Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Ex03_Building_Floor_Plan
(E) Shower andLocker Room (E) Lunch Room (E)Utility (E) Toilet (F)(E) Toilet (M) (E) Secretary (E) ConferenceRoom (E) Office (E) Office (E) Office (E) Staff Area (E) Office 8' - 6" 23 ' - 1 1 / 2 " (E) Low wall at 5' ht8' - 6"(E) Low wall at 5' ht8' - 6" (E)Low wall at 5' ht8' - 8 1/4" 25' - 4 7/8" 8' - 10 3/4" 9' - 0 " 5' - 1 1 " 9' - 0 " 5' - 1 1 " 25' - 4 3/8" 4' - 11 3/8"11' - 11 1/2" (E) Mechenical Room(E) Office (E) Audio control station (E) Corridor 7'-11" CLG (V.I.F) 9'-11" CLG (N) Panic Door 3' - 9" (E) Opening 5' - 0" (E) Conference Room (E) Reception 9'-11" CLG (E) Office (E) ADAToilet 4' - 6" 7' - 8" WALL LEGEND EXISTING WALLS DEMOLISHED WALLS, DOORS, WINDOWS, DECKS & ROOF 3' - 5 3 / 4 " 3' - 5 3 / 4 " 7' - 8 3/4"Assembly Space (Loose Chair)20 parking x 5 100 occupant Stagewith backdroppanel 8' - 1 " 8' - 1 " 16 ' - 2 " +7" +0" 3' - 4 " 6' - 0 " (N) Hallway (E) Community Kitchen 1' - 5 3/4" 25' - 4 3/8" 4' - 9 3 / 8 " 8' - 6"Existing door to be removed and filled with dry wall (N) Dry wall 60 Seats 40 Seats (E) Toilet (F)(E) Toilet (M) (E) Secretary (E) ConferenceRoom (E) Office(E) Reception(E) Conference Room (E) Office (E) Office (E) Library (E) ADAToilet 5' - 6 7 / 8 " 11' - 11 1/8" 5' - 3 7 / 8 " (N) Door (E) Office (E) Corridor (E) Exit with emergency door (N) Upgrade Panic Door 3' - 9" 7'-11" CLG (V.I.F) 9'-11" CLG (E) Opening5' - 0" (E) Shower andLocker Room (E)Utility (E) Mechenical Room(E) Office 9'-11" CLG 8' - 9 5 / 8 " 3' - 9 1/4" 2' - 0" 9' - 0 " 2' - 0" (N)Audio Control Station 3' - 4" 3' - 1 1 3 / 4 " IBC PLUMBING CODE Water Closetmale 1 per 150 occfemale 1 per 75 occ Lavarorymale 1 per 200 occfemale 1 per 200 occ (N) Wall 18 ' - 3 " 35 ' - 1 " 53 ' - 4 " 7' - 1 7 / 8 " 1' - 6 " 1' - 6 " 2' - 1 0 " 2' - 6 5/8"5' - 6 7/8" 9' - 1 1 7 / 8 " 30" x 48"MIN. CLEARANCE 3' - 0 " 4' - 6" 4' - 10"3' - 7 1/2" 60" DIAMETER UNOBSTRUCTED FLOOR SPACE 8' - 1 1/2" 1/8" 1'-0"1 Existing Demolition Plan 2625 Northup Way, Ste 100,Bellevue, WA 98004 info@5ft2studio.comwww.5ft2studio.com DATE: 5ft2 Studio Architects THIS DRAWING AS AN INSTRUMENT OF SERVICE ISTHE PROPERTY OF 5FT2 STUDIO ARCHITECTS, AND MAY NOT BE REPRODUCEDWITHOUT THE ARCHITECT'S PERMISSION. ALL INFORMATION SHOWN ON THIS DRAWING IS FOR USE ON THIS SPECIFIC PROJECT ONLY ANDSHALL NOT BE USED OTHERWISE WITHOUT THE WRITTEN PERMISSION OF THE ARCHITECT. CONTRACTORS SHALL VERIFY AND BERESPONSIBLE FOR ALL DIMENSIONS ON THE JOB AND THIS OFFICE SHALL BE INFORMED OF AN DISCREPANCIES AND VARIATIONS SHOWN ON THE DRAWINGS. 10 / 1 5 / 2 0 2 5 4 : 1 6 : 3 6 P M A1.1 25 Ren Morris 211 Existing and Demolition, Proposed Plan 211 Morris Ave SRenton, WA 98057 October 15, 2025 Conditional Use Permit October 15, 2025 NO.DESCRIPTION DATE 1/8" 1'-0"2 Proposed Plan EXHIBIT 3 RECEIVED 12/03/2025 IHarris PLANNING DIVISION Docusign Envelope ID: B1357DFB-0BFC-44D3-B19C-C223C18BB9CD