1) If we provide a Proposal Cover with graphics, firm name, date, etc., would be counted as
one of the 15 pages?
No, a proposal cover with graphics, firm name, date, etc. will not be counted towards one
of the 15 pages.
2) We have noticed discrepancies in the scoring values between the outline and the table, for
Project Team (30/35), Project Understanding (25/20), and Relevant Experience (20/30).
Would you please share the correct values?
The City of Renton will be scoring the Summary of Qualifications based on the table located
in the ‘Evaluation Criteria and Scoring’ section located at the bottom of page 6 of 8.