Loading...
HomeMy WebLinkAboutWTR2700880 W-880 WELLS#1, #2, & #3 WELL HOUSE CONSTRUCTION - WTR-9 1 #I Generi] w seoevv STATE Or WASI VGT(YV DEPARTMENT OF SOCIAL AND HEALTH SERVICES Qlnrva. WaJrgFon 98%4i CM5 November 26, 1986 Bob Bergstrom, P.E. 1 City of Renton DEC 200 Mill Avenue South Renton, Washington 98055 Re: Referendum 38 - Municipal Water Supply Construction ;rant Receipt of Signed Contract and Report Form Project Number 383360702 Renton - Source Dear Mr. Bergstrom: We received the subject material, The November 20, 1986. date of acceptance of our $333,459.00 offer is the legal date of our contract. Regarding the Report Form, based on the entry in item 1, we harp recorded this project's completion deadline as January 31, IORB. We ant,ripate the mailing o' the material required in item F of the funding c ntract by then. We have asked that funds be set aside to meet the cash needs indicated in item 2. We are anticipating the material required in item C to ba mailed to us May 20, 1987. Enclosed are the payment request instructions for your use when payment(s) on this project are requested. If you have any questions, telephone me in C^ympia at (206) 753-3528. Sincerely. : Peggy Jon, Coordinator Municipal Water Supply Funding Programs Enclosure cc: Don Olsen Moe Batra, District Engineer State Auditor Glenna Gerdts, Program Accountant .06., V PAYMtN%EQUEST ASTPUCTIONS •� p GIWIT Up to four payments of Municipal Water Supply funding Program funds may be requested. Pleasr refer to item D of the funding contract for specific • ( details regarding timing of these requests. Payment requests shall consist of the following material: .(1) A notation that the municipality has reviewed the payment material, that the material is correct, and that it is approved for payment. This notation can be in the form of a) a cover letter from municipal , official referencing the payment material, or b) the notation "Approved , for Payment" with the signature of a municipal official on each billing, or c) an approved voucher signed by a municipal official attached to the appropriate billing, or d) any other subnittal which indicates a municipal official has reviewed and approved the material for payment. (2) If there are competitive bids and/or neantiated contracts and/or. equipment ordered for funded item(S), submit a copy of the itemized billings for each item for which start up %rork material has been 'accepted. Only the most recent itemized billings need to be submitted if they contain cumulative totals. (3) If work is done by municipal employees (force account) on funded item(s), submit a document relating the work performed. This document Should contain a) the payroll names of the municipal employees who ►,orked on the project, b) the number of hours each tmpl oyee worked on the proj>ct, c) the hourly rate of pay received by each L� ployee and d) the total costs incurred for each employee working on this project may also be included. (4) If stock on hand is used on funded items, submit a document relating the cost of material used. This document should contain the original ) nrchase price and sales tax paid for the stock used on this project, The prorated costs for freight and/or shipping may be included. The Costs of handling and storage may noc be included. (5) If lands/rights-of-way/casements have been purchased as funded itcm(s), Submit a purchase document showing the amount of land purchased and , its costs. ' Pleise send this material to: Department of Social and Health Services Water Supply and Waste Section Flail Stop LO-11 Olympia, Washington 98504 If you have any questions concerning payment requests, telephone (206) 753-3528. yiE - wo • • 4-710 4—710 ID) Development Standards: In the Public Zone IP-1) the following development standards shall apply, except as otherwise provided by 1. Setbacks'. (al Front Yards:Minimum requirements on the following types of streets shall be: Street Types Front Yard Setback gterial IMajor at Secondary) 30 25' Arteriaj lQgllectorl 20' All lhhers (b)Rear Yard Ilnterior): A minimum of ten feet (to') except it the property is contiguous to a zone with a more restrictive rear yard requirement in which case the rear yard shall be the minimum of the more restrictive zone. (c)Side Yards (InterioW A minimum 01 five feet (5'1. 2.Special Setbacks. la)Any yard abutting c public right of way shall be a minimum of twenty feet (20'). (b)Where a P 1 zone abuts a lot which is zoned G-1,R-1 or R 2 on the City of Rentc .Zoning Map and designated single family or low density multiple family on the City of Renton Comprehensive Plan, there shall be a minimum setback from the common first twenty feet (20'I fromothe common lot e lotline5 minimum of the landscaped. (c)Where a P 1 Zone abuts lots zoned G-1,R-1, R-2 R 3 and R-4 on the City of Renton Zoning Map and designated medium density multifamily or high density multifamily On the City of Renton Comprehensive Plan,there shall be a•ninimum landscaped setback of twenty feet(201 from the common lot line. 3. Height: (a) The height of a building shall not exceed fifty feet(50'1 except as a conditional use. (b)Public and private utility facilities eexcept buildings)shall be allowed to exceed fifty feet (50'). 4.Parking/Circulation: Parking and circulation standards required shall be as follows: (a)Access: The principal access shall be from en arterial or collector street. w t1.V4 Nil, - �~ ` urnal o ,ommerce Box IIUSO,Seattl:. N'.A 98111. Nhune(200 622.8272 n,te...Oct...1,..1f87......... City of Rdnton 00 2 of City Clerk 00 of Ave. `o _ .„ Benton, Ws. 98655 OCT 21987 ;'T. Notice of Hid Call 7733_8 Well Rehab 5 Construction 58 lines r 1.10 per line 63.80 S8 lines C<' 1,00 Per line 5�8'-00 5121.80 Fublish,d cePtember 25, (%tober 1, 1987 Pleas include Acrnnnt \umber with Pn�mrm w � 7733_h Affidavit of Publication City of Renton Well Rehab& Construction STATE OF WASHINGTON Bididflair Urt.lg cni.iv f% h KING COUNTY—SS. wells 1.Y.cad 3 gebabilintiw and CaaetrtRoo Scaled bids will be recelved The undersigned. on oath states that he is an int t 2 so P. m_ty elk sbofti. authorized representative of The Daily Journal of Commerce, antl will beo ned and puhlirly. a daily newspaper, which newspaper is a legal newspaper read i th a floorrCmd—reure M of ;eneral circulation and it is now and has been for more 1ny�2d0 Renton nM.m bouth. than six months prior to the date of publication hereinafter TTe work to be performed refered to, published in the English language continuously WA 150 working Caya from as a daily newspaper in Seattle, King County, Washington. the date of cnenmememmt ua- and it is now and during ,,,tract .hall Include q all of said time war printed in an der this but no`be limited to. office maintained at the aforesaid place of publication of • Construction of a TILT- this newspaper. The Daily Journal of Commerce was on the GP cotiixte well building m Libert. Park, tceluding site 12th day of June. 11141, approved as a legal newspaper by work: the Superior Court of King County. • rovision of Dump ing equlpmrnt for there potable The notice in the exact form a as nnexed. w published in .at rdeeD at vmioli al equitoment regular Issues of The Daily Journal of Commerce,which was forfl.cal asti:uthhlorinatlion. regularly distributed to its subscribers during the below matic— tmlayZeres. of. existing stated Period. The annexed notice, a .. O well farilltles The City eeaervea the right to .._..................... reject any and/or an bids acid to waive anv..it all tnfwmah- ......_....._...........................__.._...._.._._..__...._.............. . es. c.firm and comncl dceunlaits and �iWtta rfY publishedfm ..$wg�.tag ..'1�---_---------------- may be obtained at the Public .4 „USX works I)e rmamt.111m owagtt the r """""""""""'-"'-"" Renton Municipal Buddua for a lee of 05.00 wch snp .--.._.��_�.... _.__._._......_..__...._._..... to rover pomaee,ifmalled. A eemfied rlieck or bid bond m the amount of five t51 percent -) of the total amount of each.bid „+j ri y3.__-_................... __ must accompany each bid. The City'a Fair Pra Am and Subscribed and sworn to before me on Noa-Wsilm,mation Policies shall a_ppl_v. MAIYI°P71;E.MOTOR. ........................... _ t Clerk. -- ' Dates of v Journal in the : Sedtle Deily Journal of Com- temper Y5 and geto ..yl........•..:........_.__ ... _....- meRe,Ryeyp Notary Wbtie for ih•Slats of WAShi ber 1,laM. _ (TT33 B/ a iag b most" gton. stR,uraa Drir Gf onal of Commerce Boa 11050,Seaulc, N'A 981II. Phone -)6I 622-8272 Date...Oct.•..1>..19.8�..,....... City of Renton Office of City Clerk OCT 2 IM 200 Mill Ave. So. Renton, Wa. 98055 Notice of Bid Call 7733-B Well Rehab 6 Construction 58 lines �d 1.10 per line 63.80 58 lines @ 1.00 per line 58.00 $121.80 Published September 25, October 1, 1987 CC,+AHTL 1 u , LAWS OF 1955 CITY OF RLNiiJN CERTIFICATION L \NE VMOCPtMN[D p1 K-'!DV !••ITIRY YNl1eR e:`.P:Tr OR x[P1VPr T T n2 W+ 'LLa wart 3!'.n fWV".xtG 1ME Y 'R!5 P•nL�`1^'.O,On ow �t vxox rcwroxY,D a o<<:,:cD x.. u M GYN ra a V6i D�'Z. anD `Pcxr'.J f'.fWld WaMfl ixE tttttttttt(ryryryryry�ir p n-.'G • '+-+t 1 aaV CLaYn��txtwEKTt aNn C[1Li� K cr 42110 /i.>nc3s.ba6ti) 77 V� Please include Account Number wilh Pasmenl r � PLAN REVIEW ROUTING SLIP DATE: ,%OPLICANT: JOB ADDRESS: - •_ —" �__. NATURE OF WJa,. TO: CorOnts Due Comments up if -tn ENGINEERING DIVISION __ I-?,� FIRE PREVENTION OIIREAU TRAFFIC ENG. DIVISION I_I BUILDING CODE REVIEW UTILITIES ENG. DIVISION I_I ZONING l: PARKING _ OTHERS �_I ENERGY CODE Comments or suggestions regarding this application should be provided is ■r Please provide comments to the Building Division by 5:DO p.m. on above date. REVIEWING DEPARTMENT/DIVISION '" � —I APPROVED I_I APPROVED WITH CONDITIONS I_I NOT APPROVED Straot West sNM N IP4tM p ,f«v P.�L sre,P., ec c kut<. Cxtnstrg tatty —k wa / me a e t p9do to two rrtwicobn NJIM AI,) ec OfY.,. t?cc. n14 /.{{cyK p..,A;�a �rr Noe _��_ r ,. Mowu b1moalt Mop" 4nM eccan��o%��ir�At Cc��bre a6ss.6 �. recess ce�1�. � m ia-nrRrr :aaas WN N eMN ~ w Dri U1I 51 FWM atom SISNot ?OWN-Z!/I .LS'✓ -fed ji lU N�vice�f c r12e jo Flags k N N"Aw III / E fa�f" ;.r7le/w (ias de a,# W/erg c 49; �/ / rs Al4rin 6yl.cme t. .<,e» DATE Signature of Director or Authorized Repzesentative -- r REVIEWING DEPARTMENT/DIVISION I_I APPROVED I_ I APMOVED WITH CONDITIONS I_I NOT APPROVED DOTE_ Signature of Director or Authorized Representative 1(/- •iV City of Renton building F Zoning Department 200 Mill Avenue South Renton, Washington Q8055 Plan correction based on the 1985 Uniform Eusiding Code Project Id. well 123 •�_ /�,j%-) Address: 30' houser wy s Dates 1 airi.aari- I+7E0 Contractors unr.nown Occupancyi 82,H6 Architect: same Type of Consts I1-N Engineer: same Pans Examiner; )h e SHEET IDENTIFICATION CORRECTION REDUIRED ssI all All sheet% to be stamped and Lsigned 6by an Arrhitoct or Fnqineer registered in this state. 2 it p1n -,.. pro This 1s required to be a 1 hour assembly sine it "•' is an occupancy separation. -- Table 5-8 t Sec. ,�, ,.sic. - 30'_•. fcl ._ ..i 3 fl pin This is required to be a 3$'hour as=embly since+ it is in an occupancy ceparati6n wall. -- Sec. 50.. (c-) 4 41 pin Note: Manually operated edge cr surFare-moi.nted fla•,h bolts are prohibiteo. -- Sec. -:04. (ci 5 fl pin nandrails on stairs handrails regd on stairs. vent regd fc% chlorine areas per fire code. b fl pin stair rise to be mw: of 7 inches � f PLAN REVIEW ROUTiN--SLIP DATE:_ APPLIk:AiT: JOB ADDRESS: NATIRE OF WM: �w/t` � �.�C-�G TO: Comments Due II Comments Due ENGINEERING DIVISION __ �_1 FIRE PREVENTION DIREAU TRAFFIC ENC. DIVISION �_� BUILDING CODE REVIEW _ I_I UTILITIES ENG. DIVISION I_� ZONIN'; B PARKING OTHERS ��,� ENERGY CODE . Comments or suggestionF regarding this application should be provided in writing. Please provide comments to the Building Division by 5:00 p.m. on above date. REVIEWING DEPARTMENT/DIVISION .1 e I_I APPROVED II APPROVED WITH C@GITIONS II NOT APPROVED c1 �� e ! -t-c.3 C� C- 0, rC-9 S r r G � wA. f, l, �' �� C- DATE Signature of Director or Authorized ReF'esentativc REVIEWING DEPARTMENTlDIVISION I'I APPROVED I—I APPROVED WITH CONDITIONS I_' NOT APPROVED DAIS Signature of Director or Authorized Representative ➢ lB3 OCT 14 1987 1125.12 Z (G27/32) - Engiffm ,ring - October 9. 1987 ` I METRO 821 Second Avenue Seattle, WA 98104 Attention: Mr, Rob Hirsch, MS-82 Dear Bob: On behalf of the City of Renton, this letter is a request for a side sewer connection for the proposed Well House for Well Nos. 1, 2, and 3. The side sewer and connection details are shown on Sheet 5 of the attached project plans. Our proposed schedule for accomplishing the work is shown on Sheet 39. The proposed side sewer is in accordance with the Joint Use Agreement on the Cedar River Trunk, dated Septemoer 2, 1971, a copy of which is attached. Thank you for your consideration, please call if you have questions or require additional information. Please send your response, with a copy to me, to: City of Renton Attn: Ron Olsen, Utility gineer 200 Mill Avenue S Renton, WA 9RO55 Sincerely, RH2 ENGINEERING, P.S. 4� Daniel R. Frvin, RE Encls: 1. Copy of the 1g71 Agreement 2. Plans 1 through 40 of 40 for the New Well Building cc: Mr. Ron Olsen, Utility Engineer 1410 Market Street,P.O.Box 1180,Kirkland,Washington 98033(206)827-6400 Engineering October 13. IgR7 1125.12 (G27/34) Mr. John Webley Director, Parks and Recreation Department CITY OF RENTON 200 Mill Avenue S Renton, WA 98055 Subject: 1988 Proposed Uniform Fire Code Modifications Dear John: Attached to this letter of transmittal are the proposed modifications to the Uniform Fire „ode for 19CS regarding emergency treatment and containment for chlorine gas. It appears that the retroactivity for ex,sting chlorination facilities is obtained by the requirement for a permit. We are currently invr�tigating this further to verify it and will provide you with this information as soon as we receive it. Please let me know as soon as possible what monifications are required to the conclusions previously reached. As we ;rrently understand those conclusions, the Wells 1, 2, and 3 Building contains all facilities necessary for the Parks Department to install its exisiting chlorination equipment for the Pool which includes compliance with the proposed Uniform Fire Code for 1998. Please contact me at your earliest convenience should you have any further questions or concerns. Sincerely, RH2 NGI/Harbert, NG, P.S. /'R chards PE cc: vier. Ron Olsen, Utility Engineer Enclosure - 1983 Proposed Modifications to Uniform Fire Code 1410 Market Gveat,P.O.Box 1180,Kirkland,Washington 98033(208)827-6400 • OF RF PUBLIC WORKS DEPARTMENT z DESIGN/UTILITY ENGINEERING 0 235-2631 0 MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.99055 "�D P �rEa SEn1E� TO: DATE: JIB No. i4io its. ATTN: _Hest t'.t von — GENTLEMEN: WE ARE SENDING YOU p ATTACHED a UNDER SEPARATE COVER VIA _THE FOLLOWING ITEMS: o SHOP DRAWINGS o PRINTS a REPRODUCIBLE PANS o SPECIFICATIONS p COPY OF LETTER a _ COPIES DATE NUMBER DESCRIPTION THESE PPE TRANSMITTED AS CHECKED SELOW' a FOR APPROVAL o APPROVED AS SUBMITTED a RESUBMIT _ COPIES FOR APPROVAL p FOR YOUR USE a APPROVED AS NOTE? a SUBLIT COPIES FOR DISTRIBUTION o AS REQUESTED a RFTLMNED FOR CORRECTIONS a RETURN CORRECTED PRINTS o FOR REVIEW AND COMMENT o a PRINTS RETURNED AFTER LOAN TO LIS COPIES TO: SIDED Oisert TITLE IF EM:UOSUIES HIE NOT AS NOTED, KINDLY NOTIFY US AT ONCE PUBLIC WORKS DEPARTMENT '} z DES:GN/UTILITY ENGINEERING • 235-2631 MUNICIPAL BUILDING 20C MILL AVE.SO. RENTON,WASH.98055 i a P 1tFa SEPTE� TE; JOB NO.: RE. - eei AMC GENTLEMEN:WE ARE SENDING YOU O ATTACHED o UNDER SEPARATE COVER VIA THE FOLLOWING ITEMS: a SHOP ORAMINGS o PRINTS D REPRODUCIBLE PLANS a SPECIFICATIONS a COPY OF LETTER o _ COPIES QATIF NIMMER DESCRIPTION NO REMARKS THESE ARE TRANSMITTf.O AS CHECKED BELOW: a FOR APPROVAL o APPROVED AS SUBMITTED a RESUBMIT _ 'OPIES FOR APPROVAL In FOR YOUR USE D APPROVED AS NOTED o SUBMIT _ COPIES FOR DISTRIB/1faN p AS REQMSTEO a RETURNED FOR CORRECTIONS o RETURN CORRECTED PRINTS O FOR REVIEW AND COMMENT a a PRINTS RETIWED AFTER LOAN TO US COPIES TO: _ SIOEO Arlene Y. SOIiV:'.[ TITLE til tiR ZRNIta oM�'oA — IF ENCLOSUES ARE NOT AS NOTED, KINDLY NOTIFY RR AT ONCE ORIGINAL S1125.I? G29121 iintaineering February 24, 1988 Mr. Ron Olsen Utilities Engineer Public Works Department CITY OF RENTON 2nO Mill Avenue South Renton. Washington 98055 9m6jeet: City of Renton Well Mos. 1, 2, A 3 Rehabilitation A construction City Attorney Involvement and Transrittal of Existing Correspondence with ImcO near Ron: Enclosed with this letter is a copy Of the Complete set, of contract correspondence hatwen Imco General Construction and the City of Renton for the ahove referenced contract. Because of the volume and nature of correspondence to date, we suggest that you transmit the enclosed correspondence to W. i_arry Warren, City Attorney, for his review. We think it would he appropriate for Larry to provide advice at this point regarding our responses to Imco's construction and contract questions. It appears that the contractor is writing letters for the purpose of future litigation or arbitration, and is structuring his correspondenre to provide himself with an optimum position for this probable eventuality. Our responses should be structured accnrdingly. and Lar�'y should be aware that this is occurring so that the City's optimum legal position is preserved in responding to Imco. We will send copies of all future correspondence to both you and Larry Warren on a weekly basis for his review if you concur. We will send weekly updates of Imco's correspondence to Larry for his use. Thank you for your consideration. Please call if you have questions or require additional information. Sincerely, R EyN INEERI..K W S. -B5hiel lt. Ervin, P.c. Facts! Imco carresonnApnce (Serial Letter Nns. 1-60) RH2 correspondence (Serial Letter NOS. I-Ail) 1410 Ma,ket Street PC Etox 1180 Kirkland Washington 98033(206)82'ti400 Lnisl Letters for Met(' 1, 2. #3 Rehabilitation Serial Lasxy of f• el Lavery of Letter Letter Yet assatutiont Letter Letter frog #Nate Iwo Disf,mition goat@ 1112 �? 1-1 7 Clarifice[im'of- ss—•Alternate ��ss. i .�ssss:a.::a:7 Notice of Nrgeorate w"-.:10/16/87 for Equiptont• on bid 11/23/97 proved Met and ratification; propoest Me repeated. and stating that only Ronald Daen and Richard Nonghton 7 1.2 7 Traffic control required by are authorised to order undated excavation in Nosier Nay. inemses, decreases, or :ab super to he reeporoible chages in the work that effects contract price or 17D2??7 Request for review of the co;ietlon ties. 11/11/97 desiged roof "tee and advise if redesign 'a ? Traesittal of required and If so;hiss I1/23/87 Rrw"tructim Cmfrenca Mich alternate systw is sine", and pgssent request desired so bids frm schedule. suppltera and Ulbcontractors can be obtained. Plesse ? Transaittal of Stppl®ntat respond within 10 days to 11/25/97 droving no 1 to Clarify the prevent project delays &tells of the wte tic transfer switch relocation 7 1-3 ? Request for colors to use for for amrxan,he 1. 11/16187 •FW Ass for Metals Exterior spplaantal drawings will be and Interior. Sp;cifice"on issued free Its to etas Me Swtim Division 9.6. reWfred. Lppl eeenlet drawings do net detail 1-4 Cnfirsing substitution of additional. work, and are net 11/17/87 24.01 auxMJxFL Tee for authoritations for a thege spwifted FLOWL on itee 17 order. if it is felt that a on sheet 22 of 40. raplesentit drawing creates an extra cost itM, charge 1-5 Request to change 24• tee order requests exist or tads 11/16/87 free all flrge to MJ a Ft. in writing to the project engineer. Notify the project 1-6 Netiee that Mr. Kelly grown engineer before preferaing 11/10/67 16 IMCO's field sperrendnt any additional coat work. sect representitiw on site. plane niggly the nise of the 7 Response to letter 1-3. Cities on site■epresentitive. 11/30/87 provide RN2 with color sawtes for sit coated t-7 Notificatim that project prodpts eo that a 11/10/87 Meroger is Mr. Don Irwin. coordinated color selection can be seek. 1-8 Substitute Byron Jackson 11/24n87 pLo" for the Fearless pupa 7 Divitian 10.5 fibers(" apwified in the contract 12/06/87 grating review stating that dor:wmts rxadek grating sbittal does not Meet space but will 1-9 Proposed fubstitutim of DI be considered if two seats 11/10/87 24• Tee for Special Stainless stated conditi ors. Steel Tes, offering a credit of $1,143.20 for the 7 Additional infonatin on Substitution. 12/08/87 it lower location as 1-10 Request charge of charge regiesteti at precenatrwtim 11/30/87 order prxedure wti,xeti in zonferewe ad traruaiting RN2 letter recited on su plesenntal drawing 02 11/23/87 due to ties required and warning of charges due to ? Clarification of wli by-pass delay of work if the 12/09/57 piping detail traveiting prceedwe is used. supplesental drawing in response to serial letter 1-13 1.11 propose alternate ce'llng 12/04/87.,at.of Osstrock and enoxy RN2-10 substituti an of a d :tile pint instead of the plywom 12/11/89 ,on tee for fitting no 15 in and white plastic la+rote lieu of the stateless steel originally specified. tee as spwified is NOT approved. I-12 Request additional 6 sets of 12/OB/87 full Scale pin sheets with RN2.11 Rexlx: se to serial letter seceMFn sheets. 12/11/87 1-11 giving realms for spwifled ceiling in chlorine 1.13 Request for <lanficati on to root end intended insulation page 1 gave 12-Jut-1988 Serial letter. for Will 1, 2, 4 3 RMabititati on 12/03/M.Met 4 of 40`well tripes methods and susesling testlna piping• immrt etawotjon of ample of later proof 12" wttet. plasmas respond Meetrock coated with M MY yion to 1L71/87. for .cid/wter resistance. 1-14 Canfinaing teiephone RM2-12 Respone to serial Letter 12/03/98 cemersation of 1211,187 12/11/87 1-15 acknowledge recipt of stating the 50 inch dimension, achedulas of values and 1 refers, on the roof C6 rep.ectfng sea of partial channel spacing on contract q„asnt fors ismwad at droving 11 of 40 1s to M wecorst,tiction cmfrerv. seswsd in the%cricantal NOT the hypotww or sloped RM2-13 swoons to serial letter position. At"aft 12/11/87 1-16 stating that sprinkler dissioning and positlaning rout. is oval table ft= Of the C channel wI II M from Grinnell in bras as vF822 or to the MEET of the chapel. with Model No. F8W dlmt cp`: end giving contact nleele 1-15 Trrsmittat of schedu', of and phone non. r. 12/03/87 wires RM2-14 Respame to serial letter 1-16 Mepmacfng sclaq to 12/11/67 1-17 ackrowledeiry recipt of 12/04/67 stbstitute for Grinnel revised wood ceiling layout Winkler ...is F9228 010 for the pup room and Is he longer weilMle reca esting add4ionst details for review. 1-17 semi tat of retaliated 12/07/87 stbtitute ceiling imuletion CR-15 Motice to prOc"d and start and finish carpentry in tee 12/W/87 150 working days as of prop roan. 12/10/G7. 1-18 Rattiest for review end RM2-16 Rasponse to•Wtice of change 12/07/87 clarifaction of dnifn rd 12/11/87 In contract St. 1+ .toting addeMa If for sanitary Mat there is no sew. with METRO rewirrmnts chorine/ftoride injector on given at pracon. the project and giving a Wallace anld Tiernan catalog 1-19 provide costs of revised droving amber for the 12/09/67 roofing Ares per redfest of •Gradated Cylinder-. 11/16/87 11M2-19 Review of sulmitted work desk 1-19 Ramat for Motice to proceed 12/11/87 tied, flow esters, and 12/07/87 sad acknowledge reclpt of progres. schoduto giving siyed contract revised part rsake for desk k top due to error in the I Motice Motice that contractor: contrast specifications, 05 7 surveyor fad sell iccations rejecting the sulamltted flew 12/14/87 diffrmtt from plans aid meter for not meeting specs rsueating Immediate aM requesting additional correction of fovds.im, its of work M identified floor, roof, retaining wtl, in the work achtstule. and piping plena. R/11/8 Response t0 diveel sbn mabar IQO Confirming tateptione w-11 t2/it/87 5.3 misc. steel nii mittsls 12/14/e7 Location inn of sell heed repeating drwirg 6648 location error. Ste MJice 6648 1, as not d a d648-3 be es above. revised as rood end t reswtolrilted. 1-21 Repast for .sell change 12/14/87 order form. R92-22 transmittal of suppLemmt-el 121M/37 droving No. 4 which 1 22 Respowse to letter RM2-19 Identifis the corrected 12/16/87 repestin, addition of four vertical died iana of the its to the proposed project it prmls, rmieh were scheduLe: incorrect m sheet 15 oft" 1, bathhouse 1Luorldation contract drwings. ewipent dismantling wili Stpplementat droving No. 4 occur roncurimtly with the also details an ptiost imtaltatim of the same modification to the wait ewipent in the new well panel dnign as a contractor. house. 2. Its W. 2 option. •Finishes" rpUires coordination efforts r,•day RM2-23 Review of pry control valve to dry basis relying n 12/16/87 and backprmss a vela POP Date 12-Jul-1968 Serdat Letters far Yells 1, 2, S 3 RMMiiiution cnstruction progress, mother submittals 'ejecting the she Material awdabillty, submitted 4ilay valves. There Would be little or no be fit to otryaam associated RN245 Trsrswittal of change order with the project by adding 12/16/67 gl for Iwo's sinstwe this activity to the construction schedule day, to 142-26 kespwwe to latter 1-10 the H.ether activities 12/16/87 allwiry man field It is Associated with. 3. observer to Authorize`Field Its 3 •wit Mao 9 flow York Orders• in an mount not raeerdinga 1s an stew for to exceed$500.00, and Mid ns requitement for rec mting corporate IMCO's services has We resolution on minutes giving fah. If 1t has ben I..,. an site It ~ overtookecl In the decuents authority to sin these press. rot Hy IIICO "Field York Orders-. iwadiet.1, 4. •Sidewlk And Orivewya is considered RN2-27 Restore* to letter 1-20. ^filt-rna Work and is t0 IN, 12/16/88 Revisions to plan Sheets 9 atcwgtishad only when the rid 22 are in work old Mai.l Project foreman date sine, be evadable by the and Of that its Installation Witt th. week. A.discussed With ewparience the least mount Dean Irwin on 12/14/87 the of e.posure to damA- fro changes do net Affect the other construction related building foudation, footing activities. or betw grade piping, and th,elore there is no need 1-23 Motica, that contract... tc delay in construction. 12/17/87 forces will mobi Uza and (tart work an 12/21/87; end that Mr. Dan Irwin Of RN2 infara d contractor by Ph. that Misstocation Of wit heads will he" n0 inect on foundation, looting or below RXi28 iranaittal of Change Order e great concrete work, and that 12/16/87 2 for Iwo's signature. revised plans Will be applied within two days. RN2-30 C...ectnon to letter RN 21 Notice given the wissl,.Stim 12/22/87 adding •General Notes" to be has delayed project , den added to MiaxllArens Steel and the cast Of sew. Will b skia itbls. fort., casing. RN2-32 Refpanse t0 letter 1-23 1-24 Confirwing tlllata," 17/21/87 stating that ai,dlays 12/17/87 conversation with METRO that caused by the moll head . fees, line will Match location was liwitw to crowns With the METRO 42• Detester 14 and that rry tine, further delay was not the responsibility of the City. 1-25 Clarify portion on serial Any changes required shove 2/17/87 letter 0119, that proposal for the fovWatiotM Witt 1g alternate roofing is Valid covered in. forthcosing only after recieving change order. engineering approval of the W-Ray"tat Products roffing RN2-33 Subittal of Snint Ms Steet fystes. 12/22/57 fabricated TN rejected. Revise to show correct 1-26 Transmit r guested cost break disentros and the taps for 12/17/87 down of r aposed changes to the chlorine solution piping. the electricet systes. Total for p.rosed chsn, s is R142-34 Transmittal Of change order S17,ON.99 12/28/87 No. 2 And noteing that Ieca's roqurnments to disease*(, 127 Rpwst 11112 provides the bests And provide for 12/18.187 structrot desire to stpport transportation to witness the the skylights as aAnittW factory tests haN b,rM frw Lair-Swanson so that it deleted, but the City does May be rrconrporated into the not wive any rights in the structure) Mop drawings. contract decuents by deleting than. two it. in 1-28 Re9.mst RN2 review the this Change order. 12/18/87 reciuiroMnts for Markle rods. In particular, Shaer 22 RN2 35 Acknowledge reciNpt of change of 40 Itee, 8, 10, 22 AM 26, 12/28/87 order 01 with JGo revision pope 3 Date 12-Jul-1988 0 Serial letters for Wits 1, 2, S 3 RMablGtetion that tW roof Witt We 1-29 Lrarwittal of laco'x stpowtlrg sea chsisn. Chenille 12/13/87 equipaant and labor at. for order sill net W fourMl charge order Mork. to City laltit ,Mitt roof ,Amittals are reciewel And 130 Request for 112 scaie Newt approvM. 12/18/87 1uLl state reproOac role (sepia) drwin for .a in Rx236 TrrmaittaL of a 14ster set Transmitting Cop'. to 12/25/57 of 1/2 ..1.drwiros sw-,.tr.ctors and siappl lira. ineLWlrg segplaaantal drwin,a i.outo to date mrwt 1-31 Rnprae to wrial letter M14 two rwised drwin9s for 12/18/67 recommitting detail of N99d contractors ua. those finish orould skylights, and 4uater.W rat W rIrwrnai, to how to attach finish hoard d' the City lFOrl ftlltract top Of It pdrnal. capletlon. F.LL site Ptah sets .,it W leeuwd at S6o.00 1-32 ais.ing Wr set . stated in The contract. 1-33 Confirm rKiapt of 12/15/87 supplemental drwirg K rwt RN2-37 Reaast to prwlde eddltiont its trramittol to supplier 12/29/97 shackiinp for fittings Nos. of wit zereei L. Extra cost 6, 9. 22, Newt 24 on shoat 22 for increased site Will W of the cratrmUon plan. for Mcairg. RN238 lrpowaitul of cnpoga oryr 1-34 Re,tone to"risk Letter 026 12/n/87 03 for si"ture and ooClrg 1 12/21/87 designt'M field of, contract time tetenNon. sgerentmwt@nt Beity Bran as Nu[harlsed to na, i.e fte(d RNZ-39 Response to Letter 138 char,,@ ordere m to $S00.0o. 12/28/87 reaxsvng the City to relocate the <Nutirg pour 1-35 Irentswit.l of si,ned Charge transformer. Any relocation 12/21/87 order 05, With ootice of of the exlatlng power charge to prices due to oo trereforwer WILL W don at ,,or agreement . Imco's eNpenaa as eaplicitly "di.r.wdle @n Owl in the stated in the contract. Into presence of City 00.eryer•, am,at it's awo risk wwt •traw.L for ong City relate the 24^ pipetin an Eaplcwe to Wilre.. factory discimsed With MI. Bros, on test.. the site on 12,23/47. 136 Request for Charge order d+e 0x2-40 Respond to letter 1.31 12/15,57 to Cwistion on the wC 12/28/87 ringardiN cool. for trcatiore fro ori9ingt inspection. Corractin, 1w.'s drwirgs to Met shah M interpertation of pre-con revised dr.w,ngs /9 and 022. et.taart.. Iwo way work COIL of cheeges 51,672.54 nr,d flesiOle hour pole Will not exterwt contract 5 working W charged for inayettion days. prior to 8:00 M NM after 5:00 w dunrg the 150 day, 1-37 Po.ition letter that, per the dur.tion of the contract 12/23/67 dlscweiore at the We ,s•.1 ws ,npactioh is rwulred coatrmtim confrence, Iwo to W made by a city Witt W wrk.M flr.lbL. espt oyu. If cowisints are hour. wwt.,It be charged for recie,sd regarding INol's Inp!ctlm "We only When a work during the hours aotslde City trozoctor is REWIRED To the 8:00-5:OD periat The oe present Wfore 8:W M or contract Ottit.tim of work after 5:00 TWO. to 8:00'S:DO Witt W onforced. 135 Notice that existing power RN2-43 Review of n3lnit.l of 12/24/87 transformer. ore in conflict 12/31/87 .taint.. steel motorised with the intatat,on of the I ere. The aJaitt Nl is 24• pipeline and that LOT oprowd. Shaer 2 of 2 contrmtion is halted moll I. also ng, is No. 4 finish is the Omar reLacatois the r.gs,rW on It eapo.d tram formers. Stain that ...... rwt actwtgr useably owing 32 of 40 says; -the is not shorn No stainless contractor shall not rewnwin, •tee,. Revlw and rwiLeit. the wstleg trpoafonMrs", awt that documentation of Rx2-44 Response to latter 1-43 &toy cWls Will W forth 01/04/88 a:.tirg that at this time toairg, C.tyin veWerpoL in not IN, PW 4 oat* 12-Jul-IM Saf bl tYttera for test It 1, 2, S 3 YeNapi li tat I Kceps(b4 s,pefntengr,t and 1.39 atice that the eaisOng 24o reaastrng detailed 12/28/e7 piping IMH!Hw.1" 1" references and bKk9rrand iwtai.tion Of the.ea pup saperiertl for Mr. h-p S piping, and that he varWrpol. Iha contrart cat of tha sstra tort repiirea a s4parntsNnr re,tlirw It K01.77, a vita full sutlowitY to Kt on change o is rapestw and the co trwton bahstf be notice of possible satr. .ort pretnt It a{: tics ,,ring, and asprse that geY be wit as at this dw that It cwaad 1. the future by the Mf. Iadtof "Yr. scot. reloca[in of the py-pass lift. a.4-45 baorre t. left" I." 1-40 Mice o/ shistirie 12• wpe Ot/04/be reaattiy additions, 12/23/87 inharf...n,Yitn the information of the -"it ,ra44Pn of Me .el� pup xwoanU`. contfactprt by-pass piping and 'ataieatIN attntton, is directed to the thwW order of t209.17 w prepared. .yd shset raM 10 i p on 15 Off 40 sad piping u 1'41 ripest for rir order o/ show on sheet 4 of M. r 1112e/e7 Yese.e2 for eat's t ioat sae to and id aetwn part.el nays.. rasu ga t tl par te t ri C1/O4/811 rases( Yo. t Mich rat not W uppl+.seitat Moving M. arKHsw due to 12 the at,vaf 12 days alter the D91 to raittal Of prrrpoofd cats cuoafl date W 21 got iZ/29/b] for rerau[ing the itt, n sWatltw on Na fors per di.ct8157, to on.ire on thou i red And liven to two at 12/2e/b7, [net otiwcw at the pre-con And in letter 11235.70 ah2 12. 1-43 Mn Ke ty slog, Is stung ant-47 Th.doors, framer, snip 12/30/97 the proi fcl riper NtafHrtt 01105768 hordare, as s,patttw, are .I([ be Kirin yr IPOt. .OI approves. the sWsittat doer not inoitde 1.4 fhmIc.t for reaolut,w of 4 tpecifiubma for the 12/70/97 a[aratrwtion t.fam,,to and n.rd.are, lowers, li itt.. TheAs- t lnnga ilitew to 4 oolfit, .Data, anic per. The 1. off... toy of tha star etsp, and panic Far. twist. oiferi to preor[t PstagesrevitT tasknd ruteeti tr. this .k i a r e.oD pet hour or on a nepoeiated (,s, as RY2.44 traMrit41 of charge urdtt ba.11, 01/OS/ee Mo. 4 for sivrtwe. 1-45 (Aastiora the newirearrt for 11112-50 Irerp,t4: of charge .,per a2130/e7 a Ut label for the chlorin OINSIM Ye. 5 for u9rahR. rifting systb apfiniker control pant. R%2-55 Iha polypropylene fleor I)IM/tle Main and ia.t.piping are 1.46 are n ttio obitwf1w to.4,(7 the ("'(I, tat, NOT OpraM for ae on this 12/30/e7 nydro,tS Shots,M ere,Dian, and rhqueat#S Geian project.fit Menw. I1 r.QutratAnd sasc rt If they are to M •eddlC to theha.t i,oor .in and wM contract. wping 4"C.C. Pbwe rmsa 1.47 confiner, 4laphrs aft resrbi[t. Ot/06/5e converse ion of 1!/u 442 58 lrrreittal of revive of door Wr.br Iwo .il, prov-de all 01/21IN And n.rdwre aIAsh'tt k , lift And VAI*states rtl.11 tiat,ng asverti fltas Mich other tont1wtio, luting M not stet .wifineion, rti Dravtlds Mt rgrtred and reparating reatbnitt.l. as-built infone.tio. at . was,au pf is.of s7000.00, s.Z-60 Confirwtton of 0112016E 01/211M sareearnt that the lid eonftreieg telephone Oiacreplo,cy of details 17, 011081M COM"Al tlo,of III'M arm. Is w resoletd to that Meraby two sill prwnde th.corral cols,, interior different pap moo, frog tol.And MI I tnurl lra. those orisinr.ly awif iep MOuld atl InteraKt to ne for • total atlas of c..iatant .IN the rTgaw,g 512,010.WO connect Plan. I-49 brafraltul of elwtricat a.2 62 the Pressure sw". and 01/0e/8e siCcontrwton pasgaw costa 01/25/ee or".tIre w,tchea aLLailtw for conga to rha enKRlul s.e wr 4worteef. sit". Page 5 Date 12-m(.19bb Sf fal Letters for Wits 1, 2, S 3 tehab,l'taTlon sytaa rap.stml W the rasJesit iMiudim the wrens at . cat of s9,203.89. sasarfacti rer and Kcwacy Of the presawe gLesm, sM I-SD TrYWlttal of eteitrl Gl highlight the Type " 01/08/88 •Wrmtlwtors proposal casts W'.a to 6e included for tu 'oside DFl protection at the pes•we switches. the IDO smp min circuit or....r as rapastes by the tN2-65 Trew•Ittal of letter fra over at s cat of 111700.14. 01/26/m puget power rpaMlrp elactrncal ayTaa dear aM 1 51 agrees to prattle tripple repreat'rg Iwo to coordinate 01/22/b Nall hytrares Pr sheet 15 Of dtrwtly isith Paget parer. 40 if a Thope abler of Sdee 30 plum I" is issued. RN2 66 The 200 0 elettric wtor 01/2f/88 .ataittal is not conapleTe. 1-52 Transmittal of euweyors Please 'wiss anal rfl4a.it 01/22/88 4-Wilt dres"of the irclWbp the Inforeastion as .fail, 24• ester main rW datailal in the technical 12- etas aMr in"..' i etlfiesttaM. way. Pleese ra.Va. anc! pro.ide wrwtion to resatee RN2-67 tesporae to trial Electncs The grade conflict and 01/26/98 letter of 12/28/87 regarding minim Re contructim de Lay. the W Inset for the s'ineler area control 1 53 Forest repeat for •et of parer. The NEC section 90 4 01/29/88 plan sho.ing the M. IeyauT govern " the Wilding for the •tructwet footings, empartwnt elactric.l Wlta .d roof for the steel Inapectoo .ill reps,,* the 0t roof .pptyr. all label or a talml fra the esaoo fatal cost to b State of Nash. Dept of Labor forwrdnd to the TIT,. end Irdnlrles. 1-54 PrOpossl to Iretall the ne. Re2'68 The sWsittal• for 02/01/88 ri• PIW line per 01/i8/88 thachioritina anti aIap;k antet drm.in a7 for ftarldstlon .ytaa eW iaesnt 1110,594.83 and an 6 wrklrg 'e relacted bKM1te: day ertentlm to the 1) TM apdpant dies net contract. The City Is t0 say, the repll'vent4 ease the 11e-1n and be outlined in the'olect respaa ible for arty, further some nficati on and testing reprtred. The change cdNtrwetla drMlrgm. order asrt be isaWd by 2/1/8 2) The suh.ittale (10 net wet or add Irk wool dellay charger the rapdreaanta of section .Ill be Inewa. 1 05.341) for eubaittsla and ahoy hwims, ar.l sett,on Ids eepart for caapenestlon for 1-06.7 for sale tltuti an. 02/01/88 emirs cats in testin0 24" 3) The equtpaant sLEaicted pi De line per ovsera .00Ld require the rases,W of direction on 1/27/88 in the the cht'intion end .swot of 111,851.49, fluoridation •ytess, Mich .as net addresses in the 1-56 file Ifeter stating two Wa adalttats. 02/02/88 direttal to etW coretructim of the Dim mlery mrd test Nw2 69 Tr~iTe.l of sLipplaacotal the nee. 24• pimlin on 0I/27/88 hxlp M. 7 in response to 117,188 by serial letter 070. letter of 01/25/88 I On 1/29130 in .phew sur.eyors as Wilt of cwvereat1w the ait"'ete et'ki"es engird C.tion solution of see ortrim he. to eelsting 24 Irch ester Dim gate', slsb n in in Messer Wy, and de.Olitlon of the entire also not"To stake Wrk order ws woo d'.T..W t0 mlfwlnle ,iisWd. masible delay, .d Iwo 'ooedes to finish the Poor. IN2'TO Notice net to contrwt Ve 01/27/Eb p,m gallery retaining M11a 1-57 Confining letachan ertilL an accaketimle pressure 02/05/88 corners.tion of 2/5/88 test of the Ir. 24 Irch weer i nforairy Iwo that the City in is preforsad. eduld Irish the inblstlon of the 24• Dim line " R42-71 the Dehaidifler sidsittai as repesatirg capaaa[ion of 01/28/88 rec,eved is intaplete. 57055.00 for restocking Please reslimalt providing cNrge• send lost time, epeciflcatlon a the'Odret hair sJattted. Tiffs 6 Date 1DJu1-1988 Serial letters for Yells 1, 2, B I Rehebilitetion 1.51 )Iotice that a UMIs of the U101/11 tilt-W sell panels i, RM2-75 Respone to latter of availtale for irrsection on W/03/41 01/29/11 reprsting Mips 2/10/11 said that the forma details for the roof etc. reed stacl tabs, all be Kellam refer t9 latter RM2.60 aystlmblt at the seer rise. (01/21/06) With contsim the Poor is srhedulma for 2/11/11 info requested. so irrpectim is reefed prior to that dale. RN2-77 tranamittat of change order 02/04M M. 6 for Igosture. 1-59 Submittal 01 ITS motorized 02/09/86 loner details to clarify RM2.71 Res orae to teller 1.55 points rallied in tacisl 02/04/a/ rejecting claim for testing letter R43. 24 inch "Tor. Justification, I W Ackmm( i t of sky that the York mas not edM r ac sp y r,q,rad by the on/iml 02r10/11 tight debits on .upplemanbi contract aril that RN2 or the droving R a1d no'"tin/ City ws rasporsibla for the extra comarmotlon of extra wrk preformeed, Mill be $0,712.99 to )WIsment than. required. tan additional wrking days ere also roppested and change RM2 11 Response TO littler 1.61) order must be relieved by 02/16/11 r•jwtim claim to extra 2/12/11 to avoid delay cmpkiostiOn for eKYtight srd eh.rgas. skylight leasing. 1-61 Reoome to serial fetter 971 1142-62 RevieM of Clorfmtim 02/16/58 repeating justification of 02/16/11 egdipsent submittal. The extra charges for testing the Capitol controls eWiresent is 24' pipe lire (serial letter NOT e%Ai to the Wallace and 155) claiming that serial Tiernan specified and in letter R70 Of 1/27/80 rejected. directed two to preform the test tamedistely and this RM2,a3 Trarerittal of rnised voter repaired the pausing of a 02/16/11 Min plan for the 24 inch Thrust black altieh mould not Connection..st of the Mall hey,been reprired it the Wilding. Kelly Broken Time pipe Lim imetilation could advi sad of construction start have been coplated. by City forces. submit exits coat dots for this wk. 1.62 Notice that Iwo is ready to 02111/M accept deLivery of sob R112-64 Revisit of NI-build 1pexOlire removed by the park$ Capt. 02/17/58 costing sibittal. Please submit s coplete finishes 1-63 mf.sing submittal as per section 9.6 of the contract. 1.64 Request for extra 02122/11 Compensation for use of UN09 RN2-17 Reapome to letter 1-63 backhoe to a$sist city forces 021231M eVi.inir, mat the fn making the first dmaidifier %",ml me. 9oremectian to the 241 pipe returned marked Nrevist and Lim in the roman[ of resubmit^ because it did not r.m.25. contain the specification information raptired by 1-65 Repntt for *air, contract {section 15.90). 02/22/11 cmpematim for wrk preformed *,sitting the city RM2 81 Please revise the sulmitbt forces to complete the ifnat 02124JM on the 750KVA tramf.mr, to coned don of me 24- "pe cla�ify the TILL 9aing: 1. Lim in Mouser any n& the Draining No. 52.617-0021-14.01 shunt of R4,412.19, mrd No. M61-0 do not "wee. 2. Wh.t Is the rating 1-65 Request for extra W type of the primary fuse, 02/22/58 compensation it, framing sky "m don it Comaty mire the lights in roof, claiming this "pall icsti. 7 3. oft. the mam mited from the bid plan$ sKadarypbryrnaanC have a and aince addendum 6 did not $K9ndary and"bit"., 7 4. contain the information Does the unit anst the reefed to Mips the framing standards refrenced in sac. this mas amited from the 16.19 7 Wet is the bid. thus the wrk is not trareformaer impad"rce sit included in the bid price and K/R ratio. S. Provide extra cogamation of certifibtion the the unit S6,712.9p is dale taco. meets .(( repuiremerls "mad page 7 Date 12-JuL 1988 Serial Letters for Yells 1, 2, 6 3 Rehabilitation refreKed at erdatd of the ,-67 missing Moro ificati one. 1-68 Rgo aat arbitration of claim R82-89 Remuect by subcmt'Ktor to G2f29/88 for extra ccepamatim of 02/25,85 use medium Wight CMU is extra work on sky Iigh•a as satisfactory. Include the per "risk letters 160 and required information in your 166, formal suhatittat. 1-69 supply detail sugary of Rk2'93 Trammfttal Of the detailed D2/29/88 rayxsts for it. 02/29/88 color schakIle. Color of any colperlsatl on regarding the inadvertent Mi Miens Yiit W 24- pipe line instil Mtim n detersifeld at tfft Of Coating. rah ercad in serial letters 155, 157, 164, and 165; and Rf- 95 Review of door and harcaMre giving torsi compensation 03/01/88 re-submittal With Still has reQxated as$19,837.32. a list of 6 its Wich still do rot get SpKiffcotiau. I Request for coptate color 03/03/55 schedule for all itw to W R82-96 Review of flooring painted and stating that Imo 03/03/88 Submittal. The general is resporaibis for pefnting poi Were Ceramic Carpet this, Lift only statue t that flwrim systr don rot meet all roof steel will be Specifications and is Monterrey Red. rejected. Meese rextEmft a flooring vYstm that meets or 1-11 Tranwittsl of tub letters exceed the contract 03,04/88 free electrical wbcontrector apecifications. repmating clarification of distribution dssign and hard Ra2-97 Response to letter 1.7o aid hole location W stating 03/08;Ba telephox conversation of that Puget power costs are 3/3/88 t•enwiting revised the ouners responsibility color echeuuta. The contract Also that blue color on the Finish schedule specifies all control panels wit'. IK W it. that esquire emating. extra lost and rift itea. The maision of any, it.on the color schedule don hot 1.12 Confimirp conversation on retie. the contrectuat 03/07/55 lob aft- that Imo will reQairw it to cost all itw furnish ali structural Steel w the Finish Schedule. The pine coated and Ydll finish City Yf I hot accept a cost per serial letter I70. -.rtlall compleH facility and wi It rot pay extra to 1-73 Response to totter Rm2-99 cost an it.that is 03/11/88 stating that section 16.4 identified in the finish referd to by Mr Ervin does Schedule. hot direct the contractor t0 include the cost o/ providing R112-99 Response to letter 1-71 primary powr in his bid, ad 0310a/88 regarding questioru froe the this is only reasonable Since elrotrical sbcOntactor. In Puget RgRr Yplld net W.& accordance with sections these costs ud I11 a des ion 16.4, 16.6. and 16.8 of the wee complete. contract the City will rot MY additional comit for 1-74 Repast for extra power supply to the 03/14/88 ccmpemetion for imtelation facility. The finish of a 1" copper ester service schedule is YOT superseded by to the chlorine storage roan the requiremants for a at $368.87. mafafact.res •scaderd line-Wpm. Also plesse 1-75 Request for extra coordinate directly with 03/14/85 coperewo, for cleening the Puget power regarding the air", infant of the aran,seent of the primary project. States City forces switch and is, cabinet. removed the curb and gutter and this Is the cause for the 11112-102 iranhux stet Of COMplafnt debris being tracked into the 03/14/88 froacement Mason's Local No. strut. Therefore lace work 528 regarding prevailing wge to cleat the street is ..its rates. The contract rNaires work and they Mould W paid payer of prevailing wge W7.37 for the ork to due. rates for class of work preforred, not for employ. 1-76 Traemitting revised floor geterat title. Please revs. 03/14/88 colors and regxstirq y r wg- rates aril correct Page a Date 12-Jul-1988 Serial Letters for Wits 1, 2, g 3 Rehabilitation approval of the floor systr soh,oversights Mich Might since the new IRAP11tat is have ban made. diferant from that proniolwly ra jected. R82-1Wr Response to letter 1.69 03/15,93 deninp standby ties payment 1-77 Resomse to serist letter of the excavator and 03/16/M*102 rew slim wage raise for transmiting change order woo. amson so orpoeter and 7 for I"two. stating that two believes sit workers are paid RR2.105 Mortification that a credit of correctly. 03/21/88 13500.00 is expected for the Cities cost M to the 1-76 Transmittal of code layout destruction of the hot-dip 03/17/88 requirements for trasformars galsoniting son the pipe W transfer witch gallery grating edge sports. Indicating extra work is red,i e i and requesting extra RH2.IM Response to Utter 1-76 compensation of 53,172.83. 03/21/88 realising the rejection of the G.P. Ceramic carpet floor 1.79 Wtlfleetlon that the covering and requesting 03/22/55 "Wilding roof plan" is in suffic+ant technical error Hn0 that this has inforotion on the product caused considerable *Arco fcr review if resubitted for work and that extra amysent apprwal. will b reyired. R142. Rsepame to totter i t75 I.80 Contending that pear is Ol/21/M/88 Mning*Ulm for ..it. 03/22/88 thar"s to that char et army crepe ream for Horse[ deal 07 ring oral that charge order up and aintaiing Rower way n cue tocke.ed is to be Maintained con to• clean settle stand Offers to stets by the contractor or x settle 0 as full issue for be retained contractor will $39Weso as full cthe min,. be eetei nod he clsai the aM resolution of the ratter, chant Nd the cent o/ the cleanup will be deducted tram 1-81 Dnisl of city claim it is the contract mosuin. 03/23/58 entitled to credit of $3500.00 for hot dip RH2.103 Response to letter 1-78 galvanized repairs and 03/23/38 daring request for astrs requesting arbitration if the compensation for the claim is not dropped. instalation of rockery for the electrical transformer 1-82 Rpueating a new dint and transfer switch because 03/29tU contaurs plan' for the site. this work /s food, the Claiming that plan sheet 6 is contractors resp.ibiltty by not correct and will not work the contract. on the site. Also request a cow drwing m the rockery RH2.111 Raeporso to totter 1-81 retaining wit with new 03/31/88 reiterating that the disentionis to cmfons to the Wlvmieed grating edge .duel site conditions ad supports dowge was reported rwised-final contour*". to the project field stperintadant on 3/16/55 and 1.83 transmittal of crrresporserce was rejected at that ties. 03/30/88 frm electrical contractor The edging ant be resisted regarding 750 RYA tea if.reer or a credit is due the City. and requesting rwiw. RN2-112 As discussed eat the syse:ing 1 84 Confirming ...rsati ens 03/30/811 of 3/24/a8 the di were onsl O4/07/88 regarding Manpower errors in the roof joists utm.iition reports fr. idartmad in letter 1-79 are Triad Electrical and Diamond the result of a g pluming Mich were subcontractors error and not subettted to Ron Olson on rerrmeouer dissentient on the 3/29 ad 3/30, and contract plays. The City conversation of 3/25 to Mich sssues no rseposibility for Iwo had subelted copies of in,reased costs or it" as a the "items sent to Lap but result of this error and not yet returned by Men. became of this error the contract preforMree is 1.85 Submittal of proposed behind the approved 04/21/85 alternate handrail system schedule. please imuedistely with a 180 finish arwl lacquer identify the proposed Method costing. of asking up this Lost ties. Page 9 Date 12-JUL 1988 Serial Letters for Walls 1, 2, 8 3 Rehabilitation 1-86 Reapnwe to letter (4/26/88)7 Rw2-113 1btica that the cherry crass O4/I8/08 stating that at this ties 03/31/88 M the point site hew ben Iwo would prefer to hold dosm- Of the contractors .rhitrstiM until the project forces. Plan mid, is complete we It appears pruning scbdii. and ther will be other iteas to "wrrmtiM to the City for arbitrate. At" response to this dnneet. otter (4/4/88)7 stating that Iona$ufa$med for .roitietion RN2'114 motic that the grate supports is for the changes to the 03/3O/811 aabdsd in the concrete floor roof mtructur.L cospwent. are the wrong site rug are recs,ired to support the rot accwtable. pleese skylights, net -for pywnt provide the details of the of skylight framing costs' es iproposed rest if icatim of stated in the stave refrrced this pobles. letter. Re2-115 actice that is loWiN dock 1-67 Resprsie to letter RN-117 03/31/88 hardratl ,;ports imbde0 in 05/16/88 stating that it I$ Iwo's the cone-ate of the loading uv)erstarding that oM Ervin dock are not ply or allowed had verbally approved and or.rot acceptable. applying a thicker Leyer of plemsa provide the details of florring to correct the its, the prop ad rectification of spot. in the uppr puproee this pit&,W she fluoridation ros,iper concrete slob. Further Re2-116 Wotice that the Radial roof sating that the floors were 03/31/a8 beWcolun connection plate constructed to spot cast into the cove rate corner, elw.tions hewn on the pt. colon is not level and And! as soon W rot prwiW therefore is nor acce0obt.. for . floor slop. Please provide the details of the proposed rectification of 1-88 Repeat for arbitnpM for this problems. 05/20/08"upot Power service dgngasw. Regest that this kh2-117 Notice that the concrete itw be Included Yitk 03/31/99 floor has several los spots Previwp itme for structural that de not drain a, required $test modifitstic for and is th...for. not skylights. wcMtadle. Please provide the details of the prcpsW 1-69 Request for 5 working days rectification of this Wobtaw. 0527/a8 ePtantim to cmtrwt [lee he Added to change order No. 7 Rk2-118 Transmittal of Puget power 04/05/88 field service charge bill of 1-90 Request for the regiil~ts $2.124.36. The City has 05/27/58 for +8rbitrator" as unable to Aid these charges directly find Any in the to Puget Power to Warrant specific.tiwe. Will pursue delays in Iwq lead the apoinuMt of M electrical iteme, but atilt acceptable aroitrator when holds two responubl. for aware of the rpuiranrnts. than charges. Ptea.e ply this amount directly to the 1-91 Confirming lob site City or f.mly request 05/27/88 discussion of 5/26108 that .reit,stiM .s required by the City will b responsible the contract. for the asphalt repir on harm Wy Wen INOO was; 0142�119 Reitterating the discussion ,reforming change order work W051M at the sitting of 3/24/80 at the City's request Artist Payment request No. 3 Including apblt cutting, wi l iret be processed ontIll removal, compaction rid the 4 thly gun replacement. Mitigation Reprt.• are recievad fro Oiamand R 1-92 Claim for damages due to ptu ling and tried electric 05/31/88 failure to ease p.yastameit and Iwo'. -Intent to pay No. 4 in . tiwely over. pwatting wopesv, signed by Regeet for 11 work l rip day LSI is rwiered. Q(Mtlm to cMVwt t:R and$720.00 in interest Re2.120 further review of the motor ircurad by contractor during 04/04/58 control canter subittal has the 18 calendar day late discovered that the required payment, tine delay in the Pup start circuits shown as '4O1• M ppe 10 Oats 12-Jut-i9(i8 Serial letters for Yens 1, 2, S S RMsb+l itat•.on 1-93 Ropaat for a 19 calrms, dry sh"t 37 of 40 of the 06/01/m aateMim to the contract c.trst plans is s{esiry. coplstion Gate due to eios,have the s,pptier ml two and ,tomes misting ret,mit the ohm drwirm. praiaW detavary data of Sit/m to apron. 6/9/88. 1112-124 Retu iv a Utter fro the Ol/211/811 /boring sea Wtruta, End 1-95 mown" to latter Rat 112 lotim that arty psrrns MIM/m 'Latins that eer"silJro cape of b,ss4 Ira two to the Mimi certif{Cat4w for City. Alec the its, sets in WOW", payment ma ailed the flow ha"not bean on 4/15/m And revawtiry addressed, And the r,mir of drag", IM„est And Tim sm,Vt Tie a{proywi Wfwo e tentiw, the floor coverlro s"tm is approved. 1.96 Repast for clwilica[im of 06/06/88 schedde confti(ts in 4e2-125 Respenee to latter 1 65 wsoitits of erietirq mil 01/ZS/m relectiry the propossd how and start w lacperd hrsd rail And k,viry reyirarrlte for res mils a soorca for the sms,1,ed and floridat,on epeipssd. rat tiro. States that IMCO saes no rpJl/anon, in the Cwt,WT R42-126 Repxet for retpoMl t0 t. ,owlet. other portions of 04129/88 letters Ra2.113, 114, 115, the work talwe meolmo, M. and 117 all rated begins. Radiants Insatiate 1/S1/m. view,Wattle respmre to ct"ify Ray $leds the dotefts of the propeasil atheWt{ray COKIM1p ends rectification Of Those prpHde a contract thieves, pretties to sin{sir, the order In raprired, poesibil{tr That repat vill Iepect caapletatl ark. 1-97 6espmre to serial totter M/m/m (6/Zion), statirve that IW(t R112-127 Irwittal of Ssxv{mlr Mark finds ro contIKtwal MOWN 11 aobsittal sweetest if obligation to be read/ for Wattled aith a 30 sireto atwttp on 6/17/00 and Offers high Wessar gl{nier. to raptiste the pssibll ity of eapidiMry TM cork. RR2.128 Irrssfttiry letter fro City M/16/35 re)Wtirp the sanitary senor 1-96 eespns, to "risk latter frobbtia and reyaootim M/07/88 R42-131 states 1KAt vork on rattilimitan. the project ma delayed for 20 mrk{ry days by the CItiee Ra2.1291rsronfttak of handrail failwe to Weida direction M/13/m repys{ttat approved" on Ties to proceed. This 20 .emitted. mrklry day delry translated into an overall coopletion Ra2-130 Tra,esi of electric e„it date delay of 5 Marktro days M/20/8111 hooter Mimi approesd es don 10 ron-"ailaillty of noted. Cram sro a ipmnt And {rofffe{are{es Created by RM2 131 Respdae to serial letter rsachadeliro Mork Cram. 05/3T/m 1-09 rapxstiry identification of delays by 1,99 Contends that spiel, repair City. 06/09/m on Srrron my is the Cities, responsibility end repaes"M 9M2-132 kesposa to serial Utter a harp order for $2,047.32 OarO+!ke 1-92 donyirve daMaghn And Tim to Cppbta the it. extention for let&payment of progress estiesto AT,4 ba0aw IKO did Ma coyly Mlth the psynent schadote provided at the presrstrpation Conference. RM2-133 Resperiss to aerial latt« M/06/1111 1.93 drry{ry 19 day Contract "treiim bwaw the city is not Impossible for poimaM detiv,ry data". Rk2-134 Respasa to wlot tatter 06/13/m 1-96 dany{ro repast fW dete"Was a cons TIM extstion. Rtl2 rots tea" 11 Data 12-M-19m Serial letters for Yells 1, 2, \ 3 eMabl i I tat ion irict"te IIILJI crM eer Yaed entirely on other .,k Ahite the city Me W"Iring plain and spci fictsti rr for the reriaad c.tn tiara, and all wrk not inth,origlral contract was, prefix ated by city crew[ except for the esuvator and ciperator which •ere r.Iw cn an nourly owes;is. Mh2 135 YApanaa to aerial letter 06/13/98 1-97 stating that IMCA is resposesb.a for [tang on 1Vm iy " ~ on the acheAtle slbitted by 1M N Wr icon in the contract dactwenb. Its is critics) that this "tar ayply from this facility M ansitabte by jute 17. If the achadule is net cosplied with datpeawill be charged. eh2 136 eetaest to sign arC return 06/13/W change order go 7 within 3 ds". in accordrlCe wint section I IA.5 of the if this ser tecif irration, if Me aitt,red .hang: order is pot returned.,thin S days it [till !K coreiered accorded and ph it It c t accordingly. If this di appal t ion of at frilly mats pot prwaple follow the co contract fsrucedures. page 12 Data 12-JUL-19fM w-sso RH2 ENu1NEERING, P.S. d[E (O F Vff9AKS'A Ik 1. 1410 Market Street P.O. Box 1180 KIRKLAND. WASHINGTON 98033 august 8, 1988 111h.13 (206) 827-6400 TO _ City of Renton M 11 200 Mill Avenue S_ -- __, Renton YA 98055 I WE ARE SENDING YOU Attached Under separate covr vie the following items: S"p drawings ,g Prints Cl Plans C Sampw ❑ Specilksta s Copy of Inter D change omc IE Roofing guarante< 1 _ Roof aularantee for Well Bldg. I I THESE ARE TRANSMITTED as checked below: C` For approval Approved as submined C': Resubmit—._.Copies for approval It for your use Approved as noted O Submd__copses for distribution C As requested Retumed for corrections ❑ RMum_corrected prints f7 For review arM crommant _ C: FOR PIDS DUE 19._❑ PRINTS RETURNED AFtFR LOAN To US REMARKS nIK CITY OF RENMN ^QRB Dept. COPY To _ SIGNED: Dan Ervin wlN,siii, rwm n.^.ww....n nn..,wr.a.A,".,mMr..r.rw.. --- Bankers Construction / Nu-Ray Metal Products, Inc. 1501 - 20th Street N.W. • Auburn, WA 98001 (206) 833-7228 BANKEC1161CW (206) 833-8637 G U A R A N T E E We the undersigned. &k93_iippII?,IIlSS14IIL(31i-8e>•�1sS41 ProdtasLa,_Ins-. Subcontractor for: --Imes---Ganrtxpl C�op3.$�ps�14a�_llas�• General Contractor, do hereby guarantee for a period of five (5) years from date of Final Acceptance of the project, that portion of the work performed by us and those particular materials furnished by us, more specifically outlined in our Subcontractor Agreement with the above mentioned General Contractor, dated 12/22/g9 , and in the plans and specifications for that c--tain project identified Protect: Renton Wells 1,2 k 9 Rehabilitation 1305 Houser Way North Renton, WA 98055 Contract No: We will remedy at our expense any defec..s appearing during that period due to poor materials and/or poor workmanship and will pay for correction of any damage to other work resulting from occurrence of these defects or their correction. This Guarantee shall not be interpreted as holding this subcontractor liable for any deterioration of the work due to normal use or the abuse of the work by the Owner or others. Banker's Construction/ N!3-Bay_ft&aJ-PT2ducts.. Inc Company Name __ Tit1e: .�,Qp1,LfSS AdminlstLfS4I�. Date: - Appll!L-I }!3 CUSTOM-GILT METALS, INC. 20 YEAR ZINCALUMP' WARRANTY CUSTOMBILT METALS INC.ieereader called CEMI warrants to YEAR AFTER DATE theidlawing EndUser OF SHIPMENT CIEWS SNARE END•VSF SKAN LIA _ fPilr E. lu Through IIXh 100% MI. ihil cal Wrieta and accessories fahgFated Irom LINCALUMFe i tth Through IMh 75% 25t Ihd dipped alum,num-aim ally coaled sMet steNl lobe used m 15th Through I'Ih 50% 50% she cusel ox wn d fixed structure..CBM provides the following INS Through 21Xb 25% 75% EXPRESS LIMITED WARRANTY to Purchaser and or End-User who Chef 20 0% T00% corodr wish Zen,Of this guarantee NI retain of isllsires will be wartam to wigiiMl date of SMpmeM 1. EXPRESS LIMITED WARRANTY.CBM wanems dsal all coil, or puoahase. WresaM xceswnes(abnratetl from 2lNUUlMEa wiliheiree 6 EXCllIS1VE REMEDY': The afrXe menbsmrxi remedy IS sole burndNxts,and If used wwitMn the normal eMiseenng guidelines and R AREDY::Tire so she purcha.ei and remedy is arm properly installed, tl no,rupture.loll structurally or penes am ate for 20 Years ]. LIMITATION OF LIABILITY:EXCLUSION OF CONSFQUFN- 2. PROCEDURES NEEDED TO MAKE THIS WARRANTY EF- TML DAMAGES CBM5 TOTAL LIABILIT's FOR ALL CLAIMS OF FECTIVE: ANY KI%U INCLUDING WITHOUT LIMITATION, 3REACH OF a Insult Pares xcordlrN to CBMs published Installation WARRANTY OR OTHER BREACH OF CONTRACT NEGLIGENCE ,neyh.ds AND STRICT LEA JILITY IN TORT,FOR LOSS OR DAMAGE ARIS III Use only approed fasteners. aM dher aclesswies that ING OUT OF. ONNECTED WITH OR RESULTING FROM THE are 21NCALUMEe coated ar whNwlae Zino Alomlrmm. COP, PANELS OR ACCESSORIES. EM THE USE OR PERFOR Stairsms Steel nr Cedm.um Place 51"1 SEANCE THEREOF,SHALL IN No EVENT EXCEED THE AMOUNT c. Na remme.change wanes or aBN lmm ortgiWl Iwo REQUIRED FOR THE REMEDY SET FORTH ABOVE SHALL CRAM LIABLE FROM ANY E I N NO hMI END-USER ORTHIRD Ill, OR ENT, fa ure of CBM within 45 days anN the wcurrcnce d arry PARTY SEQUENTIAL DAMAGES,INCIDENTAL DING WITH SPECIAL OR CON udure d the Wrlels w mi LOSS OF IAL FITSOR INCLUDING WITHOUT LIMITATION FO e. Take rer rarixn ct action umd CBM has examined failure LOSS OF PROFITS OR REVENUE.OR ANYINJURY OTHER LOSSES FOR and approved corrective measures. PROPERTY DAMAGE Off PERSONAL INIURY. 1 THE FOLLOWING MAKE THIS WARRANTY INFFFECTIVE: ASSIGNMENT RY PURCHASER a Any namage sustained during handing nnufi.wo ship prig or storage_W It mechanical or chemical In nature Purctuur hereby asagm all nghu,udt,and Imemt in and under D. Pedorahonsmanydher damage causHl lnwhdewin Wn n��o,,U,xtuha EXPRESS issriionwm roil a Le ITED WARRI tisferred.Itte '� bychemicalagents,Ilal con Bases,nfumes.liquidsirun rhan direct instillation l d normal c r cause is y ar external t uc for improper IiwuW konuor di.o file flood im by explosion shorten iNcludmple, r Renton Wells #i 2 & 3 otheral hmluhon. tire.Rood, eau ed b. Noon,tempest w f other acts of C.od,and disaster caused by an R_nIDlly 12A Damage due to vd spar oon pmximny a wean almaf End User City Cf Renton/City Clerk phere when W nets are Irntalled clover tern 1500In"from the M'11�_. r_ y^r LEA _ ongm or the.1t sores! Address CIry SUN Zip Code EXCLUSIVE WARRANTY. THE FOREGOING EXPRESS LIM Apo TIED WARRANTY SUPERCEDES ALL OTHER WARRANTIES Job Number N SNpmem EXPRESS OR IMPLIED.CBM MAKES NO WARRANTY TO ANY PERSONS OTHER THAN PURCHASER OR ENDEJAIC Boddmg� lw�Oal.on Ballkert�s Cosln� Lion/ 5. REMEDY.if any coil panels or xcnsones are found ma to PURCHASER conform to the above EXPRESS LIMITED WARRANTY Is,are, INamel causes covered and during site applicable lemi.CBM will,at its we discretion within slaty(SO,don aft"notice d failure Closer 1501-20th St. NWa ?ili%Erny VA mine no.Sixth.11i are or W reltIred,repau'lls replied. 9800 or dhemise treated are CBM well ainiwn the For uta share sH _ / I �/4- "Is in tne, Idioseng table d Cost d labor am rnmenes Bs Imtrket value)requited 10 cooed the failure. Am wreeA SanNai r d Assignmem Tim 3Elnkers / Presicent VALIDATION. Ered-Usur most validate Mis EXPRESS LIMITED WARRANTY IN ctX PaVolk this room and mailing n to CUSTOM GILT METALS INC P.U.Bm 17'7 Mot WmMmPon 98012.within one 1 ear d the Date of Shrprnont specified above EndUMr should main the canal 1 ono Iw is or his he. �MCO (2061671-3936 September 27, 1988 Serial Letter No. 131 City of Renton Re: Renton Wells 1,2, 6. 3 200 Hill Ave. S. "Slope Seamless Flooring Renton, WA 98055 Away from Electrical Panels" Attention: Ron Olsen Gentlemen: As per our agreement on September 26, 1988 we will build up the seamless flooring in the area of the electrical panel to provide drainage away from the panels as requested. The area, approximately 12 feet X 8 feet, will be built up with resins approximately 3/0 inch along the panel to slope away from the panel area and provide the requested drainage. We have ordered the materials today, which have approximately a 10 day delivery time, and will proceed to complete the work immediately upon receipt of the resin materials. Very truly yours, Frank imhof IHCO GENEPJd CONSTRUCTION, INC. FI/cb cc: Dan Ervin, RH2 Engineers S:P y aids r,,.e, CITY OF RENTON Engineering Dept. W-tAV �w \i 51125.13 (.02i) September 29, 1988 Mr. Frank Imhof IMCO GENERAL CONSTRUCTION 4509 Guide Meridian Bellingham, WA 98226 Subject: City of Renton Wells 1, 2, 3 Rehabilitation and Construction Final Payment Serial ♦155 Dear Frank: The City of Renton is in the process of completing the processing of the final payment for the above-referenced construction contract. Enclosed is a copy of the final payment form for your use. The City cannot release the check for final payment until you complete the remaining work: 1. Complete all punch list items ipunch list attached). 2. Provide a copy of the .1B'idavit of Wages Paid for Banker's Construction and Diamond "B' Plumbing. 3. Provide Prevailing Wage Payment Certification for the month of September, 1988. 4. Pr-- .de Monthly Manpower Utilization Report for the month of September, 1908, for IMCO and Triad Electric. Thank you for your consideration. Please call if you require additional information. Sincerely, � R112 E�GINEEIiIt�V..Ca:.7'S. Daniel R. Enin, P.E. cc: Mr. Ron Olsen, City of Renton Enclosure - Punch list CITY OF RENTON Engineering Dept. 1410 Market Sireet. P.O Box 1 t80.Kirk�and.Washington 98033 t206)827-6400 September 29, 1988 (.027a) CITY OF RENTON WELLS 1-2-3 REHABILITATION AND CONSTRUCTION* PUNCH LIST NO. 5 1. Provide equipment spare parts. 2. Repair/replace floor areas that do not drain. 3. Complete system test. 4. Provide compensation for tree damage. 5. Provide temperature indicators for each motor. 6. Provide general cleanup. 7. Provide a Number 4 finish on the cover for the exterior electrical outlets in the fluoride feed room. 8. Provide touch-up paint per specifications. 9. Provide seven copies of operation and maintenance manuals. 10. Provide as-built data. 11. Revise operation and maintenance manual information to reflect as-built renditions. 12. Remove construction signs and support posts. 13. Provide concrete filler between sidewalk and rockery between loading dock and pool walkway. 14. Remove rust stains from loading dock driveway. 15. Paint driveway gates and remove 'writing" in sidewalk area adjacent to gates. J/IS/Pa ELI, of Aenten - pey ctMnt e/ PYL)lc Mu[Y6 r+ojacl: -ILL NO:. : 2 3 RCIL4YI LirR2lgi MD C911.4TRpCT:Ui c0nt[ou :w.: c.1c 044_0I cool r.0 or: lice piY14NL Nxs:xuc:oN C:oi lrvp O9w: +Ci'T. :5,tl Ir.AAu :9aO 0:D ub;T PFWIW3 runou4 TN34 :1115 TOT.&L DL5Ck:PT:ON GNIT: 06". :O:AL • tk:CE WN:::TY ,WLYI pUAiiIT'[ FNWN- DUAF;::Y ....... rA0:L:4AT:PNi D[2g0)LIEA:SON .. 1 :D,706 BD :U9,564.N 2 SIZE O09A .+ Ilia.14:al; :oo 4::o.106.0 LC. : Ill.53C 50 .10,377.00 S.,13].W :00 J LOOLOCNWJ v:kIL:TILI W' I S:E,9]1 :4O :12,936.00 •V i COSE114TC PAVE Lg • SU.+aD ],-, 0 44.00 100 3)2.936.GG 5 ."l, tlY:W:9W :10,:J5.00 ]O 34,]{{.00 00 S.4.N0.00 LS i 4:971 2;; :N N9i,E15.W 6 T:N:411CG 0 40.N 100::97,233.W 1.5 : : 6. 100 S:c.445.N 0 40.00 > SELL PP "0MOi OF i00 3161f5.O0 L3 ! 480.442 112 100 406.492.0Q 0 4II.oa IN Sa6,442.00 0 rLDOx1DAT:ON 511111 L: 410.750 300 5:4.]i4.O0 O 4S.W 1Q0 ::C,]18.N 0 Cx:AI+(NC cT4:1. 1 :S . 59.454 :00 44.409.04 0 �' '� 100 54,I94.4G 30 4LCROS: SYSTLY 2 40 I 82].Oa 100 :23,0;:.00 • VV 0 40.W IOG 931.O:1.N.i l.LCNAN:CAL L4 ) 61351600 IN 4:35,604.0 •2 LLLc:x:CAL � 0 40.00:)SB.530 1N 5135.601.04 nb:C L4 1 55 4:50.9n1.SO 47,944.50 1Q0 4130.130.N i) HTIC COk:FO:. 121 1 445,119 95 36:,N9.65 , 5 43,257.31 Igo a3.:{].p0 ;+ :.AND"TWI 47.SW :S 31,434.00 tl5 461,24.04'. :1 DvIgL:T)Ok LS 1 SLOW SOQ :7,$60.0 0 .0.10 Go 41.900.00 :00 44,900.00:4 vARx FLCLANAt)Fv :S 1 4E,400 20 :SeO.np OE C4i FOr:NG 43.9$0.00 Ic0 SE.400.00 L: . S3.)80.)3 100 iJ,]90.48 ;G.W 10; 43,360.30 CO3 03 L2LV O`5 L4 • 1'+9,I59.4W 100 149,159.401 J :G.N 100 (:9.1;9.491 CGi -ELL iA4A:i0N w • :595.3 1N i199.]) 0 50.04 Ca LLLCT.ICK 4rcwl 1Go i'v99.D .• • 4$3.0B9.6] !00 420,0]),O O :W.OD 100 :20.80].6]cN 4TAxINc ..,. 1 s),cN.N 1N s3.Dap.aD 9 40.40 Cp1 HALL NYDWr`RS w 1 4660.30 :00 3440.40 u i o.W ICE 431000.40:00 a6a.JD.i:.)..0 c . .s<e.0 :GO 4:..sn iOrsOIL )+0.E6 -• . R.95p.9f 0 G.C.. :Dc 52.050.04 ;0p R.959.96 :J9 1'ILW Q(FI:C TiVC.: L4 : 61,490.16 0 40.0I1 :d0 a:.490.46 Colo Nl:c CLA:. 100 ::,440.44 G i 64.04 0 :0.00 140 40.00 r c0;: JIP,w I'LLs i0D i4.W LS . 42,111.t0 0 S0.00 :00 :1.ar'JD :00 :I,144.-0 ]LOi]:FL SDQ,Etl6.11 •4]u,464.6: .S 4ALC4 iAx A2 tl.:\ 49:u]24.51 460,111.10 45,701.17 473,44).85 :QTAL 3909,430.E9 476,146.IK 5105.1]L.JI NLTAINAN I59 Or :NT4TAL1 :{2,014.J: 4),52E.01 4+i, SO9TOTAL 59f.33 :OLi,]6i Btl $72,624.41 55)'1.990.04 TOTAL PA:D :O JA:E mwuxt II4L ru:4 u:,n:c 44671165.16 4]2.43+.04 II t"t CITY OF RENTON "LL BUILDING & ZONING DEPARTMENT Earl Clymer, Mayor Ronald G. Nelson, Director MEMORANDUM DATE: October 3, 1988 TO: Richard Houghton, Public Works Director FROM: Ken Bindara, Lead Inspector SUBJECT: B-13626 ISSUED FOR CONSTRUCTION OF WELL BUILDING LOCATED AT 99 HOUSER WAY NORTH Dick: We notice that you are now occupying the above mentioned structure. I don't see where a final inspection was ever made or a Certificate of Occupancy issued. If you would please call for a final inspection, we can issued the certificate and clear this matter from the computer. Thanks for your cooperation. CB:plp _ r�il�a1. ✓✓✓✓ �z , , u eo w 1 J�- nIWO eaysr. COB k � . 41, 200 Mill Avenue South• Renton,Washington 99055 • (206) 235-2540 RH2 ENGINEERING, P.S. METT[EM MIF T''M,/A �RZDGwi 0VT"kfL 1410 Market Street P.O. Box 1180 KIRKLAND, WASHINGTON 98033 �w 02 09 89 �5112s.13 (2061 S27-6400 Ron Olsen TO CITY OF RELATOR Wells 1. 2.. 3 200 Mill Avenue South FF FEB 10198a WE ARE SENDING YOU 'X AftOw % Under separate cover via-- twordn`Kama: C3 Shop drawings Pants ❑ Plans € �P{ ❑ $pedhcetiDM ❑ rapy of letter ❑ Change order ❑ conca Deft I m I _wwrnwn 1 Daily Inspection Reports (12/29/87 - 06/15/88), bound THESE ARE TRANSMITTED a checked balm ,r ❑ Few opprowl ❑ Approvm as suDm t ed [ Resubmit—copies Pow approval s 'R For your use ❑ Approved as noted ❑ Submit—CWM tar distrlbWion X As requested ❑ Returned for corrections ❑ Ratum—cDwwacted prnts For review and comment Q FOR BIDS DUE 19_❑ PRINTS RETURNED AFTER LOW TO US REMARKS-----_____ COPY TO_. _. SIGNED: Dan Ervin n�nnr geas . .�r 11.zim.n..ro•or..NM.a..ronry.1 FILE TITLE / • r