HomeMy WebLinkAboutC-On Hold Response Letter_091525_V1.pdf
304 Alaskan Way South, Suite 301, Seattle, WA 98104 | w: thirdplacedesigncoop.com | p:206-331-3795
third place design
co-operative
where architecture meets community
Date: September 16, 2025
Alex Morganroth, AICP, Principal Planner
City of Renton, Planning Division
Renton City Hall
1st Floor Customer Service
1055 South Grady Way
Renton, WA 98057
Project: Willowcrest Phase II – LUA25-000073/PR25-000021
To Alex Morganroth,
Responses to the on hold letter for Willowcrest Phase II – LUA25-000073/PR25-000021 have been provided. They are:
1. Response to Engineering Memorandum dated April 25, 2025. See Attached response from Coterra Engineering
a. See attached response from Coterra Engineering.
b. See attached letter from Bravo Environmental about vactor truck access.
c. See attached revised drawing files.
i. P_Grading_and_Paving_Plan_250804_V2.PDF
ii. P_Utility_Plan_250804_V2.PDF
iii. P_Street_Profiles and Cross Section_250804_V2.PDF
iv. P_Site_Plan_250804_V2.PDF
v. P_Site_Plan_Open_Space_250804_V2.PDF
vi. P_Planting_250804_V2.PDF
vii. CA_LANDSCAPE ANALYSIS_250804_V2.PDF
2. Response to the applicant shall provide a narrative responding Item #12 ‘Statement Addressing Compliance with Each of the
Following Decision Criteria’ of the Planned Urban Development Submittal Requirements:
a. See Attached file PN_Project_Narrative_250804_V2.PDF
3. Response to the applicant shall provide a narrative describing the specific development standards they are seeking relief
from including but not limited to, standards related to streets, landscaping, open space, building design, etc.
a. See attached file M_Willowcrest_II_RMC4-2-115_and 4-4-040_Matrix_250804_V2.PDF
Sincerely,
Brent Chastain
Director of Landscape Architecture
Third Place Design Co-operative