HomeMy WebLinkAboutWWP2700350(8) BEGINNING OF FILE DATE January 31, 1984 TO: FINANCE DIRECTOR WN: PUBLIC WORKS DIRECTOR SUBJECT: PROGRESS PAYMENT CONTRACTOR: Ford Construction Co. ESTIMATE # 5 CONTRACT # CAG 047-83 PROJECT: Kennydale Sanitary and 1983 Sanitary Sewer Rehabilitation 1. CONTRACTOR EARNINGS THIS ESTIMATE S 16,459.73 2. SALES TAX P 8.1% 1 ,333.24 3. TOTAL CONTRACT AMOUNT THIS ESTIMATE S 17,792.97 4. EARNINGS PREVIOUSLY PAID CONTRACTOR S 217,350.74 5. EARNINGS DUE CONTRACTOR THIS ESTIMATE $ 15.636.14 6. * (95% x Line 1) SUBTOTAL - CONTRACTOR PAYMENTS $ 232,987,48 7. RETAINAGE ON PREVIOUS EARNINGS $ 11,439.51 8. * RETAINAGL ON EARNINGS THIS ESTIMATE 822.99 9. SUBTOTAL - RETAINAGE $ 12,262.50 10. SALES TAX PREVIOUSLY PAID $ 19,532.01 11. SALES TAX DUE THIS ESTIMATE 1,333.24 12. SUBTOTAL - SALES TAX $ 19,865.25 GRAND TOTAL $ 265,115.23 FINANCE DEPARTMENT ACTION: PAYMENT TO CONTRACTOR (Lines 5 and 11): ACCT. 0 401/O00/15.501.37.65(35) $ 15,547.20 # 5 ACCT. # 401/000/15.501.37.63(15) E 1,422.78 0 5 RETAINED AMOUNT (Line 8): ACCT. # 401/000/15,501.37.65(35) S 753.99 # 5 ACCT. # 401/DCC/15.501_37.63(15) __ $ 69.00 # 5 CHARTER 116. LAWS OF 1966 TOTAL THIS ESTIMATE $ 17,792.97 CITY OF RENTON CERTIFICATION *RETAINAGE: 5% of amount. ,W „M, M, wll1 ,,.M , ",. M 'C Y�ft IQ M M 4 NMOM.O U 0„nl@ y.,M .� „Yi 1N llA1M �.;III OW .MD Yrb Alf W,,,d.m N ay*w,c.n Ni arwr q YD ICY. ,.1n1a CITY OF RENTON 0 DEPARTMENT OF ENGINEERING • • MUNICIPAL BUILDING, 200 MILL AVE. SOUTH, RENTON. WA. 98055. 235-2631 PROJECT v.Pallgdaia Sanitary teworc PROGRESS PAN'MENT ESTIMATE NO.� R 1983 San. Sewer Rehab. Contract No. CAG 047-83 Contractor Ford Construction Co_ Closing Date 1-31 -84 Sheet-lofj k PREVIOUS TOTAL THIS ESTIMATE TOTAL O DATE No Hw Description Unit Unit Price Qty- Qty. Amount Qty. Amount Qty. Amount SCHEDULE A 1. Mobilization L.S. 3,000.00 L.S. 'S 2.550.00 85% 2t550.00 2. Clearing R Grubbing L.S. 2,000.00 L.S. I 2.000.00 1001Z 2,000.03 3. Foundation Material Tons 5.00 1,200 T7,22 1,436.10 87.22 1,436.10 .4. Select trench backfill Tons 3.00 1,200 1433.2 4,299.66 57.49 172.47 490. 4,472.13 S. Manhole - 48" Standard Ea. 1,200.00 14 t4 16,800.00 14 16,8M.00 6. Manhole - 54" Standard Ea. 1,400.00 1 1 1,400.OO 1 1.400.00 7. Manhole - 48" extra depth v,F. 110.00 30 32.1 3,531.00 32.1 31531.00 8. Manhole - 54" extra depth V.F. 150.00 18 17.6 2,640.00 17.6 2,640.00 9. Inside drop connection Ea. 1,200.00 1 1 1,200.00 1 1,200,00 10. Vertical connections Ea. 400.00 5 5 2.000.00 5 2,000.00 11. 8" Sanitary sewer pipe L.F. 17.50 2,970 669.3 46.712.75 6693 46,712.75 12. B" D.I. pipe (cl. 50) L.F. 50.00 671 950. 47.515.O0 950.3 47,515.00 13. 6" Sanitary sewer pipe L.F. 14.00 1,520 1594 22.316.00 1594 22,316,00 14. 8" x 6" Tees Ea. 62.00 34 37 2,294.00 37 2,294.00 is. Connect to exist. M.H. Ea. 1,000.00 1 1 1.000.00 1 1,00(1.00 16. T.Y. Inspection L.S. 1,000.00 L.S. 17. Finish d clean-up L.S. 500.00 L.S. 18. Construction staking L.S. 2,500.00 L.S. 100., 2.500.00 1nPO3 2,50n.00 • SUBTOTAL SCHEDULE A 8/1= SALES TAX 152,823.51 7,543.47 60,366.98 12.378.71 _ 611.02 12.989.73 TOTAL SCHEDULE A 165.202.22 8 154.49 173,356.71 CHANGE ORDER 41 1. Replace water Services L.F. 6.00 2,000 - 920 5.520.00 920 5,52,.00 2. Install 8 x 6 Tee onto in Ea. 250.00 4 4 1,000.00 4 1,000,00 iSubTotal Change Order F1 _ 6,520.00 6.520.00 .1% Sales Tax e28.1.. 528.12 I O,A1, CHANGE ORDER 01 7,048.12 7 048.12 CHANGE ORDER v2 1. 8" D.I. Water Line L.F. 5.75 1,250 846. 4.864.50 240 1,390.M1 1026 6,244.59 2. Hookup Services to Main Ea. 62.00 14 3. Fire Hydrants Ea. 190.00 2 1 190.00 1 lg0.n0 Subtotal Change Order a2 5.054.50 1,380.00 6.434.50 8.1. Sales Tax ! 409.41 _ 111.78 521.19 TOTAL CHANGE ORDER +2 5,463.91 1,491.78 6,955.69 I i i 1 TY E - E- - 0 --- M CITY OF RENTON 0 DEPARTMENT OF ENGINEERING • 4 • MUNICIPAL BUILDING, 200 MILL AVE. SOUTH, RENTON, WA, 98055. 235-2631 PROJECT "anavdale Sanitary Sewers PROGRESS PAYMENT ESTIMATE NO.__ Contract No. LAC041-83 % 1983 San. Seder Rehab. Contractor Ford Construction Co. Closing Date Stiest".Lof it Ban PREVIOUS TOTAL THIS No. Na Est' ESTIMATE TOTAL OO Description Unit Unit Price Qty. Qty. Amount Qty. Amount Qty. larapn t iSCHF 6L'LE 8 1. Clearing b grubbing L.S. 3,000.00 L.S. 100'. 3.000.00 1n0% 3 f,-00 2. Sawcutting L.F. 0.10 11000 1199 119.00 1199 '10.90 3• Sele- trench backfiil Tons COO 1,000 212.7 4,851.16 43.33 573.32 356.1 5,,24.48 4. Foundation material Tons 10.00 250 31.6 376.70 37.6 376.70 Manhole - 48" Standard Ea. I'200.00 6 6 7.200.00 6 7,200.00 6. Manhole - 54" Standard Ea. 1,400.OG 1 1 1,400.00 1,40C.00 7. Inside drop connection Ea. I,OD0.00 1 i 11000.00 1 1,000.00 8. 8" Sanitary sewer pipe L.F. 25.00 1.322 i315.5 32,881.50 113155 32.887.50 9. 6" Sanitary sewer pipe L.F. 10.00 600 195 11950.00 46 461) 00 741 2,410.00 10. 8" ■ 6" Tees Ea. 100.00 40 18 2,800.00 2 200.00 :'0 3,000.00 1l. Connect to exist. line or M.0 Ea. 1.000.00 4 5 5.000.00 5 51000.00 12. Install 5' chainlink fence L.F. 6.00 75 13. Crushed surfacing (5/8"-) Tons 8.00 300 242.1 1,936.88 71.13 569.04 13.24 2,505.92 14. Asphalt Conc. cl. 'B' Tons 60.00 5 10 600.06 10 600.00 I5. Cold rain asphalt Tons 30.00 150 73 2.190.00 16 480.00 89 2,670.00 16. Construction staking L.S. 1,000,00 L.S. C 800-0 801, am.M 17. T.Y. inspection L.S. 100.00 L.S. :8. Concrete driveways S.v. 20.00 25 36.7 I 730.00 6.7 734.00 .9. Finish R clean-up L.S. 500.DO L.S. SUBTOTAL SCHEDE4 E 8 8.1 SALES TAX 64,392.24 4,736.26 69,128.50 ' 5'215.77 383.64 S,S99.e1 TOTAL SCHEDULE B 69.608.01 5.119.90 74,727.91 QfA gRDER N0. 3 1. 6" Stubs in Wells Ave. S. L.F. 25.00 3M 112 2,800.On 112 2,800.00 SUBTOTAL CHAKE ORDER )a. 2,800.00 2,800 00 8.1" SALES TAX 226.80 226.80 3,026.80 3,026.80 SUBTOTAL SCHEDULE A 160,366 98 SUBTOTAL SCiE0t4_E B 69_72B.5a t1IT0TA1. (HAlY-E ORDERS - 15.754.50 i:MBIMEP CONTRACT SUBTOTAL -" `.'.LES TAX (8.1 ) 254.249.09- ?MBTHED COHTRAfT ATTAI, 19.865.2` IETA10Aff (5 ) 265.715.23 :htlLMi PRE Y1011511 (`410 12.262.50 at" 235,882.75 ('UE THIS ESiIMATi 16.969 eo i� UNION III 111111 Hill IN I ii . � �. . . •� � � 11 ` \ ♦ , .. .. ..0 ��.C.:'C��..�•�CCC�CS�T ����_ �� _ ����.��G��..���. .......ems ..��.. ::�.' :.�. DATE J<w. ?o rfod TO: FINANCE DIRECTOR FROM: PUBLIC WRKS DIRECTOR SWEOT: PROGRESS PAYMENT CONTRACTOR: corm SSTIVATE I 5 CONTRACT / CArsw-ri PROJECT: 1. CONTRACTOR EARNINGS THIS ESTIMATE S /s. dig, )n / 2. SALES TAX @ 8.1% 3. TOTAL CONTRACT AMOUNT THIS ESTIMATE S fZ "a. f 7 4. EARNINGS PREVIOUSLY PAID CONTRACTOR S a/7. -6-.7ri 5. EARNINGS DUE CONTRACTOR THIS ESTIMATE S P" -- 74 6. • i95% x Line 1) SUBTOTAL - CONTRACTOR PAYMENTS 7. RETAINAGE ON PREVIOUS EARNINGS $�1M�►sI B. • RETAINAGE ON EARNINGS THIS ESTIMATE 9• SUBTOTAL - RETAIMAGE j /2 +j, f 10. SALES TAX PREVIOUSLY PAID S_ r 11. SALES TAX DUE THIS ESTIMATE 12. SUBTOTAL - SALES TAX S GRAND TOTAL $ - FINANCE DEPARTMENT ACTION: PAYMENT TO CONTRACTOR (Lines 5 and 11): ACCT. A �-- �.St+/.37. $ /e r47.-..., # .- ACCT. M RETAINED AMOUNT (Line 8): ACCT. a .._rZ.:•;;s` $ 71 �— ACCT. N _ .�_ a` ,b (rd) $ e, � - M . CHANTER 116. LAWS Of 1965 TOTAL THIS ESTIMATE S i7.'fa,9 7 - CITY OF RENTON CERTIFICATION *RETAINAGE: 5% of amount. d(1 l M1,vgtxw¢vm c0 na:o.u.rn i�q.w+wM1 a 1�(/y xAM.. IIMI MC e✓.CC�Wx w.t ittF Mv:MO Ml MM�a, M M W'9n M.gMyp y pA(.� IMq ar RMt ISM l4YA r y�l.py .Yp y1Np ma olubm" ftp�A 1 .M (,M1 W tA1q 4O tit 1/A Wi p YIIIyMC1UC1 M CMI�I W W CUM Oi E_ _ - 0- M ve CITY OF RENTON 0 DE13ARTMENT OFENGINEERING MUNICIPAL BUILDING, 200 MILL AVE. SOUTH, RENTON, WA. 98055a235-2631 PROJECT uun daln Sanitary Cnur: PROGRESS PAYMENT ESTIMATE NO.= 6 1983 San- Serer Rehab. Contract No. - 047-h3 Contractor Ford Cow tru tinn Co. C 4 Ios.ng Date Sheet�ot"1 k Bors Est, PREVIOUS TOTAL THIS ESTIMATE TOTAL TO DATE P/o- No Description Unit Unit Price Qty. Qty. Amount Qty. AnaowA Qty, AffAwd SCHEDULE A 1. Rabilizetion L.S. 3.000.00 L.S, r` ..55'�. �,: rsa•cn� 2. Llearirf S Grubbing L.S. 2,000.00 L.S. ?.ODO rani oao.oa ' 3. I Foundation Material Tons 5.DO 1,ZflU 1,436. zz 1434•/1 ` 4. Select trench backf:il Ton, 3.00 1.200 IJ33.' 4,299ic `74tf /7z. 47 14W..)r 4472.rj 5. Manhole - 48" Standard Ea. 1.200.00 14 11 16.800.00 /4 14, ?aa.av 6. Manhole - 54" Standard Ea, 1,400.00 1 1 1.400.00 7. Manhole - 48" extra depth V.F. 110.Di 3O 32•l . >•S2/•4a 3z./ 383ha� 8. Manhole - 54" extra depth Y.F. 150.00 18 /74- ? y4'.eo r7o --s.te- ve 9. Inside drop connection Ea. 1,200.00 1 / _ z4o.ao / rzea�.oQ 10. Vertical connections Ea. 400.00 5 5 1.p011.00 3 ieae.ea if. 8" Sanitary serer pipe L.F. 17.50 2.970 669,3 46.71.'.75 zssr s k 7✓z.73 ' 12. 8" D.I. pipe (cf. 50) L.F. 50.00 671 440. 47.515.0tt 33a.3 4.70,0,ea 13. 6" Sanitary sewer pipe L.F. 14.00 1,520 '594 22,316.1H1 15f4 Z. 3"!,oa* 14. 8" x 6" Tees Ea. 62U0 34 37 21294.00 37 2 z94.0e 15. Connect to exist. M,H. Ea. 1,0DO.00 I I LOGO 00 / rGaC.aa ' 16. T.Y. Inspection L.S. 1.000.00 L.S. 17. Finish 4 clean-up L.S. 500.00 L.S. 18. Construction stakinq L.S. 2,500,00 L.S. 100. 2.500 00 ix7- Lsoa.ao r • SUBTOTAL SCHEDULE A 8/1' SALES TAX _ t52.d23.51 y_<,i? 47 U _ 12.378.71 bl/.OZ JZ,?-If,TOTAL SCHEDULE A � '- _165.202.22 gJ<4.a9 1Tg ._ '7/ i CH:W4 O2,OER /1 1. P.eplace Water Services F. 6.00 2.000 920 5.520.00 _ 91^ !SLa.ew ' 2. Install 8 x 6 Tee onto main Ea. 250.00 4 4 1.(W.00 F taen.aa I SubTotal Change Order 01 6.520.W G 5 La•so r', .It Sales Tax . - _o28.i.. SLP.rL i. OTAL CHAIIGE URDE? x1 . 1_048_12 7 4 e r 7- CHANGE OROEP a2 1. 8" 0.1. Water Line L.F. 5.75 1,250 E46 4.864.50 ?O.aa is8r!_ Lz 44.3t� 2. Hookup Services to Main Fa 62.00 14 3. Fire Pydrants Ea. 190.Of) 2 1 190.00 Subtotal Change Order r2 5.054.50 73 v a r 1414 a e. 9 ✓ 8.I. Sales Tax 409 O1 S /if 7r' 05zJ It TOTAL CHANGE ORDER r7 I 5.463.91 eY7� I 1 CITY OF RENTON o DEPARTMENT OF ENGINEERING a • MUNICIPAL BUILDING. 200 MILL AVE. SOUTH. RENTON. WA. 98055. 235-2631 PROJECT x -nnvdale Sanitary Sewer, PROGRESS PAYMENT ESTIMATE NO._ 4 1A43 San. 5~r Rehab. Contract NO. LAG 047-83 Contractor Iord r-.onnnuction Co. Closing Datc Sty1-2o /ens O•scriptlon Unit Unit Price Est, PREVIOUS TOTAL THIS ESTIMATE TOTAL TO _ Qty. Qty. I Amount Qty. Amount Qty. I. Clearino 6 (trubbinq L.S. 3.00O.O0 L.S. 3.000.00 3aaa t^ 2. Sawcuttin8 Lf. 0.10 1.000 3. Select trench backfill Tcns 4,00 I.Ot10 112.7 4.851,16 '79,_Z 4. Foundation ■atertal Tuns 10.00 250 3:.6 376.70 tianhole - 48" Standard Ea. 1.200.W 6 6 7,200.01) - 6. 11anhOle - 54' Standard Ea. 1.400.00 I 1 1,400.00 ;,��•.- 7. Inside drop connection Ea. 1,000.00 1 1 taan.00 �4+as 8 9' Sanitary sewer pipe L.F. 25.00 1.322 1115. 32,887.50 9. 6- Sanitary sewer pipe L.f, 10.00 600 195 1,950.00 4 4aco OO - z4-taa 10. E' x 6" Tees Ea. 100.110 40 ?B 2.ww 00 Z Gaa.a� _?. 20."r : it. Connect to exist. line or Obi fa. 1.000.00 4 5 S.!100.00 5 gaixr.o� 12. Install 5' chainlink fence L.f. 6.00 75 13. Crushed surfacing (5/9--) Tons fI.W 300 242.1 1.936.EP. f'--a of" 3f3aa Ifoli4.tz 14.. Asphalt Conc. cl. 'it' Tu•�s 60.03 5 (,ae,ors r Loe..ar '.S. Cold six asolialt Tons 30.00 I50 73 2.190.0O %'sP 494•CO Fi Z�V.o0 16. Construction staking l .S. 1.001).00 L.s. +.Y! 600.00 Y: A2"v i7. T.Y. insrecti.in L.S. 200.00 L.S. °. Concrete 'riveoA)s S.Y. 20.00 25 347 734L.co 7?4.C•- 9. Finish .: dean-up L.S. WO.00 L.S. <08TOT14. SihEtnpF B 64.392.24 I79f.. Lz' !/29.50 5.1 S4tESTAt 5:215.77 363,4' * TOTAL SCf ME B _F9.603.01 7;.7rL f% i 3Y7nL.80 :^-Sa.lo E � t i StZ76T%? SCfe:Fi _ A �. 4L-Fis T:.L <fwf.'L4-f B �i1a_SO -::"N ILRIRAS 9i 30 '-•Yi ^ "•,-iiCi y,9Ta•nt. *5 Z31.1� ! ZGZ.!fO I I 1 INSPECTORS DAILY REPORT EnSiteeriag Department City 'E Renton PROJ..T: RennWale Sanitary Sewr 4 1981 sanl Sew r DATE: Rehab. CONTIIAMR: Ford Construction ('o WEATHER:_ 1 SCHEDULE B Bid Item No. Description Unit Quentity Remarks _ 1. Clearing and Grubbing L.S. 2. Soucutting L.P. 7. Select Trench Backfill Tons 4. Foundation Material Tons S. Manhule - 48" Ea. 6. Manhole - 54" Ea. 7. Inside Drop Connection Ea. S. B" Sanitary Sewer PipeI„p, 9, b" Sanitary Sewr Pipe L.F. lo. B"x6" Tees Ea. 11. COUntYt to Ex. Line or M.N. Ea, 12. 5' Chainlink Fence L.F. 13. Crushed Surfacinst Tons 14. As ph. Conc. C1. B Tons 15. Cold Mix Asphalt Tons 16. Construction Suklnx L.S, 17. T.Y. Ins action L.S. 18. Conc. Drivowa s Sly, _19. Finish 6 Claanun _ _ L.S. S.+ r 9 DAILY INSPECTION DIARY RETORT 1 DAY: DATE: WORK PER10D: f'•1v,lP•a• t%�a.?*fi 1^ WEATHER: '_C_, _ TEMP. MAX gL_'F MIN J_'F PRECIPITATION;QrI'. GT WORK ACCOMPLISHED TODAY: 7 or r. f i CONTRACTOR SIGNATURE 1NSPECTOR SMINATURE DATE; DWY iNSP 104 DIMY R RT i DAY: DATE: l/:!lf'Q WORK PERIOD:Ti,^L�,m.IP.R1. to ,.'�, a.�I,/(ti:2e. WEATHER: TEMP. MAX 15&re'F MIN -14 °F PRECIPITATION: WORK ACCOMPLISHED TODAY: CONTRACTOR SIGNATURE � INSPECTOR iGNATVRE 'SATE: INSPECTORS DAILT PERIRT Engineering Department City of Renton JRM _Rennydole Sanitary Severe 6 1961 San. awL DAM Rehab. CTOR: Ford Construction Co._____- NFATNER: SCHEDULE A id Item No. Description Unit ntit Remarks 1, Mobilt2stion L.S. 7. Clearing 6 Grubbing_-- __L.S. J. Foundatton Material Ton, _ 4. Select Trench Backf tll Tons 5. Ksnholes - 48" Ea. 6. Wholes - SA" Ea_ 7_ anhole_AE" extra depth y,p, 8. lanhole - SA" extra depth V.P. 9. nalde Drop Conner tlon gas 10. lertical Connection Is. 11. _ Sanitary Sewet Plpa _ L.P. 12. Ductile IQMA L.P. 11. Sanitary 16. "x6" Tees IS. nnect to E16. N. lnspectl7. 18. onstruction Staking L.S. _ DAILY MPECTION DIARY DAY: DATE: —_!--/-'NORH PERIOD:_4 a.m./p•e. to" �G..a. REPWt7 WEATHER: _•�.. TEMP. MAX �_'F MIN .2i'. *F PRECIPITATION: WORK ACCOMPLISHED TODAY: c .e CONTMCTOR Sl GNATURF. INSPECTOR SIGNATURE DATE.; M.A. SEGAON INC. ASPHALT DIVISION P O.br am.MINI NATTNCaNn"PARMAY T11RM1LA,AA IN"I. tSNI SN0m0 n3 01 k GA LM-A312MO OATS t. �_— KANT ORIIER M _ TIME AND DATE WEIGHT GROSS TARE NET TY UNIT.ONGRNTION UM ftN AMOUNT LSSM,. COLOMIX _ TONS ASPHALT TREATED SASE TONS STATF SPECIFICATION CLASS GALS.EMULSION AR N00 ASPHALT �RE�'ISR[CI►iI— RECt1W0 •._A_•:. L11 PY. SA, �= iAX �t-- x . MCi1V ft�Y 103470 � ;;"A �OIp, ,P.. m;8waw M, INSPECIORS DAILY REPORT Engineering Department City of Renton PROJECT: Kennydale Sanitary Sewer k 1983 San. S er DATE: Rehab. CONTRA'- Ford ons tract ion Cu. WEATHER:�'i' !{�'• SCHEDULE B 111d Item No. Description Unit uanttt Remarks 1. Clearin and Crubbin L.S. 2. Sawcuttln L F, 3. Select Trench Backfill Tons 4. Foundation Material Tons 5. Manhole - 48" Ea. A. Manhole - 54" Ea 7. Inside Drop Connection Ea. B. 8" Sanitary Sewer ei a L,F. 9. 6" Sanitary Sewer Pipe L.F. 10. 8"xV Tees Ea. 11. Connect to Ex. Line or M.H. Fa. 12. 5' Chainlink Fence L.F. 13. Crushed Surfacing (5/8"-) Tons 141"' As ph. Conc. Cl. B Tons " J ter• I5. Cold Mix As halt Tons tA. Construction Staking L.S. 17. T.V. Inc ection I..S. 18. Conc. Driveways S.Y. 19. Finish 4 Cleanup L.S. DAILY INSPECTION DIA Y REPORT ! DAY: _ .� , DATE: ✓' WORK PERIOD:_X.m./p.m. to;7-L e ' WEATHER: TEMP. MAX %F MIN F PRECIPITATION: .+�k',i K WORK ACCOMPLISHED TODAY: �a r� r CONTRACTOR SIGNATURESIGNATURE DATE: INSPECTORS DAU T REPORT gnglneering Department City of Renton OJECT: Kennydale Sanitary Severs 61983 San, Sever DATE: Rehab. RACTOR: Ford Construction Co. YTATHERi t� /[ e i rne-S SCHEDULE. A id Item No. Description Unit ntit Re"rks 1. Mobilization L.S. 2. Clearing 4 Grubbing _ L.S. D. Foundation Material Tons 4. Select Trench gackfill Tons 5. nho lea - 4g" Ea, 6. anholes - 54" Ea, 7, anhole - 48" extra depth V.P. 2_ / ../J r- rJ- w s- B. anhole - S4" extra depth V,F, i n 9. na 11 Drop Connection Ea• to. ertical Connection Ea. it, - Sanitary Senor_Pipe L.P. 12. " Ducttle Iron Pipe L.P. _ 17. ' Sanitary Sever Pipe L.F. _ 14. "x6" Tees Ea, 15. nnect to Exist M.X. Ea, 16. ,V_Ins ect ion L.S. 17. inlsh 6 Cleanup L.S. 18. onstruction StakingL.S. DAILY INSPECTION DIARY REPORT / DAY: DATE: L. -; / WORK PERIOD:. to, WEATHER: `'�. TEMP. MAX _`F MIN 'F PRECIPITATION: !; > WORK &COMPLISHED TODAY: LL- '!r r , ,_ r, : d - CONTRACTOR SIGNATURE INSPEC OR SIGNATURE DATE; INSPECTORS DAILY REPORT Engineering Dapartwnt City of Renton PROJECT: Kennydale Sanitary Sewer 4 1983 San. Sewer DATE: /- '-T, Rehab. CONTRACl'OR: Ford o�truct ion Co. WEATHER: C� C, DC<. Ci SCHEDULE 8 Eid Item No. Description Unit Quantitym Rearks Clearing and Grubbing L.S. 2, SawcuttlnR L.F. .e.L£� Alit / 3, Select Trench Backfill Tone 4 Foun itlon Material Tons 5, Manhole - 48" Ea. 6. Manhole - 54" Ea. 7. Inside Drop Connection Ea, 8. 8" Sanitary Sewer Pine L.F. I. 6" Sanitary Sewer Plpe I, F 10, 8"W' Tees Ea. 11, Connect to Ex. Line or M.H. Ra. 12. 5' Chainlink Fence L.F. 13. Crushed Surfacing (5/8"-) Tons 14, As ph. Conc. Cl. B Tons 13. Cold Mix Asphalt Tons 16. Construction Stakin L.S. 17. T.V. Inspection 1„y. 18. Cone. Driveways S.Y. 19. Finish 4 CleanupL.S. DAILY INSPECTION DIARY R F.R PT DAY: FIY DATE: / /_ � YORR PERIOD:_ a.m./p.m. .0 .z a.n.(p.m. WEATHER: TEMP. MAX __•F MIN �S�`_•F /PRECIPITATUIN: WORK ACCOMPLISHED TODAY: - 4- CONTRACTOR SIGNATURE � �-INSPEC70R SIGNATURE DATE: INSFEC[ORS DAILY REPORT Engineering Department City of Renton PROJECT: Kennydale Sanitary Sever 6 1987 San Sewer DATE: t{wr CONTRACTOR• Rehab. —_ • F,ar�onstructlon NFATNER: �. .:'�/#` OK o SCHEDULE 8 Rid it** No. Macri Lion Unit Quantity, rks Re i. Clearing and Grubbing L.S. 2. Savcuttin _ r 1, Select Trench 8ackf111 Tons Y 4. Foundation Naterlal Tons 5. Manhole - 48" Ea h, Manhn.e - 54" Ea. 7, inside Drop Connection Ea, 8. 8" Sanitary Sever Pipe L.F. 9. b'• Sanitary Sewer VI a L.F• W, 8"W' Tees Ea. it. Connect to Ea. Line or M.N. Ea. 12. 5` Chelnllnk Fence L,p. Il. Crushed Surfacing (SJP"-) Tons 14. As h. Cont. Cl. R Tons IS. Cold Mix Asphalt Tons lh, Construction StakingL,G 17. T.V, Inspection 18, Conc. Driveve a _- S.Y. I9• Finish 6 Clean, L.S. DAILY INSPECTION DIARY REPORT DAY: s,.i4� j.TJ"DATE: ( l`S/f,1. WORK PERIOD:_+ a:m./P.p. to�L07 L8tops. zj' WEATHER: TEMP. MAX •F MIN �_°F PRECIPITATION: r. 't} WORK ACCOMPtiHED TODAY: CONTRACTOR SIGNATURE T —INSPECTOR Stf.`UTtRIE DATE: = M = DAILY INSPECTION DIARY REPORT F DAY: DATE: WORK PERIOD:_^ a.m./P.m. to WEATHER: TEMP. MAX OF MIN °F PRECIPITATION: WORK ACCOMPLISHED TODAY: y, CONTRACTOR SIGNATURE '.�._._ —� INSPECTOR SICNATURF DATE: DAILY INSPECTION DIARY DAY: ial!/—�- DATE: PERIOD• i RETRT I WEATHER: -•t -. Cm./P.w. [o. ,lw.w.fP.n. HED TEMP' NAIL •p MIN A! WORK ACCOMPLISHED TODAY: ►�ECI}ITATION: -------------- ------------- C_ F, -- - - —NTRACTOR SICNATURF -y__„� INSPECTOR SMAT E DATE; riir � it r it �■ �r r � �w rr � � r DAILY I1IS I191 DW f�DAY: - ;7"• DATE: ! 12,f/r MDf PERIOD, 4�.Q�./P.�. to,�yA7t i.��/Br�. REPORT HEATHER: dL TEMP. MAX 4 , of MIN PRECIPITATION- (f(JA.1AF— WORK ACCOMPLISHED TODAY: ".Al x /x- 7;9::e z .( if --- Gy it — �`CONTRACTOR SIGNATURE INSPECTOR SICNAT _ DATE: ri = i 7 = m = 7 DAILY INSPECTION DIARY REPORT f DAY: s DATE:`WORK PER,OD: �.m./p,�, to '.EAThFR: 14' - TEMP. MAX MIN MIN ` _'F PRECIPITAZIOAt WORK ACCCMPLISRED TODAY: Al�4z ,.. , r CONTRACTOR SIGNATURE INSPECTOR SIGNATURE DATE: r m m m m m m m m m m m DAILY IN%tCTION DIARY DAY: 4�� VATE: . 141,i 4.WORK PERIOD: YZ,A.m./P.®. [o, %A. REPORT-77 WEATHER: !'rG TEMP. MAI< F MIN ,.`'S'F PRECIPITATION: L A t7: 4(�;VAI�-f-- WORK ACCOMPLISHED TODAY: GN 1Y��I.G' -P" !)/tp l�if7 l.�l /� 1,-� .wJde� .✓E i/F.o'.E' .S l / ''//5 -• T //E CONTRACTOR'SIGNATURE 'L a INSPE TO�SIC.NATURE DATE: DAILY INSPMIGN DIARY REPORT / DAY: DATE: Q_&J�4//WORK PERIOD::{;A,/p,�, to "/_. J�,L, WEATHER: TEMP. M0 < _•F MIN µ..me F PRECS^ITATION: -.Y{` Y;r _fJa;„CL WORK ACCOMPLISHED TODAY: i— CONTRACTOR SIGNATURE INSPECTOR SIGNATUR DATE: DAILY IFIMTId1 DIARY REPORT 0 DAY: _ f Y DATE: /.¢n/. WORK PERIOD: g7 , ,'gyp./P,w, to y�b a,U�*U, rC WEATRER: h11.�,E� TEMP. MAX �_'P MIN Z'F PRECIPITATION: WORK ACCOMPLISHED TODAY: -70 �. <.. CONTRACTOR SIGNATURE — ,- INSPECTOR S GNATURE DATE: INSPECTORS DAILY.REPORT Engineering Departwnt City of Renton PROJECT: Kennydale Sanitary Sewer 6 1981 San. Sewer DATE: CONTRACTOR: Ford Cona[ruct ion Co Rehab. WEATHER: SCHEDULE B Bid Items NO. Description Unit Items tke 1. CleerinR and Grubbing L.S• 2• Sawcuttin L.F. 1. Selezt Trench Backfill Tons 4. Foundation Material Tons 5. Nanhole - 4811 Ea. 6. Manhole - 54" Ea. 7. Inside Drop Connection Ea. 8• 8" Sanitary Sewer Pipe L.F. 9, 6" Sanitary Sewer Pipe L.F. .S 10. 8"x6" Tees Ea. „ 11. Connect to Ex. Line or M.H. Ea. 3 t 5 S 12. 5' Chainlink Fence L.F• 1 '. Crushed Surfacing (5/8 Tone 14. Aa h. Conc. Cl. B_ Tons 15. Cold Mix Asphalt Tons 16. Construction StakinR L.S. 17. T.V. Inspection L.S. 18. Conc. Driveways S.Y. 19. Finish i Cleanup L.S. zjj DAILY INSPECTION DIARY REPORT a DAY: DATE: WORK PERIOD: , a.m./p.m. to 7��, a.m./P•m. �__ 0• WEATHER: TEMP. MAX >> •P MIN •F PRECIPITATION: )C WORK ACCOMPLISHED TODAY: � a ! , r %� ,ram •$,'cam ,/' .;J u �Y:+.•�+'� Sp 0e0. Se • 0• 1 CONTRACTOR SIGNATURE "�- INSPECTOR SIGNATURE DATE: o• ' 47 A60•000 1oSSp.000 27580.000 0• 21 s80' 2000• ' 13.790 0• • 50W.000 19%13.000 ' 00T A0.000 2pT AO• 2000• 15.1'0 r Aeoeo•ppp - 19sto•00o 4 . 2 B1SO.p00 73j3tl• 2000• 14.090 4,400.000 700 A^•000 � IwZOL 21360• 2000• ' 10.690 A6170.000 1yPSp.000 26990•000 26190• 2000• ' 13.AAS 13.A50 1>,Ino ♦ j5.370 I A., 90 LP,4eO y 61 33Q'y TARE .-' ' -NET der 0� L.._J ON ookm To "*-'7�'f11�k'*f. Cup°nr ON... _: . S,f Y 0 r ^•T�AtA T a�ewo GROSS _Y rARE �"� 1r : o, osom a.. cwm�. o y <r At, 1 „ f 0 6 .7 6 CROSS TARE Q..-c rf O 3 0 7VC-' NET Dfn D W r' 4AD TA11E Dow T. Omm . a I F O9LIVWVTiCK9T • pl16MT LAKESIDE SAND i GRAVEL CO„INC. P.O. 60X 067 ISSAGUAN,WASH. 98W 0 4 7464M0 y- --- 60466 ot I'? '6 01►.. NET Wx MAW ouArTm `..__..,_�,. OnCRrRTroe uNrT Mv.'6 Arn,,.T CltllMTO110CK TIR O (MI� Al WTOYKOl GKwz GALS �o0e000K�x ' 'YIS NATIONAL TOTAL '' 1 LAPT PLANT Two a Mus TAR '�TA11T V•OUII TOTAI foArAipma �r U1t AM qM106MIMT To Rl L • LIW�YOVGMAt N MKIN • CUSTOMER COPY • i BIACK Ri QUARRY, INC. i i SSOB SOUTH 14M SEATTLE,WASH„98176 i 2-0620 i `DATE q 4 L 04LADORESS * TO: T K NUM E I qq/MR"W OR MRCR HIES p" I,■C,Moon" • wranrrrMt ltirw Mamie wn. —! $A"MINUS _ rresREpcwyEt _ _ IYe"MINUS _ CMfSMFC WU.YEI T. � 216"COARSE swo i / .6 Tyson i GRIZZLY \ i GROSS WEIGHT L6S. i TRUCK WEIGHT LBS. Tn i NET WEIGHT LSS. , A TOhI i • YARDS TONS • � X K2185C 2*4 *ad INSPECTORS DAILY REPORT Engfneering Department City of Renton p PROJECT: Kennydale Sanitary Sewer 4 1963 Sw. Sever DATE: 4- Rehab. CONTRACTOR: Ford Construction Co. WEATHER: SCHEDULE d bid Item No. Description Unit Quantity Remarks 1. lClearing and Grubbing L.S. 2. Sawcutting L.F. 3. Select Trench Backfill Tons 1 47 19 '. S ,4 Vt~ e:0 4. Foundation Material Tons 5. Manhole - 48" Ea, _ 6. Manhole - 54" Ea. 7. Inside nrop Connection Ea. B. 8" Sanitary Sever Pipe L.P. 9, 6" Sanitary Sewer Pipe L.F. J [� a .. 4 AS 10. 8"x6" Tees Ea. 11. Connect to Ex. Line or M.N. Ea. 12. 5' Chainlink Fence L.F. "IV Crushed Surfacing (5(8"-) Tons _ /G'. OS- $o 14. As h. Conc. Cl. B Tons 15. Cold Mix Asphalt Tons 16. Com :ruction Staking L.S. 17. L.V. Inspection I-S. 18. Conc. Driveways S.Y. 19. Finish 6 Cleanup L.S. O *[ DAILY INSPECTION DIARY DAY: IMlR: / 1611t wORR PERIODe�,i.�./P.�. t�7% •.� p�j R WEATHER: G' ^� IP. INt %L•? MIN •I PRECIMATION: ,CQ6 is WORK ACCWLIIM lamb GL7' t'r`i � M/R' �/'- � �✓ rU'/6 M:'w.,f 11i �. 41 / � �'i�/; `•♦ 71'f►t •:J�CJ /�rls/ llN d1: .r7 _ fi .. d/''�Y.wi.�/ •, / ' mac. . T'_ /' i �'., (,mob yd1:�-�1 , /✓i/�i ' /.�i`/!/ �" � y ... a 4 ----------------------------------- CONTRACTORSIGNATURF INSPECTOR SIGNAL E DATE: ST0 � gW��Y r U.pX'a O w w-Owsal MNOII goo moo ClIv M� 61UVS. _ _ c�plN�o ROCK tAX No. F 06455 Mww sroNEWAV Cx"Undam .. 0.box m REMTOR wmswem am Mwr oAtE / -,ate_ PO 0- MLO M to , LIVM �M��♦ MKYf\Nw a vs "NO GRAVEL CRGENEO ROCK tAX V. 1l p111V1R No. i 06452 Ilk NR+IRw iA4+�Erw�AV aEruKn Rx..•nN Y W NIW IR w wrIn OROWr.Ewa ardbuft o"R MREN pow"RMRIM R! wvi IiIRIM,w AA�R•ti Y� BTOK`^' ^ '`�6 f�? v J.D MiXw PENTON.WAWIMTON Mw'J m-VM pAlF�` cm— OPAYU CPUfNFD POCw Y i� }DIAL W x — TAX IJ0. F 06453,W"C"cmtll lot N1 M pNP NwN Mw Np�"W"WNW*v aM PN+ra;; P.P�"0.N AdoM A1�IIM�IMF M Pr MNw INSPECTORS DAILY REPORT Engineering Department City of Renton JELT: _Kennydale Sanitary Sewers_6_199�_Sa�, Seve_�_ DATE: - �� CTOR: Ford Construction Co. Rehab. G YTNER: C_ ` (l' S� i SCHEDULE A !d Itw No. Deacri Lion unit ntit Remarks 1, obilleatton L.S. 2. tearing 6 Crubbin L.S. _ J. FoundatlOn Material Tons �-4. elect Trench Eackflll _ Tons Sly 5, Unholes - 48" Ea. 6. anhois - 54" Ea, 7_ anhole_• 48" extra d�th_ , _ V.F 8. ianhole - $4" extra deLth V,F, 9. Inside Drop Connection__ Ra. 10. ferlical Connection _ -gam__ 11. Sanit"ry Sever P.l�e L.F, -- 12. " Ductile Iron Pipe L.P. 15, Sanitary Sewer Pipe L.P. 14. "x6" Tees _ Ea l5. onnect to Exist M.N. ga, 16. A. Insr—ctton L.S. 17. inish 4 Cleanup L S. - 16. onstluctlan S[wk lnR L.S. DAILY INSPECTION DIARY REPORT B DAY: I DATE: WORK PERIUD:__- /p.m. ty a.m./P,1. WEATHER: _ TEMP. MAX . "F MIN �L'F PRECIPITATION: WORE ACCOMPLISHED TODAY: Z r. 77 CONTRACTOR SIGNATURE ,SPECTOR SIGNATURE DATE: INSPECTORS DAILY.REPORT Engineering Department City of Renton PROJECT: Kennydale Sanitary Sewer 4 1983 San. Sewer DATE: _ofif Rehab. CONTRACTOR: F.,rd Conalructlon C.. WEATHER: SCHEDULE B Bid Item No. Description Unit uanti[ Remarks _ I. Clearing and G ubbing I.S. 2. Sawcuttln L.F. Select Trench Backflll ^ona 4. Foundation Mvterial Tons 5. Manhole - 48" Ea. 6. Manhole - 54" Ea. 7. Inside Drop Connection Ea. 8. 8" Sanitary Sewer Pip, L.F. 9D b" Sanitary Sewer P1 e _ L.F. 10. 8"x6" Tees Ea. _ _11. Connect to Ex. Line or M.H. Ea. 12. 5' Chainlink Fence L.F. 13. rushed Surfacing (5/8"-) Tons _ 14. As h. Conc. Cl. B Tnns 15. Cold Mix Asphalt Tons 16. Construction Staki_n L.S. _ _ 17. T.V. Inspection L.S. 18. Conc. Driveways S.Y. 19. Finish 6 Cleanup L.S. SEG4�C' STU65 1A.1 F.. CLIELL .aVE So. ' DAILY INSPECTION DIARY DA-1: ^'1 )'" DATE: 611 -WORK PERIOD:_1(a.m./P.m. Ltr NOT WEATHER: % a.nt/p°n. R OT a WEATHER: TEMP. MAR °F MIN °F PRECIPITATION: WORK ACCOMPLISHED TODAY: , CONTRACTOR SIGNATURE r INSPECTOR SU78ATURE DATE: DAILY INSPECTION DIARY DAY: DATE: =1/- won PERI00: .1P.®. [ a. A. R ,pT WEATHER: y TEMP. MAX _ F MIN _^•F PRECIPITATION: -� WORK ACCOMPLISHED TODAY: Al �. CONTRACTOR SIGNATURE INSPECTOR SIGNATURE. DATE: pLE M xspt4A` G �MEn�nna• EP pA�E� -}i7% ]�]9 0.SE,f>.LM E4AM� NO"EA Ate' ND DATE GROSS 1ME A'. CARE MET t �IJtnT'r i*S W COL-dtp% Aft TNEATED got tOFp St ATE SPECIE�GA(10M C4 ASS pR l� AV" SWLVAR i ryf0 AL 0• S2640.00 24860.63 27700•00 27780• t 2000• 13.89 0• 54640.00 24060.00 - 29780.00 29780• 2000- 14.89 0. $4020.00 24860.00 29960.00 29960• t 2000• 14.98 0• i5500•00 24060.00 - 30640.00 30640- 2000 IS•32 + 0• + 13. 14.89 14.90 IS•32 + .l"4 ( ,fiUS� GROSS ARE TrYcti H°' OP Q Q v- y wpPmN OrA._ �iS GROSS SA 8 203 TARE �G� IcO NET OR i Cuttom Ord. y' � OMiw.To ' -A& !` E PamrYt 14 _ I i ---46_ I GROSS TARE -`_.._..-ON ')A D'W OnQ q4e OvMw li NMI y O wu 4w 13N CD ND .. - tlaul 3HVl pp1L6 POO I INSPECTORS DAILY.REPORT Engineering Departaient City of Renton PROJECT: Kennydale Sanitary Sewer 6 1987 San Sever DATE: /—le-ar{e Rehab. CONTRACTOR: Ford Construction Co _ WEATHER: U C, ¢.10 SCHEDULE B Etd Ice* No. Description Unit Quanttty Resurks I. _.Clearing and Grubbing I„S, 2. Sawcurtin L.F. 7. Select Trench Backf111 Tons _ 4. Foundation Material Tons 5. Manhole - 48" Ea. _ 6. Manhole - 54" Ea. 7, Inside Drop Connection Ea, 8. 8" Sanitary Sewer Pipe L.F. 9. 6" Sanitary Sever Pipe _ F. 10. 8"x6" Tees Ea. II. Connect to Ex. line or M.H. Ea. !2• S' Chainlink Fence T� Crushed Surfacing 14. As ph. Conc. Cl. B Tons elrJ Cold Mix Asphalt Tons I 16. Construction Staking L.S. 17. T.V. Inspection L.S. 18. Conc. Driveways S.Y. 19. Finish S Cleanup L.S. c:.o G"PVC • S/,io& stuLa ✓e�2cS .h/r So GG /y DAILY INSPECTION DIARY REPORT / DAY: (�.is�c hJs� DATE: / (/l Id'J�WORK PERIOD: • :�:®./p,m. [Q-?� a.mtl�,.L. �� WEATHER: dL TEMP. MAX OF MIN 4f OF PRECIPITATION; WORK ACCOMPLISHED TODAY: r C CONTRACTOR SIGNATURE '`TOR 1CNATURE DATE: M y r�i�4•; C C� J 1=3 DAILY INSPECTION DIARY / DAY: DATEt ! I/?!�'�/ WORK PEA20D:�'le./P.t. tC.,�� A.��/,�. REPORT E NEATMER: "V- MAX Qk'P MIN -1(2'F PRECIPITATION: /�i✓C NORK ACCOMPLISHED TODATI r O/. r h L ,tom y ctu, 9 CA- . ,V(. , r .. R//' 6 Af CONTRACTOR SIGNATURE INSPECTOR IGNATURE r DATEt INSPECTORS DAILY REPORT Engineering Department CitF of Renton JFCT: Kennydale Sanitary Severs 4 1981 San. Sever DATE: Rehab. CTOR: Ford Construction Co. _ tfUQlleg:C 44 e SCHEDULE A id Item No. Description Unit ib&sntfty Remarks 1. obilitation L.S. 2• Clearing 6 Grubbing L.S. 5. Foundation Material Tons _ 4. Select Tren<h 8ackfill Tons S. nholes_48" Ea. -- 6. qanholes - 54" Ea. 7• 4anhole - 48" extra d.!Eth V.F. B. anhole - S4" extra depth V,F. 4. Inside Drop Connection Ea. -�''' iH is !�C.:...✓�- 10. ertical Connection Ea. -�sr 11• ' San lta�Sewer Pipe L.F. 12. Ductile Iron Pipe L.F. 13. Sanitary Sever Pipe - L.P. 14. "x6" Tees Ea. 15, nnect to Exist N.H. ga. Be .V. Inspection L.S. _ 17. 'lnish 4 Cleanup L.S. I8. Construction st,iing L.S. 0• si140•00 + 19620.00 31$20.00 0• ` 31520- 2000 15.76 0• 48780•00 + 19620.00 29160.00 0• 29160• + 2000• 16.58 0. 50560.00 + 19620.00 30940.00 309e0- 2000• 15•47 49500•00 + 19963.00 29540.00 29540• + 2000• 1A•77 + S0700.00 19960•00 30740.00 307a0• + 2000- 15.37 0• 15.76 Ie.5d + 15•47 + 14.P7 + 1 S•31 r 75.9s p. At� Timm TAKE Morry v S'20 NET Fuck No._ -..� Ord 4a,,, 10 °" ;W /S 7� Gorrouy.Ord oft � p� era _ `-. SAY ip Hersitid By -- i - Time- -- GROSa yb'r% TARE p+terut__. 6�� /g� TmrM po_- aG I / C NET Or ee Off Cunomer Ortl.. �_ Pegty F Oliver 8R63S *wu' RE i C u Old OIU,R.io 1{1l} -� t3POSS TAPE TrudRo.. NET ornx: ��qv ; Rawl WWW _ _. _ M.A. SEGALE INC. ASPHALT DIVISION PO'MOX�eD•1�M0 EOYtK^.ENTf q PAgRWAY 213,01 Sr.GA lP 4321R, DATE PLANT fVFICHASE --�-- ' DADFq�E_ IiEM IH/� ` TIME AND DATE �- WEIGHT GRO&7 TARE NET _Dl!ANtITY WIT DMMCR!PTIDN �- YR1!PRq AMOUOtT LSM,MC COLD MIX TONS ASPHALT TREATED SASF TOSTATE.PECIFICATION GLASS TON GALS.EMULSION AR AOOS ASPHALT Tf'1REIYTMPi£DF RECEIVED TAM -_ P ■ALtt x A _ 1-� � R(CNl1:4 y♦ I r'w04 ww TOTAL WN:C-,u ,YE 011e ,f bRIGmbA. -�I INSPECTORS DAILY.REPORT Engineering Depsrtment Clty of Renton PROJECT: Re_ nnyd te Sanitar Sece_r 6 1983 San, Sewer DATE: �t l AQ CONTRACTOR: Fo_d Cur struct ion Co Rehab. NG:MER: SCHEDULE B Bid Item No. Dear rlptlon Unit ntlt Remarks 1• Clearin anJ Grubbing 1.,5. Z• Savcuttlnt L.F. 3•_ Select Trench Bac kf tll Toni:_ _ 4_, -oundat ion Ma[aria_ I __.__ -----------_ Tons .anhole - 48^ -- --�_ Ea. A• Manhole - 51," Ea. 14 Inside D,np Connection Ea. B• 8" Sanitary Sewer r Pipe :..F. 9• 6" Sanit nr Sever Plpe 1 �; !0. g"W' Tees Ea. 1I• Connect to Ex. Line or M.H. EA. _ Imo?• 5' Chainllnk Fence L.F. 13. Crushed Surfac ng Tuna 14• Atph. Conc. Cl. g Tons I5, Cc a Mix As halt Ton:. 16• Construction St_nktn8 L.S. .7. T.v Ins action 1..S. IB, Cont., Driveva s S.Y.1�• finish 6 Cleanup L.S. W-' DAILY INSPECTION DIARY REPORT f DAY: _L�_', - _ DGCF.: (//ice=: YOPB PERIOD:�../tlA}�./P.n. t<��- WEATHER TEMP. MAX j& •P MIN :;1_. •F PRECIPITATION: WORK ACCOMPLISHED TODAY: --�-- 10 CONTRACTOR SIGNATURE. :9SPE bR SIGNATURE I DATE: i