HomeMy WebLinkAboutWTR2702210(3) W-2210 Highl-nds 565 Tank IntetiQr Paintinc=-permits
BEGINNING
OF FILE
V
FILE TITLE V
� 01, �
f
i
1
Y
1
CITY OF RENTON
DEVELOPMENT SERVICES DIVISION
ABBREVIATED ENVIRONMENTAL CHECKLIST
FOR PROJECTS BELOW SPECIFIED SEPA EXEMPTION LEVELS
TM Sat.Enwonm""Poky Ad ISEPAI CM p,w u-21C.RCW,requ e1 porarMYMd e9u+ k o.rukar tlr emDamwvd k,PiioU d a IxapaW f
a.lan m N d.chixi a AYXrpn ea SW.Etv ixt Untal ft"Ad do.a Weooy uihhe,Wep.wa-. Pt M,ON"rai k s Oi S�EPA"We"w by V
bc.l ag•,cMe X tlura Y.iesaC.d d poMo..prvliure aMww eWacl.*an an Gner.Ue M.aoXuih...n1rX IXp1ed. AYrxe
g.Mney,asulrl enarW,W W donXrY,Xallon MNn a Vq>or Y atteocrr.11y,w ro,M"seeser pol.rfa.n.In IDOL a W d.Wy.r M MXd,Y,M
e..110 AYa,u1d.r raperX Wb•Y'»Yu.d IM a'e Wa.M gm S DeaDM1.r'or E*WM.16 ww,m vtl l tlrl Do r Wit ra>i.yAq Ptgj alma the
SEPA w.a eaMka,.d. TTY Houk G wneY1M.11a.1 pB0 sMe Cowl d A11PesY daeNbn yM.a 11e10*W saDMMD*row oonaker Yk.ly.r,Ww,vxiMl
M.cra gegh app a ac SEPA patepol(al eu dditia TM Cry d Re,vn"d t d rx 6111 pia o WMad any v M i-n In done a.. Pt.aa. - ,al
.I<a Ru.dim and aaaeh Yew an..nn on addttlonal Pape.a you naafi nwn apace. Da r,el Maw any�welbn planMJl a*walbn du. ,al
apply,please notethis n the a .eon
Pleas*rem@m er t ach a vicinity map,pro act narrative site plan and one complete set of protect Plans.
A. BACKGROUND
G•nfod: Torn M..1,ehrvy _
1. Name and Phone Number of Applicant: C.;ty, o F (Z C.Ato n
2. Address of Applicant 200 fy% 11 Ave S
tZ entoh r WA 919055
3. Project Name or description: S65 Z.nc R.>el vo;c Znfcr:.r R._res+:n.
{. Address(or Sectionrrownship/Rsnge if the site has no addril 3'1 1 O N E 12+h S't ree_S .9i
5. Tax Account Number of the Subject Site o'7 2.B O S 9 I S(o
6. Is this proposed action related to an existing structure or activity on or in the immediate vicinity of the subject
Site? y Yes No. If yes,please describe in the project narrative. E
7. Do you have any Plans for future additions, expansion, or further activity related to or connected to this
project? X Yes No
6. List all federal,state and local governmental approvals or permits that will be needed for your proposal, it
known. WwS" nyio(Y
G'+y of Re.n4eg r, 6v.1 r�:n, 1?.•r•m:'t
9. Please posed a es,the a descriptiontoan of g your proposal,(in
ardsUn9 asps on the type o site,
the proposed uses,the amount of any grading or rtlling pn cubic yards),the amount and type of any
on-site contamination,and the size of the project and site(in square feet).
10. Attach one complete set of pciJect plans, a scaled site plan, and a neighborhood detail (vicinity)
map.
If. What is the current zoning classifc on of the site? N\\1 _
12. If applicable,what is the current shoreline master program desfgnsaon of the sit*? N A
13. What is the current use of the site and adjacent properties? Z h r c,i<- wrr eX.T1 v c„n+n
2 . AA hyunT' creel
14. What were the previous uses of the site? Could any of these have resulted in contamination of any type on
the site?
No _ Yes. If so,generally descnbe.
...•, ,w..,....-..,.u-+*.oar+re.,..w.-r.,:: _
B. ENVIRONMENTAL ELEMENTS
1. Are there any surface indications or history of unstable sots In the immediate vicinity andfor Could erosion
occur as a result of clearing,construction,or the proposed use? No Yes. If yes,
generally describe and discuss proposed measures to reduce or conlml erosion,or other impact to the earth,
if any.
2. Will this proposal result in the emission of any hazardous substances(such as paint or petroleum products
fumes), smoke, or odors Into the atmosphere during construction or when the project is Completed?
No X Yes. If yes,please explain and discuss proposed measures to reduce or control
mr Onaor Other tOak,NwY. A ern.\\ wsne„Wr •E pa:ntin r„ �l\ be rsonr-
0^ Cho ..kMr:er •4 Tlna tonIL, The 4ntra t OW,w en sh.re:°Tito
GntTa for Sha\l Qr•taat ? 6\:. end Prluwta ?r.P'"y fr.,.. �:r 6•.na c.n?o w:n.a
FfM /Vffa t. fea?.r t:•n .Y A :ap;'t Paint. Th. '.ntrartw abaft "
Pell
yna. ,n{Tata
ranval or Otin.r e✓/r:n to ?ro.;J� rw:a \av R.t:.n.., tt 1
S. WI0 the"ad requite an�work over,In or adjacent to(within 200 few)of an surface water body,such as e
stream,pond,lake,or wet and? _X No Yes. If yes,please explain.
a. Does the proposal lie within a 100-year 0oodplain as indicated on the latest Federal Emergency Management
Agency(FEMA)map? No _ Yes. it yes,please note the 0oodplsin location on the site
plan.
6. Is the project located within an Aquifer Protection Zone? _Yes,Zone 1 —.L—Y.s,Zone 7 _No
6. Are there any environmental health hazards, including possible exposure to toxic chemicals, risk of fire or
explosion,spills or hazardous waste,that you know of that could Occur as a result of this proposal?
NO _ X Yes. tfyu,pNe6texplain, j2 e.+.s vnl ef-
blpytln L4rPliaul:en of nc.,. uqt'.n• witti:n q^ i.n.-les.� Str✓-t✓'C,
If. Could waste materials from the proposal or activities ort the site enter ground or surface waters?
dyes __No Tit. yasa;b;ltY axtsTs i..wa.cr -ham vntra�t cta}cL•,
4.,r Twa 4ntraaivr c6y1) aterar x.nfQ.et awd a:aWpeN •f r 6a
T\at :a In c..np4anca .TA gt'1:u616 fadcro\, >tatc, q.d I/a..l rst.�l.at:enS,a
•, M Hare any threatened or endangered species known to be on or near the site? _ No _ Yes.
N yte,please indicate what they are.
9. What types, levels, and hours of noise would be Groom a Of associated with the project due to its
wnstwctionorposbdevelopmentoperalion7 Jvrin1 �natr�ar,on r6, w.0 b� m:n:wal tra lE:� Tu 1 E aM lL.a S:lti ta., T1' m lot foma ne: r
wi Send blal.t:n •y �, rM.d is a/aaea:gtaq
w•r•`..:n� 6•v rS and 'rh'n w.wr c.tt.r,.61> n.;a,Q j.vclS. \
10, Could light or glare from the finished project be a safety hazard or interfere with views from nearby
properties? _ No _ Yes. If yes,please explain.
11. Could the proposed project after or obstruct views In the hnmedlale vidnhy7 NO �(_ Yes ifyes,please describe. mrn\I
"l -;P•eQ.kR he._. tHa. {-c.>c.rve' to L The. rcS�rtro;r
`h • S.
12. Would the proposed project displace any existing recreation uses on she? s No Yes, If yes,
please describe. _
47
x
' U. Will the pro d resua in an increased need for public services(for example,fire or police protection,schools,
etc.)? No Ves. If yes,please explain.
I
CERTIFICATION
The above answers am true and complete to the best of my knowledge. I understand that the City of Renton Is
relying on them in order to consider the likely environmental effects of the above described project. I hive aeamae
a vicinity map•wood Mrtativa act.Ptal a^e one camplNe M a aWKr WM
signature: 7�Q.a..-. Date:
Relationship to Appllcot C R l0 cT c 0
FOR OFFICIAL E ONLY:
Reviewed I Date Revieved:
Recomme etl Classiflcalion: Exemption Upheld '.
—Further Information Including regular Environmental Checklists.
required
f
eEVISeD IM
._d
i
{
Y•
k
t
�i II I
4y
i Sr
r
I�
HIGHLANDS 565 ZONE RESERVOIR INTERIOR RECOATING PROJECT
The site currently houses three water reservoirs. Two at grade reservoirs serve the Highlands 435
pressure zone and one elevated reservoir serves the Highlands 565 pressure zone.
The scope of this project includes:
• Removal of the existing paint, surface preparation,and application of a new protective coating
system for the interior surfaces of the reservoir.
• Fabrication,installation,and painting of a ladder landing at the catwalk.
• Fabrication,installation,and painting of a handrail around the access manhole,navigation lights,
and vent on the tank roof.
• Installation of a safety climb device on the exterior ladder between the catwalk and the tank
jI access hatch on the tank roof.
I • Removal of existing paint,surface preparation,and application of new paint on one 4 square
1 foot patch on the exterior surface of the reservoir.
The project entails no grading and filling. All waste generated from the project will be stored,
transported, and dts�osed of in a manner that is in compliance with applicable federal, state, and
local regulations. The project entails no building of new facilities but does entail the construction of
safety features on an existing facility.
i
I
Y:
A 1
y.
MJ 111oocQy S4S gene 0.es e.rvo lc Zn�ar:u r• lZ ccoo.T•� c"'r• e.� �
qr
°s Y PR6JECT
y�y Y a LOCATION Y r
Dy +
rY
a �
t
• 11CMOY � • • .�
i Mvenrnn�. T Y � n
15 �
x
• �®s no ss •• �4�
s vo sr ! •� ,^J
CITY HALL
VICINITY/KEY MAP
NITS
i,
1
4..
f
T
a,
1
L 1 2
I '
I � P SGS 2an�. �2n i I
lot
ev
Ralarw:f �1 a � d..
Highlands
a� Reservoirs "
Highlands
Elevated Tank
7 a
PLftV on
flu
B• -qN _Q,r _
i Vr
�I
t;e
own0 mom
MRS
■
�■ �� � ■� �\IfiiWll�.
�■ e. Ison ■ '� _uqb "
� , � ■YAW■■■■ �.,� �r
�� � ■rIJ■■YY■ .�iir� ■i
� ■WLi■I■WW■ ■YID■�,�f7�� ���
■ !ems . ■ ■. ■�. :.
ar
I
CITY OF RENTON Building Permit
Permit Nrunbv B950401
Permission is hereby given to do the following described work.
according to the conditions hereon and according to the approved
plans and specifications pertaining thereto,subject to compliance
with the Ordinances of the City of Renton.
Nusire of Work
ADD.OF SAFETY FEATURES TO 565 ZONE RESERVOIR TANK
Job Address
3410 NE 12TH ST �>
Owner
CITY OF RENTON
200 MILL AV S
RENTON, WA
Tenant
Contractor
PRODUCTION FINISHING INC Contractor's License PRODUFI180JG
1645 S 310TH STE A Contractor's Phone (206) 839-7950
FEDERAL WAY, WA City License 7314
98003
Comtr lender
Other Information
Date of Issue 04/23/1996 Sprinkler Required
Due of Expiration 10/20/1996 USC Type of Construction
Construction Value 20,000.00 Building Height 142
Parcel Number Story Count
Renton Job No Building Sq.Ft.
Dwelling Count 000
Zoning Occupancy Group
hereby certify that no work is to be done except Subject to compliance with the Ordinances of the
as described above and in approved plans,and that City of Renton and information filed herewith this
all work is to conform to Renton rrodcs and permit is granted.
ordinances.
Applicant A �w v\��� ` Building Official
$20.00 WILL BE CHARGED FOR COPIES OF LOST OR DAMAGED li ' ITS
BDInlid IeN) nl
I
y �
�i
al
r
A
CITY OF RENTON Inspection Record
Permit Number B950401�
24 HOUR NOTICE REQUIRED FOR ALL INSPECTIONS
Call by 3:00 pm for inspections the rollouing day.Phone(206)235-2542
Call before work I,concealed or purring concrete
Do not pour a.^crele until approved
IN,not rover until approved
Do not occupy until Mal inspection Is romplete
Nature of Work
ADD.OF SAFETY FEATURES TO 565 ZONE RESERVOIR TANK
Job Addreat
3410 NE 12TH ST
(honer
CITY OF RENTON UBC Type:
Height : 142
Conuxtor
PRODUCTION FINISHING INC Square Feet:
(206) 839-7950 Occupancy Group:
I a Date Im Comments
Foot in i
Foundation
i
Framin
Shearaall
Insulation
Roof
Ceilin
Other
I ❑dsca e
Final 7 Le
I
i
BDuOld 10141 m Post this record at job site at all times
.� CITY OF RENTON
'a Planning/Building/Public Works Department
lesu Tanner.Mayor GreU Zimmerman P.E.,Administrator
09/27/96
PRODUCTION FINISHING INC
1645 S 310TH STE A
FEDERAL WAY, WA 98003
SUBJECT: Permit Expiration - B950401, 3410 NE 12TH ST
Work Description - ADD.OF SAFETY FEATURES TO 565 ZONE RESERVOIR T
OWNER - CITY OF RENTON
Our records indicate Permit Number B950401 has not had any inspections
within the last 180 days. This permit will expire on 10/20/1996,
unless an inspection is made, or this office receives a written
request for an extension.
If you simply need a final inspection, call 235-2542 prior to 3PM
on the working day before you want the inspection and follow
instructions given in the recording.
Once your permit expires, it will be necessary to obtain a new permit
to complete any unfinished work. A new permit would be subject to all
current codes, which could include new environmental or land use reviews.
Additionally, unfinished work that could constitute a fire, life, or
health safety hazard may be required to be a.tered or moved either
voluntarily or through a civil violations process.
Your prompt attention to this matter is requested. If you have any 1
questions, please call me at 277-6180.
$nere1 anler
ng Official
200 M®Avenue South-Renton,WashinSton 9W55
-P
J P
vv1p;J�
CITY OF RENTON AUG 1'i 1995
PLANNING/BUILDING/PUBLIC WORKS CITY OFI?Eh �� '}
MEMORANDUM FUBLIC WORKS A'ON
DATE: August 17. 1993
i `
TO: Gregg Zimmerman
Sam Chastain I k
Lee Wheeler -
Ron Olsen
Jack CrumleyF' r..
Karl Hamilton
Jim Hanson
Mike Kanerman
FROM: Tom Malphrus,Project Manager
Water Utility
SUBJECT: HIGHLANDS-W ZONE RESERVOIR INTERIOR
RECOATING PROJECT
Project Proposal
4
Enclosed phrase find a copy of the project proposal for the above-referenced pray i. Please
review,sign and return the proposal to me within two weeks.
If you would like Ic assign a staff member to the design team for this project,please contact me at -
X-4413.
Thank you.
H[WS:95-702:1nM,M
' Erclowrt
LT: LYa H.by
Ty:
y
.t1
�ht
P
tY
HIGHLANDS 565 ZONE RESERVOIR
INTERIOR RECOATING PROJECT
PROJECT PROPOSAL
t
I
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS DEPARTMENT
1�•r X
f .
b.
Prepared by: Utility Systems Division
Tom Malphrus
Project Manager
August, 1995
WE
�.J
TABLE OF CONTENTS
CITY OF PENTON
HIGHLANDS 565 ZONE RESERVOIR INTERIOR RECOATING PROJECT
Project Objective: I
1. Project Background I
11. Project Description t
A. Scope of Work t
B. Design Considerations I
C. Environmental Documents 2
D. Permits 2
E. Preliminary Cost Estimate 2
F. Project Funding 2
G. Project Schedule 2
j III. InvolvamentlParticipation 2
IV. Staffing 2
A. Project Management 2
B. Preliminary Design 3
C. Design Team 3
D. In-house Reviews 3
Management Acceptance and Commitment: 4
Exhibit: Project Location
H:D005:95 694a:THM Va
t- s
jai
i r
t e
IN
HIGHLANDS 565 ZONE RESERVOIR INTERIOR RECOATING PROJECT
PROJECT OBJECTIVE
The objective of the project is to replace the existing coating on the interior surfaces of the Highlands
elevated reservoir tank.
a
1. PROJECT BACKGROUND:
The highlands reservoir was constructed in 1960 to serve the upper areas of the Renton Highlands. k
The reservoir is a 3/4 million gallon elevated steel structure. The reservoir is currently the only
reservoir serving the 565 pressure zone in the Renton Highlands.
The exterior of the reservoir was repainted in 1978, however the interior of the reservoir still
contains the original coating. An engineering inspection of the interior of the reservoir was
performea in 1985 and found corrosion was developing on the tank in the area of water fluctuation.
i The inspection also found some rust developing around support beams in the ceiling. The inspection
5.
resulted in the recommendation that the interior of the reservoir be recoated within five to seven
years
IL PROJECT DESCRIPTION: I
' I A. SCOPE OF WORK:
The scope of work for this project entails:
• Removal of the existing paint,surface preparation,and application of a new protective coating
System for the imerior surfaces of the reservoir,
• Fabrication,installation,and painting of a ladder landing at the catwalk. _
• Fabrication, installation, and painting of a handrail around the access manhole, navigation
lights,and vent on the tank roof. w
• Installation of a safety climb dt vice on the exterior ladder between the catwalk and the tank
access hatch on the tank roof.•
Sanding and painting a 4-ft' section of the exterior surface of the reservoir. 4'
B. DESIGN CONSIDERATIONS:
Design considerations for this project include:
• Determination if the presence of lead in the existing coating, found to be in the range of 1500
ppm, will require special removal and disposal procedures. Determination will be made by
testing air quality within the tack during sand blasting and testing sand blasted samples prior to
disposal.
• Determination of pitting and weld nrotusion conditions after the tank ha,been drained.
i
y
4
Ii�MF—MAMWaaWaarWYFa.•
x w
I'
pi
'a
77
INIOMI
M
Project Proposal-Highlands 565 Zone Reservoir Interior Recoating Project
Page 2 g
C. ENVIRONMENTAL DOCUMENTS:
An ABBREVIATED ENVIRONMENTAL CHECKLIST has been completed and SFPA exemption
has been upheld.
D. PERMITS:
Plans and spas for the addition of safety devices have been reviewed and approved by the City of
Renton Building Department.
The State of Washington Department of Health has reviewed and approved the project in aCCOrddnce
with WAC 246-290. I
E. PRELIMINARY COST ESTIMATE:
The estimated cost for the project is as follow: *.
Design Engineering $53,181.00
Construction Contract $118,000.00-$18 1.000.00 "-
City Staff Time $151000.00
Total Estimated Project Cost: $186.181.00-$249,181.00 .y
F. PROJECTFUNDING: `+
The project will be funded through the Water Capital Improvement budget,line item:565 Reservoir
Recoat-421.000500.018.5960.0034.65.055330.
G. PROJECT SCHEDULE:
Design Engineering is complete. Sand blasting,construction and painting is anticipated to start in
October, 1995,and be completed in November, 1995, If there is a delay in awarding the contract,
the project may be postponed until spying, 1995.
III. IN VOL V EMENT/PARTICIPATION
The following agencies are,or may become,involved in this project:
I
• City of Renton Parks Department
• City of Renton Fire Department
• City of Renton Planning/Building/Public Works Department
• Washington State Department of Health
• Puget Power
IV. STAFFING
A. PROJECT MANAGEMENT:
- The project manager for the City will be Tom Malphrus from the Utility Systems Division of the
PlanningBuilding/Public Works Department
s a .
I
.,,
Project Proposal-Highlands 565 Zone Reservoir Interior Recoating Project ,
Page 3
2
R. PRELIMINARY DESIGN
Preliminary design engineering for this project was done by CH2M Hill.
C. DLSI(IN TEAM:
A design team formed for this project includes the following members:
City of Renton Tom Malphrus-Water Utility 277.4413
Lys Hornsby-Water Utility 277-5539
Ray Sled-Water Maintenance 235-2566
Jim Gray-Fire Prevention 235-2523
C112M Hill Jerry Duppong 453-5000
Additional members may be added upon review of this project proposal. To request to become a
member of the design team.rleasc call Tom Malphrus at X-4413.
D. IN-HOUSE RE\
The City of Renton design team members will be involved during the review of project plans and
specifications.
i
1
A
I
1
Y
1
Y
J
t ,
o 4
� � k
Project Proposal-Highlands 565 Zone Reservoir Interior Recoating Project
Page 4
MANAGEMENT ACCEPTANCE AND COMMITMENT
CITY OF RENTON HIGHLANDS 565 ZONE RESERVOIR INTERIOR RECOATING PROJECT
The following signatures indicate concurrence with the project scope, schedule, and budget as
outlined in the project proposal.
Project Manager Date
Utility Systems Division Manager Date
Maintenance Systems Division Manager Date `s
qTransportation Systems Divsion Manager Date
i
Planning and Technical Services Manager Uete
i
Development Services Division Manager Date
I �,r�l ���s�,�ti�.�tZar� �J
I P anmm�giB i ingl,mblic Wo s Administrator Date
Community Services Administrator Date
Fire Department Chief Date
HJXX S gidW.THM.nr
Ji
1 If
t
yy[�rarR i
..u.ww✓aaiW�vF.r..�erx •er.:r..�,x..a+vw^9rsY+!:Y_?�Mwv.:�tira�.:u.�.�+!{'am..« .,......v....w..M....,,... '.
Project Proposal-Highlands 565 Zone Reservoir Interior Recoating Project
Page 4
MANAGEMENT ACCEPTANCE AND COMMITMENT
CITY OF RENTON HIGHLANDS 565 ZONE RESERVOIR INTERIOR RECOATING PROJECT
The following signatures indicate concurrence with the project scope, schedule, and budget as
outlined in the Project proposal.
i
11ro)ec1 Managcr
Date
UWRY Syslerm Dmmon Manager Date
Maintenance Systems Division Manager Uatc
'rtitisportatlon Systems Division Manager Date
Planmrg and Technical Services Managcr pa1e
I
- a- 9'
velopment Services Divisim Manager Date
I ..
Planning/Duildmg/Publ.-Works Admmmtator Date
l,ommumry•Services Admmistnt°r Dete
Firc Depanmcnt Chief Date
N'tms 9iA IIthl
11
1 -
.� i
C
IE
a,
■ ■�� �► .u�■ NE
th Cter`
iT■ pf K �111!� �.
,
Highlands - - . - _
Y-
Y
� L
P '
1 .
Project Proposal-Highlands 565 Zone Reservoir Interior Recoating Project
Page 4
MANAGEMENT ACCEPTANCE AND COMMITMENT
CITY OF RENTON HIGHLANDS 565 ZONE RESERVOIR INTERIOR RECOATJNG PROJECT
l The following signatures indicate concurrence with the project scope, schedule, and budget as 1
outlined in the project proposal
I
Pro Manager Date
Date
M Q 42L
U ility Systems Division Manager Date
I Maintenance Systems Division Manager Date
li Transportation Systems Division Manager Date
Planning and Technical Services Manager Date
Development Services Division Manager Date
Plannin"uilding/Public Works Administrator Date
tiv
Community Services Administrator Date
Fire Department Chief Date
H.talcs 95-044 11 IM ps
t
� � 1
�3 ■■ •. ■ ■
■ �� 1Y■ill!! ■ w ! �W�
■� ■IYY■ i4��tynn■
■ �� �� :►.■�C�'�rr��n�►► his
: • .
j L
<s
r e
p Y
d .I
�� rw
_� _:. MMYOYYgrA.JMall�alArW1. "uiY '
Project Proposal-Highlands$65 Zone Reservoir Interior Recoaling Project It
Page 4
MANAGEMENT ACCEPTANCE AND COMMITMENT
CITY OF RENION HIGHLANDS 565 ZONE RESERVOIR INTERIOR RECOATING PROJECT
The followmg signatures indicate concurrence with the project scope, schedule, and budget as
outlined in the project proposal.
i
Project Manager Date
System ision Manager Dmc
2 � �
Maimena cc Systems Div, ' Manager Date
mnsportation Systems Division Manager Date
Planning and Technical Services Manager Uate
Development Services Division Manager Date
Planning/Building/Public Works Administrator Date
f
Community Services Administrator Date
Fire Department Chief Date
NDOCS:95fi 4 TIIM,
t ,
`^4
a
r ,Y
� fir/ �� �■: �' � E=y � .
FS
FAIR
u
Nunn
�� ' ��■� _�• all onMEN
it
' ` �■ �� 11�11��111 ■1111111�■■■■■■■■� ■. 1
6
Project Proposal-Highlands 565 Zone Reservoir Interior Recoating Project
Page
MANAGEML. . ACCEPTANCE AND COMMITMENT
CITY OF RENTON HIGHLANDS 565 ZONE RESERVOIR INTERIOR RECOATING PROJECT
The following signatures indicate concurrence with the project scope, schedul and budget as
outlined in the project proposal
I
Project Manager bate
Utility Systens Division Manager Date
Maintenance Systems Division Managcr Date
Transportation Systems Division Manager Date
-&F r Yj A
t _ .;1' -
Planning an eclimcal Services Manager -Date
E 5_
Development Sem ,as Division Manager Date
Plannhng/Euilding/public Works Administrator Data
Community Services Administrator Data
i
Fife Department Chief Date
R:oasysew naa.v.
T2 F •.
� ter/ - � C■ �i�=y Cam.
■ .■ F-TT-1 �r
� �• � G�.G�WW. CYO■ . ���
■1►l■■1th C
�� �� �,�■��� �Y�.YI'r111Yii�la/
: . .
I
Project Proposal-Highlands 565 Zone Reservoir Interior Recoating Project
Page 4
MANAGEMENT ACCEPTANCE AND COMMITMENT
i CITY OF RENTON HIGHLANDS 565 ZONE RESERVOIR INTERIOR RECOATING PROJECT
r
The following signatures indicate concurrence with the project scope, schedule, and budget as
outlined in the project proposal.
Project Manager Date
Utility Systems Division Manager Dale
Maintenatice Systems Division Manager Date
Transportation Systems Dlvlslon Manager [Tart
Planning and Technical Services Manager Date
Development Services Division Manager Date -
PlannmgiBudding/Public Works Administrator Datc
Commumry Services Administrator Date
I
ireLmParmlent Chid
it11 C V{-AW IIW p.
J
I' i16i �►
i
IE
��iW rn
47
: • •
Hightancls . -
r 1 1
1 tia�pp
r .
r...•...� . ..._..._....�_.e....,.....o....,.s..�_.__
Page 4 -
fa:r
yr.
t
MANAGEMENT ACCEPTANCE AND COMMITMENT o
CITY OF RENTON HIGHLANDS 565 ZONE RESERVOIR INTERIOR RECOATMG PROJECT _t
The following signatures indicate concurrence with the project scope, schedule, and budget as
outlined in the project proposal.
Project Manager Date
Utility Systems Division Manager Date
Maintenance Systems Division Manager Date
Transporutinn Systems Division Manager Uatc
Planning and Technical Services Manager Uate
Development Services Division Manager Uate
i
Plutmng/tlulldmg/Publlc Works Administrator Date -
f
Community Services Administrator Date -
rim Depanment Chief Dare
i;
II:nOCS9y-0w411M ps
F
e r.
i
w,i
a
�� ■i■■ ' it
u ��•a_
NE
� ■ Tit!. �� ���
� ■u■■ t h
_� � ��i ■C i1=i��i����ii■iii �I
�! r� �����1���11 !1111111���11■■■■■� �
- 0 400 : . .
r
��
Y A X
¢ , s i fi� a s•,�4
fie] i
Y
f
Y
t
CITY OF RENTON
PLANNINGBUILDING/PUBLIC WORKS
MEMORANDUM
a
DATE: January 3, 1996
i
TO: Development Services Division
FROM: Tom Malphrus
SUBJECT: Building Permit for the addition of safety features to the
j Highlands 565 Zone Reservoir Tank ? `
II We've delay,d the bid process for the Highlands 565 Zone reservoir recoating project to the
Spring of 1996. Please continue to hold our building permit for this project until after we award r
the contract.
If you have any questions,please contact me at X-4413.
aL00.nOCltlun
y
µf t
L
r
s � 1
7: 0 6
i
t
i
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
MEMORANDUM
DATE: August 16, 1995 _
TO: Arthur Larson
N
FROM. Ron Olse tl
STAFF CONTACT Tom Malp ms
SUBJECT: Highlands 565 Zone Reservoir Interior Rewriting
Enclosed please find one set of construction documents for the Highlands 565 Zone Reservoir �
{ Interior Rmoating Project. We hope to bey' work on this project in September, 1995. The
Scope Of Work for this project includes:
• Removal of the existing paint,surface preparation,and application of a new protective coating
system for the interior surfaces of the reservoir.
• Fabrication, installation,and painting of a ladder landing at the catwalk.
• Fabrication, installation, and painting of a handrail around the access manhole, navigation
lights,and vent on the tank roof.
Installation of a safety climb device on the exterior ladder between the catwalk and the tank
access hatch on the tank roof. l}f
• Sanding and painting a 4-ft2 section of the exterior surface of the reservoir.
Two issues of possible concern for the Fire Department are:
1. The storage and use of solvents,paints and other hazardous materials at the project site.
2. The removal of the reservoir for approximately two months from the City's water supply 4
system.
We pawn to address these issues in the following manner Aim
1. The contractor will be required to comply with all applicable federal, state, and local
regulations regarding the transport,storage and use of hmrdom materials. local regulations
include City of Renton Ordinance NO, 4367, AQUIFER PROTECTION ORDINANCE,specifically section section 8-8-7, E,entitled: CONSTRUCTION ACTIVITY STANDARDS. -
2. The 565 Pressure Zone will be supplied by the Monroe Avenue Pump Station when the 565
Zone Reservoir is removed from the system. The Highlands Pump Station will be placed on
standby. Enclosed is a schematic and description illustrating this operation. As indicated,
provisions will be made through back up supply from the Highland's Pump Station and
interties to Water District#90 to ensure increased water supply in the event of a fire condition
in the 565 Pressure Zone.
For your convenience,we've marked areas of the documents that relate to these concerns. Please
review the documents and return them to Tom Malphrus along with any comments or concerns
that you may have regarding the project.
If you have any questions please contact Tom Malphrus at X-4413. Thank you.
H:rx)cs:+a�r.ilLat:F. I
F.W..
„}1
Y ; ,
�F
..
SUPPLY TO THE HIGHLANDS 565 ZONE DURING THE 565 ZONE RESERVOIR
INTERIOR RECOATING PROJECT
I
Normal Demand Condit ons-
The Monroe Pump station will supply the 565 zone through one continuously running
pump. The second pump at the station will be set to come on line as demand ^
dictates. Under normal demand conditions one pump will be capable of supplying the
zone. The combined capacity of the 2 pumps is 2,500 gpm. The station is not
equipped with emergency power.
Emaroancy Demand Conditions:
i
The Highlands Pump Station will be placed on standby. If demand exceeds the
capacity of the Monroe pump station the Highlands Station will automatically come
on line. The three pumps at the station will be lagged and start as demand dictates.
Once running, the pumps have to be shut down manually. The three pumps at the
station have a combined capacity of 3,900 gpm. The station is equipped with an
emergency backup generator housed on site. Operation and control of the generator
is automatic when power to the site is lost. The generator runs on diesel fuel and is
supplied with enough fuel to run all three pumps continuously for 12 hours. The
system will send an alarm when only two hours of fuel remain,
Emergency intertie with Water District 90:
� The City of Renton Water Utility can perform a fire hydrant to fire hydranjAntertis
p with Water District 90. On NE 10th St., just east of Anecortes Ave NE, the City of
Renton and Water District 90 each maintain a fire hydrant. The hydrants are located
within 120 feet of each other, The Cityo enton Water Utility can connect a 2 inch
hose between the hydrants. The connection w Renton's 565 pressure zone to
Water District 90's 645 pressure zone. The connection will result in 35 psi of
pc.;five pressure at Renton's 565 pressure zone. The connection will supply Renton
at a rate of approximately 150 gallons per minute.
t,
.t
y. CLOSE THIS VALVE
' - 7056SRESERVOIR —
� SG5 ZONE
• Ei+ti�� �rmp sYaY'•on t>n S�pP1Y melt Fle,,,i Yk.an Yb.t Rtsatvo:!',
L \r
435 ZONE
HIGHLANDS PUMP STA
That siw+.on 1vs te'.er9cr.w.'� bnakVt
-q, CHANGE BPS SETPOINT TO MAINTAIN 565
H.E.AT HIGHLANDS PUMP STATION.
DISABLE PRV PILOTS.
TRANSFER VALV kN TH `
PRV AND UPS Pi O S ' PUMP RUNS CONTINUOUSLY,
-, ,—EXCESS PRESSURE IS RELIEVED
wh
TO SUCTION HEADER.
-- PLACE LEAD PUMP IN'HAND".
RESET START SETPOINTS AT 50%
FOR I st AND 91d LAG.
kt
565 ZONE
43520NE 5G5ZONE
MONROE PUMP STATION 56
DURIN
CLOSE THIS VALVE
565 ZONE LEVEL TRANSMITTER WILL START
LAG PUMPS DURING FIRE CONDITION.
t l.a Resar vo;f, L ■�_ - —I— PUMPS MUST BE STOPPED MANUALLY.
RESE W01 L VEL TRANSMITTER ?^'Ps Sisri ouVo r`a�c•1\Y
CJ
d35dCNF STATION ON STANDBY
HIGHLANDS PUMP STATION
Th•c S1•�.en Y.es er..0 9en�T bn�kvp - n desal 4•.a.e•t•r wlils s
Pwnps C �w.SM fuN f• run alb f1Maf,
•r 11 wawp. Tl.a s tiaw�w Aan • 1'j 1 �.ae�f •F 1 fanJ3 ••T an a.l•rp
�s 9.a.,aJ en s.Te 1 opo.ai.ten.•ma Tba �•.....i.r`
•..is.n•'f:a ,,.Man la�„� i• •n t eewlrel !y
Tb a{TL S 1•a?.
-na
z;
SETPOINT TO MAINTAIN$65
ANDS PUMP STATION.
PILOTS.
CONTINUOUSLY,
SURE IS RELIEVED
EADER.
LIMP IN'HAND*.
I
SETPOINTS AT 50% `
nd LAG.
7
F65 ZONE
565 ZONE OPERATION
DURING RESERVOIR ISOLATION
a
CONCU. . :PiCE
wig f��b
l'DA
CITY OF RENTON j
PLANNINGBUILDINGIPUBLIC WORKS
MEMORANDUM
DATE: October 4, 19%
C
TO: Jim Chandler
I /r
-. - FROM: Ron Olsen �;rG i
STAFF CONTACT: Tom Malphms(x-4413) "
SUBJECT: Highlands Elevated Re alr;Permit N B"Nel
The contractor on the Highlands Elevated Reservoir recoaung project has gone out of business. We
are in the process of having the contractor's Surety-take over the project. As pan of the projecL the
contractor obtained a building permit for the construction of a ladder landing on the reservoir. We
has a been informed that this permit is about to expire.
The ladder landing is complete. If possible.we would like to have a final inspection of the ladder
landing and have the building permit signed off. If there is a problem with having the permit signed
off,please let us know how we can address it.
Your help with this matter is greatly appreciated.
H IXx%a 5}'TIIM.{n
It 1yN10aaa5
f
�a
Y
1
.M
y�
I
.� CITY OF RENTON
`IL Planning/Building/Public Works Department
Jesse Tanner.Mayor Gregg Zimmerman P.E.,Administrator
I January 4, 1996
I
Tom Malphrus
City of Renton
200 Min Ave S
Renton, WA, 98055
Dear Tom:
SUBJECT: Expiration of Application - Plan Check is 8950401 - Highland 565 Zone
Reservoir Tank
Our office has received your written request for an extension of the above-subject permits.
Your request has been granted. The new expiration date will be July 21, 1996. If you have
questions or concerns, pleax,contact me at 277-6180.
Since the inspectors look at the permit expiration, this letter should be attached cp the
permit prior to any inspection.
I .
1Sincerely,
Building Official
Development Services Division
cactus
:aW._.e I
4
�I
1
2f10 N'9l Avenue South-Renton.Washington 98055
®rn.aswaaxrw so+nrrm w«w.meoas�amaxrn.
.:
l�
F
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS DEPARTMENT
BUILDING DEVELOPMENT SERVICES DIVISION
PERMIT PHONE: 235-2540
1. Property Address: ylo NF 111 str..t
APPLICATION
(If new construction, City will assign address)
ALL REC'JESTED ITEMS MUST BE PROVIDED IN ORDEI. .O PROCESS THIS APPLICATION
2. Description of Work to be performed: AAAd-k:on e E c,.{r,+T Fec ivres to the. SGS
nb. s•-rw•r Twnk
3. Value of Construction' 4. Boeing Job# (if applicable):
pf new construction-C ry willh compute value)
5. Land Use File #(if applicable) (lihax Assessor Number: otia3o5 9/86
(Z) Legal Description of Property (Please see reverse side). Two copies required.
- S. Property Owner. :=;+y of R.nTen Phone: 277- Yef/3 Ck-eyli)
Street Address: 2.porti.it Ave-S City/State: r% a wA Zip; 990S5
3. Contractor: Not ye.t A..t., M'"A Phone' '-
Street Address: City/State: — Zip:
10. State Contractor's License #: - UBI Tax IDI: -
(Must include copy of contractor's license) —'-
11. Contractor's City of Renton Business License # (Required):
t,
12. Interim Construction Lender or Firm Holding Payment Bond: Phone_
Street Address:__ _ City/State: Zip:
13. Tenant Name (if a l
Ppl, Suite/Room #:
14. Contact Person: Daytime Phone:
15. ALL APPLICANTS MUST COMI'ETE THE FOLLOWING:
Sprinkler Req IY/N) N Public Owned IYM)- Dwelling Count zy A
Building Height /Y 1 r u'r Story Count N A Bldg Sq Ft: Finished: ,vA
UBC Type of Conri Occ Group_N A Unfinished: *H
Flood Zone(YMI ,y Remodeled Sq. Ft x A Garage:. k A
I certify that IN Inloneabon on this application hurrah"by.r U true a"correct ere that the applicable reeuire.ant,of IN City of Renton will
be rhoh I u"hsarW the'free appellation..vW0 for Me months Ire.the application data. If a parent Is oat Iusu" d INa N.phi",IN
application wee b"hne yoid. TNs pPlicatipr.does not conanmu a P-1-1 he work. Work is not to common..unul the buildl-e permt is poll"
en Prhnoa where work a to be paler.". Certification is terror tariff ered that No work a to be done aaepl o Snonb".end that all wort
shall conform to the applicable a"es. Whk in pubke dehtwol-war he'/or utility Ura.ents is not cwthaer"..near INa pplio"on.
Applicant Signature: - !
Date: "7
Plan Check Fee: $ Date:
Permit Fee: S _ Date:
Code Fee: 5 Drainage Plan Check Fee: 5 Date: "
Fire Mitigation Fee: $ Storm SUCC Fee: S Date:
i
Highlands 565 Zone Reservoir Interior Recoating Project
Address:
3410 NE 12 Street
Renton,WA 98056
Owner:
• City of Renton
Taa 4
0423059186
Legal Description:
All the following described property located in Section 4,Township 23 N,Range 5 E.W.M
the E 1/2 of the SW 1/4 of the SW 1/4 of the SE 1/4 less county road.
1 t
z
Y C l�
b�;