Loading...
HomeMy WebLinkAboutWTR2701766 BEGINNING OF FILE FILE TITLE w 4r ?I j i� � k yy 'v W A 3�. R P r-• Sao- � �'�sLt �1 x r � k 'RI ,l •• AW 'h 'jr *t.i '`� rYy rjj } 'ry -aR1 •!. r°�`' ., .!� •` �rR.,r .` -_ V "4 a .. 9" er.,�ip' �aa,✓•"5 ,ry r '� h """trr OF RED � T PUBLIC WORKS DEPARTMENT DESIGN/UTILITY ENGINEERING 0 235-2631 x MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON,WASH.98055 9e b 0 ,91 Tf0 SEPIcoe BARBARA Y. SHINPOCH MAYOR June 10, 1986 FIRST CITY DEVELOPMENTS CORP. 800 Fifth Avenue Suite 4170 Seattle, Washington 98104 Attention: Barbara E. Moss, Director of Planning Subject: Sewer and Water Development Charges • BLACK RIVER TECHNOLOGY PARK Dear Barbara: The City can segregate the area into development phases. What will be required would be to have your engineers prepare an overall map of the Black River Technology Park, dividing it into the phases that you would like to have so that we can make a permanent record of the whole project area. If you have any questions about this, please contact myself, Ron Olsen, Utility Engineering, at 235-2631. Very truly yours, Ronald L. Olsen, Utility Engineering :mf 11L l 14 1 I FIRST CITY/ SCHUMAN May 30, 1986 Mr. Robert Bergstrom CITY OF RENTON 200 MITI Ave. S. Renton, WA 98055 Re: Sewer and Water Development Charges BLACK RIVER TECHNOLOGY PARK Dear Bob, I noticed in the utility engineering comments on the staff report to the Hearing Examiner for the grading permit on the Black River property that the sewer and water system development charges are based on 40 per square foot and have been charged against the entire site. I am writing to request that we establish a phase-by-phase basis on which these fees would he charged so that MY costs associated with the building of each phase will be paid only as 1 develop each phase. Specifically, on my grading permit for Black River, Ron Olson indicated 40 per square foot water charges based on 50 acres (entire site), coming to $87,120. An identical fee is charged for the sewer charges on the entire property. 7 he first phase of development on the Black River property is to accommodate a lease with ADMAC. 1 have attached legal descriptions of areas for the ADMAC site, including the area for Naches to the cul-de-sac and two landscape buffer areas. The site area being segregated for their parcel is 277,674 s.f. At 40 per square foot, the ADMAC water fee would be $11,106.96 and the sewer fee would be $11,106.96. Bob, if we could work out an agreement whereby FCDC pays on a phase-by-phase basis calculated on land area, it would he a great help to me. Please consider my request and get back to me with your recommendation. Warm Regards, FIRST CITY DEVELOPMENTS CORP. Ac&u e, Barbara E. Moss Director of Planning cc: Elliott Severson 800 Fifth Avenue Suite 4170 Sepnte,Washington 98104 1206)624 9223 f*of Fstate De *)prre±nt and Inveshntods RUSH, ROED& HITCHINGS, INc. BLACK RIVER CORPORATE PARK ADMAC PHASE I• THAT PORTION OF THE SOUTHEAST QUARTER OF SECTION 13, TOWNSHIP 23 NORTH, RANGE 4 EAST, W.M., KING COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: COMMENCING AT THE INTERSECTION OF THE EAST LINE OF SAID SUBDIVISION WITH THE NORTH LINE OF THE SOUTH 650.00 FEET THEREOF, SAID NORTH LINE BEING ALSO THE NORT❑ LINE OF WASHINGTON TECHNICAL I CENTER AS RECORDED IN VOLUME 122 OF PLATS, PAGES 98 THROUGH 102, RECORDS OF SAID COUNTY; THENCE NORTH 88"15'00" WEST ALONG SAID NORTH LINE 1596.S0 FEET; THENCE NORTH 1°45'00" EAST 50.00 FEET TO THE TRUE POINT OF BEGINNING; THENCE NORTH 1°45'00" EAST 175.00 FEET; THENCE ON A CURVE TO THE LEFT WITH A RADIUS OF 1150.00 FEET A DISTANCE OF 165.57 FEET; THENCE SOUTH 88'15'00" EAST 549.79 FEET TO THE. SOUTHWESTERLY LINE OF THE BURLINGTON NORTHERN RAILROAD RIGHT-OF-WAY; THENCE SOUTHEASTERLY ALONG SAID SOUTHWESTERLY LINE 8.52 FEET; THENCE. SOUTH 1045'00" WEST 290.11 � FEET; THENCE SOUTH 58°15'00" EAST 70.42 FEET TO A POINT ON THE j NORTH LINE OF THE SOUTH 710.00 FEET OF SAID SUBDIVISION; THENCE SOUTH 1°45'00" WEST 10.00 FEET; THENCE NORTH 88°15'00" WEST 605.98 FEET TO THE TRUE POINT OF BEGINNING, CONTAINING 187,619 SQUARE FEET FOR 4.3072 ACRES. (NOTE: THIS DESCRIPTION IS NOT A LEGAL SEGREGATION) FIRST CITY/SCHUMAN BLACK RIVER CORPORATE PARK ADMAC SITE BRH JOB NO. 85235.07 MAY 14 , 1986 ALH/SURV. DISK 8 ppQ� ~w `y�Y ti c _ Z f IST ��AI lnNO SJn,ll M r , BUSH, HOED& HITCHINGS. INC. BLACK RIVER CORPORATE PARK# ADMAC PHASE II: THAT PORTION OF THE SOUTHEAST QUARTER OF SECTION 13, TOWNSHIP 23 NORTH, P.ANGE 4 EAST, W.M., KING COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: COMMENCING AT THE INTERSECTION OF THE EAST LINE OF SAID SUBDIVISION WITH THE NORTH LINE OF THE SOUTH 650.00 FEET THEREOF, SAID NORTH LINE BEING ALSO THE NORTH LINE OF WASHINGTON TECHNICAL CENTER AS RECORDED IN VOLUME 122 OF PLATS, PAGES 98 THROUGH 102, RECORDS OF SAID COUNTY; THENCE NORTH 88015'00" WEST ALONG SAID NORTH LINE 1596.50 FEET; THENCE NORTH 1045'00" EAST 225.00 FEET; THENCE ON A CURVE TO THE LEFT WITH A RADIUS OF 1150.00 FEET A DISTANCE OF 165.57 FEET TO THE TRUE POINT OF BEGINNING: THENCE CONTINUING ON SAID CURVE 116.83 FEET; THENCE NORTH 61-45'00" EAST 330.39 FEET TO THE SOUTHWESTERLY LINE OF THE BURLINGTON NORTHERN RAILROAD RIGHT-OF-WAY; THENCE SOUTH 37635'03" EAST ALONG SAID SOUTHWESTERLY LINE 103.38 FEET; THENCE ON A CURVE TO THE LEFT WITH A RADIUS OF 1005.57 FEET AND ON SAID SOUTHWESTERLY LINE 296.84 FEET TO A POINT WHICH BEARS SOUTH 88015'00" EAST FROM THE TRUE POINT OF BEGINNING; THENCE NORTH 88"15'00" WEST41849.79 FEET TO THE TRUE POINP OF BEGINNING, CONTAINING 90,567 SQUARE FEET 2.0791 ACRES. FOR (NOTE: THIS DESCRIPTION IS NOT A LEGAL SEGREGATIO:) FIRST CITY/SCHUMAN BLACK RIVER CORPORATE PARK ADMAC SITE BRH JOB NO. 85235.07 MAY 14, 1986 ALH/SURV, DISK 8 r,,,TQi Fws. i ,, �10 2441 "'77 BUSH. ROED& HITCHINGS, INC. LANDSCAPE BUFFER NO. 1, SOUTH OF ADMAC PHASE I: THAT PORTION OF THE SOUTHEAST QUARTER OF SECTION 13, TOWNSHIP 23 NORTH, RANGE 4 EAST, W.M., KING COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: COMMENCING AT THE INTERSECTION OF THE EAST LINE OF SAID SUBDIVISION WITH THE NORTH LINE OF THE SOUTH 650.00 FEET THEREOF, SAID NORTH LINE BEING ALSO THE NORTH LINE OF WASHINGTON TECHNICAL CENTER AS RECORDED IN VOLUME 122 OF PLATS, PAGES 98 THROUGH 102, RECORDS OF SAID COUNTY) THENCE NORTH 88`15'00" WEST ALONG SAID NORTH LINE 990.52 FEET TO THE TRUE POINT OF BEGINNING; THENCE NORTH 88015'00" WEST NLONG SAID NORTH LINE 605.98 FEET; THENCE NORTH 1045'00" EAST 50.00 FEET; THENCE SOUTH 88°15'00" EAST 605.98 FEET; THENCE SOUTH 1045'00" WEST 50.00 FEET TO THE TRUE POINT OF BEGINNING, CONTAINING 30,299 SQUARE FEET FOR 0.6956 ACRES. (NOTE: THIS DESCRIPTION IS NOT A LEGAL SEGREGATION) FIRST CITY/SCHUMAN BLACK RIVER CORPORATE PARK ADMAC SITE BRII JOB NO. 85235.07 MAY 14, 1986 ALH/SURV. DISK 8 110 f ZQ =. f r+ �C• i e Z Fi BUSH. RCED & HITCHINGS. Uac. BLACK RIVER CORPORATE PARR BUFFER NO. 2, SOUTHEAST OF ADMAC: THAT PORTION OF THE SOUTHEAST QUARTER OF SECTION 13, TOWNSHIP 23 NORTH, RANGE 4 EAST, W.M., KING COUNTY, WASHINGTON, DESCRIBED AS FOLLOWS: COMMENCING AT THE INTERSECTION OF THE EAST LINE OF SAID SUBDIVISION WITH THE NORTH LINE OF THE SOUTH 650.00 FEET THEREOF, SAID NORTH LINE BEING ALSO THE NORTH LINE OF WASHINGTON TECHNICAL CENTER AS RECORDED IN VOLUME 112 OF PLATS, PAGES 98 THROUGH 102, RECORDS OF SAID COUNTY; THENCE NORTH 88"15100" WEST ALONG SAID NORTH LINE 856.35 FEET TO THE WEST LINE OF POWELL AVENUE SOUTHWEST AS SHOWN ON SAID PLAT AND THE TRUE POINT OF BEGINNING; THENCE NORTH 88015'0L" WEST ALONG SAID NORTH LINE 134.17 FEET; THENCE NORTH 1°45'00" EAST 50.00 FEET; THENCE SOUTH 88"15'00" EAST 134.17 FEET; THENCE SOUTH 1045'00" WESP 50.00 FEET TO THE TRUE POINT OF BEGINNING, CONTAINING 6,708 SQUARE FEET FOR 0.1540 ACRES. (NOTE: THIS DESCRIPTION IS NOT A LEGAL SEGREGATION) FIRST CITY/SCHUMAN BLACK RIVER CORPORATE PARK ADMAC SITE BRH JOB NO. 85235.07 MAY 14, 19A6 ALH/SURV. DISK 8 ,toe VR 1.P.l r` �'Pp i0f ASy1 \ Its 2 AAl lA„U ��1 BUSH, ROED& HITCHINGS. INc. BLACK RIVER CORPORATE PARK, ACCESS ROAD WEST OF ADMAC (NACHES AVENUE SOUTHWEST) THAT PORTION OF THE SOUTHEAST QUARTER OF SECTION 13, TOWNSHIP 23, RANGE 4 EAST, W.M., KING COUNTY, WASHINGTON, LYING WITHIN 30.00 FEET ON EACH SIDE OF THE FOLLOWING DESCRIBED CENTERLINE: COMMENCING AT THE INTERSECTION OF THE EAST LINE OF SAID SUBDIVISION WITH THE NORTH LINE OF THE SOUTH 650.00 FEET THEREOF, SAID NORTH LINE PEING ALSO THE NORTH LINE OF WASHINGTON TECHNICAL CENTER AS RECORDED IN VOLUME 122 OF PLATS, PAGES 98 THROUGH 102, RECORDS OF SAID COUNTY; THENCE NORTH 88015'00" WEST ALONG SAID NORTH LINE 1626.50 FEET TO THE TRUE POINT OF BEGINNING; THENCE i NORTH 1°45'00" EAST 225.00 FEET; THENCE ON A CURVE TO THE LEFT k WITH A RADIUS OF 1120.00 FEET A DISTANCE OF 275.03 FEET; THENCE NORTH 12°19'12" WEST 253.20 FEF ; THENCE ON A CJRVE TO THE LEFT WITH A RAVIU. OF 600.00 FEET A )ISTANCE OF 46.77 FEET TO POINT "A" AND T, 5 END OF SAID CENTERLINE, ALSO THAT PORTION OF SAID SUBDIVISION NOT HERE BEFORE DESCRIBED LYING WITHIN 50.00 FEET OF SAID POINT "A", CONTAINING 53,048 SQUARE FEET FOR 1.2178 ACRES. (NOTE,: THIS DESCRIPTION IS NOT A LEGAL SEGREGATION) FIRST CITY/SCHUMAN BLACK RIVER CORPORATE PARK AD14AC SITE BRH JOB NO. 85235.07 MAY 14, 1986 ALH/SURV. DISK 8 (�w`SLH, 4 1� a V � TEQED `o r� JQ r '0�<1 lMU S ir' BUSH, ROED 3 HITCHINGS, INC., P.S. F/¢ST C/T✓/ staurJ4i/ CIVIL ENGINEERS L LAND SURVEYORS 40M4C .SITE 40 SEATTLE.WASHNGTON 3a,w �d u Ql4CK Qmex fo4Io.P4TFP.�aK \%N QC// Mp 8sr1S- 07 M4✓ /.�/ /9 g j Z Tft ♦�� 6 D E p - f f o o s ID o¢ }\ `t a OHi4SEZr .9 "o P ? t r +� b. — — — poo •i� le /OOS.1T 1 �, -4.D. Iln fYO e.rfin.r /li fa I ds O't9.D/. VD 79 vq nIp 1 o c � tio, PHASE 1 Jo Ja0' `M I DO I 'y y $ o 0 I iW ] �I tQ v!I'iBeo'w bas9s Z o � N I )e jD LA/✓OSC4/E 9u«EZ A/o. / Qv� Nv2 Li Brs.sr b os. ye _ r- /✓. BBS B/ '00" N/. _-c 00 M 410 TECNNJCAL ChWTfR 7 ZA6j B opoiweLL i I OF Rat. Act! i u �A TEST� ,�. ° PUBLIC WORKS DEPARTMENT _ DESIGN/UTILITY ENGINEERING 0 235-2631 n MUNICIPAL BUILDING I-U MILL AVE.SO. RENTON.WASH.68055 ' P ,TF b D SEPT S SARFQRA Y. SHINPOCH MAYOR September 29, 1986 FIRST CITY EQUITIES 800 - 5th Avenue Suite 4170 Seattle, Washington 98104 Attention: Barbara Moss SUBJECTI BLACK RIVER UTILITY EASEMENT Dear Barbara: Thank you for yuur letter of September 22 regarding the proposed easement for your ADMAC water utility easement. We have reviewed your propose) . nd have some problems with the language, which precludes us from accepting Its form. I. Our easement rights must be permanent, not a temporary easement. I was hoping you would come up with some language to modify the location rather than our present policy of vacation of old easements, and granting of new easement rights, at the time of a utility relocation. 2. The FCE hold-harmless clauses probably will not be acceptable by the City Attorney. So paragraph'. 2, 3, 40 5 and 6, will be a problem. Thank you for the opportunity to revlr. the proposal, however, unless there Is considerable change, our Department will not be able to recommend approval. I have attached a copy of our standard form for your use. Very truly yours, Robert E. Bergstrom, P.E. Engineering Supervisor A1.01.16:mf Attachment I FIRST CITY srr z s uses September 22, 1986 EQUITIES Mr. Bob Bergstrom CITY OF RENTON Public Works Department Municipal Bldg. 200 Mill Avenue So. Renton, WA 98055 RE: ADMAC 8" Water Line Temporary Easement BLACKRIVER CORPORATE PARK Dear Bob: As we have discussed, the ADMAC building will require an onsite 8" water line to serve Phase I of their building. Eventually, they may wish to expand their facil4ties into a Phase II building whici. would fall over the proposed 8" water line presently being designed for the Phase I facility. At that time we would have to abandon the 8" line and replace it with a 10" line to accomodate the expansion area. In order to avoid creating a permanent easement for the 8" line which is likely to be vacated in the future, First City Equities is pr.1posing we enter into an easement agreement with the City of Renton which would automatically allow for the termination of the 8" line easement when it is replaced with a 10" line. (See paragraph 8 of attached form of agreement. ) Bob, I aovld appreciate your reviewing the enclosed agreement for its application to the ADMAC property. If your city attorney approves the use of the agreement or some revised form, it would save us the future problem of having to go through a lengthy vacation procedure to eliminate the 8" line. i 800 Eitth, je Suite 4170 Seanle,Washington 98104 (206)624 9223 Red Estate Development oni"�ftnents r Mr. Bob Bergstom CITY OF RENTON Public works Department September 22, 1986 Page Two Thank you for your help in this matter. warm regards, FIRST CITY EQUITIES Barbara E. Moss Director of Planning BEM:bc cc: Michael Courtnage Bob Roed Royce Berg Greg Byler TEMPORARY UTILITY LINE EASEMENT AGREEMENT THIS AGREEMENT, made and entered into this day of , 1986 by and between FIRST CITY EQUITIES, a Washington general partnership ("FCE") , and CITY OF RENTON, WASHINGTON, a municipal corporation ("Renton") . 1. FCE hereby grants to Renton, its successors and assigns, an eight (8) foot wide non-exclusive temporary easement for the installation, operation, maintenance, repair and replacement of a waterline under the surface of the real property described in Exhibit 1 hereto (the "Easement Area") , together with the right of access from the surface of such real property and the right of ingress and egress over FCE's adjacent land for the purpose of exercising the rights granted herein. 2. Any installation, operation, maintenance, repair or replacement performed hereunder shall be at no cost to FCE unless agreed to in writing by FCF, and shall be so performed as to interfere as little as reasonably possible with the use and enjoyment of the Easement Area and FCE's adjacent land by persons occupying the same or lawfully present thereon. To effectuate this intent, Renton shall keep the Easement Area and FCE's adjacent areas free of equipment and materials at all times, except when workmen are actively working in the Easement Area unless FCE gives its prior written consent to do otherwise. 3 . If the surface of the Easement Area and/or surface of FCE's adjacent real property and/or any improvements thereon shn . be disturbed by installation, operation, maintenance, repair or replacement, said surface and/or improvements shall be promptly restored by Renton to their condition Just prior to such disturbance. 4 . FCE shall not be liable for any claim for damages for normal and reasonable use of, or vehicular or pedestrian traffic over, the Easement Area. 5. Renton agrees that it will permit no mechanics' , materialmen's or other liens to be filed against the Easement Area or FCE's adjacent property for work or materials furnished Renton in connection with the easement granted heroin, and Renton agrees to indemnify and hold FCE harmless from the same. (8/28/86) -1- 6. Renton agrees to indemnify FCE against and hold FCE harmless from all demands, claims, causes of action or judgments, and all reasonable expenses, including attorneys' fees, incurred in connection therewith, for injury to person, loss of life or damage to property occurring on or about the Easement Area and arising out of Renton's use or occupancy of said area. 7. FCE agrees no buildi:ig structure shall be erected or permitted on the Easement Area; provided, however, FCE reserves the right to require, at FCE's expense, the relocation of all or part of the utilities installed by Renton hereunder to the extent from time to time as it is necessary to permit further development of FCE's property. a. The easement granted hereby shall terminate at such time as Renton, its successors and assigns, permanently discontinue use therefor or at such time as a new water line is installed to serve the improvements on the subject property. Renton and FCE shall execute an instrument in recordable form to reflect of record the termination of this temporary easement. IN WITNESS WHEREOF, the parties have executed this Agreement as of the day and year first above written. FIRST CITY EQUITIES ("FCE") By David M. Schuman, Partner By First City Developments Corp. , Partner By Its CITY OF RENTON, WASHINGTON ("Renton") By Its -2- s f s STATE OF WASHINGTON ) ss. COUNTY OF KING s 1 On this day of , 1986, before me, the undersigned, a Notary Public in and for the State of Washington, duly commissioned and sworn personally appeared { DAVID M. SCHUMAN, known to me to be a partner of FIRST CITY !t EQUITIES, the corporation that executed the foregoing instrument, and acknowledged the said instrument to be the free and voluntary act and deed of said corporation, for the purposes t therein mentioned, and on oath stated that he was authorized to execute said instrument. I certify that I know or have satisfactory evidence of p the person appearing before me and making this acknowledgment is the person whose tree signature appears on this document. WITNESS my hand and official seal hereto affixed the day and year in the certificate above written. NOTARY PUBLIC in and for the State of Washington, residing at My commission expires I I i -3- a� d STATE OF WASHINGTON ) as. COUNTY OF KING ) On this day of 1986, before me, the undersigned, a Notary Public in and for the State of Washington, duly commissioned and sworn personally appeared DAVID M. SCHUMAN, known to me to be a partner of FIRST CITY EQUITIES, the partnership that executed the foregoing instrument, and acknowledged the said instrument to be the free and voluntary act and deed of said partnership, for the purposes therein mentioned, and on oath stated that he was authorized to execute said instrument. o j I certify that I know or have satisfactory evidence of I the person appearing before me and making this acknowledgment is the person whose true signature appears on this document. WITNESS my hand and official seal hereto affixed the day and year in the certificate above written. NOTARY PUBLIC in and for the State of Washington, residing at _ My commission expires -a- of ) S ) ss. of ) i On this day of , 1986, before me the undersigned, a Notary Public in and for the of duly commissioned and s"'C'rn, personally appeared of FIRST CITY DEVELOPMENTS CORP. , the corporation that executed the foregoing instrument, and acknowledged the said instrument to be the free and voluntary act and deed of said corporation, for the purposes therein mentioned, and on oath stated that he was authorized to execute said instrument. I certify that I know or have satisfactory evidence of the person appearing before me and making this acknowledgment is the person whose true signature appears on this document. WITNESS my hand and official seal hereto affixed the day and year in the certificate above written. Notary Public in and for the of resiling at My c mmission expires -5- STATE Of WASHINGTON ) ss. i COUNTY OF KING ) 1 On this day of 1986, before me, the undersigned, a Notary Public in and for the State of Washington, duly commissioned and sworn personally appeared known to to be the of CITY OF RENTON, �W SH NGTONIDe the municipal corporation that i executed the foregoing irstrument, and acknowledged the sai.. instrument to be the free and voluntary act and deed of said corporation, for the purposes therein mentioned, and on oath stated that _he was authorized to execute said instrument. I certify that I know or have satisfactory evidence of the person appearing before me and making this acknowledgment is the person whose true signature appears on this document. WITNESS my hand and official seal hereto affixed the day and year in the certificate above written. NOTARY PUBLIC in and for the State of Washington, residing at _ My commission expires -6- r e 1 w- ff9 OF RF' rtECEIVED 4. 2255 BUILDING & ZONING"I0�PAI?�Nfggsg ENT �n 1 RONALD G. NELSOW�y,N't pp OtR &&GS IVC. O MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON.WASH.9W55 * 235-2540 90 0 O9,TE0 SEPt E'AO' BARBARA Y. SHINPOCH MAYOR ((('�',���►�,' February 17, 1986 Ike` tl '.-VB 1 `J i986 LPN Arch r_??i Architects & Planners 114 Vine Street Seattle. Washington 98i21 SUBJECT: FIRST CITY EQUITIES. VALLEY 405 PH:2,E III PLAN REVIEW Gentlemen/Ladies: The following items found in our plan review must be corrected and approved before a permit may be issued: 1. Fire Department ,A. 2000 GPM fire flow required. One additional hydrant required at northwest corner. —C. Provide turning radius at northeast corner by Building D. -D. Naches Avenue S.W. to be paved prior to building above foundation. 2. Utility Engineering Division -A. Approved water main plan required. B. Approved sewer main plan required. 3. Design Engineering Division A. Revise storm drainage, road and sanitary plans per comments on plans. B� Move sidewalk to be common and adjacent with curb. C. Provide geotechnical basis for roadway fill and pavement design. Provide design calculations on thickness and type. — D. Provide geotechnical basis for storm drainage - 60" storm design - foundation rock? Pile supported? 4. Traffic Engineering Division A. Requires that street light plans be provided to City standard. LPN Arch February 17. 1986 Page 2 5. Building and Zoning Department y A. Perimeter rigid insulation to extend to top of slap (Typ). B. Take framing members into account - including rouf trusses, uninsuiated Glu-Lam beams, etc. C. Provide lighting - power budget. D. Provide L�—calcs. - Buildings C and D. Various other notes may appear in red on your plans. These items will have to be corrected during construction but revised plans are not required prior to building permit issuance. Si cerely, G; 6 / James C. Hanson Assistant Building Director JCH!ss 0774E Job Weed 1 8•R t!. CIA, CcAe'tj �-y � seder � r� • �. . .. +, �.. t 4 p i! 4' ,; i .�,� ��M r i � : � , � :: f , : i