CONSTRUCTION REPORT FOR PUBLIC WATER SYSTEM PROJECTS
Effective September 9, 1983 the following Regulation applies: WAC 246-290-040(3)- A'aonstruction
report shag be submitted to and accepted by the department within rovty prior to
�bysthe department or projects
use of any project for which plans and specifications have been app Y
designed by a professional engineer. The construction report must bte signed by a professional engineer.
The report shall state in the opinion of the signee whether the project has been constructed in accordance
with approved plans and specifications and the installation, testing and disinfection of the system were
carried out in accordance with department regulations.
(a) If a project is being completed in state construction, attach a map and description of portion of
project being certified as completed as approved on date given below.
(b) As future portions of staged construction projects are completed,each must be certified as required
by WAC 246-290-W3).
(c) Additional certification forms are available upon request from DOH offices Its I below. ,
Renton water netlily DOH Water System No. ❑0 110 0❑
Name of Water System Referendum
200 Mill Ave c No. (if any) ❑110 El E]E]
Mailing Address Date i'lans and Specifications Approved
Rea=WA 98055 by Department of Health
CityState Zip
MOW—
PROJECT NAME AND DESCRIPTIVE.TITLE: Date Project or Portions Thereof Completed
Renton Water Utility
King County
Highlands 565 Zone Reservoir Interior Recoating -
Submittal#954M2
The undersigned engineer or his authorized agent has inspected the above-described project, which as to
layout, size and type of pipe,valves and materials, reservoir and other designed physical facilities
eshoas been
constructed in accordance with the plans and specifications approved by the Secretary, Depart
Health,and in the f the cngin.mr, the installation, testing and disinfection of the system was
carried out in the specifications approved by the Secretary for the project.
A G
00
" Engineer
F, ISTF. p�
,N'V NAL f� are
Please retu Tn"MEY
H office checked below:
Fastem Driolr'.n-Water
NW Drinking Water SW Drinking Water rJ- Environmental150 on Fourth, Suite 305 Health
® Environmental Health El Environmental Health Environmental
Third, Suite 719 Mail Stop 7823 1
Seattle, WA 98101 Olympia,WA 98504 Spokane,WA S
l
x
n,
n
STATE OF WASHINGTON
DEPARTMENT OF HEALTH
IS11 ThWMe.,LIMB 719• Seattle,wa,W om W101.1e37
June 18, 1997
MR TOM MALPHRUS
CITY OF RENTON
200 MILL AVENUE SOUTH
RENTON WA 98055 `
Subject'. Renton W ster System-ID#71850L
King County
Highlands 5L5 Zone Reservoir Interior Recoating
Submittal No.9"722 -
Dear Mr.Malphrus'.
This letter acknowledges receipt of the construction report for the subject water system which was
signed by Arthur Storbo. The report indicates that the project has been completed according to plans
and specifications which were approved by this department.
relly,
1 .
Robert
Regional � gineer
N.W. Drinking Water Operations
cc'. Seattle-King County Department of Public Health
Arthur Storbo,CH2M HILL
I
i
4
. ......,,._....—.�w..wnar w...rra..r.,.,:eaw Yew•w"..+waaV"a"^'"",..M.,..�....---.._._ .
Y
t
oil
^ 'r
i r r
�. IR.
I,.
1 �
STATE OF WASHINGTON
DEPARTMENT OF REVENUE
P.O. Not 47150 CNmpla, Washinow 9850647650 • (560) 706.6100 FAX(360) SW5;4J
INTERNET ADDRESS: htlp://www.wa.Rov/dor/wadeehtm
CERTIFICATE
601256979
Ct ',
TO: CITY OF RENTON
200 MILL AVE S
kENTON WA 98055
RE: CAG 96-038 HIGHLANDS 565 RES RECOAT PROJ W-2210
Mom than forty-five days have elapsed since the completion of the above-inferred public
improvement contract between PRODUCTION FINISHING INC and CITY OF
RENTON,
Pursuant to the provisions of RC W 60.28.040.050,and 060 the Department of Revenue
of the State of Washington certifies that there is due and owing to the State of
Washington from said contractor taxes,increases and penalties in the sum of$11,652.96
with respect to the above-described contract.The Department of Revenue further certifies
that there is due and owing to the State of Washington from said contractor other taxes,
increases and penalties in the sum of S0.00.
1„ymcm of such taxes,increases and penalties out of the fund retained by you under the
aforementioned contract,pursuant to the provisions of Chapter 60.28 RC W,is hereby
requested in accordance with the provisions of RC W 60.29.040.050 and 060,which
sections provide that the taxes•increases and penalties due with respect to the above-
described contract are a lien prior to all other liens upon the retained fund,and that the
other taxes,increases and penalties due and owing from said contractor are a lien upon
'he balance of the retained fund remaining in your possession,niter sit other statutory lien
claims have been paid.
You transmittal of the taxes•increases and penalties due with respect to the above-
described contract is to be made to the Department of Revenue within ten days of the
receipt of this certificate and request as provided by RCW 60.28.060.
i
If you have any questions regarding this contract,please call Scott Turnbull in our public
works contract section at(360)753-5537.
l
i
/
i dA
j
1
Payment should be directed to State of Washington
Department of Revenue
Attn: Scott Tomball
P O Box 47474
Olympia WA 985047474
Dated this 29TH day of SEPTEMBER.1997.
DEPARTMENT OF REVENUE OF THE STATE OF WASHINGTON
A
a
i
Kenneth J.Capek
Assistant Director.Audit +,
cc: PRODUCTION FINISHING INC
�4m
k,
a•
f.
f
1
Y
i
J'
{
x }
I
ei } CITY OF RENTON
.Y Planning/Building/Public Works Department
Fart Clymer.Mayor Gregg Zimmemusn P.E..Admi.61no or
July 19. 1995
Bob James
Washington State Department of Health
1511 3rd Avenue - STE 71 3
Seattle, WA 98101
SUBJECT: DOH REVIEW OF PLAYS AND SPECS FOR RECOATING THE INTERIOR
OF THE HIGHLANDS 565 ZONE RESERVOIR
Dear Mr. James:
Enclosed please find a set of preliminary construction documents for the City of Renton
Highlands 565 Zone Reservoir Interior Recoating Project. Please review as per
Washington State Department of Health standards.
We intend to place the project out to bid in early August and begin construction in
Sept--mber. your assistance in ensuring a timely review by DOH will be !greatly
appreciated.
i
If you have any questions or concerns, please contact me at 1206) 277-4413.
Sincerely, '
I
Tom Malphrus
Water Utility
H:D005:95-69 Y:T HM:ps
Enc�oswa
cc Lys Hornsby
200 Mill Avenue South-Renton.Washington 98055
t
X
I
1
STATE Of WASHINGTON
DEPARTMENT OF HEALTH
July Il, 1995 Ian ThYC Ave.,Suite 719• Sr&", I 1 9 90101.1632
MY SLED
CITY OF RENTON
3555 NE 2ND STREET
RENTON NA 98056
Subject: RENTON, CITY OF
KING COUNTY IDF 71850L .
HIGHLANDS 565 ZONE RESV INTERIOR RECCAT
SUBMITTAL 095-0722
Dear MY SLED :
On �Iuly 21, 1995 our office received the referenced documents from
your engineer submitted for approval per MAC 246-290. This submittal hes
been assigned the unique identification number shown on the last line of the
subject heading. Please use this number on all future orrospondence or
additional submittals pertaining to this project. Also, please allow about
six weeks from the date of receipt for a response betore calling to check
on the status. Consideration may be given for expedited review of pr,.jects
solving an existing public health problem. If you wish to request expedited
review, please provide written justification supporting your request.
Upon completion of the review, you will receive either the approval letter
or a comment letter identifying items which need to be satisfactorily addressed
to gain department approval. The letter will be accompanied by the invoice
requesting payment of the fall for the review. The fee covers one =to
submittal on this project. Pleass note that the payment of review fees does
not guarantee approval of the submittal. If additional review letters and
submittals are required, another invoice for additional fees charged will be
sent with the final approval letter.
MIS LETTER SSAVES AS OFFICIAL NOTICE THAT IF YOU COIO2NCE CONSTRUCTION WITHOUT
ALL REQUIRED APPROVALS UNDER CHAPTER 246-290 WAC, YOU AND ANY PERSON ASSISTING
YOU MAY BE SUBJECT TO A PENALTY OF UP TO FIVE THOUSAND DOLLARS PER SERVICE
CONNECTION AND YOU MAY BE REQUIRED TO EXPOSE SYSTEM COMPONENTS FOR DOB
INSPECTION AT YOUR EXPENSE. TEE DEPARTMENT IS UNDER NO OBLIGATION TO ACCEPT
tR APPROVE ANY COMPONENT INSTALLED OR CONSTRUCTED PRIOR TO APPROVAL.
Pease call Suellen Sediee at (206) 464-7670 if you have any questions on
this letter. t
Sincerely, y
"than M. Moseng, P.S., Section Head {
Nirthwsst Drinking Water Operations
cc: CH2M HILL
J
1
CITY OF RENTON
Planning/Building/Public Works Department
i
Jesse Tanner.Mayor Gmag Zimmerman P.E.,Administrator
March 18,1996
Bob James
Washington State Department of Health
1511 3rd Avenue-Suite 719
Seattle,WA 98101
SUBJECT: CHANGE OF COATING SYSTEM FOR THE HIGHLANDS 565 ZONE
RESERVOIR INTERIOR RECOATING PROJECT(SUBMITTAL 095-0722)
Dear Mr.James:
In August of 1995 we received DOH approvai for our Highlands 565 Zone Reservoir Interior
Recoming Project. Since Ihcn, we have decided to change the coating system specified in the _
Contract Documents. We arc now specifying a 10W6 solids polyurethane coating system for
application to the interior surfaces of the reservoir. The 100.solids polyurethane coaling system is
NSF approved for potable water use. i
We have revised the Special Provisions section of the Contract Documents to reflect this change.
I have enclosed a copy of the revised Special Provisions section for your review and approval. The
project is now being advertised for bid and construction is expected to start in late April.
Please call me if you have any questions or need additional information for your review. My number
is(206)277-4413.
Sincerely,
Tom Malphrus
Water Utility I
tt.nO:StB-M Mjs
u: I ys H.1s,
r
21)U Mill Avenue Souui-Renton.Washington 98055
r.
14
h
c
I
r
r
CITY OF RENTON
Planning/Building/Public Works Department
Jesse tanner.Maym Gregg Zimmerman P-F_,Administrator
gs
Sl
March 5, 1996
4,a
Bob James
Washington Slate Department of Health
1511 3rd Avenue-STE 719
Seattle,WA 98101
SUBJECT: TEMPORARY EMERGENCY INTERTIE:CITY OF RENTON AND WO 90 '91 -•
1
Dear Mr.fames: �I�P
'rhis Spring the City o,Renton plans to most the interior of its Highlands Elevated Reservoir. The
Highlands Elevated Reservoir is the only reservoir that serves the City's 565 pressure zone. While
the Highlands Reservoir is out of service,the City will supply the 565 pressure zone through its
Monroe Avenue Pump Station. The City will place its Highlands Pump Station on standby to
support the Monroe Avenue Pump Station in case of an emergency.
In order to provide an additional level of emergency back up supply, the City is asking Water
District 90 for approval to construct a temporary,emergency intertie betweel their 645 pressure zone
and the City's 565 pressure zone. The intertie will connect a Water District 90 fire hydrant to a City
of Renton fire hydrant through a flexible potable water hose. The intcrtie will consist of a water
meter, a double check valve backflow prevention assembly and a pressure reducing valve. Please
we the attached sketch.
We anticipate that the intertie will be in service from mid-April,19%,to mid-June,19%.
We would like to receive written approval from DOH to construct this temporary, emergency
intertie.
If you have any comments or concerns,please contact me at(206)277-4413,
i
Sincerely,,},,
Tom Malphrus
Water Utility
Ilnol's W161My,
tt lvs 14mmxM ,
S
rep'.
r - r
v S 200 Mill Avenue South-Renton,Washington 98055
It
i1Fh�
4
t
}
t1.
r«.
Y�
i
TEMPORRRyr EMERGENol IN1Efa TlF_ /II '
GtTY OF R{NTON 6, WATER VZS-fR%Cr tO
k.
N
cr.ly of RENTON
Et.RZ_tlYPiSH � a o< P= N Y
(545 PRBLSURi
ZOML) • a•rura•ra a . a F•aw ao . • (G YS PRESS)RE TAKE)
x —
n s
i NE IO+M STREET
A
t ti
m
0
P
M
n
w��y
Ya y r
• c
r %S Yr
kq '
� t
STATE OF WASHINGTON p
DEPARTMENT OF HEALTH '
I31/ Tblyd A,e.,SYilt 719 - SNINe, Washinglm 98101-1632 f
April 11, 1996 `
Mr. Tom Malphrus
City of Renton
Planning/Building/Public Works Department
200 Mill Avenue South
Renton, Washington 98055
Subject: King County
Renton Water Syst ,m _.
Highlands 565 zone Reservoir Interiur Recoating
Submittal No. 95-0722
fDear Mr. Malphrus:
This department has received your letter dated March 18, 1996
regarding the above project and the proposed change of the
interior coating system. We are hereby amending our previous
approval dated August 7, 1995 to include the use of the 100%
solids polyurethane coating system.
If you should hrve any questions please contact this office in
Seattle at 464-7671.
Sinerely,
M 1
i
G
Ro ar . Jmes,t E
Regional E ineerP.E.
N.W. Drinking Water Operations
cc: Seattle-King County Department of Public Health
rr
i,
F1
i iq �a a
r
i
t
-
STATE OF WASHINGTON
DEPARTMENT OF HEALTH 9F�
1511 Third Ave.,Simile 719 S"Uhr,Washkiii t,991014632 gGC FiL�
August 7, 1995 �A�"CJ. '9B/ _
Honorable Mayor and
Members of the City Council
Renton Water Utility
200 Mill Avenue South AUG -91995
Renton,Washington 98055
CITY OF RENTON
Subject: Renton Water Utility OD d71850L) PUBLIC WORKS AMN.
King County
I tghlands 50'Lone Reservoir Interior Recruiting
Submittal#95-0722
Dear Mayor and Members of the City Council: -
The project report for the above project received in this office July 21, 1995 has been reviewed and,in
accordance with the provisions of WAC 246-190 is hereby APPROVED. The approval issued herein is 1
only valid as it relates to current standards outlined in WAC 246-290,revised July 1994. Future revision% Iti
in the rules may be more stringent and require facility modifications or corrective action.
As required in WAC 246-290-040(2)within sixty days following the completion of and prior to the use of
the above project or portions thereof,the enclosed construction report must be completed by a professional
engineer and returned to this department.
Regulations establishing a schedule of fees for review of planning,engineering and construction document.%
have been adopted(WAC 246-290-990). An itemized invoice for$75.00 is enclosed. Please remit your
complete payment in the form of a check or money order within thirty days of the date of this letter to:
DOH, Revenue Section,P.O.Box 1099,Olympia,WA 98507-1099.
Nothing in this approval shall he construed as satisfying other applicable federal, state,or local statutes,
ordinances and regulations.
Sincerely, I�
I
Robert .lames, P.E.
Regional Engineer
NW Drinking Water Oparations
Enclosure
cc: Seattle-King County Health Department
.,tr.
W�
f :
t �t
u
,tG.r<rern+.��.,,.,....a„- •...�;,r'""e. „-...r, ,.. M.""'t!$•+nrar)'1!; .
• CONSTRUCTION REPORT FOR PUBLIC WATER SYSTEM PROJECTS
Effective September 9, 1983 the following Regulation applies: WAC 246-290-040(3)- A construction
report shall be submitted to and accepted by the department within sixty days of completion and prior to
use of any project for which plans and specifications have been approved by the department for projects
designed by a professional engineer. The construction report must be signed by a professional engineer.
The report shall state in the opinion of the signee whether the project has been constructed in accordance
with approved plans and specifications tnd the installation, testing and disinfection of the system were
carried out in accordance with department regulations.
6 (a) If a project is being completed in state construction, attach a map and description of portion of
i project being certified as completed as approved on date given below.
(b) As future portions of staged construction projects are completed, each must be certified as required
by WAC 246-290-040(3).
(c) Additional certification forms are available upon request from DOH offices listed below.
. s
Renton Water Utility DOH Water System No. ❑❑❑❑❑❑
Name of Water System
Referendum
200 Mill Ave S No. (if any) ❑❑❑❑❑❑❑❑❑
t Mailing Address
Date Plans and Speci`cations Approved 4
Renton WA 98055 by Department of Health +
City State Zip
08/07/95
PROJECT NAME AND DESCRIPTIVE TITLE:
Renton Water Utility Date Project or Portions Thereof Completed
King County
Highlands 565 Zone Reservoir Interior Recoating
Submittal#95-0722
The undersigned engineer or his authorized agent has inspected the above-described project, which as to
layout, size and type of pipe, valves and materials, reservoir and other designed physical facilities has been
constructed in accordance with the plans and specifications approved by the Secretary, Department of
Health, and in the opinion of the engineer, the installation, testing and disinfection of the system was
carried out in accordance with the specifications approved b) the Secretary for the project.
r
Engineer's Engineer
seal
Date
Please return completed form to DOH office checked below:
NW Drinking Water SW Drinking Water Eastern Drinking Water
® Environmental H;talth ❑ Environmental Health ❑ Environmental Health
1511 Third, Suite 719 Mail Stop 7823 1500 W Fourth, Suite 305
Seattle, WA 98101 Olympia, WA 98504 Spokane,WA 99204
i
J
X-
A.