HomeMy WebLinkAboutRS_Stormwater_TIR_251027_v2 addendum Page 1 of 1 TO: Michael Sippo City of Renton Development Engineering DATE: October 27, 2025 FROM: James Daley Tacoma - (253) 383-2422 PERMIT NO.: C24002558 PERMIT NAME: Talbot Hill Elementary School Site Improvements SUBJECT: Talbot Hill elementary School TIR Addendum This project memo is an addendum to the approved Talbot Hill Elementary School Site Improvements Technical Information Report under Permit No. C24002558. This addendum proposes the maintenance of an asphalt paved pedestrian walkway connecting the school to the adjacent neighborhood south of the school. The existing asphalt paved walkway is approximately 140-ft long and varies from 6-ft wide with a total impervious area cover of approximately 840 square feet. This addendum proposes to demolish the existing asphalt paved pedestrian walkway and replace it in kind. The new asphalt paved pedestrian walkway will maintain the same dimensions and cover as the existing walkway. The work related to this addendum does not propose to increase the existing impervious cover. The walkway drains to an existing type 30 catch basin located on the Talbot Hill Elementary School property at the north end of the path. Please refer to the attached record drawing for the location of the walkway to be replaced and the catch basin it drains to, in-plan CB #12. The replacement of the asphalt paved walkway will maintain the existing drainage conditions. Stormwater runoff generated by the walkway will sheetflow to, and be collected by, the existing catch basin CB #12. From the existing catch basin stormwater will be conveyed via the existing stormwater system of pipes to the existing stormwater treatment and detention pond. Addendum to Conditions and Requirements: CR 3: Flow Control – Flow control is provided by the existing engineered stormwater treatment and detention pond. The new pedestrian walkway will not increase the total site impervious cover and therefore will not increase flows to the pond. CR 4: Conveyance System – The existing stormwater system will not increase flows and therefore the conveyance capacity will not change. CR 8: Water Quality – The new pedestrian path is non-pollution generating and therefore will not change the level of treatment required. Treatment is provided by the existing engineered treatment and detention pond. JAD/ c: David Nason - AHBL Andrew Hollenback – Renton School District Q:\2023\2230870\10_CIV\NON_CAD\REPORTS\Storm - Site\TIR Addendum - for existing path\20251027_TIR Addendum_Talbot Hill ES.docx 10/28/2025 0 1 2 3 4 TEL www.ahbl.comWEBTELwww.ahbl.comWEBTELwww.ahbl.comWEB 2215 North 30th Street, Suite 300 Tacoma, WA 98403 253.383.2422TEL www.ahbl.comWEB TACOMA SEATTLE SPOKANE TRI-CITIES Know what's below. before you dig.Call R 253.383.2572 FAX TALBOT HILL ELEMENTARY SCHOOL 2230870.10 FIELD ADDENDUM OCTOBER 27, 2025 JAD JAD DCN 1 TALBOT HILL ELEMENTARY SCHOOL A PORTION OF THE NE 1/4 OF THE NE 1/4 OF SEC. 30, TWN. 23 N., RGE. 05 E. W.M. CITY OF RENTON, KING COUNTY, WASHINGTON. RENTON SCHOOL DISTRICT ANDREW HOLLENBACK 300 SOUTHWEST 7TH STREET RENTON, WA 98057 10/27/2025 SITE ADDENDUM FOR PATH C2 4 0 0 2 5 5 8 PERMIT REVISIONS C3.0 1 FIELD ADDENDUM 1 C3.0 SUBGRADE HMA CL 1/2", PG 58S-22 PER WSDOT 9-03.8(6) AND 9-02.1(4) 2-1/2" CRUSHED SURFACING BASE COURSE PER WSDOT 9-03.9(3) 4" NOTES: 1.DEPTHS INDICATED ARE COMPACTED THICKNESS. 2.HMA SHALL BE COMPACTED TO A TARGET AVERAGE DENSITY OF 92% BASED ON THE RICE THEORETICAL MAXIMUM DENSITY PER ASTM D-2041. INDIVIDUAL LOCATIONS SHALL BE COMPACTED NOT LESS THAN 90% NOR MORE THAN 96%. 3.ALL ASPHALT BASE MATERIAL SHALL BE COMPACTED TO A MINIMUM DENSITY OF 95% BASED ON THE MODIFIED PROCTOR MAXIMUM DRY DENSITY PER ASTM D-1557. 4.SUBGRADE SHALL BE COMPACTED TO A FIRM AND UNYIELDING CONDITION PRIOR TO PLACEMENT OF ANY PAVEMENT LAYERS. ANY LOCALIZED ZONES OF SOFT, ORGANIC-RICH, OR DEBRIS-LADEN SOILS SHOULD BE OVEREXCAVATED AND REPLACED WITH STRUCTURAL FILL MATERIAL. 5.SEAL JOINTS WITH EMULSIFIED ASPHALT PER PROJECT SPECIFICATIONS. 1 NOT TO SCALE ASPHALT PAVEMENT - STANDARD DUTY LEGEND ASPHALT PAVEMENT - STANDARD DUTY REMOVE AND REPLACE ASPHALT PEDESTRIAN WALKWAY 1 C3.0 Stormwater generated by the new walkway drains to this catch basin, CB #12 Existing asphalt paved pedestrian walkway to be replaced Walkway connection to Talbot Hill ES