Project: f n n/ ,,nrLE —1 n1
Locatlarn(2 rY n nrYK G A V n 5� ILL L -JC6
Attached plca.e find copies of:® PERMIT 9 BILLS OF SALE
i ® RECEIPT COST DATA INVENTORY
LETTER OF SPECIAL BILLING ® EASEMENT(S)
u STUB SERVICE AGREEMENT ® COPY OF AS-BUILT
® PRECON NOTES
® PRECON ATTENDEES
® DRAINAGF REPORT ® "
MEMO-WATER BREAKDOWN
® 6
® MAP WITH NEW MAINS AND VALVES
® OTHER
• !t
Front:
i Dam: /O
1
J crvucox:onnw
rt
1 PROJECT'CLOSING a Fluid Cast an
;FINAL COST DATA AND INVENTORY said l..sismn
SUEJECT: 5,11PAT !�H-� CITY PROJECT NUMBERS: WTR-
WWP-
Name of pro)ea 9v—I�7 giNPL
TO: City of Renton FROM:
Plan Review Section
Muming/BuildingtPublic Works
200 Mill Avenue South
Renton.WA 9HO55 DATE:
Per the request of the City of Renton,the following information is fumidied Concerning final costs for improvements
installed for the above referenced project.
WATER SYSTEM CONSTRUCf1ON COSTS;
Leh Sire Type
DL L.P.of _ ' (_ WAT®UMIPI �`L LPY %�1►Lc
LP.of - WATERMAIN
L.P.of WATTIRMAIN
LF.of WATERMAN
EACH of GATE VALVES
EACH of GATE VALVES
EACH of --- ' GATE VALVES
EACH of - FIRE HYDRANT ASSEMBLIES s 7 7 ?y
(Cot of Fire Hydrous must he lined sepanlely) S
(Include Enginsc ing and Sales Tax if applicable S
TOTAL COST FORWATER SYSTEM S
SANITARY SEWER SYSTEM: STORM DRAINAGE SYSTEM:
Length Size Type Length Sire Type
D 1 LF of _ y _ • P,c- SEWER row s_7 LF.of j.L.. STORM LINE
LF.of ss3WER MAN L.F.of STORM LME
L.F.of . SEWER MAN LF.of STORM LINE
EA or yR - DIAMX!TER MMNOIES EA of STORM NtET�OtlOPr
EA of DIAMETER MANNol2s �_ EA of 7IlA'/ • .L:�Ata2 STORM CATCHBASIN
(led""Bngiimis,aM gab T. J_ EA of - aTTT• STORM GTMBASN
Ifappaoble) g (IrcluNria Enaineaktg sad Salrh
TOTALCOSTIORSANITARYSEWERSYSTEM S if appliuhls) a
TOTnL cosr w.sroRM dIANAmSYSJma S
STREET IMPROVEMENTS: (I.I ding orb,Gutter.Sidewalk.Asphalt Pavernem and Street lighting)
18 1 S Y CcASc f3"
SIGNALI ATION: (lmrcltu ing Fatg.Design Cow,City Permit Fees,WA St Sales Taal
STREET LIGHTING: (Imiumng pull.Design Costs,City Permit Tres.WA St Sales T sx)
!/or /-' :
Rim signatory name a day phure a
(SIGNATURK
ImiWODSTDAIT D06bh (Signatory must be authorised agent
or owner of subject development)
J
Y , r
J r
Ve jt �I
N
s°
YI e J
IX
I
Return Address:
City Clerk's Office
City of Renton
200 Mill Avenue South
Renton,WA 98055-2189
{
BILL OF SALE 2, I Property Taa Parcel Nainate - 204
Project Filea''LVA 95-187 8t�"loirieo"a"'Ancortes AV ANHrrand NE 26th Ct
Reftrenrc--ove(p or Documso-atsigaa w reload:Addiliwral rcfuence number are on page
GrantVi): Gnntee(a):
I,Dona d E. Enright 1. City of Renton,a Municipal Corporation
2.
The Gnator,as named above,for,and in coruidenGon of mutwl benefin,hereby grants,bargain;sells and delivers to
me,Grantee,m named above,she following descnhed personal property:
WATER SYSTEM
Length Sim Type
102 LF 8 CL 52 WATERMAIN
i
SANRARY SEWER
Length Sin Type
102 LF 8 " PVC SEWER MAIN
I EA 48" DIAMETER MANHOLE
STORM DRMNAGE SYSTEM.
7I Lestgtll Sim Type
59 LF 12- CMP STORM LINE
2 EA TYPE I CONC. STORM CATCH BASIN
I EA TYPE 11 CONC. STORM CATCH BASIN
i
STREET IMPROVEMENTS
f Asphalt Pavement 289 SY of Class"B"
r
By this ennveya urs.Grantor will w.t and defend the sale hereby mar.unto Ilrt(Imntee against all and cvcq person
of perauns,whomswvea lawfully claiming or to claim the same. This ceavevame shall bind the heirs,esccutora,
administrators and assigns forever
U:t9TINUwSBa.DEX'ibh ..
IMgc I
a
t{ l
Form as W!IISh
IN WITNFM WHMUW,I bare blaemdp set my hand and acal the day and year as wriveo below.
INXK,DUAL FORM OFAd&6*T__EOfMEM
Notary Seal mue be..the.box STATE OF WASHINGTON )SS
COUNTY OF KING )
F El. I wnfy thm 1 know u love smisbawy evidence t t
p. rI DONM.D £ flJRlie."-f gyea' I .
ngnW .m mrtand parr os
r q y � acklwWldgd 11 b be IIIL)laaylgr flee ad VOInaWy a<I or InC nSG NQ pYrpOStt
'bOTARy C c mmtuawe in the ntarvrnan
It'd PUBLIc
Notary Public in and for the S * Washington
Notary(Print) l.lk)nA-C KuJ GS fAV
My appointment expires:
Dated: -
REPRESENTATIVE FORM OPACXN092ZDGMENT
Notary SW mug be within bax STATE OF WASHINGTON )SS
COUNTY OF KING )
I unify ttit I know,or hive sansfadory evidence that
signed this ungrument,on oath
surd dual he/she/they wisher• authorized to execute b%instrument and
acWowldred it as the and
of to be the free and voluntary an ul Inch
party/pan:es for the uses and purposes meneond in the.MmmeoL
Notary Public in and for the State of Washington
i Notary(Print)
p My appointment expires:
Dated:
CO RATE FJRM OFACKNOWLEOGMENT
No Seal murt be within boa Notary STATE OF WASHINGTON )SS
COUNTY OF KING )
On this_day of 19 Wace me personally appeared
to me known to
be of the corporation that
exeeutd the whin iissuumenL and acknowledge the said instrument to be the free
and voluntary as and ded of said urporation,for thc uses and purposes therein 'e
mentioned,and each on oath stated that he/she was authorized to execute said
instrument and thin the seal affixed is the corporne seal of said corporation.
Notary Public in and for the State of Washington
Notary(Print)
My appointment expires: f
Dated:
J
)
VJ7R 2.122u 5 T �v� 06
P+CssKnt IG) f Iw ype�lo��
Project Name: ENRIGHT SHORT PLAT PJe SSWL,< 'test
Address:
Permit No.: C960063 'takes -M
Assigned Inspector. Mark Wetherbee
Day-Wed Dab,7/17/96 Weather-Overcast Tempfi4-70 Preeip-Showen
Attended Pre-CORI'lntcti0n meeting for up wining shod plat on NE 26th and Anacories. Contractor to be
faValley's Backhoe.
Day-Mon Date4/12/96 Weatber-Clear Temp-59-92 Precip-None
IaValley's Baekhoe on site mobiliring equipment and materials. Surveyor to stake utilities. Contractor
to prat hole existing utilities this shift.
Day-Tyne Date-0/13/96 Weather-Clear Temp-60-02 Prtlp-None -
- - laValky's Backhm on site. Contractor has excavated existing sanitary sewer and begun to install new B"
PVC main line.
Day-Wed Date-8/14/96 Weather-Clear Temp-59 Precip-None
LaVailm's Backhoe Contractor on site Inspected low air test on sanitary sewer this shift. Acceptable no
loss in pressure. All side sewer stubs also tested. Contractor to begin installing 6"ductile iron Wale
main today.
Day-Tour Date-6/151% Weatber-Clear Temp-61-76 Precip-Noce
Con,saor has installed the 6"DJ water main this shift. Same minor field m isions west made.
Manhole was movisd splines.5'south and last ewer stub will be moved to avoid conflict with water train.
Contractor to pour deadman block tomorrow.
Day-Mum Date4l/19/96 Weather-Cloudy Temp-W72 Precip-Noce
LaV Wry's Backhoe bas completed the hydrostatic pressure tests on new 6"ductile iron water main.
City s Water Department has chlorinated same. Contractor has adjusted Type 1 CB due to conflict with
sanitary sewer stub. Timm Engineering to"As Built"changes.
Dar-Tue Date-11:20196 Weather-Overcut Temp-5"9 Precip-Showers AM
LAValky's Backhoc on site installing out fall N 12 in last Type I CB. Contractor also flushing newly
chlorinated water main, i twit purity sample into Laucks Testing Lab this shift. 1 have also coordinated
the tie-in with City Forces for next Monday pending satisfactory purity results.
i
Day-Thur Date-e/22/96 Weather-Clear Temp-56A3 Pncip-None
1 rcaived purity test results for Water main. Results are good and 1 heye confirmed tic-in with Water
Dept for next Monday. Contractor to excavate and provide fittings.
Day-Sat Dated/24/96 Weather-Clear Temp-60.90 Precip-None
Checked job site and verified proper fittings for Monday's tie-in.
Y
Day-FM Dirl"126/96 Weather-Haar TempfiS-76 Precip-None
LaValieys Backhne on site. Contractor has excavated existing 6"ductile iron water main. City crew on
site this shift and made final tie-in. Too=Engineering on site this shift"as-bailting'utility recisions,
Mc.
Day-Mon Date-9109t96 Weather-Clear Temp-W75 Precip-None
Contractor has poured new concrete approach and has placed and compacted subgradc rock.
Dar-Tues Date-9/10/96 Weather-For)AM Temp-511-76 Precip-None
4ly
Ml
Mid-Mountain comraclors on site installing gas to project. Laralley not on site this shill.
Day-Thum Dale-9/12N6 Weelher-Cldy Temp61-70 Precip-None
Lavallev Bxkhm on stte mntraclor forming access approach lakendge to pare next wok. Walk thin to
follow
Day-Moe Dale-9/23/96 Weather-Clear Temp-356S linvip-None
All franchise utilities are installed wtbgradc rocked and compacted,no paving yet.
Dar-Wednes Da1a10/9/96 Weather-Morning fug Tempt4-72 Preclp-Naas
Paving has been completed. The inverted crown on road-wav shows several irregularities. This,howner,
is a private street. 1 have submitted a walk-through request to City's Water,Sewn and Storm Division
Day-Thun Dale-101I0N- Weather-Cloudy Temp46-60 Preolp-Nose e
On's Sewer Division to walk-through pmjen tomorrow. La Valley Backbm has conucted me and will
be onsite the first of next work to exm%ate'or Franchise Utilities. Sanitary sewer stubs will also be
extcnded past franchise trench.
Day-Moe Dal,-101I4/96 Weather-Cloudy Temp- 10.57 Precip-Showen
City's StorMSew<r Division has conducted walk-through of pmjccl. Their comments to be included with
t
my punch list.
Day-Wed Dine-10123N6 Weather-Cloudy Temp- 12-50 Precip-Showen
La Valley has been excavating franchise utility trenches No punch list items completed.
Day-Thum Date-10121N6 Weather-Cloudy Temp- 13-10 Precip-
Met with Ted LAValley and Greg O'Farrell-owner of Lakc Ridge Paving. I informed Greg Out asphalt
paving is unacceptable due to the following deficiencies
1 inverted crown uneven approximately lll"drop at scams
2 Excessive ponding at catch basin at the end of the roadway
1 No thickened edge on end of the roadwmv
1 the mix used-has areas of exposed aggregate that can be kicked away-no frncs incorporated
at sercral areas
5 excessive surface irregularities
Day-Man Dali,10/28N6 Weather-Cloudy Temp- 43-50 Precip-Heavy Rain
No Activity.
Day-Fri Date11/IN6 Weather-Clear Temp- 10.S6 Precip.None
Attamrtes Ave and NE 26th Court. Repairs to sub standard asphalt tare been made. All punch list items
have be^,completed. 1 received"As Butlts'and venfied m consAm itd Prolect accepted as mnstruct,d
Strect siga and private roadway sign to be Installed by Cov forces according to Tullic Hill.
r,.
W 21199 FED 13:50 FAX .�...........ry F.....LwnF,mc. `�,I. 1 Z 4 S 4002
CmS.No" 9P919P.WA wim C
WATER BACTERIOLOGICAL ANALYSIS
suwr:MAMMaEP OSTMC O040NV=OFOULDOWOODR
■Yr.FPe.r M FwhFP.P4.PF.r.�r wWwe.
"nooulcm M.w
.a.n. r T4F
8 2a/9b I f.-'4,f k ^g
�O 1o.No. ] / L mcneow
FW wm
tL or eel
- e+ewc�er.Ta ew+YnEaw o TTaEPFOF .o.
1 2' 13S 2( V6
eiear..�7 .� / evEFw
a%1ECIFDK.e1w1 S.9TE.OPnLEP19p0.:P.PF1
—MRIW YFWTd11 3UMI@ MLUEMCE
❑sur.0 Ow�r A. E)v"F¢
ZOC "''Mll�ll." VVALV C S 6---
1
. . TYPe MSwPIEN.>r.r.UFFFFMFI
tl1REFMFE�+8�.,
uwFe.or
ka
9 CewETEF �FPpP�m ❑1EIY WF
IEW Oa0QmdlfwL'f1a1.IKIYw1 P1.10l4F
OTw9ew�wll
IwPIF0.
w er aaf awwae waw.9auEn
n~T&vCmft.Cffik FPST. WCT096�
9� LJCawP.~.E B::,.
oTwuea�9TeKwwuEn
i TOTK�eOwL� /M. !wu—Ao
P9aEeoEeewL_F®■ pun cam
woneLewuwleuwo
' MW1l IDTIePO9e01tIeE TOL WMTPRl9eerwF:
Yqur� or.r.•F '
�W"�
M�wFFTw TwPFr.
on rww9 sm OF 9m"00"Pw LP~TCN OF mums
TOO
Y oEE
SdK
P
I
I
Loucks Test to LabOrstOrlee,'RC-
"OS Wm y Sa ttb.WANIOS
WATER BACTERIOLOGICAL ANALYSIS
' SAWU CMLECTION.REAO R6TRMTiONS ON RAM 6 GOLDFIDIDD CORE
R YaetRaeRe at,w haeteee.-ample tall r tyeau& i
DA COu OLLECi® COIF IIyAIE
er '
rpeopsystim relLlCSyrwo rEETE.
pus❑uc
lestelDlauRm newwuaauaw TBwe17E Mb �
Iz• S/ow orr- 11 sa IL3� '2GyN
t(AA.&7--,
94 marr ReRRIBW:.Id L%SOURCEORpROeMTflIw MUrACEe*RAWN E.
Dwsou ❑9RIHU&, prmom pMERR1^I e.�w-%O.Olil11m I .
iEnroRr�� AearrR7aCreM
Zoe M.l%- Avg So _
Typ[Or 9MNE ic�ww...r b!/SI
fff���OMaMtRE4EM._ rm�
L
MeMTr�
❑
WAM Rsloa
aAa um oleo ewwlatErwRsan
p eelATgEAerorv,oeeRmreRW ❑�.
1!W nn�+{E.Cep"m tco~
R.� ul"Mlls�
pTyCTa,e01S/�_ROSM F.COU L' MFN
Pn&OMAON__ROeel R{AfEOOURf__Re
IROMR SnrEE REGMD
wIrLE Rot TESTED wCAUSE TESTVMRmoewCAUSE:
❑o m,,*w e p OReYRM reee,
p wwmv r Cl TRTC
❑RMNRR Avm �TVReMw
❑ _._ ___ IJ Eawe.aRn
SEF Hf.Vt0.h slut v t'.Nf t NC,(]Py iwi Gl%AW.PIw tY n[SU.TS
wReRar'R ese�: RFyayRsow
i "TJ>T/T
't'F'w�✓aI Sti
AIMY� �
eetMRF�I!
WATER SURRIrR COPY
05 21 96 ,1ED 15 50 FAX 10002
.....y N....+.�SwnR.x,c.
CDOS.No , E..EI..WAMIOE
WATER BACTERIOLOGICAL ANALYSIS
I W.WUOa fiCr*t*AD161RU *40NVOOFWLDFNROOCDPY
E hwwWN w w mR.wE.&Mob OEI Y,.ONW.
TE OOILEC.FO I rAwcoN.NF
8 20/9 w ��l k.r.g I
�1 MIEN y"J"&"F .COMAKM
COME a
NN.�M"wlry i
NRNE OE frE //�' /I
l Or �t►T iOM
��p JTp MME mLEC1l01FEE1'.Cl��i
2` fik... oss o.r 'VS-26y6
tauttrtoEr.p►,.1 ErfTENawNEn+iml:plwi ,
aaErc Tr.E anaNpv..Rn uuEN ..IUENOE
Dwv#C4 ❑va HEu QS.wc DF. m . �otb"°""+ MN
ElM[ i T Iti R.IR�YY OMN
Sj� n I.NwEf�lr�
Zoe M.11 A.vc Se
. . ME 1dp1pyEyNTWyE[E�RSR.wywl�wrwy
�dYI1Rq MT@I ❑CMEMAwy.M'._Tw`Am)
UI a OON
R.W f01A10[rM+EX ER.W.Om ❑A�Ifrmn
NEw�R��o<Rf4YR4 o.N.imm„
OM R1F�M
,EwNRNs
Ej
wuransiwagwRn REUEn
uru.nvw:raREo+e..n.,.. E"aiN ..em"
acmp.w BE.mr..
REpAREo F.a.r.n. ram
_ oTxp�uw�RnRnwuEn ----
roTroouraRN ECOU_Mm
ryUL OOLEOw�._nmN MTlCdMT_r
ENIWE MT TEfTID.E U MT{.yUWIKCA05E
}EF�u{,,{ERoaarr �nnc
L El
.wiEMae� MYew.
LRw YR
on RMRfE SL!OF GREEN OWY.OR.NMNT1011 d F41 LTS
uENR.pq Tr RNyNeo RRxn.Rw
t
k.'
c •
rx
y:
Yr
Short Plat (SHPLN
REQUEST MR PROJECT N Prelim.Plat (PPN )
CAG N
To: Technical Services Date T. /a - WON rr7 Pr 7 GrounN i
Prom: flan Review/Project Manager
Project Name Fate IG HT -',4rlc7 YGHT
rru mvrous maal i
Deam�ltim Of Project: _a'S - Lcrr ,Silo[:1 P L NT
{
( V
Circle Size of Waterline: gr- 10" 12" Circle One: New or Extension
' Circle Sim of Sewerline: 10" 12" Circle One: (EW) or Extension
Chcle Size of Storroine: 15" 18" 24" Circle One: 0ew or Extension
Address or Sweet Names) A.JF �/n N,
DvlpdContrwtodOwnei/Cnslt::
peol�ararRW
Check each discipline involmd in Pmjoct Ur Drwg N rdsheets per discipline
Trans-Stomr l,.(q�r �r-F�' ❑ ��
IRaa«alalrelmlr) (ORar«irrrrnwa«wx�rcluar asset rwrcl Irrcluae ltSC aaxu) '�
❑ Transportation avwvaon tT«arro.mon lsnanrl ❑ ❑
1r Wastewater nue / -L- ❑ Fr .1
' SanrurY&+v Mun Inxlrnlc a+.rn nan«I — -
M1f Water (Mrm.va l;ya ❑ or,
❑ Sufatt:Water " lMcluae aonrnu«A llmmnW C4!SFua)
t.R Improvements MWUKEVT�e. ..q 0❑ ❑
TS Use Only 'f
Approved by TSM Due:
i ,
4L .