HomeMy WebLinkAboutWTR2701141(1) W-18 MT. OLIVET 3 MG RESERVOIR WTR-11 1
#2 Corre�,p ,,J ondence ��...�.--���' �----7
�yeF41� ;
EGIN NG
OF FILE
FILE TITLE
woo, I 0 J / �lT •Vtiu�e�'
�Fo2 coRRes(�eNPpnK'F
. .
Cd16tAL CONDITIONS
1. Interpretation of Phrases:
a. 'ahenover the word "City" is used in this contract, it shall be under-
stood to mean the City of Renton.
b. Whenever the word "Engineer" is used it shall be understood as refer-
ring to the City Engineer, or his representative en the job as the case may be.
Whenever the words "directed," "permitted," "considered necessary," or words of
like import are used, it shall be understood that the direction, permission
order, etc. of the Engineer is intendadl similarly, "approval," "satisfactory,"
"acceptable" shall mean approved, satisfactory, or acceptable to the Engineer.
c. The word "contract" will be understood to include all the terms,
stipulations, and covenants contained in the Bid Proposal, General Conditions,
Specifi.cstiors, Plans, and Bond.
d. Whenever the word "Contractor" is used it shall mean the oerson(s),
co-partnership, or corporation who has agreed to perform the work covered by the
contract, or to his legal representative. During the absence of the Contractor,
the job superintendent will be considered to be the Contractor's representative
unless otherwise designated by the Contractor.
II. ?sights and Responsibilities of the Aistriot:
a. Ins ction: It is rnutally agreed that the City, through its agent
the City nn�shZl inspect the work during the construction to determine its
acceptability, conformance tt plans and specifications, quantities of work perform-
ad, and other functions requisite to securing a satisfactory, works, nlike job.
The Contractor shall furnish reasonable aid and assistance as required by
the Engineer, or Inspector, for the proper inspection of the work and measurement
of quantities.
b. Eight of Entry: The City reserves the right to construct or install
:rxh cnliatera work—s—a—TE may desire daring the period of this construction.
Su.h work will be done with as little hindrance or interference as possible with
the Contractor. The Contractor agrees not to interfere with or prevent the perforn-
ar.--s of such work or to claim any extra compensation or damages by delays or hin-
d.an-es which may be caused.
o. Cha a Alterations and .3xtra ',Fork: The Contractor agrees that the
City may make sac: a era ons as 1t may see-1'rL in the line, grade, form, dLrtin-
sions, plan or material of the work either before or after the beginning of con-
struction.
If such alterations diainish the quantity of the work to be done, they
shall not constitute a claim for damages or anticipated profits on the work that
may be dispensed with. If they increase th- omoent of work, such increase shall
be paid for according tc the quantity actually done, and at tts prices established
ter such work under the contract. However, if such changes make useless any work
e_rea$q dons, or material alread;, furnished or used in said work, the Listrlct
rhzll recompense the Contractor therefor.
-1-
General Conditions
Fo work skull be regarded as extra work unless it is ordered in writing by
the Engineer and with the agreed price for the same specified in said order, pro-
vided the price is not otherwise determined by this contract. All claims for extra
unrk shall be made before the work is started, ud a statement of the cost of the
sane shall to made within 30 dgga after completion of the extra work.
d. W.3crepancies and Wcalons:It isfurther agreed that it is the intent
of this co. a —alworx must a ens and all material must be furnished in
accordance with the best practice. In the evert of any discrepancies b. ',ween the
plane and specifications, or otherwise, or in the event of any doubt as to the mean-
ing of any portion of the contract, specifications, or plans, the Engineer shall de-
fine which is intended to apply to the wwk, and the Contractor shall be bound by
such decision.
;ro work or material not hereir. specif' t which may be fairly implied
as included in the contract, of which the Eng.. 11 be the judge, shall be done
or furnished by the Contractor without extra cz_-
c. ]rimated Quantities: Thic agreement, including the plans, specifl-
caticns, and estimate is inte to show clearly all work to be done and material
to be furnished hereunder. The quantities are approximate and are to be used only
as a basis for estimating the probable cost of the work and for comparing the pro-
posals offered for the work. It is understood and agreed that the basis for pay-
ment shall be the actual amount of work done and the material furnished.
f. Lines and Grades: The alignment and grade :hall be as shown on the
plans, and as staked in the rield by the Zngineer. The Contractor —,ill give the
enfineer ample notice of the time and place where the lines and grades will be
nee led. All stakes, marks, etc., shall be carefully preserved by the Contractor.
Securi of Franchises, Eas^.•nents, Rights-cf-_lay: The C'ty for the
purpose a.� a corucon,agrees to secure soon franchises, perdts, easements,
and/or Rights-of-Way as are necessary foi Las permanent locatiun and operation of
the pipe lines. The Contractor s:iall be furnished copies of surh agnesments as
affect construction operations.
the Contractor agrees to secure those special permits, easements, cr agre,-
mants of a temporary nature as may be desirable due to conditions of construction.
h_`at��i�m�a��tea��a��r�dd �F tmmsento: An estimate in writing will be nade tit, the
Fngineor once a mont�n of work done and material furnished, including
aterlal delivered on the ground to be used in the completed work, and of the value
thereof in tsrm3 of the contract. The City will pay the Contractor 85% of this
eotimatei ral.ns, an'. whenever the cantra;t shall b� completed, and when said work
and mata,ial rhall be accepted by the City, a careful and detailed estLrate shall
bw rc.ca of the value of all work And matey-al furnished and the Contractor shall be
paid for this amourt within thirty-five (35) days, provided, however, that claims
for labor and material, darages, royalties, or otherwise have been satisfied.
Far sal and linal payments wi1_' to made in cash.
v
General Conditions
i. Extra Work: If during the performance of this contract the Engineer
steal, order.-other work done or materials furnished which cannot be class-
ified under the unit prices of this contract, the Contractor shall perform such work
and furnish such material and shall be paid therefor the actual cost plus 151 in
addition thereto. The actual cost is defined to include the cost of all labor,
equipment and materials necessary for the performance of the extra work, including
any extra expenses incurred directly on account thereof, and also the wages of fore-
men and the expen3es attached to the Contractor's liavilitY in3uronce covering the
labor so emolo7ed, equipment rental rates used in arriving at the actual cost shall
to the prevailing rats, or th, latcs8 published AGC schedue of ownership
e xpe^.e e.
No additional allowance shall be made for overhead charges, general super-
intendence, general expenses, contingencies, or depreciation of equipment.
M. Rights and Responsibilities of Contractor:
a. Personal ,lttertion of Contractors The Contractor shin give personal
atte.nt:.on to the althfu ps�osecution ar7 mpleti on of this work and shall be
present either in person or by duly authorised representative on the site of the
work continually du •g its progress.
b. C^_ntractor+s Address: The Contractor shall designate in his proposal
on address to w c. yr t en co cos pertaining to this contract may be sent, and
_ : i m,ediately notify the City of any change in such address. imlivery of such
notices to the address designated shall constitute receipt by the Contractor.
c. observance of Laws and Ordinancee: The Contractor shall conform to the
requiremeM,s o e anch sea covering won along State and County highways and to
the State and Local laws pertai-dr,g to this work..
d. Protection against_Meglig=.I,' and Damages: The Contractor agrees dur-
inng the per ormance of t e xcr tot a alI necessary precautions and to place
}roper safeguards for the prevention of accidents, including barriers, lights, aid
ing sign. The contractor shall take proper means to protect property which
nj&t to injured by any process of construction, aril he shall be liable for any
maims for damage, on account of his failure to so do.
Whenever it is necessary in the course of construction to rem.ve or dis-
varb culvsr.s, driveways, roadways, pipe lines, or other existing Laprovements
.-ley shall be replaced to a condition equal to that existin3 before thsy were so
ratnved or disturbed.
Prid3ing shall be provided across private driveways and roadways during
tine -yarlod the trench :oust be open, in such manner as to not constitute a hazard
to t`.s people who use them. All construction operations shall be conducted in c_rh
mane^r as to interfere as little as possible with the normal procedure of traffic.
General Conditions
e. Protection Against Claims for Tabor and Material: The Contractor
agrees that he wiSS irolemni and save harmless tbsCC ty—fFm- all claims for mater-
ial furnished or work done under this rontraot. It is further agreed that he will
furnish the City satisfactory evidence that all persons who have done work or f%u -
nisied material under this agreement have been dully paid for such work or mates:.
In case such evidence is demanded and not furnished, such amount as may do the
opinion of the City be necessary to meet the claims of the persons aforementioned,
may be withheld from the money due the Contractor until satisfactory evidence is
furnished that all liabilities have been fully discharged.
f, Assi nment and Subletting: The Contractor agrees that he will not
sublet the aforesaid work or the furnishing of material, and that he will not assign
by power of attorney or otherwise any portion of said contract unleae by and with
the previous consent of the City. The granting of such consent by the City shall
not in any way relieve the Contractor of his prime responsibility for the performanca
of the work Lneluding the work done by subcontractors.
g. Abandonment: In case the Contractor shall abandon the work and fail,
,or refuse ?o oommence it againwittin 10 days after notification, or if he shall
fail to owply with the orders of the Engineer or with this agreement, then and in
that case the sureties on the bond shall be notified and directed to complete the
Same.
h. Time and Order of Com lP etlon: It is the meaning and intent of this
contract, urless other_ se eras er specifically provided, that the Contractor
shall be allowed to prosecute his work at such times, in such order of precedence,
and in such manner as shall be most conducive to econurw of construction, provided
however, thwt the order and the time of prosecution shall be s•ich that the work
shall be completed as a whole within the time of completion hereafter designated;
provided also that when the City is having other work done, the riginser may direct
tt.e time and manner of constructing the work under this contract so that conflict
will be avoided an. the various works being done shall be harmonised. The Engireer
will arrange all such work so as to avoid as far as Practical all unnecessary in-
com,enience and expense to the parties concerned.
Ext-ension of completion tine will be granted only upon submission of a
roqueet in •. Ming to the Engineer stating the condition necessitating such exten-
srxi, at least two weeks before the expiration of the contract time. Eeterminatioc,
as to whether or not an extension of time shall be granted will be at the discretion:
of the Engirwor, subject to approval by the City.
The Contractor agrees that he will commence the work within days
after the si^yninC of this contract and will progress therewith so than w—i in
days after date of contract the work shall be completed. —�
i. Plans and Specifications Accessible: The Contractor will be furnished
copies of p7—ns ar�spec;lam 'no
o and sha=cep one copy of the same constantly
accessible o; as lob,
'I Protection ql Finished or Partially Finished Work; The Contractor
shall be rsstona .e or a she or psrt1q11y Pints vork until the entire
contrsot is completed and accepted by the rigiaeer. Estimates of partial payment
shall not release Us Contractor from such. raspvnaibility.
_L
Cenral Conditions
k. Defecis and Their Remedies: It is agreed that if the work or any
part thereof, or any material brought cn the ground for use in the work, shall be
d>eaot. by the Engineer as unsuitehle or not in conformity with the specificati-ns,
the Contractor shall forthwith remove auch material and robuild or otherwise n:medy
such work so that it shall be in lull accordance with this contract.
1. Sanitation: Necessary sanitation convergences for the use of workmen
on the So , proper secluded from public observatio,i shall be constructed and
maintained by the Contractor.
m. C'_ean_uP: Before this contract shall be considered complete, the
Contractor 8 �S leave the backfill in trenches _e:el, clean out ditches that may
have been filled during the work, replace damaged surfacing, remove surplus
materials and trash, burn or otherwise dispoee of brush, repair all damages, and
otherwise leave the Sob in a neat, orderly, and workmanlike ecndition.
SPECIFICATIONS
WELDED STEEL WATER STORAGE TANK
1. GENERAL
1.01 Sco a of this Contract
TE s esitract s to ewer the design, fabrication, delivery to site,
erection, testing and painting of a welded steel water reservoir of
3,000,000-gallon capacity. The tank is to be flat bottomed, resting
directly on a prepared grade, and with a standard steel conical roof.
The site provided by the City is located immediately east of the main
bcsiness district. Distance from a rail siding is approximately 1/4 mile.
Water at 100 psi is available within 300 feet.
The grading and preparation of the site, including construction of tank
foundation and :cease road,will be perfcrmed by others prior to delivery
of tank materials.
1.02 Ga••ernln S ecifications
work to be per roamed under this centre:t shall conform to A.W.W.A.
specification D10042 for the construction of steel water tanks, D102-52
for the painting of steel water tanks, or any subsequent modifications
of the same.
1 03 Guarantee
l aTT-onr'actor shall guarantee the structure against any defective
mterials or workmanship, including paint and painting for a period of
one year from date of completion. If any materials or workmanship prove
to be defective within one year they shall forthwith be replaced or
repalzed by the Contractor.
Specifications
2_ MATERIALS
2.01 Quality
The quality of material incorporated in this tank, and used in painting
it shall conform to the apec!.fications of the American Water Works
Aasoci.atfon referred to in . .tion 1.02 and to the reference ASTM specifi-
cations.
3. DgSM11
3.01 Leads
groper provision shall be made in the design of the tank for such dead,
live, snow, wind and eartsquake loads ae the structure is likely to
enccun',er in this location.
3.0' Dimensiors
'wee capcapa'cfty of 3,000,0% gallons is to be obtained with a etructLre not
Vaster than 120 feet in diameter and with a shell height of 37.5 feet
plus or minus 2.5 feet.
3.03 Accessories
+1 ran-role not less than 18 x 22 inches in size shall be located in the
bottom ring of the shell. It shell be covered with a bolted steel plate.
A ladder shall be provided on the outside of the tank, extending from a
point 8 feet above the foundation to the roof. The ladder shall be of
steel, securely fastened to the tank shell. Side members not less than
2 x 5/15 inches and nmgs not less than 5/8-inch round or square bars.
A roof hatch or manhole shall be provided near the outside ladder. Cover
shall be hinged and se-ured by a padlock hasp. A curbing approximately
u Leaches high above the roof surface shall exclude surface water from
the tank. The cover shall lnp over the curb.
,he roof sr..�ll be provided with a ven'c of sufficient size to equalize
pressures inside and outside tha tank at any possible rate of flow. It
shall be screened or so constructed as to effectively exclude birds and
animals.
In addition a stub overflow emending at least 12 inches beyond the
shell and not lose than 12 inr.hes in diameter shall be provided.
A fanged fitting for connection to 16-inch pipe shall be presided it
the tank floor. Top of fitting shall be flush with the floor and a
b inch high, removable silt stop shall be provided.
�•Ju P)rns
Ti(`ontractor will be provided with plans showing the desired location
of th, sper.ified accessories immediately after award of contract. As
coon thereafter as may be fer.sible, the Contractor shall submit to the
Engineer th-ae (3) sets of prints savaing the details cf the propwo,i
construction.
StO�I
rt M. r
we.awIti"tU"
4. CONSTRMTICN
4.01 Oeneral
T=tractor shall provide such ?abor, tools, and equipment as may
be necessary to completely erect th^ tank ready for use.
The City will provide a clear, graded site approsimatoly 180 feet by
300 feet with suitable road access prior to erection of the tank.
The City assumes no liability for damage to property adjacent to the
site.
The Contractor shall provide for delivery of tank material to the site
and for its arrangement and storage thereon..
Welding procedures and welding operators shall have been qualified in
accordance with the American Welding Society's Standard Qualification
Procedure. Reports mid records of er..h qualifying tests, examinations
by a reputable testing agency shall be available on request.
4.02 Preparation of Base
Prior arect—io—nVy the tank Contractor, the City will have graded the
site, installed pipe line connections to the tank vicinity, constructed
an access road, and concrete ring wall foundation, and had a sand
cushion spread uniformly over the base of the tack.
The tank Contractor as, or before, the bottom plates are laid out for
welding shall re-level the sand cushion as necessary to secure uniform
support and a level botton.
4.03 Welding
Fieldassembly shall be done entirely by the shielded electric are
process. Auturatic processes may be used where practicable.
La^ joints, welded on the top side only, shall be used for the bottom
and ro%f plates. Shell plates shall have butt joints.
Any clips, jigs, or lugs welded to the plates for erection purposes
shall be removed without damaging the plates and any porti:n of weld
beads remaining shall be chipped or ground smooth.
Welding procedures and techniques shall be such an to produce sound,
strorg joints with a minimum of distortion and internal stress. Trepanned
plugs shill be cut from important shell seams by the Contractor
sufficient to show the quality of the welds.
4.04 Grouting Base
Xgie-rise to c has been completed and triad up, the sand cushion shall
be removed for a distance of about 12 inches back from the outer edge
of the tan% and replaced with a L1 sard-cement grout. The naterials,
labor and equlpment are to be furnished by the Contractor.
530413
necificatioos
5. TESTING
Upon completion of erection and before painting, the tank shall be
tested for watertightness by filling to the overflow level. Any dbfects
shall be repairea by cutting out the defective welds and re-welding.
The City will furnish water for the test. Upon completion of the test,
the rater stall be drained to waste.
6. SURFACE PREPARATION AND PAINTING
6.u1 F_reparaticn for Painting
tee an atruc�u shapes shall, after fabricating, be cleaned of all
rust and mill sale by the phosphoric acid "pickling" process, or by send
or grit blasting, to bare metal. The latter process may be applied in
the shop or in the field after completion of erection. All surfaces
cleaned shall be painted the same day with a red lead primer cat.
6.02 Interior Paint
surfaces Inside the tank after completion of erection shall be dried,
cleaned, and wire brushed as necessary to remove any rust or other
undesirable material from the surface of the steel and thereafter shall
be covered with three coats of rust inhibitive red lead paint, the
first coat being a patch coat repairing and completing the shop primer
coat. The paint say be applied by brushing or spraying. The Contractor
shall provide ample ventilation and illumination for the safety of the
workmen, reasonable drying time and the securing of good workmanship
and inspection. Succeeding cats of the red lead paint shall be tinted
slightly to help indicate proper coverage.
6.03 Exterior Paint
T es�x e. of surfaces shall be given a patch coat of red lead primer and
two finish cats of an aluminum, or other color, .s may be selected,
exterior paint. If applied by spraying, the Contractor stall select
weather conditions that will not cause drifting of the spray. The
Contractor shall assume all liability for any damage resulting from spray
drift.
7. STERILIZING AND CLEANUP
7.01 Steriliaili
Auer c-o mp etion of interior rainsing and removal of scaffolding and
othe- materials, the interior of tho tank shall be carefully cleaned by
ho":ng down the side walls, roof and roof supports, and flushing out the
bottom. The surfaces shall then, be sterilised by spraying with a water
rolution containing approximately 50 parts per million of available
chlorite. The suggested method is to use a "Cascade Sprayer" or similar
type of sprinkler nozzle, which incorporates an aspirator type of auction,
introducing chlorine solution into the stream of water.
53OW
Spaaifieatlxu
?. STERILIZING LO CLEAUMF (cmi1)
7.02 Cleanu
M completion of the work, tib Contractor shall remove all excess
material, rubbish, and unsightly material, and leave the site in a
neat rendition.
8 .^AYlt6k
Payment for the work u.:der this contract shall be in cash, and will be
made monthly on the basis of ?rogress esthetes mde by the Engineer.
VIC4
THIS AORMIMNT, made and entered into this Qn�'day of
19�, by ari between THE CITY OF RENTON, Washington, a municipal corloration
of the State of Washington, hereinafter referred to as "City" and HANMOSD
(KgrA TANK DIY.)
I.ROH iPDHSS, ! , hereinafter referred to as "Contracts"
W I T N E S S E T H7
1. That the Contractor shall perform within the time stipulated, to-wit;
to corplete construction within one hundred seventy—Y.n'175) calendar days
from date of execution hereof as required by contract, of which this agreement
is a ccmponect part and everything required to be performed, and Contractor
:`all provide and furnish any and all of the labor, materials, tools, equipment,
ceility and transportation services necessary to perform the contract, and
complete same in a workmanlike manner and all the construction work covered by
t!:e contract in connection with the construction and--lam vemen of
A STEM[. WATER RESERVOIR TANK and all the foregoing to
5;=4.ct conformity with the plans and specifications, including any and all
c,dderd,a Issued by the City, with the other documents hereinafter enurerated.
I; is agreed and stipulated that said labor, materials, tools, equipment and
ra-vices shall be furnished and the contract performed and completed under the
direction of and subject to the approval of the City and/or its authorised
representative.
2. The contract entered into by the acceptance of the Contractor's bid
and the signing of this agreement consists of the following documents,all of
which are mmponent parts of said - ntraut and as fully a part thereof as if
b ersin set out in full, and if not attached, as 1f hereto attached:
(a) This agreement
(b) Instruction to bidders
(c) Bid proposal
(d) General conditions
(e) Specificat'ons
f) Nape and plans
(g) Bid
(h) Advertisement for bids
(i) Special contract provisions, if any
3. If the Contractor reuses or fails to prosecute the work or any part
thereof, with such diligence as will insure its completion within the ti w
specified in this contract, or any extension in writing thereof, or fails to
complete said work within svah Use, or if the Cortracton shall be adjudged
a bankrupt, or if he should make a general assignment for the benefit of his
creditors, or if a receiver shall be appointed on account of the Contractor's
insolvency, or if he or any of his sub-contractors should violate any of the
provisions of this contract, the City may than serve written notice upon him
and his surety of its intention to terminate this contract, such notice to
contain the reasons for such intention to terminate the contract, and unless
within ten (10) days after the serving of such notice, such violation or non-
compliance of any provision of the contract shall cease and satisfactory
arrangement for the correction thereof be made, this contract, sha P_, upon
the expiration of said ten (10) day period, cease and determine in every respect.
In the event of ary such termination, the City shall immediately serve writ/en
notice thereof upon the surety and the Contractor aria the surety shall have the
right to take over and perform the contract, provided however that if the surety
within fifteen (15) days after the serving upon 't of such notice of termination
dxs not ps^form the contract or does not commence performance thereof within
bhir�.y (30) days from the date of serving such notice, the City itself may take
rar the work under the contract and prosecute the same to completion by
r.ontract or by any other method it may deem r.dvisr)le, for the account and at
the sole expense of the Contractor, and his surety shall be liable to the City
for any excess test or ether damages occasioned the City thereby, and in such
avant the City may, without liability for so doing, take possession of and
utilize in completing said contract such mmterials, appliances, plants and
ether properties belonging to the Contractor as may be on site of the project
&nd nocessary therefor.
I,, The foregoing provisions are in a5dition to and not in l.ti tatcon of
any ot'ar rights or remedies available to the City.
5. The Contractor shall hiid and save the 'Yty and its officers, agent,
corvante and employees harmless from any and all liability of any nature or
kind, including all cos is and legal expenses, for, or on account of any patented
or unpatentod invention, proce: , article, or appliance manufactured for use
-2-
.
in the performance of the contract, including its use by the City, unlesa
otherwise specifically stipulated in this Contract.
b. kny notice from one party to the other party under the contract shall
be in writing and stall be dated and signed by the party giving such notice or
by its duly authorized representative of suet. party. Any such notice as here-
tofore specified shall be by personal dolivc:y thereof or by depositing same
in the United States Nail, postage prepaid and registered.
7. The Contractor shall commence perfomance of the contract on the
3 day of , 19,t,, and shall complete the full performance of
the contract not later than one hundred seventy-five (175kalendar days from
said date of commencement. For each and every day of delay after the date of
comple eon, it is hereby stipulated and agrm# that a damages to the City
/ /
occ '.oned by said delay will be the sum ire
bb
as /�7 _ 1S/
as liquidated damages for each au oYf day, to be paid by Contractor to
the City.
8. Neither the final certificate of payment nor any pro•islen in the
contract nor partial or entire ura of any installation provided for by this
ce::iract by the City shall constitute an acceptance of work n,t done in accord-
u:ce with the contract or relieve the Contractor of liability in respect to
any express warranties or rei�onsibility for faulty v terial.: or workmanship.
Tim Contractor shall be undo: lee duty to remedy any defects in tt,e work and
;ay for anv damage to other work resulting therefrom which shall apprar within
the period of one (1) year from the date of final acceptance of the work, unless
a lAHrtr perio; is specified. The City will give notice of observed defects
ke „eretofore specified with reasonable promptness after discovery thereof.
9. The Contractor and each sit)-contractor, if any, shall submit to the
City such schedules of quantities and costa, progress schedules, payrolls,
-cport.s, ostimateo, records and mistallaaeoos data pertaining to the contract
a:, may be requested by the City from time to time.
10. The Contractor shall furnish a curaty bond or bonds cs security for
the faithful perfonunee of the contract, including the payment of all persors
performing labor on the construction protect under this contract anu furnis.'rlag
.t_
of materials in connection with this contract. The surety or sureties on
such bond or bonds must be a duly licensed surety company.
11. The total amount of this contract is the sum of sixty nine thousand,
nix Hundred fifty dollars and sixty—six cents ($69a650.66) which includes
state sales tax. Payments will be rade Untn Contractor as speciftod In the
"gerw-al conditlonse of this ccntract.
0 1n,W- S WWEOF, the City bas caused these presents to be signed by
its Mayor and attested by its City Clerk sad the Contractor has hereunto set
his hand and seal the day and year first above w:i+.ten.
CIiT CF �
Mgor
A estCity r
Clerk
/ !F a
contractor
h �1
r.
1rlrfae, hm
een►laneet
Us 1154rbwa boft MwWau that 3w has arcs ani teaeoaO,*
On NwltleMSoae 9110 MS too rack. It in fwtakr a WWA6od ttrt We
60490044W ie to inlliea the aeteriala, labor sad s*llaakat aeoeaatr tar ttr
wakrtrmtlas at a ewulsa pvftj et exano an ogwatrirw aPewifloely ebsaal in
the aPeeitinsttme, —A tact Ow am at the Was ere ieciww in the Priam
40,14 %W**Jfter. eaas*weldr, the undersigned p'Maam and eve" 0 ebderwite
OW sasplKs w werk r hat forth, in the UM WA %t UN Wine gualad as
fbllaw i
Iten tit t* ry AAMt
1. 1 Furnish and asset me 3,OW,OPO-
1Cllaa flat bcttawpd, oaeical roof,
Welded .tool ester tank m foonatlm
l9takldw bP tda cit�T, with soce"ars"
as apaaitiad and tccladlft painting skzjja_w<=
Dinsnalma of took bide Seine Tax 3% id.
Dimstar i6: L TOTAL DID
Haight to overflow _it y
Start of ~Ica M1 be eapeated within gde calendar dye, had we
bwsbg "Vim to oosplete the work witbia oaleadsr dark after ]ate
of Contra,t.
Aetamaa 6atvto ia 'I,, ,, for ty� , Tana to ta.
J
Treasurer of 0it7 , �aoact a ++ the bid above.
Address of Siddert Signal ca{4, ,jofRa if,iPd
L , I
"IF:MAKD E. WOLFF
:.'Y It. LNf.'NGGR IaOe 9Yn•\ *twee au Tn[l w.•« Ne rpx
1 P«oNC MMN pelf
December 6[ 19%
Someone Iron Verkm
P. o. Nam n
Proeop Utah
kttmtiml M:. johoam
Dee. Mr. dohasm:
This ie is reply to year letter of November )Oth mprding
the mbstitmtim of phenolic resin varnlAb for rsc lcadp
lineead oil as the primer cost m tho interior of the Renton
tank.
Since AYM! Specification D-102 is the ,;, miag specification
for this Job, appllortion of a red load, �bmnolic resin var-
nish in aonfora mae with Sectlm 5, L. ) of that mraeification
will be acceptable.
[oars truly.
n. E. Lolfi'
RV.In civil ingireor
WAI.. !U[pLY _.\ - [[W.6[1111.TY[NT YUxICI«nL [M61x[tnINO
tdnwr !a, 195�
Owes, MA r amn
fir,
rubinu+.
.i'i.u'd'St �
P. o. am n
Pro. It4h
1tcs, aid x amop"Lo ANOWA
1 f'v.rr1-A and .r..t am 3 eg
stool weber reservoir, 1m1adift
p.lnaLrg a67,622.00 85 a57.476.70
Lea 15% retained 1 80
a ,6 .
Flue 3% sales tax iM5.Ti
Payment dae eortrxator $50,322.61
A. t. lwltt
Ccneumd tni City Sbg'.n,rr
CITY OF R 1V�T
T O N H1tiG COUNTY, WASri)NG" :)N
.a A. iA/'Ind. YriM1
C•JYpiN\A i OOf.{Tf. iYYiWXb \AL6 W 11pi/ ..p1..IOLW W Wt
WII,tY CJIiUI(.4Yt
w.AiYw L Y1Y.M COYYfILYtY
♦iiMMY
M\LLiM Orr.<n UIYYL.L CW YYO�TI
• tYniO .L1M w w111MM11
CTI[I 01 IWKi MY L NYIIIwRMI
Y[W M. Yg1Y1.
Iln pll V LLIY[I.Y1p
JiJ�NNY•YY iwNt O. •flit
CM' Mr1M\9 .TI\ 'MiMYY1Y1
D1VwJ./O/ V •W\Y.Y1i Y�Yt
rt. nL...[\ dmril. 96 1945 •.. Yov. n
umw� .Lui,Yow
w.wv canY.un
V Jolson, Centel 'renaaw
thew .ron Ww 1
P. co uK Tl
motet Utah.
Peer Sire
Enaloeed pleeee find two CH..'y of Bantca itvnt.ere•
ocieries mama 60 soot oanpens to IYr *otttVwA-1,00C40M
".011M at"l Wteir reservoir. The det/l of aneeptube by tha
City CamoU tab 'WI )e 1955 wl thi YicewmT report bet `.*+os
ma:l led the State of WashlV rem Tax Coro'adseim, Tour oonpw w
Will be eligible for p%jw* of tbo retau)ed pwmntege on
JYee It 1 and WwM eertifteete of nleaee by the Tam CoY-
missiee.
Very truly "mays$
CIT. CP PM.Teg
James L. aft' y Weer
J"itdr
Me,
RF373-55
son OF WaMINGTON - DEPARTMT OF HEALTH
Smith Toyer - Seattle Q, Washington
REPORT ON BACT:,ICLCGICAL EXAMATION OF WATER. SAHPLE
Collected by _ R. W. Publeh Date Collected 4"20'w
Sc,zce of Water_ Well _Owner of Supply C1tT of Rente%
To xr• J. Hiehton, Hater Supt.
Renton We er Department
Renton, Washington 1Date of report 4-26w66
1 a00 ratorr °tint w�arE xyy.r or 1? ml. osnaral
hltak! �anp18 M! port;ws shoeing '.}nCl kf ion! �f not
Collfnnn priori MS. Set i Stu to ry
"Ortlons exatinaa) est oneele unaatlsrael�or,__1
1733 Stc^age Tank (new) 0
1734 Storage Tank (new) 1
Unsatisfactoryt Investigate trouble IUMIATELY, SUB:.IT ADDITIOHAL BAUBLES,
Questionable% Repeated results of this type should ^- coneidercd unsatis-
factory. Investigate trouble and submit additi-nal samples.
If pg portions anov prae0000 of coliforr, organisms the remilt is Satisfactory.
TV meet State Department at Weer to oute"1091CAl %tamers% a moll' water swplr snail confaml to
the rolluwinyy:
Ot all the slsnaaro ten milliliter (rem:.) portions exa.inea Der mante, not mpre than ten (le) per
cent mall snow the presunce Of organlsns of the col harm group.
OCUaionall, three (3) or more of the five iq eelal ten milliliter (tool.) rartions wnstltuting
a SInyle stanaara saiple may sroe the preyue of organises of the coliform ;,ow. pro"aW that
this snail hot be allaxeple If it occurs in conaewtsve semies or :n mare then
(a) Five (a) per cent of the at antra eovles keen tee ty (20) of mro Smoles nave Man r:aexlnu
per month.
(a) One (1) stanaari ample wean lots than teent, (r^) soviet have own ens-rnea per ninth,
the weave exam Mtions fern anae o) the Stets Department of Nall, Laboralor.as in accoratime eith
the latest a*i t,On Of Stewsra Matro'se of water Analysis.
Dapiea to:
Eros Co. Health Dept.
Publio Health Engineer
NORTH AMERICAN INSPECTION & TESTING
G
nos euTe avaaue was
warueec oleo
SEAM.f.].WASHINGTON
Fly"I r Oy SYRCCS"T" S�srr. AM 11winf 1T:aPSCTL01t
PROJECTS ".`leer "Sllicn Gallon tmtor Task
ADDRUSS Renton, 'Aeshington
!M=N�.Ar Richrrd F. Xolff
All playo and etruc'.urel aomters hve bode inspected for site, fit-up
cnd field bolting c.nd velding. Inopeated test plugs vddeh sera out out of tank
abeot. All plugs xro satisfactory except ore out from c t betwoen first erd second
ring horizontal.. This area ran gouged out and revelded satisfactory. A13 dasmgod
structural members were straightened as requested. All demaged plats vme velded,
chipped and ground stasfeetory. The balance of Meld woidtnt; end belting is
satisfectory and in accord All, the approved plena. lnspeetd vacuum teat:n4
periodically on bottom. 111 Teldir:g perfore.ed by City of Seattle Certified Relders.
':.itneseed testing of three (3; welders who were not eertif:d. 7"clderv,
revsmn and Schnoid5r fail-d in .n:.s toet crd sere rot parmittd to weld on task.
Inspected the proprrati.`, a+.xing cad plccing of dry-pack undar task
bottom periodically. This work vas porforued satisfactory red in accord vdth the
approved plans.
R`"up=TrULLY ruBvTT1 D,
NOIC7i (Gt%R/I�QA/V INNSPECTT'ION�}
/ NG
& TTzSTI
bert O. Rathbun f�
INVOICE •
HAMMOND IRON WORKS
9 4 KEYES TANK DIVISION
R" N.— Sisth S.oh And F,% EAif
Te1Ms6ans 6106—►.O.In 71—Tw..3S
MOVO, UTAH c,t N __
ah
ram__ ---- — -- Cod. :,:..
Jab No__'- '
CUANTM --y_DESCRIPTION—�UNIT COST OMNSION TOTAL
I
I
II
Au
. .s�`'' � c.ral♦nooeee'•.«oe-oTeN�
W.++.Y.Xe Nllip 1,KMY OT W.NIi
u+N,«ew.n.XuwY+. R O. BOX TI- PROV O, UTA�
IIN)�O.UT.X.Mt.C1eKO,WrOYiMO T[I[TIPE PROVO 366 TFICIN0NE ..06
April 28, 1955
Mr. Richard E. Wolff
1506 Smith Tower
Seattle 9 , Washington
Dear Mr. Wolff:
Re: City 4 Renton, Washington
Water Reservoir - Our Job F-171
We have attacaed our invoice covering complet.on of
erection of the 3,000,000 gallon reservoir at Renton,
Washington , together with our contractor's affidavit.
We wish to thank you for this order and if anything
further is required before our invoice can be placed
in line for payment we will appreciate your advising.
Very truly yours,
IDIMMOND IRON WORKS
Keyes Tank fjDi,viiss/iion
LJ:nik Lester Johnson,
Attachments General Manager
Steel Plate Yahricaton and 6rectors
RICHARO E. WOLFF
'f"J°-d
IEN SMRH TOWER • SEATTLE 4,WASH.
MAIN 0w
ark Im
2mttaft
P. a I= Tl
ftop% 00
i ;urrtah and .awe rlr J►NIyMD p12ao ERsaI Ik►Eflt.OD
UAW arratrds, Lubmaim pa*4m
3% etita a" TAM s.00Q�.6S
TSUI&M 30 rr�eai W.
650.66
lnaa ")p
mm plum M '
kt 05 M.L N..w w. .M..M. $lr
I �by asttuy thM we dommo e d sass rmp2agad In sesallora
EAM pun ad rpol3:mleam r , Met tb *am rmtlm tr
ofalaet ttr rrrtisArf that the m M ertstm♦ (UQ,243.3O) to pt1.
C.ree:ad lm . ow grgtmw
STAI'EMENi •
NEYES 1ANN 0!VlSfON
H."WOND IRON WORKS
$IETN SOUTH AND NAM NST
>.O.sox>h IMONE uU
ROVO, UTAM
a.
MAY
e:ry ur NeNTON
�ZKIJpS, WASHINGTON
L J
WRWARO �
� is,aza.ns
i
i
i
i
i
I
WT AMOUNT IN MANGE COLUMN I$AMOUNT TOO OWE
• • CI,\IL ADDt LLNMi wOnD{,tN11
._.._._.1..we
RPNT\
W wPw(N wND M,\{O L,KMMD{WwM,/.
a,PM,N1.0 CAlA4 Nw P O. m0% Ol 5 OVO,rELI ON
wwOVO Y{wN wNO Cw9PLN.a.O,u NO {LLL{TP[ NNOVO JDl {[�L PnONE� v
June 7, 1955
City of Renton
Renton, Washington
Attention of Br. James L. Nighton, City Engineer
Gentlemen:
Thank you for your letter of April 9, enclosing two
City of Renton vouchers covering payments due us in
accordance with our contract for 3,000,000 gallon
steel reservoir.
We are returning voucher for $10,143.30 (retained
percentage) and voucher for $9,184.75 (final esti-
mate) , which have been properly signed and notarized.
Very truly yours,
HAMMOND IRON WORKS
Keyes Tank Division
NOW:mk N. O. Williams
Enclosures
Steel Plate _7ahricators and Erectors
w11e.wJu{ 3Wwtf.arlMw tiut w a rw(i Was{
Me{V dIWM.•4Yr•
A.r»w l Y.VMw a.M.1/w MF
♦TY{.Ih fie{....w.A.Y.iMF
a w i.wnu .Hle i,rw{
er» MIYM »il A wi+i
64W M Wei+( .a�4 IIIIIOY.W
.M 64'Y 4M..t. .R(NMSOw
a ft
{It]{IIIW YF{HYY.Y«
«.», .... buy S► 1�k .�.,. wY...
6rw . wuwY..
6aauald :l'd h'arka
Pro►o► 'tab,
1 Untlent 'R. 8. Cs T=i&aa
aeaa• 6's�
*O -a: W yaur letter of Jaw 208 17rO rs
fitrl PV+'Aftt aA r' eretreet Witt: the City of 9Wntn► p1a67»
be inforud as fallemi The City Clark tas skim$ #0 that ae
»tarn has bWu rsneiwd fret tba Rate Tat C*wAs tim aR yoer
release. 1 have Writtse the Tat comkieedsa r U" W mw to
mp"its this tvaeet in tM anent of ftO'VW'X1 dv rw
cc►a+ap.
Far7 UNIT 7aa'Ws
CTTT or RSPTf(
L. HightaN city.
Jtnldr
1`1 l O LING COUNTY. WAt&kflm ?Qx
DOIIOMIM• qt •. M41}rM. IMwM
OOMtTT,IiYMY Nlc. W I sift. M.•MM IaMI
WlaaT MaOa.Mib\
tiWt•,.NWM.
♦TtYM[t MYw'1Ularr
• tMO I.•4Tft tMW W.Ar u.r1t t.
Ri,�aa x/Ittt Mal F•tYtt
tMf II.L16 C4iY i4.ulKF
NM t.talallW
Cnr[/pt I.p,rcY MT •,rOYM�4,
♦:l ty� vA•M.wpN
faY MIV �YAI F MIO
Y�]M 1\WtM yl A MMtIMYN
MIA MItM WM4�Yrl1
OiM 1,tV•M �� r+ �,i% •AW TMYMY
trM. M YN'fr•s .y TOr4l 4 .Inr9
nnr.a, utT..w•
M ••T�• Faux
we.n anwarww
3tete of W�ta1t ;Suc (1>telsetoe
Attwtica V, J&* d. Giloeri., Aad:tor
Dear Sir#
L 'Am or, file a sofa of the rbw.*1 wRetue of
C04t*�m of T-dhUe V&4m C',et C4. for Famed Taae Morho
PrOv�%� Otah rhiCh ra waled the Statll ?at rA.rlsaion on 4
6M 195r. 73w City tlFrk Lu infornrd as fl cetaarn oa
thin r*M tro :60n re¢eiwd lay his offltt yOe F1/eN
*driC» m on this aettor is ardor to p*@Ok . ab •he raLAN
of the Caet"Ottart
Very ti yours$
CFAT RINTOr
,ILN�dr
i
ra m..�ewawis
ta..r.. ..t-a.
DISBURSING OMCE[t Reg. No.__�_ 'M
Tax Commission of the State of Washington
Contrac[cr.
PWC N° 9833
iia�asa iron Works
P. Co. Not 'A, 1
pf^O' Certificate of Payment of State Excise
j
Taxes on Public Warks Contract
We hereby certify that taxes, increases and penalties due from the above named con-
tractor under Chapter 160, Laws at 1935, as amended,have been paid in full or provided for
with respect to the following public works contract: IUELIs t and arast aaa 3,WO,(Gd-.galiaa
atwl aaur ta"A 01V aC AgAU46
This certificate is issued pursuant to the provisions of RCW 82.32.250 (Section 204-A,
Chapter 160, Laws of 1935, as amended), for the sole purpose of informing the state, county,
or municipal officer charged with the duty of disbursing or authorizing the payment of public
funds to said contractor that the Tax Commission hereby releases its lien on the retained per-
centage which is provided by RCW 60.20.010 for Excise Taxes due from said contractor.
This certificate does nct release said contractor from liability for additional tax which
may be later determined to be due with respect to the above mentioned contract.
Dated at Olympia,Washington, J44 is 1933
TAX COMMISSION OF THE STATE OF WASHINGTON
4/00 c
40W' i CertilYbip U!ice,
i Jack J. Gilbert, AWitar
rxia.onnrnu a. WVLr r
CIVIL INGINiaa IaOa }NI\N TOWtl1 • aa1)Tl•a,W,.•NINa\OM
}NONa, MA.N ONa♦
Mr. James H'gbton, City Enginssr
City Hall
Renton, Wash In Kton
Dear Jinr
Attached is an airmail letter received today from Hammond
Ircn Works in which they request a 40.day extension of
time due to delays caused by rvany weather. I am forward-
ing this to ycu for whatever action you wish to take.
The tank contract was signed August 30, 1954, with stipulated
completion tine of 175 calendar days, which would be
February 21, :.955. 0n November 30, 19549 I wrote a letter
to Hammond in which I informed them that the site was com-
pleted suific_ently to receive materials at any tiara, and
that erection could begin within ten days. 1'ne steel for
the tank started arriving Jav,uary lf, 1955, and erection
was started on January 24, 1955. The weather since has been
unusually favorable with not more than four or five days
lost since on th• , sormmt..
The extension of time, th-sfora, need not, be grained on the
basis as requested nor on the bas.a that site preparation
caused any delay. Regarding the question. as to the availa-
bility of water for testing, it, of course, is available at
any time.
Anotner consideration is the fact that the fence Stem on
Malaspina's contract and the 15% hold back are being delayed
until the tank is completed.
My expense for inspection is, of course, greater, due to the
delayed completion. However, I leave the question of the
time extension to you and the Council for decision.
Yours £rely,
REW:1 Richard E. Wolff
Encl.
Wa.ae}u.ar aawaea sewaea VaaRaerwa wu Nicou Z:j
wr. 3404 too
nu Nos
,otitis of (AwoLtim of Po1/:ie Works Contract
Too Ramise Tu Division DAtA1 vA}' 01 19"
Aadit S"Mm
Ya Carsiaaim
01YI4UR Washington Do Net Use
°rau Asrignel Too
Date Awiiiwdl
P. W. C. Datedo
Late of Clatne
^lentle" Po
r!otioe is hambv riven relative^ to the reoopletion of contrut or pro,,"t
described belovt II
fieseription of Co zwt aF....,;at, ._J a.e.� a«s �.ee.•ee �.1�•« iN.� w.�. �r�
Contractor', % ma 1 FI..•....,._J 1.-•., Ml.«ks
Contractor'* Address . D,a, 3.K •11 rev u�.4
Date Work Comanoed o .).......j 24, t,)SS'
Date Work CwCastod o M.g %, o-DST Mato do•k Accepted a M%y d 1955
r
",,rety or :IondlM Coospany o U.;.4eJ P..,4 1«, ,,...e C..,,T..,l
Ageoit's Address ws14e. De«k 0-11J,:.� 3.1� L.{oe e.41 1,Q4.l
Contract Awmat o L Gl�Gxl.00 kxmt 1, *bursed 1 r5l,41910
Additions o N•«• Atwtmt i:ntainod o 1e, 14].30
Sale@Tax o 2et.y. Sc. 'otal o Gl,Gx2.oe
Total 1 443,Gfo.Gr.
1
:.tt. Clerk
TWO COPIES 0!. THIS N(TIC. „, nx CR.'U11. `.'L, rr: ' nsEINO
!ri?1C42t A'i LQ) TAX
'."iMtATM.E AP"r!t ACC,PTAMI 2:' TM MR '1;:F T I:' UO :ion T.
• CAelZ 1DDD[(9 MANOWC-.1W
JIVAiVLAITAI
NAeap AND a%.erD,KNMblvAnlA
tlaedenw,A,AMNA P. O. m0% 71-PN0 VO, UTAM
rovo.lRAn Ane CA(Kw,VrDNrne eeovo Dee *(wwo N(A
:ume 20, 1955
Jity of Renton
Renton, Washington
Attent.inr: Mr. J.L. Highton,
::ity Engineer
Rae rinrl Payment for contract.
Steel Hater Reservoir for
City of Renton,
f,mutlemon9
wo hive ,your letter of April ? whiih states that
we vould be eligible for final rnvment on reference
contract on .tune 5, 1955.
We wvs complied in all respecte with the tax laws
of the State of Washington fcr this contract and are
wondering if you here raceived final release from the
Tax Commission.
We wnuld an^reriaU knovine when we my expect
final oavment.
Very truly yours,
HAMMCNP IE('N I.QRRS
Keyes Tank 111001on
N.O. Wi111ams
Steel Platt, yahrn•ators and f rectors
... ,.. .. ,,.. •. • (eu.t PaWfml l,tww.L,ar
M.N..
rued.M MaM(.KNwF.vNNu
MPP,MNu,1LLAeNyN P. O. ®O% 91-PROVO, UTAH
.IOYO,VIIN%NY GI,LKP.N+IM,NO ♦(r (1Y"( PNOVO458'rLILnYON(� RLN�W
July 5, 1955
City of Renton
Renton, Washington
Att>rtion: sir. J.L. Pi>hton,
".sty Engineer
Subjects Final Paymnt for contract.
for atewl water reservoir
for City of Renton.
Gent lemens
he have just received a envy of " Art.'ficate of
Payerat of State Sxoise Saxes on Pudic Workn „ontract",
PWc R'. 9833.
Wn are ettachine triplloate copy for vmr Information.
'do creeume this release All clear the way for final aay-
+aant, of suh'ect omtrnct..
P1e3so advise if any further information is Mednd
by yiur office.
Very truly ynur3,
"WM1N0 :4'''h N,.:F(
Steel Plate Jahri<ators and erectors
bJrt�ll SEq G �r+�•
QF FIL
FILE TITLE.
a �HKr #Ytf
*a GORge Sf%V&Ak2