HomeMy WebLinkAboutWTR2700880 W-880 WELLS#1, #2, & #3 WELL HOUSE CONSTRUCTION - WTR-9 1
#I Generi]
w
seoevv
STATE Or WASI VGT(YV
DEPARTMENT OF SOCIAL AND HEALTH SERVICES
Qlnrva. WaJrgFon 98%4i CM5
November 26, 1986
Bob Bergstrom, P.E. 1
City of Renton DEC
200 Mill Avenue South
Renton, Washington 98055
Re: Referendum 38 - Municipal Water Supply Construction ;rant
Receipt of Signed Contract and Report Form
Project Number 383360702
Renton - Source
Dear Mr. Bergstrom:
We received the subject material, The November 20, 1986. date of acceptance
of our $333,459.00 offer is the legal date of our contract.
Regarding the Report Form, based on the entry in item 1, we harp recorded
this project's completion deadline as January 31, IORB. We ant,ripate
the mailing o' the material required in item F of the funding c ntract
by then. We have asked that funds be set aside to meet the cash needs
indicated in item 2.
We are anticipating the material required in item C to ba mailed to us
May 20, 1987.
Enclosed are the payment request instructions for your use when payment(s)
on this project are requested.
If you have any questions, telephone me in C^ympia at (206) 753-3528.
Sincerely.
:
Peggy Jon, Coordinator
Municipal Water Supply Funding Programs
Enclosure
cc: Don Olsen
Moe Batra, District Engineer
State Auditor
Glenna Gerdts, Program Accountant
.06.,
V
PAYMtN%EQUEST ASTPUCTIONS •� p
GIWIT
Up to four payments of Municipal Water Supply funding Program funds may be
requested. Pleasr refer to item D of the funding contract for specific • (
details regarding timing of these requests.
Payment requests shall consist of the following material:
.(1) A notation that the municipality has reviewed the payment material,
that the material is correct, and that it is approved for payment.
This notation can be in the form of a) a cover letter from municipal ,
official referencing the payment material, or b) the notation "Approved ,
for Payment" with the signature of a municipal official on each
billing, or c) an approved voucher signed by a municipal official
attached to the appropriate billing, or d) any other subnittal which
indicates a municipal official has reviewed and approved the material
for payment.
(2) If there are competitive bids and/or neantiated contracts and/or.
equipment ordered for funded item(S), submit a copy of the itemized
billings for each item for which start up %rork material has been
'accepted. Only the most recent itemized billings need to be submitted
if they contain cumulative totals.
(3) If work is done by municipal employees (force account) on funded
item(s), submit a document relating the work performed. This document
Should contain a) the payroll names of the municipal employees who
►,orked on the project, b) the number of hours each tmpl oyee worked on
the proj>ct, c) the hourly rate of pay received by each L� ployee and
d) the total costs incurred for each employee working on this project
may also be included.
(4) If stock on hand is used on funded items, submit a document relating
the cost of material used. This document should contain the original
) nrchase price and sales tax paid for the stock used on this project,
The prorated costs for freight and/or shipping may be included. The
Costs of handling and storage may noc be included.
(5) If lands/rights-of-way/casements have been purchased as funded itcm(s),
Submit a purchase document showing the amount of land purchased and ,
its costs. '
Pleise send this material to:
Department of Social and Health Services
Water Supply and Waste Section
Flail Stop LO-11
Olympia, Washington 98504
If you have any questions concerning payment requests, telephone (206)
753-3528.
yiE -
wo
• • 4-710
4—710
ID) Development Standards: In the Public Zone IP-1) the following development
standards shall apply, except as otherwise provided by
1. Setbacks'.
(al Front Yards:Minimum requirements on the following types of streets
shall be:
Street Types Front Yard Setback
gterial IMajor at Secondary) 30
25'
Arteriaj lQgllectorl 20'
All lhhers
(b)Rear Yard Ilnterior): A minimum of ten feet (to') except it the
property is contiguous to a zone with a more restrictive rear yard requirement
in which case the rear yard shall be the minimum of the more restrictive zone.
(c)Side Yards (InterioW A minimum 01 five feet (5'1.
2.Special Setbacks.
la)Any yard abutting c public right of way shall be a minimum of
twenty feet (20').
(b)Where a P 1 zone abuts a lot which is zoned G-1,R-1 or R 2 on the
City of Rentc .Zoning Map and designated single family or low density multiple
family on the City of Renton Comprehensive Plan, there shall be a minimum
setback from the common first twenty feet (20'I fromothe common lot e lotline5 minimum of the
landscaped.
(c)Where a P 1 Zone abuts lots zoned G-1,R-1, R-2 R 3 and R-4 on
the City of Renton Zoning Map and designated medium density multifamily
or high density multifamily On the City of Renton Comprehensive Plan,there
shall be a•ninimum landscaped setback of twenty feet(201 from the common
lot line.
3. Height:
(a) The height of a building shall not exceed fifty feet(50'1 except as a
conditional use.
(b)Public and private utility facilities eexcept buildings)shall be allowed
to exceed fifty feet (50').
4.Parking/Circulation: Parking and circulation standards required shall be as
follows:
(a)Access: The principal access shall be from en arterial or collector
street.
w
t1.V4 Nil, - �~
` urnal o ,ommerce
Box IIUSO,Seattl:. N'.A 98111.
Nhune(200 622.8272
n,te...Oct...1,..1f87.........
City of Rdnton
00
2 of City Clerk
00 of Ave. `o _ .„
Benton, Ws. 98655
OCT 21987
;'T.
Notice of Hid Call 7733_8
Well Rehab 5 Construction
58 lines r 1.10 per line 63.80
S8 lines C<' 1,00 Per line
5�8'-00 5121.80
Fublish,d cePtember 25,
(%tober 1, 1987
Pleas include Acrnnnt \umber with Pn�mrm
w �
7733_h Affidavit of Publication
City of Renton
Well Rehab&
Construction STATE OF WASHINGTON
Bididflair Urt.lg
cni.iv f% h KING COUNTY—SS.
wells 1.Y.cad 3
gebabilintiw and
CaaetrtRoo
Scaled bids will be recelved The undersigned. on oath states that he is an
int t 2 so P. m_ty elk sbofti. authorized representative of The Daily Journal of Commerce,
antl will beo ned and puhlirly. a daily newspaper, which newspaper is a legal newspaper
read i th a floorrCmd—reure M of ;eneral circulation and it is now and has been for more
1ny�2d0 Renton
nM.m bouth. than six months prior to the date of publication hereinafter
TTe work to be performed refered to, published in the English language continuously
WA
150 working Caya from as a daily newspaper in Seattle, King County, Washington.
the date of cnenmememmt ua- and it is now and during
,,,tract .hall Include q all of said time war printed in an
der this
but no`be limited to. office maintained at the aforesaid place of publication of
• Construction of a TILT- this newspaper. The Daily Journal of Commerce was on the
GP cotiixte well building m
Libert. Park, tceluding site 12th day of June. 11141, approved as a legal newspaper by
work: the Superior Court of King County.
• rovision of Dump ing
equlpmrnt for there potable The notice in the exact form a as nnexed. w published in
.at rdeeD at
vmioli al equitoment regular Issues of The Daily Journal of Commerce,which was
forfl.cal asti:uthhlorinatlion. regularly distributed to its subscribers during the below
matic—
tmlayZeres. of. existing stated Period. The annexed notice, a ..
O
well farilltles
The City eeaervea the right to .._.....................
reject any and/or an bids acid to
waive anv..it all tnfwmah- ......_....._...........................__.._...._.._._..__...._..............
.
es.
c.firm and comncl dceunlaits and �iWtta rfY publishedfm ..$wg�.tag ..'1�---_----------------
may be obtained at the Public .4 „USX
works I)e rmamt.111m owagtt the
r """""""""""'-"'-""
Renton Municipal Buddua for
a lee of 05.00 wch snp .--.._.��_�.... _.__._._......_..__...._._.....
to rover pomaee,ifmalled.
A eemfied rlieck or bid bond
m the amount of five t51 percent -)
of the total amount of each.bid „+j ri y3.__-_...................
__
must accompany each bid.
The City'a Fair Pra Am and Subscribed and sworn to before me on
Noa-Wsilm,mation Policies
shall a_ppl_v.
MAIYI°P71;E.MOTOR. ...........................
_
t Clerk. -- '
Dates of v Journal in the :
Sedtle Deily Journal of Com-
temper Y5 and geto ..yl........•..:........_.__ ... _....-
meRe,Ryeyp Notary Wbtie for ih•Slats of WAShi
ber 1,laM. _ (TT33 B/ a iag b most" gton.
stR,uraa Drir
Gf onal of Commerce
Boa 11050,Seaulc, N'A 981II. Phone -)6I 622-8272
Date...Oct.•..1>..19.8�..,.......
City of Renton
Office of City Clerk OCT 2 IM
200 Mill Ave. So.
Renton, Wa. 98055
Notice of Bid Call 7733-B
Well Rehab 6 Construction
58 lines �d 1.10 per line 63.80
58 lines @ 1.00 per line 58.00 $121.80
Published September 25,
October 1, 1987
CC,+AHTL 1 u , LAWS OF 1955
CITY OF RLNiiJN CERTIFICATION
L \NE VMOCPtMN[D p1 K-'!DV !••ITIRY YNl1eR
e:`.P:Tr OR x[P1VPr T T n2 W+ 'LLa wart
3!'.n fWV".xtG 1ME Y 'R!5 P•nL�`1^'.O,On ow
�t
vxox rcwroxY,D a o<<:,:cD x.. u
M GYN ra a V6i D�'Z. anD `Pcxr'.J f'.fWld
WaMfl ixE tttttttttt(ryryryryry�ir p n-.'G • '+-+t 1
aaV CLaYn��txtwEKTt aNn C[1Li� K
cr 42110 /i.>nc3s.ba6ti) 77 V�
Please include Account Number wilh Pasmenl
r �
PLAN REVIEW ROUTING SLIP
DATE:
,%OPLICANT:
JOB ADDRESS: - •_ —" �__.
NATURE OF WJa,.
TO: CorOnts Due Comments
up if -tn
ENGINEERING DIVISION __ I-?,� FIRE PREVENTION OIIREAU
TRAFFIC ENG. DIVISION I_I BUILDING CODE REVIEW
UTILITIES ENG. DIVISION I_I ZONING l: PARKING _
OTHERS �_I ENERGY CODE
Comments or suggestions regarding this application should be provided is ■r
Please provide comments to the Building Division by 5:DO p.m. on above date.
REVIEWING DEPARTMENT/DIVISION '" �
—I APPROVED I_I APPROVED WITH CONDITIONS I_I NOT APPROVED
Straot West sNM N IP4tM p ,f«v P.�L sre,P., ec c
kut<. Cxtnstrg tatty —k wa / me a e t
p9do to two rrtwicobn NJIM AI,) ec OfY.,. t?cc. n14 /.{{cyK
p..,A;�a �rr Noe _��_ r ,.
Mowu b1moalt Mop" 4nM eccan��o%��ir�At Cc��bre
a6ss.6 �. recess ce�1�.
� m ia-nrRrr :aaas WN N eMN
~ w Dri U1I
51 FWM atom SISNot ?OWN-Z!/I .LS'✓ -fed ji lU N�vice�f c r12e jo
Flags k N N"Aw III / E fa�f" ;.r7le/w (ias de a,#
W/erg c 49; �/ / rs Al4rin 6yl.cme
t.
.<,e» DATE
Signature of Director or Authorized Repzesentative
-- r
REVIEWING DEPARTMENT/DIVISION
I_I APPROVED I_ I APMOVED WITH CONDITIONS I_I NOT APPROVED
DOTE_
Signature of Director or Authorized Representative
1(/- •iV
City of Renton building F Zoning Department
200 Mill Avenue South
Renton, Washington Q8055
Plan correction based on
the 1985 Uniform Eusiding Code
Project Id. well 123 •�_ /�,j%-)
Address: 30' houser wy s Dates 1 airi.aari- I+7E0
Contractors unr.nown
Occupancyi 82,H6 Architect: same
Type of Consts I1-N Engineer: same
Pans Examiner; )h
e SHEET IDENTIFICATION CORRECTION REDUIRED
ssI all All sheet% to be stamped and Lsigned 6by an Arrhitoct
or Fnqineer registered in this state.
2 it p1n -,.. pro This 1s required to be a 1 hour assembly sine it
"•' is an occupancy separation. -- Table 5-8 t Sec.
,�, ,.sic. - 30'_•. fcl
._ ..i
3 fl pin This is required to be a 3$'hour as=embly since+ it
is in an occupancy ceparati6n wall. -- Sec. 50.. (c-)
4 41 pin Note: Manually operated edge cr surFare-moi.nted
fla•,h bolts are prohibiteo. -- Sec. -:04. (ci
5 fl pin nandrails on stairs handrails regd on stairs. vent regd fc%
chlorine areas per fire code.
b fl pin stair rise to be mw: of 7 inches
� f
PLAN REVIEW ROUTiN--SLIP
DATE:_
APPLIk:AiT:
JOB ADDRESS:
NATIRE OF WM: �w/t` � �.�C-�G
TO: Comments Due II Comments Due
ENGINEERING DIVISION __ �_1 FIRE PREVENTION DIREAU
TRAFFIC ENC. DIVISION �_� BUILDING CODE REVIEW _
I_I UTILITIES ENG. DIVISION I_� ZONIN'; B PARKING
OTHERS ��,� ENERGY CODE .
Comments or suggestionF regarding this application should be provided in writing.
Please provide comments to the Building Division by 5:00 p.m. on above date.
REVIEWING DEPARTMENT/DIVISION .1 e
I_I APPROVED II APPROVED WITH C@GITIONS II NOT APPROVED
c1 ��
e ! -t-c.3 C� C- 0, rC-9 S r r
G � wA. f, l, �' �� C-
DATE
Signature of Director or Authorized ReF'esentativc
REVIEWING DEPARTMENTlDIVISION
I'I APPROVED I—I APPROVED WITH CONDITIONS I_' NOT APPROVED
DAIS
Signature of Director or Authorized Representative
➢ lB3
OCT 14 1987
1125.12 Z
(G27/32) -
Engiffm ,ring -
October 9. 1987 ` I
METRO
821 Second Avenue
Seattle, WA 98104
Attention: Mr, Rob Hirsch, MS-82
Dear Bob:
On behalf of the City of Renton, this letter is a request for a side sewer
connection for the proposed Well House for Well Nos. 1, 2, and 3. The side
sewer and connection details are shown on Sheet 5 of the attached project
plans. Our proposed schedule for accomplishing the work is shown on Sheet
39.
The proposed side sewer is in accordance with the Joint Use Agreement on
the Cedar River Trunk, dated Septemoer 2, 1971, a copy of which is
attached.
Thank you for your consideration, please call if you have questions or
require additional information. Please send your response, with a copy to
me, to:
City of Renton
Attn: Ron Olsen, Utility gineer
200 Mill Avenue S
Renton, WA 9RO55
Sincerely,
RH2 ENGINEERING, P.S.
4�
Daniel R. Frvin, RE
Encls: 1. Copy of the 1g71 Agreement
2. Plans 1 through 40 of 40 for the New Well Building
cc: Mr. Ron Olsen, Utility Engineer
1410 Market Street,P.O.Box 1180,Kirkland,Washington 98033(206)827-6400
Engineering
October 13. IgR7
1125.12 (G27/34)
Mr. John Webley
Director, Parks and Recreation Department
CITY OF RENTON
200 Mill Avenue S
Renton, WA 98055
Subject: 1988 Proposed Uniform Fire Code Modifications
Dear John:
Attached to this letter of transmittal are the proposed modifications to
the Uniform Fire „ode for 19CS regarding emergency treatment and
containment for chlorine gas. It appears that the retroactivity for
ex,sting chlorination facilities is obtained by the requirement for a
permit. We are currently invr�tigating this further to verify it and will
provide you with this information as soon as we receive it.
Please let me know as soon as possible what monifications are required to
the conclusions previously reached. As we ;rrently understand those
conclusions, the Wells 1, 2, and 3 Building contains all facilities
necessary for the Parks Department to install its exisiting chlorination
equipment for the Pool which includes compliance with the proposed Uniform
Fire Code for 1998.
Please contact me at your earliest convenience should you have any further
questions or concerns.
Sincerely,
RH2 NGI/Harbert,
NG, P.S.
/'R chards PE
cc: vier. Ron Olsen, Utility Engineer
Enclosure - 1983 Proposed Modifications to Uniform Fire Code
1410 Market Gveat,P.O.Box 1180,Kirkland,Washington 98033(208)827-6400
• OF RF
PUBLIC WORKS DEPARTMENT z
DESIGN/UTILITY ENGINEERING 0 235-2631 0
MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.99055
"�D P
�rEa SEn1E�
TO: DATE: JIB No.
i4io its.
ATTN: _Hest t'.t von —
GENTLEMEN:
WE ARE SENDING YOU p ATTACHED a UNDER SEPARATE COVER VIA _THE FOLLOWING ITEMS:
o SHOP DRAWINGS o PRINTS a REPRODUCIBLE PANS o SPECIFICATIONS
p COPY OF LETTER a _
COPIES DATE NUMBER DESCRIPTION
THESE PPE TRANSMITTED AS CHECKED SELOW'
a FOR APPROVAL o APPROVED AS SUBMITTED a RESUBMIT _ COPIES FOR APPROVAL
p FOR YOUR USE a APPROVED AS NOTE? a SUBLIT COPIES FOR DISTRIBUTION
o AS REQUESTED a RFTLMNED FOR CORRECTIONS a RETURN CORRECTED PRINTS
o FOR REVIEW AND COMMENT o a PRINTS RETURNED AFTER LOAN TO LIS
COPIES TO:
SIDED Oisert
TITLE
IF EM:UOSUIES HIE NOT AS NOTED, KINDLY NOTIFY US AT ONCE
PUBLIC WORKS DEPARTMENT '} z
DES:GN/UTILITY ENGINEERING • 235-2631
MUNICIPAL BUILDING 20C MILL AVE.SO. RENTON,WASH.98055 i a
P
1tFa SEPTE�
TE; JOB NO.:
RE.
- eei
AMC
GENTLEMEN:WE ARE SENDING YOU O ATTACHED o UNDER SEPARATE COVER VIA THE FOLLOWING ITEMS:
a SHOP ORAMINGS o PRINTS D REPRODUCIBLE PLANS a SPECIFICATIONS
a COPY OF LETTER o _
COPIES QATIF NIMMER DESCRIPTION NO REMARKS
THESE ARE TRANSMITTf.O AS CHECKED BELOW:
a FOR APPROVAL o APPROVED AS SUBMITTED a RESUBMIT _ 'OPIES FOR APPROVAL
In FOR YOUR USE D APPROVED AS NOTED o SUBMIT _ COPIES FOR DISTRIB/1faN
p AS REQMSTEO a RETURNED FOR CORRECTIONS o RETURN CORRECTED PRINTS
O FOR REVIEW AND COMMENT a a PRINTS RETIWED AFTER LOAN TO US
COPIES TO:
_ SIOEO Arlene Y. SOIiV:'.[
TITLE til tiR ZRNIta oM�'oA —
IF ENCLOSUES ARE NOT AS NOTED, KINDLY NOTIFY RR AT ONCE
ORIGINAL
S1125.I?
G29121 iintaineering
February 24, 1988
Mr. Ron Olsen
Utilities Engineer
Public Works Department
CITY OF RENTON
2nO Mill Avenue South
Renton. Washington 98055
9m6jeet: City of Renton
Well Mos. 1, 2, A 3 Rehabilitation A construction
City Attorney Involvement and
Transrittal of Existing Correspondence with ImcO
near Ron:
Enclosed with this letter is a copy Of the Complete set, of contract
correspondence hatwen Imco General Construction and the City of Renton for
the ahove referenced contract. Because of the volume and nature of
correspondence to date, we suggest that you transmit the enclosed
correspondence to W. i_arry Warren, City Attorney, for his review. We
think it would he appropriate for Larry to provide advice at this point
regarding our responses to Imco's construction and contract questions.
It appears that the contractor is writing letters for the purpose of future
litigation or arbitration, and is structuring his correspondenre to provide
himself with an optimum position for this probable eventuality. Our
responses should be structured accnrdingly. and Lar�'y should be aware that
this is occurring so that the City's optimum legal position is preserved in
responding to Imco.
We will send copies of all future correspondence to both you and Larry
Warren on a weekly basis for his review if you concur. We will send weekly
updates of Imco's correspondence to Larry for his use.
Thank you for your consideration. Please call if you have questions or
require additional information.
Sincerely,
R EyN INEERI..K W S.
-B5hiel lt. Ervin, P.c.
Facts! Imco carresonnApnce (Serial Letter Nns. 1-60)
RH2 correspondence (Serial Letter NOS. I-Ail)
1410 Ma,ket Street PC Etox 1180 Kirkland Washington 98033(206)82'ti400
Lnisl Letters for Met(' 1, 2. #3 Rehabilitation
Serial Lasxy of f• el Lavery of
Letter Letter Yet assatutiont Letter Letter frog
#Nate Iwo Disf,mition goat@ 1112
�? 1-1 7 Clarifice[im'of- ss—•Alternate ��ss. i
.�ssss:a.::a:7 Notice of Nrgeorate w"-.:10/16/87 for Equiptont• on bid 11/23/97 proved Met and ratification;
propoest Me repeated. and stating that only Ronald
Daen and Richard Nonghton
7 1.2 7 Traffic control required by are authorised to order
undated excavation in Nosier Nay. inemses, decreases, or
:ab super to he reeporoible chages in the work that
effects contract price or
17D2??7 Request for review of the co;ietlon ties.
11/11/97 desiged roof "tee and
advise if redesign 'a ? Traesittal of
required and If so;hiss I1/23/87 Rrw"tructim Cmfrenca
Mich alternate systw is sine", and pgssent request
desired so bids frm schedule.
suppltera and Ulbcontractors
can be obtained. Plesse ? Transaittal of Stppl®ntat
respond within 10 days to 11/25/97 droving no 1 to Clarify the
prevent project delays &tells of the wte tic
transfer switch relocation
7 1-3 ? Request for colors to use for for amrxan,he 1.
11/16187 •FW Ass for Metals Exterior spplaantal drawings will be
and Interior. Sp;cifice"on issued free Its to etas Me
Swtim Division 9.6. reWfred. Lppl eeenlet
drawings do net detail
1-4 Cnfirsing substitution of additional. work, and are net
11/17/87 24.01 auxMJxFL Tee for authoritations for a thege
spwifted FLOWL on itee 17 order. if it is felt that a
on sheet 22 of 40. raplesentit drawing creates
an extra cost itM, charge
1-5 Request to change 24• tee order requests exist or tads
11/16/87 free all flrge to MJ a Ft. in writing to the project
engineer. Notify the project
1-6 Netiee that Mr. Kelly grown engineer before preferaing
11/10/67 16 IMCO's field sperrendnt any additional coat work.
sect representitiw on site.
plane niggly the nise of the 7 Response to letter 1-3.
Cities on site■epresentitive. 11/30/87 provide RN2 with color
sawtes for sit coated
t-7 Notificatim that project prodpts eo that a
11/10/87 Meroger is Mr. Don Irwin. coordinated color selection
can be seek.
1-8 Substitute Byron Jackson
11/24n87 pLo" for the Fearless pupa 7 Divitian 10.5 fibers("
apwified in the contract 12/06/87 grating review stating that
dor:wmts rxadek grating sbittal
does not Meet space but will
1-9 Proposed fubstitutim of DI be considered if two seats
11/10/87 24• Tee for Special Stainless stated conditi ors.
Steel Tes, offering a credit
of $1,143.20 for the 7 Additional infonatin on
Substitution. 12/08/87 it lower location as
1-10 Request charge of charge regiesteti at precenatrwtim
11/30/87 order prxedure wti,xeti in zonferewe ad traruaiting
RN2 letter recited on su plesenntal drawing 02
11/23/87 due to ties required
and warning of charges due to ? Clarification of wli by-pass
delay of work if the 12/09/57 piping detail traveiting
prceedwe is used. supplesental drawing in
response to serial letter 1-13
1.11 propose alternate ce'llng
12/04/87.,at.of Osstrock and enoxy RN2-10 substituti an of a d :tile
pint instead of the plywom 12/11/89 ,on tee for fitting no 15 in
and white plastic la+rote lieu of the stateless steel
originally specified. tee as spwified is NOT
approved.
I-12 Request additional 6 sets of
12/OB/87 full Scale pin sheets with RN2.11 Rexlx: se to serial letter
seceMFn sheets. 12/11/87 1-11 giving realms for
spwifled ceiling in chlorine
1.13 Request for <lanficati on to root end intended insulation
page 1 gave 12-Jut-1988
Serial letter. for Will 1, 2, 4 3 RMabititati on
12/03/M.Met 4 of 40`well tripes methods and susesling testlna
piping• immrt etawotjon of ample of later proof
12" wttet. plasmas respond Meetrock coated with M MY
yion to 1L71/87. for .cid/wter resistance.
1-14 Canfinaing teiephone RM2-12 Respone to serial Letter
12/03/98 cemersation of 1211,187 12/11/87 1-15 acknowledge recipt of
stating the 50 inch dimension, achedulas of values and 1
refers, on the roof C6 rep.ectfng sea of partial
channel spacing on contract q„asnt fors ismwad at
droving 11 of 40 1s to M wecorst,tiction cmfrerv.
seswsd in the%cricantal
NOT the hypotww or sloped RM2-13 swoons to serial letter
position. At"aft 12/11/87 1-16 stating that sprinkler
dissioning and positlaning rout. is oval table ft=
Of the C channel wI II M from Grinnell in bras as vF822
or to the MEET of the chapel. with Model No. F8W dlmt
cp`: end giving contact nleele
1-15 Trrsmittat of schedu', of and phone non. r.
12/03/87 wires
RM2-14 Respame to serial letter
1-16 Mepmacfng sclaq to 12/11/67 1-17 ackrowledeiry recipt of
12/04/67 stbstitute for Grinnel revised wood ceiling layout
Winkler ...is F9228 010 for the pup room and
Is he longer weilMle reca esting add4ionst details
for review.
1-17 semi tat of retaliated
12/07/87 stbtitute ceiling imuletion CR-15 Motice to prOc"d and start
and finish carpentry in tee 12/W/87 150 working days as of
prop roan. 12/10/G7.
1-18 Rattiest for review end RM2-16 Rasponse to•Wtice of change
12/07/87 clarifaction of dnifn rd 12/11/87 In contract St. 1+ .toting
addeMa If for sanitary Mat there is no
sew. with METRO rewirrmnts chorine/ftoride injector on
given at pracon. the project and giving a
Wallace anld Tiernan catalog
1-19 provide costs of revised droving amber for the
12/09/67 roofing Ares per redfest of •Gradated Cylinder-.
11/16/87
11M2-19 Review of sulmitted work desk
1-19 Ramat for Motice to proceed 12/11/87 tied, flow esters, and
12/07/87 sad acknowledge reclpt of progres. schoduto giving
siyed contract revised part rsake for desk k
top due to error in the I
Motice Motice that contractor: contrast specifications,
05 7 surveyor fad sell iccations rejecting the sulamltted flew
12/14/87 diffrmtt from plans aid meter for not meeting specs
rsueating Immediate aM requesting additional
correction of fovds.im, its of work M identified
floor, roof, retaining wtl, in the work achtstule.
and piping plena.
R/11/8 Response t0 diveel sbn mabar
IQO Confirming tateptione
w-11 t2/it/87 5.3 misc. steel nii mittsls
12/14/e7 Location
inn of sell heed repeating drwirg 6648
location error. Ste MJice 6648 1, as not d a d648-3 be
es above. revised as rood end t
reswtolrilted.
1-21 Repast for .sell change
12/14/87 order form. R92-22 transmittal of suppLemmt-el
121M/37 droving No. 4 which
1 22 Respowse to letter RM2-19 Identifis the corrected
12/16/87 repestin, addition of four vertical died iana of the
its to the proposed project it prmls, rmieh were
scheduLe: incorrect m sheet 15 oft"
1, bathhouse 1Luorldation contract drwings.
ewipent dismantling wili Stpplementat droving No. 4
occur roncurimtly with the also details an ptiost
imtaltatim of the same modification to the wait
ewipent in the new well panel dnign as a contractor.
house. 2. Its W. 2 option.
•Finishes" rpUires
coordination efforts r,•day RM2-23 Review of pry control valve
to dry basis relying n 12/16/87 and backprmss a vela
POP Date 12-Jul-1968
Serdat Letters far Yells 1, 2, S 3 RMMiiiution
cnstruction progress, mother submittals 'ejecting the
she Material awdabillty, submitted 4ilay valves.
There Would be little or no
be fit to otryaam associated RN245 Trsrswittal of change order
with the project by adding 12/16/67 gl for Iwo's sinstwe
this activity to the
construction schedule day, to 142-26 kespwwe to latter 1-10
the H.ether activities 12/16/87 allwiry man field
It is Associated with. 3. observer to Authorize`Field
Its 3 •wit Mao 9 flow York Orders• in an mount not
raeerdinga 1s an stew for to exceed$500.00, and
Mid ns requitement for rec mting corporate
IMCO's services has We resolution on minutes giving
fah. If 1t has ben I..,. an site It ~
overtookecl In the decuents authority to sin these
press. rot Hy IIICO "Field York Orders-.
iwadiet.1, 4. •Sidewlk
And Orivewya is considered RN2-27 Restore* to letter 1-20.
^filt-rna Work and is t0 IN, 12/16/88 Revisions to plan Sheets 9
atcwgtishad only when the rid 22 are in work old Mai.l
Project foreman date sine, be evadable by the and Of
that its Installation Witt th. week. A.discussed With
ewparience the least mount Dean Irwin on 12/14/87 the
of e.posure to damA- fro changes do net Affect the
other construction related building foudation, footing
activities. or betw grade piping, and
th,elore there is no need
1-23 Motica, that contract... tc delay in construction.
12/17/87 forces will mobi Uza and
(tart work an 12/21/87; end
that Mr. Dan Irwin Of RN2
infara d contractor by Ph.
that Misstocation Of wit
heads will he" n0 inect on
foundation, looting or below RXi28 iranaittal of Change Order e
great concrete work, and that 12/16/87 2 for Iwo's signature.
revised plans Will be
applied within two days. RN2-30 C...ectnon to letter RN 21
Notice given the wissl,.Stim 12/22/87 adding •General Notes" to be
has delayed project , den added to MiaxllArens Steel
and the cast Of sew. Will b skia itbls.
fort., casing.
RN2-32 Refpanse t0 letter 1-23
1-24 Confirwing tlllata," 17/21/87 stating that ai,dlays
12/17/87 conversation with METRO that caused by the moll head
. fees, line will Match location was liwitw to
crowns With the METRO 42• Detester 14 and that rry
tine, further delay was not the
responsibility of the City.
1-25 Clarify portion on serial Any changes required shove
2/17/87 letter 0119, that proposal for the fovWatiotM Witt 1g
alternate roofing is Valid covered in. forthcosing
only after recieving change order.
engineering approval of the
W-Ray"tat Products roffing RN2-33 Subittal of Snint Ms Steet
fystes. 12/22/57 fabricated TN rejected.
Revise to show correct
1-26 Transmit r guested cost break disentros and the taps for
12/17/87 down of r aposed changes to the chlorine solution piping.
the electricet systes. Total
for p.rosed chsn, s is R142-34 Transmittal Of change order
S17,ON.99 12/28/87 No. 2 And noteing that Ieca's
roqurnments to disease*(,
127 Rpwst 11112 provides the bests And provide for
12/18.187 structrot desire to stpport transportation to witness the
the skylights as aAnittW factory tests haN b,rM
frw Lair-Swanson so that it deleted, but the City does
May be rrconrporated into the not wive any rights in the
structure) Mop drawings. contract decuents by
deleting than. two it. in
1-28 Re9.mst RN2 review the this Change order.
12/18/87 reciuiroMnts for Markle
rods. In particular, Shaer 22 RN2 35 Acknowledge reciNpt of change
of 40 Itee, 8, 10, 22 AM 26, 12/28/87 order 01 with JGo revision
pope 3 Date 12-Jul-1988
0
Serial letters for Wits 1, 2, S 3 RMablGtetion
that tW roof Witt We
1-29 Lrarwittal of laco'x stpowtlrg sea chsisn. Chenille
12/13/87 equipaant and labor at. for order sill net W fourMl
charge order Mork. to City laltit ,Mitt roof
,Amittals are reciewel And
130 Request for 112 scaie Newt approvM.
12/18/87 1uLl state reproOac role
(sepia) drwin for .a in Rx236 TrrmaittaL of a 14ster set
Transmitting Cop'. to 12/25/57 of 1/2 ..1.drwiros
sw-,.tr.ctors and siappl lira. ineLWlrg segplaaantal
drwin,a i.outo to date mrwt
1-31 Rnprae to wrial letter M14 two rwised drwin9s for
12/18/67 recommitting detail of N99d contractors ua. those
finish orould skylights, and 4uater.W rat W rIrwrnai, to
how to attach finish hoard d' the City lFOrl ftlltract
top Of It pdrnal. capletlon. F.LL site Ptah
sets .,it W leeuwd at S6o.00
1-32 ais.ing Wr set . stated in The
contract.
1-33 Confirm rKiapt of
12/15/87 supplemental drwirg K rwt RN2-37 Reaast to prwlde eddltiont
its trramittol to supplier 12/29/97 shackiinp for fittings Nos.
of wit zereei L. Extra cost 6, 9. 22, Newt 24 on shoat 22
for increased site Will W of the cratrmUon plan.
for Mcairg.
RN238 lrpowaitul of cnpoga oryr
1-34 Re,tone to"risk Letter 026 12/n/87 03 for si"ture and ooClrg 1
12/21/87 designt'M field of, contract time tetenNon.
sgerentmwt@nt Beity Bran as
Nu[harlsed to na, i.e fte(d RNZ-39 Response to Letter 138
char,,@ ordere m to $S00.0o. 12/28/87 reaxsvng the City to
relocate the <Nutirg pour
1-35 Irentswit.l of si,ned Charge transformer. Any relocation
12/21/87 order 05, With ootice of of the exlatlng power
charge to prices due to oo trereforwer WILL W don at
,,or agreement . Imco's eNpenaa as eaplicitly
"di.r.wdle @n Owl in the stated in the contract. Into
presence of City 00.eryer•, am,at it's awo risk
wwt •traw.L for ong City relate the 24^ pipetin an
Eaplcwe to Wilre.. factory discimsed With MI. Bros, on
test.. the site on 12,23/47.
136 Request for Charge order d+e 0x2-40 Respond to letter 1.31
12/15,57 to Cwistion on the wC 12/28/87 ringardiN cool. for
trcatiore fro ori9ingt inspection. Corractin, 1w.'s
drwirgs to Met shah M interpertation of pre-con
revised dr.w,ngs /9 and 022. et.taart.. Iwo way work
COIL of cheeges 51,672.54 nr,d flesiOle hour pole Will not
exterwt contract 5 working W charged for inayettion
days. prior to 8:00 M NM after
5:00 w dunrg the 150 day,
1-37 Po.ition letter that, per the dur.tion of the contract
12/23/67 dlscweiore at the We ,s•.1 ws ,npactioh is rwulred
coatrmtim confrence, Iwo to W made by a city
Witt W wrk.M flr.lbL. espt oyu. If cowisints are
hour. wwt.,It be charged for recie,sd regarding INol's
Inp!ctlm "We only When a work during the hours aotslde
City trozoctor is REWIRED To the 8:00-5:OD periat The
oe present Wfore 8:W M or contract Ottit.tim of work
after 5:00 TWO. to 8:00'S:DO Witt W onforced.
135 Notice that existing power RN2-43 Review of n3lnit.l of
12/24/87 transformer. ore in conflict 12/31/87 .taint.. steel motorised
with the intatat,on of the I ere. The aJaitt Nl is
24• pipeline and that LOT oprowd. Shaer 2 of 2
contrmtion is halted moll I. also ng, is No. 4 finish is
the Omar reLacatois the r.gs,rW on It eapo.d
tram formers. Stain that ...... rwt actwtgr useably
owing 32 of 40 says; -the is not shorn No stainless
contractor shall not rewnwin, •tee,. Revlw and rwiLeit.
the wstleg trpoafonMrs",
awt that documentation of Rx2-44 Response to latter 1-43
&toy cWls Will W forth 01/04/88 a:.tirg that at this time
toairg, C.tyin veWerpoL in not IN,
PW 4 oat* 12-Jul-IM
Saf bl tYttera for test It 1, 2, S 3 YeNapi li tat I
Kceps(b4 s,pefntengr,t and
1.39 atice that the eaisOng 24o reaastrng detailed
12/28/e7 piping IMH!Hw.1" 1" references and bKk9rrand
iwtai.tion Of the.ea pup saperiertl for Mr.
h-p S piping, and that he varWrpol. Iha contrart
cat of tha sstra tort repiirea a s4parntsNnr
re,tlirw It K01.77, a vita full sutlowitY to Kt on
change o is rapestw and the co trwton bahstf be
notice of possible satr. .ort pretnt It a{: tics ,,ring,
and asprse that geY be wit as at this dw that It
cwaad 1. the future by the Mf. Iadtof "Yr. scot.
reloca[in of the py-pass lift.
a.4-45 baorre t. left" I."
1-40 Mice o/ shistirie 12• wpe Ot/04/be reaattiy additions,
12/23/87 inharf...n,Yitn the information of the -"it
,ra44Pn of Me .el� pup xwoanU`. contfactprt
by-pass piping and 'ataieatIN attntton, is directed to the
thwW order of t209.17 w
prepared. .yd shset raM 10 i p on
15 Off 40 sad piping u
1'41 ripest for rir order o/ show on sheet 4 of M.
r
1112e/e7 Yese.e2 for eat's t ioat sae to and id aetwn part.el nays..
rasu ga
t tl par te t ri C1/O4/811 rases( Yo. t Mich rat not
W uppl+.seitat Moving M. arKHsw due to 12 the
at,vaf 12 days alter the
D91 to raittal Of prrrpoofd cats cuoafl date W 21 got
iZ/29/b] for rerau[ing the itt, n sWatltw on Na fors
per di.ct8157, to on.ire on thou i red And liven to two at
12/2e/b7, [net otiwcw at the pre-con And in letter
11235.70 ah2 12.
1-43 Mn Ke ty slog, Is stung ant-47 Th.doors, framer, snip
12/30/97 the proi fcl riper NtafHrtt 01105768 hordare, as s,patttw, are
.I([ be Kirin yr IPOt. .OI approves. the sWsittat
doer not inoitde
1.4 fhmIc.t for reaolut,w of 4
tpecifiubma for the
12/70/97 a[aratrwtion t.fam,,to and n.rd.are, lowers, li itt..
TheAs- t lnnga ilitew to 4 oolfit, .Data, anic per.
The 1. off... toy of tha star etsp, and panic Far.
twist. oiferi to preor[t PstagesrevitT
tasknd ruteeti tr.
this .k i a r
e.oD pet hour
or on a nepoeiated (,s, as RY2.44 traMrit41 of charge urdtt
ba.11, 01/OS/ee Mo. 4 for sivrtwe.
1-45 (Aastiora the newirearrt for 11112-50 Irerp,t4: of charge .,per
a2130/e7 a Ut label for the chlorin OINSIM Ye. 5 for u9rahR.
rifting systb apfiniker
control pant. R%2-55 Iha polypropylene fleor
I)IM/tle Main and ia.t.piping are
1.46 are n ttio obitwf1w to.4,(7 the ("'(I, tat, NOT OpraM for ae on this
12/30/e7 nydro,tS Shots,M ere,Dian, and rhqueat#S Geian project.fit Menw. I1 r.QutratAnd sasc rt If they are to M •eddlC to theha.t i,oor .in and wM
contract. wping 4"C.C. Pbwe rmsa
1.47 confiner, 4laphrs aft resrbi[t.
Ot/06/5e converse ion of 1!/u 442 58 lrrreittal of revive of door
Wr.br Iwo .il, prov-de all 01/21IN And n.rdwre aIAsh'tt k ,
lift And VAI*states rtl.11 tiat,ng asverti fltas Mich
other tont1wtio, luting M not stet .wifineion,
rti Dravtlds Mt rgrtred and reparating reatbnitt.l.
as-built infone.tio. at .
was,au pf is.of s7000.00, s.Z-60 Confirwtton of 0112016E
01/211M sareearnt that the
lid eonftreieg telephone Oiacreplo,cy of details 17,
011081M COM"Al tlo,of III'M arm. Is w resoletd to that
Meraby two sill prwnde th.corral cols,, interior
different pap moo, frog tol.And MI I tnurl lra.
those orisinr.ly awif iep MOuld atl InteraKt to ne
for • total atlas of c..iatant .IN the rTgaw,g
512,010.WO connect Plan.
I-49 brafraltul of elwtricat a.2 62 the Pressure sw". and
01/0e/8e siCcontrwton pasgaw costa 01/25/ee or".tIre w,tchea aLLailtw
for conga to rha enKRlul s.e wr 4worteef. sit".
Page 5
Date 12-m(.19bb
Sf fal Letters for Wits 1, 2, S 3 tehab,l'taTlon
sytaa rap.stml W the rasJesit iMiudim the
wrens at . cat of s9,203.89. sasarfacti rer and Kcwacy Of
the presawe gLesm, sM
I-SD TrYWlttal of eteitrl Gl highlight the Type "
01/08/88 •Wrmtlwtors proposal casts W'.a to 6e included for
tu 'oside DFl protection at the pes•we switches.
the IDO smp min circuit
or....r as rapastes by the tN2-65 Trew•Ittal of letter fra
over at s cat of 111700.14. 01/26/m puget power rpaMlrp
elactrncal ayTaa dear aM
1 51 agrees to prattle tripple repreat'rg Iwo to coordinate
01/22/b Nall hytrares Pr sheet 15 Of dtrwtly isith Paget parer.
40 if a Thope abler of
Sdee 30 plum I" is issued. RN2 66 The 200 0 elettric wtor
01/2f/88 .ataittal is not conapleTe.
1-52 Transmittal of euweyors Please 'wiss anal rfl4a.it
01/22/88 4-Wilt dres"of the irclWbp the Inforeastion as
.fail, 24• ester main rW datailal in the technical
12- etas aMr in"..' i etlfiesttaM.
way. Pleese ra.Va. anc!
pro.ide wrwtion to resatee RN2-67 tesporae to trial Electncs
The grade conflict and 01/26/98 letter of 12/28/87 regarding
minim Re contructim de Lay. the W Inset for the
s'ineler area control
1 53 Forest repeat for •et of parer. The NEC section 90 4
01/29/88 plan sho.ing the M. IeyauT govern " the Wilding
for the •tructwet footings, empartwnt elactric.l
Wlta .d roof for the steel Inapectoo .ill reps,,* the 0t
roof .pptyr. all label or a talml fra the
esaoo fatal cost to b State of Nash. Dept of Labor
forwrdnd to the TIT,. end Irdnlrles.
1-54 PrOpossl to Iretall the ne. Re2'68 The sWsittal• for
02/01/88 ri• PIW line per 01/i8/88 thachioritina anti
aIap;k antet drm.in a7 for ftarldstlon .ytaa eW iaesnt
1110,594.83 and an 6 wrklrg 'e relacted bKM1te:
day ertentlm to the 1) TM apdpant dies net
contract. The City Is t0 say, the repll'vent4
ease the 11e-1n and be outlined in the'olect
respaa ible for arty, further some nficati on and
testing reprtred. The change cdNtrwetla drMlrgm.
order asrt be isaWd by 2/1/8 2) The suh.ittale (10 net wet
or add Irk wool dellay charger the rapdreaanta of section
.Ill be Inewa. 1 05.341) for eubaittsla and
ahoy hwims, ar.l sett,on
Ids eepart for caapenestlon for 1-06.7 for sale tltuti an.
02/01/88 emirs cats in testin0 24" 3) The equtpaant sLEaicted
pi De line per ovsera .00Ld require the rases,W of
direction on 1/27/88 in the the cht'intion end
.swot of 111,851.49, fluoridation •ytess, Mich
.as net addresses in the
1-56 file Ifeter stating two Wa adalttats.
02/02/88 direttal to etW coretructim
of the Dim mlery mrd test Nw2 69 Tr~iTe.l of sLipplaacotal
the nee. 24• pimlin on 0I/27/88 hxlp M. 7 in response to
117,188 by serial letter 070. letter of 01/25/88 I
On 1/29130 in .phew sur.eyors as Wilt of
cwvereat1w the ait"'ete et'ki"es engird C.tion
solution of see ortrim he. to eelsting 24 Irch ester
Dim gate', slsb n in in Messer Wy, and
de.Olitlon of the entire also not"To stake Wrk order ws
woo d'.T..W t0 mlfwlnle ,iisWd.
masible delay, .d Iwo
'ooedes to finish the Poor. IN2'TO Notice net to contrwt Ve
01/27/Eb p,m gallery retaining M11a
1-57 Confining letachan ertilL an accaketimle pressure
02/05/88 corners.tion of 2/5/88 test of the Ir. 24 Irch weer
i nforairy Iwo that the City in is preforsad.
eduld Irish the inblstlon
of the 24• Dim line " R42-71 the Dehaidifler sidsittai as
repesatirg capaaa[ion of 01/28/88 rec,eved is intaplete.
57055.00 for restocking Please reslimalt providing
cNrge• send lost time, epeciflcatlon a the'Odret
hair sJattted.
Tiffs 6 Date 1DJu1-1988
Serial letters for Yells 1, 2, B I Rehebilitetion
1.51 )Iotice that a UMIs of the
U101/11 tilt-W sell panels i, RM2-75 Respone to latter of
availtale for irrsection on W/03/41 01/29/11 reprsting Mips
2/10/11 said that the forma details for the roof etc.
reed stacl tabs, all be Kellam refer t9 latter RM2.60
aystlmblt at the seer rise. (01/21/06) With contsim the
Poor is srhedulma for 2/11/11 info requested.
so irrpectim is reefed prior
to that dale. RN2-77 tranamittat of change order
02/04M M. 6 for Igosture.
1-59 Submittal 01 ITS motorized
02/09/86 loner details to clarify RM2.71 Res orae to teller 1.55
points rallied in tacisl 02/04/a/ rejecting claim for testing
letter R43. 24 inch "Tor. Justification,
I W Ackmm( i t of sky that the York mas not
edM r ac sp y r,q,rad by the on/iml
02r10/11 tight debits on .upplemanbi contract aril that RN2 or the
droving R a1d no'"tin/ City ws rasporsibla for the
extra comarmotlon of extra wrk preformeed, Mill be
$0,712.99 to )WIsment than. required.
tan additional wrking days
ere also roppested and change RM2 11 Response TO littler 1.61)
order must be relieved by 02/16/11 r•jwtim claim to extra
2/12/11 to avoid delay cmpkiostiOn for eKYtight srd
eh.rgas. skylight leasing.
1-61 Reoome to serial fetter 971 1142-62 RevieM of Clorfmtim
02/16/58 repeating justification of 02/16/11 egdipsent submittal. The
extra charges for testing the Capitol controls eWiresent is
24' pipe lire (serial letter NOT e%Ai to the Wallace and
155) claiming that serial Tiernan specified and in
letter R70 Of 1/27/80 rejected.
directed two to preform the
test tamedistely and this RM2,a3 Trarerittal of rnised voter
repaired the pausing of a 02/16/11 Min plan for the 24 inch
Thrust black altieh mould not Connection..st of the Mall
hey,been reprired it the Wilding. Kelly Broken Time
pipe Lim imetilation could advi sad of construction start
have been coplated. by City forces. submit exits
coat dots for this wk.
1.62 Notice that Iwo is ready to
02111/M accept deLivery of sob R112-64 Revisit of NI-build 1pexOlire
removed by the park$ Capt. 02/17/58 costing sibittal. Please
submit s coplete finishes
1-63 mf.sing submittal as per section 9.6
of the contract.
1.64 Request for extra
02122/11 Compensation for use of UN09 RN2-17 Reapome to letter 1-63
backhoe to a$sist city forces 021231M eVi.inir, mat the
fn making the first dmaidifier %",ml me.
9oremectian to the 241 pipe returned marked Nrevist and
Lim in the roman[ of resubmit^ because it did not
r.m.25. contain the specification
information raptired by
1-65 Repntt for *air, contract {section 15.90).
02/22/11 cmpematim for wrk
preformed *,sitting the city RM2 81 Please revise the sulmitbt
forces to complete the ifnat 02124JM on the 750KVA tramf.mr, to
coned don of me 24- "pe cla�ify the TILL 9aing: 1.
Lim in Mouser any n& the Draining No. 52.617-0021-14.01
shunt of R4,412.19, mrd No. M61-0 do not
"wee. 2. Wh.t Is the rating
1-65 Request for extra W type of the primary fuse,
02/22/58 compensation it, framing sky "m don it Comaty mire the
lights in roof, claiming this "pall icsti. 7 3. oft. the
mam mited from the bid plan$ sKadarypbryrnaanC have a
and aince addendum 6 did not $K9ndary and"bit"., 7 4.
contain the information Does the unit anst the
reefed to Mips the framing standards refrenced in sac.
this mas amited from the 16.19 7 Wet is the
bid. thus the wrk is not trareformaer impad"rce sit
included in the bid price and K/R ratio. S. Provide
extra cogamation of certifibtion the the unit
S6,712.9p is dale taco. meets .(( repuiremerls "mad
page 7 Date 12-JuL 1988
Serial Letters for Yells 1, 2, 6 3 Rehabilitation
refreKed at erdatd of the
,-67 missing Moro ificati one.
1-68 Rgo aat arbitration of claim R82-89 Remuect by subcmt'Ktor to
G2f29/88 for extra ccepamatim of 02/25,85 use medium Wight CMU is
extra work on sky Iigh•a as satisfactory. Include the
per "risk letters 160 and required information in your
166, formal suhatittat.
1-69 supply detail sugary of Rk2'93 Trammfttal Of the detailed
D2/29/88 rayxsts for it. 02/29/88 color schakIle. Color of any
colperlsatl on regarding the inadvertent Mi Miens Yiit W
24- pipe line instil Mtim n detersifeld at tfft Of Coating.
rah ercad in serial letters
155, 157, 164, and 165; and Rf- 95 Review of door and harcaMre
giving torsi compensation 03/01/88 re-submittal With Still has
reQxated as$19,837.32. a list of 6 its Wich still
do rot get SpKiffcotiau.
I Request for coptate color
03/03/55 schedule for all itw to W R82-96 Review of flooring
painted and stating that Imo 03/03/88 Submittal. The general
is resporaibis for pefnting poi Were Ceramic Carpet
this, Lift only statue t that flwrim systr don rot meet
all roof steel will be Specifications and is
Monterrey Red. rejected. Meese rextEmft a
flooring vYstm that meets or
1-11 Tranwittsl of tub letters exceed the contract
03,04/88 free electrical wbcontrector apecifications.
repmating clarification of
distribution dssign and hard Ra2-97 Response to letter 1.7o aid
hole location W stating 03/08;Ba telephox conversation of
that Puget power costs are 3/3/88 t•enwiting revised
the ouners responsibility color echeuuta. The contract
Also that blue color on the Finish schedule specifies all
control panels wit'. IK W it. that esquire emating.
extra lost and rift itea. The maision of any, it.on
the color schedule don hot
1.12 Confimirp conversation on retie. the contrectuat
03/07/55 lob aft- that Imo will reQairw it to cost all itw
furnish ali structural Steel w the Finish Schedule. The
pine coated and Ydll finish City Yf I hot accept a
cost per serial letter I70. -.rtlall compleH facility
and wi It rot pay extra to
1-73 Response to totter Rm2-99 cost an it.that is
03/11/88 stating that section 16.4 identified in the finish
referd to by Mr Ervin does Schedule.
hot direct the contractor t0
include the cost o/ providing R112-99 Response to letter 1-71
primary powr in his bid, ad 0310a/88 regarding questioru froe the
this is only reasonable Since elrotrical sbcOntactor. In
Puget RgRr Yplld net W.& accordance with sections
these costs ud I11 a des ion 16.4, 16.6. and 16.8 of the
wee complete. contract the City will rot
MY additional comit for
1-74 Repast for extra power supply to the
03/14/88 ccmpemetion for imtelation facility. The finish
of a 1" copper ester service schedule is YOT superseded by
to the chlorine storage roan the requiremants for a
at $368.87. mafafact.res •scaderd
line-Wpm. Also plesse
1-75 Request for extra coordinate directly with
03/14/85 coperewo, for cleening the Puget power regarding the
air", infant of the aran,seent of the primary
project. States City forces switch and is, cabinet.
removed the curb and gutter
and this Is the cause for the 11112-102 iranhux stet Of COMplafnt
debris being tracked into the 03/14/88 froacement Mason's Local No.
strut. Therefore lace work 528 regarding prevailing wge
to cleat the street is ..its rates. The contract rNaires
work and they Mould W paid payer of prevailing wge
W7.37 for the ork to due. rates for class of work
preforred, not for employ.
1-76 Traemitting revised floor geterat title. Please revs.
03/14/88 colors and regxstirq y r wg- rates aril correct
Page a Date 12-Jul-1988
Serial Letters for Wits 1, 2, g 3 Rehabilitation
approval of the floor systr soh,oversights Mich Might
since the new IRAP11tat is have ban made.
diferant from that proniolwly
ra jected. R82-1Wr Response to letter 1.69
03/15,93 deninp standby ties payment
1-77 Resomse to serist letter of the excavator and
03/16/M*102 rew slim wage raise for transmiting change order woo.
amson so orpoeter and 7 for I"two.
stating that two believes
sit workers are paid RR2.105 Mortification that a credit of
correctly. 03/21/88 13500.00 is expected for the
Cities cost M to the
1-76 Transmittal of code layout destruction of the hot-dip
03/17/88 requirements for trasformars galsoniting son the pipe
W transfer witch gallery grating edge sports.
Indicating extra work is
red,i e i and requesting extra RH2.IM Response to Utter 1-76
compensation of 53,172.83. 03/21/88 realising the rejection of
the G.P. Ceramic carpet floor
1.79 Wtlfleetlon that the covering and requesting
03/22/55 "Wilding roof plan" is in suffic+ant technical
error Hn0 that this has inforotion on the product
caused considerable *Arco fcr review if resubitted for
work and that extra amysent apprwal.
will b reyired.
R142. Rsepame to totter i t75
I.80 Contending that pear is Ol/21/M/88 Mning*Ulm for ..it.
03/22/88 thar"s to that char et army crepe ream for Horse[ deal
07 ring oral that charge order up and aintaiing Rower way
n cue tocke.ed is to be Maintained con to• clean
settle stand Offers to stets by the contractor or x
settle 0 as full
issue for be retained
contractor will
$39Weso as full cthe min,. be eetei nod he clsai the
aM resolution of the ratter, chant Nd the cent o/ the
cleanup will be deducted tram
1-81 Dnisl of city claim it is the contract mosuin.
03/23/58 entitled to credit of
$3500.00 for hot dip RH2.103 Response to letter 1-78
galvanized repairs and 03/23/38 daring request for astrs
requesting arbitration if the compensation for the
claim is not dropped. instalation of rockery for
the electrical transformer
1-82 Rpueating a new dint and transfer switch because
03/29tU contaurs plan' for the site. this work /s food, the
Claiming that plan sheet 6 is contractors resp.ibiltty by
not correct and will not work the contract.
on the site. Also request a
cow drwing m the rockery RH2.111 Raeporso to totter 1-81
retaining wit with new 03/31/88 reiterating that the
disentionis to cmfons to the Wlvmieed grating edge
.duel site conditions ad supports dowge was reported
rwised-final contour*". to the project field
stperintadant on 3/16/55 and
1.83 transmittal of crrresporserce was rejected at that ties.
03/30/88 frm electrical contractor The edging ant be resisted
regarding 750 RYA tea if.reer or a credit is due the City.
and requesting rwiw.
RN2-112 As discussed eat the syse:ing
1 84 Confirming ...rsati ens 03/30/811 of 3/24/a8 the di were onsl
O4/07/88 regarding Manpower errors in the roof joists
utm.iition reports fr. idartmad in letter 1-79 are
Triad Electrical and Diamond the result of a
g pluming Mich were subcontractors error and not
subettted to Ron Olson on rerrmeouer dissentient on the
3/29 ad 3/30, and contract plays. The City
conversation of 3/25 to Mich sssues no rseposibility for
Iwo had subelted copies of in,reased costs or it" as a
the "items sent to Lap but result of this error and
not yet returned by Men. became of this error the
contract preforMree is
1.85 Submittal of proposed behind the approved
04/21/85 alternate handrail system schedule. please imuedistely
with a 180 finish arwl lacquer identify the proposed Method
costing. of asking up this Lost ties.
Page 9 Date 12-JUL 1988
Serial Letters for Walls 1, 2, 8 3 Rehabilitation
1-86 Reapnwe to letter (4/26/88)7 Rw2-113 1btica that the cherry crass
O4/I8/08 stating that at this ties 03/31/88 M the point site hew ben
Iwo would prefer to hold dosm- Of the contractors
.rhitrstiM until the project forces. Plan mid,
is complete we It appears pruning scbdii. and
ther will be other iteas to "wrrmtiM to the City for
arbitrate. At" response to this dnneet.
otter (4/4/88)7 stating that
Iona$ufa$med for .roitietion RN2'114 motic that the grate supports
is for the changes to the 03/3O/811 aabdsd in the concrete floor
roof mtructur.L cospwent. are the wrong site rug are
recs,ired to support the rot accwtable. pleese
skylights, net -for pywnt provide the details of the
of skylight framing costs' es iproposed rest if icatim of
stated in the stave refrrced this pobles.
letter.
Re2-115 actice that is loWiN dock
1-67 Resprsie to letter RN-117 03/31/88 hardratl ,;ports imbde0 in
05/16/88 stating that it I$ Iwo's the cone-ate of the loading
uv)erstarding that oM Ervin dock are not ply or allowed
had verbally approved and or.rot acceptable.
applying a thicker Leyer of plemsa provide the details of
florring to correct the its, the prop ad rectification of
spot. in the uppr puproee this pit&,W
she fluoridation ros,iper
concrete slob. Further Re2-116 Wotice that the Radial roof
sating that the floors were 03/31/a8 beWcolun connection plate
constructed to spot cast into the cove rate corner,
elw.tions hewn on the pt. colon is not level and
And! as soon W rot prwiW therefore is nor acce0obt..
for . floor slop. Please provide the details of
the proposed rectification of
1-88 Repeat for arbitnpM for this problems.
05/20/08"upot Power service
dgngasw. Regest that this kh2-117 Notice that the concrete
itw be Included Yitk 03/31/99 floor has several los spots
Previwp itme for structural that de not drain a, required
$test modifitstic for and is th...for. not
skylights. wcMtadle. Please provide
the details of the prcpsW
1-69 Request for 5 working days rectification of this Wobtaw.
0527/a8 ePtantim to cmtrwt [lee he
Added to change order No. 7 Rk2-118 Transmittal of Puget power
04/05/88 field service charge bill of
1-90 Request for the regiil~ts $2.124.36. The City has
05/27/58 for +8rbitrator" as unable to Aid these charges directly
find Any in the to Puget Power to Warrant
specific.tiwe. Will pursue delays in Iwq lead
the apoinuMt of M electrical iteme, but atilt
acceptable aroitrator when holds two responubl. for
aware of the rpuiranrnts. than charges. Ptea.e ply
this amount directly to the
1-91 Confirming lob site City or f.mly request
05/27/88 discussion of 5/26108 that .reit,stiM .s required by
the City will b responsible the contract.
for the asphalt repir on
harm Wy Wen INOO was; 0142�119 Reitterating the discussion
,reforming change order work W051M at the sitting of 3/24/80
at the City's request Artist Payment request No. 3
Including apblt cutting, wi l iret be processed ontIll
removal, compaction rid the 4 thly gun
replacement. Mitigation Reprt.• are
recievad fro Oiamand R
1-92 Claim for damages due to ptu ling and tried electric
05/31/88 failure to ease p.yastameit and Iwo'. -Intent to pay
No. 4 in . tiwely over. pwatting wopesv, signed by
Regeet for 11 work l rip day LSI is rwiered.
Q(Mtlm to cMVwt t:R
and$720.00 in interest Re2.120 further review of the motor
ircurad by contractor during 04/04/58 control canter subittal has
the 18 calendar day late discovered that the required
payment, tine delay in the Pup start
circuits shown as '4O1• M
ppe 10 Oats 12-Jut-i9(i8
Serial letters for Yens 1, 2, S S RMsb+l itat•.on
1-93 Ropaat for a 19 calrms, dry sh"t 37 of 40 of the
06/01/m aateMim to the contract c.trst plans is s{esiry.
coplstion Gate due to eios,have the s,pptier
ml two and ,tomes misting ret,mit the ohm drwirm.
praiaW detavary data of
Sit/m to apron. 6/9/88. 1112-124 Retu iv a Utter fro the
Ol/211/811 /boring sea Wtruta, End
1-95 mown" to latter Rat 112 lotim that arty psrrns
MIM/m 'Latins that eer"silJro cape of b,ss4 Ira two to the
Mimi certif{Cat4w for City. Alec the its, sets in
WOW", payment ma ailed the flow ha"not bean
on 4/15/m And revawtiry addressed, And the r,mir of
drag", IM„est And Tim sm,Vt Tie a{proywi Wfwo
e tentiw, the floor coverlro s"tm is
approved.
1.96 Repast for clwilica[im of
06/06/88 schedde confti(ts in 4e2-125 Respenee to latter 1 65
wsoitits of erietirq mil 01/ZS/m relectiry the propossd
how and start w lacperd hrsd rail And k,viry
reyirarrlte for res mils a soorca for the sms,1,ed
and floridat,on epeipssd. rat tiro.
States that IMCO saes no
rpJl/anon, in the Cwt,WT R42-126 Repxet for retpoMl t0
t. ,owlet. other portions of 04129/88 letters Ra2.113, 114, 115,
the work talwe meolmo, M. and 117 all rated
begins. Radiants Insatiate 1/S1/m. view,Wattle
respmre to ct"ify Ray $leds the dotefts of the propeasil
atheWt{ray COKIM1p ends rectification Of Those
prpHde a contract thieves, pretties to sin{sir, the
order In raprired, poesibil{tr That repat vill
Iepect caapletatl ark.
1-97 6espmre to serial totter
M/m/m (6/Zion), statirve that IW(t R112-127 Irwittal of Ssxv{mlr Mark
finds ro contIKtwal MOWN 11 aobsittal sweetest if
obligation to be read/ for Wattled aith a 30 sireto
atwttp on 6/17/00 and Offers high Wessar gl{nier.
to raptiste the pssibll ity
of eapidiMry TM cork. RR2.128 Irrssfttiry letter fro City
M/16/35 re)Wtirp the sanitary senor
1-96 eespns, to "risk latter frobbtia and reyaootim
M/07/88 R42-131 states 1KAt vork on rattilimitan.
the project ma delayed for
20 mrk{ry days by the CItiee Ra2.1291rsronfttak of handrail
failwe to Weida direction M/13/m repys{ttat approved"
on Ties to proceed. This 20 .emitted.
mrklry day delry translated
into an overall coopletion Ra2-130 Tra,esi of electric e„it
date delay of 5 Marktro days M/20/8111 hooter Mimi approesd es
don 10 ron-"ailaillty of noted.
Cram sro a ipmnt And
{rofffe{are{es Created by RM2 131 Respdae to serial letter
rsachadeliro Mork Cram. 05/3T/m 1-09 rapxstiry
identification of delays by
1,99 Contends that spiel, repair City.
06/09/m on Srrron my is the Cities,
responsibility end repaes"M 9M2-132 kesposa to serial Utter
a harp order for $2,047.32 OarO+!ke 1-92 donyirve daMaghn And Tim
to Cppbta the it. extention for let&payment of
progress estiesto AT,4
ba0aw IKO did Ma coyly
Mlth the psynent schadote
provided at the
presrstrpation Conference.
RM2-133 Resperiss to aerial latt«
M/06/1111 1.93 drry{ry 19 day Contract
"treiim bwaw the city is
not Impossible for poimaM
detiv,ry data".
Rk2-134 Respasa to wlot tatter
06/13/m 1-96 dany{ro repast fW
dete"Was a cons TIM
extstion. Rtl2 rots
tea" 11 Data 12-M-19m
Serial letters for Yells 1, 2, \ 3 eMabl i I tat ion
irict"te IIILJI crM eer Yaed
entirely on other .,k Ahite
the city Me W"Iring plain
and spci fictsti rr for the
reriaad c.tn tiara, and all
wrk not inth,origlral
contract was, prefix ated by
city crew[ except for the
esuvator and ciperator which
•ere r.Iw cn an nourly
owes;is.
Mh2 135 YApanaa to aerial letter
06/13/98 1-97 stating that IMCA is
resposesb.a for [tang on
1Vm iy " ~ on the
acheAtle slbitted by 1M N
Wr icon in the contract
dactwenb. Its is critics)
that this "tar ayply from
this facility M ansitabte by
jute 17. If the achadule is
net cosplied with datpeawill
be charged.
eh2 136 eetaest to sign arC return
06/13/W change order go 7 within 3
ds". in accordrlCe wint
section I IA.5 of the
if this ser tecif irration,
if Me aitt,red .hang: order
is pot returned.,thin S days
it [till !K coreiered
accorded and ph it
It c t
accordingly. If this
di appal t ion of at frilly mats
pot prwaple follow the
co
contract fsrucedures.
page 12 Data 12-JUL-19fM
w-sso
RH2 ENu1NEERING, P.S. d[E (O F Vff9AKS'A Ik 1.
1410 Market Street
P.O. Box 1180
KIRKLAND. WASHINGTON 98033
august 8, 1988 111h.13
(206) 827-6400
TO _ City of Renton M 11
200 Mill Avenue S_ --
__, Renton YA 98055
I
WE ARE SENDING YOU Attached Under separate covr vie the following items:
S"p drawings ,g Prints Cl Plans C Sampw ❑ Specilksta s
Copy of Inter D change omc IE Roofing guarante<
1 _ Roof aularantee for Well Bldg.
I I
THESE ARE TRANSMITTED as checked below:
C` For approval Approved as submined C': Resubmit—._.Copies for approval
It for your use Approved as noted O Submd__copses for distribution
C As requested Retumed for corrections ❑ RMum_corrected prints
f7 For review arM crommant _
C: FOR PIDS DUE 19._❑ PRINTS RETURNED AFtFR LOAN To US
REMARKS
nIK
CITY OF RENMN
^QRB Dept.
COPY To _
SIGNED: Dan Ervin
wlN,siii, rwm n.^.ww....n nn..,wr.a.A,".,mMr..r.rw.. ---
Bankers Construction / Nu-Ray Metal Products, Inc.
1501 - 20th Street N.W. • Auburn, WA 98001
(206) 833-7228 BANKEC1161CW (206) 833-8637
G U A R A N T E E
We the undersigned. &k93_iippII?,IIlSS14IIL(31i-8e>•�1sS41
ProdtasLa,_Ins-. Subcontractor for: --Imes---Ganrtxpl
C�op3.$�ps�14a�_llas�• General Contractor, do hereby
guarantee for a period of five (5) years from date of
Final Acceptance of the project, that portion of the
work performed by us and those particular materials
furnished by us, more specifically outlined in our
Subcontractor Agreement with the above mentioned
General Contractor, dated 12/22/g9 , and in the plans
and specifications for that c--tain project identified
Protect: Renton Wells 1,2 k 9
Rehabilitation
1305 Houser Way North
Renton, WA 98055
Contract No:
We will remedy at our expense any defec..s appearing
during that period due to poor materials and/or poor
workmanship and will pay for correction of any
damage to other work resulting from occurrence of
these defects or their correction.
This Guarantee shall not be interpreted as holding
this subcontractor liable for any deterioration of the
work due to normal use or the abuse of the work by the
Owner or others.
Banker's Construction/
N!3-Bay_ft&aJ-PT2ducts.. Inc
Company Name
__
Tit1e: .�,Qp1,LfSS AdminlstLfS4I�.
Date: - Appll!L-I }!3
CUSTOM-GILT METALS, INC.
20 YEAR ZINCALUMP' WARRANTY
CUSTOMBILT METALS INC.ieereader called CEMI warrants to YEAR AFTER DATE
theidlawing EndUser OF SHIPMENT CIEWS SNARE END•VSF SKAN
LIA _ fPilr E. lu Through IIXh 100% MI.
ihil cal Wrieta and accessories fahgFated Irom LINCALUMFe i tth Through IMh 75% 25t
Ihd dipped alum,num-aim ally coaled sMet steNl lobe used m 15th Through I'Ih 50% 50%
she cusel ox wn d fixed structure..CBM provides the following INS Through 21Xb 25% 75%
EXPRESS LIMITED WARRANTY to Purchaser and or End-User who Chef 20 0% T00%
corodr wish Zen,Of this guarantee
NI retain of isllsires will be wartam to wigiiMl date of SMpmeM
1. EXPRESS LIMITED WARRANTY.CBM wanems dsal all coil, or puoahase.
WresaM xceswnes(abnratetl from 2lNUUlMEa wiliheiree 6 EXCllIS1VE REMEDY': The afrXe menbsmrxi remedy IS sole
burndNxts,and If used wwitMn the normal eMiseenng guidelines and R AREDY::Tire so she purcha.ei and remedy
is
arm properly installed, tl no,rupture.loll structurally or penes
am
ate for 20 Years
]. LIMITATION OF LIABILITY:EXCLUSION OF CONSFQUFN-
2. PROCEDURES NEEDED TO MAKE THIS WARRANTY EF- TML DAMAGES CBM5 TOTAL LIABILIT's FOR ALL CLAIMS OF
FECTIVE: ANY KI%U INCLUDING WITHOUT LIMITATION, 3REACH OF
a Insult Pares xcordlrN to CBMs published Installation WARRANTY OR OTHER BREACH OF CONTRACT NEGLIGENCE
,neyh.ds AND STRICT LEA JILITY IN TORT,FOR LOSS OR DAMAGE ARIS
III Use only approed fasteners. aM dher aclesswies that ING OUT OF. ONNECTED WITH OR RESULTING FROM THE
are 21NCALUMEe coated ar whNwlae Zino Alomlrmm. COP, PANELS OR ACCESSORIES. EM THE USE OR PERFOR
Stairsms Steel nr Cedm.um Place 51"1 SEANCE THEREOF,SHALL IN No EVENT EXCEED THE AMOUNT
c. Na remme.change wanes or aBN lmm ortgiWl Iwo REQUIRED FOR THE REMEDY SET FORTH ABOVE SHALL CRAM LIABLE FROM ANY E I
N NO
hMI END-USER ORTHIRD
Ill, OR
ENT,
fa ure of CBM within 45 days anN the wcurrcnce d arry PARTY SEQUENTIAL
DAMAGES,INCIDENTAL DING WITH SPECIAL OR CON
udure d the Wrlels w mi LOSS OF IAL FITSOR INCLUDING WITHOUT LIMITATION
FO
e. Take rer rarixn ct action umd CBM has examined failure LOSS OF PROFITS OR REVENUE.OR ANYINJURY
OTHER LOSSES FOR
and approved corrective measures. PROPERTY DAMAGE Off PERSONAL INIURY.
1 THE FOLLOWING MAKE THIS WARRANTY INFFFECTIVE: ASSIGNMENT RY PURCHASER
a Any namage sustained during handing nnufi.wo ship
prig or storage_W It mechanical or chemical In nature Purctuur hereby asagm all nghu,udt,and Imemt in and under
D. Pedorahonsmanydher damage causHl lnwhdewin Wn n��o,,U,xtuha EXPRESS issriionwm roil a Le ITED WARRI tisferred.Itte '�
bychemicalagents,Ilal con Bases,nfumes.liquidsirun rhan
direct instillation
l d normal c r cause is y ar external
t uc for improper
IiwuW konuor di.o file
flood im by explosion
shorten iNcludmple, r Renton Wells #i 2 & 3
otheral hmluhon. tire.Rood, eau ed b. Noon,tempest w f
other acts of C.od,and disaster caused by an R_nIDlly 12A
Damage due to vd spar oon pmximny a wean almaf End User City Cf Renton/City Clerk
phere when W nets are Irntalled clover tern 1500In"from the M'11�_. r_ y^r LEA _
ongm or the.1t sores! Address CIry SUN Zip Code
EXCLUSIVE WARRANTY. THE FOREGOING EXPRESS LIM Apo
TIED WARRANTY SUPERCEDES ALL OTHER WARRANTIES Job Number N SNpmem
EXPRESS OR IMPLIED.CBM MAKES NO WARRANTY TO ANY
PERSONS OTHER THAN PURCHASER OR ENDEJAIC
Boddmg� lw�Oal.on Ballkert�s Cosln� Lion/
5. REMEDY.if any coil panels or xcnsones are found ma to PURCHASER
conform to the above EXPRESS LIMITED WARRANTY Is,are,
INamel
causes covered and during site applicable lemi.CBM will,at its
we discretion within slaty(SO,don aft"notice d failure Closer 1501-20th St. NWa ?ili%Erny VA
mine no.Sixth.11i are or W reltIred,repau'lls replied. 9800
or dhemise treated are CBM well ainiwn the For uta share sH _ / I �/4-
"Is in tne, Idioseng table d Cost d labor am rnmenes Bs
Imtrket value)requited 10 cooed the failure. Am wreeA SanNai r d Assignmem
Tim 3Elnkers / Presicent
VALIDATION. Ered-Usur most validate Mis EXPRESS LIMITED WARRANTY IN ctX PaVolk this room and mailing n to
CUSTOM GILT METALS INC P.U.Bm 17'7 Mot WmMmPon 98012.within one 1 ear d the Date of Shrprnont specified
above EndUMr should main the canal 1 ono Iw is or his he.
�MCO
(2061671-3936
September 27, 1988 Serial Letter No. 131
City of Renton Re: Renton Wells 1,2, 6. 3
200 Hill Ave. S. "Slope Seamless Flooring
Renton, WA 98055 Away from Electrical
Panels"
Attention: Ron Olsen
Gentlemen:
As per our agreement on September 26, 1988 we will build up the
seamless flooring in the area of the electrical panel to provide
drainage away from the panels as requested. The area, approximately
12 feet X 8 feet, will be built up with resins approximately 3/0 inch
along the panel to slope away from the panel area and provide the
requested drainage.
We have ordered the materials today, which have approximately a
10 day delivery time, and will proceed to complete the work
immediately upon receipt of the resin materials.
Very truly yours,
Frank imhof
IHCO GENEPJd CONSTRUCTION, INC.
FI/cb
cc: Dan Ervin, RH2 Engineers
S:P
y
aids r,,.e,
CITY OF RENTON
Engineering Dept.
W-tAV
�w
\i
51125.13 (.02i)
September 29, 1988
Mr. Frank Imhof
IMCO GENERAL CONSTRUCTION
4509 Guide Meridian
Bellingham, WA 98226
Subject: City of Renton
Wells 1, 2, 3 Rehabilitation and Construction
Final Payment Serial ♦155
Dear Frank:
The City of Renton is in the process of completing the processing of the final payment for
the above-referenced construction contract. Enclosed is a copy of the final payment form
for your use.
The City cannot release the check for final payment until you complete the remaining
work:
1. Complete all punch list items ipunch list attached).
2. Provide a copy of the .1B'idavit of Wages Paid for Banker's Construction and
Diamond "B' Plumbing.
3. Provide Prevailing Wage Payment Certification for the month of September,
1988.
4. Pr-- .de Monthly Manpower Utilization Report for the month of September,
1908, for IMCO and Triad Electric.
Thank you for your consideration. Please call if you require additional information.
Sincerely, �
R112 E�GINEEIiIt�V..Ca:.7'S.
Daniel R. Enin, P.E.
cc: Mr. Ron Olsen, City of Renton
Enclosure - Punch list
CITY OF RENTON
Engineering Dept.
1410 Market Sireet. P.O Box 1 t80.Kirk�and.Washington 98033 t206)827-6400
September 29, 1988
(.027a)
CITY OF RENTON WELLS 1-2-3
REHABILITATION AND CONSTRUCTION*
PUNCH LIST NO. 5
1. Provide equipment spare parts.
2. Repair/replace floor areas that do not drain.
3. Complete system test.
4. Provide compensation for tree damage.
5. Provide temperature indicators for each motor.
6. Provide general cleanup.
7. Provide a Number 4 finish on the cover for the exterior electrical outlets in the
fluoride feed room.
8. Provide touch-up paint per specifications.
9. Provide seven copies of operation and maintenance manuals.
10. Provide as-built data.
11. Revise operation and maintenance manual information to reflect as-built renditions.
12. Remove construction signs and support posts.
13. Provide concrete filler between sidewalk and rockery between loading dock and
pool walkway.
14. Remove rust stains from loading dock driveway.
15. Paint driveway gates and remove 'writing" in sidewalk area adjacent to gates.
J/IS/Pa ELI, of Aenten - pey ctMnt e/ PYL)lc Mu[Y6
r+ojacl: -ILL NO:. : 2 3 RCIL4YI LirR2lgi MD C911.4TRpCT:Ui
c0nt[ou :w.: c.1c 044_0I
cool r.0 or: lice piY14NL Nxs:xuc:oN
C:oi lrvp O9w: +Ci'T. :5,tl Ir.AAu :9aO
0:D
ub;T PFWIW3 runou4 TN34 :1115 TOT.&L DL5Ck:PT:ON GNIT: 06". :O:AL
• tk:CE WN:::TY ,WLYI pUAiiIT'[ FNWN- DUAF;::Y .......
rA0:L:4AT:PNi D[2g0)LIEA:SON .. 1 :D,706 BD :U9,564.N
2 SIZE O09A .+ Ilia.14:al; :oo 4::o.106.0
LC. : Ill.53C 50 .10,377.00 S.,13].W :00
J LOOLOCNWJ v:kIL:TILI W' I S:E,9]1 :4O :12,936.00 •V
i COSE114TC PAVE Lg • SU.+aD ],-, 0 44.00 100 3)2.936.GG
5 ."l, tlY:W:9W :10,:J5.00 ]O 34,]{{.00 00 S.4.N0.00
LS i 4:971 2;; :N N9i,E15.W
6 T:N:411CG 0 40.N 100::97,233.W
1.5 : : 6. 100 S:c.445.N 0 40.00
> SELL
PP "0MOi OF i00 3161f5.O0
L3 ! 480.442 112 100 406.492.0Q 0 4II.oa IN Sa6,442.00
0 rLDOx1DAT:ON 511111 L: 410.750 300 5:4.]i4.O0 O 4S.W 1Q0 ::C,]18.N
0 Cx:AI+(NC cT4:1. 1 :S . 59.454 :00 44.409.04
0 �' '� 100 54,I94.4G
30 4LCROS: SYSTLY 2 40 I 82].Oa 100 :23,0;:.00 • VV
0 40.W IOG 931.O:1.N.i l.LCNAN:CAL L4 ) 61351600 IN 4:35,604.0
•2 LLLc:x:CAL � 0 40.00:)SB.530 1N 5135.601.04
nb:C
L4 1 55 4:50.9n1.SO 47,944.50 1Q0 4130.130.N
i) HTIC COk:FO:. 121 1 445,119 95 36:,N9.65 ,
5 43,257.31 Igo a3.:{].p0
;+ :.AND"TWI 47.SW :S 31,434.00 tl5 461,24.04'.
:1 DvIgL:T)Ok LS 1 SLOW SOQ :7,$60.0
0 .0.10 Go 41.900.00 :00 44,900.00:4 vARx FLCLANAt)Fv :S 1 4E,400 20 :SeO.np OE
C4i FOr:NG 43.9$0.00 Ic0 SE.400.00
L: . S3.)80.)3 100 iJ,]90.48 ;G.W 10; 43,360.30 CO3 03 L2LV O`5 L4 • 1'+9,I59.4W 100 149,159.401 J :G.N 100 (:9.1;9.491 CGi -ELL iA4A:i0N w • :595.3 1N i199.]) 0 50.04
Ca LLLCT.ICK 4rcwl 1Go i'v99.D
.• • 4$3.0B9.6] !00 420,0]),O O :W.OD 100 :20.80].6]cN 4TAxINc ..,. 1 s),cN.N 1N s3.Dap.aD
9 40.40 Cp1 HALL NYDWr`RS w 1 4660.30 :00 3440.40 u i o.W ICE 431000.40:00 a6a.JD.i:.)..0 c . .s<e.0 :GO 4:..sn iOrsOIL )+0.E6
-• . R.95p.9f 0 G.C.. :Dc 52.050.04 ;0p R.959.96
:J9 1'ILW Q(FI:C TiVC.: L4 : 61,490.16 0 40.0I1 :d0 a:.490.46
Colo Nl:c CLA:. 100 ::,440.44
G i 64.04 0 :0.00 140 40.00
r c0;: JIP,w I'LLs i0D i4.W
LS . 42,111.t0 0 S0.00 :00 :1.ar'JD :00 :I,144.-0
]LOi]:FL SDQ,Etl6.11 •4]u,464.6: .S
4ALC4 iAx A2 tl.:\ 49:u]24.51
460,111.10 45,701.17 473,44).85
:QTAL 3909,430.E9 476,146.IK
5105.1]L.JI
NLTAINAN I59 Or :NT4TAL1 :{2,014.J: 4),52E.01 4+i,
SO9TOTAL 59f.33
:OLi,]6i Btl $72,624.41 55)'1.990.04
TOTAL PA:D :O JA:E
mwuxt II4L ru:4 u:,n:c
44671165.16
4]2.43+.04
II
t"t CITY OF RENTON
"LL BUILDING & ZONING DEPARTMENT
Earl Clymer, Mayor Ronald G. Nelson, Director
MEMORANDUM
DATE: October 3, 1988
TO: Richard Houghton, Public Works Director
FROM: Ken Bindara, Lead Inspector
SUBJECT: B-13626 ISSUED FOR CONSTRUCTION OF WELL BUILDING
LOCATED AT 99 HOUSER WAY NORTH
Dick:
We notice that you are now occupying the above mentioned
structure. I don't see where a final inspection was ever
made or a Certificate of Occupancy issued.
If you would please call for a final inspection, we can
issued the certificate and clear this matter from the
computer.
Thanks for your cooperation.
CB:plp _
r�il�a1.
✓✓✓✓ �z , , u eo w 1 J�- nIWO eaysr.
COB
k � .
41,
200 Mill Avenue South• Renton,Washington 99055 • (206) 235-2540
RH2 ENGINEERING, P.S. METT[EM MIF T''M,/A �RZDGwi 0VT"kfL
1410 Market Street
P.O. Box 1180
KIRKLAND, WASHINGTON 98033 �w
02 09 89 �5112s.13
(2061 S27-6400
Ron Olsen
TO CITY OF RELATOR Wells 1. 2.. 3
200 Mill Avenue South
FF
FEB 10198a
WE ARE SENDING YOU 'X AftOw % Under separate cover via-- twordn`Kama:
C3 Shop drawings Pants ❑ Plans € �P{ ❑ $pedhcetiDM
❑ rapy of letter ❑ Change order ❑
conca Deft I m I _wwrnwn
1 Daily Inspection Reports (12/29/87 - 06/15/88), bound
THESE ARE TRANSMITTED a checked balm
,r
❑ Few opprowl ❑ Approvm as suDm t ed [ Resubmit—copies Pow approval
s 'R For your use ❑ Approved as noted ❑ Submit—CWM tar distrlbWion
X As requested ❑ Returned for corrections ❑ Ratum—cDwwacted prnts
For review and comment Q
FOR BIDS DUE 19_❑ PRINTS RETURNED AFTER LOW TO US
REMARKS-----_____
COPY TO_. _.
SIGNED: Dan Ervin
n�nnr geas . .�r 11.zim.n..ro•or..NM.a..ronry.1
FILE TITLE
/ • r