPAL BUILDING 20O MILL AVE.SO. RENTON.WASH.990% 9$ e 99rE0 SEPTEloP TO, ENC,INIFRTNCDATE: JOB Iq.: _ '.;lp Market Street RE: W-17- -ercv::. tstlnate ^Srkland, t'A g8033 ATTN: ,.nald /let ke GENTLEMEN: WE ARE SENDING YOU O ATTACHE-) ❑ UNDER SEPARATE COVER VIA THE FOLLOWING ITEMS: o SHOP DRAWINGS ❑ PRINTS ❑ REPRODUCIBLE PLANS a SPECIFICATIONS a COPY OF LETTER O tted frr :,,,pr,vaI r - f In.1 - <stL S DATE R Amends Item Peco me din Fivial Fm �reval T9ird and Final Fay Estivate Project Coat Breakdown Change Order %o. I 1 Change Order No. 2 Letter of Ac4e,tanc, Pi, mendatior THESE ARE TRANSMITTED AS CHECKED BELOW: o FOR APPROVAL o APPROVED AS SLO41TTED ❑ RESUBMIT _ COPIES FOR APPROVAL a FOR YOUR USE ❑ APPROVED AS NOTED ❑ SIBIIT _ COPIES FOR DISTRIBUTION o AS REQUESTED ❑ RETURNED FOR CORRECTIONS a PIERIAN CORRECTED PRINTS D FOR REVIEW AND COMMENT ❑ a PRINTS RETURNED AFTER LOW TO US COPIES TO: SIGNED Ronald L. Olsen TITLE Lt.iliry Engineer IF ENCLOSURES ARE NOT AS MUTED, KINDLY NOTIFY US AT ONCE For Use By City Clerk's Office Only AGENDA ITEM RENTON CITY COUNCIL MEETING SUBMITTING Dept./Div./Bd./Comm. Public 'WorksiUti!ity Engr. For Agenda Of (Mee ling Date Staff Contact R. Hou hton/I . Olsen Name Agenda Status: SUBJECT: PW Contract: Wells 1. 2, and 3 Consent Production Well '1r i11inD. G-877 CAC 064-$6 Public Hearing Correspondence General Contractor: Armstrong Drilling, Inc. Ordinance/Resolution Old Business Exhibits: (Legal Descrn, Maps, Etc.)Attach New Business Study Session A. Su.—ary Sh nn[ for Final Fne Fcrimetu Other B. Letter of Acceptance Recommendation- RH2 Engineering C Approval : Legal Dept. Yes_ No_ N A_ COUNCIL ACTION RECOMMENDED: Approval of Finance Dept. Yes_ No. Final Pay Estimate, Request Final Acceptance Other Clearance of Project and Begin 30-Day Lien Period. FISCAL IMPACT: Expenditure Required S Amount S Appropriation- $ Budgeted Transfer Required SUMMARY (Background information, prior action and effect of implementation) (Attach additional pages if necessary.) This project was completed on September 1, 1987 and accepted by the Public Works Deptartment on September 18, 1987. The total contract amount is $151,213.96. It is recommended that the City Council accept completion of the project as of September 28, 1987. If after 30 days, no liens or claims are outstanding, and proof of payment of tax and insurance liabilities have been received, it is recommended that the retained amount of $6,994.17 be paid to the Contractor. PARTIES OF RECORD/INTERESTED CIT 'PNS TO BE CONTACTED: SUBMIT THIS COPY TO CITY CLERK BY NOON JN THURSDAY WITH DOCUMENTATION. DATE_Auy, q_24 _12&L.. TO: FINANCE DIRECTOR FROM: PUBLIC WORKS DIRECTOR SUBJECT: PROGRESS PAYMENT CONTRACTOR: ARMSTRONG DRILLING ESTIMATE N-ja 6 Final CONTRACT N CAG 064-86 PROJECT: Wells 1. 2, and 3 Production Well Drilling 1. CONTRACTOR EARNINGS THIS ESTIMATE S 1r,R46.4n 2. SALES TAX @ 1.164.66 3. TOTAL CONTRACT AMOUNT THIS ESTIMATE S 181210y96 4. EARNINGS PREVIOUSLY PAID CONTRACTOR $ 116,885.15 S. EARNINGS DUE CONTRACTOR THIS ESTIMATE $ 16 n.D 4.OR___ 6. ' (95% x Line 1) SUBTOTAL - CONTRACTOR PAYMENTS S 117_889.73 7. RETAINAGE ON PREVIOUS EARNINGS $ fi.151.85 8. " RETAINAGE ON EARNINGS THIS ESTIMATE 842.32 _ 9. SUBTOTAL - RETAINAGE $ 6 994.17 10. SALES TAX PREVIOUSLY PAID $ 9 96fi.Dn 11. SALES TAX DUE THIS ESTIMATE 1.164.66 12. SUBTOTAL - SALES TAX S 11,330.56 GRAND TOTAL S 151,213.96 FINANCE DEPARTMENT ACTION: PAYMENT TO CONTRACTOR (Lines 5 and 11): ACCT. N 421/000/15/596.38.65(15) S R n79_aa N 1 ACCT. N 404/000/20.596.76.65(22) $ 9,339.21 3 RETAINED AMOUNT (Line 81: ACCT. N 421/000/15.596.38.65(15) _ $_ 389.40 1 3 ACCT. N 404/000/20.596.76.65(22) $ 452.92 N 3 TOTAL THIS ESTIMATE S 18,210.96 CHARTER 116, LAWS OF 1965 CITY OF RENTON CERTIFICATION •REIAINAGE: 5% of amount. [ M[ wa.sc+m vo...m.u.r.1 c ew. K.0 w rtw.r. our ,.\ ,un�ws M1K sew ..eo.„n aavvxa urn\uo a ms u;an n..owm M ws gwnro O\VWnOY RWw\t M[ CA 01 0 w nlon[ro ro . un u,o coon[ LUTE r/_2_5' [ CITY OF RENTON • DEPARTMENT OF ENGINEERING • • MUNICIPAL BUILDING. 200 MILL AVE. SOUTH RENTON. WA. 98055.235-2631 PROJECT_ ❑ells 1. 2, end 3 PROGRESS PAYMENT ESTIMATE NO __ Contract No "' G64-86 _ Contractor ARMSTRONG DRILI`NG Clo ng Data__SMat Lof11 IL Est. PREVIOUS TOTAL TMtS ESTIMATE TOTAL TO DATE No. Uex npt�on Umt Umt P,,.. Qty Qty. Amount Qty. Amount Qty 1 A� 7-- -T- I MpBliIIAT;ON-DEMOB iiIIAT ION LS IS25,000.00 IOOIt OOS $15.00O.Go 03 f0.00 I003 575,000.00 SITE PREPARATION AND CLEANUP 2 DRILL FOR 24-INLN CASINGS LF 5110.00 300 81 130,910.00 0 10100 2P.1 530,910.00 3 FURNISH ANO !*STALL LF $32.00 225 lEfi.S $5,968.00 0 $0.00 BA.S 16,468.00 24-,4CH CASINGS 1 4 2<-INCH DRIVE SHOES EA SI,D0D.017 3 3 f3.ODO.00 1 0 iD,06 I 3 $3,000.Co 5 30-INCH SANITARY SEAL EA $2,500.00 3 3 $1.500.00 I 0 $0.00 3 17.500.00 6 FURNISH 6 :NSTAL� THREE 24-INC4 LF 5529.W 75 62 32.798.00 0 $0.00 62 $32.798.00 WELL SCREENS A ACCESSORIES INCLUDING PACKER 6 RAIL BOTTOM FURNISH 6 INSTALL 24-I4CH LF 542.00 15 33 $1,386.00 0 $0.00 33 $1.386.DO RISER PIPE 8 FURNISH, INSTALL A REMOVE EA $1.800.00 3 3 $6,400.00 0 $0.00 3 55.400.00 TEST PUMP FOR INDIVIDUAL WELL PUMPING TEST 9 TEST PUMP WELL FOR INDIVIDUAL WELL PIMPING TEST MR 565.00 l50 21 5105.00 0 50.00 111 I 17,885.00 `I 0 FURNISH, INSTALL 6 REMOVE THREE IS 56,000.00 100% 67S $4.000.00 0 50.00 671 I $4.000.00 TEST PUMPS FOR MULTIPLE WELL I ) PUMPING TEST 1 TEST PIMP WELL FOR MULTIPLE HR I $200.00 i 10 0 50.00 0 50,00 0 I $0.00 WELL PUMPING TEST , 2 DEVELOPMENT ANO OTHER ADrtwRlzeD WORKS60.O 10 D 225 9 .5 $5,610.00 0 V. 3.5 1516 .00 3 DISPOSAL OF WASTEWATER FOR A SI,200,00 3 INDIVIDUAL WELL PUMPING TESTS 3 f3,600,00 ! 0 f0.00 3 33,600.00 CHANGE iNtDER N0. 2 ILS ! $9,059.40 1100% I 0 $0.00 100t i 59,058.40 ' 0% S4, ,.40 4 CHANGE ORDER 40. 1 LF 5236.00 33 0 $0.00 33 $7,788.00 0 $7,788.00 SUBTOTAL (ITEMS 1.141 23,037.00 f_16.. 846___.40 1391BB3.40 _. ... SALES TAX (8.11) $9,986.00 11.364.56 $11.330.56 TOTAL ___ ..... ___... .........._....._.._ 3 33,003.OD $18.220." 151.213.96 RETAi NAGS IS% OF SUBTOTAL) $6,151.85 $842.32 ) 16,99e.17 SURTOTAL f 26,851.I5 S17,369.64 I 1@4,219.74 0 DATE I( 9 1 State of Washington R No Depar.maet of Revenue Reg AX-02 -:164-8(i r Au81 Prpoadores 8 Admmis:ra;nn Olympa,Wasnmglon 98504.O090 Date' NOTICE OF COMPLETION OF PUBLIC WORKS CONTRACT From. City of Renton DEPARTMENT USE ONLY Finance Department 200 - Mill Avenue S Assigned To Renton, WA 98055 ate ssgn Notice is hereby given relative to the Completion of Contract or project described below. Description of Contract City of Renton, Wells No. 1, 2, and 3 Production Well Drilling W-877 Contractors N]me Telephone No. Armstrong Drilling, Inc. (206) 845-1672 Contractor's Address 10715 - 66Lh Ave. East, Puyallup, Washington 98373 Date Work Accepted Date Work Commenced Date Work Completed September 18, 1987 Marc!. 16, 1987 September 28, 1987 Surety or Bonding Co. —. SAFCD Agent's Address Bratrud - Middleton :_ , :rnnce, 6402. S 19th St. , Tacoma, Washington 98411 Contract Amount. $ 146,255.00 Amount Disbursed. $ 144,219.79 SSuht ractions: A>dOMroot. (13,365.77) _ Amount Retained �6 994.17 Sales Tax: 11 330.56 Total 151,213.96 Total: 151.213.96 By-___ Offiter) -_ Phone No. The Disbursing Officer must complete ar d mail three Copies of this notice to the Department of Revenue,Olympia. Washington 98504,immediately after acceptance of the work done under this contract. NO PAYMENTS SHALL BE MADE FROM RETAINED FUND until receipt of Department's Cerld cala.and then only in accordance with said certificale. FORM REV 31 0020(2-86) MA Ve 1125,11 �� G27/15 September 21, 1987 Mr. Richard C. Houghton, Pubic Works Directo, CITY OF RENTON Public Works Department 200 Mill Avenue South Renton, WA 98055 Subject: Well Nos. 1, 2 and 3 - Production Well Drilling Contract CAG 064-86 Contract Completion and Final Pay Estimate Dear D;ck: Armstrong Drilling In,,,. has completed all work on the subject contract in accordance with the contract plans and specifications as modified by change orders No. I and No. 7. We recommend the City's acceptance of the contract and the disbursement of final payments to Armstrong Drilling Inc. in accordance with the contract conditions. The original contract amount, based on the estimated quantities of work contained in th« contract bid documents, including sales tax is 1153,101.55. The final Well Nos. 1, 2 and 3 contract amount, excluding the work performed for the Park Denartment, is 1141,421,83. The lower final contract amount is primarily attributable to a redured requirement for development and other hourly work and for pump testing. If you have any questions, please contact me. Sincerely, RHH2 ENGINEERING, P.S. Ronald R. Heinke, 'E { , 1410 Market Street,P.O.Box 1180,Kirkland.Washington 9803:12061827,6400 CITY OF RENTON WELL NOS. 1, 2, AND 3 ARMSTRCNS DRILLING, INC. SUMMARY OF WORK PERFORMED DATES WORK PERFORMED 3-16 to 3-20-87 Drill Well N1 3-23 to 3-26-87 Drill well it 3-27-87 Drill Well 12 3-30 to 4-3-87 Drill Well I2 4-6 to 4-7-87 Drill Well NZ 4-8 to 4-9-87 Set screen in Well tl 4-10, 4-11, and 4/13 Develop Well 01 4-14 Place sanitary seal in Well it 4-15, 4-21, and 4/22 Pulled casing and set screen in Well 02 4-24-87 Develop Well 02 4-27, 4-28, 4-29, and 4-30-87 Test pump Well tl and finish development with test pump 5-1-87 pour seal in Well .r2 5-2, 5-4, 5-5 and 5-14 through 5-20- 87 Set up and Drill Well 43 5-23, 5-27 and 5-28-87 Set pump and test pump Well 02 5-29, 6-2, and 6-3-97 Pulled casing, set screen and poured seal in Well 43 6-8, 6-9, and 6-IF Developed Well $3 6-11 and 6-12-87 Set pump and test pump Well 43 6-16, 6-17, 6-18, o-19-87 Set up for pumping Well Nos. 1 and 3 and test pump Well r3 7-1 through 7-14-67 Drill, develop, and test pump Golf Course I rrigation Well Engineering August 24, 1997 ----- S1125.11 (G27/23) . -r r I WED rscwa"ii Mr. Ron Olsen Water Utilities Engineer CITY OF RENTON P 6 1 Engineering Oept. cknwcro�Na Dc"Pf. 200 Mill Avenue S Renton, WA 98055 Subjeetr Well Nos. 1, 2, and 3 - Production Well Drilling Armstrong Drilling, Inc. Change Order Nos, l and 2 Dear Ron: Enclosed herewith are the original and one copy each of rhange Order Nos. 1 and 2. Both copies of each change order have been signed and dated by Armstrong nrilling, inc. We recommend the change orders be approved by the Public Works Director. In accordance with your verbal instructions Progress Pay Estimate No. 2 forwarded by our 'etter of August 17. 1987, was modified to exclude payment for the above change orders and the revised pay estimate was delivered to yaj for processing and payment. Progress Pay Estimate No. 3 which includes the payment for Change Order Nos. 1 and 2, is attached to this letter. This 's the final progress pay estimate for Armstrong Drilling, Inc. We have requested that Armstrong Drilling, inc., send to you directly signed copies of their manpower utilization forms for June 13-21, and July 1 - 14. A summary of the time periods worked by the contractor, and a hrief description of the work performed during the time period is enclosed as you requested. I trust the information contained herewith will allow you to complete the process of acceptance of the contract of Armstrong Drilling, In_ and payment of the final contract amounts. Very tr yours, tWRING P/ . Ronald R. eiei e 141D Market Street,?.0.Box 1180,Kirkland,Washington 98M(206)827-6400 0 BID TABULATION IHEFIT PROJECT : WELLS 41, 2 AND 3 REHABILITATION 6 CONSTRUCTION DATE • October 16, 1987 Addenda Ack. EEO MBE BIpD� AA BB 810 IMCO General Const, ..,o,. X 5936,695.15 4939 Guide Meridian Bellingham, WA 98226 MEGA CONTRACTORS, INC. X 1 078 794.76 P.O. Box 428 Duvall, WA 98019 SEABOARD CONSTRUCTION, INC. X $1,062,388. ,2 2470 Westlake Avenue N. Suite 204 Seattle, WA 98109 LARSEN CONSTRUCTION X $1,265,420.00 20038 15th NE Seattle, WA 98155 M. D. MOORE CO. X 51 006 432.00 13652 SE 101th Pl. PO Bcx 2603 Renton, WA 98056 FERRELL-PENNING, INC. X 5999 384.50 17510 Aurora Ave. N. PO Box 33578 Seattle, WA 98133 Engineer's Estimate: $1,116,132.50 APO /o -/!- For Use By City Clerk's Office Only Ia.l. I AGENDA ITEM RENTON CITY COUNCIL MEETING ..ea..a.............................n....... s...........�..o.w...®.m SUBMITTING Dept./DIv.;Bd./Comm. City Clerk For Agenda Of 10/26/87 (Meeting Date Staff Contact M. Motor Name Agenda Status: SUBJECT: Bid Opening 10/16/87 for Wells_ Consent XX Nt, 2 and 3 Rehabilitation & Construction Public Hearing Corfespo..Jence Ordinance/Resolution Old Business Exhibits: (Legal Descr., Maps, Etc.)AttdCh New Business Study Session A. Bid Tabulation Sheet 16 bids) - Other_ B. C. Approval: Legal Dept. Yes_ No_ N/A_ COUNCIL ACTION RECOMMENDED: Refer to Finance Dept. Yes_ No. N/A_ Utilities Committee Other Clearance FISCAL IMPAfT: Expenditure Required S Amount S appropriation- S Budgeted Transfer Required SUMMARY (Background information, prior action and effect of implementation) (Attach additional pages if necessary.) Engineer's estimate: $1,116,132.50 PARTIES OF RECORD/INTERESTED CITIZENS TO BE CONTACTED: SUBMIT THIS COPY TO CITY CLERK By NOON ON THURSDAY WITH DOCUMENTATION. AMRlIIIIRnI O( a�A A4 .� slim , W*W t a A25504-om ,p+ 111rnyM, WMNnytM 98bWO0a0 Cerifinte of Payment o. State E cite NOV 3 iSBT i Taxes by Public Works foatfacta 'y Contractor: I PWC 70 79; :J7: - 66 AZ- We hereby certify that taxes, increases and penab.ies due or to become due from.the above named contractor under Chapter 180, Laws of 1935, ;,s amenred, with respect to the following public works contract: .::Y CP together with all other taxes, increases and penalties due from such contractor, have been paid in toll or that they are, in the Department's opinion,readily collectible without recourse to the state', lien on the retained percentage. This certificate is Issued pursuant to the provisions of Chapter 60,28 Revised Code of Washington for the sole purpose of informing the state, county or municipal officer charged with the duty of disbursing or authorizing the payment of public fords to said contractor that the Department of Revenue hereby releases the state's lien on the retained percentage provided by this Chapter for ex- cise taxes due from said contractor. This certificate does not release said contractor fro liability for additional tax which ma} be later determined to be due with .espect to the ab(ve mentioned contract or other activities. Date At Olympia, Washington, f.,ri STATE OV WASNINMN DvphltTMENT of REVENUE .4C: :- . 17,1110.9 ofcrt ROl TI\G what Copy Itnbounµ Wi v l nn.ny C,q.. l'untnaw. fVRV RE4 II tV2t a.en Pink Cory -Irk. (nAdtnnd(,.pt SwW hic —t Z Engineering 1125.13 (.097) March 23, 1989 IMCO GENERAL CONSTRUCTION 4509 Guide Meridian Bellingham, WA 98226 ATTENTION: Mr. Frank Imhof Subject: City of Renton Well Yoe. 1.2.3 Rehabilitation Request for Warranty Service Dear Frank: This letter is a request for warranty service at Well Nos. 1-2-3 in the City of Renton. The work necessary ircludes the folluwnig: 1. Repair rain gutters damaged by the r^_cer-t snowfall. 2. Repair monerative wall ventilators and louvers in the chlorine and fluoride rooms. Please respond to this request as soon as possible. Contact Ray Sled at 215.2646 for access to the facility, and..pleaso keep us informed of your efforts and progress. "—Daniel R. Ervin, P.E. cc: Jack Crumley, City of Itenton Ray Sled, City of Benton Ron Olsen, City of Renton C.17Y Cr Kt!T v; E, . r,d Lcl.. 1410 Market Street, P.0 Box 1180, Kirkland,Washington 98033(206)827.6400 S1125 (.276) D 'r 'i, 1989 ` ` ' Mr Ror. Olsen CITY OF RENTON 200 Mill Avenue South Renton, WA 98055 SUBJECT: WELLS 1, 2, 3 REHABILITATION PPOJECT AS-BUILT PLANS Dear Ron: The enclosed drawings were used by RH2 Engineering in preparing the as-bailt plans for the above-referenced project. in accordance with Dan Ervin's instructions, they are being forwarded to you for archi- ving at the City of Renton. Thank you. Sincerely, RH2^^EEx7NNGINEERRING, P.S. R l, '244, Zita E. Petkus Records Enclosure: plans 1410 Market Street. P.O. Box 1180, Kirkland. Washington 98033(206)827.6400 ENDING QF FI� FILE TITLE V� 87Coe-�� (JAR - 9 S So+.ncFe.