HomeMy WebLinkAbout2-page ContractAGREEMENT
CITY PROJECT NO. TED4004265
CONTRACT NO. CAG-25-290
THIS AGREEMENT, made and entered into this ___ day of ___________ , 20_
by and between THE CITY OF RENTON, Washington, a municipal corporation of the State of
Washington, hereinafter referred to as "City" and _Active Construct=io=n�ln=c�. ______ _
hereinafter referred to as "Contractor."
WITNESSETH: That in consideration of the terms and conditions contained herein and attached and
made a part of this agreement, the parties hereto covenant and agree as follows:
1.The Contractor shall do all work and furnish all tools, materials, and equipment for:
M.a.p!e_wpod Sidewalk R�habjljtation in accordance with and as described in the attached
plans and specifications, and the 2025 Standard Specifications for Road, Bridge, and
Municipal Construction, as prepared by the Washington State Department of Tran sportation
{WSDOT} and the Washington State Chapter of the American Public Works Association
(APWA) which are by this reference incorporated herein and made part of hereof and, shall
perform any changes in the work in accord with the Contract Documents.
The Contractor shall provide and bear the expense of all equipment, work and labor, of any
sort whatsoever that may be required for the transfer of materials and for constructing and
completing the work provided for in these Contract Doc uments except those items
mentioned therein to be furnished by the City.
2.The City hereby promises and agrees with the Contractor to employ, and does employ the
Contractor to provide the materials and to do and cause to be done the above described
work and to complete and furnish the same in accord with the attached plans and
specifications and the terms and conditions herein contained and hereby contracts to pay
for the same according to the attached specifications and the schedule of unit or itemized
prices at the time and in the manner and upon the conditions provided for in this contract.
The sum total of all progress payments is not to exceed the Total Bid Amount listed in the
Schedule of Prices incorporated into this contract, unless the Total Bid Amount is amended
by change order(s) prepared and executed in accordance with these Contract Documents.
3.The Contractor for himself/herself, and for his/her heirs, executors, administrators,
successors, and assigns, does hereby agree to full performance of all covenants required of
the Contractor in the contract.
4.It is further provided that no liability shall attach to the City by reason of entering into this
contract, except as provided herein.
Contract Documents
Maplewood Sidewalk Rehabilitation
Page 23
October 2025
8th December 25
CAG-25-290
5.In the event litigation is commenced to enforce this contract, the prevailing party shall be
entitled to recover its costs, including reasonable attorney's and expert witness fees.
6.This Contract is executed in two (2) identical counte rparts, by the parties, each of which
shall for all purposes be deemed an original.
IN WITNESS WHEREOF, the Contractor has executed this instrument, on the day and year first
below written and the Mayor has caused this instrument to be executed by and in the name of the
City of Renton the day and year first above written.
November 24, 2025
[Date)
CITY OF RENTON
Armondo Pavone, Mayor
ATTEST
Jason Se th, City Clerk
"'NOTE: Evidence of the signatory's authority to sign the Agreement on behalf of the
business entity shall be submitted.
CONTRACTOR ADDRESS
FOR GIVING NOTICES
Active Construction, Inc.
Mailing: PO Box 430, Puyallup.WA 98371
Physical: 5110 River Rd E, Tacoma, WA 98443
tylerc@activeconstruction.aim; 6avid.ee=nU@activeconstrucllon.com
Contract Documents
Maplewood Sidewalk Re habilitation
CITY OF RENTON ADDRESS
FOR GIVING NOTICES
Transportation Systems Division
Renton City Hall-5th Floor
1055 South Grady Way
Renton, WA 98057
Page 24
October 2025