Loading...
HomeMy WebLinkAboutWTR2700880(6) W-880 WELLS'41, #2, & #3 WELL HOUSE CONSTRUCTION WTR-9 1+ Daily Inspection Reports BEGINNING OF FILE so FILE TITLE moolo wo orp� 590L ! uA&I 04-U- house- SfRuCf' Qa ; Lx 1/o� pcf'en� Rok O.P.Ls* 1, 402, d 3 to? -ay. Y7 -rAQk �- is- as r r r r DAILY INSPECTION REPORTS FOR WELL NOS. 1, 2 & 3 12129187 - 06115188 r r r r CITY OF RENTON r r r r r r RH2 ENGINEERING, P.S. 1410 11ARKRT STREET A.U. BOX 1180 rKLRK1.AND, WA 98033 (206) 827.6400 ' (206) 463-0241 i 1 r TOTAL DYNAMIC HEAD (FT) t 0 V O N (Nn V O N fn V O N V O (n O (n O (n O (n O to O (n O O N t .. .. .. -- C V O .. .. Z 00 O .. .. .. .o..... G N ' .. .. Y N ........... ...j...._ Z ' (n - . .. .. ...... .. .. . a- - - - - -- - - - - - - N . . . . . . , J ' C � 0 v m v O W I N -� 7] ' DAILY INSPECTION REPORT ' PROJECT: Well Nos. 1, 2, A 3 REPORT MO. 97 City of Renton ' DAY: Wednesday DATE: 06/15/88 WORK PERIOD: 8:30 a.m./p.m. to 4:30 a.m./p.m. WEATHER: Clear TEMP. MAX. 65 OF MIN. 65 OF PRECIPITATION: None WORK ACCOMPLISHED TODAY: 3:00 p.m, - Two electrical crewmen are on-site. In the past two days 1mco has completed the hookup of the fluoridation system ' including the day tanks, saturator;, feed pumps, bag feeder, and have installed most of the grating. The chlorination system is ready for final piping. The remainder of the chlorination equipment has been delivered to the job site. 1 1 1 1 7 i• TONY PAPi. FK()JU;1 INSPLIA6R ' 3F, DATE: 1 ' DAILY INSPECTION REPORT tPROJECT: Well Nos. 1, 2, A 3 REPORT NO. 96 City of Renton ' DAY: Monde DATE: 06/13/88 WORK PERIOD: 9:30 a.m./p.m. to 4 30 a.m./p.m. WEATHER: Clear TEMP. MAX. 80 'F MIN. 65 'F PRECIPITATION: None WORK ACCOMPLISHED TODAY: 3:00 p.m. - Kelly informs Tony that imco is going have trouble getting a UL Inspector on-site until Wednesday. The Building Department has required that a UL label be posted on the motor control center before startup and testing. imco is ready to proceed with s}stem startup and testing, and are working on miscellaneous equipment such as tl,e emergency shower hose racks, and assorted louvers and ventilation grates. City park crews are breaking up the sidewalk between the pool and existing well house in preparation for pouring a new sidewalk. Punch list items: 1. There are gaps below several of the doors in the Fluoridation and Chlorination Roams 2. The rockeries along the loading dock and the electrical equipment do not have smooth, level tops. 3. The painting around the exterior door frames is not acceptable. a. The grout between t' , exterior face of the calls and the concrete columns is cracking and uneven from place to place. 5. Tne rain gutters and flashing on the east and west corners have warps. 6. Grating edges that have been cut need to be re-resined. 7. The ventilation louvers into the Pump Room are unsatisfactory. 8. The electrical conduit in the pipe gallery needs to he rerouted underneath the pipe. 9. The painting edge at the top of wall panels in the Pump Room is uneven. 10. The rain gutters leak. 1 t _ U ' 1125.13 TONY ?Wl, PROJECTINSPECT R G36/2 DATE: ' " DAILY INSPECTION REPORT PROJECT: Well Nos. 1, 2, 8 3 REPORT NO. 95 City of Renton ' DAY: Thursday DATE: 06/09/88 WORK PERIOD: _8:30 a.m./p.m. to 4:30 a.m./P.M. WEATHER: Cloudy TEMP. MAX. 65 OF MIN. 55 OF PRECIPITATION: None WORK ACCOMPLISHED TODAY: 3:00 p.m. - The rest of the motor control center has been delivered and is being installed. ' Tony is informed that all of the electrical equipment has been delivered. The plumber has finished piping up the copper pipe in the Mechanical Room. ' There are Imco four crewmen working on the electrical , one crewman working on the plumbing, and one crewman working on miscellaneous equipment. ' 1125.13 TdM 11 J PECTOR ' G32199 DATE: ' DAILY INSPECTION REPORT PROJECT: Well Nos. 1, 2, 6 3 REPORT NO. 94 City of Renton ' DAY: Wednesday DATE: 06/08/88 WORK PERIOD: 8:30 a.m,/p.m. to 4:30 a.m./pin. WEATHER: Sunny TEMP. MAX. 70 'F MIN. 55 'F PRECIPITATION: now_ WORK ACCOMPLISHED TODAY: ' 2:00 p.m. - Two of the three motor starters and breakers have been delivered to the job site and are being installed. ' imco has begun working on the sink in the Fluoridation Room and are continuing with the fluoridation chemical piping. ' The sidewalk and driveways turned out marginally acceptable with a brushed finish, and have some undesirable markings. 1 1125.13 G32/98 DATE: ' (AILY INSPECTION REPORT PROJECT: Well Nos. 1. 2, A 3 REPORT NO. 93 City of Renton ' DAY: Tuesday DATE: 06/07/88 - WORK PERIOD: 8:30 a.m./p.m. to 4:30 a.m./p.m. ' WEATHER: Cloudy TERN. MAX. 65 'F MIN. SS 'F PRECIPITATION: Rain WORK ACCOMPLISHED TODAY: ' The MCC did not arrive on-site yesterday as scheduled and is expected today. The transformers were delivered yesterday and installed in place, but still have have not been wired. f9:30 a.m. - The concrete subcontractor is preparing the sidewalk along Houser Way as well as the loading dock ramp. The concrete for the sidewalk has been delayed until ' 11:30 a.m. Sam from the Parks Department arrived on-site and expressed his concerns to Kelly: 1) Sam would like the landscaFing and sod squares oo the east side of the job site ' switched from what is shown on the plans, keeping the sod areas adjacent, 2) Sam would like the concrete mowing edge up behind the rockery to match that of the existing, and 3) Sam is concerned with the saw cutting along the sidewalk done by ' unto. Kelly Brown promised Sam that it would be fixed to his satisfaction, it began to rain during the pouring of the sidewalk, and the subcontractor G'.d not get the freshly poured concrete covered. Tony informed the concrete subcontractor ' that the concrete must be finished so it is satisfa^tory to the City. Kelly was informed by Ron Olsen that he may have occess to dismantle and to reinstall ' the existing fluoridation equipment one week prier to the system startup. Tony informed Kelly that the rain gutter is severely leaking on the east and west sides of the building. Kelly informs Tony that the sidewalk will be covered and will be refinished later. t1125.13 T NY PVUI, ROJ CT INSPECTOR G32/97 DATE DAILY INSPECTION REPORT PROJECT: Well Nos. 1, 2, d 3 REPORT NO. 92 City of Renton ' DAY. Monday_ DATE: 06/06/88 WORK PERIOD: 8_30 a.m./p.m. to 4:30 a.m./p.m. ' WEATHER: _ C-ot�y TEMP. NA1. 60 -F MIN. _SO 'F PRECIPITATION: Rain WORK ACCOMPLISHED TODAY: e 8:30 a.m. - The painting subcontractor painted the dividing wall between the pump and Mechanical Roams. ' Kelly informs Tony 'hat the rest of the motor control center and the transformers are due to arrive on-site this afternoon, Imco continues piping the chlorine and fluoride solution lines, and have most of the valve boards installed. The chemical feed pump control panels have been installed as well as the sprinkler syste, control panel . Two of the four sprinkler system deactivation panels have also been installed. ' The concrete subcontractor plans on pouring the sidewalk on Tuesday morning, June 7, 19R8. ' Tony informs the electrical sub to only cross the pipe gallery pit at the 24.inch stainless steel tee, and to keep the c *dint running along the pipe, underneath the ' pipe, and secured with either a tie-wrap or some other approved method. The first 60-volt chlorine bonster pump was delivered •0 the job site this morning, ' 1125.13 TONY PW,. PROJECT INSPEC R G32196 I DATE: i 1 ' DAILY INSPECTION REPORT PROJECT: well Nos. 1, 2, i 3 REPORT NO. 91 City of Renton ' DAY: Thursday DATE: 06/02/88 WORK PERIOD: B-30 a.m./p.m. to 4 30 a.m./p.m. ' YFATHFR: Cloudy TEMP, MAX. 65 'F MIN. 50 'F PRECIPITATION: _ Rain WORK ACCOMPLISHED TODAY: 10:00 a.m. - Imco installs the chlorine booster pump and piping. Tony reminds Kelly to coat all of the cit ends of the grating with resin. t1125.13 T Y PA YI, PRO.IEC INSPT ECTOR O32/95 DATE: ___� 1 DAILY INSPECTION REPORT PROJECT: Well Nos. 1, 2, i 3 REPORT NO. 90 City of Renton DAY: Wednesday DATE: 06/01/88 WORK PERIOD: 8`30 a.m./p.m. to 4:30 ' WEATHER: Cloudy_ TEMP. MAX. 53 _'F MIN. 45 'F PRECIPITATION: Rain WORK ACCOMPLISHED TODAY: ' 10:30 p.m. - Installed during the past two Jays were: valve boards, the grating in the pipe gallery, the stairways into the pipe gallery, the pressure gauges on the 12-inch main, the flammable cabinet in the Pump Room and in the Fluor;dation Feed Room. Imco has put together three valve boards partially complete, and some of the piping in the saturator pit has been installed. Two of the feed pumps are ready to be hooked up as well as the booster pump in the Mechanical Poom. ' The rubber seal between the double-doors in the Fluoride Storage Room does not close completely and allows air into the room. The fixed louvers in the exterior doors have been installed. ' Kelly informs Tony that the transformers will he on the job site Monday, June 6, 1988. The foreman for Triad "lectric informs Tony that the.power to the pump motors will be tried the next day. Triad has seven crewmen working on-site today. The joor between the Fluoride Rooms has been cut in preparation, for installing a window. The replacement louvers for the Chlorine Rooms have been delivered and installed. These louvers are capable of a tighter fit and an removable from the outside of the ' building. Tony reminds Mark Fowler of Triad to relocate the electrical conduit running along ' the 12-inch waterm.,,: in the pipe gallery pit to underneath the pipe. 1125.13 G32/94 TONY A i65EuT'fN$f��TtSR ' DATE: C ' DAILY INSPECTION REPORT tPROJECT: Well Nos. 1, 2, 8 3 REPORT NO. 89 City of Renton ' DAY: Friday DATE: 05/27/88 WORK PERIOD: 8:30 a.m./p.m. to 4:30 a.m./p.m. ' WEATHER: Cloudy_ TEMP. MAR. 50 'F MIN. 40 'F PRECIPITATION: Rain WORK ACCOMPLISHED TODAY: 1:00 p.m. - Imco has two crewmen working on the MCC, and one crewman working on the lights in the Chemical Rooms. ,mco has begun to install t,.e stairway stringers in the pipe gallery and the valve boards for the Fluoridation Ronm. ' Kelly Brown is not on the job site today. Gator of Imco informs Tony that ,mco will not Se working over the weekend, but will ' probably return to the job s;te on Monday. Cato, is working on the valve boards and the injection lines into the 24-inch main, t 1125.13 f Y P PROJECT IRSPECTOR G32193 DATE: 7/�� ' DAILY INSPECTION REPORT PROJECT: Well Mos. 1, 2, A 3 REPORT NO. 88 City of Renton ' DAY: Thursday DATE: OS/26/88_ WORK PERIOU: 8:30 a a•./p.+. to 4:30 a.m./p.m. WEATHER: Clear TEMP. MAR. 65 'F KIM. 55 'F PRECIPITATION: Mone WORK ACCOMPLISHED TODAY: 8:30 a.m. - The cabinets for the sink in the Fluoride Feed Room have been delivered to the job site. The floors in the north half of the building are ready to be walked on. The painter is on-site this morning and is sanding the exterior doors in preparation for another coat of paint. 9:00 a.m. - Progress Meeting with loco in attendance were Tony Pardi, Dan Ervin, and Kelly Brown. Points discussed: ' The major point discussed was the schedule. Kelly was informed that next Friday imco is supposed to be ready for system testing and startup according to the approved ' submitted schedule. Kelly states that because of delays in getting equipment such as the transformers and chlorination equipment imco will not be able to make this schedule. He estimates that imco will be able to startup the pumps around June 9 or 10, 1988. Kelly informs Tony and Dan that the chlorine equipment supplier has stated ' that the chlorine equipment has not been shipped yet and, if necessary. Kelly can install some temporary equipment. t Tony requested that Kel ,y make a list of the outstanding field work including a price summary and Tony will follow-up with the completed field order. The landscaping subcontractor is expected on site later this week or next week to finish the rockery. imco is going to get the sanitary sewer retelevisioned next week. ' Dan informs Kelly that Frank Imhof has to get Change Order No. 7 signed as soon as possible, and has to select an arbitrator by Friday. ' Dan asked Kelly to write a letter summarizing the schedule as determined by the promised arrival dates of the equipment that has not been delivered yet. Kelly is to ' include in this letter the dates that he ordered the equipment and make a proposal on getting the system on line and operational as soon as possible. The flooring subcontractor is finished with all of the floors except for a final coat ' in the pump room, and because of spills and stains that have occurred in the last week, they request that the final coat wait until the end of the project when they will repair the damaged areas and then apply the final coat. Tony approved the ' request. ' Inspection Report No. AA--pdge 2 May 26. 19M ' John Stein from the Street Department came on-site at 1:30 p.m. and painted the required replacement sections on the asphalt on Houser Nay. John stated to Kelly Brown that he hls to match the existing thickness. ' ;mco has three crewmen working on installing the last four bays of the motor control center, one crewman working on the valve boards in the fluoridation room, and one crewman working on the sink and cabinets. 1 ' DATE: ' DAILY INSPECTION REPORT PROJECT: Well Nos. 1. 2. 8 3 REPORT NO. 87 City of Renton ' DAY: Wednesday DATE: 05/25/88_ WORK PECIOD: 9:30 a.o_/p.o. to 4:30 a.o./p.m. WEATHER: Ptly. ClougU TEMP. PAX. 60 OF MIN. 50 'F PRECIPITATION: NOW WORK ACCOMPLISHED TODAY: Dan Ervin and Tony Pa.di met with Kelly Brown on the job site to discuss restoration of Houser Way. it was decided that Houser Way would be repaved as fellows: starting just north of the steps at the bathhouse, out about 15 feet, south to just north of ' the caanhoie, east to the centerline, then south to the bridge. Anything west of this description is to be repaved. Ray Sled was also present to discuss the transfer of the fluoridation equipment from the pool gallery to the new well bulling. Ray said that the Pqui pment can he out of service for a maximum of one day. It was decided that the transfer of equipment could he made in 1 to 1-1/2 days. Kelly Rrown will coordinate with Ray Sled as to the actual time of the transfer of equipment. 4 1125.13 M, Y G32/91 ' DATE: O 1 1 1 OAIL" INSPECTION R`:PORT PROJECT: Well Nos. 1, 2, A 3 REPORT NO. 86 City of Renton - ---- 1 DAY: Monday DATE: 05/23/88 WORK PERIOD: 8:30 a.m./p.m. to 4_30 a.m./p.m 1 WEATHER: — Clovly TEMP. M. 65 'F MIN. 50 'F PRECIPITATION: None WORK ACCOIPEIShED TODAY: 1 1:30 p.m. - The flooring contractor is on-site today and has informed Tony Pardi that the north half of the building will be ready to be worked on by Wednesday morning, and that the south half of the building will be ready by Thursday morning, 1 Three representatives from Triad Electric are on-site today taking receipt of the equipment being delivered. MCC bays 7, 8, 9, and 10 were deliverd earlier today. 1 The rest of the motor control center and electrical equipment is expected the later part of this week or early next week. 1 1 1 1 1 1 1 rrr, 1125.13 T N �, R JEC iNSPELTOR G32/90 DATE: 1 DAILY INSPECTION REPORT PROJECT: Well Nos. 1, 2, 8 3 REPORT NO. 85 City of Renton DAY: Tuesday DATE: 05/17/88 WORK PERIOD: 8:30 a.m./p.m. to 4_30 a.m./p.m. ' WEATHER: Windy. Cloudy. TEMP. MAX. 60 'F MIN. 50 'F PRECIPITATION: WORK ACCOMPLISHED TODAY,. ' imco crews worked both Saturday and Sunday of the previous weekend to complete the ceiling in the Pump Room and to remove the scaffolding. ' The rucKery subcontractor installed the rockery by the loading dock wall and around the electrical equipment on the south side of the project. There is still finishing work to be completed on the two rockeries. ' The flooring subcontractor acid-washed the concrete floors in the Well Building on Monday. May 16. 1988. 8:30 a.m. - Imco has one crewman using a small batkhor to prepare for the forming of the curb and gutter on Houser Way. The sidewalk subcontractor plans on pouring the curb and gutter later this day or tomorrow. Tony requested he compact the native ' material prior to putting a layer of 4-inches of structural backfill crushed rock and then compacting that before pouring. 1:00 p.m. - Imco's sidewalk subcontractor has formed the curo and gutter along Houser ' Way and still plans on pouring either today or tomorrow depending on the weather. Tony asked him to put down 4-inches of crushed rock and compact it with a hand compactor before pouring the curb and gutter. tA crewman infomos Tony that the left lane of Houser Way will be open for traffic by 3:00 p.m., and that he will place cones along the broken edge of the asphalt. ,mco was .'eminded on May 16, 1988 by the Renton Police Department that the traffic lanes have to be open by 3:00 p.m, everyday. The flooring subcontractor is not working today; he still ha: the heaters going to ' dry the floor after the acid-washing. The floors do appear dry at this time. t1125.13 T 1' PA VKUJLLT INSPECT ' G32/89 — DATE: 71:11000P t 1 DAILY INSPECTION REPORT 1 PROJECT: Well Nos. 1, 2, 6 3 REPORT NO. 64 City of Renton ' DAY. _ Friday DATE: 05/13/88 WORK PcRIOD7 _8:30 a.m./p.m. to 4_30 WEATHER: — Unudy TE14. MAX. uF WIN. 'F PRECIPITATION: Rain WORK ACCOMPLISHED TODAY: ' 1:30 p.m. It is ohvious that IMCO covered up the sidewalks before it started raining. The downspouts from the rain gutters have been installed and the sprinkler piping in the mechanical room has been painted. I talked to the plumbing sub about keeping the vent pipe up against the east/west and then coming across in one spot. 1 ' 1125.13 TONY Pr 1, PmuituiP i R G32/66 DATE: ' DAILY INSDECTION REPORT PROJECT: Well Nos. 1, 2, A 3 REPORT NO. 83 City of Renton ' DAY: Thursday DATE: 05!12/88 WORK PERIOD: 8:30 a.m./p.m. to 4_30 a.aijp.m. WEATHER: Clear Skies TEMP. MAX. 75 'F MIN. 60 'F PRECIPITATION: NOW WORK ACCOMPLISHED TODAY: 1:30 p.m. ' IMCO has been pouring the sidewalks around the building sir-e 9:30 a.m. they are now approximatemly 80% complete. Also, the painter is working, and he is painting the walls and ceilings in the chlorine and fluoride rooms. IMCO has one-third of the wood slats up in the pump room. The roofing subcontractor has installed the rain gutters. They do not meet the criteria of being straight and without warps. Kelly informs me that IMCO will be working Friday, Saturday, and Sunday, possibly, in order to get ready for the flooring sub to put the Torginol down on Monday. ' Kelly informs that IMCO had removed the half dam out of the saritary sewer manhole in order to television the sewer main and they have been waiting for acceptance from the City before re-installing the half dam. t 1125.1? TONY PAT PROJECT INSP R DATE: d t DAILY INSPECTION REPORT PROJECT: Well Mos. 1, 2. 6 3 REPORT NO. 82 City of Renton �— DAY: � 30e _ 83 . . p. . a n.0./p.m. WEAT4ER: Clear Skies TEMP. MAX. 80 'F HIM. 65 •F PRECIPITATign: None WORK ACCOMPLISHED TODAY: ' 11:30 am. Kelly called and informed me that the transformer inside the building has arrived and that it is larger than the housekeeping ped that was rnured fol it. t was agreed tha`. Kelly would add apprnxi-ately six inche, to the housekeeping ^ad in order for the transformer to fit. W.0 agreed to dowel into the f;oor and the existing housekeepin5 pad and to �-ave the flnering suh do that area at the pump roan of the builoing last. IWO has started putting the cedar trim at the ceiling level in the fluoride and chlorine roams. IMCO is arproximately 75% finisN d installing the insulation in the pump room, ' ;n stead of painting the insulation black, they are using tar paper to cover the insulation. I informed Kelly that the door between the fluoride storage and fluoride feed does not have a window In it as is shown on the plans. The sidewalk sutcontractor will install expansion joints at the building corners and along the bathhouse and along the well building opposite the retaining wall, and they will install expansion joints perpendicular to the building at the concrete columns, and intermediately between wall panels. IWO is going to pour the sidewalks Friday morning at 7:30 a.m. 1125.13 TON TONY PA PI, 4059-ET INSPECTOR r,32/hd DATE: S.� 1 1 DAILY INSPECTION REPORT 1 PROJECT: Well Mos. 1. 2. 6 3 REPORT NO. _ 81 City of Renton 1 DAY: Tuesday DATE: 05/10/88 WORK PERIOD: 9:30 a.m./;.A. to 4:30 a.m./p.m. 1 VEATIER: Partly Cloudy TEMP. MAX. 10 'F MIN. 60 'F PRECIPITATION: _None WORK ACCOMPLISHED TODAY: 1 2:00 P.M. The sidewalk sub is working on forming the sidewalk around the building perimeter, 1 The piping in the pipe gallery and the pumps and motors have all been painted Hidden Lake. :MCP has started on the insulation in the pump room, They .re using R30 insulation. 1 Roy Carr, the electrical subcontractor, is on-site today. iMCO has installed the rest of the sprinkler pipe which rums down into the chlorine roans. They have not 1 screwed on the sprinkler heads. IMC.O has installed the two wall-mounted fans from the mechanical room into the 1 fluoride roams. They are both Dynamasters, one is an 1`0108, the other is a model FQ9R, 1 i 1 1 1 1 1 1125.13 TONY PrOl, PROJECT INSPECTOR G32/63 DATE: 1 1 DAILY INSPECTION REPORT ' PROJECT: Mell Nos. 1, 2, & 3 REPORT N0. 80 City of Renton ' DAY: _Monday DATE: 05/09/BA WORK PERIOD: 8:30 a.m./p.m. to 4_30 a.m./p.m. MEANER: Partly Cloudy TEMP. MAX. 60 •F NIN. 50^•F PRECIPITATION: None WORK ACCOMPLISHED TODAY: t2:30 p.m. Eric Davidson with Metro called me earlier to verify the fact that the gravity sewer to Metro Manhole has been approved by the City. I told him to contact Ron Olsen :egardin,, that point. He also inquired as to whether or not a half dam had been installed in the upper half of the connection at the Metro Manhole. I told him 7 would verify it with Kelly. IMCO is approximately 90% done. with ti;e sprinkler system piping and they are now drilling the penetrations through the sheet rock. The electrical sub has set the boxes for most of the lights in both the north and south halves Of the building. The roofing sub finished up the additional flashing in the underside of the roof overhang. He still has yet to install the rain gutters. The sidewalk sub is on-site this afternoon, and he informed Kelly that he would be out tomorrow to start forming up the sidewalks, ' Dan informed Sam of the Parks Department that they can start Putting equipment into their chlorine roans in about three weeks. Kelly informed me that the floor Sub would be out next Monday to start work on the floors. 1125.13 'd G32/fi2 TD DA ROJECT 7NSPECTOk np DATE: jI„7a�rY� DAILY INSPECTION REPORT 1 PROJECT: Well Nos . 1, 2, 6 3 REPORT NO. 79 City of Renton 1 DAY: Friday DATE: 05/06/88 WORK PERIOD: 8:30 a.m./p.m. to 4:30 a.m.//k.w,_ WEATHER: Cloudy TEMP. MAX. 54 'F MIN. 44 'F PRECIPITATION: Rain _ WORK ACCOMPLISHED TODAY: 1 8:30 a.m. IMCO has sandblasted the fittings and has applied a primer coat to the fittings. The 1 roofing contractor is working on the flashing as requested earlier in the week. IMCO has the handles and locks on most of the doors. IMCO also sandblasted and primed on the sprinkler fittings in the mechanical roan. IMCO is approximately 75% 1 finished with the sprinkler pipe above the ceiling. The IMCO crew is not working today, only the roofing contractor. i 1 1 1 1 1 1 1 1125.13 Y R �, P E R 1 G32/61 OATS: G; 1 i ' DAILY INSPECTION REPORT PROJECT: Well lbs. 1, 2, A 3 REPORT NO. 78 City of Renton ' DAY: Thursday DATE: 05/05/98 WORK PERIOD: 8:30 a.m./p.m. to 4:30 a.m./p.■. WEATHER: Partly Cloudy .- TEMP. MAX. 55 OF MIN. 35 OF PRECIPITATION: Showers WORK ACCOMPLISHED TODAY: ' I informed Kelly Rrown that IMCO must sandblast all the pipe and fittings in the pipe gallery except for those fittings that were shop-primed prior to painting them, 3:00 p.m. ' Kelly called the office and informed Dan that they were done sandblasting the fittings and requested Dan to inspect the preparation prior to them painting. t G` 1 i 175.13 TO -PAPI, PROJECT INSPECTOR G32/60 GATE: 0 1 DAILY INSPECTION REPORT PROJECT: Well Mos. 1. 2, A 3 REPORT NO. 77 City of Renton DAY: Wednesday DATE: 05/04/88 WORK PERIOD: 8.3C a.m./p.m. to 4,30 a.m./p.m. WEATHER: _Cloudy _ TEMP. KAI. 58 'F MIN. 48 'F PRECIPITATION: Chance of Rain ' WORK ACCOMPLISHED TODAY: ' 0an and I had a meeting with the roof decking contractor in order to discuss the problem that we are having with the flashing. The flashing is not fitted properly and is therefore uneven on each side of the building. A crew of one is working on sacking and sanding the loading dock wall . A crew of one is working on installing the door hardware. A crew of three is +orking on the electrical conduit in the pump room. tI told the electrical sub to run any and all of the electrical corduit in the pump room vertically down from the ceiling to minimize the amount of conduit on the w4:1 . Also, any conduit at ceiling level should be above the wood slats. At another meeting the roofing contractor said that he would get the flashing fixed t and would also seal up the gaps that were up in t`,o cupola. IMCO has started work on the sprinkler pipe above the mechanical room. t ' 1125.13 TON' PAP1, PROJECTECTOR i G32/5g PATE: ��G ' DAILY INSPECTION REPORT ' PROJECT: Well Nos. 1, 2, 6 3 REPORT MD. 16 City of Renton DAY: Tuesday DATE: 05/03/88 WORK PERIOD: 8:30 am./p.a. to 4:30 a.a./p.o. WEATHER: Cloudy TEMP. NAI. 50 'F %IN. 40 'F PRECIPITATION: Raininl_ IMLO spent the day completing the interior walls in the north half of the huilding. ' The HVAC is only hooked up temporarily in order to get the paint fumes out of the building. ' I informed Kelly that we would like the addition of sic gate valves to the sprinkler pipe system in order to be able to isolate each room and turn off the sprinkler system in each individual room. ' The electrical sub is working on routing the power and instrument conduit from the motor control center to the north half of the building going up the ceiling above the wood slats. The painting sub is working on the pain- ing of the structural steel in the pump room, 1125.13 TONY P I, PROJECT 1NSPEf.TOR t 632/58 y 00.TE: ��p ' DAILY INSPECTICH REPORT ' PROJECT: Well Nos. 1. 2, & 3 REPORT NO. 75 City of Renton ' DAY: Monday DATE: 05/02/88 WORK PERIM: 8:30 a.m./p•m• to 4:30 a.m./p.m. WEATHER: Cloudy TEMP. HAK. 50 OF HIM. 40 OF PRECIPITATION: Rain $IMIARY OF WORK ACCOMPLISHED DURING THE LAST TWO WEEKS: The roof decking and flashing has been finished. The roof is finished except for the ' rain gutters. The interior sheet rock ceiling has been installed in the north half of the building and the HVAC is approximately 50% complete. The electrical sub has installed about 50% of the electrical conduit above the ceiling in the north half of ' the building. The stairs on the east and west side of the building have been installed, as well as all the housekeeping and pump support columns. Also, the thrust blocks in the pipe gallery have been poured. The grating for the t pipe gallery has been delivered to the job site, as well as the grating for the fluoride pit. The grating for the fluoride pit and the method of flashing in the cupola is not satisfactory, and Kelly has been informed that they must close up the ' slats with a larger piece of neoprene to keep out insects. IMCO has started installing the wood slats in the south half in the pump room. 1 i HY P i R SP EC�R 1 1 DAILY INSPECTION REPORT PROJECT: Well %as. 1, 2. 8 3 REPORT NO. 74 ' City of Renton DAY: Friday DATE: 4/15/88 WORK PERIOD: 8:30 a.m./p.m. to 4_30 a.m./p.m. ' WEATHFR: _ Cloudy TEMP. MAX. 65 'F MIN. 50 'F PRECIPITATION: None WORK ACCOMPLISHED TODAY: 1 10:00 a.m. - Kelly informs Tony that the cement mason crew has completed the interior walls, therefore, Tony contacts Pacific Testing Laboratories to take grout and mortar samples. 10:30 a.m. - A representative from Pacific Testing Laboratories arrives on-site to ' take grout and mortar samples. Kelly informs Tony that the roof decking crew will continue work on Saturday, April 16, 1988. ' Mark Semrau will be in charge of inspection for the next two weeks in Tony' s absence. 1 Advl ' R ECJ INSPECTOR 51125.13 /O G32/39 DATE: J O ' DAILY INSPECTION REPORT PROJECT: Well Nos. 1, 2, t 3 REPORT NO. 73 ' City of Renton DAY: Thursday DATE: 4/14/88 WORK PERIOD: 8:30 a.m./p.m. to 4_30 am./p.m. ' WEATHER: Cloudy TEMP. MAX. 60 'F MIN. 45_'F PRECIPITATION: None WORK ACCOMPLISHED TODAY: t8:30 a.m. - The roof decking crew of three has finished the cupola and are starting work on the roof decking on the main roof. ' Imco has two crewmen sanding the pipe gallery walls and wall columns, two crewman working on roof steel , two crewmen working on the CMU walls, three crewmen working on ' the roof decking, and three crewmen working on electrical conduit. The head block mason informed Tony that a bond beam would be poured the following day at approximately 11:00 a.m. Tony contacted Pacific Testing Laboratories for grout ' and mortar samples to be taken. 10:00 a.m. - Imco has two crewnen working on the roof, two crewman work on roof ' steel , two crewmen working on the CMU walls, two crewmen work on excavating for additional electrical conduit, and two crewmen sacking and sanding. ' 11:00 a.m. - Imco has two crewmen working on the CMU walls, two crewman working on roof steel, two crewmen sacking and sanding, two crewmen working on the roof decking, and three crewmen working on electrical conduit in the area of the Puget Power manhole. ' C ' T ,PROJQE�CT INSPECTOR G32/3613 DATE. `' %e 32/36 _ ' DAILY INSPECTION REPORT PROJECT: Well Nos, 1, 2, 8 3 REPORT NO. 72 ' City of Renton DAY: Wednesday DATE: 4/13/88 WORK PERIOD: 8:30 a.m.,p.m. to 4:30 a.m./p.m. WEATHER: _ Ctoudy TEMP. MAX. 60 'F WIN. 45 'F PRECIPITATION: _ None WORK ACCOMPLISHED 'TODAY: 8:30 a.m. - The wall louvers for the chlorine rooms were delivered to the job site the previous day. They are not as RH2 designed, and do not appear to be heavy-duty ' enough for the application. Imco has three crewmen working on the CMU walls, three crewmen working on conduit in ' the CMU walls, two crewmen working on the roof decking for the cupola, and two crewmen sawing the third skylight frame. 10:00 a.m. - Imco has three crewmen working on the roof decking for the cupola, three ' crewmen working on the CMU block, three crewmen working on electrical conduit, and two crewmen installing the third skylight frame. The masons are done with the long, east-west, CMU wall, and seventy-five percent c�,plete with the north-south wall of ' t'ie mechanical room. 1:00 p.m. - Imco has three crewmen working on roof decking for the cupola, one ' crewmen working on shackle rods for the discha aping, four crewmen working on CMU block walls, three crewmen working on electrica. ..onduit, and one crewman working on miscellaneous roof steel, 2:30 pie. - Imco has three crewmen working on the roof, three crewmen working on conduit in the CMU walls, and two -rewnen working on the roof structural steel. 3:30 p.m. - The cement mason crew finishes up for the day. Thr-e Imco crewmen finish putting decking on the cupola. The electrical crew of three are also finishing up for the day. Three crewmen perform general clean-up and sweeping of the floors. TONY�ARDI. PR ECT INSPECTOR 51125.13 G32i35 DATE: �� DAILY INSPECTION REPORT PROJECT: Well Nos. 1, 2, 8 3 REPORT NO. 71 tCity of Renton DAY: Tuesday_ OATE: 4/12/88 _ WORK "ERIOD: 8:30 a.m./p.m. to 4.30 a.m./p.m. _ WEATHER: Clear_ TEMP. MAX. 70 'F MIN. 55 'F PRECIPITATION: None WORK ACCOMPLISHED TODAY: Mark Semrau was the inspector for the first part of the day. ' 1:30 p.m. - Imco has four crewmen working on the CHU walls, three crewmen unloading block, and three crewmen are working on the electrical conduit. ' Imco has installed three-fourths of the shackle rods. 2:30 p.m. - Imco has three crewmen working on the electrical conduit, three crewmen working on roof decking for the cupola, and two crewmen installing the third skylight ' frame. 1 1 51125.13 G32/34 DATE: .S DAILY INSPECTION REPORT PROJECT: Well Mos. 1. 2, A 3 REPORT NO. 70 City of Renton DAY: Monday DATE: 4/11/88 WORK PERIOD: 8:30 a.m./p.m. to 4_30 a.m./p.m. ' WEATHER: _ Clear--,-- TEMP. MAX. 65 'F MIN. 50 'F PRECIPITATION: None WORK ACCOMPLISHED TODAY: ' 8:30 a.m. - Another truckload of block is delivered to the job-site. Imco has four crewmen laying CMU block in the center wall and have progressed up to the ceiling line. Block outs have been inserted for the two ventilation ducts. Three crewmen work on the power conduit to the bathhouse, one crewman is working on ' grouting the pipe support for the four-inch pipe in the mechanical room, and one crewman is working on the remaining roof steel. Equipment on site includes: a small backhoe, boon truck, and a crane. The equipment ' has remained unchanged for several weeks. One crewman is working on shackle rods for the 12-inch discharge pipe. ' 9:30 a.m. - The roof decking subcontractor arrives on-site with a crew of two. ' Imco has four crewmen cementing the wall , three crewmen working on the conduit for the bathhouse, one crewman working on the shackle rods and discharge pipe, and one working on the roof steel . 11:00 a.m. - Kelly is informed that the electrical subcontractor cannot run the electrical duct bank horizontally, but has to conceal the electrical conduit above the wood slats. This is per the earlier agreement with Roy Carr, ' Imco has four crewmen laying block, three working on conduit in the bathhouse. one working on the shackle rods, and one working on flashing for the wall panels. ' 1:00 p.m. - Imco has four crewmen working on the CMU block, three working on the electrical conduit in the bathhouse, two crewmen weld+ q in the cupola area, and two crewmen fabricating decking for the roof, ' 2:00 p.m. - Three crewmen are pulling conduit in the bathhouse, three crewmen working on the roof, four crewmen working on CMU block, and one crewman working on forms for ' the thrust block in the pipe gallery, 3:00 p.m. - The cement mason crew finishes up for the day. The center wail is completed and are in the process of taking down the scaffolding, The Imco crewmen continue to work on the roof. ' I, E INSPECTOR 51125.13 tG32/33 DATE: ' DAILY INSPECTION REPORT PROJECT: Well Nos. 1, 2, 3 3 REPORT NO. 69 ' City of Renton DAY: Friday_ DATE: 4/8/98 WORK PERIOD: 8:30 a.m./p.m. to 4_30 a.m./p.m. ' WEATHER: Cloudy TEMP. MAX. 50 'F MIN. 40 'F PRECIPITATION: Rain WORK ACCOMPLISHED TODAY: t8:30 a.m. - ;mco has two crewmen working on roof steel , and three crewmen laying brick, ' Dan gave Kelly a verbal OK to install score flashing around the edge of the cupola to improve the appearance. Kelly said the cost would be $638.00. It will tv. handled in ' two field work directives. 9:30 a.m. - Imco has two crewmen loading the excess woven wire mesh that is being stored in the parking tot, and three crewmen are laying CMU block, 11:00 a.m. - Kelly is sending two crewmen to another job, and is also leaving the job site for approximately 1-1/2 hours. Three crewmen continue to lay brick. ' 2:00 p.n. - !mco has three crewmen laying brick. The center wall up to the course above the windows has been completed. One crewman is working on the vent pipe in the ' wall . 1 TONY </ 7 T INSPE T R G3?ill DATE: DAILY INSPECTION REPORT PROJECT: Nell Nos. 1, 2. A 3 REPORT NO. 68 City of Renton DAY: Thursday DATE: 4/7/88 WORK PERIOD: 8:30 a_w./p.m. to 4_30 ' WEATHER: Ptly. Cloudy TEMP. NAM. 50 'F MIN. 40 'F PRECIPITATION: Rain,' WORK ACCOMPLISHED TODAY: Mark Semrau was in charge of inspection from 6:00 a.m. to 1:00 p.m. 2:00 p.m. - Imco has three crewmen working on the center interior wall. Blocks have laid up to bottom of the two interior windows. Three crewmen are working on the roof structural steel, and three crewmen are pulling wire through the electrical conduit. 3:00 pie. - Imco has three crewmen installing the two windows in the center wall , along with laying more brick. Three crewmen continue work on the roof structural ' steel , and three crewmen continue pulling wire through the electrical conduit. Kelly informs Tony that the Building Inspector will be on-site to inspect the middle bond beam the following day, and the cement mason should be at that point by that time. Remaining work on the roof structural steel includes: 1) installation of the 3-inch ' channel sections on the outskirts of the roof overhand, 2) skylights and skylight frames and, 3) installation of roof decking. The roof decking subcontractor will be on-site on Monday, April 11. 1988 to install the roof decking. t 4:00 pie. - cement masons finish up for the day. Three crewmen have laid brick up to the top of the previously installed windows. Three crewmen continue to work on roof structural steel , and the electricians are done for the day. ' Kelly informs Tony that the pump motors will only be gone for 2 or 3 days. Tony informs Kelly that a continuous weld is necessary in the pump room only on the steel plate that is just above the wall panel and just below the box section. The reason being that the steel plate will be visible when finished. The continuous weld is not necessary in the north half of the building. Tony instructs the electrical subcontractor that the Chlorine Storage Roar No. 2 is not to be used as originally designed, and to delete the chlorine detector and add an ' extra convenience outlet in the south wall for a total of three. The pa. Ic button will still be installed, as well as the chlorine sprinkler disable button. ' TT4:A4�1, PR E T I1115PEC $1125.13 'i ' DATE: G32131 __ ' 1 1 DAILY INSPECTION REPORT PROJECT: Well Nos. 1, 2, 8 3 REPORT NO. 67 1 City of Renton DAY: Wednesday DA' 4/5/88 WORK PERIOD: 8:30 a.m./p.m. to 4_30 a.m./2.a. 1 WEATHER: Cloudy TEMP. MAX. 52 'F MIN. 43 •F PRECIPITATION: Rain 1 WORK ACCOMPLISHED TODAY: 2:30 p.m. - Tony informed Kelly Brown that it would be satisfactory if Imco installed the 1" % 4" wood trim in the pump room at 90' to the original design. The -- pieces would run crosswise to the radial roof beams. Tony was informed by Kell. ..%t Imco plans on using clear, vertical grain fir or hemlock, instead of oak as specified on the drawings. 1 Imco has two crewmen working on welding roof steel. The cement mason is not on-site today due to rain. 1 Kelly also informs Tony that the roof decking subcontractor will start work on Monday, April 11, 1988. 1 TONY 1 1 1 i 1 1 P P I S�fibR 31125.13 G32/30 DATE: 1 Tj- i 1 1 DAILY INSPECTION REPORT PROJECT: Well Mos. I, 2, A 3 REPORT W. 66 City of Renton -- DAY: Tuesday DATE: 4/5/88 WORK PERIOD: 8:30 a.m./p.m. to _4:30 aim./p.m. ' WEATHER: Cloudy TEMP. MAX. 50 'F MIN. 40 'F PRECIPITATION: Rain WORK ACCOMPLISHED TODAY: ' 2:30 p.m. - The cement mason begins on the center interior wall . Imco has three crewmen working on the roof structural steel , and the three electrical crewman are pulling wire through the new underground conduit. The cement mason quit work with the hard downpour of rain. The three pump motors have been removed from the job site, A Parks Department crew has started backfilling the 8-inch and 4-inch PVC conduit that runs parallel with the north wall of the new well building. 3:00 p.m. - Imco has two crewmen installing the pipe gallery grating edge support against the center wall . Tony requests that Kelly close one lane of Houser Nay only when absolutely necessary, especially in the evening hours during heavy traffic, E T INSVFCTOR 51125.13 G32/28 DATE: -57�7; DAILY INSPECTION REPORT ' PROJECT: Nell Mos. 1, 2, 8 3 REPORT NO. 65 City of Renton ' DAY: Monday_ DATE: 4/4/88 WORK PERIOD: 8:30 a.s./p.s. to 4_30 a.m./p.m. WEATHER: Cloudy TEMP. MAX. 50 'F MIN. 38 'F PRECIPITATION: Rain WORK ACCOMPLISHED TODAY: 8:30 a.m. - The remainder of the roof structural steel is delivered on-site. Imco has accomplished approximately 85 percent of the ins•-llation. t Imco has two crewmen welding the interior flashing above the walls. Kelly is required to have a continuous weld on the interior flashing above the walls on the south half of the building in the pump room, since it will be visible. Because the cup.-la roof steel was done differently than detailed, Kelly was asked to finish the ' cupr`a roof edge similar to the building roof edge. Kelly discussed with Tony and Dan several problems concerning the grading, Kelly ' said he would speak with Frank Imhof on whether or not a supplement grading plan is needed. Kelly feels it would not he needed. t Kelly informs Tony that the pump motors are being shipped back to the factory, Sam Chastain, Parks Department, has informed Kelly that There are plans to replace the gutter and sidewalk south of the pool and north of the r,isting well house building. ' Tony is informed that the concrete mason will be on-site today to start the Interior walls. ' Imco has four crewmen working on-site, one crewman is installing door frame'. in the interior of the building. The landscaper completes the sodding on the east side of the pool and bathhouse. 10:00 a.m. - Imco has two crewmen working on the flashing above t:ie wall panels, one crewman placing door frames, and one crewman v-orking on general cleanup. The cement mason asks Tony if the masonry walls will be tied into the concrete rolunns, as it had not been shown on the play-. Tony contacted Dan Say of Ratti , ' Perbix, and Clark and he suggested that it would be a good idea. The mason will use No. 4 dowels at four foot spacing. 11:00 a.m. - Three Imco crewman place the outermost structural steel on the roof, and one crewman does generals cleanup. 11:40 a.m. - A load of CMU arrives on-site. 1 1:00 pin. - Imco has three crewmen working on roof steel and one crewman preparing ' for the cement mason's work the following day. 3:00 pin. - Imco has three crewmen working on roof steel, and one crewman cutting out the interior floors. The Parks Department crew was digging a trench along the north wall of the building ' in preparation for installing a util!ty pipe, they have 8-inch PVC or,-site. It will be located half-way between the bathhouse and the north wall of the well building. 1 t I, CT INSPECTOR 51125.13 Mff G32/27 DATE: DAILY INSPECTION REPORT PROJECT: Well Nos. 1, 2, A 3 REPORT NO. 64 City of Renton ' DAY: Thursday DATE: 3/31/88 WORK PERIOD: 8:30 aA.!p.w, to 4_30 a.m./p.m. WEATHER: Ptly. Cloudy TEMP. MAX. 60 'F MIN. 55 'F PRECIPITATION: Mone WORK ACCOMPLISHED TODAY: ' 2:00 p.R. - The landscaping contractor is approximately 40 percent complete on the sod protect. t Imco continues to place the roof structural steel, and are approximately 50 percent complete. A catch basin was placed at the northeast corner of the well building. Except for the shackle rods, Imco has completed the work on the 12-inch discharge ' piping and the 6-inch well bypass piping, Sam Chastain informs Tony that the landscaping work is satisfactory, tImco has three crewmen on-site sacking and sanding. t Kelly informs Tony that the cement mason subcontractor will start placing block on Tuesday morning, April 5, 1988, Tony is also informed that Imco will not be working on Friday. April 1, 1988. ' Tony asks Kelly to clean the street before the end of work today. Puget Power installed two vaults. I S1125. INSPECTOR G32/26 _ 32l26 DATE: S �� DAILY INSPECTION REPORT PROJECT: Well Nos. 1, 2, i 3 REPORT NO. 53 City of Renton ' DAY: Wednesday DATE: _3/30/88 WORK PERIOD: 8:30 a.m./p.a. to 4_30 a.m./pin. ' WEATHER: Ptly. Cloudy TEMP. MAX. 50 'F MIN. 45 'F PRECIPITATION: None WORK ACCOMPLISHED TODAY: ' 2:30 p.m. - A load of sod is delivered to the job site on palettes, topsoil is spread over the area to be sod. Ten percent of the sod has beer placed, and is very mushy when walked across. ' Imco has begun to erect the structural steel for the cupola. ' Spools of electrical wire have been delivered to the job site. Imco has throe crewmen on-site, and two subconsultants doing electrical work. One crewmen is working on sanding the pipe gallery walls. Imco has backfilled the northside of the building with structural fill and compacting with a hand-compactor. ' Kelly informs Tony that the landscaper will be on-site on Wednesday, March 30, 1988 and it will take several more days for canpletion of his work. ' Tony is informed by Kelly that Sam Chastain, Parks Department, has been on-site twice and he is satisfied with the landscaping in progress. 1 foxy PARU11 E"TU Sli2F.13 n3212i DATE: �� ��• 1 DAILY INSPECTION REPORT PROJECT: Nell Mos. 1, 2, A 3 REPORT NO. 62 ' City of Renton DAY: Tuesday DATE: 3129/98 WORK PERIOD: 8:30 a.m./p.m. to 4_30 a.m./p.m. WEATHER: Cluudy TEMP. MAX. 50 OF MIN. 40 OF PRECIPITATION: None WORK ACCOMPLISHED TODAY: 2:30 p.m. - Imco has three crewmen on-site, two dre sacking and sanding, and one is working on the 4-inch piping and 3-inch double-check valve. ' Kelly informs Tony that the landscaping subcontractor will be on-site on Wednesday, March 30, 1988 to grade and lay sod in the park area. Tony is also informed that ' Kelly's crew will continue to work on sacking and sanding. Imco still awaits the return of the roof structural steel, 1 51125.13 T Y ,,Cp OR INSPECT G32/24 DATE: ...`�/9�(!op, 1 DAILY INSPECTION REPORT ' PROJECT: Well Nos. 1, 2, 6 3 REPORT NO. 61 City of Renton ' DAY: Monday DATE: 3/28/88 WORK PERIOD: 8:30 a.m./p.m. to 4.30 a.m./p.m. ' HEATHER: Cloudy TEMP. MAX. 50 'F MIN. 40 'F PRECIPITATION: None WORK ACCOMPLISHED TODAY: ' 1:00 p.m. - Imco did not work on Friday, March 25. 1988. The roof structural steel has been delivered back on-site. Imco is proceeding with ' putting up the steel . Imco has three crewmen working on-site. Kelly informs Tony that only part of the roof structural steel was delivered, it was ' determined that only four of the dozen that were delivered actually fit. The rest need to be sent back again. Tony reminds Kelly to clean the street and fix the filter fence before the end of the ' day. Kelly informs Tony that Imco will spend the rest of this day and Tuesday, March 28, 1988 working on grouting and sanding with a minimal crew. A load of top soil was delivered to the site and placed in the park area where the sanitary sewer was installed. TOMY I,' PR EC INSPECTOR 51125.13 l/� p G32/23 DATE: e DAILY INSPECTION REPORT ' PROJECT: Well Nos. 1, 2, 8 3 REPORT W. 60 City of Renton ' DAY: Thursday DATE: 3/24/BR WORK PERIOD: 8:30 a.m./p.m. to 4_30 a.b./p.m� WEATHER: Cloudy TEMP. MAX. 50 'F MIN. 40 °F PRECIPITATION: Rain WORK ACCOMPLISHED TOOt.Y: ' 3:00 p.m. - Imco has spent the day working on the discharge piping beginning with Well No. 1. ' 3:30 p.m. - Weekly Meeting with Imco In attendance: Dean Irwin, Ron Olsen, Dan Ervin, Rick Harbert, Tony Pardi , and Kelly Brown ' Points covered: ' ° Imco stated that the roof structural steel will be back on the job site next week sometime (no firm date). ' Dan requested that Imco get the radial roof beams plumbed before installing the 1 purli n5. ' Imco is to respond to the letter stating that RH2 Engineering is at fault in the dimensioning of the roof steel. The response is to show that the dimensional errors did not come from the plans, but were the fault of the steel supplier. ' Frank Imhof takes issue with Change Order No. 7. Frank feels this change order should include the stand-by time of the Hitachi H09. The City will not pay for additional rockery due to the fact that larger -lectrical equipment is to be used. Also, the City will take into consideration a rockery that would be slightly higher than the three foot planned dimension, however, from the layout on the jobsite, the rockery will not be as high as stated in Imco's letter to RH2 Engineering. A five foot height would be more practical . ' Imco is to provide the Intent to Pay Prevailing Wages on all classifications of work performed on the job site. Several classifications are still missing. Imco is to send the Monthly Manpower Utilization Reports from all subcontractors. Imco ' is to provide RH2 Engineering with a letter stating how they plan on fixing the non-draining portions of the floor slabs. Kelly states that Imco will not be working on Friday, March 25. NY Vein.t PROJE T �INSPECTOR S1125.13 G32/22 OATS: tDAILY INSPECTION REPORT PROJECT: Well Mos. 1, 2, 8 3 REPORT NO. 59 City of Renton ' DAY: Wednesday_ DATE: 3/23/88 WORK PERIOD: 8:30 a.m./p.m. to 4_30 a.m./p.m. WEATHER: Cloudy TEMP. MAX. _ 50 _'F MIN. 45 'F PRECIPITATION: Rain/a.m. tWORK ACCOMPLISHED TODAY: t 3:00 p.m. - Imco has spent the day working on the discharge piping on Well No. 3; they are about 50 percent complete. Imco also spent the day working on grouting, door frames, and the main underground electrical conduit. Tony informed Kelly of the meeting between Imco and the City of Renton on Thursday, March 24, 1988 at 3:30 p.m. Tony reminded Kelly that he needs to get the filter fence prepared by the end of the day. ' Kelly was informed by Tony that the floor slab that was poured is unacceptable as is, and the drainage problem would have to be fixed. Kelly said he would like to speak with the Torgonal flooring people to see if they can work on the drainage problem. 1 t PROJECT INSPECIUR G92iZ; GATE: —> DAILY INSPECTION REPORT PROJECT: Well Nos. 1. 2, b 3 REPORT NO. 51 City of Renton tDAY: Thursday DATE: 3/10/88 WORK PERIOD: 8:30 a.m./p.m. to 4:30 a.m./P.m, WEATHER: clear TEMP. MAX. 55 'F MIN. 42 'F PRECIPITATION: None WORK ACCOMPLISHED TODAY: 8:30 a.m. - Imco has two crewmen excavating for the main power line using a small hackhoe, one crewman pouring grout underneath the last of the wall panels, and one crewman preparing for the pouring of the floor slabs in the north half of the building, 9:00 a.m. • The pump and bowls arrive on-site. Kelly states to Tony that Imco will be installing the pump on Monday, March 14, 1988. and will be cutting the casing either this day or Friday, March 11. 1988. The floor slabs for the north and south half of the building will be poured on March 15. 1988 ' or March 16, 1999. 9:30 a.m. - Imco has two crewmen unloading the casings and pump, one crewman preparing for the pouring of the floor slab, and two crewmen working on the main power and telemetry conduit. ' 10:30 a.m. - Weekly Meeting with Imco Present were Dan Ervin, Tony Pardi , Ron Olsen, Kelly grown, Roy Carr Points covered: Imco was warned again to keep the street clean because of the numerous complaints. ' Imco was also asked to do a better job of with flagmen directing traffic when trucks leave or enter the site. The MCC will be field painted, instead of shop painted. The above-grade, obscure electrical equipment is also to be painted. The color will be determined at a later date. Since electrical conduit was not placed inside the wall panels during fabrication, we are requiring that the electrical contractor keep the amount of electrical conduit running up the interior of the wall to a minimum, and all light boxes are to be of an interior type. 12:30 P.M. - Imco has three crewmen excavating at the south end of the job site for the electrical equipment, two crewmen preparing the weld casings to be cut off later this day. i Inspection Report No. 51--Page 2 March 10, 1988 Tony instructs Kelly to clean the street and put gravel down over the mud so not as ' much would enter Houser way. 1:30 p.m. - Imco has three crewmen placing the primary power handhole, and two c ewer working on separations of Well casing No. 3. 2:00 p.m, - Imco has one crewman cutting existing Weld Facing No. 2, a crew of two placing expansion joints in preparation for pouring the concrete floor, and a crew of ' three working the main power conduit. Kelly informs Tony that he ordered a load of crushed rock to place over the mud at the entrance to Houser Way and will place it down Friday, March 11, 1988. 1 3:00 p.m. - Imco has one crewman cutting the third well casing, two crewman working on expansion joints, and two crewmen working on general cleanup. 1 TDA 1 1 J Y P JE INSP�6R 1125.1 G29/523.36 DATE: y �� 1 t ' DAILY INSPECTION REPORT PROJECT: Well Nos. 1, 2, A 3 REPORT NO. 52 city of Renton ' DAY: Friday DATE: 3/11/88 WORK PERIOD: 8:30 a.m./p.m, to 4 30 a.m./P.m. ' WEATHER: Clear TEMP. MAX. 60 'F MIN. 40 'F PRECIPITATION: none WORK ACCOMPLISHED TODAY: ' 8:30 a.m. - There are two 6-inch (approximately) PVC conduits travelling west from the existing primary switch at the south end of the job site. The conduits were broken on March 10, 19R8 by Imco. Kelly informs Tony that the representative from Puget Power will be on-site this morning to fix the conduits. Imco has three crewmen placii.g the sole plate No. 3, and two crewman working on the power conduit. The electrical inspector is on-site to inspect the conduit runs from the building to the electrical equipment and was not satisfied with the work, but did signed off on ' it. 9:30 a.m. - Imco has two crewmen placing sole plate No. 2,"and one crewman cle„nino up the street. 10:30 a.m. - Imco has two crewmen excavating for power conduit, and two crewmen finishing the cleaning of Houser Way. 10:40 a.m. - While excavating for the power conduit along the southern walkway, Imco broke what appears to be a telephone cable. 11:30 a.m. - Imco has two crewmen excavating for power conduit, and two crewmen placing the third sole plate. ' Tony asked each of the Imco crewmen their position and wage rate to see they were getting paid prevailing wages, as follows: Laborer $18.64 Carpenter S20.S8 Operator S22.25 ' Tony infonaed Kelly that the backfill Imco used to backfill part of the trench for the electrical equipment is unsatisfactory. Structural fill is required in that ' area, also, it needs to be compacted. Kelly said he would comply with Tony's request. t Inspection Report No. 52--Page 2 ' March 11, 1988 Tony reminded Kelly to cover the well casings. Kelly said he would place plywood ' over the top and wrap plastic around that. 1:00 p.m. - Imco finishes work for the day. 1 *Y - T G2 /5 .P"Et INSPErTOR -- 933.36 G29/53 GATE: t tDAILY INSPECTION REPORT ' PROJECT: Well Mos. 1, 2, 8 3 REPORT NO. 53 City of Renton DAY: Monday_ DATE: 3/14/88 WORK PERIOD: 8:30 a.m./p.m. to 4:30 a.m./p.m. WEATHER: Partly Cloudy TEMP. MAX. 55 'F MIN. 40 'F PRECIPITATION: None WORK ACCOMPLISHED TODAY: ' IMCO has a crew of four working on placing the pump shaft into Well No. 3, and a crew of two working on preparation, of the north half of the building for pouring the floor slab, 9:30 a.m. - IMCO has had some trouble with the couplings with the pump shaft. Therefore, they have sent them back to the shop to have the shafts re-threaded, so ' they expect a delay of about a couple hours. They have installed up to this point about one-third of the pump shaft in Well l'i. 3. IMCO has a crew of one working on grouting the interior of the space between the wall ' panels and columns, and a crew of two working on the rebar for the floor slab in the north half of the building, a crew of one mixing grout, and a crew of one working on preparation of the pump shaft for when the couplings and shafts come back from the machine shop. 10:30 a.m. - IMCO has a crew of two working on grouting the space between the panels ' and columns, a crew of three working on the woven wire mesh for the fluor slab, and a crew of one working on unloading a load of structural fill , 2:00 p.m. - The pump shafts are back and they are progressing with their installation. They have two of the suppliers WorKing on it. IMCO has a crew of two working on the preparation for the pouring of the floor slab, and a crew of two has been working on the electrical conduit all morning, ' 2:15 p.m. - IMCO has just finished placing the first rump head on Well No, 3. 3:00 p.m. - IMCO has a crew of five working on installing the pump shaft and column in Well No. 2. They also have a crew of two working on preparation of the pouring of the floor slab, and a crew of one is working on grouting. A representative from Byron Jackson, Mr. Jim Miller, has been on-site all day, as required in the specifications. The following wages are being paid to two electrical subs: Journeyman Electrician E22.89 Apprentice to Journeyman Electrician 12.58 1 ' 4:00 p.a. - IMCO has a crew of five working on installing the second pump ' shaft and column into Well No. 2, a crew of one working on grouting, and a crew of two working on the preparation of the pouring of the floor slab. rx � o ' T vpigil-�Irf1 DRIT ICT R G29/66S1125.13 029/66 DATE: A7 DAILY INSPECTION REPORT PROJECT: Well lbs. 1, 2, 8 3 REPORT NO. 54 City of Renton DAY: Tuesday DATE: 3/I5/88 WORK PERIOD: 8:30 a.m./p.m. to 4 30 a.m./p.m. WEATHER: Clear TEMP. MAX. 65 OF HIM. 40 OF PRECIPITATION: None WORK ACCOMPLISHED TODAY: 2:00 p.m. - Mark has been the inspector for the first part of the day from 8:00 a.m. to 2:00 p.m. in my absence. t IMCO has a r.rew of four working on the preparation of the pouring of floor slab, which will be Thursday at 8:00 a.m. They are pumping the concrete in. I reminded Kelly to get the street sweeped up before the end of the day. ' Roy Carr and i discussed the options available on the electrical equipment on the southwest sidr of the site regarding the opening directions of the doors. It was our decision that the doors should open opposite the area's access from the front, which is the walkway side of the electrical equipment. Kelly informed me that they will sweep the street before the end of the day. 3:00 p.m. - Kelly informed me that they will spend the rest of the day cleaning up and furthering their preparation for the concrete floor on Thursday morning, ' Dean Irwin of INCO was informed at 4:30 p.m, that the grading edge supports for the pipe gallery and saturator pit have been rejected due to the fact that IMCO welded the corners of the gradient edge supports, which nas destroyed the galvanizing. He ' was told that they would not be accepted until they were re-galvanized by the hot-dip method. t S1125. t ' 13 TORY 6 0�NV CfOR G29/67 DATE�/��7/Oil DAILY INSPECTION-REPORT ' PROJECT: well Nos. 1, 2, 8 3 RFPORT NO. 55 tCity of Renton DAY: Wednesday DATE: 3/16/8A WORK PERIOD: 8:30 a.m./p.m.•�• to 430 a.m./,-.�. ' WEATHER: _ Clear TEMP. MAX. 60 'F MIN. 40_'F PRECIPITATION: None ' WORK ACCOMPLISHED TODAY: Kelly informs me that he intends to pour the concrete floor tomorrow without repairing the damaged galvanized grating edge supports, and that the bag feeder ' tracks will be delivered black and painted, not galvanized, 8:30 a.m. - IMCO has a crew of two working on the preparation for the pouring of the ' floor slab, a crew of two backfilling the electrical conduit, and a crew of une working on grouting. I informed Kelly that the backfill, electrical conduit, they must pour pea gravel around the conduit and then structural fill from there to final ' grade, and it must be compacted. 9:00 a.m. - IMCO has a crew of one rutting radient edge supnort in the saturator pit in two places. 10:00 a.m. - i'ICO has a crew of three working on backfilling the electrical conduit, and a crew of tvo working on preparation of the concrete for tomorrow. They have cut out the section of grating edge support where the hag feeder tracks would be in order to attach the bag feeder tracks to the grating edge supports. A crew of one is working on grouting in between the wall columns and wall panels. ' 11:OO a.m. - IMCO has a crew of one working on backfilling the electrical conduit, a crew of two working on backfilling and compacting behind the loading dork retaining wall , and a crew of one working on groutin Kelly was informed that in order for them to be allowed to pour tomorrow and the grating edge supports to be approved, they must give to us sufficient information that their me hod of repair is adequate, along with an approved credit for the non-specified work, ' 1:00 p.m. - IMCO has a crew of two grouting, and too working on preparation for the pouring of the floor. ' 2:00 p.m. - IMCO has a crew of two working on the preparation of the forms for the stairs in the east side of the job site, a crew of ore working on backfilling the electrical conduit, a crew of two working on grouting, Kelly left the job site at approximately 1:40 p.m. Kelly returned to the Job site at 2:30 p.m. 2:45 p.m. - IMCO has a crew of two working on applying a product called Welco Galvize. They are doing this trying to repair the damaged galvanizing on the grating edge support. This product has not been accepied by the r.it SFE�ffSR 51125.13 DATE: T �� G29/68 DAILY INSPECTION REPORT ' PROJECT: We]) Mos. 1, 2, 8 3 REPORT NO. 56 City of Renton DAY: Thursday DATE: 3/17/88 WORK PERIOD: 8:30 a.m./p.m. to 4_30 a.m./P.m. ' WEATHER: Clear_ TEMP. MAX. 65 'F HIM. 45 'F PRECIPITATION: None WORK ACCOMPLISHED TODAY: 7:30 a.m. - IMCO has a crew of five prepa.i ng for the concrete floor today at 8.00. They have a pumper truck .in-site to transport the concrete to the floor area. i talked to Kelly and expressed my concern with the fact that their woven wire mesh falls short of the door opening. He told me that they would he able to add a piece of rehar across each of the door openings to help prevent any later cracks. The representative from Pacific Testing Laboratories is on-site. 1 asked Gator to get the silt fence along the south edge of the job site repaired like it was before the start of construction on the electrical conduit. Kelly informs me that they plan on pouring three loads spaced at 45 minutes apart, and 1 informed the representative from Pacific Testing Laboratories of this. He says it will not cause problems with his schedule. ' 8:4b a.m. - The first loaa of concrete is here. 9:00 a.m. - IMCO has a crew of six working on the concrete floor. IMCO has a crew of one loading excess material Into a dump trick. 10:DO a.m. - IMCO has a crew of three working on installing more electrical conduit, and d crew of six working on the concrete floor. They have just finished with the second concrete truck, 10:4b a,m. - The fourth concrete truck has arrived. IMCO has a crew of six working on the !Ivor. 11:00 a.m. - IMCO has a crew of seven working on the concrete floor, a crew of three working on excavating and laying electrical conduit. I reminded Kelly to get the street cleaned up before the end of the day, Kelly ' informs me that IMCO will spend the remainder of the day finishing up the concrete, and that they will not be working tanorrow, � -- S1125.13 G29/69 DATE: T 1 ' DAILY INSPECTION REPORT ' PROJECT: Moll Nos. 1, 2, 8 3 REPORT NO. 51 City of Renton ' DAY: Monday DATE: 3/21/88 WORK PERIOD: 8:30 a.m.1p•m• to 4_30 a.m./p.m. ' WEATHER: _ Cloudy TEMP. MAX. 52 'F MIN. 45 'F PRECIPITATION: Rainy WORK ACCOMPLISHED TODAY: t B:00 a.m. - A load of roof structural steel has arrived on the job site, iMCO has a crew of two working on unloading, and a crew of four working on pulling off the corms from around the floor that was poured last Thursday. Ther•: are some low spots in the tfloor, both in the north and south halves of the building. 9:00 a.m. - IMCO has a crew of two working on unloading the structural steel , and a cn.w of three working on general clean-up and pre^aration. 11:00 a.m. - IMCO has a crew of four working on placing the first radial roof beam. They have the center column temporarily braced. 1:00 p.m. - IMCO has a crew of four working on placing toe last radial roof beam, a crew of one working on grouting the door frames, and a crew of one working on sanding ' the pipe gallery wall . The single doors and hardware arrived on-site at approximately 11:30 a.m. today. It turns out that the MC section on the outer edge of the roof was fabricated too long, therefore, it'CO will have to send them back. After taking further measurements, it appears that the box sections above '.he walls ' as well as all the C sections are also too long. 2:30 p.m. - The pump and motors have arrived on-site. As an alternate plan, they ' intend on working on the discharge piping and installing the pump motor. 3:00 p.m. - They have one crew man grouting, one crew man sanding, and a crew of three working on the discharge piping. ' T;�*POI. P INSPECTOR 1125.13 ' G29/10 DATE: DAILY INSPECTION REPORT PROJECT: Well Nos. 1, 2, A 3 REPORT NO. 58 ' City of Renton DAY: Tuesday DATE: 3/22/88 WORK PERIOD: 8:30 am./p.m, to 4:30 a.m./p.m. WEATHER: Cloudy TEMP. MAX. 55 'F MIA. 45 'F PRECIPITATION: Rainy WORK A"ANPLISHED TODAY: 3:00 p.m. IMCO has spent the day backfilling the electrical conduit and working on discharge piping and grouting around the door frames. Kelly informs me that the plan for tomorrow is to spend the day working on the discharge piping, it is still ' unknown how long it will be until the structural steel for the roof canes bacK. 1 1 RA D P T. IN PECTOR S1125.13 G29/71 DATE: / �_ DAILY INSPECTION REPORT ' PROJECT: Well Nos. 1, 2, A 3 REPORT NO. 49 City of Renton DAY: Tuesday DATE: 319/88 WORK PERIOD: 8:30 a.m./p.m, to 4_30 a.m./p.m. ' WEATHER: Cloudy _ TEMP. MAX. 52 OF MIN, 37 OF PRECIPITATION: Rain WORK ACCOMPLISHED TODAY: ' 8:30 a.m. - Imco has four crewmen waiting the arrival of the second load of wall panels. 9:30 a.m. - Imco has two crewmen installing the 12-inch check valve and meters in the pipe gallery, and two crewmen working on the grating edge supports for the pouring of the concret- floors. ' 10:30 a.m. - Imco has two crewmen working on the pipe gallery piping, and two crewmen working on the grating support. ' 11:00 a.m. - The truck witl. 'our additional wall panels arrives on-site. 11:30 a.m. - Imco has four crewmen working on the placement of the first wall panel of the dp The electrician is not on-site. 12:30 p.m. - Imco has four crewmen placing the second wall panel . ' Kelly informs Tony that the well pumps have arrived in Renton and will be delivered to the job site on Thursday, March 11, 1988. 2:30 p.m, - Imco has four crewmen working on the placement of the fourth and last wall panel. ' Two additional I-inch, Schedule 80 PVC pipes have been installed under the floor of the s,aller chlorine room. This additional work is to be covered under Work Directive No, 3 along with the 1-inch copper water services that were previously ' installed. 3:00 p.m. - Imco has one crewman finishing the welding of the panels in place. The remaining crewmen are working on 3eneral cleanup. e NY C . PR CT INSPEC R 3.36 G29/50 u29/5D DATE: I/ 1 DAILY INSPECTION REPORT PROJECT: Well Nos. 1, 2, A 3 REPORT NO. 48 City of Renton DAY: Monday DATE: 3/7/88 WORK PERIOD: 8:30 a.m./p.m. to 4_30 a.m./p.m. ' WEATHER: Ptly. Cloudy TEMP. MAX. 55 'F MIN. 35 'F PRECIPITATION: Rain WORK ACCOMPLISHED TODAY: ' 8:30 a.m. - First truckload of wall panels arrive on-site at 8:15 a.m. and are unloaded. The door frames are installed as they install wall panels. Four crewmen work on the wall panels, and one crewman working is operating the crane. Kelly is told by Tony to have Houser Way swept and the hole repaired by the end of the day or it will be fixed by others and billed to Imco. ' 10:00 a.m. - Fourth panel is installed. Five crewmen work on the wall panels. 11:30 a.m. - Five Imco crewmen continue to work on wall panels. 2:30 p.m. - Imco installs wall panel on the north half of the building. They have ' installed eight wall panels. 3:00 p.m. - Three crewmen work on unloading of equipment, and one crewman works on ' finishing up welding of the column/panel connections. The placement of the first eight panels went without incident. It tuok less than an hour for each wall panel to be unloaded, set in place, and welded. ' One crewman works on pouring grout underneath the wall panels and two crewner, work on the hole patch on Houser Way. 4:00 p.m. - Imco has twc crewmen installing one of the 12-inch check valves, one crewman "ing grout underneath the wall panels, and two crewmen working on general cleanup. r P I: INS ECG ' 1125.13.36 G29/49 DATE: 1 1 DAILY INSPECTION REPORT 1 PROJECT: Well Nos. 1, 2, a 3 REPORT NO. 47 1 City of Renton DAY: Thursday DATE: 3/3/88 WORK PERIOD: 8:30 a.m./p,m, to 4_30 a.m./p.m. 1 WEATHER: Ptly. Cloudy TEMP. MAX. 55 •F MIN. 35 'F PRECIPITATION: None WORK ACCOMPLISHED TODAY: 1 2:00 p.m. - Imco has removed the forms from the loading dock wall. The ,lading support angles were delivered to the job site. 1 Two Imco crewmen begin work on putting fittings together that will go into the pipe gallery. Assembly to the Stainless Steel tee, reducers, Pxtension valves, and the meters has beer. made. Assembled fittings are placed in pipe gallery. Fabricated 1 supports are being used. The carpenters remove forms from the last concrete columns. There are three 1 carpenters on >ite. The electrician is working on electrical conduit. Kelly informs Tony that the carpenters will not be on-site on March 4, 1989, but Kelly and a small Imco crew will be on-site grading in the area of the rockery and 1 electrical equipment. Tony rem.nds Kelly to get the small hole in -jouser Way fixed as soon as Possible. The Hitachi H09 is delivered back to the ,lob site. 1 3:00 p.m. - Imco has two crewmen working on the pipe gallery piping, two crewmen working on the removal of forms from the concrete columns, and one crewman working on the electrical conduit. 1 1 1 ON DI, PR ECT INSPECTOR 1125.13.36 �� G29/4R DATE: i 1 DAILY INSPECTION REPORT PROJECT: Well Nos. 1, 2, b 3 REPORI NO. 46 City of Renton DAY: Wednesday DATE: 3/2/88 WORK PERIOD: 8:30 a.m./p.m. to 4_30 a.m./p.m. WEATHER: Cloudy TEMP. MAX. 52 °t MIN. 40 'F PRECIPITATION: Drizzle ' WORK ACCOMPLISHED TODAY: ' 8:30 a.m. - Imco has two crewmen backfilling the electrical conduit. Kelly will pour concrete underneath the building footing where it was excavated for the electrical conduit. Two Imco crewmen remove materials from the southern portion of the job site where the road and sidewalk will be laid out. Imco removes the extra ductile ' iron pipe from the job site. 9:30 a.m. - The replacement crane has arrived on-site, as well as the surveyor and ' his assistant. q:45 a.m. - The concrete truck arrives on-site. Imco has removed the leaking crane from the job site. Imco has three crewmen working on the concrete pour. A crane and bucket are being used to transport the concrete. No one from Pacific Testing Laboratories showed up. ' Equipment on site today: Crane, backhoe, and boon truck. ' In pouring the loading dock wall Imco is filling the form half way, vibrating, filling the rest of the way, then vibrating again. Ron Olsen has requested some additional work outside the contract to be performed by Imco. Additional wort includes running two water services lines. one from the water softener and one from the 4-inch main to a wall in the middle chlorine room, also, a half-inch Schedule 80 PVC solution line to that room. ' A sewer manhole was found at the north end of the pedestrian bridge close to the new location of the power and telemetry boxes. t 1:00 p.m. - Imco has two crewmen working on excavation, for the pull box in the southeast corner of the job site. Two crewmen work on trowelling the loading dock wall that was poured earlier. ' 1:30 p.m, - Imco has three crewmen working on forms for the floor in the pump roan, two crewmen working on the electrical conduit, and two crewmen are workinq on ' placement of the pull boxes in the southeast corner of the job site. 2:00 p.m. - Imco has two crewmen working on backfilling around the pull boxes, two crewmen working on the forms for the west retaining wall , and one crewman working on ' electrical conduit. ' NY I. PR ECT INSPECTOR 1125.13.36 G29/46 DATE: 7 ' DAILY INSPECTION REPORT ' PROJECT: Well Nos. 1. 2, A 3 REPORT NO. 45 City of Renton DAY: Tuesday DATE: 311/88 WORK PERIOD: 8:30 a.m./p.m. to 4:30 a.m./p_m_ WEATHER: Cloudy TEMP. MAX. 55 'F MIN. 40 'F PRECIPITATION: Rain/A.M. WORK ACCOMPLISHED TODAY: 8:30 a.m. - Imco has one crewman working on the excavation for the power pull box in the sidewalk, three crewmen working on the forms for the loading dock retaining wall, and one crewman working on the power and telemetry conduit. Imco has backfilled the western 24-inch watermain connection. 1 9:30 a.m. - Imco has one crewman working on the excavation for the new power box, and has run into interference from a concrete block and the old, abandoned 12-inch ' ductile iron watermain. Imco has three crewmen working on the forms for the loading dock wall , and one crewman working on the electrical conduit. While excavating for the new power box in the sidewalk Imco damaged the existing, abandoned 12-inch ductile iron watermain, and a small leak became apparent. Tony expressed to Kelly his concern of putting the box on top of this leak as it may cause unwanted settling of the pull box. Kelly is not concerned and resumes placing the ' pull box on top of the existing 12-inch ductile iron pipe. 10:00 a.m. - Tony contacts Pacific Testing Laboratories regarding the concrete pour ' at 10:00 a.m., March 2, 1998 of the loading dock wall and slab for the west retaining wall . ' 11:00 a.m. - Imcc has two crewmen placing the pull box on the sidewalk, two crewmen working on the inserts for the removable section of the loading dock railing, and one crewman working on the electrical conduit. 12:00 p.m. - Imco has two crewmen working on backfilling around the pull box in the sidewalk, two crewmen working on the placement of the forms on the last two concrete columns, and one crewman working on electrical conduit. ' Imco has excavated underneath the wall foundation in two places at the motor control center. In one of the places is quite a large hole and Kelly was informed by Tony to make sure that the hole gets filled with concrete. 1:00 p.m. - Imco has two crewmen working on the installation of the relocated telemetry Pull Box No, 1 as identified on the Electrical Site Plan. Two crewmen are ' working un the forms for the concrete columns, and one crewman is working on the electrical conduit. rInspection Report No, 45--Page 2 March 1, 1988 r1:00 p.m. - Tony informed the crewman working on the electrical conduit Of the importance of keeping the site clean and free of oil and other type spills. r2:00 p.m. - Kelly leaves job site for the day; his crews are instructed of further work to do, which mainly includes cleanup and site maintenance. r r r r r r r r r r r r r � PAR ECT INSPECTOR r 1125.13.36 /� C29/38 DATE: it .l'0 _ r r DAILY INSPECTION REPORT tPROJECT: Yell Mos. 1, 2, A 3 REPORT NO. _ 44 City of Renton tDAY: Monday DATE: 2129/88 WORK PERIOD: 8:30 a.m./p.m. to _4_30 a.m./p.m. WEATHER: Cloudy TEMP. MAX. 60 'F MIN. 45 'F PRECIPITATION: Rain WORK ACCOMPLISHED TOIIAY: 8:30 a.m. - Tony informed Pacific Testing Laboratories of the concrete pour at 12:30 p.m. today. Imco plans on pouring the three additional columns. ' Imco has two crewmen working on the forms for the columns, and on crewman working on the rebar for the loading dock wall . Tony talked with Kelly about making a cost estimate to make the visible areas of the retaining walls exposed aggregrate: he said he would work on it. Kelly li r gives Tony an estimate of S825 for exposed aggregrate walls. Tony will advise Da Ervin. ' Kelly was asked by Tony when the asphalt patch on Houser Way would occur; Kelly said he has discussed this with the asphalt company, and a cold patch will be put in when it dries up. Kelly informs Tony that a new, non-leaking crane will be brought on-site on Tuesday. March 1, 1988. and the leaking crane will be removed from the job site. The City crews are working on the new watermain. There still ap?ears to be a leak in the section that the City laid. Kelly stated that the hole on the west side needs to be filled up by Monday, March 7. 1988 because they are going to start putting panels ' in place. Cne Imco crewman is working on the stub-out with PVC for the roof drain. The City crews state the 24-inch watermain is holding the pressure. The Water Department representative states that pressure was placed on the 24-inch main, and the purity test came back it passed. Kelly is asked by Tony if he would like the final connection made this day. 9:30 a.m. - Imco has two crewmen working on the concrete column forms, one crewman working on the roof drain pipe, and one crewman working on the rebar on the loading dock. The equipment on site today is: boom truck, backhoe, and leaking crane. The southwest roof drainpipe stub-out was backfilled with native material and was not ' compacted. Kelly informed Tony that the City crews tested the waternain with the valve in Houser Way open, ' Inspection Report No. 44--Page 2 February 29, 1988 9:30 a.m. - The City decided that the S82S for exposed aggregrate finish was too expensive. ' 10:15 a.m. - The two larger power pull boxes, and the other required pull boxes arrive on-site. The electrical sub-contractor is on-site digging holes underneath the building footings. The Diamond 8 of umber arrives on-site. The pressure test that was taken earlier on the watermain passed. The required valves were closed. 10:30 a.m. - Imco has one crewman preparing the 24-inch watermain for the City to make the connection, the plumber is working on the additional water service lines, and three crewmen are working on the forms for Ile concrete columns. 11:30 a.m. - Imco has three crewmen working on the concrete column forms, two crewmen ' excavating for telemetry and power conduit, and one crewman unloading • truck with telemetry and electrical equipment. ' 12:00 pie. - A representative from Pacific Testing Laboratories arrives on-site. The City crews are working the 24-inch watermain connection. ' 12:35 p.m. - The concrete truck arrives on-site. The City uses Imco's backhoe and operator for placing the 24-inch spool and ' couplings. Imco has three crewmen working on the concrete pour, and one crewman working on excavating f ' telemetry and power conduit. The plumber has installed the last two water service lines for the other hose bibs. Kelly informs Tony that the last two columns will be poured on March 2, 1988, and tilt-up work on the wall panels will begin March 7, 1988. That operation will take three days (three truckloads of panels). ' 1:00 p.m. - Gator ran into one of the existing trees on the west end of the job site with the backhoe, and removed a 4-inch diameter branch. Kelly was instructed by Tony to contact Sam from the Parks Department about the broken branch. Kelly instructed two crewmen to build a temporary railing on the north side of the piping gallery to meet MISHA requirements. 2:30 p.m. - Imco has one crewman backfilling the west connection to the 24-inch watermain, 2 crewmen excavating for telem^try and power conduit, and two crewmen ' working on the forms for the loading dock wall. The non-standard tie rods between the butterfly valve and tee on the 24-inch watermain connection were not removed by Ron Olsen's directive. 1 Inspection Report No. 44--Page 3 February 29, 1988 2:30 p.n. - Kelly informs Tony that the last-two concrete columns and the loading dock wall will be poured at 10:00 a.m, on March 2, 1988. 1 i 1 1 1 1 1 1 1 1 1 1 ?ATE,.; PR 1 ECTOR 1 1125.13.36 G29/37 A 0 i 1 1 1 ' DAILY INSPECTION REPORT PROJECT: Well Nos, 1, 2, A 3 REPORT NO, 43 City of Renton ' DAY: Thursday DATE: 7/75188 WORK PERIOD: 8:30 a.m./p.m, to 4_30 a.m./p.m. WEATHER:—Clear TEMP. MAX. 55 'F MIN, _ 38 •F PRECIPITATION: None ' WORK ACCOMPL oHED TODAY' ' 8:30 a.m. - Imco closes off the left lane of Houser Way in order to excavate for the power pull box. The pull box will be located in the middle of the sidewalk. Imco has three crewman working on the placement of the field for the columns on the e north half of the building. Imco laid new 3-inch telemetry conduit South from power Pull Rox 4 to 15 feet north of the existing pull box. Kelly informed Tony that Imco maintained the minimum 2 foot cover, 9:30 a.m. - Kelly informs Tony that 3 columns and footings for the loading dock will be poured at 3:00 p.m, this day. Imco has three crewmen working on the column forms and the forms for the retaining wall footings, '.<elly had one long column footing forms cut short so more short columns could be poured at one time. ' Tony asked Kelly to have accumulated oil and gas spills cleaned up from lmco's yellow crane, ' 10:00 a,m. - Weekly meeting with Imco - present were Ron Olsen, Rick Harbert, Da Ervin, Tony Pardi, Kelly Rrown, Dean Irwin, Frank Imhoff, and Jack Crumley. ' Points covered: 1. It was decided that Imco would supply and lay the sod in the park across from the pool. 2, The Parks Department would take care of the pruning of the trees. 3. Imco provided a list of extra costs to the City for the eastern 24-inch watermain connection. Pan stated that he would like a total summary including not only the costs, but the credits. 4. The issue of the skylight framing is still unresolved. 1:00 pm. - Imco crews have taken down the light pole, and are storing it on-site. Imcn has three crewmen working on the forms for the oading dock footings. The plumbing for the forms for the concrete columns has been completed. An electrician ' is working on the repair of the telemetry lines. 2:00 p.m. - Imco has four crewmen working on the rebar for the loading dock wall , ' Imco pl,ires a tarp under the leaking crane, 2:30 p.m. - 7 Building Department Inspector arrives on-site to inspect the rebar for the loading dock footings. ' Inspection Report No. 43--Page 2 February 25, 1988 3:00 pip. - Imco has three crewmen working on the concrete pour for the columns. The concrete is being poured all the way to the top of the columns and then vibrated. tThe crane and a bucket are being used to transport the concrete. The Pacific Testing Laboratories representative is on-site for the pour, slump cylinders, and entrained air. Kelly states the crane will be removed from the job site on Friday, February 26, 1988. and another one will be brought cn-site. 3:45 pm. - Kelly informs Tony that only a small crew will be working on Friday, February 26, 1988 pulling off forms and general cleanup. t TONY INSPECTOR ORTE- DAILY INSPECTION REPORT PROJECT: Well Nos. 1, 2, A 3 REPORT NO, 42 City of Renton DAY: Wednesday DATE: 2/24/88 WORK PER101): q:00 a.m./p.m. to _4:3n WEATHER: Clear TEMP. MAX. 60 OF MIN. 40 •F PRI,CIPITATION: None WORK ACCOMPLISHED TODAY: t ):n0 a.a. - ran Ervin informs Tony that the weekly meeting is scheduled for Thursday, February 24, 1088 at q:OO a.m. 1 While excavating for the loading dock, the Imco crew has broken the telemetry and power lines on the east side of the job site. Imco has three crewmen working on digging out the broken section. ' One City of Renton crewman is working on the r^moval of water from the new 24-inch watermain. ' The previous afternoon Imco completed the work on the forms for the footings on the north half of the building, and started excavation for the loading .lock. ' The four 1-inch, Schedule 00 PVC solution lines from the northwest chlorine room have been installed. Imco crewmen have hit one of the southeast :nrner columns with a backhoe, and the column sustained minor damage. 10:00 a.m. - The representative from Pacific Testing Laboratories and the concrete truck arrive on site. The column will be poured first. In trying to expose the broken telemetry lines to find the conduit. Imco has come very close to undermining the existing column foundation and wall foundation of the new building. Tony informed Kelly not to dig anymore, but tr ,just replace the lines. Tony states that continuing to dig could possibly cause ful.ure structural problems. Kelly refuses Tony'% request and continues to dig under the building. Imco has three crewm.rn working on the concrete pour, and two crewmen working on excavating out the broken telemetry lines. 11_:00 a.m. - Imco has four crewmen working on the concrete pour; the footings are being poured at this time, The City crews are taking possession of the extra 24-inch fittings: a flange-by-flange butterfly valve, ,. MJ-by-MJ butterfly valve, a mechanical joint 45' bend, and a mechanical joint 22.5° bend. Inspection Report No. 42--Page 2 February 24, 1988 t 11:00 a.m. - Tony talks with George Stahl concerning the fixing of the broken telemetry lines. Kelly had informed George that Imco was under contract to perform the work and Imco will fix them. Jack rrumley's requirement is that Imco get the ' telemetry line repaired by February 24. 1988 at 12:00 p.m., or the City crews will do it and bill Imco. Imco will install both the telemetry and power pull boxes. Tony informs George that the power box was to be a larger box, and was paid for by change order. The pull box that had been taker. out of the ground had been delivered. Tony informed Kelly that the locations for Puli Roxes 4 and 5, as shown on the electrical plans, are ' unimportant as lorg as they are away from the sidewalk, and out of the loading dock. While George was investigating the size requirement of the new poi.er box, it was determined it needed to be larger than the pull box that Imco has on site. 2:00 p.m. - Imco has three crewman working on the two pull boxes. Kelly is installing the original power pull box. 3:00 p.m. - Imco continues to work on the pole boxes. The two power boxes required are 4'8"A4'8", therefore, Kelly is going to remove the power boxes that have beer installed. The City crews are taking possession of the smaller power pull box. ' The surveyor is on site to locate the leading Jock retaining wall , 1 e C 1A 1125.13.36 TGNY PAPYI. INSPECTOR G29/34 DATE: �� �� DAI' Y INSPECTION REPORT PROJECT: Wel I Ros. i. 8 3 REPORT NO. _41 City of Re-'on DAY: Tuesday_ DATE: _ 2123/88 _ WORY PERIOD: R:10 a.m./p.m. to 4-30 a.m./p.m. 4E ATHE R: Ptj. C1 ot1dy TEMP. MAX. 5='F MIN. 40 'F PRECIP.1wTION: _ None WORK ACCOMPLISHED 'QDAY: 10:00 a.m. - :mco Is having the Hoe/Pack removed fror. the job site. 1 In Tony's absence the previous day, Imco's accomplishments were the following: 1 Imco finished backfilling the northern halt of the huilding up to floor slah grade. 1 2. Excavated for the footings. 3. Started installing the forms for footings. 4. Installed form for thx last concrete column on the southern half of the 1 building. Kelly i arms Tony that a representative from W1SHA was on site on February 19. 1988. and expressed only minor concerns. Imco Complied with their wishes. 1 Imco has a second crane on-site. 1 Kelly states that the concrete for the footings and column will be poured on February 24. 19AR at 10-00 a.m. 1 10:00 a.m. - Imco has a crew of three working on the is for the footings on the north half of the building. The Hitachi H09 was taken off-site un February 22. 1999. 11:00 a.m. - Imco has three crewmen working on the fe ms. 1 Tony contacted Pacific Testing Laboratories, and informed them of the concrete pour on February 24. 1998, 1 1 NY P ,�I!' NSPE�TQI 25.13.3b G �� 1 29/29 DATE: _.-- i 1 1 DAILY INSPECTIDII REPORT 1 PRO:IECT: Well Nos. 1, 2. E 3 11"Ok1 PTO. -_ 40 City of Renton DAY- IlDxwlay DATE: _2/22/89 WORK PERIOD: 8:30 a.m_/P.R. to 4_30 0a./p.w. ' WEATHER:__ Clear _ TEIP. MAT. 50 -F HIM. 40 OF PWIPITA7100: Mahe WORK ACCOMPLISHED TODAY: 8:30 a.m. - Imco has two crewmen removing the fonas from the concrete columns, and one crewman applying cold tar epoxy to the exterior face of the saturator pit wails. Kelly informs Tony that ` ity crews filled the new 24-inch watermain with chlorine solution on Friday, February 19. 198R. t 9:30 a.m. - Imco has two crewmen removing forms from the concrete columns, and one crewman werking on backfill ing at the north end of the building. T -. I PROD 1NWOOR ---- I125.13.3f, G29/2f1 GATE: t t GAILY INSPECTION REPORT MUM: Well lbs. t, 2, a 3 REPORT NO. _3_9_ _ City of Renton DAY: TNorsda_y _DATE: _2/1N/8t _ WORK PERIOD 7.30 a.m./p.m, to 4:30 a.m./p.m. WEATHER: Ptl y._fl oud�_ Tor. MR. 45 'F Him. 38_•F PRECIPITATION: _ None AORK Accoppuwn TODAY: 7:30 a.m. - Concrete truck arrives on-site to pour saturator pit walls and two ■ columns. t Imco has three crewmen working on the concrete pour. They are using the rented boom truck to lift the concrete into the column forms. and filling the forms to near full before vibrating. ' A representative fro- Pacific Testing Laboratories is on-site to make concrete tests. Tony is informed that the slump is 3-inches and the entrained air is 3.5. ' 7:50 a.m. - Plumber arrives on-site. 8:00 a.m. - The saturator pit wails begin to be ooured. ' Imco excavates again for the eastern 24-inch watermain connection. City crews had installed up to the tee the previous day. t ;mco finishes pouring concrete. e 9:00 a.m. - Imco has one crewman helping the City with the fittings for the connection, and one crewman working on general cleanup. The dumber is working on the floor drains. i10:00 a.m. - City crews shut down watermain. Kelly informs Tony that Imco has ordered concrete for the thrust block for 3:00 p.m. ATony leaves site until approximately 3:00 p.m. 2:30 p.m. - The City crews have installed the tee, and are now installing the coupling on the hranch. 3:00 p.m. - The concrete truck has arrived for the pouring of the thrust blocx. tImco wraps the and fittings in plastic in preparation for the pour. t 1 1 Inspection Report No. 39.-Page ? February IA, 1998 1 The plumber informs Tony that he is finished with the drain pipes which have beer inspected and tested. The water service pipe will he worked on Friday. February 19, 19P8. 1 3r30 p.m. - City crews complete their work, :mco has one crewman working on the ■ backfilling of the tee, 1 4*00. p.m, - Imco has two crewman 9ackfilling and Lumpecting around the 24-inch tee, 4:30 p.m, - Imco has two crewman backfilling and compacting around the 24-inch tee. 1 Kelly informs Tony that he will be working on Friday. February 19, 1988 at backfilling the chlorine and fluorine roans floor drains. Tony reminded Kelly to use 1 plenty of pea grave'. and structural hackfill since he, will not be on site Friday, February 19, 1989. Dan Ervin will be notified to have the backfilling checked. i 1 1125.13.36 'f0 PAR R EC INSPECTOR 1 G29/19 DATE, A� i 1 1 1 1 1 1 1 DAILY INSPECTION REPORT PROJECT: Well Nos. 1, 2, A 3 REPORT NO. 38 ' City of Renton DAY- Wednesday DATE: 2/17188 WORK PERIOn: 8:30 a.m./p.m. to 4:30 a.m./n.m. WEATHER: Cloody TEMP. MAX. 50 'F MIN, _ 40 'F PRECIPITATION: Rain WORK ACCOMPLISHED TODAY: ' 8.30 a.m. - Imco has one crewman using the Hitachi H09 to PxcavatP for the new 24-inch watermain, Imco clnsed off the left lane of Houser Way. ' The plumher is working on the chlorine floor drains. 9:30 a.m. - Imco has three crewmen working on the forms for the saturator pit walls. ' one crewman working an the excavation for the 24-inch watermain, and one crewman working on the floor drains. ' Kelly informs Tn' I that Imco plans on pouring the walls for the saturator pit and two more columns at 7:30 a.m, on Thursday. February 19. 1988. t Imco has cnmpleted PxcavAtinn, an: has exposed the new 24-inch watermain and the existing 24-inch watermain. The existing 24-inch wALPrmain is sloping down tnwArd Hauser Way. and it is approximately at the sap , elevatinn new 24-inC cermain. The electrical contractor, Triad, is on-site working with Puget Power. The new watermain is 7/1 -f a foot lower than the existing watermain. ' Tony informed Pacific Testing Laboratories of the concrete pour on 2/18/88. 10:30 a.m. - Imco has two crewmen nrkinq an the saturator pit wall forms, and one crewman working o, the chlnrine room drain. City crews are working on the 24-inch watermain. The Hitachi H09 is being used. 11:30 a.m. - Imcn has two crewmen preparing the forms for the thrust block for the oo, bend, and thraa Crewmen wnrkinq an the forms far the saturator nit walls. 12:30 p.m. - Imco has three crewmen working on the I- ;nn of the thrust blocks for ,he 90' and 11-1/4a bends, and one crewman working •arms for two more concrete columns. 1:30 p.m. - Imco has nne crewman backfillinq the watermain with pea gravel, one crewman working on Cie floor drains far the chlorine roans, and three crewmen working on the forms for the concrete cnlanns. ' 2:30 p.m. - Imco has two crewman hackfilling with flip 41tac i H09, one crewman working on the floor drains, and a crew of three working on the fo-ms for the ' concrete columns. }ti 7� F Inspection Report No. 38--Page 2 ' February 17, 1988 3:30 p.m. - Imcn has four crewman cleaning kip and backfilling. P,y the end of the day ' the excavation was completely hackfilled, and the left lane was reopened. Today the City crews installed ]he 24-inch 90" hend, and approximately 25 feet rf 24-inth pipe to jnst short of where they are gninq to the tape tomorrow. 1 1 1 1 1 1 1 ' _1'� FfI INS�Efl(IR ' 1125.13.36 — G29/18 GATE: 2 t ' DAILY INSPECTION REPORT PROJECT: Well Nos. 1, 2, 8 3 REPORT NO. 37 City of Renton ' DAY: Tuesday_ DATE: 2/16/88 _ wpRK PERIOD: H:30 a.^_ip.m, to 4:30 a.m.IF m, ' WEATHER: Clear _ TEMP. MAX. 48 'F MIN. 40 '1 PRLCIPITATION: None WORK ACCOMPLISHED TODAY: ' 8:30 a.m. - Imco has one crewman working on the fnrms for the saturator pit, floor, and one crewman remnvinq debris from the ,job site, ' The City has hePn contacted, and is aware of the broken power, telemetry, and fluoride solution lines. ' 9-30 a.m. - Imco has one crewman using the Hitachi H09 to remove tha sidewalk in preparation for excavating the 24-inch watermain, four crewmen preparing the forms for the saturator pit Ill lot. and one crewman working on the floor drains for the chlorine rooms. 11:00 a.m. - Imco has one crewman removing the forms from the two columns that were poured 2/15/88. three crewmen working on the forms for the ,aturator pit, and one crewman working on general clean-up. 1:00 p.m. - lmco has three crewmen working on removal of the forms from the concrete ' columns, two crewmen working on reroutinq the nower wires to the bathhouse. A representative from Pacific Testing Laboratories is nn-site. The concr-LP truck is due to arrive shortly, ' 1.15 p.m. - The conrete truck arrives on-site. 1:30 p.m. - Imco has three crewmen working on the concrete pour, and one crewman ' pumping water out of the 24-inch :,oin hPlnw the pipe gallery slah. 2:30 p.m. - Imco has one crewmen working on the plumbing, and two crewmen workinq unlnading structural hackfill from a dump truck that has shown up. The dump truck ' will he lnddcd with I•nwantpd waste material. 3:30 p.m. - 1 i has one crewman loading debris into a dumptruck, ind two CrewmPn ' preparing forms for two more concrete columns. The plumber continues to work on floor drains fir the chlorine rooms. TOW IIINSKF-T 1125.13.36 G29/17 DATE: _1 Z DAILY INSPECTION REPORT ' PROJECT: Well Mos. 1, 2, d 3 REPORT NO. 36 ' City of Renton DAY: Monday DATE: 2/15/88 WORK PFRIOD: 8:30 a.m./p•m• to 4:30 a.m./p.m. ' WEATHER: Cloud TEMP. MAX. 45_'F MIN. 40 'F PnECIPITATIOR: _ Ronr_ WORK ACCOMPLISM TODAY: ' 8:30 a.m. - Imcn rebuilds forms for two col,imns that were poured Thursday. Fnhruary 11, 1988. The floor drains were installed on Friday. February 12. 19RA, ' Imcn is usinq the Hitachi H09 to excavate where the sanitary sewor connection was. Two more cencrptp columns will be poured today at 3:00 p.m. Tony has contacted ' Pacific Tostinq Laboratories. The plumber has not yet arrived nn-site, but is oxpocted. All the ASS pipe for the ' fluoride rooms has hewn installed: the PVC pipe for the chtorinp rooms still has to he installed. 10:30 a.m. - Imco has four crewmen workinq on the placement of the forms for the second two concrete columns, and one crewman workinq on the pLimbinq. 11:30 a.m. - Imco has four Crewmen working on the placement of the forms for the t cancrptp cnlumns. and one crewman working on the pinmhing. Specifically, the plumber is installing the soft copper pipe for the water services. The ASS waste piping has been covered with pea gravel and structural hackfill. ' 1!00 p.m. - Imco has three crawmon levplinq the forms for the coLtmns, two crewmen workinq on the plumbing, and one crewman workinq on the forms for the saturator pit slah. 2:00 p.m. - Imrn is wnrkinq on the forms for the saturator pit slah with a crow of three. Twn crf•wnen are working on the floor drains in the chlorine rooms. 3:00 p.m. - The concrete true. arrives On site, Imco has four crpwmpn working an the Concrete floor. The roprpspntative from Pacific Tpstinq Laboratories has arrived nm-sit,p, and is taking samplps. The pL:mhpr is working on the drainpipe for the chlorine rooms. ' 3:45 p.m. - Imco has broken some power nos running adjacent in the existing well bmisp. It is not known if these lines are activo or not. Tony advised Gator, one of Imco'S lah^-ers, to contact Ray Sled. 4:10 p.m. - Kelly determined that the pnhprlinps broken earlier are supplied to the pool hath hnusp, thereforp, they do not have to he repaired immediately. ' Inspection RPnnrt. No. 36--Page 2 February 15, 1988 Imw.o damages and breaks the chlorine sobition line going to existing well house again. One crewman is repairing the line. R11 of the solution, water Service, and telemetry lines fcr the fluoride system are hroken. Gator states he will repair them ' before he leav Ps the. site.. Ray was haneed a copy of Supplement Drawing No. R which mrtTin►s the responsihilities of the Citv and Imco in makinq the alternate connection to the 24-inch watermain. ' Kelly stated he would contact noan and then advise. Ray states that the connection will he made the morninq of 2/17198. 1 1 a PROJECT SPEf.TON G3.36 29/14 -- p — — 1125.1 DATE: Z w DAILY INSPECTION REPORT PROJECT: Well Nos. 1, 2, 8 3 REPORT NO. 35 City of Renton -- DAY: _Thursday DATE: 2111/88 WORK PERIOD: 8:30 a.m. P.m. to 4:30 a.m./p.m. WFATHER: F,l oudy TEMP. NAE. 55 •F WIN, 4/ •F PRECIPITATION: Slight WORK ACCIMPLiSHEO TODAY: ' 8:30 a.m. - Imco has rented scaffolding to assist in pouring of the two calumns today. ' The plumber is on-site working on floor drains in the chlnrino rooms. Imco has three crewmen working on aligning the forms of the concrete ;olumns. Imcn Plans no using the Hitachi Hog and a hurkpt to put the concrete into the forms. ' Tony dskpd Kelly to devise a better way to protect the pump anchor holts from rust and water. ' 9:30 a.m. - Imco has three crewmen trying to keep husy. The plumber is wnrkinq on the floor drains. 10:30 a.m. - Imco iras two crewmen working on the floor drains, and two a^wmpn working on preparations for the concrete pour. Kelly informs Tony that the plumber will he working on Fabrudry 12, 1988. and work will begin again no uary 15, 1998. Kpliy states that. the Ruildinp pepartmont inspected all the rehar for the columns on the southern half of the huildinq. 17:30 p.m. - Imco has three crewmen working on tying rphar for the cnlumns, and ono ' crewman working on the floor drain;, 1:30 p.m. - Concrete truck arrives, and Imco hpgins to pour the cnlumns with a rrpw of three. No one from Pacific Testing Lahnrat.orips has arrived nn-site. ' Imco is using an Hitachi H09 and a bucket to place the concrete in the forms. Each �:nlumn is hying done in two lifts. 2:30 p.m. - Imen is cleaning up after the concrete pour. One of the laborers informs Tony that Imcn will continue to the work on the plumbing the following day, the plumhing inspection will he on Monday, Fehruary 15. 1983, and then start backfillinq. Insr<,ction Report No. 35--Page 2 tFebruary 11. 1988 , 3:00 p.m. - Imco has two crewmen working on the plombing. T P . ' ECT IMSPEU— � i75.'3.3n DATE: Z Z3 1 1 DAILY INSPECTION REPORT 1 PROJECT: Well Nos. 1, 2, 8 3 REPORT NO. 34 City of Renton ' DAY: WPdnesdaT- DATE: 2/10/88 WORK PERIOD: 8:30 a.m./p.m. to 4:30 a.m./p.m. 1 WEATHER: Cloudy TEMP. MAX. 55 OF Mill. 47 OF PRECIPITATION: Rain WORK ACCOMPLISHED TODAY: 1 8:30 a.m. - Tony Pardi returns to site after hPing away on Fehruary 9, 1989 duo to illness. 1 The steel forms for the columns were dPlivarod to the sit,P, and imco poured the footinqs for the southern hair of the huilding on February 9, 199R, Concrete samples were taken durinq the pour. the cylinders are still on-site. 1 Imco has three crewmen working on the removal of the forms. Tho surveyor brought to Tony's attentinn that there is a discrepancy hetwean the station and off set of each of the corner columns and the 28 foot 11 inches shown on the plans. That distances 1 are off by a maximum of 5/8 of an inch. Tonv does not see where this will cause any problem, and the discrepancy should he able to ha taken up, however. Kelly is concerned. 1 Dan Ervin informs Tony that he is going to Rellingham today to look at the test panel , and that Imco will he pouring the wall panels tomorrow in Bellingham. Ron 1 Dlspo and Jim Hanson, 1101dinq Department, will he. there inspecting. 9:30 a.m. - Imcn has three crewmen working on the rcmovat or the forms. 1 10.00 a,m. - The plumber is on-site to work on floor drains and waste piping in the north half of the building. 1 10:30 a.m. - lmcn has four crewmen working on the preparatinn of installing the rahar fnr the columns in the smith half of the buildinq. 1 'men's smrvPyor is working on a detail and description of the acijustmPnts in the :repancV be• v,,n the station reference, and the distances between centerlines on P foundation clans. 1 11:30 a.m, - has four crewmen working on the placement, of the coln,nn rahar do the footings. _P`ly states Imcn plans on pouring two of the columns tomorrow. 1 2:00 p.m. - Tnny hand delivers a copy of Drawing Supplement No. 6, Water SarvlcP Detail, to Kelly Rrnwn. 1 Imco has three crewman installing the forms for pouring the concrete columns. Imco is tantativaly planning on pouring two columns the morning of February 11, 1988. 1 1 1 1 Inspection Report No. 34--Page 2 , February 10. 1988 3:30 p.m. - loco has three crewmen working on the forms for two of the 11 foot 1 columns, and two crewmen working on the flnor drains it the Chlorine Rooms. 4:00 p.m. - Kelly informs Tony that loco has scheduled the concrete pour for February 1 11, 19R9 at 1:00 p.m. Tony `.nfnrmed Pacific Testing Laboratories. 1 1 1 1 i 1 1 i 1 1 1 1 Y—/ FU I SPECTCR 1125.13.36 1 ' DAILY INSPECTION,REPORT PROJECT: Well Was. 1, 2, A 3 REPORT NO. 33 city of Renton OAY: Monday DATE: 2/8/9R WORK PERIOD: 8:30 a.m./p.m. to 4:30 a.m./p.m. WEATHER: Cloudy TEMP, MAIL-_SO •F MIN. 40 -F PRECIPITATION: Rain WORK ACaWLISHED TMAY- R:30 a.m. - Kelly returns from vacation. Imco has one crewman working on the rrhar for the corner columns, two crewmen working on the roof drain pipe. and a total crew of five on-site. The surveyor is on-site, tImco is exCavatinq for the south half of the foundation. The surveyor is estahlishing the huilding cOrnors. ' 9:30 a.m. - Imro has two crewmen working on the root drain piping, and two Crewman wrrkinq on the forms for the fnundAtinn. Kelly informs me that Imco plans no pouring the footings fnr the south half of the huilding tomorrow. t10:30 a.m. - Imco has three crewmen working on the forms for the foundation, and two c,ewmpn working on the roof drain pipe. _ 11:30 a.m. - Imco has three crewmen working on the forms for the foundation, and 4 crpw of two workinq on the 4-inch water service pipe. 1:30 p.m. - Imco has three crewmen working on the forms for the southern half of the wall A ndAtion, and two crewmen working on the 4-inch water sprvicp pipe. ' Kelly informs Tony that Imco plans nn pouring the southern half of the wall and column footings tomorrow At 2:n0 p.m. Tony cnnt,Acfpe Pacific Testing LAhorAtnripv to come to the site and run cnncrptp tests. Imcn is hackfillinq and compacting the trenches for the roof drain pipe, and 4-inch water service. Imco has laid the 4-Inch water service pipe all the way to the Mechanical nnnm and have laid pipe coming up through what, will he the floor. It has rained mnst of the morning and Aftprnoon. ' 2.30 p.m. - Imcn h„s three Crewman working on the forms for the foundation. and two crewman workinq on hackfilling for the 4-inch water service line. 4:00 p.m. - Imco is finishing up for the day. TORY P 'i, PROD IfISPEC'T�R 1125.13.36 G99/in GATE: � DAILY INSPECTION REPORT ' PROJECT: Well Mos. 1. 2. A 3 REPORT NO. 32 City of Renton ' DAY: Friday DATE: Feb. 5, 1986 WORK PERIOD: 8:311 a.m./p.m. to 11:30 a.m./p.m. ' WEATHER: cloudy TEMP. MAX. 49 'F MIN. 32 'F PRECIPITATION: WORK ACCOMPLISHED TODAY: ' 9:30 a.m. IMCO has a crew of 2 working on the star bolts for the 4-inch water service tap. Calvin informs me that 1MCO will word urtil 11:30 today. They have a crew of 3 working on installing the 4-inch gate vaive for the water service line. ' 10:30 a.m. IMCO has a crew of 3 working on the roof drain pipe and the 4-inch water service line. 1 t j 2t/ ..11ECT I16PECf0It 1125.13.36 029/2h DAILY INSPECTION REPORT ' PROJECT: Well Nos. 1, 2, A 3 REPORT NO. 31 City of Renton ' DAY -ada_ DATE: Feb. 4, 1988 WORK PERIOD: 8:30 a.w,/p,w, to 4:00 a.m./p.m. WEAi. _clout TEMP. MAX. 42 -F MIN. 31 -F PRECIPITATION: WORK ,ACCOMPLISHED TODAY: ' 8:30 a.m. The surveyor is on site this morning. 9:30 a.m, Weekly meeting with IMCO. Present were Ron Olsen, Pan Ervin, Tony Rarni, Calvin, and Dean Irwin. Points covered included 1) a discussion was held on who was to make the east Connection; a final decision was not made at the meeting. Howevpr, alternative methods of connection were discussed. We told IMCO that we would have a water service detail to them by the end of next week. Dan also t irformed Calvin that he needs to get the sanitary sewer plugged hecause Eric Davidson has called several times and is concerned. Also, we requested that they shackle the fittings coming out of the 4" tap instead of the thrust block. The thrust block makes getting to the fittings difficult at best. Dean says that they will be pouring the wall panels next week and Ron requested that he contact him in order to nail down the time so that the Building Departmem: can be present for inspection. ' 11:00 a.m, IMCO is working on backfilling and installing the remainder of the roof drain pipe. They have encountered a 16" ductile watermain coming out of the east ' side of the existing well house and I informed them that if they want( i to they could just cut it off. It has been abandoned. 11:30 a.m. Dan has reported to me that the City plans on making t e connection, ' The connection is not going to be made as designed. Instead, we are going to turn south outside of the well house building ;nd tee into the 24" watermain that runs east and west. I have asked Calvin to expose existing 24" where we plan to make connection to find the invert elevation of the existing pipe. 12:30 p.m, While excavating for the roof drain, IMCO "lso encountered a 6-inch ' ductile iron pipe assumed to be the o'd sewer line `he lath house. They have cut the pipe off and removed it. L•DO P.M. I informed Calvin that the alignment r, rain as th-y were ' putting it in will take the roo` drain underneath t 1 ini I told h this contradicts the agreement, we had with Kelly that thi .in wield not h order the building. Therefore, they are going to reroute rom the new bu ding. ' The old meter manhole is in the way of the route for top roof dra'. Sipe. Therefore, they are going to remove the old meter manhole. IMCn has had a .re. of 3 working today. The surveyor was on site for approximately 3 hours. t 1 I ' inspection Report No. 31--Page 2 Fehruary 4, 1989 2:00 p.m. 1MCO is removing the abandoned water meter manhole. They are using the Hitachi H. to remove it. CO he tion ' linesp running out of the excavating 9 well or the roof house nbuiilding Mand has encountered t damaged them. They are now executing repair of the fluoride solution lines. IMCO also pulled the t telemetry wires out of the telemetry box inside the well house building. They have contacted George Stall who will repair it. 1 1 t t ' 117i.:3.36 DATE: _. 1 W-880 WELLS #l, #2, & #3 WELL HOUSE CONSTRUCTION WTR-9 2 Daily In.pection Reports DAILY INSPECTION REPORT ' PRQIECT: Well Nos. 1. 2. A 3 REPORT NO. 30 City of Renton ' DAY: Nednesday DATE: Feb. ?, 198R WORK PERIOD: 8:30 a.m./p.m. to 1:00 a.m./p.m. WEATHER: _cloudy TEMP. MAX. 45 •F MIN. 38 OF PRECIPITATION: _ ' WORK ACCOMPLISHED TODAY: ' 8:30 a.m. I informed Calvin that the pressure test was not acceptable and they did not pass and that they will have to run another pressure test. IMCO has a crew of 1 working on compaction around the pipe gallery walls. They excavated down to undisturbed earth and are placing compacting and structural fill 2 ft. lifts. Kelly ' is on vacation starting today until Monday. Calvin is acting foreman. There is only a c^ew of 2 on site today includino Calvin. ' 9:30 a.m. IM,'.n has a crew of 2 workinq on backfilling around the pipe gallery walls. They are using the Hitachi H09 to hack fill and a backho to compact, 10:00 a.m. IMCO has a crew of 2 working on backfilling and a crev of I working on preparation for another pressure test. ll•.n0 a.m. IMCO is having problems with a small leak around the 24" spool in the pipe ' gallery pit. They are working on fixing it. Three 12-inch flowmeters were delivered today. 12:45 p.m. 1MC0 passed the pressure test. In one hour's time they had lost 8 ins of pressure down to 210 lbs, per sq. inch and it took 22 ct, to gain the pressure back which is less than the 32 oz. maximum allowed. ' 1:00 p.m. IMCO has a crew of 2 backfilling; they are using the Hitachi H09, a backho, and a backho with a compactor. I reminded IMCD to clean the streets before the end of the day. I reminded Calvir of the weekly meeting tomorrow at 9:00 am. i 1 ' Y P AI: E ILWECIOR _. DATE: tDAILY INSPECTION REPORT ' PROJECT: Well Nos. 1, 2, 8 3 REPORT NO. 29 City of Renton ' DAt: Tuesday DATE: February 2. 1988 WORK PERIOD: 8:30 a.m./p.n. to 3_00 a.w./p.s. WEATHER: cloudy TEMP. MAX. 35 'F NIN. 25 'F PRECIPITATION: chance of snow ' WORK ACCOMPLISHED TODAY: 0:30 a.m. IMCO is applying the Tnemec brand coal tar epoxy. IMCO plans to put on two coats and will allow four hours between coats. They have a crew of 2 working on that appl`.,ration. Q:30 a.m. IMCO is preparing for another pressure test. 3:40 a.m. Kelly Brown arrives on the site for the first time today. Kelly informs me e that he is going on vacation starting tomorrow and Bill not he back until Monday. Calvin will be here on site acting as IMCO's superintendent, The plan for the next couple of devs is to finish coating the pipe gallery walls, then backfill and compact as well as excavate for the saturator pit and then start on She forms for the ' saturator pit and lower foundation. 10:30 a.m. IMro is finished with the first coat of epoxy. 11:00 a.m. IMCO ha, a crew of 3 working on the second coat of epoxy and a crew of I working on preparation for the second pressure test. ' 1:45 p.m. IMCO is starting the pressure test. I informed Kelly Brown that he was to remove the till m:,terial they used around the foundation. It is not approved structural fill . IMCO pumped the pressure tip to 218 lbs. per sq. inch and then after 30 minutes, the pressure had dropped to 211, a change in pressure of 7 lhs. per sq. inch in 30 minutes. However, the pump was not. working properly. They. therefore, could not pump water back into the system to increase the pressure back to 218. Imco ' is using the Hitachi Hog to hold a mon-backfilled section of the 24-inch main in place. 3:00 o.m, IMCO is fin-ishing up for the day. ' 0 IIOP[L ilal 1175.13.36 GZB/95c DATE: _ �� _ ' DAILY INSPECTION REPORT ' PROJECT: Well Nos. 1. 2. 8 3 REPORT MD. 28 rity of Renton DAY: Monday DATE: 2/1/88 WORK PERIOD: 8:30 a.m./p.m. to 4:n0 a.m./ZA_ WEATHER: cloudy TEMP. MAIL. 38 •F MIM. 32 •F PRECIPITATION: WORK ACCO1PLISHEO TODAY ' 8:30 a.m. Mark informs me that IMCO had not passed the pressure test on Friday and went ahead and poured the pipe gallery walls anyway. This morning IHCO is nulling t,, arms cff the pipe gallery walls. IMCO pumped the water from the 24" main and t into floor drain of the pipe gallery. 1W.0's plan for the day is to remove the forms for the pipe gallery walls and run another pressure test this afternoon. 1:00 p.m. 114CO is done removing forms and is now cleaning up the lumber and grouting ' up the holes for the form ties. 3:00 p.m. IMCO is preps-ing the pipe gallery walls for coal tar epoxy. 1MCO ha a crew of 2 working. 3:30 p.m. i asked Kelly to get the archor bolt inserts around the well casings ' plugged up to keep debris out of them. t 1 t1125.13.36 r/"'�„S�y G28/95b DATE: DAILY IMSPECTICN REPORT ' PROJECT: Well Nos. 1, 2, 8 3 REPORT NO. 25 City of Renton DAY: Wednesday DATE: 11121188 WORK PERIOD: a.m,/p.m. to a.m./p.m. WEATHER: TEMP. MAX. 'F MIN. 'F PRECIPITATION: WORK ACCOMPLISHED TODAY: 11 :Of) a.m, I hand delivered two letters to Kelly grown, one detailing our ' recomne„led change on the easternmost connection to the 24" watermain, The second is a letter from Rick to nean Irwin requiring that IMC.O pressure test the new 24" watermain prior to pouring any more s*^uctural concrete. Mark Semrau will he in charge of the inspection Thursday and F :ay. 1 TOMS'-P'�i�, PRb3��-i-NSPE-fit ' 1125.13.36 — G28/95a DATE: ��P 01` DAILY INSPECTION REPOkf PROJECT: Well Mos. 1, 2, 8 3 REPORT NO. _ 24 City of Renton DAY: Tuesday DATE: 1/,26/88 WORK PERIOD: 8:30 a.m./p.m. to 12 00 a.o./p.ft. ' YEATHER: cloudy TEMP. MAX. 48 'F MIN. 34 'F PRECIPITATION: WORK ACCOMPLISHED TODAY: 8:3D a.m. 1MCO has cleaned off around the lid for the METRO manhole as required by Eric Davidson from METRO. Yesterday IMCn put up about half of the forms for the pipe ' gallery walls and more or less completed the roside wall forms along with two of the well bypass piping penetrations. IMCO has a crew of 4 working this morning. Kelly informs me that IMCO also installed a half-dam in the plug as required by rric ' Davidson. Kelly tells me they installed the plug at the METRn manhole end of :he sanitary sewer. IMCO broke the telephone line near the southeast corner of the bath house. A representative from Pacific Northwest Bell is out this morning to fix it. ln:00 a.m. IMCO has a Crew of 5 working on the forms for the pipe gallery wall . 11:00 a.m. IMCO has a crew of 4 working on the forms for the pipe gallery walls. t t 1 - I 1175.13.36 DATE: G7B/94 DAILY INSPECTION REPORT PRWECT: Well Nos. 1. 2. A 3 REPORT NO. 23 _ ' City of Renton _ DAY: Nonday DATE: 1//25/98 WORK PERIOD: 8:30 a.m./p.m. to 9_30 a.m./p.m. WEATHER: clear TEMP. NAX. 45 'F MIN. 35_F PRECIPITATION: WORK ACCOMPLISHEO TODAY: 8:30 a.m . IMCO has a crew of 4 working on the forms for the pipe gallery walls and a crew of I working on moving dirt around using the Hitachi H09 and a backho. Kelly informs that the Parks Dept. crew drove along the west side of the swimming pool on the grass and caused the new damage to the grass that was apparent this morning. Kelly says he has a picture of the Parks Dept. vehicle parked at the southwest corner ' of the pool. Kelly informs me that the IMCO crew is going to spend the day working on the forms for the pipe gallery walls and they may spread some top soil in the Park in preparation for the sod this afternoon if they get a backhoe here. 1 1I75.13.36 G28/93 DATE: /O �� DAILY INSPECTION REPORT PROJECT: Well Nos. 1, 2, 8 3 REPORT NO. 27 ' City of Renton DAY: Thursday DATE: 1//21/SA WORK PERIOD: 8:30 a_w./p.m, to 300 a.w./p.w. ' WEATHER: Mostly sunny_ TEMP. MAIL. 45 OF MIN. 33 OF PRECIPITATION: _ WORK ACCOMPLISHED TODAY: 8:30 a.m. Kelly and 1 both signed work a.rective Change No. 2 regarding an additional cost to the City of $483.59 for the addition of shackle rods to the 6-inch well bypass piping. After tightening up the cap of the easternmost section of the 24-inch watermain, IMCO still had a small drip from the cap and when they ran the pressure test, they only lost a cup of water. Kelly is convinced that it is that small drip causing the problem. He is going to go ahead with the concrete pour today. 1MC0 has ' a crew of 3 working on moving dirt around and a crew of 1 working on the preparation of the pipe gallery foundation, ' 9:30 a.m. IMCD has a crew of 2 moving dirt around using the H09 and a backho and a crew of 3 working on the preparation of the concrete pour for the pipe gallery. IMCO also has a crew of 2 working on final grading of the Park in the area of the sanitary ' sewer. 10:3o a.m. IMCO has a crew of 2 working on final grading along the sanitary sewer and crew of 4 working on putting the rebar together for the concrete columns. ' 1 :30 a.m. IMCO has a crew of 1 working on moving dirt around and a crew of 2 working on the final grading of the Park. 12:30 p.m. Concrete truck arrives on site. IMCO has a crew of 5 working on the pouring of the concrete. The represenative from Pacific Testing Labs informed ma that the slimp on the first of concrete was 2-1/4 inches. The second concrete truck ' arrived at 1:20. 1:30 p.m. IMCO has a crew of 5 working on the concrete pour. Kelly informs me that ' IMCO is not going to work tomorrow in order to let the concrete set. 2:30 p.m. IMCO is finished pouring the concrete and are now doing screeding. TON 1. ECT INSPECTOR 1125.13.36 G28/92 DATE: DAILY INSPECTION RFPORT PROJECT: Well Mos. 1. 2, A 3 RFPORT NO. 21 City of Renton DAY: Wednesday DATE: 1//20/88 WORK PERIOD: 9:3n a.m./p.M. to 4:30 a.m./Pm_ ' WEATHER: windy/cloudy TEMP. MU. 48 •F MIN. 40 -F PRECIPITATION: rain/am WORK ACCOMPLISHED TODAY: 8:3n a.m. - We are going to try to schedule our weekly Wednesday, 9:00 a.m. meetings, for sometime later an this morning. Dean Irwin will not be able to make it. I have informed Kelly on the fix for the inconsistency in the plans concerning the location ' relationship between walls and the columns. IMCn has removed the forms from around the pump support pads this morning and they are preparing the pipe gallery foundation for a 10:00 a.m. concrete pour tomorrow. Kelly informs me that he has called the building department to arrange a rehar inspection, first thing Thursday morning. Kelly informs me that IMCO marked the locations of the damaged sprinkler wipes out in the park yesterday afternoon. And coordinated with the Parks Department on getting them repaired. The Parks Department is here now repairing the sprinkler lines. Kelly informs me that Sam Chastain is happy. Kelly informs me that they rescheduled the concrete pour for 12:3n p.m, tomorrow. 10:00 a.m. - IMCn is running the low pressure air test on the 24" main, A crew of 3 is working on the placement of the rebar for the pipe gallery footing. ' 11:00 a.m. - IMCO has a crew of 4 working on the placement of the rebar for the pipe gallery footing. And a crew of 1 working on the low pressure air test. The low ' pressure air test did not. pass. They lost 5 pounds of pressure in I hour: pumped up to 15 pounds of pressure. 1:00 p.m. - IMCO nas a crew of 3 working on un_overing the existing watermain on ' Houser Way. It has been determined that the invert elevations of the existing watermain and sewer are the same. IMCO has a cr-w of 1 working on the rehar for the pipe gallery foundation. Eric Davidson from METRO called Dan with three ' requirements. I have relayed these to Kelly Rrown. They are as follows: 1) IMCO is to uncover and sweep clean the cover of the METRO manhole. 21 install a half-dam at their sanitary sewer connection, 1) install a plug somewhere in the sanitary sewer line until the sanitary sewer nas '+oen t.v. inspected. 2:00 p.m. - Minutes for weekly meeting with IMCO. Present were Dan Ervin, Tony Pardi, Ray Sled, Ron Olsen and Kelly Rrown. The major point covered was that Ray ' Sled would like the 1-1/2 inch water service line taken from the 4-inch sprinkler pipe inside the mechanical room instead of at the 24 inch wate. main to minimize the amount of connections and fittings of pipe. Kelly B^own says he does not have a ' prohl em with this nor does Ban. Rey said he would check with the Fire Mrrshal to see if he had any concerns with this. 3:On p.m. - 1MCr has a crew of 4 working on the rehar for the pipe gallery ' foundation and a :rew of 1 working on backfilling the existing watermain on Houser Way. IMCO has performed a water pressure test to determine if there is a leak, and they have determined after pimping an lbs. that there is a leak. They are going to ' expose the easternmost section of 24-inch watermain to Check that joint first. ' Inspection Report No. 71--page 2 January 70, IgAR 4:00 a.m. - IMCn ha: a crew of 4 workinq on the rebar for the pipe gallery ' foundation and a crew of 7 uncovering the 24-inch watermain. Kelly informs me that IMM will backfill the 24-inch watermain that they are uncovering by the end of the day so that there is no open hole for anybody to fall into. Calvin says that there t is a leak at the easternmost cap of the new 24-inch watermain. IMCO used a cold patch to re Dai- the section of Houser torn up during excavation of the 24-inch watermain. 1 t t ' 1RR1�/�iiS�P �fTif� 1125.1 3.36 BATE: ' DAILY INSPFCTION REPORT ' PROJECT: Yell Nos. 1. 2, 8 3 REPORT N0. 20 _ City of Renton DAY: Tuesday_ _ DATE: 1/19/88 _ WORK PERIOD:R_30_ a.m./p.m. to 4:00 a.m./p.m. WEATHER: Cloudy_____ TEMP. NAX. 45 'F MIN. 38 'F PRECIPITATION: WORK ACCOIPIISHED TODAY: ' 8:30 a.m. - IMCo has cut a new hole to relocate the transducer port. Kelly informs me that IMCO is going to reschedule the pour for the Dump support pads to 11:00. 1 have call Pacific Testing Labs and they can make that time. IMCD is now removing the ' steel sheeting that was used as forms for the thrust blocks for the 2 45" bends. I informed Kelly that they have to have all the sprinkler pipes that were damaged during placement of sanitary sewer capped and marked by the end of the day. Kelly ' informs me that the Parks Department had asbuilt all those. I informed him that it was still his responsibility to get them marked and if he wanted to, he could coordinate with the Darks Department and get their ashuilt notes but he still had to t do the marking. 9:0D a.m. - IMCO has a crew of 1 working on excavation of the east end of the 24" main for performing the low pressure air test today. They have a crew of 3 working ' on the forms for the pump support pads. 9:30 a.m. - Kelly Brown is leaving the job site for cbout 1 hour. ' 10:30 a.m. - IMCO notified us that the 37" spacing on the discharge head of the pumps on.y allows a 1/4" clearance between the face of the pump support pad and the decko anchor bolts, therefore Oan called Byron Jackson and the plan was altered to space ' the bolts at 34" on center, i have ; •tormed IMCO of this change. 11:00 a.m. - Concrete truck has just Shown up. IMCO has a crew of 4 working on the preparation of the forms for the pump support pads. 12:00 p.m. - They are pouring the pads in two lifts each. A crew of 4 is working on ' the pour. the1:00 p.m. - They are finishing up the pouring of the pump support pads. they had emptied the concrete truck just short of tinishing up the third pad. Therefore. Kelly has gone to get more concrete. A representative from the Parks Department is ' on site and is coordinating with Calvin from IMCO on the locations of the sprinkler pipes that need to he fixed. ' ?:OD p.m. - IMCO has a crew of 2 working on the spool to connect the 24" water main u, the butterfly valve. And a crew of 1 unloading equipment. And a crew of 2 working on the forms for the pipe gallery foundation. ' 3:00 p.m. - IMCO has a crew of 4 working on the preparation `or the low pressure air test. I Insp. Rpt. No. M--Page 2 IJanuary 19, 19R9 4:00 p.m. - iMCfl has a crew of 4 working an the preparation for the low pressure air test. A crew of 2 working on the pipe gallery foundation. 1 1 1 1 1 1 1 i i Y P 1125.13.36 G28/75 nAfE: 1 -- I DAO.Y INSPECTION REPORT ' PROJECT- Well Nos. 1 . 2. A 3 RFPORT 110. 19 City of Renton DAY: Momda1r DATE: 1/18/88 WOK PERIO1:8:30 a.m./p.m. to 4;00 a.m./p.m. t WEATHER: clear skies___ TEMP. MAX.45 'F MIN. 33 'F PRECIPITATION:______ WORK ACCOMPLISHED TODAY: ' IMCD is going to pour the rest of the thrust block for the 2 45° lends at 9:00 a.m. 8:30 a.m. - IMCO has a crew of 5 working on preparation for pouring the thrust block. 9:30 a.m. - IMCO has a crew of 1 unloading rebar and a crew of 3 working on the pouring of the thrust block. ' 10:30 a.m. - IMCO us finishing up the pouring of i.he tf,n6t block. And a crew of 1 is cleaning up the site and removing the mud from the surface. ' 11:10 a.m. - 1MC.n has a crew of 3 working on the forms for the remaining 2 pump support pads. Kelly informs me that they are going to pour the concrete for the pump support pads tomorrow afternoon at 2:00 p.m. I have called Par`ic Testing Labs to ' arrange the test of the concrete. I reminded Kelly that they e , to pour the pump support pads against the existing sanitary seal , they need to wirebrish the casings, and the rebar needs to he centered. 1:00 p.m. - IMCO has a crew of 3 working on the installation of the forms for the pump ,upport pads and a crew of 1 working on the unloading of rebar, 2:00 p.m. - IMCO is pouring gravel for a base for the footings. They are using a hand compactor to compact the gravel . IMCO wants to remove the light pole in the next couple of days. The plans say to remove the light pole after the new wells are ' in service. Dan said it is O.K, to remove the light pole now. 3.00 p.m. - IMCO nas a crew of 3 working on the forms for the pump support pads and a crew of 2 working on removing the forms for the thrust block. 3:30 p.m. - Sam Chastain, from the Parks Department, came on site to talk to Kelly Brown. 1 Inspection Report No.79--Page 2 ' Janaury 19, 1988 COO p.m. -Transducer port on well casing Nl was installed at the wrong location and is therefore not going to work as installed. IMCO is going to cut it off and reinstall it. The plan on performing a low pressure air test on the 24" water main tomorrow as well as start laying rebar for the foundation. They are also going to fix the transducer port by cutting the existing one of at the casing, putting a bevel on it and turning it. 1 1 1 1125.13.36 TD RDI, P E. INSPECTOR G28/74 DATE; av ' DAILY INSPEr.T1nN RFPORT ' PROJECT: Well Nos. 1. 2. A 3 REPORT NO. 18_ City of Renton ' DAY: Friday DATE: 01/15/8-9 _ WORK PEPIOl1:R:3C a.m./p.m. t0 2:00 WFATHER:_ptll cloudy TEMP. MAX._52. 'F MIN. 45 'F PRECIPI-ATIOR: WORK ACCOMPLISHED TODAY: 8:30 a.m. - IMCG has a crew of c working on putting peagravel around the waste ' piping. 9:30 a.m. - IMCD has a crew of 3 working on putting crushed rock down at the base of the foundation. And a crew of 3 working on the thrust block for the 2 45' bends. I asked Kelly to have smAeone go out and clean up the area around the Metro manhole and remove all debris and materials. Also, the reserve parking Sign that 1MC0 removed is ' now missing. Kelly says, they don't have it. Therefore, either the parks department picked it up or its been stolen. IMCO has exposed the capped 12" ductile iron water main that runs east/west and is just north of the pole hoxes adjacent to Houser Way. It is obviously not under pressure because there is no thrust block behind the cap ' now. I've asked IMCn to get the CAP repaired, since it was damaged during their excavation. I have also reminded Kelly to -ap and mark all damaged sprinkler pipe. It's raininq. ' 10:00 a.m. - IMCO is cleaning up the park area and moving all materials on to the job Site. ' 11:n0 a.m. - IMCO has a crew of 3 working on the thrust block, and a crew of 1 working on the waste. piping. 1:00 p.m. - A crew of 3 is working on the thrust block for the 24" water main. 2:00 p.m. - IMCO is cleaning up l .r the day. t ' Toth-P dlf � i DATE: / DAILY INSPECTION RFPORT PROJECT: Well Mos. 1, 2, i 3 REPORT NO. 17 _ f.ity of Renton DAY Thursday DATE: 01/14/88 WORK PERIOD:8:30 a a./p.m. to 3_00 a.m./p.m. iWEATHER: cloudy/windy TEMP. NAIL. 54 •F HIM. _47 •F PRECIPITATION:rery ratnfr ' WORK ACCOMPLISHED TODAY: 8:30 a.m. - IMCO has a crew of 5 working today. Yesterday afternoon they placed some reba• in preparation for pouring the pump support pads and are now setting the forms ' for the thrust block for the two 24' 45' bends. Kellv Brown left the job site at approximately 8:00 and returned at q:10. 9:15 a.m. - 4 crew of 3 is working on the forms for the thrust block. The invert elevation of the sanitary sewer at the cleanout is 33.07 instead of the 33.43 per design. This was due to the fact that the invert at the manhole was done in error. ' However, this error works in our favor since there is a minimal amount of fall between the floor drains in the pipe gallery and the cleanout. Calculations show that we will not he able to obtain to 2% fall from the floor drains in the pipe gallery to the cleanout per das`gn. IMU piins on pourinq the hasp for the thrust 1 block for the 45' bends later on this afternoon. 10:d1 a.m. - A crew of 3 is working on the thrust block for the 45' bends. 1 I1:00 a.m. - IMCD has a crew of 3 working on the forms for the thrust block for the 45' bends. 12:00 p.m, - It's raining hard, and I'm getting wet. Kelly informs me that because of geometric constraints, they can't get the 8 turn-buckles around the upper 45' bend as shown on the detail and the drawings. The most they can get is 5. The concrete ' truck is scheduled to arrive at 1:30 p.m, to pour the base only,of the thrust block. They have all the rebar in place, as well as the turn-huckles. The landscaper was on site He has a question on how much topsoil is required and where it is required. ' The specifications detail the makeup of the topsoil but not where and how much. 1:30 p.m. - IMCO is pouring the base of the thrust block. Also, up to this point they have elated the forms around the first well casing for the pump support pad and ' have laid 50% of the pipe for the floor drains in the pipe gallery pit. They are using schedule 40 ARS pipe. While pouring the hasp. for the 4hrust Klock, IMCO did not pump out the water that is standinq at the lower end of the thrust block. There ' was probably about 2 feet of water there. t Inspection Report No.17 --Page 2 January 14, 1988 2:0o p.m. - A crew of 3 is working on the plumbing for the floor drains and a crew ' of 4 is working on the thrust block. 3:00 p.m. - 'MWO has a crew of 6 working on the forms for the pump support pads and the waste piping. 1 1 e ' Tony - ect Inspector 1125.13.36 ' G28/71 nATE: " ®P ' DAILY INSPECTION REPORT PROJECT: Well Nos. 1. 2, A 3 REPORT NO. 16 City of Renton fDAY:u nesday__ DATE: 01/13/88 WORK PERIOD:8:00 a.m./p.m. to 11.00 a.m./p.m. ' WEATHER: cloudy -- TEMP. MAX. 45_'F MIN. 39__ 'F PRECIPITATION: rain_ WORK ACCOMPLISHED TODAY: ' H:00 a.m. - IMCO has a crew o; 2 working on forms. IMCO has cleaned the sidewalk and roadway j•,ring cleanup last night. 9:00 a.m. - Meeting with IMCO. Present were Dean Irwin, Kelly Brown, Ray Sled, Dan Ervin, Tony Pardi and Ron nlsen. Points covered: 1) IMCO requested a detail for the shackle rods to the wall , including a Burke insert. It was decided upon that two ' 5/9" tie rods will be used. 21 IMCO and the City of Renton agreed on a trade for the extra wall lLogth that was discovered, due to the dimensional error. In trade for the acceptance of the duradek. It was decided that this was a verbal agreement and does not need to be communicated in writing. 3) Dan Frvin will determine who is responsible for whether or not the sprinkler control panel needs to be I1L listd. 4) Bailey valves will not he accented. 51 The City will install the service lines to the outer edge of the building foundation. Imrn' , plumber is responsible for the ' continuation of those lines. 6) IMCO needs to submit PVC pipe for the chlorine waste pipe, polypropylene is not covered in the IIPC, ' 11!00 a.m. - IMCO is unloading a load of rebar. A crew of 2 is working on the forms for the pump support pads. I supplied Kelly Brown with a detail for the shackling of the 6" bypass piping to the pipe gallery wall . The plumber is on site for the first time today to start laying the waste pips. t ' rdi401-e-COTIfk—w—o-r- 1125.13.36 1�' r.2B/72 DATE: ' / ' nA1LY INSPFCTION RFPORT ' PROJECT: Yell Nos. 1, 2, A 3 REPORT NO. 15 City of Renton MY: Tuesday DATE: 1112188 _ WORK PERI011:8_30 a.m_/p.m. to 3_00 a.w./pw_ tWEATHER: Cloudy. Rain Poss. TEMP. MAX. 45 -F MIN. 38 'F PRECIPITATION: slight WORK ACCOMPLISHFO TODAY: 8:30 a.m - Imco has .:^ crewman working on the ;orms for the pipe gallery nutietion, a crew of one wci..'lg on the forms for the thrust blocking for the a4-inch watermain, and a crew of one working on grading. 10:00 a.m. - Imco has three crewmen working. t Kelly states the thrust bloc' for the 24-inch tee will he pour=d at 1 :30 today. Kelly was informed that the thrust block should he formed such that no concrete is around the bolts. ' Kelly also slates that final grade on the sanitary sewer will not he made until next week. e 11:00 a.m. - Imco has three crewmen working on the forms for the pipe gallery pit, and a crew of one working on grading, ' Imco has wrapped the 24-inch tee and sleeve in plastic and have prepared the form for the thrust block. 11:30 a.m. - Representative from Pacific Testing Labs has arrived on site. He has ' informed me that he would take three tests along the sanitary sewer, one just north of the Metro man hole and two intermittently between the manhole and the location of the cleanout. He will then take three more samples in the pipe gallery pit. Jeff is ' the name of the representative from PTL. On the existing 12" ductile iron pipe running west out from Houser way there was a Cap that has been damaged by IMCO during excavation. Jeff used a nuclear densometer to measure the moisture content and the density of the soil . 1:00 p.m. - The concrete truck showed up to pour the thrust block. The thrust block was poured at 1:15 p.m, i reminded Kelly that the all sprinkler pipe that was ' damaged or broken during construction was to he capped and marked for future repair. IMI.O has a crew of 4 working on forms for concrete placement. ' 2:00 p.m. - IMCC has a crew of 2 working on the roof drain pipe and a crew of 2 working on forms for the pump support pads. 1 m - ■ Inspection Repnrt No. 15--rage 2 January 12. 19RR ' 1:00 p.m. - A crew of three is working on the roof drain pipe and a crew of 2 is working on tha forms for the pump support pad. 1 t 1 t INSP�CTDN DATE: ' DAILY INSPECTION REPORT PROJECT: Well Nos. 1. 2, A 3 REPORT NO. 14 city of Renton ' DAY: Monday DATE: 1/11/RR WORK PERIM: R:OO) a.m./p.m. to 4:30 a.m./p.m. MF ATHER: Cloudy__ TFNP. NAI.4_5 _-F MIN. 35 -F PRECIPITATION: None WORK ACC,ONPLISHFO TODAY: ' 9:00 a.m. - A City crew is or site t. :=-install the 24-inch ductile iron tee at the west connection. lmco's plumber is on site. t9:30 a.m. - The City crew readies to lift damaged tee out of the gound. Imco's Hitachi HOg is being used. The excess water is being pumped out to the storm system in the street. 9:45 a.m. - Tony Pardi leaves site for approximately four hours. ' 2:20 p.m. - lmco has two crewmen work on forms for the pipe gallery footing. A representative from Pacific Testing Laboratories is scheduled to be on site the ' morning of January 15. 198H to run the density tests. 3:30 p.m. - Imco has three crewmen working on the pipe gallery foundation, and one 1 crewman working on the 24-inch watemnain. t w/?•a y3 MNY P - 1. PROJECT INSPECTOR ' 1Aii4.36 DATE: ' DRILY INSPECTION REPORT ' PROJECT: Well Nos. 1, 2, 8 3 REPORT 111. 13 City of Renton eDAY: Friday _ DATE: 1/R/RR WORK PFRIOO: Rap a,m./p.m. to 2:nn a.m./p.1. tHEATHER: rloodry TEMP. PAX. 45 •F "IN. 35 •F PRECIPITATION: Rain WORK ACrOMPLISHED TODAY: ' 8:30 a.m, - Imco has one crewman working on compaction of sanitary sewer, one crewman is working on the transducer ports (close to installing all three), and one crewman is unloading plywood. Kelly states Pacific Testing Laboratories can he called for compaction tests on the excavation of the sanitary sewer and the area under the pipe gallery foundation. Density tests are scheduled with Pacific Testing Laboratories for the afternoon of this day or morning of January 11, 19P.R. 9:30 a.m. - Imco has one crewman working on the compaction of the sanitary sewer, and two crewmen unloading plywood and limber. ■ MOO a.m. - Im,,,, now has a crew of two working on the compaction of the sanitary. O■ Ray Sled states the existing 24-inch watermain will be shut down to relieve pressure in the new tee. The tee continues to leak more this morning, but is no more than a pinhole leak. The city plans on installing a new tee to replace the leaking one in the morning of ' January 11, 19A8. 1n;30 a.m. - Imco has two crewmen working on the roof drain pipe. A representative from H.D. Fowler is on site to inspect the leaking ter. Kelly is leaving job site at II:nO a.m. and will return in approximately one hour, 11:00 A.M. - Imco has one crewman working on the compaction of the sanitary sower, and a crew of two working on the roof drain piping. 11:45 a.m. - Kelly returns to job site, ' 1700 p.m. - One crewman is working on roof drdir piping, which has been installed from the new well by-pass manhole to the existing 24-inch watermain. Two surveyors are on site. 1:15 p.m. - Compaction and backfilling is being done around new well by-pass manhole. Kelly states work will end at 2:00 p.m. today. 1 ' Inspection Report No. 13• age 2 January R, 1988 1 1115 p.m. - Kelly states that the leak in the existing well by-pass manhole will be fixed by grouting it from the inside. The two surveyors are working on locating the ends of the roof drain pipe. ' Progress made today: Compaction on sanitary sewer was completed. Aackfill compaction around the new by-pass manhole was begun, ' Cutting and installing three transducer ports was r mp�eted. Surveyors locate the termination points of the roof drain piping. ' 1:45 p.m. - A Pacific Testing Laboratories representative was on site to discuss the density tests. Tony was informed that a four-foot hole would have to dug by the City or Parks Department for the samples to be taken January 11 , 14AR, 1 i 1 1 1 i 1 i i r/at- Y Poww P cToa G28/65 1 f.28/fi5 DATE: � S 1 1 ' CAILY INSPECTION REPORT ' PROJECT: Well Nos. 1. 2, 8 3 REPORT 40. 12 City of Renton DAY: Thursday DATE: 1/7/88 WORK PERIOD: 8:00 a.m./p.m. to 4_30 a.m./ WEATHER: Mostly Sunny _ TEMP. RAI. 4S •F MIN. _ 38 'F PRECIPITATION: None ' WORK ACCOMPLISHED TODAY: ' IO:DO a.m. - Kelly was informed that Sam Chastain approved the Schedule 80 PVC to repair the broken drain line. 11:00 a.m. - Meeting was held with Dean Irwin, Frank Imhof, Kelly crown, Tony Pardi, Dan Ervin, and Rick Harbert. 12:30 p.m. - Imco has one crewman compacting the sanitary sewer. The well by-pass t pipe ends have been covered, and the street has been cleaned. One crewman is working on the watermain and one crewman is working on the new well by-pass manhole. The City crews used Imco's Hitachi H09 from 10:30 a.m, to 2:00 p.m., with a half-hour off for lunch. The west connection was made to the 24-inch watermain at approximately 2:30 p.m. The concrete by-pass piping coming out of the existing well-house was broken. A temporary repair was made with a 6-inch C,MP 11ipe. Imco spent me,ning compacting the foundation of thi pipe gallery. ' Kelly states that he will bring the new well by-pass manhole up to the same grade as the. existing well by-pass manhole by adding an additional riser section. ' 2:30 p.m. - Imco has one crewman working on the transducer ports and two crewmen working on the compaction of the sanitary sewer. Imco Plected to use ductile iron pipe to repair the pool drain pipe that was previously broken. 3:00 p.m, - Imcn has two crewmen working working on the compaction of the sanitary t sewer, one crewman working on the transducer port, and one crewman working on general cl Pan-up. ' 3:30 p.m. - When the City repressurized the existing 24-inch watermain there was a small leak in the new to H.D. Fowler was called to re-install a new tee January 11, 19R8. ' A considerable amount of mud entered the new 24-inch ductile iron pipe during installation of the new tee. ' 4:OD p.m. - Two crewmen are working on the ::ompaction of the sanitary sewer. Imco has restacked the ductile iron pipe and placed it on boards. ' Inspection Report No. 12 `age 2 January 1, 1988 4:00 p.m. - Kelly was informed that the open ends of the transducer ports have to be capped in some manner. ' 4:15 p.m. - lmco begins clean-up of site and street. t 1 t t .y NY P I, R INSPEf.TOR t DAILY INSPECTION REPORT ' PROJECT: Well Nos. 1, 2. A 3 REPORT NO. 11 City of Renton DAY: Wednesda DATE: 1/6/88 WORK PERI00: 8:00 a.m./p.m, to 4_30 a.m./p.m. WEATHER: Mostly Cloudy TEMP. MAX. 45 'F MIN. 39 'F PRECIPITATION: None ' WORK ACCOMPLISHED TODAY: 8:00 a.m. - The boom truck was removed from the site. ' Imco is excavating for the foundation with a crew of two using a small backhoe. A Surveyor is on site. 1 Kelly states that he needs the City of Renton to make connections 3 the 24-inch main, and the water service lines, and meters. ' Tony Pardi will leave the job site for two hours this morning. ' 1:00 p.m. - A crew of two continues work on the excavation. Kelly Brown is not on the job site. 2:00 p.m. - Imco has crew of two working on excavation for the thrust block for ' 24-inch main. 3:00 p.m. - Imco broke one of the valve boxes for the existing 24-inch butterfly ' valve. Kelly Brown returns to site. Rick Harbert and Dan Ervin appear on site and informed ' Kelly that the City has had some complaints about the Project so far and he should be more cautious in cleaning up and working in a more orderly fashion or he will be charged. ' The City plans on making connection to the 24-inch ductile iron watermain on January 1, 1988. 3:45 p.m. - Kelly states that a sweeper truck will arrive in the morning on January 7. 1988 to clean the street and sidewalk. Kelly asks that Sam Chastain be contacted to see if the broken drain pipe can be fixed with Schedule 80 PVC. ' 1:00 p.m. - Imco has a crew of three working on preparation of the thrust block for 24-inch main. ' 4:30 p.m. - Imco finishes up for day. Kelly states that excavation will continue for the pipe gallery foundation, and finish compaction of sanitary sewer on January 7, 1988. 1 ins i T NYPqW. PMECT INSP ' 1 .36 G28/63 DATE: / __ ' DAILY INSPECTION REPORT tPROJECT: Well Nos. 1, 2, 8 3 REPORT NO. 10 City of Renton ' DAY Tuesday DATE: 1/5/RR WORK PERIOD: R:oO a.m./p.m. to 4:30 a.m./P�Mv ' WEATHER: mostly Cloudy MAX. 33 'F KIN. 'F PRECIPITATION: None _ WORK ACCOMPLISHED TODAY: 8:DO a.m. - Imco has a crew of three working on the sanitary serer. Excavation has been completed to oast the end of the hathhonse, and backfilling has been completed to the ,jai, doors. Kelly Brown states Imco will recompact at a later time. It will be done by re-excavating, backfilling, and compacting again. ' 9:00 a.m. - Imco has a crew of three working on the sanitary sewer, and one crewman is working on the 24-inch watermain, ' Preparation has begun to intall the clean-out. 9:30 a.m. - Imco installs clean-out aad backfills. The vertical section of the ' clean-out has not been installed. An Acme truck delivers the 24-inch ductile iron spool . 10:00 a.m. - Imco has a crew of three installing the ?A-inch ductile iron spool , a crew of one backfilling the sanitary sewer, and a crew of one working on the western p.rt of the 74-inch watermain. The Surveyor is not on site today. e11:00 a.m. - Imco has a crew of two working on the sanitary sewer. Rackfilling is heing done with an Hitachi HO9 and compacting follows. ' 12:45 p.m. - Imco has a crew of two working on backfillinq of the sanitary sewer, and a crew of two working on the 24-inch water,nain. ' The Parks Department is removing some srurubbery from the south end of the Project site. Kelly was informed that the boom truck is leaking a small amount of oil , and it needs to be taken off-site or diapered. 1:30 p.m. - The City has been contacted about shutting down the 7.4-inch watermain in order to do the tie-in some time tomorrow. The 24-inch watermain lies just over the concrete pipe which is the old wellhouse by-pass pipe. George, City of Renton, wants Kelly to inform him when he wants the watermain shut down. M - Inspection Report No. 10 Page 2 January 5. 1988 ' 2:00 p.m. - Kelly Brown leaves job site. Imco has one man working on the 24-inch watermain, and 2 crewmen working on the backfilling of the sanitary sewer. A grader has been brought on site to assist in the backfilling, 3:00 p.m. - Two small leaks appear on the water pipe that runs along the east side of the hathhouse, and Imco proceeds to fix them by tightening up the union which had ' just worked loose. 3:30 p.m. - Imco has a crew of two working on backfilling, and a crew of two working On the 24-inch watermain, The boom truck continues to leak, and Kelly Brown was reminded to get it off-site or place a tarp under it. George talked to Ray Sled and it was determined that the street watermains will be shut-off in the morning of January 6, 1988 and will sit overnight so Imco can make ' tap in the 24-inch main Thursday Torning, January 1, 1988. 4:30 p.m. - Clean-up begins. Site is readied for the plumber to install floor drains on January 6, 1988. Excavation will begin on thrust clock for 24-inch main on January 6, 1988. ' IlaT TORY PARDI, PROJECT INSPECTOR .36 G28 DATE: /y�� ' DAILY INSPECTION REPORT 1 PROJECT: Well Nos. 1, 2. 8 3 REPORT NO. City of Renton ' DAY: Nonday__ DATE: 1/04/88 _ WORK PERIOD: 8:00 a.m./p.m. to 4_30 a.m./p.m. HEATHER: Partly Cloudy TEMP. MAX. 45 'F MIM. _ 40 •F PRECIPITATION: None WORK ACCOMPLISHED TODAY: 8:00 a.m. - Im-o continues work on sanitary sewer with a crew of three. One crewman ' Is working on the telemetry pull box close to the light-pole. Imco has backfilled and compacted to approximately half-way between the end of the ' fence and the bathhouse. Kelly Rrown was reminded of the broken pool drain pipe that was broken during ' excavation and he said it would be fixed upon the completion of the sanitary sewer. Imco chained the easternmost transformer back to the westernmost transformer for security should the bank fail . ' Kelly had some confusion as to some of the footing elevations on the foundation plan. It was explained to him that the top of footing was different than the top of pipe gallery slab. 9:00 a.m. - Imco has a crew of four working on the sanitary sewer, A Hitachi P09 is being used for excavation, a small backhoe for backfillinq, and a dump truck to move the excess material off-site. A crew of one continues to work on the telemetry pull box. ' 9:30 p.m. - Sam Chastain, parks Department. called Dan Ervin to say he was unsatisfied with the compaction job at the Park by Imco. Pacific Testing Laboratory, will be contacted to run some density tests. 9:45 a.m. - Contact was made with Pacific Testing Laboratories. Density tests were scheduled for the morning of January 5, 1g88. 10:00 a.m. - Imco has a crew of three working on the sanitary sewer, and a crew of two working on the 24-inch watermain. Excavation continues for the 24-inch tee to the west using a small backhoa. ' Imco has not used the compactor all morning, just the backhoe is being used to baCkfill the sanitary sewer. During excavation an additional 2-inch waterpipe was found running approximately parallel to the sanitary sewer about five feet to the east. This pipe had not been marked during locates. It has a depth of approximately three feet. ' There is a small water leak caning from the waterpipe that crosses the sanitary sewer at the cornier of the bathhouse. The leak is ar the sprinkler vault. M____ Inspection Report No. 9--rage 2 January 4, 1988 ' 11: 30 a.m. - Imco installs first sanitary sewer tee. 11:45 a.m. - Dave, the Surveyor, arrives on site. 1-nO p.m. - Imco has a crew of four working on the sanitary sewer, and a crew of one ' working on the 24-inch main. Excavation for the tee continues. Imco has determined that the galvanized pipe that Crossed the sanitary sewer at the door to the bathhouse is a gas line and are removing it. The galvanized pipe gas pipe had been abandoned. The capped watermain shown on the sanitary sewer profile is going to cause some ' interference. Kelly states that a representative from the Water Department will come to the site to ' either lower the pressure or shut-off the watennain that will interfer with the excavation of the sanitary sewer. Ray Sled, Water Department, arrives on site. Kelly Brown will ask Ray to turn off the watermain. 1:45 p.m. - The second tee for the sanitary sewer is installed. t2:00 p.m. - Dan Ervin arrives on site. ' Imco now has a crew of five working on the sanitary sewer. It has been determined that the watermain in question lies directly above the sanitary sewer, and is an abandoned section of pipe. Imco is removing it. tKelly 1s reminded to keep Houser Way swept clean. 3:00 p.m. - Imco has excavated the sanitary sewer out past the bathhouse. ' A crew of three continue to work on the sanitary some, . An Hitachi H09 is being used for excavation; backfilling is not being done at this time. f 4:00 p.m. - ImCo has a crew of three working on the sanitary sewer and a crew of one working on the 24-inch watermain. ' Imco begins clean-up for day. The street is being swept and fence is being put up. ' ( PAR ,PROJECT INSPECTOR t !099. 1 6 .36 G28/51 DATE: / Oro 1 1 ' DAILY INSPECTION REPORT PROJECT: Well Nos. 1, 2, 8 3 REPORT NO. 5 City of Renton OAY: MondaL_ DATE:_ 12/28/87 WORK PERI00:_ a.m,/p.m. to _ a.m./p.m. ' WEATHER:_Ptl .. Cloudy__ TEMP. MAX. 38 'F MIN. 35 'F PRECIPITATION:—None WORK ACCOMPLISHED TODAY: Kelly informs me that someone from METRO will be out between 9:n0 a.m. and 1n:DO a.m. to look at the METRO manhole. Imco is now excavating around the manhole for that reason. The manhole will be bored today at approximately 2:00 p.m. ' 9:00 a.m. - Imco broke off a sizable branch from the tree by the METRO manhole. Kelly was instructed to be more careful , and to saw off the broken end. ' 9:30 a.m. - Dan Frvin arrives on-site. Dan agrees to approve rusted butterfly salve if Ray Sled also approves it. ' A Parks Department representative visits site and has roncerns about the storage in the parking lot, and that damage would be done. T stated Imco had received permission from Sam, from the Parks Department. an,esentative was going to check back with Sam to make sure Imco is following 9 _,lies. Imco has the south face of the METRO manhole exposed, and they are awaiting the ' arrival of METRO representative. Kelly. Dan, and I discussed alternatives to the roof piping system that we have designed. The concern that because of the adjustment in grade of the well by-pass ' piping, that there will not be enough cover once the roof drain piping is placed. Ray Sled informed me that Ron is on vacation, and implied that he has no problem with the rust on the inside of the butterfly valves. He said he would appreciate it if IMCO could put some plywood up against the open ends of the pipe in the ground. Eric Davidson, METRO, is on site. He asked Imco to unload the back of METRO manhole to relieve the soil pressure from that side. 10:00 a.m, - Concrete Coring Company. from Seattle, arrives on site. Also on site ' this day are the Project Foreman, the Surveyor, and four crew. 11:30 a.m. - Well by-pass piping installation continues by a crew of three. A leak ' is noticed underneath Imco's boon truck, Kelly is informed. 11:45 a.m. - Coring is begun on METRO manhole. 2:30 p.m. - Al . Parks Department, informs Kelly Brown that he does not want them to use the west side of the bathhouse area for moving their equipment back and forth. Some grass had been torn up, and Al asks Kelly to replace some sections. They reach ' an agreement to continue using that strip of grass as an access between the parking lot and the construction site, so long as they repair and replace all damaged areas. 1 0 - Inspection Report No. 5--Pr+ 2 December 29, 1987 1 3:00 p.m. - Kelly questions what type of tests. are we requiring for the well hp-pass piping. I told him I would check on this. 1 The METRO representative remains on site. The core drilling was completed at 115 p.m. 1 Because of the hour, Im:o said they were going to leave the METRO manhole open. Kelly Brown was instructed to install adequate barriers around the perimeter of the hole. Eric Davison, METRO, was satisfied with the coring of the manhole. Dan Ervin informed Kelly Brown that the well by-pass piping will be tested at 225 pounds per square inch, therefore, Kelly has sized the required concrete blocking with that requirement in mind. 1 Kelly states that they will lay the sanitary sewer tomorrow. December 29, 1987. Imco also plans on pouring the th;tist block for the well by-pass piping, and, 1 possibly try to lay some of the roof drain pipe. 1 1 1 1 1 i 1 1 1 T6SNY ��ECT61t va DATE: i i 1 DAILY INSPECTION RFPORT PR(UECT: Well NOS. 1, 2, A 3 REPORT NO. _4 City of Renton DAY: Thursday DATE: 12/24/87 WORK PERIOD: 8:00 a.m./p.m. to 12_00 a.m./R. . WEATHER: Cloudy TEMP. MAX. 32 OF MIN. 30 OF PRECIPITATION: None WORK ACCOMPLISHED TODAY: t8:30 a.m. - Kelly reminds me that work will be conducted for half-day only today, Christmas Eve, and that he will he leaving the site to attend a meeting this morning, ' Kelly places Calvin in charge, in his absence. 9:00 a.m. - On site are Dave, the Surveyor, Calvin, and four laborers. They have installed the new 48-inch well by-pass storm manhole, length of pipe has a 45• bend, the second length of pipe, tee, reducer, and well by-pass piping to Well No. 1. 9:15 a.m. - Imco found another interferring ductile iron water pipe running ' perpendicular to the existing 24-inch main. It is suspected that it is the stuhout from the tee. It is located west of both butterfly valves, which is contrary to our records. t IIZS. W�' - ' Y E T INSPECTOR G28/ 8•36 4 DATE: i ' DAILY INSPECTION REPORT ' PROJECT: well Nos. 1, 2, A 3 REPORT 00. 3 City of Renton ' DAY: Wednesdal_ DATE:_ 12173/91_ WORK PERIOD: Brno a.m,/p,m. to 4_30 a.m./p.10- WEATHER: Ptl_y. cic TEMP. NIR._32 IF film. 30 IF PRECIPITATION: IWW ' WORK ACC.DMPLISHED TODAY: ' Imco proceeds to dig holes for the well by-pass manhole and well by-pass piping with a crew of three. In the process, a PVC conPvit running by the manhole was broken. A Hitachi Hog is being used. Imco feels the two pole boxes located adjace^t from Hauser Way should be removed. Dan Frvin suggested they cut the line At that spot and ' reroute it next to the bathhouse above grade. 10:30 a.m. - Base of manhole is placed. Four inches of oea gravel was place underneath. Ray Sled, City of Renton, will pick up the extra two pole boxes from imcc. Kelly Brown. Dave, the Surveyor, and five laborers are at the site. 11:30 a.m. - Imco is concerned with the 11-1 /4' hend adjacent to the smaller ' transformer. They would like to consider using a 45' bend just under the building footing, and tying back into the 24-inch main. Mark Semrau will be contacted to make that adjustment on CAD. ' 12:35 p.m. - Imco states the well bypass pipe, as designed, .ill pass through the approximate centerlinp of the existing 74-inch main. Ron Olsen and Dan Frvin were cnntacted: they directed that the well by-pass piping be moved up to cross over the ' top of the 24-inch ductile iron pipe. I:DO p.m. - Kelly Brown was notified of the interference, and informed to raise the ' fi-inch by-pass piping just under two feet. I received a Notice of Change order to sign and will hand deliver to Ron Olsen. Imco spent an additional fifteen minutes discussing whether additional changes needed to he made. ' Frank Imhof arrives on-site. One pole box adjacent to Hauser Way was removed and placed on sidewalk outside of ' fence. Kelly grown is asked to remove it as soon as possible. 1:20 p.m. - Verbal direction was given to ,iroceed: at 2:Oo p.m. work was actually e resumed. 2:00 p.m. - It was agreed to wrap the well by-pass piping in plastic, as well as the ' fittings. 1 t ,nspection Report No. 3--Page 2 December 23. 1987 ' Kelly stated that in the Schedule of Prices it reads, "calendar days", and in the I ' contract it reads, "working days." 1 COD p.m. - Kelly complies with my request to cleanup outside the fence on the sidewalk on Rouser Nay, and to have the pole box moved to the parking lot. ' Imco installs the 12-inch tee and the well by-pass piping and wrapping all pipe fittings in plastic. ' Kelly states that Imco will work one-half day tomorrow, December 24, 19117. 1 t Y Pv 1" EC�EC�DR 1125.13.36 G28/47 DATE: i DAILY INSPECTION REPORT PROJECT: Well Nos. 1, 2, 8 3 REPORT NO. 2 City of Renton tDAY: Tuesday DATE: 12/22/87 WORK PERIOD: 8:n0 a.m./pin. to 4:30 a.m.1p w. WEATHER Cloudy TEMP. MAX. 38 'F PIN. 35 'F PRECIPITATION: Rain/AM ' WORK ACCOMPLISHED TODAY: Mark Semrau was the Observer for the first part of the day. 8:00 a.m. - The Contractor damaged a telephone line while excavating for the 24-inch watermain located under the new building. Kelly Brown requested clarification concerning what was to be wrapped with plastic Curing the installation of the watemains. According to Sections 7-77.3(09)A and ' 7-11.3(13), transition couplings and all fittings are to be blocked with concrete and shall be wrapped with ployethylene plastic. Rick Coco, from the City. located all the water mains and telemetry conduits for the Contractor. Washington Natural Gas also marked the gas mains. The gas mains shown on Sheet 5 of 40 does not match the recent markings by the gas company. Some of the fittings have rusted. Ray Sled said additional coating is not necessary if the Contractor wraps the entire pipe and fittings. ' The Contractor has had difficulty with the NJ jcints on the 24-inch MJ x FL fitting located below the pipe gallery. Two representatives from N.O. Fowler ro. came to the job site to assist them. ' Pacific Northwest Bell Co, worked on repairing the damaged telephone lines. The Contractor's survey crew staked out the sanitary sewer from the new building location to the MFTRO sewer. Kelly questioned the rigidity of the piping diagram as shown Co Sheet 22 of 40. Kelly feels that there are too many unrestrained mechanical joints on many of the piping runs. 3:30 p.m. - Tony Pardi returns as Observer for the Project. Imco is using the southeast corner of the parking lot north of the bathhouse for storage of additional mater•als. The have PVC pipe and pea gravel stored there. The telephone company, when repairing the telephone lines, spilled a silicone-type fluid on the ground. Kelly had the material removed by backhoe and will remove it from the site December 23, 1987, 1125,13.36 TE: zj'0" - G28/4fi DATE: ' DAILY INSPECTION REPORT ' PRO,IFCT: Well Nos. 1, 2. A 3 REPORT NO. 1 City of Renton DAY: Monday DATE: 12/21/87 WORK PERIOD: 7_30 ail./p.m. to 4_30 a.m./p_w_ WEATHER: Cloudy A Cool TEMP. MAX. 38 OF MIN. 33 OF PRECIPITATION: None ' WORK ACCOMPLISHED TODAY: The building permit is posted in the job shack, as well as Prevailing Minimum Hourly Wage Rates. Kelly was asked to post the Equal Opportunity Employment Certificate and the Intent to Pay Prevailing Wages. Imco spent the first part of the morning moving materials on-site, such as: 6. R, 12, 24-inch ductile iron pipe, assorted fittings, and a new by-pass manhole. 10:00 a.m. - The Piping Plan was discussed with Kelly at which time he pointed out the need for some vertical restraint on the pipe surrounding the 6-inch pipe control valves, specifically the vertical runs of the ductile iron pipe. I told Kelly we ' would be sending out a thrust restraining detail . Kelly informed me that the Parks Department did not OK the use of the bathhouse ' restroom, therefore, Sanikan is heing hrought on-site. 12:00 p.m. - Sam Chastain, Parks Department, showed Kelly Rrown a peace where they can haul excavated material , The location is 3rd and Union, approximately one-half mile from the job site. Imco begins excavation starting with the piping pit, pump roan floor, then the north ' half of the building. 2:00 p.m. - Kelly was informed to get a flagman with an orange vest and a sign to better control traffic on Houser Way when moving the dirt off-site. A flagman was placed, along with a "Road Construction Ahead" sign several hundred feet up on Houser Way. ' 3:00 p.m. - Excavation begins for the pipe gallery. Imco plans on laying the lower pipe gallery pipe on December 22, I987. Kelly was reminded that all surface rust must he removed from the ductile iron pipe and then covered with tar, at which time ' he was quoted DOT Spec. Sec. 7-11. which covers the handling of ductile iron pipe. TIiRY�Tv�i PR ' 13.36 G28/4 — 2R/46 DATE: !1'alloop ' DAILY INSPECTION REPORT PROJECT- Well Nos. 1, 2, A 3 REPORT NO. 8 City of Renton ' DAY: Thursday DATE: 12/31/87 WORK PERIOD: 8:00 a.m./p.m. to 1 :30 a.m./p.m. WEATHER: Ptly. Cloudy, Cold TEMP. MAX. 42 OF MIN. 32 OF PRECIPITATION: None _ ' WORK ACCOMPLISHED TODAY: 8:00 a.m. Imcc works on sanitary sewer. 8:30 a.m. Crew of on, is working on 24" main to the west. ' Rank adjacent to transformers appears unstable: material has fallen into excavation. Kelly was recommended to tie back transformer back to well-house building. Kelly is instructed to have 24" main cleaned out before more pipe is installed. 9:00 a.m. Imco has crew of two working on the 24" watermain, and a crew of three working on the sanitary sewer. 10:00 a.m. Imco has difficulty holding the bank during excavation of the sanitary sewer. Kelly instructs one of his crew to crawl into the 24" tee and clean out the ' 24" pipe after it is all put together. 11:30 a.m. Three lengths of sanitary sewer pipe have been installed. There is now a crew of five working on the sanitary sewer. No one is working on the 24" watermain, Imco is using an Hitachi H09 for excavating the sewer and small backhoe for backfilling the excavation. ' 11:45 a.m. Imco has installed a total of four lengths of sanitary sewer using a crew of four. One crewman backfills and compacts. 1:00 p.m. Imco continues working on sanitary sewer. Excavation to the bathhouse has been accomplished with a crew of five. tRoom truck has been moved without oil leakage. Kelly instructs that easternmost transformer be chained back to keep it in its ' present position. 1:30 p.m. Imco stops excavation on sanitary sewer: cleanup begins. ' TONY`Pr, PROJECT INSPECTOR r : ' G28/53 DATE: i 6 7 DAILY INSPECTION REPORT ' PROJECT: Well Mos. 1, 2, A 3 REPORT NO. 1 ' City of Renton DAY: Wecnesday DATF: 12/30/9R1 WORK PERIOD: 8:00 a.m./p.m. to 4 10 a.m.Jp.w. ' WEATHER: Sunny, Clear TEMP. MAX. 40 •F MIN. 34 •F PRECIPITATION: None WORK ACCOMPLISHED TODAY: ' 8:00 a.m. The cleaner still has not arrived. Kelly will be reminded that Sam, Parks Dept., should be at the site in the afternoon to nake sure cleaning is accomplished. ' Imco proceeds to remove portion of rock wall to the east so 24" main can he installed. On site this day is Kelly, Dave, and crew of four. 9:30 a.m. One of the power conduits going to the transformers is broken. Kelly was asked to get it repaired. Existing well by-pass manhole is leaking near the new inlet. Kelly was asked to get it repaired. 1 9:40 a.m. Wells 1 and 2 have come on and discharge is backing up into the new manhole,. Kelly was concerned that the roof piping system, as shown now, will cut through the existing well building, which means it could not he installed until after the demolition. He asked if he could reroute it for installation at this time. He was told he may do so as long as it does not cause any interferences. ' Imco has used a short section of PVC" pipe to temporarily repair the power conduit. 9:45 a.m. Imco now has a crew of five at the job site. Excess material and asphalt is being taken off-site by a dump truck, ' Imco has their compactor on site: no oil leaks are evident. 10:00 a.m. Digging for the trench for the roof drain piping begins. 10:45 a.m. Imco has determined that the roof drain piping will cross the 24" watermain at a point where the top of the watermain is at an elevation of 39.59. Imco was told to go over the top of the watermain with the roof drain pipe to avoid ' conflicts with the other 24" watermain as it ties back into the building. With this alternative they can go out wide. away from the well building: keeping the drain pipe out from underneath the well building. ' Dave, the Surveyor, informs me that the minimum cover that we will have on the roof drain pipe is 24". This is only for a short section. 1 Inspection Report No. 7--?age 2 Oecember 30, 1987 11!00 a.m. Kelly contacts street cleaners who are expected to be on site in the afternoon to clean the parking lot. 12:DO noon Imco continues to determine how to route the roof drain pipe; problems with other utilities are present. ! 12:15 p.a. Street cleaner appears on site. Imco uses small backo to excavate for the roof drain pipe. They use the Hitachi H09 to install the 24" main to the east. Half the crew works on 24" main to the east, and other half is working on 24" main to the west. 1:45 p.m. Imco backfills east of the 24" vertical tee, and are using a compactor. Kelly was asked to give 24-hour notice prior to starting any foundation work, and ' after they are done compacting and backfilling. 3.00 p.m. Kelly Rrown leaves .lob site for the day. A crew of three are working on ' backfilling of 24" main into the bui'ding. 3:30 p.m. Imco finishes day by reinstalling fence and cleaning up street. 1 1 TON p 1, R ECT INSpE—CT bR 1 G2RiSi DATE: / S-& O DAILY INSPECTION REPORT tPROJECT: Well Nos. 1, 2, A 3 REPORT NO. 6 _ City of Renton ' DAY: Tuesday DATE: 12/?9l87_ WORK PERIOD: Sion a.m./p.m. to 4.10 a.m./P.m. YEATHER: Partly cloudy TEMP. NU. 35 'F "IN. 37 'F PRECIPITATION: slight WORK ACCOIPLISNED TODAY: Imco was already pouring the first thrust block for the well bypass piping, as required, when 1 arrived on site. I instructed Kelly to scrape the concrete away from the bolts on the tees and bends. They had not done an adequate job of forming ' up the thrust blocks. At 8:45 AM Sam Chastain, Renton parks Department, was on site and instructed Kelly Brown on keeping the Park orderly and clean and some additional requirements. I instructed Kelly to take the necessary precautions while excavating for the sanitary sewer iy the tree. They are now excavating by the tree, and the ' hank looks very unstable. 10!30 aim. IMCO has hooked a sling around the tree and connected that to a backhoe to attempt to support the tree while excavating. It is their intention to get the bracing in as soon as the trench is deep enough. Rick and Dan came on site since Sam Chastain had called Bob Bergstrom to complain about the .use of materials in the parking lot. Rick and Dan told Kelly to not use the parking lot for stockpiling materials and to clean up the parking lot 1y the end of the day. Kelly was also instructed not to use Houser Way to move the Hitachi HOS. Ry the end of the day IMCO is to have the parking lot cleaned and all materials removed and hosed down. Also, ' the grass is to be raked and sawdust put down in muddy areas. The street is also to be cleaned. t Yesterday, 12128/87, IMCO had a crew of two men working approximately three hours on putting together the 24-inch 45' bend and other fittings in preparation for pitting it into the ground. On site today are Kelly Brown, nave, the surveyor, and a crew of 1 five. They are all working on the gravity sewer. They are using the Hitachi HO9 for excavation. l0:DO a.m. Dave, the surveyor, is leaving the job site until tomorrow mcrninq. Fric Daw on, METRO, left at approximately 10:30 AM. He was satisfied with the connection to the METRO manhole. ' 10:40 am. They laid the first pipe length of ductile iron pipe out, of the METRO manhole. From the METRO manhole, a full-length ductile iron pipe was laid, and a transition coupling, then PVC pipe. They are using a small backhoe to load up pea gravel and to backfill the excavation around the METRO manhole. 1:00 PA. They have stopped work on the sanitary sewer and are now laying the pipe going into the well bypass manhole. Imco is bricking up the easternmost knockout in the well bypass manhole. It seems to me that they have decided to go with the ' Alternative roof drain system which we laid out yesterday. 1 ' Inspection Report No. 6--Page 2 December 29, 1987 1:30 p,m. Started excavating ,or the 24" watermain by the existing wells. I warned Kelly of the power conduit crossing their intended excavation. George from the City of Renton came by to pick up the pulibox Imco had pulled out of the ground, 2:00 P.R. Two .aen are working on hackfill {ng the METRO manhole and cleaning up the Parking lot. Two men are working on the excavation of the 24" main, and one man is ' working on the grouting of the well bypass manhole. Dan Ervin arrived on site. He suggested calling Pacific Testing Labs to have them do compaction tests on a periodic basis. I informed Kelly that he needs to get a compactor on site. I cautioned Kelly about the fact that we will have sc a testing done on their compaction. He informed ' me :hat their compactor was broken and another will be on site tomorrow. He also said they will do some additional compacting around the METRO manhole. I instructed him to get ribbon, wires, and barricades around the pit which is still open. I also ' instructed him not to put sawdust in the muddy area. Approximately 40' from the METRO manhole, INCO broke a concrete pool drain line which will need repair. By the end of the day they had located the 24" watermain to which they are connecting. They had removed all materials from the parking lot. However, the cleaner had not arrived yet. 1 TONY P ►,/PR�WECT INSPECTOR G2N750 DATE: /-- f A 1 -S8 -SI - 90 t7Vy4 SITIO do (voif-Dat4N= �7i �cr 31111 3lij E)NiaN3