HomeMy WebLinkAboutWTR2700904 W-904 Maple Valley Hwy. Extension
,
BEGINNING
i
I
I
I N T E R O F F I C E 4 E Y 0
Tot 4,
DATE: Doc3i jr
FROM: -!5J4 t..-
SUBJECT:
- J� ",e - of Ua..sbd7 �a �y.7til/ I✓rJ7 d
1, Fvlc;ol Jae G-t//
�3
i
1 �y
nu+�elccr+rxx: - u RECEIVED
PUBLIC WO
gKS DEPf,
CITY OF RENTON
avt IX NCWMITI� �7/j,'
DEPARTMENT OF TRANSPORTATION
Oper cl 1)~ ltlnwmvamr • 1) 1 W11 Cww 9ve b. Cll I410 • Wdnb Vloh (m W 100
December 18, 1985
City of Renton
200 Mill Avenue South
Renton, Washington 98055
Attention: Richard Houghton
SR 169 CS 1734
196th S.E./Jones Road to 140th Place S.E.
Milepost 18.72 to Milepost 22.96
City of Renton L-8607
Utility As-Built Plans
Gentlemen:
The Department of Transportation is P p preparing plans for construction impro%emenis
of SR 169. Plans call for widening of the State highway..
It is possible that you have existing facilities within our right-of-way. Enc-
losed is a vicinity map and plan sheet for your information and use. Please re-
turn the plan sheet or a copy of your as-built plans indicating existing faci-
lities in green and your proposed facilities, if any, in red by January 24, 1986.
Contact Mr. Mark Jeseritz, 233-2348, if additional information is needed.
I
�\—Vee�r-y truly yours,
V QMX�
PAUL JOHP.E.
i District Utilities Engineer
MSJ/ss
Enc.
j bcc:
i
�- J
I
' I
�.. p . • -
111
WOOD
1 < ._ , R s NENTpN
f4 RNJ
5 w �
z ' ' K t a c
25
4L 9
S - — J , + 1
• F
.tea-S$
31
Lake
s 41
� s
6 6
:¢tershed
C i D I IEOF
k E
4. 4
_J
qt'
Sri _! E 43 1.
-r--, o-
lif
i urn• -41
4 +yam'.y. 2'i�w.�. .�G
K l N C � '
�Y. 23 3 ��� �, 23 k '30� _� " ; � 29 ' , �
IX
AR OUNTAI
33
_ 36 Y 31/
f y,. ake ' 4<<-...
f x wig 1 -
•
,wwft ��rl'6te7'S/:e ;t m 6
J
J
J ✓�:..p�r..,
�y -� CITY OF RENTON��
PARKS and RECREATION
Barbara Y. Shinpoch, Mayor FyL 4jp. mdi&An�,44pkn E. Webley, Director
y
December 23, 1986 T[.t a-4-3 6--
Washington State :)apartment of Transportation
Mr. Chuck Hathoway
Highway 99, Suite D
Lynnwood, Washington 98036
Dear Chuck:
This is the recap of our meeting on December 11, 1986 at 9:00 a.m. in
the Renton Municipal Building. Departments attending were WSDOT, City of -
i
Renton Traffic Division, Engineering, and the Parks and Recreation Department.
It was my understanding that the DOT needed additional property from the
Renton Parks Department Maplewood Golf Course property for a slope easement.
The area needed was on the southeast section of the golf course adjacent to
I the railroad right-of-way. At this time we discussed the possibility of
i trading said property for various improvements to the highway, proposed trail,
and golf course.
Item (1): We would like the DOT highway design to include the new
relocated entrance road to the golf course at the signalized
intersection of 131st Avenue SE. The renovation of the golf course will
eliminate the existing entrance road and the new road will be off the
13_st Avenue SE intersection. This will provide a safe intersection for
the ingress and egress for golf course traffic. The design change was
made after previous discussions with DOT to facilitate safer traffic
movement by including the entrance into the new traffic signal design.
Item (2): 1 expressed to you the Park Board's concern for some type of
buffering between the highway and the golf course on the southeast
portion between station 1451 + 44.00 to station 1441 + 23.94. This
buffering would be in the nature of landscaping and some type of fence,
i concrete or metal structure to reduce the noise. We are receptive to
vour engineer's design as to material and structure.
I
Item (3): You expressed the DOT would rebuild that portion of trail
where the new construction would be eliminating the existing railroad
bed. Other portions of the proposed trail to be constructed by others.
200 Mill Avenue South-Renton,Washington 98055 -(206)235-2560
I _
I �
WSDOT
Page 2
I
Item (4): We discussed the railroad trestle bridge and you agreed that
the DOT would work up a cost estimate for relocating the bridge to the
north of its present location. It was understood that the relocation of
the bridge would be Part of the negotiations for the property needed by
the DOT for slope easement. previous proposals by DOT included a
pathway from the golf curse uuder the new bridge, over the old one and
onto a pathway east of the riser running underneath both bridges. This
a.:cess would be unnecessary if the trestle were moved at east for golf
course use. "
Item (5): The existing Maplewood str-am location was a concern voiced
by your agency and ours, and tt was agreed that the DOT would
participate in relocating the stream during the DOT construction or with
the City's golf course project. This item also could be part of the
iegotiations for the property needed by DOT.The City would proceed with
a concept design and discuss this idea with the Washington State
Departmer• of Fisheries.
Item (6): We discussed the need for fencing along e..e remainder of the
golf course property to the east. This could possibly be worked .nto
part of the noise barrier.
Item (7): Both agencies agreed on concrete curb, gutters, and sidewalks
along the roadway. During this meeting we discussed the possibility of
a concrete sidewalk behind the Norway Maple trees between stations 1456
+71.02 to 1470 + 52.80 on the southwest side of the golf course. Since
our meeting, I have made a Site visit and there is not sufficient space
for a concrete sidewalk between the maples and new cyclone fence. So at
this time I would like for the DOT to consider- placing the sidewalk to
the south of the trees. My reason for this is that the left turn lane
for the golf course Sa not necessary since the entrance road will be
relocated to 7.31st Avenue SE.
Item (d): We discussed the need for adequate street lighting along the
new construction to 131st Avenue SE and you indicated that lighting was
part of the construction program. When I reviewed the plans from DOT, I
I saw no proposed luminaries from station 1470 + 52.80 to 1451 + 44.00 in
the directlhn west to east along the new highway. The street ligbting
should be extended along the golf course frontage.
WSDOT
Page 3
Item (9): During the meeting I inquired if the need for a F-4 statement
was in order for this project, and the Indication was no. Could your
staff please clarify this so that I can report back to the Penton Park
Board.
Item (10): In addition, the Utilities Department has indicated to our
de .artment that a water main extension be a part of this project from
the Maplewood residential neighborhood east across the Cedar River.
This main extension could possibly be worked into part of the property
negotiations.
In atcenuance: WSDOT - Gar) Kirk, Don Hoffman, John Jones, Chuck Hathoway;
City of Renton Engineering - Bob Bergstrom, Doa Monaghan, Vince Lee; City of
Renton Traffic Division - Gary Norris; City of Renton Parks Department - Sam
Chastain.
Sincerely,
i Sam Chastain
j Parka Superintendent
i!I City of Renton
Attachment: Golf Course Master Plan
cc: John E. Webley
i Richard 9ougnton
vBob Bergstrom
Vince Lce
Don Monaghan
Gary Norris
l �
.,
. � �
k.
��
•�
� TTT
7.: '.
�'
r j.