HomeMy WebLinkAboutWTR2701848(1) •
--_._ r
�. t
B INNING
OF FILE
FILE TITLE
tl
ppv"5
� E --i-
1 5 1996
omrwiM a R.,tnw
Rua TM OWN&ON
art Reseal t Mew
OtAar traftwe^ WOoI-Wa0
800 laS 314
l ertificate of Payment of State Excise
Taxes by Public Norks Contractor
Contra-tor-
GARY BUDD CONST CO PWl 67957
2440 140TH AVE NE
SUITE 82
BELLEVUE NA 99005
We hereby certify that taxes, increases and penalties due or to become due from the above named
contractor under Chapter 180. Laws of 1535. as amended, with respect to the following public works
Contract.
CITY OP RENTON
PRV STATION INSTALLATION S 23RD It SNATTUCR
together with all other taxes, increases and penalties due from such evntractur, have been paid it full
or that they are, in the Department's opinion, readily c•ullecuble without recourse to the statess lien olt
the retained percentage,
This certir—Ate is ossued pursuant to the provisions of Chapter 60.28 Revised Cafe of Washington
for tine sole purpose of informing the state, county or municipal officer charged with the duly of
disbursing or authunroig the payment of public funds to said contractor that the Department of
Revenue hereby releases the states hen on the retained percentage provided by this Chapter for ex-
cise taxes due from said contractor.
This certificate does not release said contractor from Itabtlilj fur additional tax which may be later
determined to be due with respect to the above mentit, ed contract or other activities.
Date at Olympia. Washington, CEP 1 U'96
STATc or WASHMGTON
CITY OF RENTON DRPAwrm&Nr or Ravariva
RECEIVED >f
SEP 1 198E jo kY11�fir"O fie OR
ROLTIrG Wiata Cue IxiOamea t11TNn.Cetrry Cu� rw'-Cuei1w.
PURCItA��'Ile4 pi• nst eoor t�k,t:uNeNtvd tie, -sptcwi fae
MM at,
sills N wrrE(ra
asom VAX N AN"
�owPfAxaIsa11
Aar►r WOWA A smoo
airwau serer.EEEOa00Ee
400 lea 31e
Certificate of Payment of State Excise
Taxes by Public Works Contractor
Contra.torn.
DARY RUDD CONST CO PWC 68054
2440 140 NE Eat
BELLEVUE MA 9600y
We hereby certify that taxes, increases and penalties due or to become due from the above named
contractor under Chapter IEO. 1-m., of 1985 o, amended, with respect to the following public works
contract
CITY OF REKTON
PONDEROSA ESTATES WATER SYSTEM
together with all other taxes, marries and jwoalties due from such contractor, have been paid tit full
or that the.) are, in the Department's opinion, readily collectible without recourse to the states lien on
the retained percentage.
This ecrtificete is issued pursuant to the provisions of Chapter 60.28 Revised Code of Washington
fur the sole purpose of nilormmg the state- county or municipal officer charged with the duty of
dubursing ur authorizing the payment Of public funds to said contractor that the Department act
Revenue hereby releases the atate's hen on the retained percentage provided by thts Chapter for ex-
One taxes due from said contractor
This certificate does not release said contractor from liability for additional tax which may be later
determined to be due with respect to the above mentioned contract or other activities.
Date at Olympia, Washington. eEP 1 0%
STATE Or WASnINGTON
C1-Ty flf RfNION UPASTMENT Or REVENUE
RECEIVED .4 - , .I4.
l0 LI;; NICKER, AUDITOR
SEP 1 Er 1986 CrnOr(wa Ofic"
N(N Tl%(. wsnr (,pi nwOnn�nr laTn.a.(�wrf (up (rnarn,ay.
ROM•k% t: 00440ASING
(�[ PN t upi hk,tiWMnrut llyq Slacul ilk
a , tuwt4 i •
tYll(IIX
57411 Or V A51Rvt.T0N
DEPARTMENT OF LABOR AND INDUSTRIES
(',a..dr �iewmrrxar �W • ria,rew� 4c a.MiRh e wx+�.n)r
August 28, 19b6
SEP 2 19%
City of Renton
Finance Department
200 Mill Avenue S
Renton WA 98055
Re: Firm No. 452,026-CO-8
Contract No. M-709 C.A.G. O:S-86
Gentlemen:
Please be advised that the Department of Labor and Industries does hereby
release the City of Renton from any further liability pursuant to RCM 51.12.050
and RCM 51.12.070 as wecld otherwise incur in connection with a contract calling
for P.R.V. station installations at South 23rd Street and Shattuck Avenue South.
This certificate does not release Gary Budd Construction Company from liab 1111y
C0 for additional contributions which later may be determined to be due with
respect to the above mentioned contract or any other contracts said contractor
may have performed.
Very truly yours.
Kaye Klorlaug
Administrative Assistant
Contractor Compliance Unit
t�r7 Phona: (206) 751-4398
\t�+f/ CCU1:S:14.1b48
FL 725
Rev. 10/14/70 Gnuracl No. L.A.G.
NOTICE OF COMPLETION Of PUBLIC WORKS CONTRACT
lot State of Washington Date:
Excise Tax Division
Audi: Section
Tax Connission
Olyipia, WA 96504
Do Not Use
F. City of Renton Assigned to:
Finance Department
200 Mill Avenue South Date Assigned:
Renton, WA 98055
P.W.G. Number
Date.
Gentlemen:
Notice Is hereby given relative to the Conpletion of contract or project
described below:
Description of Contract : W-709 P.R.Y. Station installations R South 23rd St,
and Shattuck Ave. S.
Contractor's Name Gary Budd Constrcction Co.
Contractor's Address 2440-140th Ave. N.E., Suite 02, Bellevue, AA 98005
Date Work Commenced MAY 27. 1986
Date Work Completed July 28, 19R6 Date Work Accepted: August 25. 1986
Surety or Bonding Company Maurer, McGinnis, B Lill Inc.
Agent's Address 1200 Westlake Ave. N., N605, Seattle, WA 98109
Contract Amount $30.535.10 Amount Disbursed $31.946.96
Additions S 451.27 Amount Retained : S 1,549.31
sales Tax S 2.509.90 Total $33.496.27
Total $33.496.27
By
Disbursing Officer - Finance Director
THREE COPIES Of THIS NOTICE MIST BE COMPLETED BY THE DISBURSING OFFICER
AND MAILED TO THE DEPARTMFNT OF REVENUE AT OLYMPIA, WASHINGTON IMMEDIATELY
AFTFR ACCEPTANCE OF THE WORK DONE TINDER THIS CONTRACT. NO PAYMENTS SHALL
BE MADE FROM RETAINED FUND UNTIL REC-IPT OF DEPARTMENT'S _CER'TIi1CATE, AND
THEN ONLY IN ACCORDANCE WITH SAID CERTIFICATE.
cc: Department of Labor and Industries
For Use By City Clerk's Office Only
A.I.
AGENDA ITEM
RENTON CITY COUNCIL MEETING
................................................... ..«.....................................
SUBMITTING
Dept./Oiv./Bd./Comm. PUBLIC WORKS/Utility Engr. For Agenda Of 08-25-86
Meeting Date
Staff Contact Ronald L. Olsen
Name I Agenda Status:
SUBJECT: W-)Og PRV Stations at, S. 23rd. St. Consent
and Shattuck Ave S. Public Nearing
Correspondence _
GARY U11 CONSTRUCTION CO- .__._ Ordinance/Resnlution
Old Business
Exhibits: (Legal Descr. , Naps, Etc.)Attach Mew Business
Study Session
A. Final Pay Estimate Other _
B. Notice of Completion
C, Approval
Legal Dept. Yes_ NO N/A
COUNCIL ACTION RECOMMENDED: Approval Of finance Dept. Yes_ No N/A
DloJect and final authorization to begin Other Clearance
30-Qdy lit _n_ncrind AL of 8-%-86.
FISCAL IMPACT:
Expenditure Required $ Amount Approprietion-
33,496.27 Budgeted S 40,000.00 Transfer Aeg4i red $
SUMMARY (Background Information, prior action and effect of Implementation)
(Attach additional pages If necessary.)
the Public Works Department recommends the project and the Final Estimate be approved and
that the retainage of $2,509.90 be released after, 30 days if all taxes have been paid and
no lien has been filed.
The project was completed on July 28, 1986 and accepted by the Division Of Public Works.
It is recommended that the City Council accept completion as of 8-25-86.
PARTIES OF RECORD/INTERESTED CITIZENS TO BE CONTACTED:
SUBMIT THIS COPY TO CITY CLERK BY NOON ON THURSDAY WITH DOCUMENTATION.
Aoki
1 v.ox
17�TL tw 1\We\GTC W,
DEPARTh',£NT OF LABOR AND INDUSTRIES
.�J� a.m•x,'V.- larlawi Unpw Ajlv ''i �wuar.f
August 5. 1986
City of Renton
200 Mill Avenue 5
Renton. WA 980$5
Re: Firm No. 452.026-00-8
Contract No. CAG 025-66
Gentlemen:
^ Please be advised that the Department of Labor and Industries does hereby
release the City of Renton from any further liability pursuant to RCY 51.12.050
and RCw 51.12.010 as would otherviae incur in connection with a contract calling
for water main installation - water project w-709.
This certificate does not release Gary Budd Construction Company from liability
for additional contributions which later may be determined to be due with
respect to the above mentioned contract or any other contracts said contractor
�,/ may have performed.
Irk very truly yours.
U
Rays R)orlaug
Administrative Assistant
Contractor Compliance Unit
Phone: (206) 753-4399
CCU1:5:22.1b23
cc to
Gary Budd Construction Company
2440 - 140th ME, 642
Bellevue. WA 98005
St�TF lls N'15FNGt(Yr
DEPARTMENT OF I ABOR ,AND INDUSTRIES
t:�.ee•N +:a rn:n.v+9AIm a O"w KVwg,,x efi(Mtia�l
August S. 1986
City of Renton
200 Kill Avenue S
Renton. VA 98055
to: Firm No, 452.026-00-8
Contract No. CAG 025-86
Gent lemon.
Please be advised that the Department of Labor and Industries does hereby
fj release the City of Renton from any further liability pursuant to R[V 51.12.050
l� and RCV 51.12.070 as would otherwise incur in connection with a contract Calling
for water main installation - water project V-709.
This certificate does not release Gary Budd Construction Company from liability
for additional contributions which later may be determined to be due with
respect to the above eentiored contract or any other contracts said contractor
may have performed.
Very truly yours.
Kaye K3orlaug
Administrative Asaistant
rontractor Compliance Unit
Phone: (206) 753-4398
CCU1:5:22.lb23
cc to
Gary Budd Construction Company
2440 - 140th K8, R42
Bellevue, VA 98005
DAILY IMRCIg1 DIARY
DAY:
�AAANNN ��'�v 1 DAM "t IL1 /d6 WORK PERIOD: a.m./p.m. to a.m./p.n. REPORT E
WEATHER: TEMP. MAX 'F MIN _4'F PRECIPITATION:
WORA ACCONPLIS SAY: _r
--iu shy k_ JQ3. feqIF
(iA+1,th Fit, d ,dtu,hn.
,h1ftU A)j# kV JCmst(t L %(14 Ei,4wF► 1'Q11 h 0% '.�I.n u.__' id 1 +11 .
� oAY Eia�a S�t_�Mg� ,nle Ati at <e�A4,. 1x�e
t Qt1N�lt I[T aa_.t► 2b 40tb n .e r. V . L:o I eP�slw •,1.<�
x lltd 104344, , .m In Kv VAAkV ya111+ Ir,ISI 11 ItR.t 20LI
CONTRACTOR SICNAWTRF ,_.--- -'�- INSP ICNA E
DATE: 71111?4
WRK ORDER iOR TYPING
•
ITEM: 1E (Lr%V cu 'T,
PRIORITY 1 (4) ;
TIME NEEDED G° -
Date and Hoa•
REQUESTED BY *i l_`r
SPECIAL INSTRUCTIONS
(Please fill out and attach to
any item for typing and circ,e
or,
�-( A S Tom' tZ
CERTIFICATION BY GE& CONIRACTOR
ref: Payment of Prevailing Wages
to be submitted to City with each Progress Payment Request
DATE:
PROJECT_W_709 PRY's at S. 23rd and Shattuck Ave. CAG No. 025-86 This is to certify that the prevailing wages have been paid to our employees
and our subcontractors' employees for the month of _
in accordance with the Intents to Pay Prevailing Wage Tiled ritfi the-
Washington State Department of tabor A Industries.
Gary Budd Construction Cam ny
Camnany 8amr
Title ------ -------
pFNp OV)Illflq ^�
t �IATHp MIAMPRSTW M .r. 1 , , 7Oa�
V OEFM111MT0/WCYI'AlIYI1EAlM W /
WATER BACTERIOLOGICAL�ANALYSIS
SAMPt I C.OLEECTIOIE.MAD WSIRUCTMIMH ON HAGI OF WNKROO Ctrs
N Inewcl,onF W ME NRbret LLRgIL wlo M MWIW
DAIS COLLECTED TWEOalf AHD CDIMPFNAME
6NONTH 12' 6 ; 8°a� , K�1JG
TV OF EYETSM V NMMISYI M.COMKETE
1
❑INwVIW11L I.D.No. I S S O L t I R
MAY''H OF 6VfTEM ,x�� W P1 f R_
L�11Y Of R �N'1oN- N69L f/
SN[uIt LOUIRW RMM SAMN[CDEUiCt! SKRN RKMUMEA MME MD RIPWE ND'
. Aar YI.aMM,�.�M
�Rlcle _kAIGNT
►I.ERA �Nld_ S.ty4 w I ( ) 2 55-2631
BAMKE ecTm EY;PNw
A000w- 4kPOAFK-uut!j Imp
301WCE,.Rs I
❑511RFACf ❑wau ❑SREMNO ❑aIRCNASm OMB'NATION
dOIF ER
SE yD pEpOq�[
twvn��p„M pYdr�El�wcaw, Q .�S,psL
/�.,1,}Il i• I��' HEEL
1Z T/veE ej Wbw«o,oN n55
rvn a sAMKF
T.a OIKNKINOOEATlR ❑`^"^-_Ib1RFe1F11M:_,PIFI_F,..I
CMEI,NeaNlo 1-i ❑ F111NIE • -
FFF---III Q uaaRMFO«anH
2. y MW SOURCE WATERI
9 '6 NM W CONSTRUCTION 0108 R ,
S. OTHER ISPWfV)
COMKETE IF THIS SAMFLL 18 A CHECK SAMKE
NHvu."I M,W
PREVIOUS SAMKE COLLECTION DATE
REMARKS J NJ.C•�M 4510
vw n c ZV f SbA l
I —
. 'r LABORATORY RESULTS PM LM MM MIT
MPN COI IFORM 510 KATE COUNT SAMPLE NOT TESTED
n EECAUSE
1 / /rj..+..w..rw /aI
VVM-PN DRUNON IFST UNSUITAEIE 13 LPK,P,e tm D,a
� �iFp nx 1. ❑ CaMNA+.I Omaln ❑ Na In Prtfq,C.anMInR
MF COLIFORM 2. �] INTC ❑ Ineulllrem lmo,^e4m
aaxwatl-Plaeee ReEM
_-- INMIRMPM IR Farm
FECAL COUFO ❑ El.DPp1s ,n.
u MPN n MF , FJ ❑ , 1
FOR 091AKING WATER SAMPLES ONLY THESE RESULTS ARE.
it SATISFACTORY ❑ UNSATISFACTORY
SEE RFVERM SM OF SIIIESN COPY Fg1�PW11U OF RMUIIV
:-( ,a
AF NU OATL 1, IIECUVED- Mtt E�os.
wTF FMnO I IEPUTMY
I'T
AENAms
WATER SUPPLIER COPY !1
ORIGINAL DATE,
REVISION 1` OATS,
TO, Accounts Payable
FROM: Public Norte
SUBJECT! Camtrtwtioa Ceatraet CAD
Project MIND, <U - 7U`j S t� 1 SH4TTUGC C'f2V S
Price Ooetractor, G1L(!T_QUp0 Qpti Sr•
M!l RRCIIgRD DATI 11f�1i11® I
Rlli I:DNf71A47gt a BOK'DRlRA47oRl IMlIRT To MT AMDAPIT or
PREVAILING MR= UUMMR PAID
CON I . r Signed
Project vCJ( /t•
Project R"ineer
cc: Project File
Form: 4/15i S5
_ ' ' • • LAJ 7o 1�
MAIL. Tle Statelaaal of
INDUSTRIAL STATISTICIAN r INTENT TO PAY
Department of tabor • Industries PREVAILING WAGES
Empiayment Standards DividoM (Public Works Contract)
Geneml Administration Building
Olympia. WA 9611,04
it") 751-4019 C,atract Number SAG U25-86
Date Bid Was Due L26/86
Contract Awarding Public Agency Date Coattact Awardwl 4 7 86 -_
C1LV of Renton _, County in Which Work Performed King
Addres,200 Mill Ave. S. _ LtIcation Within County Rentoo
A n orl• Wash. 98055 Prime Contractor Gary Budd Corst Cr
Pbone U--2631 Contractors Registration Certificate NaG�FYBCC-1800Q__
Do You Intend To Use Subcontractors" Yen 1.1 No X
In compliance with RCW 19.12-040 1, the undersigned, being a duly authorised representative of
Garry B +drt ona r tj5)p._C4IIlR.3IIX—:.440 140 th N.E. t42_y£lj>i+,YSLc. Waste_q.M5
11's:+vb.v.S.6aY.tb` oo4mal
do hereby certify that the fallowing rates of hourly vage and hourly fringe heart will he paid to all
laborers,workmen and mrchanicr employed F. me loom the public works project dr. :n.Ad above and that
no laborer,workman or m"hanic will be paid leas than the"prevailing rate of wage"as determined by the
Industrial Statistician of the Department of Labor and Industries.
['LEASE NOTE: If apprentices are to he used they must be registered with the State Apprenticeship
Council or they must le paid prevailing journevmnn wages.
L'aAPT aeTIMATEII NI'M6aR MATE OF RATE.Or HOURLY
OF wIORaaRa Not RLY PAY Ea1NG1 arsim"
Laborer f i3.dU 1.41
Pipe )sync 14.28 3.43
watermain Construction workers
Non. Attach Additional Sheets oo Needed. Gary Budd Construction Company_
Ic-tr do
By Gory Budd kjWnU
Subscribed and sworn to before me
this :W 4 day (if1 rer 1.• 1 tar tray
APPROVED
Department of Labor i Industries
IRdua al� Statiatjaiaa Nervy �ooc
Plot,Is cad fw Me Gate .4 wwxhu".s, fly l 't s' -_F'[lati'./al..�t L.._ay�
'"Wom isRefrwratM
v
BEFORE FINAL.SETTLEMENT can he made on any public wtuks project,the prime cmtractor and each
and even submittrador mast submit form 1.1-700 7 "Affidavit of Wages Paid"to the officer charged with
the diahuraement Of public funds. EACH AFFIDAVIT OF WAGES PAID MUST BE CERTIFIED BY
THE INDUSTRIAL. STATISTICIAN OF THE DEPARTMENT OF LABOR AND INDUSTRIES
BEFORE, IT IS SUBMIITF.D 11) SAID OFFICER.
PRO (MESS PAYMENTS: Each voucher chum submitted to an owner by a contractor for payment till a
project estimate%hail state that prevailing wages have been paid in accordance with the prefiled statement
or statements Of intent to pay prevailing wages on file with the public agency.
COMPLF"TE AN:) MAIL ENTIRE SE7 FOR APPROVAL TO:
F roPloylnent Standard% Divimion, llepartment of Ialav and Industries,
General Administration Building, Olympia, Washington 98MM
(I)NTRAt'TORS. DIRTRIBUT% APPRIW_gD RTATRMRNTS AN IOLIAW&
'PINK 1'OPh ORIGINAL CONTRACT AWARIAN1: AGKNt'Y
IGRRRN tOPYI UVI'LICATE. INIR-S'INIAL STATISTMIAN IReIunM to nrPrnxwnu
(BLllg COP(( TRIPLICATg FRIME(VNTRAi'FOR
IYgl1.OW l7VYIQUADRUPLIC�T{-sUBLti1NTRAl'I'gt
NIAII to A&AVIT OF
INIA IS]RIAI NitI IN I IIN
Isr"'Atlaewt of rat.., A Illdasnlrs "^t4rfyr �, WAGES PAID
1XV19yetna slaod"ds Ib.ision ON MINIX WORKS CONTRACT
(ieonal 44enwiunrir„ RaiWfrtt 'i11) Aa
(rywipia, w( ya4u Dp1'Us
irshl 7S44$14 ra r'„tiE-1,
" 'eH anuacl Number CAG 025-86
Irate Bud Wav I)" 1129i86.
Contract Awarding Pobhe Agency Date ('ontran Awarded _41'7/86
City of Renton
Date Work l,nnpkted —6/26/116
A+4raws 200 Rill Ave- SO King
Counts In Which Work 14rfrmod
Renton Wash. 98005 -- Prime Conlucln GAry Budd Construction Co.
Telephone Number 235-2631
'AI, ] 11a1NMn Of Intent Filed
Ior this Protests Yes L8 No Ll
In compliance with RCW 39.12.040 1. the undersigned, being a duty authorleed represaatative of
Gary Budd Construction Co. _2440 140th N.E. ,�2 Bel levµe. Wash, 96005 -
c<MMMw..t 111ra„ux,i Italr�l
do hereby certify that the following rates of hourly wage and hourly fringe benefits have ham paid to the laborers,
workmen and mechanic employed by me upon "i.; project tiescribod above and that no laborer, workman or
mechanic has been pad less than the-prevailing o.te(d wage" as determined by the Industrial Statistician of the
Oepartment of Labor and Industries
I Ist below each classification of labor employed by you upon it: prolctt described above and the rate of hourly pay
and hourly fringe benefits pad to each t asslfsahon
PI.FASF. NOTF
If aP "Dice I heir here rtoplgrd no this prnjntl.Pnitide this additional information: name,registration anlnher and
state of Progression.
Inh our of tear nl IMwI.
Iluwl. 1'n louse awn.. 1'u"
Laborer 13.00 3.43
Pipe Layer 14.28 3.43
Waterwain Construction
Is. Muth Adea,wl Mu u is ' ' Gary B dd Construction Com arc
qIW
Subnxibed and sworn to before me By r Gary Budd_
Ifva,
this 24 day of July
A -^ 1 Inwln.rrul. x. ..mralna m Ike.qr non"e d a Ingo .M In lam,nee
. 'f '" I..Ike pe,a.xq .eat rep,lnmmw <W H 12 awl lu s"""vlafaa
�_- ry akr w sa1 in rY 4a4 d a'"Wgaw,re.,was
wuM INII(ISTRIAI. STATISTKTAN
0ffs(RTMFNT .(W LABOR AND INDVS"[F.t
INSTRUCTIONS I f,
ts.,
1 Pursuant to RCW 39 12 040 copies of this form must be completed by the contractor and each of his sub.
ctoaraclon
Complete this form in triplicate and have it notamtd
3 Submit all form~for approval in:F.mrluymcnt Standards pwision.Department of Labor and Industries,Ocnttal
Administration Building, Olympia, W'atho gton "504.
4 Mad an approved cops to the ("onitact Awarding Public Agency
CONTRACIORS ARC RF.SIIONSIH11; FOR OBTAINING AND FILING AFkIUAVITS of the SI H
CONTRACTORS This is required by law and ri%otems can not lawfully be made until such affidavits are Ided
LTF RF � •
U C
PUBLIC WORKS DEPARTMENT
1 t1ESiGN/UTiUTv ENGINEERING 0 215-2631
1
� >Q Ml1NIC1►AL BUILDING 300 IM Cl AVE.S0. RENtON.1k ASH.90055
a
EP
rEC CEv�E�
BARBARA Y, SHINPOCH
mAvQq May 23, 1986
Gary Budd Const'uction Co.
2440-1401n Avenue R.E., 042
Bellevue, Washington 98005
SWJECT: M-709, B' PRV's at S. 23rd St. and Shattuck Ave. S.
Gentlemen:
This letter is your notice to p-oceed and to start the Count of Working
Days as of Tuesday, May 27, 1986.
Very truly yours,
David R. Tibbot,
Project Engineer
:mf
City o enton Engineering Department
• 235-2631 •
PRECONSTRUCTION CONFERENCE
DATE: Wednesday, May 21, 1986
TIME: 2:30 PM
PLACE: 3t, Floor Conference Room
DEVELOPER / CONTRACTOR OR SUBCONTRACTOR / NAME OF PROJECT
Name: Gary Budd Construction
Phone:
Project: 2 - 8" PHV Stations at Shattuck Ave. S.
Proj. a: W-709
NAME OF APPOINTED INSPECTOR
Abdoul Gafour
P ease check departments to be notified and specify person to attend.
_x Desian/Utility Eno. _
x Fire Dept.
X Police Dept.
X Street Dept. _
x Traffic Dept.
x Sewer Maintenance
X Water Shop
Park Dept.
Building Dept.
_ Other
Outside Depts.
Department of Transportation
x _ Pacific N.W. Bell Company
x Puget Sound Power 8 Light Company
_x Grout) W Cable TV Company
x Washington Natural Gas Company
a
X Other SWD (Will be connecting 1 PRV to Seattle Meter 625-216P)
INTErOFFICE CORRESPONDENCE
Date May 7, 198h
Public Works Department
TO: ATTENTION: Engineering - Dave Tibbot
FROM. Maxine E. Motor, City Clerk
SUBJECT: CAC 025-86 - GARY RUDD CONSTRUCTION CO. - Water Project W-709 - 8"
P.R.V. Stations at S. 23rd St, and Shattuck Ave. S.
-----------------------------------------.----- -----------------------------'
We return herewith fully executed document(a), as above.
captioned, copy of which we have retained for our official
public records. Copies should be forwarded to
and the other for your file.
_ Pursuant to your memo of we return herewith
I documentfal, as above-c aptfoned, which have been signed by
u City Officials and need to be :orwarded for further execution
by
We return herewith recorded document(s), as above-captioned,
copy of which we have retained for our official public records.
Copies should be forwarded to appropriate parties and retained
to necessary for your files.
Please file a fully executed copy with the City Clerk's office
for our permanent records when received,
Thank ,you
gn
cc:
Enclosures (4)
eeuw.1,9000 . •
>odaunn
Poc:Htic ln*matlonal Pipe&Enga nry
PCkkK9& iaom maaoo :mar N,adam�wcq
City of Renton
200 Mill Ave.
Renton. NA O8055
Mav 6, 1486
NOTICE TO PROPERTY OWNERS
Gentlemen,
We are advised that you are the owner, or reputed owners, of prop-
erty situated at or near the following address:
'd ter Project IW709, SE 20th A Edmonds, by Cascad,
This is to notify you that on the "k day of MLJ 19��,
we commenced to deliver materials an supplies or dented aqu:pmen[
to be used upon the real property and all improvements owned or
being constructed by you at the above address.
These materials and supplies or rented equipment ware ordered by:
Gar^ Pud:? ..^onst_ 2440 - 14i',h. Ne. . Dell van, WA aPnes,
and consist of-special vaults. . .
Wa are required by law to furnish this notice to the owners of all
property to which we deliver materials and supplies, so they Way
have notice that in the event of non-payment of our account, a
materialeman's lien may be claimed by us.
This notice is NOT in itself a claim of lien, nor does it imply
in any way that a lion say be neccessarl. It is sent only because
we are required by &.state to do so.
Gary Budd Const. Very Truly Yours,
P.I.P.R. Inc., R.C.P., Vaults
"ct_ �:-i..
eeI H is Richert E. > '
hMlcco�un e011eI iMtlp1�ew.n w� me a.e uoao Gb~CA
7S NE Cw 04.n Ift.'oF.and N.E NNW vvw,w,WA
11N•aY Wc�IC'M,hw/CooM�b�`C4tlnNA♦bm CaOa�Rw MSY•n
L�F RAC•
4,A
PUBLIC WORKS DEPARTMENT
UESIGN/UTILITv E 'vEERING 0 235-2631
... R MUNICIPA_BUtLDING 200 MILL AVE.SO. RENTON,WASH,9a055
e
P
„ED SEI't
BARBARA Y. SHINPOCH
MAYOR
MEMORANDUM
DATE: May 6, 1986
TO: Maxine Motor, City Clerk
FROM: David R. Tibbot, Project Manager
SUBJECT: Shattuck Avenue S. PRV's M-709
Attached for signatures are five copies of the above referenced contracts,
which have been signed by the contractor. The City Attorney's letter of
approval is also attached.
Attachment
OF Rf
bA OFFICE OF THE CITY ATTORNEY • RENTON. WASHINGTON
x YOaI OWIC!•Q.aN 10p a]p aiq[[i • •fMTp11 N.aMyptai Mp6t 9aa-•aTa
g LAWRENCE J.WARREN, ai.S.ra•c. DANIEL KELLOGG. Sar•rafi arr mown
DAVID M DEAN, SSaaiaft all ATTO '
P
rfe SEP'E� MARK E BARKER. .aataraxi ai.aiip•tav
ZANETTA L. FONTES,♦SMSTWT 01i ao•ry
May 5, 1986 MARTHA A FRENCH..SSISTW aTv Tlap l
TO: David Tibbot, Project Engineer
FROM: Lawrence J. Warren, City Attorney
RE: W-709 8" PRV Installr'ions at South 23rd St.
and Shattuck Ave. S.
Dear David:
I have reviewed the above contract and it is approved as
to legal form,
Lawrence J. Warren
LJW:nd
Encl.
cc; Mayor
L�f kF•
lA
r PUBLIC WORKS DEPARTMENT
DESIGN/UTILITv EN;INEERING 235.2631
€' MUNICI►AL MMLO1N0 200 MILL AVE.SO. RENTON.WASH.9WS5
0
i.P
•rE� SE e�E�
BARBARA Y. SHINPOCH
MAYOR May 1, 1986
Mr. Gary Budd
GARY BUD CONSTRUCTION Co.
2440-140th Avenue H.E. , 042
Bellevue, Washington 98005
Subject: W-709 B' PRY Stations
Dear Mr. Budd:
Your submittals for equipment to be used on the above project are approved
with the exception of the Stainless Tapping Tees, which are not approved
for use.
Very truly yours,
,�"
David R. Tibbot,
Project Engineer
:mf
Enclosure
clF R�, •
PUBLIC WORKS DEPARTMENT
t = & DESIGN/UTILITY ENGINEERING 0 235-2631
MUNICIPAL BUILDING 300 MILL AVE.S0. RENTON,WASH."os5
P
rE� SE01EW0E
BARBARA Y. $HINPD'H
MAYOR
MEMORANDUM
DATE. April 30, 1986
TO: LarryWarren,
a ren, City Attorney
FROM: David Tibbot, Project Engineer
SUBJECT: M-709 8' PRY Installations at
South 23rd St. and Shattuck Ave. S.
Attached please find a copy of the contract for the above subject project
which as been executed by Gary Budd Construction Co.
review and awise s to legal Would you please
as soon as possible. form ai we would like to start this job
:mf
Attachment
of Nt.11
z PUBLIC WORKS DEPARTMFNT
_ DESIGN/UTILITY ENGINEERING 9 23� 2631
0 U !R MUNICIPAL BUILDING 200 MILL AVE.50, RENTON,WASH 96055
b
P
\rft. st"1 0b
BARBARA Y. SHINPOCH A pr- 1 apl
MAYOR
Mr. Gary Budd
GARY BUDD CONSTRUCTION CO.
2440 140th Avenue N,E„ a42
Bellevue MA 98005
Subject: Bid Award for 8" PRV Stations at
South 23rd St. and Shattuck Ave. So. , N-709
Dear Mr, Budd:
At its regular meeting of April 7, 1986, the Renton City Council accepted
your overall low bid on the above referenced project in the amount of
$33,008.44.
To enable preparation of the contract documents, please submit the following:
1. A List of name, address, ohone number and emernency phone number for:
Responsible Officer, Job foreman, Bondina Anent.
Corporation letter or Resolution giving names of those authorized to sign
contract and samples of their sinnatures.
3. Photo copy of current State Contractors License,
4. Photo copy of current Renton Business License.
5. "Five contract bonds on Renton forms, UNDATED, date to be filled in
wher signed by the Mayor.
6. *Five signed contracts also UNDATED.
Very truly yours,
David R. Tibbot
Project Engineer
:ckd
Enclosures"
loft
CONTRACTS OTHER THAN FEDERAL-AID FHWA
THIS AGREEMENT, made and entered into this _ day of , 19_
by and between THE CITY OF RENTON, Washington, a municipal corporation of
the State of Washington, hereinafter referred to as "CITY" and GARY CUDD
CONSTRUCTION COMPANY hereinafter referred to as "CONTRACTOR."
WIT4ES5E7H:
1) The Contractor stall within the tint stipulated, (to-wit: within 30
working days from date of commencement hereof as required by the Contract,
of which this agreement is a component part) ptrfore all the work and
services required to be performed, and provide and furnish all of the
labor, materials, appliances, machines, tools, equipment, utility and
transportation services necessary to perform the Contract, and shall
Complete the construction and installation work. in a workmanlike manner,
in connection with the City's Project (identified as No. W-709
for improvement by construction and installation of: R" PRV Stations
at South 13rd Street and Shattuck Avenue South
All the foregoing shall be timely performed, furnished, constructed,
installed and completed in strict conformity with the plans and spec-
ifications, including any and all addenda issued by the City and all
other documents hereinafter enumerated, and in full compliance with all
applicable codes, ordinances and regulations of the City of Renton and
any other governmental authority having jurisdiction thereover. It is
further agreed and stipulated that all of said labor, materials,
appliances, machines, tools, equipment and services shall be furnished
• • 2 of 7
Contracts Other Than Federal-Aid FHWA
and the constructinn installation performed and completed to the
satisfaction and the approval of the City's Public, Works Director as
being in such confurmity with the plans, specifications and all require-
ments of or arising under the Contract.
2) The aforesaid Contract, entered into by the acce)tsnce of the Contractor's
bid and signing of this agreement, consists of the following documents,
all of which are component parts of said Contract and as fully a part
thereof as if herein set out in full, and if not attached, as if
hereto attached.
a) This Agreement
b) Instruction to Pidders
c) Bid Proposal
d) Specifications
e) Maps & Plans
f) Bid
g) Advertisement for Bids
h) Special Provisions, if any
i) Technical Specifications, if any
3. If the Contractor refuses or fails to prosecute the work or any part
thereof, with such diligence as will insure its conpletion within the
time specified in this Contract, or any extension in writing thereof,
or fails to complete said work with such time, or if the Contractor
shall be adjudged a bankrupt, or if he should make a general assignment
for the benefit of his creditors, or if a receiver shall be appointed on
account of the Contractor's insolvency, or if he or any of h,s
Rr v. 4/P1
Contracts Other ThapFederal-Aid FHMA
3of 7
subcontractors should violate any of the provisions of this Contract,
the City may then serve written notice upon him and his surety of its
intention to terminate the Contract. and unless within ten (10) dais
after the serving of such notice, such violation or non-compliance of
any provision of the Contrac'. shall cease and satisfactory arrangement
for the correction thereof be made, this Contract, shall, upon the
expiration of said ten (10) day period, cease and terminate in every
respect. In the event of any such termination, the City shall immediately
serve written notice thereuf upon the surety and the Contractor and the
surety snail have the right to take over and perform the Contract,
provided, however, that if the surety within fifteen SI days after
the serving upon it of such notice of termination does not perform the
Contract or does not covience_performance thereof within thirty (30)
days from the date of serving such notice, the City itself may take
over the work under the Contract and prosecute the same to completion
by Contract or by any other method it may deem advisable, for the
account and at the expense of the Contractor, and his surety shall be
liable to the City for any excess cost or other damages occasioned the
City thereby. In such event, the City, if it so elects, may, without
liability for so doing, take possession of and utilize in competing
said Contract such materials, machinery, appliances, equipment, plants
and other properties belonging to the Contractor as may be on site of
the project and useful therein.
4) The foregoing provisions are in addition to and not in limitation of
any other rights or remedies available to the City.
Contracts Other Than Federal-Aid FHWA a of 7
5) Contractor agrees and Covenu,ts to hold and save the City, its officers,
agents, representatives and employees harmless and to promptly indemnify
same from and against any and all claims, actions, damages, liability
of every type and nature including all costs and legal expenses incurred
by reason of any work arising under or in connection with the Contract
to be performed hereunder, including loss of life, personal injury
and/or damage to property arising from or out of any occurrence,
omission or activity upon, on or about the premises worked upon or in
any way relating to this Contract. This hold harmless and indemnification
provision shall likewise apply for or on account of any patented or un-
patented invention, process, article or appliance manufactured for use
in the performance of the Contract, including its use by the City, unless
otherwise specifically vrovided for in this Contract.
In the event the City shall, without fault on its part, be made a party
to any litigation commenced by or against Contractor, then Contractor
shall proceed and hold the City harmless and he shall pay all costs,
expenses and reasonable attorney's fees incurred or paid by the City
in connection with such litigation. Furthermore. Contractor agrees to
oay all costs. expenses and reasonable attorney s fees that may be
incurred or paid by City in the enforcement of any of the covenants,
provisions and agreements hereunder.
5) Any notice from one party to the Other party under the Contract shall
be in writing and shall be dated and signed by the party giving such
notice or by its duly authorized representative of such party. Any such
Contracts Other T� Federal-Aid fMwF • 5 of I
notice as heretofore specified shall be given by personal delivery
thereof or by depositing same in the united States mail, postage prepaid,
certified or registered mail .
7) The Contractor shall commence performance of the Contract no later than
10 calendar days after Contract final execution, and shall complete the
full performance of the Contract not later than ;u working days
from the date of comnercement. For each and every working day of delay
after the established day of completion, it is hereby stipulated and
agreed that the damages to the City occasioned by said delay will be
the sum of S105.00 (Sec. 1-08.9)
as liquidated damages (and not as a penalty) for each such day, which
shall be paid by the Contractor to the City.
8) Neither thne final certificate of payment nor any provision in the
Contract nor partial or entire use of any installation provided for by
this Contract shall relieve the Contractor of liability in respect to
any warranties or responsibility for faulty materials or workmanship.
'he Contractor shall be under the duty to remedy any defects in the
work and pay for any damage to other work resulting therefrom which
shall appear within the period of one (1) year from the date of final
acceptance of the work, unless a longer period is specified. The City
will give notice of observed defects as heretofore specified with
reasonable promptness after discovery thereof, and Contractor shall be
Contracts Other Than F • 6 of 7
edrral-Aid FNMA
obligated to take immed:ate steps to correct and renedy any such defect,
fault or breach at the Solt cost and expense of Contractor.
9) The Contractor and each subcontractor, if a,y, shall submit to the
City such schedules of quantities and costs, progress schedules, pay-
rolls, reports, estimates, records and miscellaneous data pertaining
to the Contract as may oe requested by the City from tine to time
10) The Contractor shall furnish a surety bond or bonds as security for the
faithful performance of the Contract, including the payment f all
persons and firms performing labor an the construct4on project under
this Contract or furnishing materials in connection with this Contract;
said bond to be in the full amount of the Contract price as specified
in Paragraph 11. The surety or sureties on such bond or bonds must be
truly licensed as a surety in the State of Washington.
11) The total amount of this Contract is the sum of 33 008.44
Thirty-three Thousand and Eight and 44/100s--7-which includes Washington
State Sales Tax. Payments will be nyde to Contractor as specified in the
"Special Provisions" of this Contract.
y,
Rev. 4/83
Contracts Other Than Iederal-Aid FHWA 7 of 1
IN WITNESS WHEREOF, the .ity has caused these presents to be signed by its
Mayor and attested by Its City Clerk and the Contractor has hereunto set
his hand and seal the day and year first above-written.
CONTRACTOR CITY OF RENTON
res e_n t7Fartneri Owner Mayor
ATTEST:
Secretary C ty erk
d/b/a GARY BUDD CONSTRUCTION COMPANY
Firm Name
Individual M Partnership
Corporation _ A Corporation
.Late of Incorporation
Attention:
If business is a CORPORATION, name of the corporation should be listed in
full and both President and Secretary must sign the contract, OR if one
signature is permitted by corporation by-laws, a copy of the by-laws shall
be furnished to the city and made a part of the contract document.
;f business is a PARTNERSHIP, full name of each partner should be listed
followed by d/b/a (doing business as) and firm or trade name; any one partner
may sign the contract.
If business is an INDIVIDUAL PROPRIETORSHIP, the name of the owner should
appear followed by d/b/a and name of the company.
OF R'6 1 •
THE CITY OF RENTON
V
MUNIC1PAl BUILDING 200 MILL AVE SO. gENTON.WASH 90055
r$ BARBARA Y. SHINPOCH. MAYOR • MAXINE E.MOTOR.
e CITY CLERK a (206)235-2501
P
�rED SEPL E
April 11, 1986
Mr. Gary Budd
Gary Budd Construction Co.
2440 104th NE 042
Bellevue. WA 98005
Re: Bid Award for Water Project W-709, 8-inch PRV Stations at
South 23rd Street and Shattuck Avenue.
Dear Mr. Budd:
At its regular meeting of April 7, 1986, the Renton City Council
accepted your overall low bid on the above-referenced project in the
amount of $33,008.44.
To enable preparation of the contract documents, please submit the
following to Project Engineer Dave Tibbot, Engineering Department,
235-2631;
List of Responsible Officer (name, address, telephone
number, and emergency telephone number)
Job Foreman (name, address, telephone number
and emergency telephone number)
Bonding Agent (name, address, telephone number
and emergency telephone number)
Corporate letter or resolution giving names of those authorized
to sign contract and samples of their signatures
Photocopy of State Contractors License (current)
Photocopy of City of Renton Business License (current)
Certificate of Insuran(e with limits per contract
Contract Bond on Renton form - UNDATED (date to bk filled in
when signed by Mayor) (Enclosed)
Five (5) signed contracts, also UNDATED (Enclosed)
If you require assistance regarding this matter, please feel free to
contact Mr. Tibbot.
Sincerely,
CITY OF RENTON
>
".G7l('Jr i
ily ,
Marn J. Petersen
Deputy City Clerk
cc: VProject Engineer Dave Tibbot
THE CITY OF RENTON
MUNICIPAL BUILDING 200 MILL AVE SC RENTON.WASH 98056
0 jX BARBARA Y. SHINPOCH, MAYOR • MAXINE E MOTOR,
spc{� rV CITY CLERK 0 (206)235-2501
9TEu SEPt E�'�;
April 11, 1986
Mr. Patrick Miller
Allied Construction
725 141it Place NE
Bellevue, WA 98007
Re; Bid Award for Water Project W-709, 8-inch PRIv Stations at S.
23rd Street and Shattuck Avenue.
Dear Mr. Miller:
At its regular meeting of April 7, 1986, the Renton City Council
accepted the overall low bid submitted by Gary Budd Construction
Company of Bellevue in the amount of $-13, '08.44 for the referenced
project.
Thank you for your interest and your bid.
Sincerely,
CITY OF RENTON
Marilyn J. Petersen
Deputy City Clerk
Lc: Project Engineer
O1' kF.
THE CITY OF RENTON
.. L MUNICI►AL OUILOING 200 MILL AVE SO 7ENiON,WASH 1W0%
10 BARBARA Y. SHINPOCH, MAYOR • MAXINE E.MOTOR,
CITY CLERK a (206)235-2501
J �P
�,JEO SEPIE
April 11, 1986
Mr. Philip Stevens
Stevens Construction
P.O. Box 584
Woodinville, WA 98072
Re: Bid Award for Water Project W-709, 8-inch PRV Stations at S.
23rd Street and Shattuck Avenue.
Dear Mr. Stevens:
At its regular meeting of Ap.,. 7, 1986. the Renton City Council
accepted the overall low bid submitted by Cary Budd Construction
Company of Bellevue in the amount of $33,008.44 for the referenced
project.
Thank you for your interest and your bid.
Sincerely,
CITY OF RENTON
Marltyn J Petersen
Deputy City Clerk
cc: Project Engineer
OF gE�
� T
y THE CITY OF RENTON
MUNICIPALBUILOINO MINILLAVE SO. RENTON.WASH.99066
BARBARA Y. SHINPOCH. MAYOR • M"INE E.VOTOR.
e CITY CLERH 9 (206)235-2001
P
lEe SEPTE�
April 11, 1996
Mr. Bert Robison
F.obison Contr. 6 Associates
P.O. Box S007
Kent, WA 98064-5789
Re: Bid Award for Water Project W-709, 8-inch PRV Stations at S.
23rd Street and Shattuck Avenue.
Dear Mr. Robison:
At its regular meeting of April 7. 1986. the Renton City Council
accepted the overall low bid submitted by Gary Budd Construction
Company of Bellevue in the amount of $33,008.44 for the referenced
project.
Thank you for your interest and your bid.
Sincerely,
CITY OF RENTON
,
Marilyn J. Petersen
Deputy Clty Clerk
cc: Project Engineer
Of REi
i THE CITY OF RENTON
MUNICIPAL BUILDING 200 MILL AVE SO RENTON,WASH.90M
BARBARA Y. SHINPOCH, MAYOR MAXINE E MOTOR,
se CITY CLERK a (206)235-2501
P
rPo sf PtEtJI�''
April 11, 1986
Mr. Jeffrey B. Kennedy
Evergreen Utility Cont., Inc.
P.O. Box 686
Woodinville, WA 98072
Re: Bid Award for Water Project W-709, 8-inch PRV Stations at S.
23rd Street and Shattuck Avenue.
Dear Mr. Kennedy:
At t:, regular meeting of April 7, 1986, the Renton City Council
accepted the overall low bid submitted by Gary Budd Construction
Company of Bellevue in the amount of $33,008.44 for the referenced
project.
Thank you for your interest and your bid.
Sincerely,
CITY OF RENTON
Marylyn J. Petersen
Deputy City Clerk
1. Project Engineer
OF i?F
c THE CITY OF RENTON
v MUNICIPAL BUILDING 200 MILL AVE SO. RENTON,WASH.99055
BARBARA N. SHINPOCH, MAYOR • MAXINE E.MOTOR.
Clrr CLERK a (206)235-2501 P
1tPO SEPtt
April 11, 1986
Mr, Delmonte Miller
Del Mar Construction Co.
15624 7th Avenue East
Tacoma, WA 98445
Re: Bid Award for Water Project W-709, 8-inch PRV Stations at S.
23rd Street and Shattuck Avenue.
Dear Mr. Miller:
At its regular meeting of April 7, 1986, the Renton City Council
accepted the overall low bid submitted by Cary Budd Construction
Company of Bellevue in the amount of $33,008.44 for the referenced
project.
Thank you for your interest and your bid.
Sincerely,
CITY OF RENTON
Marilyn 1. Petersen
Deputy City Clerk
cc: Project Engineer
OF RFti
U 2
THE CITY OF RFNTON
MUNICIPAL 1101 LOINO 200 WILL AVE SO. RENTON.WASH.99055
i $ BARBARA Y. SHINPOCH, MAYOR • MAXINE E.MOTOR,
9 e CITY CLERK a (206)235-2501
P
�404Tco SEPIE�
April 11, 1986
Mr. Robert H. Archer
Archer Construction, Inc.
1P-11 East Valley Road
Kmrt, WA 98032
Re: Bid Award for Water Project W-709, 8-inch PRV Stations at S.
23rd Street and Shattuck Avenue.
Dear Mr. Archer:
At its regular meeting of April 7, 1986, the Renton City Council
accepted the overall low bid submitted by Cary Budd Construction
Company of Bellevue in the amount of $33,008.94 for the referenced
project.
Thank you for your interest and your bid.
Sincerely,
CITY OF RENTON
r
- Mar_Uyn J. Petersen
Deputy City Clerk
cc: Project Engineer
THE CITY OF RENTON
MUNICIPAL BUILDING 200 MILL AVE SO. RENTON.WASH.96155
g BARBARA Y. SNINPOCN, MAYOR • MAXINE E.MOTOR,
P
CITY Ct.--RK a (206)235-2501
rE0 SEPtEW'�
April 11, 1986
Mr. Daniel E. Buno
Debco Construction
P.O. Box 1293
Bothell, WA 98041
Re. Bid Award for Water Project IN 709, 8-inch PRV Stations at S.
23rd Street and Shattuck Avenue.
Dear Mr. Buno:
At its regular meeting of April 7, 1986, the Renton City Council
accepted the overall low bid submitted by Cary Budd Construction
Company of Bellevue in the amount of $33,008.44 for the referenced
project.
Thank you for your interest and your bid.
Sincerely,
CITY OF RENTON
Marilyn J. Petersen
Deputy City Clerk
cc: Project Engineer
OF qE •
PUBLIC WORKS DEPARTMENT
RICHARD C HOMION • DIRICTOR
MUNICIPAI BUILDING MMILL AVE SO HINTON WASH 99055
e 106 :35 2%9
rFp SEptfW�
BARBARA Y. SHINPOCH
MAYOR March 28, 1986
yarl Clymer, Chairman
Numbers of the Utilities Committee
SubJOCt, M-709 8' P8v'a at South 21rd and Shattuck Ave. So.
D94[ Committee Members,
The hid openinq for the subject project was held on March 26, 1986.
A tabulatinn of the bids received is attached hereto.
The project iq budgetrd for S4G.00n.00 in the 1486 Nate, a Sewer Con-
struction Fend.
It :S recommended that the low hid, auhmitted I.y Gary Mldd Coustraetion
Co., in the amount nr S31,008.44 be accepted and thr cnntract for the
Rubloct projvrt be awarded to said Contractor.
Very truly yours,
Richard C. Uoughton
Public works oirector
DR'h mf
httathments
UTILITIES VnMMITTF.r
CIRIMITTF.P RF.I'UR'r
MY•a„at eostJt 27rd aBd sMatteM fk m. 80. IRrl et red: A-r-Bht
The utilities Cnmelttee concurs in the re.rommendat ton of the Public works
11epArtment to accept the low hid of Gary Budd Construction Co., to the
amount of $31,008.44,
The Committer alAo rrco,m mlia that the Mayor And Pity Clerk 130 authorized
to execute the rontrart documents,
Earl Clymer, Chairman
John Rend, Vice-Choirman -
Pirhnrd Stredirke, Hembnr
fN1f4 a711ry
QJournal o ommerce
� ; , o. kmylc, Na wtllil. l'APnc iln.. ._ '.
ox March 19, 19$6
City of Renton
Office of City Clerk
200 Mill Ave. So.
Renton, Ws. 96055
Notice of Bid Call 7259-B
W+ter Line hark
71 lines ( 1.10 per line 76.10
71 lines (d 1.00 per line 71.00 $149.10
Published March 12, 19, 1"6
Pneae fwfudr �ecnunt %umbrr wah Yuymrny
7259-e Affidavit of Publication
etey of Rita"
Wes.thn Wwk
--- --Ww~�-- STATE OF WASHINGTON
'ay`[ KING COUNTY—SS.
S Z 9sakd!..W. IM.At
fY"b"Ave.3
bid.WII be fey
Cblamh 2 m t:�DN AY. The undersirnsd. on oath states that he ir: :t
brt'" Web at she pn authorized represonlative of The Daily Journal At Commem
opass� sea ►At M
WA Rear rwdVty o daily newspaper, which newspaper is a s be nfor min,
wn Y R�wO of General circulation and it is now and has been for more
YW Lv. than six months prior to the dale of publication herefitai
ItNIYbdet IV Is.sor aertoansd refend to, published in the English language mntinuousl,.
"I of rkommdrroee�t as a daily newspaper in Seattle. King County, WashMgiol
tsadae this contract "hall to- and it is now and during all of said time was printed in iw
dUMV tna be 1.1t d1, office maintained at the aforesaid place of publication of
the terms of this mntraet this newspaper. The Daily Joutal of Cnmmerrn was nn the
it—
t of 1.e teteinstula- 12th day of June, 1BU, approved as a legal newspaper by
non of tWt dj ismsum ce the Superior Court of King County.
distant t!niona in the iisat
of-w of Shattuct Ave that
S z]rE St Taia shall inetud. The notice in the exact form annexed, was published in
,he fumnMns and install". regular issues of The Daily Journal of Commerce,which was
!ion of approximae.y is rr¢ttlarly distributed to its subscribers during the Irc]ow
Ltossi Feet of a'Ductile Irvn g
Pt tt tWu c�npplete atul PRY staled period The annexed rotice. a
34liom mctudtn all vale"", Pe
full�a end aPPts�.n in
rtallM u awsn on t r cox )Iloilo.® of ZIA Cull
eteurrior. plans and ;near
t PeciLcu Iona. and the _.....
AMA t nollM ynisel aria - ..........._..—..._
tul4 or tnai txnaItkn wait pu6Us6�m tlir:ch 12, 19, 1986
tutrtjritsay aid orthe Ili bTA.
and o waive any and/or�l -.._....._ ......._._....
intormiintea
Approved lam aadrela .......__......_....._ ..
d-it.. and fVon of eca3Lltrrt
dxttnwn:s nay be pptaltr.d
at the Publlc worts Depan ..
menu hire at the Renton
NunlripH Buildin for a �-
Oeoaut of µye r ara sat pl it Subscribed and sworn to before me rm
to to eeea��tsIt T1l If
ntauad Toe It a be
r.lundM upon "torn of Me
plain .tsd Sparuicuis in >tti�lYL 19a 1f186
din. Within thlrtw
axe, bld opeenina. The
ouilm[ tharae WI11 not he
reA Mil s r wall,1.1 ih.st.l. ,•r W..".oai
A t<nthed Mack r bid ..aaua la LanttN.
wins In the assistant or ftal
parrot f saa of W total
aaloicl ut wrn eta most.o
1y a xh elide
nt�a air Ppeli>
ill7yyiiaippclrYiwn,lion Poli on
pp rtTn Nkr[tL.MOTOR.
iaettl.3 _- �p
rM 1rtA�sMNa
• • (,ta - 7 a 9
AFFIDAVIT OF PUBLICATION caawn«.
Pr V
being first duly
wow R w.raa
:worn on oath states that e- Pe At
he she Is the Chief Clerk of the S 2310 a aria al.alaca Ave S
s..ra tad w a id nowead ma r p
P., wea Marc!,z lay a ar CA,
VALLEY NEWSPAPERS cr a. all" w .r ea 0wha
NaoN was n Rw an av oonlwaw
.Oaei.�n WNcpai aaUYia.2011 AY
(lady News Journal, Daily Record Chronicle,Daily Globe News AYe 6«An
rlw nark a by Peaodlea away 30
Daily newspapers published six(6)times a week.That said news aasut g aae f.se
araaoamww-
paper5 AN'!ofds that axwect ear eYuae twi
tie legal newspapers and are now and have been for more than six ^aa Walla
months prior to the date of publication referred to,printed and published taawtraww.d aaeaarammanw
in the'.nglish language continually as daily newspapers in Kent,King al ton wad i eya
County, Washington. Valley Newspapers have been approved as legal IA••Vaas.aY ci Snerna Aw a a s
newspapers by order of the Superior Court of the State of Washington for arnwaing
w.r o nas o,a`wamaw, M Is Lnew
King County. Fan of a-aar aan tie.on coaeMW
" MM alsaaAa aaaaiig as vnYee.
adage w apa«rnattaee arteae0 w
The notice in the exact form attached,was published in the Daily News arrlmaw deevumgiwwe...
aprdrraaaww w tlr aura a w
Journal—.._, Daily Record Chronicle _^., Daily Globe News_,and p'fae C*ra warh.ya b�rMYq
not in supplement form) which was r.galarly distributed to its e.o«rail amarrYe asr eaaM aY
subscribers during the below stated period. The annexed notice a ant=Mse.
�;d11 For, ciao AW..aa wa,and epadaseamiew
--.- ---- waspublished iorm a —11.11 d ,ovsa met be aR
on March / and 14. 19ro 11141 ) 'Wad, at tt,v P. works Depeiaeea
aaceai ma,15W Mv.rc.wi1.U40 to
0epd,1 c.�US It.ace vie d b
as o {pataa. A Aie,lp roe dpeaa w r
d na.na.d ap.n.eawi a on nwirw
The full amount of the fee charged for said foregoing ape s1K.I.t. n 9a00 a0t11arA natWl
g g g publication is the 11.av day aaw as apwig,ha avast;
sum of S.)-..SIA--. a,a.a..ai aw ea ralxlaee
A c.roa id cnecA « aid aaa r ar
isms 1 dt aw W'"(a11a a1 so Iasi
tl 11.o W B.Ch W rust asaaeaapn mey
Y s Fa,t NORIM was as iW
Means a.law
Subscribed and sworn to beforemethinldttn_dayof�rQht9�.. Paaa.nwa,th.0..,�,Pa dciaode
t+iUtl�r W le, 19" Meta
Not public for the State of Washington,
resulting at p'aderal Way,
µ..,M.. daia King County,Washington.
i ,�,
d �►� _
��I,r .
��r
':i 1�f ��
w w � � �.
._
��<<�,.�
■ �� i
r�
� �3
!�!!!•
�' `��
_�.
'c`�aa
w'"
i
p. sY\
r� ��
�Z'�'
CITY OF
RENTON WORK ORDM - DISTRIBUTION DEPA1
No. 450/9
PROJECT NO. _r DATE.6c�[�IE�
i
PROTECT NARY �l S,- it t
FUNCTIONOR OF PROJKTt✓ 4t 1 AiL _
ICE: /,J S" 7 /L -�O I•'L��, .L�
RY CITY FORCES ❑ CONTRACT ❑ R CONTRACT NO.
CONTRACTOR'S NAME
CONTRACTOR'S ADDRESS
ESTIMATED COST F1111 "SOURCE_ ACTUAL COST
AGREEMENT} ❑ D SO{ NO. SPECIAL TUTTING ❑ IF 10,
To
COMPIFTED
APPROVED RY__ .�E.(.0 ItMM
MIN Of WORK ORDER - DISTRIBUTION DEPARTMENT
UTILITIES
RFNTON NO.
i
PROJECT NO A DATE / IP
PROJECT NAME ,.� _ •I r,( �EIT-C Y� Qt L! .+Z .� /L/Q--LC� CP /�.tt• .44
FUNCTION 01 DESCRIPTION OF PROJECTA�. .�lr J /_ cI J ln. ./I.� kf l '
BY CITY FORCES ❑ CONTRACT IF CONTRACT NO.
CONTRACTOR'S NAME _-
1 CONTRACTOR'S ADDRESS
1 ESTIMATED COST _„__FUBORIO SOURCE--ACTUAL COST
AGREEMENTS IF SO NO ._ SPECIAL SILLING ❑ IF$O.
t TOE<t�, _ ) ._• 1.�1� ..-
APPROVED RY
CERTIFICATION By GENERAL CONTRACTOR
ref: Payment of Prevailing Wages
to be Submitted to City with each Progress Payment Request
DATE:
PROJECT—Watez Proiect W_109 _ CAG No.
D-2LA
This is to certify that the prevailing wages have been paid to our employees
and our subcontractors' employees for the month of Ma
in accordance with the Intents to Pay Prevailing Wage &ed wit�he
Washington State Department of Labor & Industries.
Com au ncrruct ion campa✓y
Name
_ gary flvdsL—
t�i'teet___�_----
•
CERTUICA11011 BY I:LRIRAI CORIRACIUR
ref: Payment of Pl�vailiml Wages
1. to s"itLed to CIV Kith each Proyrgss_haYa_enl keguesl
DAIL:
PRUJECT W-709 PRV's at S. 23rd and-Shattuck Ave. CMG No. M-86
fhis is to certify that the prevailiny rages have been paid to Our ragiluy+•rp
and our suhinmrae.to,s, mployees for the moth of MAy 4 ,a,-
in accordance With the Intents to Pay Prevailing Wage filed wit+ lam
Washington State Delartment of tabor A Itnlustries.
Gary Rudd Con structior Cowry
Company Name . . .
if
Y
� a
OF FILE