Loading...
HomeMy WebLinkAboutWWP2700350(14)I'* il To: Dirk Boughton - 4 - April 13, 1983 Reco®ended Proaram As listed in Table "C. I've recommended building immediately: Projects: 01, N.R. 20th St. 02. Jones Ave. N.E. /5, CID - Moses Lane Alley P6, CID - Wells Ave. i9, CID - Renton Ave. #10, CID. Alley Oast of Shattuck and possibly P3 - Jones Ave. N.R. Collector ewers, see below. Theme projects will cost $217,273, with only $157,000 budgeted. I pro- pose to fund the remainder with the $45,703 Swer Fund Carry Forward money from 1982's budget, for a total budgeted amount of $202.703, and utilizing $15,D00 from unanticipated latecomers and connection fees already collected. As for ou• Project Categories "B", I suggest that these be held until Project "C" work is completed. Projects not to be built this year ire: Projects: r'$x-demea-Aver-.`.:l. A, CID - Value Village 07, CID - Garden Ave. N. Project Categories "C', the Money Creek Interceptor and Swer Pump Station Telemetry and Electrical repairs would be funded from unanticipated late- comer and connection fees. We have collected to date $33,364 in these fees, and, in addition, expect to collect theme additional amounts from developers: One Valley Place $ 70.000 East Valley Ned. Park $ 30.000 Remaining Latecomers 18,364 Fees Total Available Unanticipated Funds for Category "C" $118,364 In addition to these ewer funds and new revenues, I have reviewed our Water Improvement Projects Status. Three projects appear to be unable to move toward construction in 1983 because of coordination with other street work: A. Wells Ave. Bridge Watermain Bridge not to be built until 1984 Budgeted $ 25.000 B. Graay Way/Springbrook Crossing No progress on street LID until 1984 Budgeted $ 18.000 C. Raymond Ave. S.W./I-405 Crossing Can be deferred until 1984 Budgeted 40.0 Total $ 83.000 w � � To: Dick Houghton - 5 - April 11, 1983 This nukes available an additional $83,000 a $118,365 or $201,364 which could he reapproprlated to fund our Category "C" Honey Creek Project and assure con- struction of, at least, Honey Creek Phase I this year. In addition, of some $129,133 Water Fund Carryover from 1982. $75,000 could be lade available by deferring several projects: 1982 Water Fund Carryover 1. Shattuck Ave. S.W. and S.W. 19th St. Pressure Reducing Station $15,000 a 2. Raymund Ave. S.W. I-403 Crossing - 12" watermain not built - in permit process $37.500 3. S. 26th St. and Benson Road Pressure Reducing Station Not built. $20,000 a 4. Grant Ave. and Benson Pressure Reducing Station Not built. $40,000 a 5. Tay`or Ave. Watermain Replacement - bcder construction. $12,500 Projects No. 1, No. 3 and No. 4 could be deferred until 1983a, making available $75,000 for Category "C" projects. This $75,000 1 propose to be reapproprlated to fund our Category "C" Jones Ave. N.F. 03 Collector Sewer project. Any unneeded funds could be used for further inccrreeezenntajl j ru construction of the Honey Creek Interceptor. jft — s OF RE 't �T y PUBLIC WORKS DEPARTMENT RICNARO C 1gU0HTON • DIRECTOR ML NIOleAL BUILDING 200 MILL AVE $0. RENTON,WASH.905a '�. lE0 �eTf.E 206 235 2569 BARBARA Y. S41NNPQC4 MAYOR MEMORANDUM DATE: August 12, 1983 TO: tarry Marren, City Attorney FROM: Doe, Monaghan, Engineering SUBJECT: Kem;ydale Sanitary Sewers A 1983 Sanitary Sewer RehahilitatiomConU,act Documents Submitted herewith is a copy of the referenced contract documents for your review. Please comment as to legal form. R18:ddr Attachment OF RF OFFICE OF THE CITY ATTORNEY* RENTON.WASIIINGTON Z W[t OM,tl tl•!M •Oa a[w[t1[t • ft.`O wMK10, M 11 [11 N11 j 1? LAWRENCE ; WARREN. c... ..rp.r. DANIEL KELLOGG, swig., a+••+rows• -' DAVID M.DEAN, ."11 ..1 <"•wawa• r MARK E.aARbER, •sys.wl Pt••Wawa• Ro step' ZANETTA L TONTES, •ssn..n+ c,1••11ow[1 August 16. 1983 MARTHA A FRENCH.••s•••r•1 n+••++aws. TO: Don Monaghan, Engineering FROM: Daniel Kellogg, Assistant City Attorney RE- Kennydale Sanitary Sewers S 1983 Sani ary Sever Rehabilitation- Contract Documents The shove captioned contract is approved as to legal form. We note that there is a typographical error in the bond given by Ford Construction Company and International Fidelity Insurance Company. In the fifth line of the last paragraph "materialmen" is mispelled. Since this is a very significant portion of any construction contract, we would deem it necessary that this bond be corrected and the correction initialled by the co.tractor and the surety. Daniel logg DK:nd Encl. cc: Mayor OF Rot. u PUBLIC WORKS DEPARTMENT Z 3 eR DESIGN/UTILITY ENGINEERING 0 235-2631 � e� F MUNIC.dAL BUILDING IDD MILL AVE.CO. RENTON.WASH.W065 P rE5 5[v�ENP4 BARBARA Y. SNINPOCM W YOR MEMORANDUM Date: AuS �%t 19. 1983 To: Maxine Motor, City ClerA From: Bob Bray - Engineering Subject: Kennydale Sanitary Sewers 6 1983 Sanitary Sewer kehabllitation - Contract Documents Submitted herewith are five sets of the referenced contract documents for the Mayor's signature. Attached is a copy of the City Attorney's approval, Jft Enclosures y .A. •IijiL3 lion— '{v'Acs�,na�iy 4�31YirrrwYs".. L,'3CA4 J�•n,�'9 IYetr. h:,5. - NAf 24 r). -e� ib N& %71A ,•s. �.^.-^, ".yZ. d4- .'t, .3.!!.�i''"i A�.t" •"..ds'. - ,l t. .JJ77V.�i;^ e�.> �t6. i'4Th' g:r w$ 1», i;r Op w BEGINNING OF FILE pF Re 4, PUBLIC WORKS DEPARTMENT g� DESIGN/UTILITY ENGINEERING 235 ?631 ��.. MUNICIPAL BUILDING 200 MILL AVE.SO RENTON,WASH.960a6 e pro Sf P 8ARSARA Y. SHINPOCH ri.h nn I 99: MAYOR Ford COnstruCtion CO. P.O. Box 5036 Kent 6A 9RO31 Subject: CAC 047-93, Kennydale Sanitary Sewer and 1983 Sanitary Sewer Rehabilitation Weekly Statement of Wnrkinq Days Gentlemen: Enclosed IS the Weekly Statement of Working Days for thy. week endinn February 24, 1984. Please note there are minus 18 working da,yS rertwininq (in the referenced Contract a; of February 24, 1984, Very truly yours, Robert L. Bray Project Engineer :tkd Enclosure DE►MITMW OF TR..NSFsJ,AAnoN • .• ,w..t..t1A MlERLT STATEMENT OF WMILING DAIS: CONTRACTOR FARO Ca.VS2zacnON Co ADDRESS P O. Bsr SD a fr _ CITY --X-1-AfT _ STATE ►vAsw! _ DATE 2-Z-7-- R Cwr.wt w.Nw �--- ---�- •��«M..w C..tq TSat�ut W.N« j GAG D*T-R3 ICciyiyy�EAt_S�,r�yFO< _ z¢,—)I The fellowmE statenant shows the neo$w of workrnE days Chwyd le row convect la the week andlnE � A fi 6 ts� /9 _ __--- ! Ow. 0..� ewer...C.nt.rw«\.p 0./. U..«\Nlt Dry Cwwo I.W... er I + ewwu CtMmwo i PWIA i s•:s Thwet � e;c' f =-s ►rdey c. op DaystMs Week.-...._......._...... .«.._...__.....«_..__...,......_...._.«.._.„,_ 4 i oats ne.,wsly hrwad.._....._......._........_....._....._....._._............_I 107 2 TwdMr.re Nw ._......................_............._._.«..........«....„_.......,.I /// Z CURRENT STATUS Ww6wy Doys Spse.6al m CewWatr._..__.....__..... _....._......_......._..._.�as 'Awo.d f.tewa.ow of T.wo......................... _._..«__...._..........__.._ TD Tate) Aothw.sod T,w.I CMWwI ......_........-............_.....«.....'_........ Les. Wwliwa Days Chwae.....__..___.___....._. ..Wwklq Day. Ro.wm.wa _ ............._._.....«...-__......,..._.........»�... �Q w"'rw7 of Woofs Att..a.es: 1Ae.MIT 0.1Ms.wts asata.ed by letter hew NaaApwtws "Use wgar,.e tools to shw ew...n .w".w MOTE: TM c",,w,w ..II be oller.l 10 &ys Iw.w a... .4 rh.s nos.r m.h.th to petest ,w era..@ tho Cwww1M\e of tMs s4aewwr, N!wrm a shell M/oa.ud to he.*Men acteetd w twtect. OF R fV ti �R PUBLIC WORKS DEPARTMENTDESIGN/UTILITY ENGINEERING 0235 263, yJI! MUNICIPAL BUILDING 100 MILL AVE.50. RENTON.WASH 99066 P P RFD SEPTE BARBARA Y. SHINPOCH February 13, 1984 MAYOR Ford Construction Co. P.O. Boa 5036 Kent WA 98031 Subject: CAG D47-83, Kennydale Sanitary Sewer and 1983 Sanitary Sewer Rehabilitation Weekly Statement of Marking Days Gentlemen: Enclosed Is the Weekly Statement of Working Days for the week ending February 10, 1994, Please note there are mine 10 workinq days remaining on the referenced contract as of February 10, 1984. Very truly yours, Robert L. Bray Project Engineer :ckO Enclosure M I WKIKIY STATRNKNT OF WORKING DAYS.' CONTRACTDR Paulo aaw/s17Pacwa r.. ADDRESS R e- B.Y se a gjip CITY eArAlT STATE kud it DATE J=-%3- 8'4- Cr.t.«t N..aor A.ae..t.A.d.A.q.«,aV-._. Nyl..oy w..C•r-y k.otllwN.MwA« ..- GAG 047-d3 The lelietain/ atateneent ohtn•e INS number of orpbing doya cherpd tc yew contract for lM .eeb ending Fir ."-j OSts DF Wooden.c«dittsa Were."a", U..t•eabt•Its, wosM cow.".. 2-e. Manley Fr r z -7 Tw•dsy P�cA� � Z-P Wed«Slay )' Z-1 Th.r.do, o.w<., i L-Iv Fnday � _5 eye ore..e..ly taFMed ... Sets, Iay0 to date ._........................_..........«......«..«.................«...__.. CURKKNT STATUS working Days SFec,had to Centroct._..,......_..._......... s3 'Awe.ed EatnuN of Totai A.thori<sel Ties,eI ConhKt ....___....«...._-._...__»._.... 9-S Loss Working Days Charges...____.__...__. /d 3 ••Working Doys R000tmng d W4eh's Act..o.os: h•t•.r a.ew. only satws.orte moMo.od by Iotler hear NeedRuWnore 'Use,«ept..e eMIS to shoe wawew is Its■ NOTK: TM San..«N. ..it be allewd to Mrs I,, date of tkis.eyort u.A,c►to ••t•.t .w«.r...y tM car.«tN u. of rho. sleto '. orhor.ow n SNIT be downed to hew be"o<ceeted oo conNt. ... •- .�t yr , OF RE o PUBLIC WORKS DEPARTMENT DESIGN/UTILiTY ENGINEERING 0 235 2631 MUNICIPAL BUILDING 200 ww LL AVE 10. UNION,WAIN.OWS b P 1r�� St P'•� BARBARA Y. SHINPOCH February 6, 1984 MAYOR Ford Construction Co. P.O. Box 5036 Kent WA 9803) Subject: CAG 047-83, Kennydale Sanitary Sewer and 19W Sanitary Sewer Rehabilitation Weekly Statement of Workino Days Gentlemen: Enclosed is the Weekly Statement of Workino Days for the week ending February 3, 1984, Please note there are minus 5 working days remaining on the referenced cohtr4ct as of February 3, 1984. Very ..uly yours, Robert L. Bray Project Engineer :(Ad Enclosure 4 WASHINGTON STATE CUMTEACiOa DEPARTMENT OF TRAN5"IATTON WEEKLY STATEMENT OF WARING DAYS: CONT"ACTOR FORD (enAAj9M40CrAQdV Co. ADDRESS R e. 6.: so 3 ina, _ CITY _,KAEelT _- STATE wI SPl DATE 2- 6- 84 cwa.w.w OI7-d3 ---�•-- ..�..Y�. I N%%"N.. C...r Ts....... r� N.,►« 1_sue MNYVet.i &WAUU 1 2/ Tie following statement shows the number of waking days drays/ to yew tams" fa the wok efdirq Fc6 3 /9S6 . MU. Dan oar awn.C.dlnw wan"twos 'i biel.Dot Cweed In,w..nm w ws.n.r C.neln.rr. .�. - alednesday _ y - L Thwedey _ y . 3 ftdon - I Dan.thr..wh.............................._..............._.».»......................... - <. Dgsero.oudr rope"ad................................................»__............. 93 Total My. t. den --- _..._......... ')F CUEEINT STATUS wwk�q Den.Seecil.od m CenheN._..__........_.............._.�....._.».... ¢s •Aeer...ad Emne1M of Trr.._...»_...._.........._._...».»........._...�... .. 4�? Total Authwrted T.Y of Canned ............_......»...._»........._,......., 93 Los.wwkrne Days Cheryes.----------._.»___»_........._._....»....... 19 ..a'wNne Deys RoYrtmne..................___...�....._._._.__-..,.._ Summary of wow►'s Athaiea: hye.t[.e .Sham only satansrsns eeerewd►y lent Mew Haadsuwtwe use neptrw resale to show a.ertun in t:Y NOTE: The contracts,erll be olleeod 10 days I," dots of this &W a.hid to Maasl ra wtrtine the cw.ednass of th.s a`enarnt,whwwtw a eke,,►e doomw to haw Mon acceeted w cw.wt, NIN . N STATE DEPARTMENT Of TRANSPDRTAMN CONTRACT011 WtERIY STATEMENT OP WOfRING DAYS: CONTRACTOR Folio �b1ZYlLcTAOn/ n ADDPESS p o- - _ STATE dtits�_ DATE!_ _4'Lit_2�Z_.Q,}_ r� •.,yJ- ,...�� �,�.�:».._c...%y a.%„«..N.y.. The following 1 nY NIN.I�n1 sllo.s 11n n%%%111er of Merlins days herNd q yer. canNK1 la IAa rAAS Alulln0 so-lbe o«. err W..a..,Cw.ry% • "_ "�"�O.r• U..aM4 0.y C...N, o M.nda► Tw.day � Wadl%..day i TAw.day Findlay Day. rhu ."Is .................. Day% ..","I _.............. Tol-I don to der. _.................». CYRRENT STATYS Warl.ry Days SPoc.l.od m C...I..c/._...._........._....».....�»..._.__.._.._.. A►Wor.d E.q.%..a at T.wo._........».._. Toro! A,$a,n.d Tu,o of Ca.lna .»..._..._.....»__.....»_.........._... Los,Wa►nq Dory.C.wp..........__... ...._......_.�........_.__._.__ ••W.rU.q Dove Ro..o.no%q........... Sway d Ma.Y% hr.hu: ..._. Aa �..»._...�.._.......V.....�_.,.....__� RNM%�M q..o"d by I.NM Items Wad�aana. "Us"••.Nr•w 1.%.I.1•.I%.o awa.w .a I..r. NOTE: The ca1.l.Kle, ..II M •Ilo..d 10 day. I,. d... 01 IA.% epw .n.I.1"q IIy ea.KIM%% .1 IM. %e"yoo".l, Mkwwls. a .A.11 beedo.ord to Aa.a Man Kc.0,"...anKl. of RF1 a � PUBLIC WORKS DEPARTMENT OES16N/UTILITY ENGINEF91NG df 235-2631 WMICIP- ' MAL01NG Ma WILL AVE.30. RENTON.WASK MR 'w �t0 SE►Yf� RARBARA Y, SNINPOC;N February 21, 1984 MAYOR Ford Construction Co. P.O. Box 5036 Kent MA 96031 Subject: CAG 047-83, Kennydale Sanitary Sewer and 1983 Sanitary Sewer Rehabilitation Meekly State,,knt of Working Days Gentlemen: Enclosed is the Meekly Statement of Working Days for tie week ending February 17, 19B4. Please note there are minus 14 working days remaining on the referenced contract as cf February 17, 1984. Very truly yours, Robert L. Bray Project Engineer tckd Enclosure W11R1f STAT/YRNT 0! WORRINO DAYS:I CONTRACTOR_150" CaA/f7ZacrAQM CO ADDRESS P o. Ae: 5 _ CITY "AlT STATE WAAA DATE- 2-2/- ?4" C I _3_7 _ GAG OI7-a; C�NI ,vy 5�,,,EQ, 23 The following otoronom shots tko MMldtor of working days chnow to Yaw eomroct f.r the reek ending _ -eip. /7 /924• lift. Der. D.r •«w GWNf« r..\w D.ps Vw.wwh D.y C...swl ti 11«10.AN a«owe.C W m"' Z - 13 khdq y _ 1s i �r S Tut z_/7 frldq o. c. / �\in.. .eek.............. ........ ....._........_.._....__._....._.._...�...._...... Day. I.a.io.sly ropo..........._.......................................... ......_........ YOGI days to daft ..........................—. .— CYRRINT STATM Werk,np Day. ._................................ »..�...... 65 'Awo.ad Ent",~of T.s.a._.....,__._....._....._._..._._..............__._.. 'a� Total A.theruod Tlaw of CMt.ocl ......_...._.._..__....._....,..�..._.......... 9.3 Loss Werk..o Dees CM.ps..»------..._•___...�....»....._._..------- Ill Doy. Re".niq. ......................... . ..».._..._........_...._...._... — /¢ flrroory of Week's Amvw tms. ss a 'I.s 'Shw"IV apore.ed Ity, latter I.r NMJWwters ••UN ntrali.a 101,16 to shess ay.nvll la t'sw NOTR. The cay.sctw .III M .11...d 10 dqs Lon date so Iles :,post .n shalt to iserest .a...t M1.E it*ca.n<Iross of tkls stafeww.t. hell be doo.ud t..Fa.e he"occpted es cons. 11EERlY 1TATEMINT Of 11"XIMG DAYS, CONTRACTOR._6= CoMw 7 agrAo d r0 ADDRESS CITY j'Ara(T STATE ► ASAlf DATE_L3O- 0 1 wya�q/4,w Cs.wry s.e.s.eew.N...yw The follow#no alalomem .Aan the numMr of war Illng days dwryal to vaster contract la Ida .aeh angling Ja.c�� 19.P¢ Data Day Woe ho Ceedwlims Wwh...a Dsas /lwewhebl.Day Ce.nN be Wsois,. Y. ... erne.c.rdmose /- Z 3 Meorwl /- Z f Wednesday a/ / /-24 Thwsday c�iu y / /- 27 frfay O.G. ,Lf 2rw Days .h's reek.......«.......__....._._....._._...._. 5 Days p.e..ously.seamd___..._.._..__..__..._..................___............. A8 2 Tool dove to do. ......................_...... CURRENT STATUS Ww6sy Days SpKlLad in AWa.ed EnMa,"of TiM............._........._._.._...._._...._........__..... 49 Total A.,hwised T.an a Coneacl ......__..._._.._....._.__..._............ .-. 43 Los Ww6q Days Chops.... ......._...... 9 "Ww ON Days Rwsenoq..... all W►.Vs Aa,..nw : ._..___.,......___ 'Jlor wily ea,eMNae eppra.ad by leww bar Neodawrle, UM nephw to via to seems awn.e w Iies, NDTE: The cr.vK,w rdl be ellered 10 4",Lase da.e A lhrs .apw, ...k.A la /ales, .e w.h.q the cwrK,Mn el lh., sla,ee 1, whwr.so 10 Ahall be deeard to hew Mon a:tepled as'emot. OF "?t R. z Pll.ILIC WORKS DEPARTMENT y DESIGN/UTILITY ENGINEERING f 235-2631 MQ MUNICIPAL BUILDING 200 FALL AVE.SO. RENTON.WASH.9W,,L b' P tEo SEP,EM� BARBARA Y. SHINPOCH Janrary 30, 1984 MAVOR Ford Construction Co. P.D. bo., 5036 Kent WA 98031 Subject: CAC, 047-83, Kennydale Sanitary Sewer and 1983 Sanitary Sewer Rehabilitation Meekly Statement of Working Days Gentlemen: Encl)sed is the Weekly Statement of Working Days for the week endinn January 21, 1984. Please note there are no working days remaining on the referenced contract as of January 27, 1984. Very truly yours, Robert L. Bray Project Engineer :ckd Enclosure OF Rx' ° PUBLIC WORKS DEPARTMENT DESIGN/UTILITY ENGINEERING 0 235 2631 O F MUNICIPAL BUILDING too ENLL AVE.SO. RENTON,WASH.9E056 b' P TEO SEPtE*D� BARBARA Y. SHINPOCH January 23, 1984 MAV011 Ford Construction Co. P.O. Box 5036 Kent WA 98031 Subject: CAG 047-83, Kennydale Sanitary Sewer and 1983 Sanitary Sewer Rehabilitation Weekly Statement c° Working Days Gentlemen: Enclosed is the Weekly Statement of Working Days for the week ending January 20, 1984. Please note there are 5 working days remaining on the referenced contract as of January 20, 1984. Very truly yours, Robert L. Bray Project Engineer :ckd Enclosure DVMTMENT Of TIMNSPORTATIWI ♦.assaMs� WISELY STATEMENT OF WOREIIID PATS. CONTRACTOR A&W Cb.✓sTledcTAOw/ Co. _ ADDRESS Po- A'SK 303 e. CITY "At r STATE wi s/94. DATE—Z-Z3. 9 4 •c..�.:.—.M..M:_"` +N.w++..r.+►Krr. MyF...w.r c.wa sM�...M.r« �14._947--A3 /9 TM foll"InE almemm shows the nunbar cl waiting days chwpd to row castract lams the week andinE ow Oq e.aw.cs Jwlo , arkcy 0aya s1,.earM40aw 11 ti Wwaraw r WaaM.Cans{.tams /• �� C�ln.•-Ce/J / Tw.My / /_r9 Thwaday fy,,.. / /• Lo f"� ✓ / Days mu.wk ....................... ............ S __ Dqs sre.,oesly N""d................. _.._............._........»_............_ T3 z Taddays to dara .........................».............._........_..___..._».. r(j1 7— CURRENT STATUS Wwk,al Dar.Spcifid ,n CaMr«..___._»._...._..«._______ 45 AW*a ed Enanuw. A Time...................... _y._...w......_...,...�,_ ¢� Tod Autwnad Teat,of Caarrwt .......... 3 Lost Wwk,n!Dora Chap....._»._._»____».._.------._._._.._...». fir ••Wwkwq 0"s Ramsiairy...__._.._.__— Srra.awy d Waak's Act mas: Shw Wit,a.r.we,ws eaara.s A kI 1eNw Into Needp.wtwe "Uw agerlw table to shw ssaw mt ie rims NOTI: The cantrwrw .,II d alle.ed 10 dsye haw dab aI th.s mW r.lud b ryse.r r w.*NJ the cwrwtaass of h,s .taaawer, arha•..w a .hell he dsewad to hs.e hoot wcepw 06 caewt. Of Re+ � ,� PUBLIC WORKS DEPARTMENT DESIGN/UTILITY ENGINEERING 235-2631 n MUNICIPAL BINLD:NG 300 MLL AVa.60. RINTW1,WAIN.MDea a P �f0 stpl E/ BARBARA Y. SNINPOCN MAYOR January 9, 1984 Ford Construction Co. P.O. Box 5036 Kent, WA 98031 Subject: CAG 047-83. Kennydale Sanitary Sewer and 1983 Sanitary Sewer Rehabilitation Meekly Statement of Working Days Gentlemen: Enclosed is the Weekly Stat aent of Working Days for the week ending January 6, 1984. Please note there are 4 working days remaining on the referenced contract as of January 6, 1984. Very truly yours, Robert L. Bray Project Engineer :jft Enclosure O[IAWMENT OF TRANSPORTATION CONTRACTOR WEEKLY STATEMENT OF VORKINO DATE: CONTRACTOR AAW ro ADDRESS _P a- Asu Ste_ 3 r CITY _A'6w/T STATE wisAd. DATE lta T, /fP� fidefYna�dt Itwss /7 ns lellawrng s11Heawnl Show. the RUMW of working days chorysd to Taw conhuy la the week ending Jae, r D... Ong a..M..C..dnrr W.:* .r r..,l un ,., ra table MW-* f{r/id y / 4 M� o.G. .rI,I• /t., /- f.i 4 de► anal. o.G. ter/ �. r.�. .Nk......................... ....»... 4 ....._........................___......... .ram___ • 2- Two] dogs to der. .......... CURRENT STATUS Malone D.ys Slrocilnd in Conn.., _...._.......»_. , Aw.Yed f I TnM._....._.-._._»....._...._...._............... 5 T.rel AorMr.sed Tins, of Cenhmt ..«............ ' Less M.rklne D.V.Ckoree•...__.....»..._». 77 "M..khre Dry s.«.__.._..»..___....... .___.._..._.._._._.._—_._ 3 Serro.y of Meok'• Acriv.sioo; -- �.. _ Yl6w"IV o.rM.i.nt pP•eY.d ky I.1r.. Moor Neoderren.r• "Uoo no"#,"ra.lo is, thens owrM in r ow NOTE: The cMr.ocror ..11 be olle.od 10 dot's I.e= 6,* .l rlrio..Pees .n erkicA N Proro.r .n wrirme rM cw.ocsnorl of rkio .rnr, .rko...to n oAoll Ins do.nyd ..he"Mon.ct.esed so tenors. .reso Of RFC PUBLIC WORKS DEPARTMENT DFSIGN,UTIU TY ENGINEERING 0 235 2631 00 g MUNICIPAL BUILDING 200 MILL AVE.$0. RENTON.WASH.96066 P 1TEp SEPtE BARBARA Y. dNPOCH MAYOR January 16, 1984 Ford Construction Co. P.O. Box 5036 Kent, WA 98031 Subject: CAG 047-83, Kennydale Sanitary Sewer and 1983 Sanitary Sewer Rehabilitation Weekly Statement of Working Days Gentlemen: Enclosed is the Weekly Statement of Working Days for the week ending January 13, 1984. Please note there are 8 working days remaining on the referenced contract as of January 13, 1984. Very truly yours, Robert L. Bray Project Engineer :Jft Enclosure RgKLY STATRMRNT OF WORKING DAYS, CONTRACTOR ioeo 0,14473tUcTdO.V CO. ADDRESS R o- Box 303 CITY geld? STATE wlsN. DATE Jdd 14 If" Cter...r a.r►r •Na.rL�.d.ergawale.ar.. nyo.ey Ne.r C.1, Teret�a r X..►w GAG 4247-83 I Ties following atatatrtant sh.aas the numkor of .orkip days chosyed to yew connect for tha rook Da. Doy eaatkr co duwr erkrao Days u..reN I.Day, e'N ti ..erlr.W r oeawr Crrdtrtoa. Monday L 4L.Srlir✓�r�• / /- /O Tweday B.G - Iy Wednesday LA 6*e I Thwadoy '.C. � y- 13 Fr-dey clew s this reek.__.........__..._.._..._....._._..__..__........__...._.._..._.. /5 I are ro.;wsly r pa sd.................»......._._._. ..........___.............. 77 2- seat days to dare .-....................._._...._.._.._..._..................._..._.... 3 1 L CWRRINT STATUS Washing Days Specified m Cannatl._..__...._.—...._...__._.»..........._.. ss 7 `Aprs.ed EatenuM of T.sr................................ ..»..._...___._ e1'� 4b � �•T7 Total AVtMrusd Tim of Costliest ..__.._..-__.. Ay— 93 lost Wrk.no Days l:Irreee....___.__'_'__......_.........--"------ — J3 ••Working Dots Regaining............... ...._.._.._.._..._..._._._......_._.__ al WeeYs Acn.mos: A".! w.taar 11"0046 Show"IV entensrsers eoere.erl by Isnsr fray Noedaoertore Use as"O."trots to Meg a.aneg in tim NOTR: The conow,ot ..It ha alleged 10 days fner date of this nrrt io'.kid Fe ptseoot rn aaiti:rd the corractneso of this etetmoat, sehor.rse rt droll be dosed to hew►art accepted as cwaet. Ilk�W__,W�wl FORD CONSTRUCTION CO. GENERAL. ENGINEERING CONTRACTOR P.O. BOA'.5036 a KENT. N'ASNINGTON980il BUS. (1(lb)ODOM838-8010 January 9, 1988 City of Renton Department of Public Works 100 M,'11 Avenue South Renton, Washington 98055 Attention: Bob Bray RB: CAG 047-83, Aennydale Sanitary Sewer and 1983 Sanitary Sewer Rehabilitation Dear Bob: We are hereby requesting an -xtension of the Working days of our contract in the amount of 18 days, to accommodate the time required for installs- tim and restoration of the additional side sewer footages added to the contract, on Wells Avenue South. These days include the loss of time for freezing weather, and hold-up on the water main extensim. Sincerely, �1rORD CONSTR TION CO. Doug Cartwright DC:irj 40 140 �a/9 /1 / 44 A Z14dp IAV all pl, 'Ile vo,/ OF o PUBLIC WORKS DEPARTMENT A _ DESIGN/UTILITY ENGINEERING 0 235-2631 M✓� UNICI►AL BUILDING 100 MILL AVE.$0. RENTGOI.1A 06E IASK.98 e ��tP �Fn SEP't^' BARBARA V. SHINPOCH MAYOR December 19, 1983 Ford Construction ro. P.O. Box 5036 Kent, WA 98031 Subject: CAG C07-83, Kennydale Sanitary Sewer and 1983 Sanitary Sewer RPhabilitation Weekly Statement of Working Days Gentlemen: Enclosed is the Weekly Statement of Working Days for the week ending December 16, 1983. Please note there are 13 working days remaining on the referenced contract as of December 16, 1983. Very truly yours, Robert L. Bray Project Engineer :ckd Enclosure WIEKLT STATEYlMT OF WMKUK DAM COMTRACTOk FORD C!QA4FZYULTAOA/ Cn. kDDRESS P. o_ AOC So3o CITY CRAW STATE DATE /Z 3 �:ssrer.rwwste .......���{I"n.glo..,w.is c+tr 7-93 CLMA/YLec6 -C&,V yff_y ' �¢ Tlr Isllewing stearent slims the nrsisr of raking days cherpi to yaw cetttrsct fa ohs creek aditq /Z — /9, _ . 19Alt. acre ass usstlw CesMttwt WNW lisps t/...rW4 nw ewwd to W.etne•w arMr cw.etttwe /Z- /L IAertLy Rarr. t IZ-r3 Twed" /Z. /I vulowsLy O•Gr.Awns r /t-/f TlwrsLy o.t . a this /L-/4 frlLy !./mow 5 sps.iwdy tepertd».................. ....... MalLys to deN ........._......____"__...._...._._._.........._.._......_- 67 CINKEMT STATUS Wr►rq Dugs Sfe..lieA in 'Atars.sd Estens.en s{ Tstel Astlow seA Tom of Cenral O Less Wr6ne Days Chinese....__..»___._. 6.7 '•Wrktty Oeys Resrmiry 11 ,14 el Week's Actt.Bros: t4etset eM 'Skew soly s.tsweierte GWO.d 4 letlst loss Msedw enges Use sgsttw tMsts to sham s..nw.s t.M MOTIR: TM certnecrr ..It be elle.d 10 Lys I.w dote of title Meer. r.hick is presto to wits AA cer,"Assss of olds stelsetee., evs ..ue .t shall be AsssreA to►ste be"e.cep d w censct. n. •••-.'f'It CIF � 1a PUBLIC WORKS DEPARTMENT CIESIGN/UTIt ITY ENGINEERING 0 235 2631 � MUNICIPAL, flU1CDING 700 MILL AVE.SO. RENTON,WASH.M066 e P QED %P 4 BARBARA Y. SHINPOCH December 12, 1983 MAYOR Ford Construction Co. P.O. Box 5036 Kent WA 98031 Subject: CAG 047-83, Kennydale Sanitary Sewer and 1983 Sanitary Sewer Rehabilitatio.l Weekly Statement of Working Days Gentlemen: En,,'osed is the Weekly Statement of Working Days for the week endinn Deamibe• 9 1983. Plee.a n:te there are 19 working days remaining on the referenced contra- as of December 9, 1983. Very truly yours, Robert L. Bray Project Engineer :ckd Enclosure WEEKLY STATdENT M RDREING DAYS CONTRACTOR_�Q6Q � neN ADDRESS — P e_ Anr p la CITY_- Ci'II/T STATE wi a& DATE 12—/2- r3 a.►wI fhe.hr c«,iry Te.....aa Nu.►. erynAci _ I / 3 The following afuamxnl enemas SIN numbs of waking do char endiq LaCG 7 Te Rod Ie Taw camroN la the reek Does Door ewMw C.dul» eah.e Oy. y,,.«.J4 Dq c-=i'e..nw« •»+» c«r„i». iz-G T wry 40c. Q..q I /Z- 7 Wednesday n I /x-j' Thw s4T / I: -4 FnMT Rt,�. I ..................._.._._«....... S eye p..lw.ly..Mad....»...-._ _........ S 7 a.l Mr. to Mr. ._..___.._.._._._. G 2 CURRENT STATUS Wahine Days Specified in Coasts"._............•.......... 4s AMa..d E.Ien..s..A T.aw............ ._._.._.._..-....._-......_..._..._.._.._ 35 Tell Aulheaisd Tim.(CMbKI .._.._......__...._....__....._._,.____ -. 80 Late eahiq oeT.CtaM.....__.______. G Z. ..yatlq Days Reminl.r........._.........�.-._...__ /g _ reel...sty Show ante.IIM.,a1.Meaald el' MMI I.m IMeee.,ala. Use McNi..I.I.I.to.haw..a...,1tm MOM TM c.enec.a ..il be .11e.d 10 A"I I,r Mu .1 06",epen ,..h,ch I. pa..I m W'I'v the c..,eelneu el Mi. a.eHeb.I, aha.1.e a .hall be doomed to have lease K.yld e.ca..il. �s - • �F kFL i o PUBLIC WORKS DEPARTMENT pESIGNiUTIUTy F.NGINEERING • 230 2631 ea >F MUNICIPAL BUILDING 200 MILL AVE.$0, RENTON,WASH 911M b �P rco SEP10 SARBAPA Y. SHINPOCH MAYOR December 28, 1983 Ford Construction Co. P J. Box 5036 Kent, WA 98031 s Subject: CAG 047-83, Kennydale Sanitary Sewer and 1983 Sanitary Sewer Rehabilitation Weekly Statement of Working Days Gentlemen: E-.closed is the Weekly Statement of Working Days for the week ending December 23, 1983. Please note there are 10 working days rem lnlng on the refer- enced contract as of December 23, 1983. Very truly yours, Robert L. Bray Project Engineer :jft Enclosure WEEKLY STATfYRNT Or woRltn DAYS, CONTRACTOR 6M CoA/at f7vu r O ADDRESS _ P o Aar so; CITY—X6w/T STATE—AYIsN « _ DATE ca JJ �Zl HPs Myk-..Pee. cnna t,w•.ux M,,,A„ --�S Th. follow,.q armama shatia r!r nu,nhw of waking dayo clrula/ 11 and inl -` dte 1� ria camwet for rho r•Ak ao Is.wl,a,csdi„w, 11wam0 Goes t1..wwlr G., Cw.sd Mc••.eaw.. wws,s, .nai,en,s Mw a 3 � o aT C/O". 1.w.dday N .4L 1hwa"y — Is_cs P,ed•y [IN - .a w,Jse-�nL/� �. / cNw. c.11 / o.y. rk,. ...k ................ Days p.e.,ersly r•aa,rad.........._......_ Total dot, r•d.,. _._......_..... ....__................._. _ D Z CURRENT STATUS wwkeq Doys sys.d,.d re C«e1.nN._..__..__.__...._....,_._._.._.._.._.. 46 AW0.9d Gt"t.sn of T,nu,_..............._.. """"_....,.....__.._ 3 S Tyrol A.rhwls•d Yews of C.nrr.a ..___.....__........_.._..._._.�___. FA Laos wwk.,@()eye Chwp• 70 wrkl,y pays R•sremey........__.......__._._..,___.._.. /O ef Shaw•..ly anrsns.sna-Sfr••.d VI'bra,Irvin ll..drnwr shw ws Use no"""rs"lo rs sasnYa,n ri.r MOM The csnr,acrw will ka allowed w days I,.w 4 0r. .1 rh,. .dwr,n w%"h ra ,r .hall ha dos /,wnr in wnug rM<arrscrn•ss�rh,• •4p...r,srhw.,s• wad e.he"h.w,•acgrd sa<w•cr. OF RE.+ i � PUBLIC WORKS DEPARTMENT DESIGN/UTILITY ENGINEERING 0 2352631 F WIMICIPAL eDILDING lee MILL AVE.a0. RENTON,WADI aanaa e .aP rFG SLo�Ew` BARBARA Y. SHINPOCH MAYOR January 3, 1984 Ford Construction Co. P. 0. Box 5036 Kent, WA 98031 Subject: LAG 047-83, Kenrtydale Sanitary Sewer and 1983 Sanitary Sewer Rehabilitation Weekly Staten�nt of Working Days Gentlemen: Enclosed is the Weekly Statement of Working Days for the week ending December 30, 1983. Please note there are 7 working days remaining on the refer- enced contract as of December 30, 1983. Very truly yours, Robert L. Bray Project Engineer :jft Enclosure VURLT 11TAj AMxT Of W1utUfi oAY6 CONTRACTOR Fol!o �✓s7�t iisn_. ADORESS --9 o. 8 e,c 5A a L CITY Ciw/T STATE kVAAH IT DATE 1- 3 -8¢ «,ili..,w.as e wwwr 1s.w�•r«,,.ks• The following elotommist« Khan the r«wlr 01 W«kfa 6p cho,N1 16 Tw tonfffl[I la the r,ok Y•rrM4 owns" by W*wk.r /z- t t Used , It-z7 Twed,y /z-ze Wednesday G/.Lf. Lf R•.. !z-tf Thwsday c4j�- cAdy L.4. R..w / pas M,s .,,k ...._................. _.. Dellsr•nwdy.•M•nl........_.._........._.._....................__......... 70 _ y TNd days of Ms• _.......... 3 CUWAlNT STATU,', Wr6.4 pars Spclf,ed „Crm,a ____............. _..____...._.._..__ •AW.od errs..fT,r.____._.__..._.—,_,.._W__..�„...- 3S Ww A•Mw,ced Time of C•,n„f Less Wwk,.y Drys Ck«p....__.._._..._.........__.... _ 73 'el Wook's AcGcnas: wg , Skw only owass.,,s of by lef.kom N•,M,wfrk Use"W'W finial,to show„NyM in fir NOT#: The s.nf..crw roll be lle-ed 10 Joy,how My •1 rk, .o s, �s wk,cA w, r,M,f.,.Wiry rhe .rrsfne•s •1 M., NN,•1,w11,arbor."",f shell be deemed to ly.,keels stowed,s crfw«w, n. •`^VYfl N TATiON WEEKLY STATEMENT OF ►ORKWK DAYS: CONTRACTOR AQAQ C!QA1-1 /Jr_r✓dV Ca _ ADDRESS PC. Biz 50 3 t� CITY . ,lEnlT _— STATE wlsN. _ DATE__ ^C�..�. ,"..b.. 4 NN►veI W..ca" MM�.+r NJw� CA __1CSL/�t The following stators nt shwas oho aytnber of working days charged to your coatfoo for the reek ending _ . 19M. owe D.y esweh C..Aaiam Verb"Dar. u..«kaste Day C....a b■..rli« « e..aw C.d,.�.,. Mandoy I Twsday Wedm.day Thuttday Friday Day,this week........_.............................................. _._�........_.. Drys Previously topottod......... ............................... ......._.......... .. Twatda•. to dote ......................................._...._................_......_. CURRENT STATUS Working Days Specified in Cmtrect._._........__...._........_..............._. ifFS AWar.d Extension of Tim.................... _...._...�..__...._..M. Total Autharised Tim of Connect ..Y_......__...._...____.....�___.__ Len Woking Days Charges ......... ••Wwktng Days Rewwning......... .._..._.___�._ Sue siwy of Wok's Activities: Skew will otemsiwrt epwo"el ky hen« Fr tlod"tatwe "Use ngwive totals is shwa evertan a iito 140TE: The canitewsr..H be dlewed 10 dart 6" dots of tale rqw• in which 4 Prwsst in wilting rM ."renews d this wetit,wit,whw.in it *hall he domed to heve Men accepted as cwtact. WEEKLY STATEMENT OF WORRINIi DA.Yie CONTRACTOR —fOAQ G$oVj6n&&X.n.I Ca ADDRESS Bnr CITY _ CEA-T _ STATE uvtsM. DATE C.,.«�:::,M..►.. a+w.+w+.r NI�►�.ores cases, sM...,t M,,:►., _ G.SCs 017-83 _ TM lollowinp ataNtt�nl shots IM nr ull) of workino days cMryad to yov contrmt for IM wok ending , 19.1a. Dot. Day Ws.Mw ca.dit as w.k.q Der. U..«k.kl.Day CwsN by Wwtk..or ._ W.M..C W nl.0 Me"" Tweday wdnaadey Tkwd.y Friday Daptk.a.«k ..............._.... _...._._........__..__....___..__. Days l o.dwaiy ropert.d...........................«..........._.....___.............. Taal day,to set. ........................._.................._._._. CURRENT STATUS Wstbnl Day.Spocifod Aworod Eat"*."of T IM._....._._.._._.._..».._...�._...._..._.__»__ Taal Autkwlcd Tor of Contract ............_.............. Lon wwk.q Day.Ckeryoo.._.......... _.»........._,_......_.,,.__»__ ••workhy Doy.R.M.noq.................»__sees_..__ Su.aory,al Wook's Act...t.os: .._.._.._.__ Sko.only.al"aism,"Waved kr lo"w kas NoodWortors -Use no"ll."total$to show« "fe r.me NOTE: The coatrxta ..II be .Ilo.d 10 drys I," sets of tk.s report .a A,ck to protest in w ,Twq the correctnon of tk.s sgnment, other.ne .t shell M doomed to hew koa occoptd at correct. OF RF v ° PUBLIC WORKS DEPARTMENT It .d► RICHARD C WXHTON • DIRECTOR k $ MUNICIPAL BUILOING 200 MILL AVE.SO. RENTO41.11UK 1110% P` nfi 235 2%9 �,�f0 SEnlc`"o. BARBARA Y, SHIKOOCH MAYOR Decerher 7, 1983 Ford Construction Co. P.O. Box 5036 Kent, WA 98031 Subject: CAC 047-83, Kennydale Sanitary Sewers and 1983 Sanitary Sewer Rehabilitation Time Extensia, 4entlemen: Per your request of December 6, 1983, you are hereby granted a ZO working days extension on the subject Contract. I-f4.91 If you have any questions, please call this office. Very truly yours, Richard C. Houghton Public Works Director Rl8:jft OF RS, ° PUBLIC WORKS DEPARTMENT 4 DESIGN:UTILITY ENGINEERING 0 235.2631 n MUNICIPAL BUILDING pa MILL AVE.SO. RENTON,WASH 99M Pe \Tr0 se vJFMNI` BARBARA V. SWNPOCN December 5, 1983 MAYOR Ford Construction Co. P.O. Box 5036 Kent WA 98031 Subject: CAG 047-83, Kennydale Sanitary Sewer and 1983 Sanitary Sewer Rehabilitation Weekly Statement of Working Days Gentlemen: Enclosed ' the Weekly Statement of Working Days for the week ending December c, 1983. Please note there are 3 working days remaining on the referenced contract as of December 2, 1983. Very truly yours, Robert L. Bray Project Engineer :ckd Enclosure M!lklT fTATlYlNT 0!' VORklllf.pATif CL nTRACTOR Fern n-•A/67X 7jr )r Co ADDRESS P, o• A4D_3 r STATE_wusw DATE S / 3 c«f.ou-N.A. Ti; tollowinp stolalet t shows the /`_� J tntwtbtp a( rarkity AyTs o year contron for the mask arditq LL-' � Dwo 19 , DM Waathw C•M..oa Wwe:q Da/• t/wewa•►M DF CMed be n..N..w Ce.an.ea• /�•2 It Naadq. U.... I /i•z le Tmsdgy Wodaosl tty ThwW Jt• s ,,F4" ndey 7 Dayat6.•...►................... �.._._..._._•____... 's Dare pa..waly reyarod...,....•_......_. Tool dots o dot. .................. CURRENTfTATUS MaLny Day a _..._........ — a3 'Awl wed En•n•.on I T.".•... I9 Total Aothw.c.d T.on of Cwhect .___.....,,.....__._..„._..,,_.,__,•„__ GO Loss Wwk,,j Days Charyae.....__.__._...... S 7 •'Wwkhy pot'•Reoo.naq........�_. .3 fwr'wy er Week's Act.v.ho•: P.aN..Ryr r -' Shw only oetea•�ao•oPit - RY lator sloes Iloadtpertara ••Uw aeRef.w fools to►how anen..n lion NOTE: TM cMtrecfet..11 ka alle.od a dot•Iron Mo er t1.i•nao.t .w.hid o MNa•. .i.A.• •tooanro, whw..0 rt she"he d•eoad ra%eve ben a.ceMd oe omool. .n vr,toy the cwrocfaa•: OF RF4 Z PUBLIC WORKS DEPARTMENT DESIGN/UTILITY ENGINEERING 0 235 2631 F MUAICI►AL BUILDING 200 MILL AVE SO. RENTON.WASH.9006E e P rCo SE r�E BARBARA Y. SHINPOICH November 28, 198} MAYOR Ford Construction Co. P.O. Box 5036 Kent WA 98031 Subject: CAG 047-83, Kennydale Sanitary Sewer and 1983 Sanitary Sewer Rehabilitation Weekly Statement Of WOrkino Days Gentlemen: Enclosed is the weekly Statement of Working Oays for the week ending November 25, 1983. Please note there are 8 workino days remaining on the referenced contract as of November 25, 1983. Very truly yours, Robert L. Bray Project Engineer :ckd Enclosure WRRRIY STAMPAINT OF WORKING OAYSI CONTRACTOR FORD QaMg acrOM re. ADDRESS P o. Bnu 5.7 R e. CITY "dT STATE wisal. DAU ALyK Zp /I 3 ' C.,r.w,W..sw --.�.0 , ::.+r:+..+r M.ah..v No.so Co.." s.a.w.«w.w« GAG Ot7-83 Ciywry -•lyct /( The following atWlomne shows Ihs n..ra, of gaping Mro d wtyd 1st Your contract for flea week ending Nov. 25 19d3. Does 0a, W.aaw,ca.a..... Wwhnay 0qs W.«h.►l.Do, c«..d h,a..*.W we.*.carwmme. //. P/ S1..doy LI• �irw t -- //_ 111. Tws"v .. //- 17 Wda say f/- 21/ ThwoMy 1 //- s 9 Fr,doy B Days this .aoh.._..._............... 3 Days yrw,wsly npwg/........._.._...._.__.»....__»......_....»_.».........__ 44'9 Taal Mys to dote .........................._............_.....__............_... �5 e CURRRNT STATUS Worhny Day.Spuhod rn Contract._..._.......».......... 4s 'Awovd E.toaion of T.ow......... __._.._._._...__........._.___.,,._ /S -. Taal A.thaud T.m aI Conti", .._.._....................._.._._.�•_...._.. �O Loss Working Dove CM.pa..»_...__.__... 5 Z ••Wathhy Days Rooaiaing...................-_....... !� Ste,aery of Wa"'s Act vmos: shaf.s,1.0. r9 Sheer only ata.s,sns yaraad lo, latest,hum I4stda.sr,as •Use"W'",ads to Gk w o..atew.w times, MOM The cstn,rwtw .,It be distal 10 Mys I," b,o of n%.a moat m.',ch to peas, .a wn.rq ton cwan.oss of thu stet a 1, aMr.ia.t shall M Mood to haw loan Weapd as comm'. OF R�C� R T PUBLIC WOrXS DEPARTMENT DESIGN/UTILITY ENGINEERING 0 235-2631 W MUNICIPAL BUILDING 300 WILL AVE.SO. MENTON.WASH.INIM T e P rF0 SEP,E BARBARA Y. SHINPOCH November 11 , 1983 MAYOR Ford Construction Co. P.O. Box 5036 Kent WA 98031 Subject: CAG 047-83, Kennydale Sanitary Sewer and 1983 Sanitary Sewer Rehabilita'ion Weekly Statement of Working Days Gentlemen: Enclosea is the Weekly Statement of Working Days for the week ending November 18, 1983. Please note there are 11 working days remaining on the referenced contract as of November 18, 1983. Very truly yours, Robert L. Bray Protect Engineer :ckd Enclosure DEPARTMEW OF NSFORTATION • WIIKLT STAfIYINT OF VWKIN6 DAYS, CONTRACTOR fofo CvVA Y.6Lja& Ca, _ ADDRESS R e. Ants SD a CITY "Aff _ _ STATE wisrt DATE.1/- Z/-8 3 Cwa»wat Wa.a. feeeekA.tiAapwaWhmAar N,�.ay t4,w C C./G 0 17-93 CEw.rYes„� cdtsvdF2< •'"" ifiwwsat Mar. 'o The following statement shows this rAwAtir of waking lays daryo/ to yaw conhstt la the week ending A/DY. /P 19d3, Daft Dar awasow condition awry Days Ua.rhMte Dar Cwssti►a awaar r awash.Cww.o.. //- /S Twsday '4. Wednesday //- /7 Thwad" / //-If Ftidey / o/ay Days this week............................ _.._._._..__..__........__.._.._.._..._... 5 Days Morioesly ndwftd............................_....................__.............. Tooldays Is wte ................... .__........_. »_......_...__ ..__ 49 CURKINT STATUS Working Days Specified in Caaaect._..__..____...._...___._._..„_.... ,_ Aperwod Em"s,"of Ti... ...... /5 Total Aethwi'ed Ties of Corkmt GO Less Wwk�q Days Chwgea...._____.___......__..... ..._._._.___.__ 49 ••awklq Days Rema.n.q....................___._».___.._.._._____.._... II _ Summery of Week's Aer,rnfte: Itopa.eaa. 'Shaw only oerwoions apereaati by Isar her Needasswtors Use wgw.vo swels to shw,awvw.n»sw 110TE: The c",,wtw.al be allowed 10 dst s f.ae tints of this ftpt .n adtich to ptwest in wwiq the cw,wass"of this stateornt, wM...sa it shell he doomed to hew►swat accepted as'amct. OF �Fti o PUBLIC �AIORKS DEPARTMENT U Z 2 !R DESIGN/UTILITY ENGINEERING 0 235-4631 f� ✓g MUNICIPAL BUILDING Too all Ll.AYE.SO. RENTON,WA4N-9aoaS 0 P 1 to SEPIt BARBARA Y. SHINPOCH Nov(`nber 14, 1983 MAYOR Ford Construction Co. P.O. Box 5036 Kent WA 98031 Subject: CAG 047-83, Kennydale Sanitary Sewer and 1983 Sanitary Sewer Rehabilitation Weekly Statement of Working Days Gentlemen: Enclosed is the Weekly Statement of Working Days for the week ending November 11, 1983. Please note there are 16 working days remaining on the reference contract as of November 11, 1983. Very truly yours, Robert L. Bray Project Engineer :ckd Enclosure DEPARTMENT OF TRANSPO►TAT" CONTRACTOR WRRKLY STATRMRNT OF WORKING DAYS: CONTRACTOR _ CgVl;nWCrdDW; ro, ADDRESS PC- Ae.c 5olf. CITY tEnlT STATE sYISN. DATE S< -83 GAG_Odt7-d3 �ctldyYBN.�SLdtl2L—�__ '�"'� s••••••,••w=.►.. The following sroftwe d skws the number d raking days chayod to 9 ending _ Nov / year Contract to the reek s«. Dew r...a«Ch A wM W.%-p D.p. IA..«a.►I.D.y W-od« ea«e«« ra.,lo c.adrNr.. //. 7 .YJ i Wednesday � Thw.day Days rhea weak................_....... ._._..............»..__._._..»_.....__. 4 day, p.aW,ly r•0.n.d......... ................»...._..__....»..._»............. Taal d.y,to d... ..................... Q dL CURRENT STATUS WMk.np Days Sp.uLad n CMt.ect._.»__......._......... 4s Appra.od E.t.ns..n al T,.r _............_....».._...._....__..-..».__�... /5 Total A.th«.aod T." al Contact __........_.,...»..._»».„.._.—„-. Lost W«k,q Days Clop.pew .__.._......_........ _._. Wwklnp Oaye a.w.n.p /G -E al Ery Slow Mly eatM,ien.nppr..od ky I.w«In«Naadlw.. ' ••Use..eM..rc Wale to slow,a.anao'n#.an NOTE: The e«hnect« .,It be ell...ad ID day, I.w da.. M this ope, .n which.. prMe.t .a M whniw♦tM c«rectne„of tA., statawt, etlo«.na .t $W i be doerd to he.. khan occ.pt.d as cwact. Mi,xi1TIdENT Of TgANSPORTAT10N CONTRACTOR WEEKLY STATEMENT Of WORKING DAYS: CONTRACTOR _. -AW C'o✓ 7aTucTbN o ADDRESS -- CITY rENL_________- STATE�IsM. _ DATEsYye! 7 1?1 �ABeteaoal..�er 11-616"No..Card, Ste,�.a,N..►. � � The 1■Ilo.tp stop INN lobo•.■ tA■ ntorl Y■s Of waking days chwgW its yow CaIM■tt for the wlo■11 *twig —L�LP✓_---'�' _ . Hsi. D't' 7.r •«tea trdtttr stab" Cov, ti W..hw r wootA :C.Jltloaa /0- �� MonaloY Thmealay ��-�' fredlop vfy C*- af. Z..� Days this.slob._..._...................._................ 5 Oy per�eusly,.po,tad ........._..... 35 Total der•to der. 40 CURRENT STATUS Wmk,n[Days Spec iflaai ,n C.twlost AWa.ed Eatens...1 LM._..._..................._.»..._. Total A.thmsod T,M of Crttect 4s Los we6ty Day•Chwpe• ....__»....».-.__.. 40 "wrhlry Day S..-WY o1 we.A'•Aeh.,hes: aC i hgNt[q, �— SM.MIT uta..r,ons OW..ad by lenm he.Noodwortms 'Use nopt-.e twat,to shoat o.o.twt to tuw NOTE: The i"t,wo, ..It M ellsoad 10 alloy I,aw dale aI th. tew •a.h"h to same" is. .#.q the CmaK IMU of Ihs sletoo.nl, mhm."o io •MII 1e aloaownt to hew Men eec.pood os c.rm t. 1T r PUBLIC WORKS DEPARTMENT _ DESIGN/UTILITY ENGINEERING 0 235-2631 R MUNICIPAL BUILDING wD MILL AVE.SO RENTON,WASH.98066 9n b fD 12ntt^' BARBARA Y. SHINPOCH MAYOR October 31, 1963 Ford Construction Co. P.O. Box 5036 Kent, WA 98031 Subject: CAG 041-83, Kennydale Sanitary Sewer and 1983 Sanitary Sewer Rehabllitatim Weekly Statement of Working Days Gentlemen: Enclosed is the Weekly Statement of Working Days for the week ending October 28, 1983 Please note there are 10 working days remaining on the refer- enced contract ast of October 28, 1983. Very truly yours, Robert L. Bray Project Engineer :jft A710N WEEKLY STATEMENT OF WORKIW.DAYSI CONTRACTOR FOAC7 COA/67MUCTA061 CO — ADDRESS .. P o- BOOK CITY _^! dinlT STATE v►ust _ DATE CMt.wl Neiw ievwFAA-anyare4ier Nlafl.er aM.w CMay Slwareenr N� _ CA — Yad&& Sty The following stwornent show. the number of raking days charged to yaw contract IN the .rook ending 29 _ 1983, ae, wean.C.ldiltw 11.6.4 Dq. lMwwsNM our Cw.d M es.n.w w aesdo.Ceadttiw. p1. Ck(S.- .w,/d I is� s✓ tdead.y � Twsday I Wdrnadey is-t7 ' Thwaday r' iozP Frday Vs lhi. .salt ..........................»................................._.................._ a,a prsrieusl, roperrd........._..................._._................»............... 30 Dial do's to date ........»...............................„....................__......_ 35 CURRENT STATUS �t Work.q Days Specified in Contract ._..__....»..._.........._..._._.._._.......�= — AWerd Easts."of Tlwe......... _._.».........._.._.__.__..........__.._.._ � .-- Taal A thw.ad T r at Contrary .... .. 45 LossWerhlq Days Chwas........ _ »»..»......�..__.».........__�__ 3s - ••Working Doys Restaieiq /O of Wook's Activities: she."IV as Malw.. eaaroNd 6V IaNw IrM tt w• Use neptwe$Weis to show evwtas in tins NOTE TM cwraactw wd! Ito elle.d 10 11a,. 1100 dae of M45 few n which to Frwest 'n willing rM cwractMaa of this alateanrll, slhw.ne �t shall be dooawd to have Men eaceald as cwreat. OF RED v : PUBLIC WORKS DEPARTMENT DESIGN/UTILITY ENGINEFRING 4 23'- -2631 pWL MUNICIPAL BUILDING 200 MILL AVE.SO. RENTON.WASH.eeees 0 P ED SEPTE BARBARA Y. SHINPOCH October 24, 1983 MAYOR Ford Construction Co. P.O. Box 5036 Kent WA 98031 Subject: CAG 047-83, Kennydale Sanitary Sewer 8 1983 Sanitary Sewer Rehabilitation - "Weekly Statement of Working Dayi" Gentlemen: Enclosed is the "Weekly Statement of Working Days" for the week ending October 21, 1983. Please note there are 15 working days remaining on the referenced contract as of October 21, 1983. Reference is made to your "projected partial payments" of September 12, 1983, wherein you projected a payment of $83,432.01 for Estimate 1 1 . The actual payment for Estimate #1 was $43,800.50 of which 515,944.99 was paid for "material on hand". It is obvious from progress to date that the prcject will not be completed en schedule unless a diligent effort is made on your part to supply sufficient manpower and equipment to complete the project on schedule. The City is understandably concerned about possible delays regaraing the street overlay contract scheduled to proceed the sanitary sewer install-,tion. Please provide this office with x revised estimate of projected payments. Should you have any questions, please call this office. Very truly yours, Robert L. Bray Project Engineer .ckd Enclosure VIEPARTMENT OF TRANSPORTATION WEEKLY STATEMENT OF /ORRINO DAYS:- COMI RACTOR_F�6D �+vs77cucYdSN o ADDRESS P. o- Box 50_ r CITY CiA/r STATE wdacN. DATE C«wur f1.eAr i.drKAy,I.N..fy�� 11..r C.«ty litatarM Ile.sa.. �G ' _�_4_PA- BdL dI J The Ioltoring etatenont Thar! 1s nuntbse d raking dogs chorgod to row conlroct Ix the rook ending _. .� 2/ IY , D Do, T W.rYN4 Day t.weed to reeNr r p. r«wn.Cww«. /e//7 Abnd•y P 4dy. /</to Thw,dsy C r ro�=/ Fnday p/.c/.17. j Days this rsek..................... 5 Days pr•.iaasly feMNed_....... ................»_....._....., 25 Tool days to dot• ....................._._. 30 CURRENT STATUS rack,.@ Days Specilisd in CsnN•d..„..__......._ .. _ ¢s 'ApMered Eefsnct•o of Times._._...._._..._.._._.__.___........._._.._.._ IV- Total Authe,ued T1•r of Cwt,", .„..._...........„ —4LS Less lvxkip Days Chops...._....._.__.___..____. 3 n ••T1ohlnp Days Reratwiwp.........._.... uwmwy of reeks Act,,d.•e: 4 er!.p «ly e.len..sns appre.ed►y letter It"14e4eserNrs Uss.spat,«later,to sksr s~,tio.w ri.r NOTE: The cant.scrw r.il be allered 10 deys I.ats dare of th„ -w iw Which to prates) .w enn•np rat co.«tnase sl rAie st•tsswl, sthatr,ss .1 tMll M d«rd is hs«hs•n eccsptad•e c•necl. OF R"Y f z PUBLIC WORKS DEPARTMENT o DESIGN/UTILITY ENGINEERING 235-M71 n kv MUNICIPAL BUILDING 200 MLLL AVE.SO, PENTON.WASK 911M a P rfo SEPIE/ O',RBARA y, SHINPOCH ,AAYOR October 10, 1983 Ford Constructl on Co. P-0. Box 5036 Kent, WA 98031 Subject: CAG 047-83, Kennydalc Sanitary Sewer and 1983 Sanitary Sewer Rehablll:ation Meekly Statement of Working Days Gentlemen: Enclosed Is the Weekly Statement of Working Days for the week ending October 7, 1983. Please note there are 25 working days remaining on the refer- enced contract as of October 7, 1983. Very truly yours, Robert L. Bray Project Engineer RLB:Jft Enclosure WEEKLY STAT{Y?wT OF YMNIM DAVIS CONTRACTOR Foev �NST?uCTi/lw/_ Co. ADDRESS P o. Box 50 3[e CITY — XArAf T STATE—riLswl. ._ GATE w /f!3 C.." sw.r.r tl.essr� _GIG 017 - t5�vvvnA� ¢ TM (4llowtnp atagtta and irq /7c24 7 nt Shawl, the twwber ofworking tleya "teryd to yww contract for live reek Dr. Der W«rk.t Cr/irtr Wrk.0 aeon. W,ioik.kt.Dot C..W by a«r►.r r ►met Twstkry .• / /•/f Wednesday r• /'vd ihwsd y •• / /e17 Fraley ...................... Dors we..ausly ray«led.........»......__»_........_...._............___.._. J� Total days to der. ................................... ZD CURRENT STATUS 111w6nt Dot:Sacc.hed in APPra..d Emms."d Total Authr.sed T.an Cutn"t Lase Working Days Chrps....____...___...._.».�_».-..__ LO ••Working Days Raewmrng.._...._..» Z's Pr.pu ewe.• ' 'S:'w only eatan"w" of W"Wl ti lenr Irw Woadgsartone N negafiw totals to she.brrtrn rn t, m NOTE: The centractar..11 M ells.ed 10 days I," date of this Mew is which to Protest in rimy the carr«teass of this statement, othrrus rt shall be doo.rd to have been"cooled at contact. M NT OF TMN'KWIATIOM WRRRLT STATSYRNT OF WORKING DAYS: CONTRACTOR FORM (2Q V6ZWr,7JON Co. ADDRESS Po Ba)c 503�E CITY _"Air STATE_ wish. DATE 7. /993 coo..«.r..a« •,...:�,,:._.�_ N.r...,w.w c..tty k..t.m,.ar nv.a« C4 G 9I7-R 5 The following deterrent shows On stakes of waking doys cherged to yew contract for Ills week _anding 'Oe7 14 _ 1ydd. Items 0" root..cm,.d.lee rm,taw 0". u .ark.al.Its, Cw..d or ve.k w reed..CMIn1«. /G_ /e Nendq L'Irwar I Twpadoy ' Wednesday, .r /D-/3 Th.rrsday •. / Fridoy S Daysth.s week......._........_......_......._»...._....... -.__._._._--------- Daryaerwiwaly spond........_............................_.._»....___.............. Total days to date ...................._...............«......_.................«.._....�. ^$ CURNINT STATUS Work,.q Days Spoc.f.d in C.ntroct. _.......».„......... ..._.._.........__.. Aype.odEeens.an of Tiwe.. .................... 169- Total A.thor.ad T.m,.of Gannett ......»....._.....»_._..».._._.......»»..»_.. At 5 La.. Wark,na Days Chugs....... Z 5 ..Wwkl..e Days Rawamine........ ZO Sw..«y of Week's Achvrtus: r e� Shen only eetan..ana opp•.vd by lams from,Nosdeaartas "Um,eeyoGw testis to them avenan m game NOTE. The <MtrKIM .dI be allowed 10 Jays Ism, date of thi,spot is which is romeal m v.twte dls ca,'"trets of this aptuabnt, ahe...ue 01 shall he dossed is have hays accepted as ca.rect. of REti i u 4000, i PUBLIC WORKS DEPARTMENT OFSiGN/UTILITY ENGINEERING • 235-2631 o g MUNICIPAL BUILDING 200 MILL AVE SO. RENTON.WASH.9SM 1, %NrEC SEp(E^ BARBARA Y. SHINPOCH MAYOR October 17, 1983 Ford Construction Co. P.O. Box 5036 Kent, WA 98031 Subject: CAG 047-83, Kennydale Sanitary Sewer and 1983 Sanitary Sewer Rehabilitation - Weekly Statement of Working Days Gentlemen: Enclosed is the Weekly Statement of Working Days for tf.n week ending October 14, 1983. Please note there are 20 working days remaining on the referenced contract as of October 14. 1983. Very truly yours, Robert L. Bray Project Engineer RLB:jft Enclosure OF RFti J � :J PUBLIC WORKS DEPARTMENT DESIGN/UTILITY ENGINEERING 9 235-2631 �, tQ MUNICIPAL BUILDING 200 MILL AVE.SO RENTON.WASH.98D65 TEp SE PI P BARBARA Y. SHINPOCH MAYOR October 3, 1983 Ford Construction Co. P.O. Box 5036 Kent, WA 98031 Subject: CAG 047-83, Kennydale Sanitary Sewer and 1983 Sanitary Sewer Rehabilitatl on Meekly Statement of Working Days Gentlemen: Enclosed Is the Weekly Statement of Working Days fur the week ei.ding September 30, 1983. Pleasenote there are 30 workLlg days remaining on the referenced contract as of September 30, 1983. Very truly yours, Robert L. Bray Project Engineer RLB:jft Enclosure DEPARTMENT OF TRANSPORTATION C'.NIi RAC fIN, WEEKLY STATEMENT Of WORKING DAYS: CONTRACTOR APAD Co.wxacnodV Co. _ ADDRESS Pei, nag 5?)3[. _ CITY &EMr _ STATE— WA9PI. DATE�f Can,.ee.Nina« �edwekA.e:wetewd4,wkm� N,gh.ar Me.•CMry tes,�en.Numae. ' 4 � 047_S�_ I rdcwNvaaes.i sdFRyE25 � ,�. The following state"rit shows the number of working days charg'd to your contract for the week ding __ , Dole DM Wasd.er,CwAtttw werk.s'ate Uswwkeate Dsy Cowed Iw W.'".w Wood ,Cewd'.lwe 9/Z' Monday f/Z Twaday q�A• Wed..eadey Thwsdey .. / Friday , Days this week........................._..»..................................._............ 5 Days psv,ovsly.spansd..........................»...._................................... .10 _ Total days to dots ......................................... .....................—.... CURRENT STATUS Work..,g Days Spec,fied n Comte-t..........................._................... Approved Eetensian of Tiste._......_ ......»..... .__..................._..._»�._ -- Total Authorised Tin 41 Cantracl ._... ..................._._..._.......•.......... 45 Loss Working Days Cha,ges........_.»..._..».........._...... /5 Working Days Rsmwning.........._........_ 30 Summwy of Week's Activams: Project 'Show only setensiws approved try letter how Neadtp.wtws ,••W Use nagsGw 1M616 to sheer evsaw.a. rims NOTE: The C"t,w,w .,If M allawsd 10 days Gem to,* of this r*W in wh,.h to protest in writing the cwrsctness of th.s statoment, aherwtse ,. .hall be deemed to Love been xcspred as cerrect. r rr rot. .. a ...:(; apt Job .asks T 00-99 Sitework and Grading 00 Mobilization 10 Clearing end Grubbing 20 Rough Grading 30 Fine Grading a0 Curb Grader 50 Sidewalk Grades 60 Deter.tim Ponds 70 TEC (Brorion control) 80 Slopes, 90 pstnol•tt eve 200-I99 Sanitary Sewer 300 Basement Clearing 110 Excavation and Installation (Letter designatim to denote run) t20 Backfill 130 Compaction 1a0 water Settling 150 Manhole Channels and Grouting 160 Adjustment to Finish Grade 170 Side Sewers 1S0 190 110-299 Storm Sewer I- Fasemant Clearing dL0 Excavation and Installation (Letter designation denote run) 220 Backfill 230 Compaction 240 water Settling 250 Channels and Grouting 260 Adjustment to finish Grade 270 Stuboutr 280 Detantitn Systems (underground) 290 Ditching incl:Rip-rap, Spjsh pads, Dissapators, etc. 300-399 water Systems 300 Easement Clearing 310 Excavation and Installation (Letter designatim to denote run) 320 Backfill 330 Compaction 340 water Settling 350 Fire Hydrants 360 Tapping 370 Connections 371 Services 380 Blow:fs 381 Air Release 390 Meter Boxes "I Valve box Adjustment 400-499 Restoration 000 Pavement Restoration 410 Landscaping 420 Shoulders 430 saseaxmts NO Hydroseeding 450 utility Repairr 460 e4ww0D ROCC R~WO*Y 070 Caxo etix 4e0 Punch List (Specify) 490 Cleanup 500-599 Surface Improvements 500 hock 510 Paving 520 Monuments 530 Curb 540 Sidewalk 550 Miden.ng 560 LYllneati.m 570 'ignin9 5B0 New Landscaping Job Tasks 500-599 Surface Improsemanis (Ca t.1 590 600-699 MISC. 600 Electrical �0� ST`'n�T S 610 Fencing 620 Rockeries 630 Barricades 640 Handwork (Spa' y) 650 Trucking Impo.t (Specify Material) 660 Trucking ESPert (Specify Material) 670 680 650 700-799 Testing 700 Compaction 710 Air Test Sewer 720 Ty Sever 730 Candle Storm 760 Pressure Test Water 750 Plush 5ewet 760 Flush water 770 Roadway Inspection 780 Purity Testing 790 1 800-899 Subcontractors „�a JP 800 CATV Crossings 810 Power Crossing 820 Telephone Crossings BJO Gas Lines 840 CAPg,Mainline 850 Power Mainline 860 Telephone Mainline 870 880 890 900-999 910 920 930 940 950 960 970 980 990 1000-1099 1000 1010 1020 1030 2040 1050 1060 1070 1060 1090 1100-1199 100 1110 1120 2230 1100 2150 1160 1170 11s0 1190 MEMORANDUM TO _ ylnance Department and Vince Lee BATE 9116,181 FROM Bob Bergstrom, Engineering Supervisor SUBJECT Cash F!w Requirements - Kennydale Sanitary Sewers t 1981 Sewer �ehab� lita tT Please review the Contractor's submittal for pay requests proposed on this construction project that is just beginning. Sfp1a�, i nia^�r..a 1 PROJECTED PART:Aa PAYMENTS FOR F i UNNYDALE SANITARY 5EWERS AND 1983 5ANITARY SEWER RENARILITATION c i t i F f } f , 3 Estimate 81 Cutoff date 9-23-83 , Ztem 8 Description puantity Unit Price AMount Schedule A 1 Mobilization LS 3000.00 3000.00 2 Clearing and grubbing LS 2000.00 2000.00 3 foundation Material 100ton 5.00 500.00 - 4 Select backfill 400ton 1.00 1200.00 5 48• MaMoles 6ea 1200.00 7200.00 6 54• Manhole lea 1400.00 1400.00 7 48• Ms.hole extra depth 20vf 110.00 2200.00 e 54• Manhole extra depth lavf 150.00 2700.00 9 Inside drop lea 1200.00 1200.00 lu Vertical connection Sea 400.00 2000.00 11 S. PVC 8001f .7.50 14000.00 12 8' DI 6711f $0.00 33550.00 13 6' PVC 7501f 14.00 10500.00 14 8 x 6 tees Ilea 62.00 806.00 15 Connect to existing manhole lea 1000.00 1000.00 is Staking LS 2SO0.00 2500.00 Subtotal 85756.00 10% Retainage 8575.60 Total 71180.40 MSST 8.1% 6251.61 Projected payment 63432.01 t i Estimate 81 Cutoff date 10-15-83 Item 8 Description 0uarrt ity Unit price Amount 4hedule A 4 Select Pill 400ron 3.GO 1700.00 , 5 40• Manholes sea 1200.00 9600.00 7 48- Manhole extra depth lovf 110.00 1100.00 11 e• PVC 7170 E 17.50 37975.00 13 6' PVC 776_f 14.00 10780.00 14 8 x 6 Tees 71ea 61.00 1301.00 Subtotal 61,957.00 10% Retainage -6,195.7C Total 55,76!.30 , MSST 8.1% 1,.516_67 ' Projected payment 60,277.97 Schedule 1 Clearing and Grubbing LS 3000.00 3C '.00 7 Sawcu,ting 10001E .10 100.00 3 select backfill 350 ton 4.00 1400.00 4 Foundation material loot on 10.00 1000.00 5 Manhole 49• 6ea 120C.00 7200.00 6 Manhole 54• lea 1400.00 1400.00 7 Drop Connection lea 1000.00 1000.00 8 a- PVC 13111f 15.00 33050.00 9 61 PVC 6001E 20.00 6000.00 10 8 x 6 Tee 40e, 100.00 4000.00 11 Connect to existing manhole 4ea 1000.00 4000.00 17 Pence installation 751t 6.00 450.00 13 Crushed r,Kk 300ton 8.00 2400.00 14 Asphalt cl�s3 8 Stan 60.00 300.00 , 15 Cold Mix 150ton 30.00 4500.00 16 Staking LS 1000.00 1000.00 17 TV inspection LS 700.00 700.00 18 Driveway repair :5sy 70.00 500.00 Subtotal 72000.00 10% Retalnage -7100.00 Total 64800.00 wSST o.lo% 5146.8C Projected Payment 70098.60 Estimate 03 - Cutoff •late 11-75-SJ , Item 0 Description Quantity Unit Price Amount Schedule A 16 Ty LS 1000.00 1000.00 17 Finish a cleanup LS 500.00 500.00 Subtotal 1500.00 10% Retainaye -150.00 Total 1350.00 MSST 8.14 109.35 Projected Payment 1459.15 Schedule 8 19 Cleanup IS 500.00 500.00 Subtotal 500.00 10% Rvtai,ap, -50:00 Total 450.00 MSST 8.1% 36.45 Projected Payment 496.45 Al OF RFM ° PUBLIC WORKS DEPARTMENT U 2 Df SIDN/UTILITY ENGINEERING 0 235-2631 00 � F MUNICIPAL BUILDING eon MILL AVE 50. RENTON.WASH.9aoss 9 p- P lrfp SEP1E BARBARA Y. SHINPOCH MAVJR September 27, 1983 Ford Construction CO. P.O. Bon 5036 Kent, WA 98031 Subject: CAG 047-83, Kennydale Sanitary Sewer and 1983 Sanitary Sewer Rehabilitation Weekly Statement of Working Days Gentlemen: Enclosed is the WeeA]; Statement of Working Days for the week ending September 23, 1983. Please note thtre are 35 working days remaining on the referenced contract as of September 23. 1983. Very truly yours, Robert L. Bray Project Engineer RLB:jft Enclosure WEEKLY STATEMENT of WO IKUK DAYS,' CONTRACTOR_fGCD '(�Q/f7�UCTiON Co ADDRESS CITY &XAfr STATE wda;Ad. _ DATE�r�2�r i!F 3 El The lellowing eteteatent shows the tttlslbor of working toys clmrgd to years contract tow the .,soh ondinE —�f 2 1 11", o.t. M •«Theses ca.dlllan a.k„y Osr• U..ws..l.o.y Cw..d ti Woolk . 7/sues/T Nwday c/[se / f/imw co Tw.doy W/alaa l Wadno./ay I/aiaeMc The,.day G y f/rCS Fndoy / C/eae. is thu.aiek._._._......._._..__.............. 5 -- or. ws.w.dy "poaad__.........................._............._..._"_".._......_ 5 mol day, to dot. .........................._................... /Q CURRENT STATUS Ww6ny Days Spoked m CMnatl.._..__.......__...._...__._..._.._..„..._. 4 'App.red EwMs,M of Less._........_..__..._._._.._.__.....__._�___._ Is- Total Aathw,..d This of CMnwr 45 Lon Wwk�.q Day.Cbgse ......... /O "Wwktne Dap R.eswn,p......_......_.._ 35 y d Wqk'.Act,vihos: ti e� ►rsaa.t Eyat�— She.Only aalwl.,Ms apparod by Ienw from Npdp,anwe DN Rover."\wails to she.Mwran to l,wa NOTE. The conbwlw.,II he allee.d 10 days i,oes elan, at th,s nowt ,n.k,d to pelot to w,1,oa to cwractnas,of this stwa.rnt, whw.no ,t shell be d.eard to hai.o been,wc.pd as sanest. DIEPARTMENT OF TRANSPORTATION WEEKLY STATEMRNT OF WORRNM:OATS: CONTRACTOR &M 0—d1A7TjUaaQA( Co. ADDRESS P. o. Box So a __ CITY Cgintr STATE wish DATE-.542Z zz /9F3 C.....•.ts•.s« n.ehwp Ms. Ca .y tt•tw.•wt tr..k.. GAG 047-A3 y�4 sawEes /� The following etotesWm shwa If , metb« of waking dogs charge/ to yaw contract la the week _ ondinE 19g3. om oft W«tw C•d.r.w. W.rs.M o•P• Yw.«sMt•a•y Ca..d ti W«rw« u���� / W."ll .Cswdntss. jp//1 MOW" 1/I3 TewntMy -Swwr Prr f/N Wedeesday / V/S FnMy / Dayshit weok......._........._......_.».................__........___.._....»...... 5 Days P•••na a1T upend __..._.__..»_........... 4- Tool doge, to d. • ..................._....._............................ ___.. 5 CURRENT STATUS Working Dey.Spoc.l.eo .n Connect._................ _....._.._._.._...»»_. 43 Appeal EYIM\IM of Tim._........_.....------._._...._...»»»..._...»_ *.V- Toot Aeth«.cd Tim of C«n.ect .............._.._..._... 45 Leos Wwkny Daye Ckwye....___._.__.___..».._.._......_.��_._..._.._ S ••Working Days Remitting...................__..__..._.._.._...._.-..__.__._ 40 of Wwk's Act...t.we: R A4 hefeet! 'ShoW enly astons.ens ewe.d by letter rim NeeMueners 'Use nepfiw tools to e►ew ewnw In tors NOTE: The cont.oct« ..!I M ellewo/ 10 .oys Lein date of this report in which to poest .n w.itw%the cwrwtnesb el this stomilint, ah«wue .t sholl be deon..d to hew Men wceptd so cenwct. RIFEST STATtIK»T OF WOAftIN6 OAVSr RACTOR_—F&90e_�' VSJ1�Ucrdn y D jt'rar -- STATE__ WASH DATE_ rr N.Mr —T iyr•y.�,�„y,Mirw. Nyhr•,W.r Cawh s.«..«.Naeaer _SAG 0IT-E3 iYf,w,uyeaer �....��� � The following Wbamem shows tha tumbor of rwkirq days charged to yow cwatrocl for 16 hook ondi% 0•.. Day Waastra Csrdittea We,fiep Deya UwrrkMM D Cw,N M Wo,dw r r. W..d,.,C,rdfn,•, Wttday Twsday Wednesday Thot.dey Fnday Day,this sr«4........................V.............. ..__..... Days wo.lewly.eportad......................... ._..._................_................ Taal days to dab ._.._....._....._...._........A................... ..._....... CURRENT STATUS Wakrny Days Sw d,od in CanNK1 Ap/ro.ed Extant,"of T,"._........_..._..»....—....._..._._...._........»......_ Taal Autharizad Tiete of C"text Loss Wakme Day,Choryas....._.........._......»......._......_....._..._..._.._.._ ..Wwkir.d Days R•weiniry ._..........__�.......«......r.._.._.�._..�._ Sur►wry of Weah's Act...live: Plot" Sh..only expansions spwe"d ky lettw k"rywdwwlaas 't4 neptiw t*Ws to shin,O a w,as five E: This connxtar.ill M allsred 10 days f," dao a this r•porf in which to loosest in r swill the cOr,atinass Of th„ stommost,aha,risO N shall►a d"ift"to haw Mon acceatad 40 correct. WEEKLY STAI ENENT OF WORKING JATS: CONTRACTOR FORD "rgacncm rn, ADDRESS P.Q. AeX S_o-4 r, CITY KRnIT STATE WA4N. DATE C«t.«r M..wMr -_•• -w�Ykoft. M.ml.wey me-or Corry :mw oet Neeeo. GAG 017-93 mtdrMNSI Stempy. The I011"MR Statement Shwt the nurber of weakittg days chwyad to row conlrect for the .Teak ending . Den Do, Wool.CWmir Workless Do,, Uowersosle Dq _— Coa.od ey wes'P .or W."coolitlrs Nartday Tuesday reodosday, Thursday Fridey DaysIh.s weak....................... ._......»...._.........._..... ter$ Vre.musly reyorted...............................__............._................ eta, days to date ..................._....._............................... CURRENT STATUS Waking Days Syncihal in Catlrect 44 Apprevod Estonaian of Tir._..._.._._.........__...._.._._....__.. To-at Authorised Times d Connect .............._........ Los Wartime Days Cherps....___._..._.__......._.........._....__...._ •�Waking Days Rowmiq......_,... .___�_____.__._.._ _ eerrry of lawti's Activities: ` _ oC She.rty oetsnsirs approved by Iona Lew headquarters Use he"""islets to shw sooner in tiA 'TE: Tir .allrocla --it M allowed 10 days Lew date of this rope, in wtricA to protest in will,the Corlett"" of this slots~#, otherwise it strl I be devoted to hvn Men accepted as cenect. . -n OF RF �y 4 z PUBLIC WORKS DEPARTMENT _ DESIGN/UTILITY ENGINEERING 0 235 2631 09 g MUNICIPAL BUILDING IBO MILL AVF.SO. RENTON,WASH.gem e rF0 ge+T EWP BARBARA Y. SHINPOCH May 22, 1484 MAYOR YVEMORANDUM TO: Gloria Minick, Purcha,ing FROM: Bob Bray, Engineering SUBJECT: CAG-047-83 Kennydale Sanitary Sewer RETAINAGE Please release the retainage for the referenced project to Ford Constructicn Company. Thank you. Robert L. Bray :ckd