HomeMy WebLinkAboutChange Order - 8CAG-24-109, CO #8-25
Approved by Cheryl Beyer via email 11/25/2025
K EŽ
Ž d Ž ŽŽ Ž
Ž EŽ
W Ž
d,KEdZ d DK K>>Kt^
Ž Ž d Ž Ž Ž Ž
Ž Ž Ž Ž Ž
WŽŽ Ž W
d Ž Ž ŽŽ
Ž dŽ D WŽ
Ž Ž WŽŽ
Ž
t Ž Ž
ZŽ Ž Ž Ž Ž Ž
D Ž Ž Ž Ž
3D\PHQW 3D\PHQW LQFOXGHV DOO DFWLYLW\UHODWHG WR WKH DERYH QDPHG RSHUDWLRQV 3D\PHQW
ZLOO EH PDGH LQ DFFRUGDQFH ZLWK 6'27 6WDQGDUG 6SHFLILFDWLRQV 6HFWLRQ
TXLWDEOH GMXVWPHQW XPS 6XP
0DWHULDOV 7HPSRUDU\LUULJDWLRQ FRQWUROOHUV PXOFK WRSVRLO DQG SODQWV
W Z&/
Z KE KZ E'Ž Ž Ž Ž Ž
Ž Ž ŽŽ Ž Ž Ž
Ž hŽ Ž Ž Ž
Ž Ž
Yh/d h^dD Ed d K Ž Ž
Ž t^Kd Wt Ž
Ž
K E
Ž Ž d E
dŽ
K EŽ
Ž d Ž ŽŽ Ž
Ž EŽ
W Ž
d Ž Ž Ž Ž Ž
Ž Ž Ž Ž Ž
yd E^/KE K&d/D d Ž Ž ŽŽ Ž
Ž Ž t^Kd Wt Ž Ž
K d tŽ Ž Ž Ž Ž
d Ž Ž Ž Ž
Ž Ž Ž Ž Ž Ž
Ž ŽŽ Ž
dŽ Ž K
Z Ž ŽŽ ZŽ
K Ž W
K
YŽŽ WŽ Ž
Ž Ž Z
Z Kd Ž Ž Ž tŽ
Ž
K
d ŽŽ Ž ŽŽ Ž Ž Ž
Ž Ž Ž ŽŽ
dŽ Ž Ž Ž Ž Ž Ž Ž Ž
Ž Ž Ž Ž Ž
dŽ t Ž W t Ž d
Ž
Ž Ž
Ž
d
Ž Ž
WŽ Ž Ž DŽ D
ŽŽ Ž
Ž
ZŽ dŽŽ D W dŽŽ
D
W
Ž
Ž
dŽ
Ž D Ž
dŽ
Contractor Cost
Proposal by Activity Activity 1- $
3,602.31 Activity 2- $
6,324.27 Activity 3- $
7,099.21 Total - $17,
025.79
7,9(
216758&7,21
1&
352-(&7
3+$6(
2'(
7(25.3(5)250('
2856 #5$7(727$/
48,3 12 48,30(17 6&5,37,21 +2856 #5$7( 727$/
81,7 #5$7(727$/
81,7 #5$7(727$/
81,7 #5$7(727$/
6
5$1'727$/
1RWH
0$5.83 21 68%2175$&725 267 9DULHV
68%727$/68%2175$&725 267
68%2175$&725 68%727$/
68%2175$&725
6&5,37,21
UHHQ LW\
6&5,37,21
6(59,&(2676
6&5,37,21
48,30(17 6&5,37,21 5$7(6
0$7(5,$/2676
25 66 5$7(6
0$132:(5
7,21$/25.6800$5<
6RXWK WK 6WUHHW RUULGRU PSURYHPHQWV
7%'
6&5,37,21 2)25.
RVW WR UHVWRUH SRZHU FRQGXLW WUHQFK
7,9(
216758&7,21
1&
352-(&7
3+$6(
2'(
7(25.3(5)250('
2856 #5$7(727$/
48,3 12 48,30(17 6&5,37,21 +2856 #5$7( 727$/
RUG 8WLOLW\9DQ
81,7 #5$7(727$/
81,7 #5$7(727$/
81,7 #5$7(727$/
6XEWRWDO
UDQGWRWDO LQFO 0DUNXS
1RWH
0$5.83 21 48,30(17
68%727$/48,30(17
0$5.83 21 25
68%727$/25
68%2175$&725
6&5,37,21
6&5,37,21
6(59,&(2676
6&5,37,21
68%727$/25
48,30(17 6&5,37,21 5$7(6
68%727$/48,30(17
0$7(5,$/2676
25 66 5$7(6
0$132:(5
UULJDWLRQ RUHPDQ
DERUHU
7,21$/25.6800$5<
6RXWK WK 6WUHHW RUULGRU PSURYHPHQWV
7%'
6&5,37,21 2)25.
RV WWR KDQG ZDWHU SODQWV GXH WR HOHFWULFDO LVVXHV
Gr
e
e
n
C
i
t
y
I
n
c
72
0
N
1
0
t
h
S
t
A
1
1
2
R
e
n
t
o
n
W
A
9
8
0
5
7
La
n
d
s
c
a
p
e
I
r
r
i
g
a
t
i
o
n
C
o
n
t
r
a
c
t
o
r
Pr
o
j
e
c
t
L
a
b
o
r
L
i
s
t
s
Pr
o
j
e
c
t
N
a
m
e
S
7
t
h
S
t
R
e
n
t
o
n
Co
n
t
r
a
c
t
o
r
AC
I
SU
T
A
F
I
C
A
F
U
T
A
T
o
t
a
l
Da
t
e
8/
6
2
0
2
5
0.
2
7
7.
6
5
0.
6
8.
5
2
0
A
B
C
D
E
F
G
H
I
Jo
b
C
l
a
s
s
i
f
i
c
a
t
i
o
n
B
a
s
e
R
a
t
e
F
r
i
n
g
e
To
t
a
l
W
a
g
e
s
A
B
To
t
a
l
T
a
x
Ra
t
e
To
t
a
l
T
a
x
e
s
A
x
D
L&
I
I
n
d
I
n
s
O
t
h
e
r
H
r
Re
g
u
l
a
r
R
a
t
e
C
E
F
G
Ov
e
r
t
i
m
e
R
a
t
e
A
E
x
1
5
B
F
Su
p
e
r
i
n
t
e
n
d
e
n
t
90
0
0
0.
0
0
90
0
0
8.
5
2
7.
6
7
1.
3
4
6
0
99
0
1
14
7
8
5
Fo
r
e
m
a
n
51
9
7
0.
0
0
51
9
7
8.
5
2
4.
4
3
1.
3
4
6
0
57
7
4
85
9
4
La
n
d
s
c
a
p
i
n
g
a
n
d
P
l
a
n
t
i
n
g
L
a
b
o
r
e
r
s
49
9
7
0.
0
0
49
9
7
8.
5
2
4.
2
6
1.
3
4
6
0
55
5
7
82
6
9
Eq
u
i
p
m
e
n
t
O
p
e
r
a
t
o
r
82
2
5
0.
0
0
82
2
5
8.
5
2
7.
0
1
1.
3
4
6
0
90
6
0
13
5
2
3
Su
b
m
i
t
t
e
d
b
y
An
d
r
e
w
F
a
l
a
n
i
k
o
an
d
r
e
w
f
@
g
r
e
e
n
c
i
t
y
w
a
c
o
m
42
5
7
5
3
1
3
3
7
Ta
x
Ca
l
c
u
l
a
t
i
o
n
No
t
e
s
A
l
l
f
r
i
n
g
e
i
s
p
a
i
d
d
i
r
e
c
t
l
y
i
n
c
a
s
h
t
o
t
h
e
e
m
p
l
o
y
e
e
a
s
t
h
i
s
i
s
n
o
t
a
P
L
A
o
r
u
n
i
o
n
p
r
o
j
e
c
t
Docusign Envelope ID: 6A8A9EE 1-4B 1 C-4F4A-A837-4EE631 BDEA41
ACI ACTIVE
CONSTRUCTION
INC.
ADDITIONAL WORK SUMMARY
A.C.I.
PROJECT
24-043
EQUIP. NO.
CAG-24-109 South 7th Street Corridor Improvements
DATE WORK PERFORMED: TBD
DESCRIPTION OF WORK
Cost to supply and install a battery operated irrigation controller
LABOR CLASS/ RATES
MANPOWER HOURS @ RATE
EQUIPMENT DESCRIPTION / RATES
EQUIPMENT DESCRIPTION HOURS @ RATE
MATERIAL COSTS
DESCRIPTION UNIT @ RATE
SERVICE COSTS
DESCRIPTION UNIT @ RATE
SUB CONTRACTOR
DESCRIPTION UNIT @ RATE
1.00 LS@ $5,646.67
SUB CONTRACTOR SUBTOTAL
MARK-UP ON SUB-CONTRACTOR COST >$25,000 (Varies) 12%
SUBTOTAL SUB-CONTRACTOR COST
GRAND TOTAL
* Note:
A.C.I. PHASE
CODE
TOTAL
TOTAL
TOTAL
TOTAL
TOTAL
$5,646.67
$5,646.67
$677.60
$6,324.27
$6,324.27
32 2;38<$//83 6+,1*721
ZZZ DFWLYHFRQVWUXFWLRQ FRP
5(48(67 25 1)250$7,21
5),12 2%12 8'12 1 7(
2%1$0(6 WK 6WUHHW RUULGRU PSURYHPHQWV
771 D\QH 5ROOLQV
72 LW\RI 5HQWRQ 3XEOLF RUNV 771 HLWK RROOH\
6RXWK UDG\D\
5HQWRQ
3+21(1
5()(5(1&(72 5$:,1*25 63(&,),&$7,21 12
68%-(&7 0LVF HOHFWULFDO LWHPV
6&5,37,21 3OHDVH VHH HVW RDVW 6LJQDO¶V 5),EHORZ
5(48,5('7(2)1)250$7,21 6$3
03$&7 21 2%7%'
5,7,&$/72 6&+('8/(HV 1R
267 7 7%'267 1&5($6(DSSUR[LPDWH YDOXH 7%'
12 1*(1 35,&(
267 5($6(DSSUR[LPDWHYDOXH
35(3$5('DVRQ OH\FWLYH RQVWUXFWLRQ QF
5(63216(
35(3$5('7(
Tie the two new Burnett crosswalk luminaires to the existing 240V luminaire circuit.
Disconnect this 240 illumination circuit from the old service in front of Tesla, and
reconnect to the City’s side of the dual service at the NW corner of Talbot/Grady. The
City will request PSE install a meter on the City’s side of this dual service. Additionally,
on the City’s side of this dual service, add a 120 V circuit and run to the irrigation
controller near the new Burnett crosswalk using existing pathways and connect to city’s
dual metered service cabinet. The new service cabinet already purchased as part of the
project should be delivered to the City Transportation Maintenance Shops located at
3555 NE 2nd ST.\n2. Maintain existing pole #22 at its currently installed location and
raise with couplers. The existing PPB pole should not be raised; but rather relocate the
PPB assembly to the eastside of pole #22 and then abandon/cap PPB foundation with
concrete (assuming, this is possible with pole #22)\n3. Please provide cost proposal for
the installation of new pole #7 at the location indicated on page 3 of RFI
7/21/2025
Addresses the
missing power for
irrigation hookup.
dual metered service cabinet
controller near the new Burnett crosswalk using existing pathways and connect to city’s
on the City’s side of this dual service, add a 120 V circuit and run to the irrigation
Additionally
20111 208th Ave SE
Renton, WA 98058
206) 579-3675
ŽŽ Z Ž ŽŽ
South 7th Street Corridor Improvements
Request # 05
Date 07/18/2025
Contractor:ACI
Clarification Requested by:West Coast Signal
Regarding:Multiple Topics walking with Renton Signals
Description:Last week we met with City of Renton Signals Department to discuss multiple
topics for project completion.
1;Service location at NW corner of Grady and Talbot. We have a viable pathway to this
location. The city needs to determine how to account for the additional meter cost being added
to the red-light camera service meter. WCS has got verbal approval from Chad Graham at Verra
Mobility for the city to ass a 120V circuit to the Verra mobility meter. After confirmation and
direction to proceed, we will trench the required conduit run to tie into the last existing light
pole. What does the city want to do with the service cabinet? We could install on a foundation
for future energization, or deliver to COR.
2;Existing Light Pole and Pole Elevations at 7th and Shattuck. The existing light pole and ppb
pole can be raised with coupler nuts and stud to proper elevation. WCS is requesting to NOT
install new light pole #7 as it is identical to existing light pole #22 that had been relocated. COR
would prefer to have a complete spare with no holes drilled for future knock downs, rather than
existing pole # 22 with holes drilled in it.
3;It was proposed to install Pole #7 on the south side of 7th at the RRFB location. WCS can
provide a C/O proposal for a new foundation and install Pole #7 at this location. Please confirm
or deny this proposal. Estimated cost would be $10-$15K for foundation and pole installation. I
would need to get anchor bolts cost and availability.
Sincerely,
Matt Lorenz
206) 718-1303
Response: