Loading...
HomeMy WebLinkAboutWTR2702955 W-2955 BEGINNING OF FILE i w - a95 � W Doge t RE-810 Tab Project Title East Kennydale Sanitary City of Ramon Frank Collucio Construction CO BID DATE:4r"2 2:30 PDT Sewer Inflll Engineers Estimate LOWBW Item Description Unit Est. Unit Bid Unit ad No. Guarnm Price Amount Rice Afnount 001 Moblization S Demobilization Lump Sum 1 $45,000.00 545,000.00 S80,000.00 $60,000.00 002 Trench Excavation Safety Systems Lump Sum t $13,000.00 $13.000.00 $1,000.00 $1,000.00 D03 Surveying,Staking.and As-Suilis Lump Sum 1 $10,000.00 $10,0D000 S20,000.00 S20.OW.W 004 Traffic Control Lung Sum 1 S10,000.00 $10,000.00 $10,000.00 $10.000.00 005 1 emporary,EroslorvSedimentation Controls Lump Sum 1 $5.000.00 S5.000.00 $4.000.00 $4.000 00 006 Landscape Restoration Lump Sun 1 $10,000.00 $10,000.00 $3,000.00 $3.000.00 007 Re-establish existing Monuments Each 12 $500.00 $6,000.00 $125.00 $1,5W.00 008 TV Inspection of Sanitary Sewers Linear Foot 3.998 $1.00 $3,996.00 $1.00 $3.998.00 009 8'PVC Sewer Pipe and Cleanout Linear Foot 3,096 us 00 $139,320.00 $50 00 S154,800.00 O70 8'C900 PVC Sewer Pipe Linear Foot 902 $55.W S49,610.00 555.00 $49.610.00 Ott 6'PVC Side Sewer Pipe Linear F.wt 1,653 $40.00 $62,120.00 $40.00 $62,120.00 012 8'C900 PVC Side Sewer Pipe Linear Foot 866 $%00 S43.300.00 $45.00 $38.970.00 013 48'Sanhary Seven Manhole Each 17 S2.000.00 $34,000.00 S2.800.00 ;AT600.00 Otb 54'Sanitary Sewer Manhole Each 4 52,200.00 $8.800.00 $3,000,00 $12,ODO.W S9.8W.W 015 Connect New Sewer to Existing Sewer Facility Each 7 $1.000,00 $7,000.00 $1,400.00 016 8'dutfile iron pipe,CI 62.Poly wrapped 8 Fittings Linear Foot 3,260 S45.00 $146,700.00 $35.00 S114,1 W.W 017 6'ductile iron pipe.Cl 53,Poly Wrapped 8 Fi Mgt, Linear Foot 43 $35.00 $1.50"0 $50.00 $2.150.00 018 6'gate calve assembly Each 17 $65000 $11,050.00 $550.00 $9,350.W $24.200.W 019 Fire Hydrant Assembly c c h I S2,50000 $27.500.00 S2,200.00 020 3/4'Water Service Connection Each 72 $600.00 $432M.00 S500.00 S38.000.00 021 3/4'Water Service Connection,(no meter) Each 5 $550.00 S2,750.W $500.00 S2,500.00 022 1'An-Release Valve Each 1 S1,2W.W $1,200.00 $1,100.00 $1,100.00 023 2'Permanent Blow-off Assembly Each 4 $1,300.00 S520O.00 $1,000.00 $4.000.00 024 Connection to Existing Water Main Each 9 S1,300.00 $11,700.00 $1,500.00 $13.500.00 025 Fumish 8lnstall 161x8-Wet Tapping Gate Valve Each 1 S2.600.0() $2'500'00 $3,000.00 $3.000 -00 026 Furnish 8 Install 12'x8'wet Tapping Gate Valve Each 1 S2•500.W S2,500.00 $2,500.00 $2.500 W 027 Concrete Thrust Blocks 8 Dead-man Blocks Cubic yard 26 $75.00 $1,950.00 $80 00 $2.080-00 028 Pwmoval of Existing Fire Hydrants,Valve Boxes and Appurtenances Lump Sum 1 $4,5W.W $4.500.00 $1200.00 $120000 029 Removal and Replacement of Unsuitable Foundation Materiel Ton 500 $10.00 $5.000.00 $7.00 $3,500.00 030 Select Imported Trench Backftll Ton 2,WD $10.00 S20,000.00 $5.00 $10,000.00 031 Asphalt Class B(Road Rebuild)Paving incl.CSTC Sq.Yard 8,922 $20.00 $178.440.00 $18.00 $1 W,596.W 032 Asphalt Class B Patch Inc.CSTC Sq.Yard 1,313 $22.00 $28,886.00 $21.00 $27,573.W 033 Asphalt Overlay l-1;2'Thick Sq.Yard 4,814 S35.W $168,490.W $5.00 $24.070.W $10.00 $4,830.W 034 Asphalt Grinding Sq.Yard 483 $15.W $7.245.W 035 Replace Pavement Markings and Traffic Buttons Lump Sum 1 $5,000.00 $5.000.00 $2.500.00 $2.500 W 036 Remove and Replace Sidewalk 6 Driveway Sq.Yard 262 $40,00 $10.480.00 $40.00 $10,480.00 037 Remove and Repace Curb&Gutter Linear Foot 612 $15.00 $9,100.00 $15.00 $9,180.W I �® Subtotal $1,142,124.00 Subtotal $546.807.00 Tax $100,506.91 Tax $63.319.02 5/11/2002 Total $1,242,630.91 Totai $1,OW,125.02 RE-BID Tab Page 2 Prtgecl Tift East Kennydale Sanitary Laser Underground Archer Construction BID DATE:4130/02 2.30 PDT Sewer Intlll Item Descrptron Unit Est. Una bid Unt Bid No Quant't, Price Amounl Price Amcunl 001 Mobilwtion B Demobilization Lump Sum 1 $33,ODO.00 S33.000.00 $48.000.00 $48,000.W 002 Trench Excavation Safety Systems Lump Sum 1 $12,000.00 $12,000.00 $26.000.W $26,000,00 003 Surveying,Slaking,and As-Builts Lump Sum 1 $13,100.00 $13,100.00 $29,000 00 $29.000.00 004 Traffic Control Lump Sum 1 $43000.00 $43,000.00 $58.ODO.00 $58,000.00 005 Temporary ErosloWSadimentation Controls Lump Sum 1 $5,00000 $5.00000 $7,800.00 $7,800.00 DD6 Landscape Restoration Lump Sum 1 $15,000.00 $15.000.00 $17.ODO.00 $17,000.00 007 Reestablish existing Monuments Each 12 5.500.00 $6.000.00 $160.00 S1,920.00 008 TV Inspection of Sanitary Sawers Linear Foot 3.998 $0.50 $1,999.00 S0.70 S2,798.60 009 8'PVC Sewer Pipe and Cleanout Linear Foot 3,096 $42.00 $130.032.00 S33.00 $102,168.00 010 8'C900 PVC Sewer Pipe Linear Foot 902 S4800 S43,296.00 S60.00 $54,120.00 011 6'PVC Side Sewer Pipe Linear Fool 1 553 540.00 S62,120.00 $32.00 $49,696.00 012 6'C900 PVC Side Sewer Pipe Lmoar Foot 866 $50.00 $43,300.00 $53.00 $45,898,00 013 48'Sanitary Serve,Manhole Each 17 54,300.00 $73,100.00 S3,300.00 $56,10000 014 54'Sanitary Sewer Manhole Each 4 $4,5W.00 $18,ODO.00 S2700.00 $10.800.00 015 Connect New Sewer to Existing Sewer Facility Each 7 $1,3D0.00 39,100.00 $2,60000 $18200.00 016 8'ductile von pipe,Cl 52,Poly wrapped 8 Fittings Linear Foot 3,260 S31.00 $101.060-00 S2700 S88.020.00 017 8'ductile iron pipe,Cl 53,Poly Wrapped a Fittings Lineer Foot 43 $47.00 $2,021.00 $26,00 $1.118.00 018 8'gate valve assembly Each i7 $1,100.00 $18.700.00 $550.00 $913W.00 019 Fire Hydrant Assembly Each 11 $2,700.00 $29.700.00 $2,200 00 $24.200.00 020 3/4'Water Service Connection Each 72 $5$D.W $39.600.00 $650.00 $46,800.D0 021 3/4'Water Service Connection(no meter) Each 5 $750.00 $3,750.00 $650,00 S3,250.00 022 1'Ain Release Valve Each 1 $1,450.W $1,450.00 $1.200.00 $1.20000 023 2'Permanent Blow-off Assembly Each 4 $1,00000 $4,000.W S900.00 $3,600-00 024 Connection to Existing Water Main Each 9 $1.600.00 $13,500.00 $2.200.00 $19,800.00 025 Furnish a Install 16'x8'Wet Tapping Gate Valve Each 1 $2.300.00 52,30000 $2.400.00 S2,400.00 026 Furnish 8 Install 12'x8'Wet Tapping Gate Valve Each 1 $2,000.00 $2,000.D0 S2.20000 $2,200.00 027 Concrete Thrust Blocks 8 Dead-man Blocks Cubic yard 26 S350.00 $9,100.00 $1 D0.00 $2.600.00 028 Removal of Existing Fire Hydrants,Valve Boxes arid Appurtenances Lump Sum 1 S1,200.00 $1.200.00 S2,ODO.00 $2,000.00 029 Removal and Replacement of Unsuitable Foundation Material Ton 500 $16.00 $8,0D0.00 $24-00 $12.000.00 30 Select Imported Trench Backfill Ton 2,000 $11.00 $22,000.00 S15.00 S30.000.W 031 Asphalt Class 8(Road Rebuild)Paving Ind.CSTC Sq.Yard 8,922 $16.00 $142 752.00 $16.00 $142 752.00 032 Asphalt Class B Patch Inc.CSTC Sq.Yard 1,313 $24.00 $31,512.W $26.00 $34.138.00 033 Asphalt Overlay 1-1/2'Thick Sq.Yard 4,814 SC25 S20,459.50 $4.50 $21.663.00 034 Asphalt Grinding Sq.Yard 483 $12.W $5,796.00 $7.00 $3,381.00 035 Replace Pavement Markings and Tragic Buttons Lump Sum 1 $2200.00 $22W.Do $2.400.00 $2,400.00 036 Remove am Replace Sidewal::8 Driveway Sq.Yard 262 $54.00 $14,148.W S40.00 S10,430.00 037 Remove and Replaus Curb 5 Gutter Linear Foot 612 $14.00 $8,%8.00 $moo $9,180.00 Subtotal $991,863.50 Subtotal S1,000.032.80 Tax $87283.99 Tax $88.002.97 5/1/2002 Total $1,079.147.49 Total $1.080.035.47 I RE-BID Tab Page 3 Project T41e East Kennydale Sanitary CA Goodman ConsL Co. Rodarts Construction BID DATE:4r30/02 2:30 PDT Sewer Infill "ern Description Unit Est Unit Bid Unit 84 No, Ouanto Price Amount Price Amount 001 MobAization 5 Demobilaaeon 1 Lump Sum 1 $41,500.00 $41,500.00 $W 230.00 $80,23000 002 Trench Excavation Safety Systems Lump Sum 1 $2,800.00 S2.800.00 $11200.00 $11,200.00 003 Surveying,Staking,and As-Bulls Lump Sum 1 $15200.00 $15200.00 S21,0D0.00 S21,000.00 004 Traffic Control Lump Sun 1 S29,400.00 $29,400.00 S451450.00 $46,450.00 005 Temporary Erosion/Sedimentaton Controls Lump Sum 1 $2,200.00 $2,200.00 S7,300.00 S7.300.00 006 Landscape Restoration Lump Sum 1 S5.000.00 $5,000.00 S28200.00 $262(1.00 007 Re-establish existing Monuments Each 12 $180.00 $2,160.00 $560.00 $6.720.00 008 TV Inspection of Sanitary Sewers. Linear Foot 3.9% $0-35 $1,399.30 $1.00 S3,988.00 009 8'PVC Sawar Pipe and Cleanout Linear Foot 3,D96 $47.00 $145.512.00 $35.00 $108,36000 010 8'C900 PVC Sewer Pipe Linea,Foot 902 $58.00 $50.512.00 $73.00 $65.846.00 011 6'PVC Skye Sewer Pipe Linear Foot 1.553 $43.30 $67,244.90 S31.00 S48,143.00 012 6'C900 PVC Side Sewer Pipe Linear Foot 666 $51.00 S44,166.00 S39.50 $34.207,00 013 48-Sanitary Sewer Manhole Each 17 $2,900.00 $49.300.00 $3,415.00 $58.225.00 014 54-Sanitary Sewer Manhole Each 4 $2,410.00 $9.640.00 $4,125.00 S16,50000 015 Connect New Sewer to Existing Sewer Fac4sy Each 7 $1,i00.00 $7.700,00 $1,900.00 $13,300.00 016 8'ductile iron pipe.Cl 52,Poly wrapped 8 Fittings Linear Foot 3,260 538.30 $124.856.00 $0.00 S74,980.00 017 8'ductile iron pipe,CI 53,Poly Wrapped 8 Fittings Linear Foot 43 $46.30 $1.990.90 532.0g $1.376.00 018 6'gate valve assembly Each 17 $610.00 $10,370.00 $7D0.00 $11,900.00 019 Fire Hydrant Assembly Each 11 $2,500.00 $27,500.00 S2,530.00 S27,830.00 020 314'Water Service Connection Each 72 $450.00 $32,400.00 $675.00 S48,600.00 021 3r4'Water Service Connection(no meter) Each 5 $420.00 $2,100.00 $675.00 S3.375.00 022 1'Air-Release Valve Each 1 $1,000.00 $1,000.00 S1,350.D0 $1,350.00 023 2'Permanent Slow-off Assembly Each 4 $900,00 $3.600.00 $1,235.00 S4.940.00 024 C ,ruction to Existing Wa!er Mao Each 9 $860.00 $7,740.00 $700,00 S6,300.00 025 Furnish a Install 16'x8'Wet Tapping Gate Valve Each 1 S2,000.00 $2.00000 $3,950.00 S3,950.00 026 Furman 8lnstall 12'x8'Wet Tappog Gate Valve Each 1 $1,700.D0 $1.700,00 S3,275.00 S3,27500 027 Concrete Thrust Blocks 8 Dead-man Blocks :;uoic yard 26 $180.00 $4,68000 $140.00 S3,640.00 028 Removal of Existing Fire Hydrants,Valve Boxes and Appurtenances Lump Sun 1 $400.00 $400.00 $765.00 S765.00 029 Removal art Replacement of Unsuitable Foundation Material Ton 5U0 $10,50 S5250.00 $14.50 $7,250.00 030 Select imported Trench Backfill Ton 2,000 $10.50 S21,000.00 $13.50 $27,000.00 031 Asphalt Class B(Road Rebuild)Paving Ind.CSTC S4.Yard 8,922 $23.30 $207.882.60 S1B.00 $160.596.00 032 Asphalt Class B Patch Inc.CSTC Sq.Yard 1,313 $19.10 525,078.30 $20.00 $26,260.00 033 Asphalt Oveday 1-12'Thick Sq.Yard 4,814 $4,00 $19.256.00 $5.00 $24.070.00 034 Asphalt Grinding Sq.Yard 493 $7,00 $3,381.00 $12.00 $5,796.00 035 Replace Pa vement Markings and Traffic Buttons Lump Sum 1 $1,100.00 $1.100.00 $2,250.00 $2,260.00 036 Remove and Replace Sidewalk 5 Driveway Sq.Yard 262 $58.00 $15,196.00 $50.00 $13,100.00 037 Remove and Replace Curb 8 Gutter Linear Foot 612 $23.00 $14,076.00 $18.00 $11.016.00 Subtotal S1.006.293.00 Subtotal $1,016298.00 Tax $88.553.78 Tax $89.434.22 5/1/2002 Tod $1,094,848.78 Total $1,105,732.22 RE-BID Tab Page 4 Project Title: East Kennydals Sanitary Tn-State Construction Gary Menirid Cocsl.Cc. BID DATE:413=2 2:30 PDT Sewer Inflll Item Descrip4on Una Est Una Bid Una No Guanbr Price Amount Price Amok" 001 Mobs"tain a Demobaiza'.nn Lump Sum 1 $72,0DODO 572.000.00 ;74,000.00 S74,000.00 002 Trefidi Excavation Safety Systems Lump Sum 1 $22,000.00 $22,000.00 $10,000DO $10,000.00 003 Surveying,Staking,and As-Builts Lump Sum 1 S,i5A00D0 535,OOODO $20,000.00 520,000AO 004 Traffic Control Lump Sum 1 $25.000DO $26,ODO.00 $2,500.00 $2.500,00 005 Temporary ErosksNSedimentabon Controls Lump Sum 1 $24,000.00 $24,ODO.00 $1,000,00 $1,00000 006 Landscape Restoration Lump Sum 1 535.000.00 $35,000.00 $3,000.00 $3,000.00 007 Re-establish existing Monuments Each 12 $420.00 $5.040.00 $400.00 54.800.00 DOB TV inspection of Sanitary Sewers Linear Foot 3.998 $1 so $5.997 00 $1.00 $3.998,00 009 B'PVC Sewer Pipe and Cleanout Linear Foot 3.096 $36.70 $113.623-20 $40.00 $123,840.D0 O10 8'C900 PVC Sewer Pipe Linear Foot 902 545.60 $41,131.20 $60.00 $54,120.00 O11 6-PVC Side Sewer Pipe Linear Foot 1.553 535.70 $55,442.10 $70.00 $108,710.00 012 6-Cg00 PVC Side Sower Pipe Linear Foot 866 $38.90 $33,687.40 Sa5.00 573,610.00 013 48-Sanitary Sewer Manhole Each 17 $2500.00 542,500.00 53.500.00 S591500DO )14 54-Sanitary Sewer Manhole Each 4 $3,300.00 $13.200.00 54,10D.00 516.400.00 015 Connect New Sewer to Existing Sewer Facility Each 7 $1.920.00 $13.440.00 S2,OD0.00 514,00000 016 8'ductile iron pipe.Cl 52,Poly wrapped a Facings Linear Foot 3,260 $5220 $170,-i 72.00 530.00 597,800.00 017 6'ductile iron pipe,CI 53,Poly Wrapped 3 Filling$ Linear Foot 43 $45.60 $1.960.80 $40.00 $1,72000 018 8'gate valve assembly Each 17 5850.00 $14.450.00 $800.00 $13AD0,00 019 Fire Hydrant Assembly Each '1 $2.672.00 $29,392.00 $3,800.00 S41'8DODO 020 3/4-Water Service Connection Each 72 $519.00 $37,368.00 $1,000.00 572,000DO 021 3/4-Water Service Connection(no meter) Each 5 $530-00 $2,650.00 $1,250.00 $6,260.00 022 1'Air-Release Valve Each 1 $1,34500 $1.345DO $2,000.00 $2,000.00 023 2-Parrtianen!Blow-off Assembly Lach 4 $600.00 $2.400.00 $2.800 00 $1 t,200DO 024 Connection to Existing Water Main Each 9 $1,585DO $14,265.00 $2200DO $19,800.00 025 Furnish a Install 16'xB'Wet Tapping Gals Valve Each 1 53,265.00 $3'265 00 $4,000.00 $4 000 O 026 Furnish 6 Install 12'x8'Wet Tapping Gate Valve Each 1 $3,03ODO $3,030.00 $3,80000 $3 800 00 027 Concrete Thrust Blocks a Deao-man Blocks Cubic yard 26 5115.00 52990 00 $200.00 5.5.2OO.DO 028 Removal of Existing Fire Hydrants,Valve Boxes and Appurtenances Lump Sum 1 $720.00 $720.00 $2SO.00 $250.00 029 Removal and Replacement of Unsuitable Foundation Materiel Ton 500 $1920 S9'800.00 522.00 $11,000 00 030 Select Imported Trench Badcfill Ton 2.000 $15.60 531200D0 $5.00 $10,000.00 031 Asphalt Class B(Road Rebuild)Paving Ind.CSTC Sq.Yard 8,922 59.50 $84,759DO 522.00 $196.284.00 032 Asphalt Class B Patch Inc.CSTC Sq.Yard 1,313 $11.90 $15,624.70 538.00 $49,894.00 033 Asphalt Overlay l-1/2-Thick Sq.Yard 4,814 $4.50 $21,663.00 $5.00 524,070.00 034 Asphalt Grinding Sq.Yard 483 $12.00 $5.796.00 $6.50 $3,139.50 036 Replace Pavement Markings and Traffic Buttons Lump Sum 1 $27,000,00 $27,000.00 $2.500,00 $2,500.00 036 Remove and Replace Sidewalk 6 Driveway Sq.Yard 262 535.00 $9.170.00 $75,00 $19,650,00 037 Remove and Replace Curb 6 Gutter Linear Foo: 612 $15.00 $9,100.00 535.DO 521.420 00 ,-rs >rsv�i Subtotal $1,035,061.40 Subtotal $1,186.855.50 Tax $91,085.40 Tax $104,443.28 5/l/2002 Total $1,128,146.80 Total $1,291,298.78 RE-BID Tab Page 5 Project Title. East Kennydale Sanitary Average Bid Lax Bid Compared BID DATE:4rM2 2 3G PDT Sewer Infill b Engineers Estimate Item Description Unt Est. Una Bic %d %of No. Quarto Price Amount Avere Estimate _ 001 Mob4aaeon&Demuoihzaton Lump Suir, 1 $58,390.00 S58.390.00 102.70% 133.33% 002 Trench Excavation Safety Systems Lump Sum 1 $12,142,86 S12,142.86 824% 7.69% 003 Surveying.Staking.and As-Bu4ts Lump Sun 1 S21,900.00 $21,900.00 91.32% 200.00% 004 Traffic CmW Lump Sun 1 $30.478.57 $30,478.57 32.81% 100.00% 005 Temporary EroslorVSudimentation Controls Lump Sum 1 S7,328.57 S7,328.57 54.58% 80.00% OD6 landscape Restoration Lump Sum 1 S14,865.71 $14,885.71 20.15% 30.00% 007 Re-estatxish existing Monuments Each 12 $335.00 $4,020.00 37.31% 25.00% 008 TV Inspection of Sanitary Sewers Linear Foot 3,998 S0.86 S3,455.41 115.70% 100.00% 009 8'PVC Sewer Pipe and Cleanout Linear Foot 3,C 76 $40,53 $125.476.46 123.37% 111.11% 010 8'C900 PVC Sewer Pipe Linear Foot 902 $56.80 S51233.60 96.83% 100 00% Off 6'PVC Side Sewer Pipe Linear Foot 1,553 $41.71 $64,782,29 95.89% 10000% 012 6'C900 PVC Side Sewer Pipe Linear Foot 866 S51.77 $44,834.D6 86.92% 90 00% 013 48'Sanitary Sewer Manhole Each 17 $3,246.43 $55,18929 88.25% 140.00% 014 54'Sanitary Sewer Manhole Each 4 S3,447.86 $13,791.43 87.01% 136.36% 015 Cor,lecl New Sewer to Existing Sewer Facility Each 7 $1,745,71 S12,220.00 80.20% /40.00% 016 B'ductile iron pipe,C152,Poly wrapped&Filings Linear Foot 3260 S33 79 $110.141.43 103.59% 77 78% 017 W ductie iron pipe,Cl 53.Poly Wrapped&Fittings Linear Foot 43 $40.99 $1,762.39 121.99% 142.86% 018 8'gate valve assembly Each 17 $737.14 $12,531.43 74.61% 84,62% 019 Fee Hydrant Assembly Each 11 $2.657.43 $29,231.71 82.79% 88.00% 020 3/4'Water Sgnrce Connection Each 72 $620.57 S44,681.14 00.57% 83.33% 021 &4'Water Service Connection(no meter) Each 5 $682.14 $3,410.71 73.30% 90 91% 022 V Air-Release Valve Each 1 $1,349.29 $1,349-29 81.62% 91.6796 023 2'Permanent Biow-off Assembly Each 4 $1.205,00 $4,820.00 82.99% 76,92% 024 Connection to Existing Water Main Each 9 $1,506,43 $13,557.86 99.57% 115.38% 025 Furnish&Instak 16'x8'Wet Tapping Gate Valve Each 1 S2,987.86 $2,987.86 100.41% '[OZJ% 026 Furnish&Install 12'x8'Wet Tapping Gate Valve Each 1 $2,643.57 $2,643-57 94.57% tOO.OD% 027 Concrete Thrust Blocks&Dead-man Blocks Cubic yard 26 S166.43 $4.327.14 48,07% 106.67% 028 Removal of Existing Fire Hydrants,Valve Boxes and Appurtenances Lure Sun 1 S933.57 $933.57 128.54% 26.67% 029 Removal and Replacement of Unsuitable Foundation Material Ton 500 $16.17 $8.086.71 43.29% 70,00% 030 Select Imported Trench BaddNl Ton 2.000 $10.80 $21,600.00 46.30% 50.00% 031 Asphalt Class B(Road Rebuild)Paving Ind.CSTC Sq.Yard a= $17.54 $156.517.37 1D2.61% 90.00% 032 Asphalt Class B Patch Inc.CSTC Sq.Yard 1,313 Sual; $30,011,43 91,88% 95.45% C33 Asphalt Overlay 1-1/2'Thick Sq.Yard 4,814 $4,61 $22,178.79 108.53% 14.29% 034 Asphalt Grinding Sq.Yard 493 S9.50 $4,588 50 10526% 66.67% 035 Replace Pavement Markings and Traffic Buttons Lure Sun 1 $5,707.14 $5,707.14 43.80% 50.00% 036 Remove and Replace Sidewalk&Driveway Sq-Yard 262 SW29 $13,174.86 79.55% 100.00% 037 Remove and Replace Cub&G:%Zter Linear Foot 612 $19 29 $11,802.86 77.78% 100.OD% Subtotal $1,026.173.00 922T.6 82.90% Tax $90,30322 9227% 82.90% 5/1/2002 Total $1.116,476.22 9227% 82.90% RE-BID Tab Page ° Protect Teo: East Kennydale Santtery Project Cos! BID DATE:4/30102 2:30 PDT Sewer InBll (low Bid) ROM Description Unit Est. Wastewater Water No, Gunn Cost Cast _ 001 Mobnization d Demobilization Lump Sum t "siseeiii30,000.00 50% 30,000.00 50% 002 Trench Excavation Safety Systems Lump Sun 1 500.00 50% 500.00 50% 003 Surveying,Staking,and As-Bunts Lump Sum 1 10,000.00 50% 10.000.00 50% 004 Traffic Control Lump Sum 1 5,000.00 50% 5,000.00 50% 005 Tsmporary ErosroNSedimentation Contras Lure Bum 1 2,000.00 50% 2,000.00 50% 006 Landscape Restoration Lump Sun 1 1,500.00 50% 1,500.00 50% 007 Re-establish existing Monuments Each 12 750.00 50% 750.00 50% 008 TV Inspection of Sanitary Sewers Linear Foot 3,998 3,998.00 10D% 009 8'PVC Sewer Pipe and Cleanout Unear Foot 3,095 154,800.00 100% 010 8'C900 PVC Sewer Pipe Linear Foot 902 49,610.00 100% 011 6'PVC Side Sewer Pipe Linear Foot 1,553 62.120.00 100% 012 6'C900 PVC Side Sewer Pipe Linear Foot 866 38,970.00 100% 013 48'Sanitary Sewer Manhole Each 17 47,600.00 100% 014 54'Sanitary Sewer Manhole Each 4 12,000.00 100% 015 Connect New Sewer to Existing Sewer Facility Each 7 9,000.00 100% 016 B-ductile iron pipe.Cl 52.Poly wrapped a Fittings Linear Foot 3,260 114,100.00 100% 017 6-ductile iron PiP9,G 53,Poly Wrapped 8 Fillings Linear Foot 43 2,150.00 100% 018 8'gate valve assembly Each 17 9.350.00 100% 019 Fire Hydrant Assembly Each 11 24,200 00 100% 020 3/4'Water Servk:e Connection Each 72 36.0 i0.00 100% 021 3/4'Water SON"Connecaut(n)meter) Each 5 2.500.00 100% 022 1-Art-Release Valve Each 1 1.100.00 100% 023 2-Permanent Blow-Off Assembly Each 4 4.000.00 !00% 024 Connection to Existing Water Main Each 9 13,500.00 100% 025 F.mnish a Install 16'xb'Wet Tapping Gate Valve Each 1 3.000.00 100% 026 Furnish 8 Install 12'x6'Wet Tapping Gate Valve Each 1 2,500.00 10D% 6,e,ow�3,1E0 027 Concrete Thrust Blocs 8 Dead-man Blocks Cubic yard 26 2,080.00 100% /// 028 Removal of Existing Fire Hydrants.Valve Boxes and Appurtenances Lure Sum 1 1200.00 100% = 4 110!Lf Uf S 029 Removal and Replacement of Unsuitable Foundation Material Ton 500 3,50000 !0D% 030 Sallie,,Imported Trench BackMl Ton 2,000 10.000.00 10D% 031 Asphalt Class B(Road Rebuild)Paving Inc.CSTC Sq.Yard 8.922 112,417.20 70% 48,178.00 30% 032 Asphalt Class S Patch Ind.CSTC Sq.Yard 1.313 20,932.00 76% 6.741 DO 24% 033 Asphalt Overlay l-11V Thick Sq.Yard 4,814 21,181.60 88% 2,888.40 12% 034 Asphalt Grilling Sq.Yard 493 4,153.80 86% 6762D 14% 035 Replace Pavement Markings and Traffic Buttons Lump Sum 1 1,250.00 50% 1250.00 50% 036 Remove and Replace Sidewalk 8 Driveway Sq.Yard 262 8,354.00 60% 2,096-00 20% 037 Remove and Replace Cum 6 Gutter Linear Foot 612 7,344.00 SD% 1.836-00 20% TOTAL �s $617.710 60 SM.096.40 $946,e07.00 $54,358,53 $28960.48 -- 902 5/1P2= $672,069.13 f358.056.88 $1,030.126.02 I t CITY OF RENTON PRECONSTRUCTION MEETING East Kennydale Sewer and Water Main Replacement WTR-27-2955 FIFTH FLOOR CONFERENCE ROOM-511-9:30 A.M. May 22.2002 SPECIAL PROJECT CONSIDERATIONS: 1. Be careful to keep the site clean of mud and dust. i 2. Work hours for w-rk in right-of-way are weekdays,7:00 AM to 5:00 PM. Work on Saturday by approval only and no Sundays. Construction hours are 7 am to 5 PM Monday through Saturday. Any changes to work hours shall have prior approval from the City of Renton. No work on Sundays or holidays.No equipment shall be on the construction site(in operation)until 7:00 a.m. 3. No use of heavy equipment on Saturday 4. Hauling limited to 8:30 am to 3:30 PM or via other approved routes. 5. No construction vehicles on other residential streets. 6. Traffic Control shall be pre- approved by City Traffic Engineer. Contact Jun Asquiviel at 430-7301. WATER- 1. Contractor shall submit a min. of 2 ea. Material submittals for review and approval. 2. Pipe materials,shall be paid per callow in construction documents. No additional payments shall be made. 3. The contractor will install all of the watermain except the connection. All connections to existing mains to be accomplished by the City of Renton. All necessary excavation, shoring,and mat. '-IIs to be supplied by the contractor and be on-site prior to City notification. 4. All blocking must be inspected before backfilling. Thrust blocks must be formed. Concrete used must be delivered to the job(no on-site mixes). In the street and in all crossings, the City requires 5/8" minus rock backfill. Compaction test may be required. 5. The contractor is responsible to place an S800 deposit for the use of a DDCVA/Hydrant Meter prior to using any City operated water. Also, contractor shall poly pig all new water main installed. Procedure for cleaning: Pine cleaning shall he by poly pigging through vertical crosses. All services shall be pressure tested to minimum of 200 psi or 150 over operating pressure (static) for 2 hours. Chlorinate for 24 hours, using liquid chlorine and chlorine pump assembly by City crews. Talk to the inspector to schedule chlorinating. They need week(5 working days)advance notice. Flushing shall be drained into the sanitary. Water purity tests are taken to the laboratory on Wednesday. Contractor shall arrange courier for any other day. n Where conflict exists,the water shall go under other utilities, however.no water mains shall be under more than 6 feet of cover. ' t BURNETT FAMILY HOUSING PRECON 7. Final acceptance shall be after final walk through inspection, adjustment of all structures and approval of as-builts,cost data inventory. 8. The contractor,as well as the engineer,shall keep as-built drawings. Show all inverts and elevations. All changes shall be shown on as-builts. As-builts shall be per City specifications. For any field changes, if minor, give City a shop drawing (by FAX- 430-7241); if major, need a day or two to review and approve. Field inspector can not give approval in field for construction changes. GENERAL: 1. . NOTIFY FIRE.POLICE AND METRO OF CONSTRUCTION SCHEDULE. CALL 9l1 FROM A LOCAL LAND LINE ONLY. FIRE DISPATCH FROM CELL PHONE: 952-2121. 2. Approximate start date is_ 3. Work hours for work in right-of-way are weekdays, 7 AM t0 5:00 PM. Work on Saturday by approval only and no Sundays. 4. Overtime takes spectai authorization. Pay schedule is $50 per hour for overtime. The City ;hall cover inspection overtime hours from 3:00—5:00 PM. 5. Keep the streets clean. Truck washing and other measures as approved required for the duration of the project. Provide whatever measures necessary for cleanup and dust control during job and at night. All truck maneuvering and materials storage to be on-site only. Right of way to remain unobstructed when possible. No stockpiles on right of way. 6. Haul legal loads. 7. Keep a set of approved by the City drawings and construction documents on-site at all times. Contractors are advised to only use sets of drawings stamped and signed by the City of Renton for constructing utility and transportation improvements. The approved plans do not constitute a fill and grade permit or grant auy rights to fill and/or grade outside of the right-of-way. Keep a set of approved drawings on-site ai all times. 8. All utilities must be inspected prior to backfill. 9. For any field changes: If minor, submit a shop drawing or schematic through the inspector or by FAX- 430-7241. If major, the project engineer should submit drawings and complete justification, information and calculations as applicable to the Plan Review project coordinator. The City will answer by memo or schedule a meeting within two days. 10. Company Logo shall be visibly located on all vehicles on the job site. r t*y CITY OF RENTON PUBLIC WORKS DEPARTMENT 425-430-7200 PREC ONSTRUCTION CONFEREN DATE: May 22,2002 ' TIME: 9:30 AM PLACE: City Hall Conference Room 511 Project Name: East Kermydale Sewer and Water Main Replacement Project ManagerPro ect Mana rs Name:John Hobson Phone 425 430 7279 Fax 425-430-7241 E-mail: 'hobsonfci.renton.wa.us Contractor Contractor's Na,adAddress (206)722_5806 Name/Address: Frank Coluccio Const.Co. Phone 9600 Martin Luther King Jr.Way South Seattle,WA 98118 Contact Name Scott Clemens Phone 206-321-8931 Fax (206)725.4764 E-mail: Construction See attached Map Location PLEASE CHECK DEPARTMENTS TO BE NOTIFIED AND SPECIFY PERSON TO ATTEND: PUBLIC WORKS DEPARTMENT ® Utility Plan Review Kayren Kittrick ® Water Utility Abdoul Gafour ® Wastewater Utility David Christensen Surface Water Utility Ron Straka ® Transportation Systems Karl Hamilton,Jun Aesquivel ® Maintenance Services Division Jack Crumley Customer Services P.I.C. Rick Kokko ® Construction Services _Kayren Kittrick ® FIRE PREVENTION Corey Thomas ® POLICE DEPARTMENT Kevin Milosevich(x-6701) ❑ PARK DEPARTMENT Leslie Betlach ® BUILDING DEPARTMENT Larry Meckling ❑ OTHER OUTSIDE DEPARTMENTS: I X I City Project Manager To Notify ® ALL SUBCONTRACTORS** Phone# FAX* ❑ Olympic Pipe Line Company(Kathy Reed) 425-235-7767 425-271-5320 ® Qwesl Communications(Frank Forrest) 206-345-2968 1.253-872-5434 ® Puget Sound Energy(Jeff McMeekin) 425-462-3824 425462-3840 ® AT&T Cable Service(Mike Martox) 253437.6876 425-6564410 ® King County Transportation Div. (Steve Wilson) 206-296-8144 206-296-8198 ® Electric Lightwave(Eric Clayton) 206-812-3349 206-812-0370 ® METRO-Bus Routes(Richard Garcia) 206-684-2732 206-684.2686 ® Renton School District(Kevin Olson)Transportation 425-204-4455 425-204-4465 ® Waste Management Rainier(Steve Aiton) 206-505-9171 206-767.4605 ❑ Chher. "Please tali 425430-7234 with updates cc NNW Infin tim Cmmm 66 fkrw Mugno Nit r/L Shy [I\NVISKA WITILMEMWASrl'.WM\KrnnvT4re um naive dw FaNNrw/other/puhwks/rre nrorm P � ■1�7 � �1�1�i �Iii111�1111111 � � ■ ■ � NOON c s=,� oil - �� ■���; _ NOON■ N■■ IN WE ON ii 11 11' ■■� ' on ■ ININ ■r■ ■��` ■■_ NONE ■ -I/�. A �■ .- .■ ■ EI ■ IN ��■1 :j�■ .■ ■ MOWN 10 Mailing Addresses QWEST COMMUNICATIONS PUGET SOUND ENERGY ATTN FRANK FORREST ATTN JEFF MCMEEKIN 7235 S 228TH ST PO BOX 90868 )au),-ot W KENT WA 98032 BELLEVUE,WA98009-0868 -FA"o SIR. 01I-249; imcmee®ouoet.com 6 l(e ^ // 27 ELECTRIC LIGHTWAVE K.C.METRO/DEPT OF TRANS. RENTON SCHOOL DISTRICT ATTN ERIC CLAYTON CONSTRUCTION CDORD. ATTN KEVIN OLSON 1218 3"AVE,STE 505 ATTN: RICHARD GARCIA 300 SW 7TH ST Seattle WA 98101 12706TM AVE S CAB-TR-0120 RENTON WA 98055 P206-812-3349 SEA7TLEWA98134 F 206-812.0370 w w 6 n:SO AT&T CABLE SERVICE WASTE MANAGEMENT RAINIER KC DEPT OF TRANSP ATTN: MIKE MARTOS ATTN STEVE AITON ROAD MAINTENANCE, / 20811 94`AVE S MI01 8111 FIRST AVE S SPECIAL OPFRATIONS KENT WA 98032 SEATTLE WA 99108 ATTN STEVE WI SON Manos.Michaelftroadband.att.mm 155 MONROE AVE NE �1eD a It.(91r So w 11: REh'1'ON,WA 98055 i FI:\DIVISION Sit I ILF IF MWASTE W71t\Kenny2U4c-cm-m+acedm Fik^Nr 0lher/puhwk.%T,e onrurm I ! LETTER OF TRANSMITTAI, Date. June 3,2002 To: Scott Clemons 9600 M.L. King Way S. Seattle,WA 98118 From: John Hobson,Project Manager City of Renton Wastewater utility 1055 So.Grady Way Renton,WA 98055 SUBJECT: East Kennydale Sanitary Infmll PH T & Water Main replacement CONTRACT CAG-0234 SUBMITTALS AS NOTED BELOW COPIES DATE DESCRIPTION Manufacturer STATUS Bid Item 1 64-02 8"& 6'PVC Sewer Pipe PW Pive NET 9& 11 r 6-4-02 8"&6"C%)0 Sewer Pipe PW Pipe NET 10& 12 1 64-02 48"Sewer Manhole Hanson NET I 13 t 1 G-4-02 54"Sewer Manhole Hanson NET 14 x f 1 64-02 Select Import Backftll Various Pits NET 30 i 1 5-31-02 Resilient Wedge Valve Mueller NET 18 ¢ A-2360 I s-31-02 Permanent B.O.Assembly Ku ferle NET 23 1 5-31-02 1"Air-vac Assembly Crispin C Series NET 16 1 5-31-02 Steel tapping sleeve ITS420 Romac Industries NET 16 1 5314)2 Romac Style 501 Coupling Romac NET 16 1 5-314)2 Poly Wrap Northtown Co. NET 16 1 5-31-02 Compression fittings Mueller Co. NET 20,21 H-15403 H-15428 1 5-31-02 Copper Meter Setter Mueller Co. NET 20,21 B2470-2060715 1 5-31-02 Corp. Stop Mueller Co. NET 20.21 H-15008 1 5-314)2 Super Centurion Fire Mueller Co. NET 19 Hd rant,A423 1 5-31-02 DI C153 MJ Fittings Tyler NET 16 1 5-31-02 C110 Flanged Fittings Tyler NET 16 1 5-31-02 Tyton joint Ductile Iron US Pipe NET 16 Pi (6•&8") 1 5-31-02 Meter Box Brooks Products. Inc. NET 20,21,23 38 Series,65 Series Status Code: _ Remarks: NET No exceptions taken 1. Missing submittal for poly pig(ethefoam bullet) _ Girrard or equal _ RAR Revise and Resubmit(see remarks) 2. Valve Box HDFCO Seattle Type 940B,or equal. R Rejected(see remarks) 3. 314"Copper Service pipe,Type K AWC A roved wit omments(see remarks bZ/ (o / 1' Z Signed Date T nalonal s.b..11.1 IXX\ BLAINE AVENUE NI AT NE 16TH ST. STA L76, 11' RL' STA. 4+85. 15" LT. —� X W) 5' RO-MAC ADAPTOR (DI-CI) �\ CONCRETE BLOC% 6' SPOOL PIECE (DI) PLUG (NJ)PLUG (M4 W/ 2- TAP STA LIEN 1( LT AND Y PLUG 6' CR TEtD BLOCK X W) \ TE B.O. ASSEMBLCONCRETE CONCRETE 3/ S TEMP. CONCRETE BLOCKS 4 EA 3/4' SHACKLE RODS FROM 90 MM rO TEE �— STA k74' SHII'ACKLE CKRT. CUT AND CAP EX- 6' WATER — ♦ EA J/4' VERT.E RODS FROM TEE m VFRT. CROSS o STA 11' X REMOVE ET L.N. ASSEMBLY 6' TEE c X 6' TEE (W X FL) ) SALVAGE CITY SHOPS 3 6' GV. (FL X NJ) i STA. k17, it' RT. CONCRETE BLOCK 16' % E' WET TAPPNG STA. L66. 2S LT. TEE (W X n) FIRE HYDRANT ASSEMBLY ISOLATE EX. 16' MAIN 6• GV. (n X NJ) CUT k CAP EX. 6'. 2- B' SPOOL PIECE (OI) $7A k27. II' RT. REMOVE EX. 6' G.V. 1- 8' LONG BODY SLEEVE E' X 8' VERT. CROSS (NJX FL) REPLACE NTH PLUG CONCRETE BLOCK 2- 8' BLIND nANOE AND BLOCK - 1- 8' PLuG (Ms) W/ 2' TAP Y AND 2' PLUG 2' B.O. ASSEMBLY TEMP. CONCRETE BLOCK CHANGE ORDER #1 BLAINE AVENUE NE CHANGE ORDER #1 BLAINE AVENUE NE FINAL CONNECTION DETAIL 5 OF 5 TESTING CONNECTION DETAIL 5 OF 5 DETAII #3 BLAINE AVENUE NI AT NE 16TH ST. BLAINE AVENUE NE AT NE 16TH ST. STA. H8S, 1Y LT. STA 4176, 11' RT.' 6' RO-MAC ADAPTOR CORCRlrETE (Mi x � 6' SPOOL PIECE (01) / 1- a' PLUG (N.Q Q 1- 6' PLw W) W/Z' TAP STA BEN 1( L7. I NEW 6• p AND Y PLUG REND�(�W x 11.E Y R.O. ASSEMIN r CONCRETE FROM 614- TEMP. CONCRETE BLOCKS AEA A' S TO S/ D TO E RODS LEE STA "78, If RT. EA 3/1' SHACKLE RODS CUT AND CAP EX. 6' WATER fey— FROM TEE TO VERT. CROSS —�� a STA. S' TF 1/'J X REAMOVE Ex. CITY ASSEMBLY .o � 8' % 6' 7�E (W % R) SAL DACE 70 PTY 5F10P5 6�G.V.BETE(F LT. STA. 4+17, 11' RT. BLOCK LE 16' x 6' T TAPPING STA. FIRE HYDRANT ASSEMBLY ISOLATE EX IV VAIN 6'TEE (W x fL. C.V. PO(FL % CO _ 7 k CAP EX 6', F 2- B' SPOOL PIECE (p) STA. 4+27, 11' RT. RENOVE EX B' B.V. � 1- R' LONG BODY SLEEVE 6' x ar VERT. CROSS (NJ % FL) REPLACE MTN PLUG 4 LpILRfh BLOCK 2- Ir BLIND FLANGE AND BLOCK i- 6' RUG (NJ) W/ 2' TAP 1r a K.1a AND Y PLUG 2' B.O. ASSEMBLY TEMP. CONCRETE WOOK I CHANGE ORDER #1 BLAINE AVENUE NE CHANGE ORDER #1 BLAINE AVENUE NE i TESTING CONNECTION DETAIL 5 OF 5 FINAL CONNECTION DETAIL 5 OF 5 i DETAIL #3 BLAINE AVENUE NE AT NE 16TH ST. DETAIL #3 BLAINE AVENUE NE AT NE 16TH ST. m 4 w NOTE: STA. 18+37, 49' RT. z INSERT 8• POLY PIG PRIOR TO PLUGGING NEW Ir MAIN \\\ RETROVE PIG AT STA. 4+B8, 11' RT. "- \ STA 4+98, 11' RT. DEAD-MAN BLOCK, 2- 8' SPOOL PIECE (MJ) PER STANDARD DETAIL /- 1- 8• LONG BODY SLEEVE (DI) 4 4 EA 3/4' SHACKLE RODS 4 6• Of FROM BLOCK TO VERT. CROSS 6- DI -7 STA 4+88, 11' RT. 6• PLUG (MJ) 8' X B• VERT. CROSS (MJ X FL) CONCRE� 2- 8• SUND FLANGE ,,{{ ----- BLOCK 1- 8' PLUG (MJ) W/ 2' TAP `!-_-- -- -_-- AND r PLUG (XlT R CAP E%. 6' WATER 2' B.O. ASSEMBLY TEMP. CONCRETE BLOCK 0 0 0 0 MODIFIED BLAINE AVENUE NE MODIFIED BLAINE AVENUE NE TESTING CONNECTION DETAIL 5 OF 5 FINAL CONNECTION DETAIL 5 OF 5