Loading...
HomeMy WebLinkAboutEX_18_C_Advisory_NotesDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 2 LUA25-000148 ADVISORY NOTES TO APPLICANT The following notes are supplemental information provided in conjunction with the administrative land use action. Because these notes are provided as information only, they are not subject to the appeal process for the land use action. Planning: (Contact: Jill Ding, 425-430-6598, jding@rentonwa.gov) 1. RMC section 4-4-030.C.2 limits haul hours between 8:30 am to 3:30 pm, Monday through Friday unless otherwise approved by the Development Services Division. 2. Commercial, multi-family, new single family and other nonresidential construction activities shall be restricted to the hours between seven o’clock (7:00) a.m. and eight o’clock (8:00) p.m., Monday through Friday. Work on Saturdays shall be restricted to the hours between nine o’clock (9:00) a.m. and eight o’clock (8:00) p.m. No work shall be permitted on Sundays. 3. Within thirty (30) days of completion of grading work, the applicant shall hydroseed or plant an appropriate ground cover over any portion of the site that is graded or cleared of vegetation and where no further construction work will occur within ninety (90) days. Alternative measures such as mulch, sodding, or plastic covering as specified in the current King County Surface Water Management Design Manual as adopted by the City of Renton may be proposed between the dates of November 1st and March 31st of each year. The Development Services Division’s approval of this work is required prior to final inspection and approval of the permit. 4. The applicant may not fill, excavate, stack or store any equipment, dispose of any materials, supplies or fluids, operate any equipment, install impervious surfaces, or compact the earth in any way within the area defined by the drip line of any tree to be retained. 5. The applicant shall erect and maintain six foot (6') high chain link temporary construction fencing around the drip lines of all retained trees, or along the perimeter of a stand of retained trees. Placards shall be placed on fencing every fifty feet (50') indicating the words, “NO TRESPASSING – Protected Trees” or on each side of the fencing if less than fifty feet (50'). Site access to individually protected trees or groups of trees shall be fenced and signed. Individual trees shall be fenced on four (4) sides. In addition, the applicant shall provide supervision whenever equipment or trucks are moving near trees. Development Engineering: (Contact: Yong Qi, 425-430-7439, yqi@rentonwa.gov) 1. See Development Engineering Memo dated November 20, 2025. Fire Authority: (Contact: Corey Thomas, 425-276-9582, cthomas@rentonrfa.org) 1. The fire impact fees are applicable at the rate of $421.98 per single-family unit. This fee is paid at building permit issuance. Credit is granted for the removal of existing homes. 2. The preliminary fire flow is 1,000 gpm. A minimum of one fire hydrants is required. One hydrant is required within 300 feet of each building. Water is provided by Soos Creek Water District. A water availability certificate will be required. 3. Fire department apparatus access roadways are required within 150 feet of all points on all buildings. Fire lane signage required for the on-site roadways. Required turning radius is 25-feet inside and 45-feet outside. Roadways shall be a minimum of 20-feet wide. Roadways shall EXHIBIT 18 Docusign Envelope ID: DF429B06-CA80-4493-87D6-C67576B95CF2 ADVISORY NOTES TO APPLICANT Page 2 of 2 LUA25-000148 support a minimum of a 30-ton vehicle and 75-psi point loading. Minimum vertical clearance is 13-feet, 6-inches. The maximum access roadway slope is 15 percent. Technical Services: (Contact: Stephanie Rary, 425-430-6592, srary@rentonwa.gov) 1. No comments at this time. Community Services: (Contact: Jason Lederer, 425-430-6547, jlederer@rentonwa.gov) 1. No comments at this time. Police: (Contact: Sandra Havlik, 425-430-7520, shavlik@rentonwa.gov) 1. No comments at this time. Building: (Contact: Rob Shuey, 425-430-7235, rshuey@rentonwa.gov) 1. No comments at this time. Docusign Envelope ID: DF429B06-CA80-4493-87D6-C67576B95CF2 DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: November 20th, 2025 June 20, 2011 TO: Jill Ding, Senior Planner FROM: Yong Qi, Civil Engineer III SUBJECT: Windsor Court 19411/19505 108th Ave SE, Renton, WA LUA25-000148 NOTE: The applicant is cautioned that information contained in this summary is preliminary and non-binding and may be subject to modification and/or concurrence by official city decision- makers. Review comments may also need to be revised based on site planning and other design changes required by City staff or made by the applicant. I have completed a preliminary review for the above-referenced proposal located at parcel # 6623400232 & 6623400233. The following comments are based on the land use submittal made to the City of Renton by the applicant. “EXISTING CONDITIONS Water and Sewer: The project is within Soos Creek Water and Sewer District. Storm: There is an existing storm drainage ditch and piped conveyance system in 107th Ave SE along the west side of the street (fronting the subject development site) that conveys runoff from the south to north (Upper Springbrook Creek sub-basin). There is also an existing storm drainage conveyance system located on the east flowline of 108th Ave SE that is owned and operated by the City of Kent (Panther Creek sub-basin). The existing property does not contain stormwater facilities. Runoff from the existing site includes three homes and 2 outbuildings where no stormwater infrastructure currently exists on-site. Transportation: The project fronts 108th Ave SE to the east, and 107th Ave Se to the west: • 108th Avenue SE is located in the City of Kent. The applicant should contact the City of Kent and WSDOT to determine frontage improvement requirements along the 108th Ave SE. • King County Assessor’s maps show 107th Ave SE is a Private Street with a property width of 30 feet and paved lane width of 16 feet and owned by the property located at 10625 SE 194th St (parcel no. 662340-0218) as a contiguous portion of the property. Docusign Envelope ID: DF429B06-CA80-4493-87D6-C67576B95CF2 Windsor Court LUA25-000148 Page 2 of 8 November 20th, 2025 WATER 1. A water availability certificate from Soos Creek Water and Sewer District is required as part of the land use Application. a. A water availability certificate was provided at time of land use which is conceptually acceptable. 2. A copy of the approved Soos Creek Water and Sewer District plans shall be provided to the City prior to civil construction permit approval. Soos Creek Water and Sewer District contact: http://www.sooscreek.com, phone number 253-630-9900. 3. Adequate horizontal and vertical separation between the new water main and other utilities (storm sewer pipes and vaults, sanitary sewer, power, gas, electrical) shall be provided for the operation and maintenance of the City mains. a. At the time of land use, utility separation was less than the required minimum of 7-feet from storm to other utilities. 7-foot minimum horizontal clearance from outside edge to outside edge of pipe shall be provided at time of Civil Construction Permit application. 4. A conceptual utility plan will be required as part of the land use application for the subject development. a. A conceptual utility plan was provided at time of land use. Utility separation was less than the required minimum of 7-feet from storm to other utilities. 7-foot minimum horizontal clearance from outside edge to outside edge of pipe shall be provided at time of Civil Construction Permit application. SEWER 1. A sewer availability certificate from Soos Creek Water and Sewer District is required as part of the land use Application. a. A sewer availability certificate was provided at time of land use which is conceptually acceptable. 2. A copy of the approved Soos Creek Water and Sewer District plans shall be provided to the City prior to civil construction permit approval. Soos Creek Water and Sewer District contact: http://www.sooscreek.com, phone number 253-630-9900. 3. Adequate horizontal and vertical separation between the new water main and other utilities (storm sewer pipes and vaults, sanitary sewer, power, gas, electrical) shall be provided for the operation and maintenance of the City mains. a. At the time of land use, utility separation was less than the required minimum of 7-feet from storm to other utilities. 7-foot minimum horizontal clearance from outside edge to outside edge of pipe shall be provided at time of Civil Construction Permit application. 4. A conceptual utility plan will be required as part of the land use application for the subject development. a. A conceptual utility plan was provided at time of land use. Utility separation was less than the required minimum of 7-feet from storm to other utilities. 7-foot minimum horizontal clearance from outside edge to outside edge of pipe shall be provided at time of Civil Construction Permit application. SURFACE WATER 1. A geotechnical report dated December 30th, 2024, completed by Terra Associates, inc., was provided with the Land Use Application. The report discusses the soil and groundwater Docusign Envelope ID: DF429B06-CA80-4493-87D6-C67576B95CF2 Windsor Court LUA25-000148 Page 3 of 8 November 20th, 2025 characteristics of the site and provides recommendations for project design and construction. a. Geotechnical recommendations presented in this report state that infiltration is not recommended due to a shallow presence of impermeable till and till-like soils. 2. A Preliminary Technical Information Report (TIR) dated November 11th, 2025, was submitted with the Land Use Application. Based on the City of Renton’s flow control map, the site falls within the Flow Control Duration Standard- Matching forested site conditions and is within the Black River basin and bisected by the Upper Springbrook Creek and Panther Creek sub-basins. The report is based on a Full drainage review and Core Requirements #1 thru 9 and the six Special Requirements have been discussed in the Technical Information Report. a. Offsite Analysis, RSWDM Core Requirement #2: All proposed projects must submit an offsite analysis report that assesses potential offsite drainage and water quality impacts associated with development of the project site. The preliminary TIR submittal includes a Level 1 Downstream Analysis. i. The TIR depicts that the project receives no upstream run-on from adjacent properties based on the topography conditions. A level 1 Downstream Analysis was provided at time of land use which identifies two threshold discharge areas, Upper Springbrook Creek and Panther Creek, and there are no known or observed conveyance system nuisance problems, severe erosion, or flooding problems. Staff concurs with this preliminary analysis and conclusion, and will further review during the civil construction permit application. b. Flow Control, RSWDM Core Requirement #3: Any proposed detention and/or water quality vault shall be designed in accordance with the RSWDM that is current at the time of civil construction permit application. The project proposes more than 5,000 SF of new plus replaced impervious, therefore, Core Requirement #3 applies. i. At the time of land use, a TIR was provided that proposes a basin diversion from Upper Springbrook Creek to Panther Creek via a detention vault that outlets to a conveyance system in 108th Ave SE which is conceptually acceptable. 1. The applicant will need to provide a drainage adjustment request per Section 1.4 of the 2022 RSWDM prior to Civil Construction Permit application. 2. The drainage basin diversion request shall be approved by City of Renton, which shall be added as a condition of approval of this land use permit. The proposed site plan and drainage plan will need to be revised if the drainage basin diversion request is not approved by City of Renton. ii. As a condition of approval of this land use permit, all applicable approvals from the City of Kent must be obtained for storm drainage. The following approvals shall be obtained: 1. Approval of a Deviation Request to Construction Standards Permit (REDR) from the City of Kent Construction Standards for storm drainage, in accordance with the 2022 Kent Surface Water Design Manual (KSWDM), must be obtained. A copy of the approved deviation shall be provided to the City of Renton Docusign Envelope ID: DF429B06-CA80-4493-87D6-C67576B95CF2 Windsor Court LUA25-000148 Page 4 of 8 November 20th, 2025 development engineering project manager prior to submission of a Civil Construction Permit application to the City of Renton. 2. A copy of the issued City of Kent Civil Construction Permit (RECC) shall be provided to the City of Renton development engineering project manager prior to start of construction of the plat improvements permitted by the City of Renton. 3. All civil construction improvements within the City of Kent (under the RECC Civil Construction Permit) shall be constructed by the developer and accepted by the City of Kent prior to final plat recording. Proof of acceptance shall be provided to the City of Renton development engineering project manager. 4. If storm drainage improvements are required by City of Kent, no work under City of Renton Civil Construction Permit shall start until all required storm drainage improvements under City of Kent Civil Construction Permit (RECC) have been constructed by the developer and accepted by City of Kent. Proof of acceptance of these storm drainage improvements by City of Kent shall be provided to the City of Renton development engineering manager prior to the start of construction of the plat improvements permitted by the City of Renton. c. Conveyance, RSWDM Core Requirement #4: All new conveyance systems constructed as part of the project must be sized to RSWDM standards for the total tributary area (onsite and offsite) that the storm systems serve. i. The applicant has deferred conveyance calculations to final engineering review process which is conceptually acceptable. The applicant will need to provide the calculations at Civil Construction Permit application. ii. Backwater analysis per Section 4.2.1 of RSWDM shall be provided and will be reviewed as part of civil construction permit application. d. Construction Stormwater Pollution Prevention, Core Requirement #5: The proposal indicates that a plan will be addressed during final design. i. The applicant has deferred the Construction Stormwater Pollution Prevention Plan to final engineering review process which is conceptually acceptable. The applicant will need to provide the plan at Civil Construction Permit application. e. Maintenance and Operations, Core Requirement #6: The proposal indicates that a maintenance and operation manual will be addressed during final design. i. The applicant has deferred the Operations and Maintenance manual to final engineering review process which is conceptually acceptable. The applicant will need to provide the manual at Civil Construction Permit application. f. Water Quality, RSWDM Core Requirement #8: All projects that add more than 5,000 square feet of pollution generating impervious surface that is not fully dispersed and less than 0.75 acre of pollution generating pervious surface that is not fully dispersed require water quality. According to the TIR, this project will be creating more than 5,000 square feet of pollution generating surface. i. At time of land use application, A BioClean Modular Wetlands treatment unit is proposed which is not an approved unit for meeting Enhanced Docusign Envelope ID: DF429B06-CA80-4493-87D6-C67576B95CF2 Windsor Court LUA25-000148 Page 5 of 8 November 20th, 2025 Basic Water Quality at a general use level by the Washington State Department of Ecology. The applicant will need to provide a proprietary facility per Table 6.1.2.B of the 2022 RSDWM or another facility with General Use Level Designation such as Contech Modular Wetlands for enhanced treatment (or alternative WQ facility) at time of Civil Construction Permit application. g. Onsite BMPs, RSWDM Core Requirement #9: Appropriate on-site BMPs will be required to help mitigate the new runoff created by this development. i. At the time of land use application, the project does not propose any BMPs for mitigation of the target surfaces. The project shall implement BMPs per Section 1.2.9.2.1 of the 2022 RSWDM at time of Civil Construction Permit application. 1. If the project is unable to achieve minimum BMP requirements, the project shall explore feasibility of Reduced Impervious Surface Credit, Native Growth Retention Credit, or Tree Retention Credit. h. Aquifer Protection Area, RSWDM Special Requirement #6: The proposed project is located in Modified Zone 1 of the Aquifer Protection Area. i. At the time of land use submittal, the project proposes to tightline storm drainage runoff which is conceptually acceptable. 2. A Construction Stormwater General Permit from the Washington Department of Ecology is required since land disturbance of the site will exceed one acre. 3. The development is subject to a surface water system development charge (SDC) fees. Fees will be charged based on the rate at the time of construction permit issuance. a. The current SDC fee is $0.94 per square foot of new impervious surface but not less than $2,350.00. b. The full fee schedule can be found at: https://edocs.rentonwa.gov/Documents/Browse.aspx?id=8217302&dbid=0&repo= CityofRenton. TRANSPORTATION 1. 108th Avenue SE is located in the City of Kent. The applicant should contact the City of Kent and WSDOT to determine frontage improvement requirements along the 108th Avenue SE frontage. a. As a condition of approval of this land use permit, all applicable approvals from the City of Kent must be obtained for roadway access to 108th Ave SE. If the applicant obtains legal rights for roadway access via 107th Ave SE through an agreement with the adjacent property owner, this change shall be considered a major modification to the approved plan. The following approvals shall be obtained: i. Approval of a Deviation Request to Construction Standards Permit (REDR) from the 2021 City of Kent Construction Standards, specifically related to roadway access from 108th Ave SE, must be obtained. A copy of the approved deviation shall be provided to the City of Renton development engineering project manager prior to submission of a Civil Construction Permit application to the City of Renton. ii. A City of Kent Civil Construction Permit (RECC) shall be issued prior to the construction of the plat improvements. A copy of the issued permit Docusign Envelope ID: DF429B06-CA80-4493-87D6-C67576B95CF2 Windsor Court LUA25-000148 Page 6 of 8 November 20th, 2025 shall be provided to the City of Renton development engineering project manager prior to start of construction of the plat improvements permitted by the City of Renton. iii. All civil construction improvements within the City of Kent (under the RECC Civil Construction Permit) shall be constructed by the developer and accepted by the City of Kent prior final plat recording. Proof of acceptance shall be provided to the City of Renton development engineering manager. b. The proposed new curb line along 108th Ave SE fronting the project site does not align with the existing curb line on 108th Ave SE. There is approximately a 6-inch misalignment on both the south and north ends fronting the project site. If this is not acceptable to the City of Kent or WSDOT. The applicant will need to update the ROW dedication, frontage improvements, and proposed site plan to accommodate this revision. 2. King County Assessor’s maps show 107th Ave SE is a Private Street with a property width of 30’ and paved lane width of 16’ and owned by the property located at 10625 SE 194th St (parcel no. 662340-0218) as a contiguous portion of the property. Property records suggest that the 5 properties to the south (19415, 19423, 19431, 19439 and 10620) are beneficiaries of an access easement and utilize 107th to access their homes. City of Renton COR Maps and initial review of the parcel legal description (#6623400218) show 107th Ave SE as a 30’ wide public right-of-way. The applicant will need to determine whether or not 107th Ave SE is private or public by coordinating with King County Department of Assessment’s and the neighboring property owner. a. If it is determined that 107th is a private street, then access is infeasible at this location and access will be required solely from 108th Ave SE at the discretion of the City of Kent. i. At the time of land use submittal, access is proposed from 108th Ave SE which is conceptually acceptable. b. In the event that 107th is determined to be a public street, the applicant and the nearby property owners may be able to reach an agreement to provide access. If this agreement is made, then 107th Ave SE and the southern half of SE 194th Street will be required to be deeded to the City of Renton as public right-of-way. i. At the time of land use submittal, access is proposed from 108th Ave SE which is conceptually acceptable. 3. Per RMC 4-6-060, the minimum right of way width for a residential access street is 53 feet; 23 feet of additional ROW dedication will be required along the project frontage. Half street improvements shall include a pavement width of 26 feet (13 feet from centerline), a 0.5-foot curb, an 8-foot planting strip, a 5-foot sidewalk, street trees and storm drainage improvements. The portions of 107th Ave SE not fronting the development property will need to be widened to 20 minimum to provide fire access between SE 194th and SE 196th Streets. a. A 3-foot dedication has been provided in the land use submittal package along 108th Ave SE which is conceptually acceptable. b. 53-foot-wide right-of-way dedication have been provided in the land use submittal package for Road A and Road B consistent with the required street section above which is conceptually acceptable. 4. In the event 107th is determined to be private street and remains so and the project gains full access from 108th Ave SE, the 23’ ROW dedication and frontage improvements along the 107th corridor may still be required at the City’s discretion. Docusign Envelope ID: DF429B06-CA80-4493-87D6-C67576B95CF2 Windsor Court LUA25-000148 Page 7 of 8 November 20th, 2025 a. At the time of land use submittal, street frontage improvements along private street of 107th Ave SE are not proposed by the applicant, which is conceptually acceptable. 5. Refer to City code 4-4-080 regarding driveway regulations. a. A minimum separation of 5 feet is required between driveway and the property line. b. Maximum driveway slopes shall not exceed 15%. Driveways exceeding 8% shall provide slotted drains. c. The maximum width of single loaded garage driveway shall not exceed nine feet (9') and double-loaded garage driveway shall not exceed sixteen feet (16'). 6. Paving and trench restoration within the City of Renton right of way shall comply with the City’s Restoration and Overlay requirements. 7. Undergrounding of all existing and proposed utilities is required on all frontages per RMC 4- 6-090. 8. Road A & B shall be designed to meet the minimum curve requirements per RMC 4-6- 060.F.7, or provide a sight distance analysis for review as part of the civil construction permit application. 9. On and off-site ADA ramps, curbing, sidewalk and parking lot improvements will be reviewed in conjunction with the civil construction permit and will require a grading plan consisting of spot elevations and slopes showing that ADA and City specifications are being met. 10. Street lighting is required along all public street frontages for projects with more than four residential units. For this project street lighting could be required along the 107th Avenue SE frontage and the frontage of any new public street. Street lighting may be required by the City of Kent and/or WSDOT along the 108th Avenue SE frontage. Required streetlights along City of Renton streets shall be per City standards. A street lighting analysis and plan shall be submitted with the construction permit. a. Street lighting was not provided at time of land use. Street lighting and photometrics analysis shall be provided at time of Civil Construction Permit application. The street lighting along 108th Ave SE shall be reviewed and approved by City of Kent prior to the construction of the plat improvements. 11. A traffic impact analysis is required when estimated vehicular traffic generated from a proposed development exceeds 20 vehicles per hour in either the AM (6:00 - 9:00) or PM (3:00 –6:00) peak periods. If the number of proposed trips estimated by the applicant engineer using the current ITE Trip Generation book is more than 20 trips in either morning peak or evening peak, then level of service study is required. The applicant engineer can contact the City to determine the extent of the traffic study that will be required for the project. If the peak trips exceed 20, a traffic impact study will be required to be included with the land use application. a. A Traffic Memorandum by Kimley-Horn and Associates, Inc. dated November 18th, 2024 was provided at land use application. The report states that the project will increase the AM peak-hour trips by 11 and the PM peak-hour trips by 15, and no TIA is required, which is conceptually acceptable. 12. The development is subject to transportation impact fees. Fees will be charged based on the rate at the time of building permit issuance. a. Unless otherwise noted on the fee schedule, the 2025 transportation impact fee for each new single-family dwelling is $11,485.67. b. Credit will be applied for each structure that will be demolished. Docusign Envelope ID: DF429B06-CA80-4493-87D6-C67576B95CF2 Windsor Court LUA25-000148 Page 8 of 8 November 20th, 2025 GENERAL COMMENTS 1. All existing and proposed utility lines (i.e., electrical, phone, and cable services, etc.) along property frontage or within the site must be underground. The construction of these franchise utilities must be inspected and approved by a City of Renton inspector. 2. Adequate separation between utilities as well as other features shall be provided in accordance with code requirements: a. 7-ft minimum horizontal and 1-ft vertical separation between storm and other utilities is required with the exception of water lines which require 10-ft horizontal and 1.5-ft vertical. b. The stormwater line should be minimum 5 feet away from any other structure or wall or building. c. Trench of any utility should not be in the zone of influence of the retaining wall or of the building. 3. All civil construction permits for utility and street improvements will require separate plan submittals. All utility plans shall confirm to the Renton Drafting Standards. A licensed Civil Engineer shall prepare the civil plans. Please visit the Development Engineering Forms page for the most up-to-date plan submittal requirements: http://rentonwa.gov/business/default.aspx?id=42473 4. A landscaping plan and tree retention shall be included with the civil plan submittal. Each plan shall be on separate sheets. 5. Additional Building Permit Applications will be required for the following: a. Any retaining walls that exceed 4 feet in height, as defined by RMC 4-4-040. b. Detention vaults for storm water flow control. c. Demo of any existing structures on the project site(s). 6. Fees quoted in this document reflect the fees applicable in the year 2025 only and will be assessed based on the fee that is current at the time of the permit application or issuance, as applicable to the permit type. Please visit www.rentonwa.gov for the current fee schedule. 7. A demo permit is required for the demolition of each of the existing buildings. Demo permits shall be acquired through the building department. Docusign Envelope ID: DF429B06-CA80-4493-87D6-C67576B95CF2