Loading...
HomeMy WebLinkAboutERC_Applicant Ltr_20251215 December 16, 2025 Peik Li Pang 2625 Northup Way Suite 100 Bellevue, WA 98004 SUBJECT: ENVIRONMENTAL (SEPA) THRESHOLD DETERMINATION In Spirit And In Truth Ministries - Conditional Use, LUA25-000380, ECF, CU-H Dear Peik Li Pang: This letter is written on behalf of the Environmental Review Committee (ERC) to advise you that they have completed their review of the subject project and have issued a threshold Determination of Non - Significance-Mitigated with Mitigation Measures. Please refer to the enclosed ERC Report and Decision for more details. Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on December 30, 2025. Appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically. The appeal submitted in person may be paid on the first floor in our Finance Department. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. If the Environmental Determination is appealed, an appeal public hearing will be set and all parties of record will be duly notified in accordance with RCW 43.21C.110 and WAC 197-11-535. In addition, this matter is tentatively scheduled for a Virtual Public Hearing on January 20, 2026. If you have any further questions, please reach me at iharris@rentonwa.gov or at 425-430-7286. For the Environmental Review Committee, Ian Harris Associate Planner Enclosure cc: Kevin Francewar/ Owner(s) King County Wastewater Treatment Div., WA State Dept of Historical Preservation, Duwamish Tribe /Parties of Record DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT ENVIRONMENTAL (SEPA) DETERMINATION OF NON-SIGNIFICANCE -MITIGATED (DNS-M) Project File Numbers: LUA25-000380, ECF, CU-H/ PR25-000076 Project Name: In Spirit And In Truth Ministries Applicant/Contact: Peik Li Pang, 5ft2 Studio Architects, 2625 Northup Way, Suite 100, Bellevue, WA 98004 Project Location: 211 Morris Ave S, Renton, WA 98057 (APN 7841800065) Project Description: The applicant is requesting an Environmental (SEPA) Review and Hearing Examiner Conditional Use Permit to convert an existing office building into a religious institution. The project site is located at 211 Morris Ave S (APN 7841800065) and is composed of an existing one-story 4,666-square-foot office building on a lot approximately 12,284 square feet (0.28 acres) in size. The property is situated within the Center Downtown (CD) zoning district and Commercial Mixed-Use (CMU) land use designation. Vehicular access to the site will continue to be gained from an existing curb cut on Morris Ave S. The proposal will not include structural changes or modifications to the building exterior. No trees are proposed for removal. According to City o f Renton (COR) Maps, the critical areas mapped on the project site include a high seismic hazard area and the Downtown Wellhead Protection Area Zone 1. The applicant submitted a Trip Generation Summary Memorandum with the application in association with the Environmental (SEPA) Review Checklist. Lead Agency: City of Renton Environmental Review Committee Department of Community & Economic Development Determination Issuance Date: December 16, 2025 Mitigation Measures: 1.The applicant shall submit an Inadvertent Discovery Plan (IDP) prepared by a qualified professional with the Building Permit for review and approval by the Current Planning Project Manager prior to permit issuance. The applicant shall provide notification to Tribes’ cultural committee prior to the start of construction. The City of Renton Environmental Review Committee has determined that probable significant environmental impacts from the proposed project can be mitigated. An Environmental Impact Statement (EIS) is not required under RCW 43.21C.030(2)(c). Conditions were imposed as mitigation measures by the Environmental Review Committee under their authority of Section 4-9-070D Renton Municipal Code. These conditions are necessary to mitigate environmental impacts identified during the environmental review process. Because other agencies of jurisdiction may be involved, the lead agency will not act on this proposal for fourteen (14) days. Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on December 30, 2025. Appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically. The appeal submitted in person may be DocusOgn Envelope ID: B1357DFB-0BFC-44D3-B19C-C223C18BB9CD SIGNATURES: Martin Pastucha, Administrator Public Works, Chair Date Anjela Barton, Fire Marshal Renton Regional Fire Authority Date Maryjane Van Cleave, Administrator Parks and Recreation Date Gina Estep, Administrator Date Community and Economic Development Environmental Review Committee Determination December 16, 2025 Page 2 of 2 paid on the first floor in our Finance Department. Appeals to the Hearing Examiner are governed by RMC 4-8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. Docusign Envelope ID: B1357DFB-0BFC-44D3-B19C-C223C18BB9CD 12/16/2025 | 2:33 PM PST 12/15/2025 | 3:50 PM PST 12/16/2025 | 4:25 PM PST DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 www.rentonwa.gov NOTICE OF ENVIRONMENTAL DETERMINATION ISSUANCE OF A DETERMINATION OF NON- SIGNIFICANCE - MITIGATED (DNS-M) POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION DNS-M: After review of the completed environmental checklist and other information on file, the City of Renton Environmental Review Committee (ERC) has determined that the proposed action has probable significant impacts that can be mitigated through mitigation measures. This DNS-M is issued after using the optional DNS process in WAC 197-11-355. An environmental impact statement (EIS) is not required under RCW 43.21C.030(2)(c). Please note that the issuance of this determination DOES NOT constitute approval of the proposal. DATE OF NOTICE OF ENVIRONMENTAL DETERMINATION: December 16, 2025 PROJECT NAME/NUMBER: In Spirit And In Truth Ministries / LUA25-000380, ECF, CU-H; PR25-000076 PROJECT LOCATION: 211 Morris Ave S, Renton, WA 98057 (APN 7841800065) APPLICANT/PROJECT CONTACT PERSON: Peik Li Pang, 5ft2 Studio Architects 2625 Northup Way, Suite 100, Bellevue, WA 98004 LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://shorturl.at/03wR1 PROJECT DESCRIPTION: The applicant is requesting an Environmental (SEPA) Review and Hearing Examiner Conditional Use Permit to convert an existing office building into a religious institution. The project site is located at 211 Morris Ave S (APN 7841800065) and is composed of an existing one-story 4,666-square-foot office building on a lot approximately 12,284 square feet (0.28 acres) in size. The property is situated within the Center Downtown (CD) zoning district and Commercial Mixed-Use (CMU) land use designation. Vehicular access to the site will continue to be gained from an existing curb cut on Morris Ave S. The proposal will not include structural changes or modifications to the building exterior. No trees are proposed for re moval. According to City of Renton (COR) Maps, the critical areas mapped on the project site include a high seismic hazard area and the Downtown Wellhead Protection Area Zone 1. The applicant submitted a Trip Generation Summary Memorandum with the application in association with the Environmental (SEPA) Review Checklist. Appeals of the environmental determination must be filed in writing on or before 5:00 p.m. on December 30, 2025. Appeals must be submitted electronically to the City Clerk at cityclerk@rentonwa.gov or delivered to City Hall 1st floor Lobby Hub Monday through Friday. The appeal fee, normally due at the time an appeal is submitted, will be collected at a future date if your appeal is submitted electronically. The appeal submitted in person may be paid on the first floor in our Finance Department. Appeals to the Hearing Examiner are governed by RMC 4 -8-110 and additional information regarding the appeal process may be obtained from the City Clerk’s Office, cityclerk@rentonwa.gov. PUBLIC HEARING: If the Environmental Determination is appealed, an appeal public hearing will be set and all parties of record will be duly notified in accordance with RCW 43.21C.110 and WAC 197-11-535. CONTACT PROJECT PLANNER: Ian Harris, Associate Planner, 425-430-7286, iharris@rentonwa.gov