Loading...
HomeMy WebLinkAboutWTR2701990 R-1 Park Place North Short Plat- N. 26fih F. Park Place Nor-t-h BEGINNING It 1 Must 00"Tot c F tau as"M u avow rn■com t w Tm g �awtry,y,"I"a, 4.. Ftlerf In Record at Request of r. N � - c T I IILUSt]R..u.RD 1 liiir ,W% 6Q1➢I��wi-9WL�jY{ZY_1 'C IE HII CIIf_ k 5/12/11 00616 0 nIIM1�1�I111� I RFCO F S.DO — --- CASHSL ►rto5.00 ffiftum 55 BILL OF SALE ""' LOOM &NOR' ALL MEN BY THESE PtEg.srn That THE NEI LTON GROUP INC. sty o1 KING ajBELLEVUE lu turd to cmaidenttm of tha wm at -Sues of Nesbiytan,tha Pan y N*a Ora put ONE L no/ 000______________________ iowfui num y of the umaed slue ol Mmice,to t hem ___•Dollars a ha nd Paid by the city of Renton tha P4My a the -coed W. lk race0 mbe I m Wfty 4koouledVd. does by time Mesta lmat h4iW.NU Y,d ,beer unto the Wd y al the mead Pot,Ue 1 Immmi at N0, 26th, �T, E �AhK PLACE N0, d� P'�'cty nw r Ue Cir�o9RENTOr� �h,a KI NG NW � of R, W, t7 Winpm, to-wn APprextma aly 260 L.F. of 8" Ductile Iron pipe and 1 of fire Hydrant NAssemblies, and 3 of Gate Valves, and all appurtenances pertaining to said watermain, expressly warrant ing said watermain against any mexnenses, cost or liens he, uto incurred thereon by, through or under seller ha rein, TO HAl-E ADD T:' RCH.D the mme to the and pMn i tatzac i=-t. i t 5 ben. necutun admmbuLw, end aa'eoa loner And Maid W 1 0l the u 9 the tsm pannoes i t hain eeetv.M, adm nutn a.eesn tura, c6 and aPreeb to Sad •.tb the mid part mxutora, admmuvaton Sod any-, that mid pan. of the first pan t hcM oexr Lim woodHof the SLd Pta'any,yer'da Mod chattek and ha; Pout nttht VW IWI authority to -II the awte and that i t Mill IMMrnnt Ltd h ilk the k bereft, mtMe unit the mxt pan). of the mcoad pan. I tS mt etora, admnimraton and uqu apiost JI and ry y penoo m persona, wbomesea-. Yaluily tiummt w i, Claim tke mme, IN WITNESS WHEREOF.The mid pan y of the hm pan ba� Im Muntu -; i t s bad ad On F i r a t day of b.nd October, ig65. i1.,. . STti! OF t1 ASHIVGT'ON. 4 County of w a- ,mere to�Gy, NVearsd helm,me . Mdr"'dual d"e'l"'d m and stba muted the atthLn and ttxegotoy ackooeiadyed that I yob td mme 4 t"' .Md vduo wom and purpom thereto mentw Y; wY M and dhV iur the GI%EN undn my bead aad OMCW amf do of N"WY hNk i and IN him Sites All MWNPCwa,_ TO: Cin OF RENTON FIVON UTILITIES DIVISION -- ZOO MILL AVE. SO. RENTON WA 98055 ATTENTION: ARLENE HAIGHT DATE: CGST DATA AND INVENTORY SCBJECT: PARK PLACE N. C1;) PROJECT NUhB@RS: W- 779 NAME OF PROJECT S_ Dear Ms. Haight: Per your request, the fcl lorinR informotfon is ''urnished cmceming cn:n.e for I Installed for the above referenced project. WATER SYSTEM: Length Size `'Type 260 L.F. OF' WATERMAIN L.F. OF — -- WATERMAIN L.F. OF WA',IRMA IN 1 L.F. OF _ WATERt1AIN EACH OF FIRE HYDRANT ASSF"BLISS _ v EACH OF " GATE VALVES _. EATH OF GATE VALVES EACH OF GATE VALVES Other: 21 2" BLOW OEL ASSEMBLIES TOTAL COST FOR WATER S5!S1'111111I $ 7 00,00 SANITARY SEWER SYSTEM: SALES TAX PAID (d 8.1% $631 .80 Length Sire Type a i L.F. OF SEWER MAIN L.F. OF i�" — SEWER ,MAIN L.F. OF —_�-" --- SEWER MAIN EACH OF DIAMETER MANHOLES Other: .- -- �� ' TOTAL COST FCR SANITARY SEWER SYSTIX S STORM DRAINAGE SYSTEM: Length L.F. OF _" STORM LINE L.F. OF _' STORM LINE L.F. OF �— STORM LINE L.F. OF V' STORM LINE Other: TOTAL OS—�C'T FOR STORM DRAINAGE SYSTEM eTREET IMPROVEMENTS: (Including Curb, Gutter, Sidewalk) TOTAL COST FOR STRFE7 IMPRO PlfEhT —'— ILLUNIR TOTAL COST FOR LLUM A S Very truly yours, ATTENTION: ATTACHED ARE AS-BUILT PRINTS FOR PROAC I: an2C PLEASE FIELD CHECK AND THIS SLIP WITH YOUR COMMENTS TO:_. It INSPECTOR'S COM?ENTS: �� r . NOTICE OF NEW FIRE HYDRANT IN-SERVICE NAME OF DEVELOPMENT ADDRESS -�-'- INSTALLATION CONTRACTOR WATER PRQIECT NO. _ NIMBER OF HY --""'DRpNTS HYDRANT LOLA-IONS (FOR FIRE DEPT. USF ONLY) 1. HYDRANT NO. 2. -_ 3. 4. INSPECTOR --___ of RAt, u r PUBLIC WORKS DEPARTMENT V70 RICHARD C HOUGHTON 0 DIRECTORMUNICIPAL BUILDING 200 MILL AVE SO RENTON,WASH 90055 SweoE 2D6 235 256: BARBARA Y, SHINPOCH MAYOR July ), 1985 The Neilton Group 14040 N,E. Rth Street Bellevue, WA 98007 SUBJECT: 11mtu Short plat - tXf•Slte Deferral, 1303 N. 26th, Renton, WA Gentlemen The Board of Public Works reviewed the subject deferral which was brought to their attention by the Design Engineering I)ivision of Pubic Works Department. It WAX determined that you should hecontacted and advised that an extension of ('0 dAYx has been granted subject to the Plat B.nd beinR updated to give all pArries involved an opportuntiv to Cleat up the pipet work Involved, our Design FnRlncer has advised that this is all that is locking toward final acceptance. please advise kits, Porter of this office ref. bond update. Wank you for your attention to this matter. Very truly yours, UTI ITY ENGIN PRE-OCCUPANCY INSPECTIEEAION REPORT Ri • w •H ughto t Richard C. Houghton 1• REWIRE: W. '�19 WATER B, SEW man. Board Public Works BILLOPIfy►IiF COST DATA a •' INVENTORY �'lrCviiE v YY__ ASWLTPEANB pfXWI.F. a � SUBJECT TO F9U INSPECTION BY_ Of RE. Am PUBLIC WORKS DEPARTMENT � DESIGN,UTILITY ENGINEERING 235 2631 i Wts"CIML WILDING N0 MILL AVE.SO RENTON,WASH.91006 b kP I.f0 aplt� BARBARA Y. SHINPGCH MAYOR May 10, 198S Haiti" Grout, 14040 N.R. 8th St. Suite 'No. 312 ^ellevue, MA 99007 Attention; Mr. John 9ratton Subject: Park Place North Project h-Itu hear Sire; Please he informed the Cjty of Penton herphy acknowledges that your rompAny Installed the 1 4" servlce lino% and appurtonancns from the P" D.1. watormAin to the three III lodit'idval lets in tle Park Place North Short Plat, for this work you will recrt,'e a prodtt of S]40.W' foT "I of the "cat of A S400,on etandA•d 1/4" residential water meter, towards each of the three meters, Hetole this ecknrtwledgement, you were issood A meter for Lot I in the short Plat And were charged the . . 11 re.,unt. Therefore, the 1v,,,Ining two lots will be charged S40.00 oa-h for the meter to make up f,ir the overcharge, plus the system development fees. The coat breakdown is ea follows; t,.t l - 900.On meter fee, less s24tt,00 credit . e,h0.t. Lot J - S4DD.en mptnr fee, less S�40.nD credit . Sl6o.pri Lot 1 - $400.00 meter fee, less $240.00 credit C 36_0. �> S._ __ S 400.rP U 0 Under 5010045 3g Lot paid 400.00 Balance owing to Ila split hr-ten Lots 1 & $ 80,00 A copy of this letter will twt kept in the Westmont file and Project Pile m-719 and made a part of the permanent record. Very truly loot tl).SJr\nF� � 0. Ronald L, Olsen Utility Engineer at 19 Agreement File • CITY OF REM. N WATER DEPAR• - Pressure Test 6 Purification Test Form PROJECT NO. &— 7 Z NA4E OF PROJECT PRESSURE TEST TAKEN AT A PRESSURE OF �.P7SI, FOR_/j MTN. TEST ACCEPTED ON //— e PURIFICATION TEST TAKEN RY ON PURIFICATION TEST RESULTS, SAMPLE el SAMPLE e2 SAMPLE el REMA4 KS: NEWTON GROUP INC. r OF FILE